October 15, 2024 FY 2024 WIN4E03566 320102106697000 May 23, 2024 Region IX Regional Office IX
UACS No. 320102106697000 Project ID: P00821184MN OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Sibuco River, Sibuco Br. Section Package 2, Sibuco, Zamboanga del Norte

CW1 - Construction of Flood Mitigation Structure: 504.76 Lineal Meters
Unit Cost: ₱ 305,190.96/ Lineal Meters
EAO: ₱ 5,600,000.00 Excess: ₱ 351,809.19
Allocation: ₱ 160,000,000.00
October 15, 2024 2024 WIN4F08250 GAA January 19, 2024 Region V Regional Office V
Project ID : P00800202LZ
UACS : 310201101399000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0631 + 670 - K0632 + 470

Physical Target :
CW1 - Road Widening - 1.596 Lane Km
CW2 - Construction of Drainage Structure along Road - 1595 Lineal meters



TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0631 + 670 - K0632 + 470

Physical Target :
CW1 - Road Widening - 1.6 Lane Km
CW2 - Construction of Drainage Structure along Road - 678 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2,300.27 Square meters
ROW - Row Acquisition - 3,990 Square meters
October 15, 2024 2024 WIN4XY00417 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800373LZ
UACS : 310207100311000

FROM :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0528 + 460 - K0529 + 941

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 3,690 Square meters


TO :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0528 + 460 - K0529 + 941

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 2,373.6 Square meters
October 15, 2024 FY 2024 300217100272000 June 18, 2024 Region IX Regional Office IX
UACS No. 300217100272000
Project ID: P00835099MN

Convergence and Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridge (or, roads that traverse multiple LGU jurisdictions)

Construction of Road along NRJ Barangay Camul - NRJ Barangay Lumbayao Package 2, Zamboanga del Norte
CW1- Construction of Concrete Road: 3.7942 Lane-km
Unit Cost: ₱ 15,579,501.76/ Lane-km CW2- Construction of Concrete Bridge: 665.388 sq.m.
Unit Cost: ₱ 129,607.91/ sq.m. CW3- Construction of Gravel Road: 6.9077 Lane-km Unit Cost: ₱ 4,103,928.02/ Lane-km
EAO: ₱ 6,300,000.00
Allocation: ₱ 180,000,000.00
October 15, 2024 FY 2024 WIN4E03608 300224100044000 July 2, 2024 Region IX Regional Office IX
UACS No. 300224100044000
Project ID: P00837280MN

Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Coastal Roads/ Causeway for environmental protection/conservation

Construction of Mampang-Rio Hondo Coastal Road, Zamboanga City (Package 3)
CW1- Construction of Gravel Road: 2.092 Lane-km
Unit Cost: ₱ 37,468,169.25/ Lane-km CW2- Construction of Road Slope Protection Structure: 2,521.853 sq.m.
Unit Cost: ₱ 8,155.06/ sq.m.
EAO: ₱ 1,000,000.00 Excess: ₱ 50,739.52
Allocation: ₱ 100,000,000.00
October 15, 2024 2024 WIN4F08249 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800383LZ
UACS : 310207100316000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 765, K0499 + 865

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0495 + 928, k0496 + 984, k0499 + 642

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
CW2 - Construction of Road Slope Protection Structure - 281.81 Square meters
October 15, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800387LZ
UACS : 310207100312000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement Primary Roads - Daang Maharlika (LZ) - K0491 + 635, K0491 + 735

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement Primary Roads - Daang Maharlika (LZ) - K0483 + 713, K0490 + 072

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Construction of Road Slope Protection Structure - 233.77 Square meters
October 15, 2024 2024 WIN4F08247 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00801611LZ
UACS : 310204102834000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 19, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 3.72 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 19, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 670.02 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1795.89
October 15, 2024 FY 2024 WIN4E03565 310204102630000 May 23, 2024 Region IX Regional Office IX
UACS No. 310204102630000
Project ID: P00801296MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Construction of Bungiao-Quiniput Road, Zamboanga City, Phase 2
CW1- Construction of Concrete Road: 4.21 Lane-km
Unit Cost: ₱ 21,288,810.82/ Lane-km ROW Acquisition: 54,773.00 sq.m. Unit Cost: ₱ 124.63/ sq.m.
EAO: ₱ 3,500,000.00 Excess: ₱ 47,877.22
Allocation: ₱ 100,000,000.00
October 14, 2024 2024 WIN4XY00414 GAA 2024 January 19, 2024 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00836901LZ
UACS : 300203102635000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Daet - Vinzons leading to Mantigbi - Sula - Sabang - Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 0.059 Lane Km
CW2 - Construction of Road Slope Protection Structure - 476.46 Square Meters


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Daet - Vinzons leading to Mantigbi - Sula - Sabang - Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road - 0.0686 Lane Km
CW2 - Construction of Road Slope Protection Structure - 394.491 Square Meters
October 14, 2024 2024 GAA 2024 January 19, 2024 Region V Catanduanes District Engineering Office
Project ID : P00800183LZ
UACS : 310202101694000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Catanduanes Circumferential Road - K0198 + 953 - K0201 + 550, K0202 + 361

Physical Target :
CW1 - Road Widening - 0.178 Lane km
CW2 - Construction of Road Slope Protection Structure - 990.00 Square meter


TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Catanduanes Circumferential Road - K0198 + 224 - K0198 + 246, K0198 + 390 - K0198 + 390 - K0198 + 422, K0198 + 982 - K0199 + 019, K0202 + 300 - K0202 + 361

Physical Target :
CW1 - Road Widening - 0.178 Lane km
CW2 - Construction of Road Slope Protection Structure - 337.60 Square meter
October 14, 2024 2024 WIN4F08239 GAA 2024 January 24, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00800185LZ
UACS : 310202101698000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 159 - K0009 + 263

Physical Target :
CW1 - Road Widening - 0.208 Lane Km

TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 076 - K0009 + 091

Physical Target :
CW1 - Road Widening - 0.03 Lane Km
CW2 - Construction of Drainage Structure along Road - 3 Lineal meters
CW3 - Road Safety : Street Lightning - 2 Number of Units
October 14, 2024 2024 WIN4XY00430 GAA 2024 December 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00800254LZ
UACS : 31020210696000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Masbate - Cataingan - Placer Rd - K0002 + 502.80 - K0003 + 918, K0003 + 963.60 - K0003 + 1316

Physical Target :
CW1 - Road Widening 2.918 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Masbate - Cataingan - Placer Rd - K0002 + 503 - K0003 + 275

Physical Target :
CW1 - Road Widening 0.984 Lane Km
CW2 - Construction of Drainage Structure along Road - 990 Lineal meters
CW3 - Road Safety : Street Lightning - 31 Number of Units
October 14, 2024 2024 WIN4XY00418 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00800255LZ
UACS : 310202101534000


FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Milagros Rd - K0002 + (-711) - K0003 + 255

Physical Target :
CW1 - Road Widening - 3.92 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Milagros Rd - K0002 + 925 - K0003 + 250, K0005 + 894 - K0006 + 115 Rd - K0002 + 503 - K0003 + 275

Physical Target :
CW1 - Road Widening - 1.092 Lane Km
CW2 - Cosntruction of Drainage Structure along Road - 1092 Lineal meters
CW3 - Road Safety : Street Lightning - 54 Number of Units

Physical Target :
CW1 - Road Widening - 3.92 Lane Km
October 14, 2024 2024 WIN4F08252 GAA FY 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
OO2: Protect Lives and Properties against Major Floods

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Baybay City Breakwater, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 109.238 M
Structure: 806.703 Lineal Meters

EAO P 3.962 M

Total P 113.200 M

AS MODIFIED:
Construction of Baybay City Breakwater, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 109.238 M
Structure: 143.5 Lineal Meters

EAO P 3.962 M

Total P 113.200 M
October 14, 2024 2024 WIN4XY00428 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802547LZ
UACS : 310105101166000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 453 - K0039 + 795

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.684 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 453 - K0039 + 606

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.306 Lane Km
CW2 - Construction of Drainage Structure along Road - 306 Lineal meters
CW3 - Road Safety : Street Lightning - 16 Number of Units
October 14, 2024 2024 WIN4F08238 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802551LZ
UACS : 310105101162000

FROM :
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 075.50 - K0036 + 250

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.349 Lane Km


TO :
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 120 - K0036 + 188
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.136 Lane Km
CW2 - Construction of Drainage Structure along Road - 136 Lineal meters
CW3 - Road Safety : Street Lightning - 8 Number of Units
October 14, 2024 2024 WIN4XY00388 GAA 2024 January 19, 2024 Region V Camarines Sur 4th District Engineering Office
Project ID : P00823636LZ
UACS : 320101111015000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Mitigation Structure along Kulasi River (Upstream - Dahat Section), Package 1, Lagonoy, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 1,032.21 Lineal Meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Mitigation Structure along Kulasi River (Upstream - Dahat Section), Package 1, Lagonoy, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 632 Lineal Meters
October 14, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00832295LZ
UACS : 300204101525000

FROM ;
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines

Physical Target :
CW1 - Construction of Concrete Road - 6.667 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines

Physical Target :
CW1 - Construction of Concrete Road - 3.127 Lane Km
CW2 - Construction of Drainage Structure along Road - 824.54 Lineal meters
CW3 - Construction of Slope Protection Structure - 6708.41 Square meters
October 14, 2024 2024 WIN4XY00429 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00837423LZ
UACS : 300214101181000

FROM :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 225.60 - K0099 + 925

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.399 Lane Km


TO :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 235 - K0099 + 520

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.57 Lane Km
CW2 - Construction of Drainage Structure along Road - 576 Lineal meters
CW3 - Road Safety : Street Lightning - 30 Number of Units
October 14, 2024 2024 WIN4XY00387 GAA 202 January 19, 2024 Region V Regional Office V
Project ID : P00842625LZ
UACS : 300215103855000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay

Physical Target :
CW1 - Construction of Concrete Road - 4.64 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay

Physical Target :
CW1 - Construction of Concrete Road - 3.096 Lane Km
CW2 - Construction of Gravel Road 0.0729 Lane Km
October 14, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00846331LZ
UACS : 300226109804000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buldings


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)

Physical Target :
CW1 - Construction of Multi Purpose Building - 2 Number of Buldings
October 14, 2024 FY 2024 310111100640000 May 13, 2024 Region IX Regional Office IX
UACS No. 310111100640000
Project ID: P00800392MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads

Seit-Tayungan-Camp Andres Rd - (S00020SL) K38+000 - K39+830, K39+830 - K40+510
CW1- Construction of Drainage Structure along Road: 4,960.00 ln.m.
Unit Cost: ₱ 14,008.06/ ln.m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00
October 11, 2024 2024 WIN4XY00207 FY 2024 GAA December 20, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Olongapo - Bugallon Rd - K0153+387 - K0153+944
October 11, 2024 CY 2024 WIN4F08126 CAA No. 2024-04-0035 April 29, 2024 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 310102101679000
Project ID.: P00801687LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

Gen Santos Ave – K0025 + (-879) – K0025 + (-830), K0025 + (-830) – K0025 +
(-786), K0025 + (-786) – K0025 + (-528), K0025 + (-450) – K0025 + (-320)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.672 lane km
Unit Cost (P’000) = P 7,737.919/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00

As Modified
UACS No. 310102101679000
Project ID.: P00801687LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

General Santos Ave – K0025 + 480 – K0025 + 670 (Westbound), K0025 + 632 – K0025 +
668 (Eastbound)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.226 lane km
Unit Cost (P’000) = P 23,008.318/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00
Bar Code #WIN4F08126
October 11, 2024 CY 2024 WIN4XY00365 CAA No. 2024-04-0030 April 29, 2024 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

Gen Santos Ave – K0025 + (-180) – K0025 + (-060)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 10,722.833/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00

As Modified
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

General Santos Ave – K0025 + 480 – K0025 + 632
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 16,930.789/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00
Bar Code #WIN4XY00365
October 11, 2024 CY 2024 WIN4F08125 CAA No. 2024-04-0030 April 29, 2024 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ

OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Dela Paz, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 320 linear meters
Unit Cost (P’000) = P 36.75/linear meters
Allocation (P’000)= P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00

As Modified
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ

OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Santolan, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 188 linear meters
CW2 = Rehabilitation of Paved Road – 0.188 lane km
Unit Cost (P’000) = P 47.11/linear meters
= P 15,441.86/ lane km
Estimated Cost (P’000) = P 8,856.93
(P’000) = P 2,903.07
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00
Bar Code #WIN4F08125
October 10, 2024 2024 WIN4XY00407 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800891LZ
UACS : 310107100613000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 522.4 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 127.32 Square meters
October 10, 2024 2024 GAA 2024 January 19, 2024 Region V Camarines Sur 5th District Engineering Office
Project ID : P00800897LZ
UACS : 310109101589000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0453 + 980 - K0454 + 042

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 200 Square meters


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0444 + 255 - K0444 + 305

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 344.2 Square meters
October 10, 2024 2024 WIN4XY00408 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805162LZ
UACS : 310101101257000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570

Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 1.019 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570

Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 0.699 Lane Km
October 10, 2024 2024 300207101112000 FY 2024 GAA January 2, 2024 Region II Regional Office II
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Road Network (Training Ground), Mt. Leson, San Vicente, Sta. Ana, Cagayan,
Phase III

October 9, 2024 FY 2024 GAA P00834662MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1722 + 596
Physical Target:
CW1: 9,005.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Safety: Pavement Markings)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1772 + 596
Physical Target:
CW1: 29,116.00 lineal meters (Road Safety: Pavement Markings)
CW2: 170.00 number of units (Road Safety: Roadway Lighting)
CW3: 341.00 number of signs (Road Safety: Road Signs)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 21,017,270.26 (Road Safety: Pavement Markings)
CW2: P 18,585,245.35 (Road Safety: Roadway Lighting)
CW2: P 9,397,484.39 (Road Safety: Road Signs)
EAO: P 1,000,000.00
October 8, 2024 2024 310204102803000 FY 2024 GAA January 2, 2024 Region II Regional Office II
Network Development - Construction of By-Pass and Diversion Roads - Construction of Tuguegarao West Diversion Road (Jct. Carig-Linao-Atulayan-Bagay-Buntun) Cagayan, Package 4
October 8, 2024 2024 310106101100000 FY 2024 GAA January 2, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - K0483+550- K0484+020
October 8, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800390LZ
UACS : 310207100318000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0508 + 778, K0508 + 878

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0502 + 575, K0509 + 805

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection
October 8, 2024 2024 310203100798000 FY 2024 GAA January 2, 2024 Region II Cagayan 3rd District Engineering Office
FROM:

Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 1434

TO:

Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 297
October 8, 2024 2024 300215104458000 FY 2024 GAA January 2, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of La Suerte- Nabbialan- Cordova Road, Amulung, Cagayan (Phase V)
October 8, 2024 2024 300215104470000 FY 2024 GAA January 2, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Maguirig, Solana, Cagayan
October 8, 2024 2024 WIN4XY00411 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800400LZ
UACS :3102071003240000

FROM :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 979, K0638 + 788 K0639 + 182

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 3282.7 Square meters



TO :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 983

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 1236 Square meters
CW2 - Construction of Road Slope Protection Structure - 1407.85 Square meters
October 8, 2024 FY 2024 GAA WIN4XW00156 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + 195 - K1459 + 000, K1459+ 310 - K1459 + 535,
K1460 + 001 - K1461 + 640, K1462 + 000 - K1462 + 705, K1463 + 000 - K1464 + 197, Davao del Norte
Physical Target:
CW1: 10.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + (-573) - K1456 + 135,
K1461 + 090 - K1461 + 115, Davao del Norte
Physical Target:
CW1: 3.589 lane km (Road Widening)
CW2: 3,589.00 lineal meters (Construction of Drainage Structure along Road)
CW3: 49.00 no. of units (Road Safety: Roadway Lighting)
ROW: 909.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 58,649,636.00 (Road Widening)
CW2: P 20,683,329.00 (Construction of Drainage Structure along Road)
CW3: P 9,212,035.00 (Road Safety: Roadway Lighting)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
October 8, 2024 2024 320101111776000 FY 2024 GAA January 2, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 1+330), Cabatuan, Isabela

TO:

FROM:

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 0+674), Cabatuan, Isabela
October 7, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800380LZ
UACS : 31020710031400

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 655, K0498 + 755

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 759, K0500 + 655.50

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Constructions of Drainage Structure along Road - 220 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 240 Square meters
October 7, 2024 2024 WIN4XY00409 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800382LZ
UACS : 310207100315000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 390, K0499 + 490

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 230, K0499 + 381

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 399 Lineal meters
October 7, 2024 2024 WIN4F08211 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800389LZ
UACS : 310207100313000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0496 + 615, K0496 + 715, K0497 + 914

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0489 + 695, K0490 + 853, K0490 + 914

Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 305.82 Lineal meters
October 4, 2024 2024 WIN4F08209 SR2024-01- 007243 January 31, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Convergence and Special Support Program

Basic Infrastruture Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Brgy. Dayanog Road, St. Bernard, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 9.900 M
0.197 Lane Km

EAO P .100 M

Total P 10.00 M

AS MODIFIED:

Construction of Brgy. Dayanog Road, San Juan, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 6.26864138 M
0.664 Lane Km

CW2- Construction of Drainage Structure P 2.31241121 M
along Road: 336.00 Lineal Meters

CW3- Construction of Road Slope Protection: P 1.31894741 M
267.36 Square Meters

EAO P .100 M

Total P 10.00 M
October 4, 2024 2024 WIN4XY00410 GAA FY 2024 March 21, 2024 Region VIII Eastern Samar District Engineering Office
Convergence and Special Support Program

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

AS PER GAA/ORIGINAL:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar

Physical Target: Allocation:
CW1- Construction of Concrete Road: P 4.900 M
0.400 Lane Km

EAO P .100 M

Total P 5.00 M

AS MODIFIED:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 2.02132236 M
0.0556 Lane Km

CW2- Construction of Road Slope : P 2.87867764 M
Protection Structure 128.42 Square Meters

EAO P .100 M

Total P 5.00 M
October 4, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte

Physical Target: Allocation:

CW1- Rehabilitation/Major Repair of Multi P 4.950 M
Purpose Building: 1.00 Building

EAO P .50 M

Total P 5.00 M

AS MODIFIED:

Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte

Physical Target: Allocation:

CW1- Rehabilitation/Major Repair of Multi P 1.585 M
Purpose Building: 1.00 Building

EAO P .50 M

EXC P 3.365

Total P 5.00 M
October 4, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Local Program

Buildings and Other Structures – Multipurpose/ Facilities – National Building Program

AS PER GAA/ORIGINAL:
Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City
Physical Target: Allocation:

CW1- Rehabilitation/Major Repair of Multi P 4.825 M
Purpose Building: 1.00 Building

EAO P .175 M

Total P 5.00 M

AS MODIFIED:

Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City

Physical Target: Allocation:

CW1- Rehabilitation/Major Repair of Multi P 3.225 M
Purpose Building: 1.00 Building

EAO P .175 M

EXC P 1.6 M

Total P 5.00 M
October 4, 2024 2024 WIN4F08210 FY 2024 GAA December 20, 2023 Region III Bataan 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Road

Roman Expressway - K0102+173 - K0102+825
October 4, 2024 2024 WIN4XY00400 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija
September 27, 2024 2024 WIN4XY00389 FY 2024 GAA December 20, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Bridge at Barangay Wawa, Pilar, Bataan
September 27, 2024 2024 WIN4F08116 FY 2024 GAA December 20, 2023 Region III Bulacan 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Along Eastern Bulacan Rd - K0075+416 - K0077+783, Doña Remedios Trinidad, Bulacan
September 25, 2024 2024 P00800059MN GAA2024 January 1, 2024 Region X Bukidnon 3rd District Engineering Office
P00800059MN
310202101759000

OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Secondary Road

FROM:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 +736
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.91 Lane Km
Allocation:
CW1: Php 39,200,000.00
EAO: Php 800,000.00

TO:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 + 551
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.54 Lane Km
CW2- 641.6 Linear Meter
Allocation:
CW1: Php 32,880,294.27
CW2: Php 6,319,705.73
EAO: Php 800,000.00
September 25, 2024 2024 P00800063MN GAA2024 January 1, 2024 Region X Bukidnon 3rd District Engineering Office
P00800063MN
310203100884000

OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Tertiary Roads

FROM:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 +200
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.70 Lane Km
Allocation:
CW1: Php 33,138,700.00
EAO: Php 676,300.00

TO:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 + 720
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.80 Lane Km
CW2- 553.94 Square Meter
Allocation:
CW1: Php 26,413,150.00
CW2: Php 6,725,550.00
EAO: Php 676,300.00
September 24, 2024 2024 P00803857MN SR2024-01-003689 January 29, 2024 Region X Regional Office X
P00803857MN
310204102715000
OO1: Network Development Program - Construction of By-Pass and Diversion Roads

FROM:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.00 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00

TO:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Off-Carriageway Improvement: Paving of Shoulders
ROW- ROW Acquisition
Physical Target:
CW1-2,361.15 Square meters
CW2-15,360.00 Square meters
ROW-5,000.00 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 115,800,000.00
CW2: Php 67,550,000.00
ROW: Php 9,650,000.00
EAO: Php 7,000,000.00
September 24, 2024 2024 P00803888MN SR2024-03-013788 March 20, 2024 Region XII Regional Office XII
Contract ID: 24M00217
Project Name: Saldua Bridge in Polomolok, South Cotabato
Type of Work: Replacement of Bridge
Physical Target
From: 333.900 Square meters
To: 477.0 Square meters
September 23, 2024 2024 300219102208000 FY 2024 GAA January 3, 2024 Region II Isabela 4th District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 3, Dinapigue, Isabela
September 23, 2024 2024 300219102201000 FY 2024 GAA January 3, 2024 Region II Isabela 4th District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dimaluade Flood Control Structure, Section 1, Dinapigue, Isabela
September 23, 2024 2024 300219102209000 FY 2024 GAA January 3, 2024 Region II Isabela 4th District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 4, Dinapigue, Isabela
September 23, 2024 2024 300219102136000 FY 2024 GAA January 3, 2024 Region II Isabela 4th District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela
September 20, 2024 CY 2024 WIN4F08181 UACS No. 300225101728000 March 20, 2024 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities

Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Makati City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 796 lineal meters
Unit Cost (P’000) = P 18.6558/lineal meters
Allocation (P’000) = P 14,850.000
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00

As Modified
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities

Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Taguig City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 515 lineal meters
CW2 = Rehabilitation of Paved Road = 1.03 lane km
Unit Cost (P’000) = P 23.5933/lineal meters
= P 2,601.154/lane km
Allocation (P’000)= P 12,150.539
P 2,679.188
Excess (P’000) = P 20.272
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4F08181
September 20, 2024 CY 2024 WIN4XY00396 UACS No. 300221104954000 March 20, 2024 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities

Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Makati City
Physical Target: CW1 = Rehabilitation of Paved Road – 1.4 lane km
Unit Cost (P’000) = P 10,607.142/lane km
Allocation (P’000)= P 14,850.00
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00

As Modified
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities

Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Taguig City
Physical Target: CW1 = Rehabilitation of Paved Road – 0.571 lane km
CW2 = Rehabilitation/Major Repair of Slope Protection Structure = 2,568.87 sqm.
Unit Cost (P’000) = P 15,843.850/lane km
= P 2.258/sqm.
Estimated Cost (P’000)= P 9,046.838
P 5,800.578
Excess (P’000) = P 2.583
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4XY00396
September 20, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837418LZ
UACS :

FROM :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550

Physical Target :
CW1 - Rehabilitation of Paved Road - 4.542 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km


TO :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0514 + 981 - K0515 + 248, K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550

Physical Target :
CW1 - Rehabilitation of Paved Road - 5.574 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km
September 20, 2024 2024 WIN4F08182 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00820435LZ
UACS : 320101111025000

FROM :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II, San Antonio, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 244.14 Lineal Meters


TO :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II and Brgy. San Antonio, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 227.26 Lineal Meters
September 20, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00821005LZ
UACS : 320101111049000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog 11, San Antonio, Labo (Phase II), Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 137.49 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog II and Brgy. San Antonio, Labo (Phase II), Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 143.88 Lineal meters
September 20, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00832311LZ
UACS : 300207101061000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Other Facilities - 1 Number of Facilities


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Other Facilities - 23 Number of Facilities
September 19, 2024 2024 WIN4XY00406 SR2024-01-002054 January 24, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL:

Palo – Pastrana – Sta Fe By-Pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 144.750 M
15.00 Lane Km

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Palo – Pastrana – Sta Fe By-Pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 107.97176206 M
4.20 Lane Km

CW2- Construction of Road Slope Protection P 36.77823794 M
Structure: 7,067.95 Square Meters

EAO P 5.250 M

Total P 150.00 M
September 19, 2024 2024 WIN4XW00153 GAA 2024 January 1, 2024 Cordillera Administrative Region Baguio City District Engineering Office
"From:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-260) - K0249 + 100,
Loakan Rd - K0246 + 323 - K0246 + 940, K0249 + 875 - K0250 + 096, K0250 + 380 - K0250 + 842,
Magsaysay Ave. (Trinidad Rd) - K0251 + (-120) - K0251 + 180, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 34,
Lt Tacay Rd - K0308 + 000 - K0308 + 400,
South Drive - K0251 + 120 - K0251 + 860,
Harrison Rd No 1 (S04713LZ) - Chainage 360 - Chainage 780, (S04714LZ) Chainage 0 - Chainage 780,
Legarda Rd - K0251 + (-160) - K0251 + 080;
Type of Work:
Road Safety: Solar / Reflectorized Pavement Studs;
Physical Target:
2761 Number of Units;
Allocation:
Php 45,000,000"

"To:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-291) - K0249 + 284,
Loakan Rd - K0245 + (-162) - K0250 + 842
Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0252 + 444, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 244,
Lt Tacay Rd - K0308 + (-599) - K0308 + 754,
South Drive - K0251 + (-295) - K0252 + 755,
Harrison Rd No 1 (S04713LZ) - Chainage 0 - Chainage 807, (S04714LZ) Chainage 0 - Chainage 807,
Legarda Rd - K0251 + (-360) - K0251 + 980;
Type of Work:
CW1: Road Safety: Roadway Lighting
CW2: Road Safety: Pavement markings;
Physical Target:
CW1: 124 Number of Units
CW2: 15,496 Lineal meters;
Allocation:
Php 45,000,000"

September 18, 2024 2024 FY 2024 GAA December 20, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Olongapo-Bugallon Rd - K0164+149 - K0164+930, K0232+000 - K0234+026, K0234+128 - K0235+000, K0243+000 - K0244+000
September 18, 2024 2024 WIN4XY00400 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija
September 18, 2024 2024 WIN4XY00399 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Arayat-Magalang Rd - K0095+000 - K0097+308
September 18, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 2nd District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Lubao Div Rd - K0084+250 - K0084+447.84, K0084+499.84 - K0084+627.84, K0084+676.74 - K0084+760, K0084+780 - K0085+238
September 18, 2024 2024 WIN4XY00392 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0040+726 - K0040+970
September 18, 2024 2024 WIN4XY00398 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0044+500 - K0044+563, K0047+770 - K0047+860, K0047+885 - K0047+945, K0048+000 - K0048+090
September 18, 2024 2024 WIN4XY00401 SR2024-01-002085 January 27, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 606 Square Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220, K0925+1240-K0925+1280

Physical Target: Allocation:

CW1- Off-Carriageway Improvement P 1.749361 M
Paving of Shoulders: 726 Square Meters

CW2- Construction of Road Slope Protection P 143.000639 M
Structure: 5,611 Square Meters

EAO P 5.250 M

Total P 150.00 M
September 18, 2024 2024 WIN4XY00402 SR2024-01-004759 January 29, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+840 - K0810+948

Physical Target: Allocation:

CW1- Off-Carriageway Improvement P 4.328339 M
Paving of Shoulders: 216 Square Meters

CW2- Construction of Road Slope Protection P 140.421661 M
Structure: 6,026 Square Meters

EAO P 5.250 M

Total P 150.00 M
September 18, 2024 2024 WIN4XY00391 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Daang Maharlika (LZ) - K0085+065 - K0085+758, K0086+331 - K0087+076
September 18, 2024 2024 WIN4XY00403 SR2024-01-004759 January 29, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840

Physical Target: Allocation:

CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0812+312 - K0812+392

Physical Target: Allocation:

CW1- Off-Carriageway Improvement P 11.474981 M
Paving of Shoulders: 240 Square Meters

CW2- Construction of Road Slope Protection P 133.275019 M
Structure: 5,744 Square Meters

EAO P 5.250 M

Total P 150.00 M
September 18, 2024 2024 WIN4XY00390 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road in Baliuag, Bulacan (Phase 1)
September 18, 2024 2024 WIN4XY00395 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road, Baliuag, Bulacan (Phase 2)
September 18, 2024 FY 2024 GAA P00834654MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1564 + (-478) - K1593 + 057, Davao del Sur
Physical Target:
CW1: 29,696.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Safety: Pavement Markings)
EAO: P 1,750,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1556 + 700 - K1556 + 885,
K1557 + 761 - K1559 + 201, K1560 + 002 - K1560 + 917, Davao del Sur
Physical Target:
CW1: 2,551.020 lineal meters (Road Safety: Pavement Markings)
CW2: 261.00 no. of road signs (Road Safety: Roadway Lighting)
CW3: 2,910.72 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 5,524,371.00 (Road Safety: Pavement Markings)
CW2: P 24,309,840.00 (Road Safety: Roadway Lighting)
CW3: P 18,415,790.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 1,750,000.00
September 18, 2024 FY 2024 GAA P00803811MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1497 + 500 - K1500 + 345
Physical Target:
CW1: 5.626 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1514 + 000 - K1515 + 670
Physical Target:
CW1: 6.592 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
September 18, 2024 2024 P00834863MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 1st District Engineering Office
P00834863MN
300215104031000
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities

FROM:
Construction of Barangay Macalibre Alto, Barangay Burgos, Barangay Piniel Road, Lopez Jaena, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.25 Lane Km
Allocation:
CW1: Php 54,802,350.00
EAO: Php 1,987,650.00

TO:
Construction of Barangay Macalibre Alto, Barangay Burgos, Barangay Peniel Road, Lopez Jaena, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection/Structure
Physical Target:
CW1- 4.120 Lane Km
CW2- 656.56 Square Meters
Allocation:
CW1: Php 48,984,803.36
CW2: Php 5,817,546.64
EAO: Php 1,987,650.00
September 18, 2024 2024 WIN4XY00405 SR2024-01-008099 January 31, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0971 + 035 - K0972 + 000, K0996 + 153 - K1000 + 000

Physical Target: Allocation:

CW1- Preventive Maintenance of Road P 113.897020 M
Asphalt Overlay: 9.628 Lane Km

EAO P 4.130980 M

Total P 118.028 M

AS MODIFIED:

Daang Maharlika (LT) - K0971 + 035 - K0972 + 000, K0996 + 153 - K0998 + 636

Physical Target: Allocation:

CW1- Preventive Maintenance of Road P 113.897020 M
Asphalt Overlay: 6.874 Lane Km

EAO P 4.130980 M

Total P 118.028 M
September 17, 2024 2024 P00830255MN SR2024-02-010018 February 13, 2024 Region X Regional Office X
P00830255MN
300201100125000
CSSP:Construction/ Improvement of Access Roads leading to Airports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)

FROM:
CConstruction of Access Road leading to Bukidnon Airport (Jct. KKK Road/Langcataon Pangantucan-Jct Don Carlos-Kdingilan Road/San Nicolas(Langcataon, Pangantucan-kawilihan-Mahayahay-Pualas, Don Carlos Section), Package 8, Bukidnon
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-954.00 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00

TO:
Construction of Access Road leading to Bukidnon Airport (Jct. KKK Road/Langcataon Pangantucan-Jct Don Carlos-Kdingilan Road/San Nicolas(Langcataon, Pangantucan-kawilihan-Mahayahay-Pualas, Don Carlos Section), Package 8, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-10.60 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
September 17, 2024 2024 P00833225MN SR2024-01-005535 January 30, 2024 Region X Regional Office X
P00833225MN
300215104036000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:
Construction of Jct. Sayre Highway to Jct. Don Carlos-Kadingilan Rd (Poblacion, Kitaotao-Calao-calao, Don Carlos), Bukidnon, Package 2
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.40 Lane Km
Allocation:
Total: Php 180,000,000.00
CW1: Php 173,700,000.00
EAO: Php 6,300,000.00

TO:
Construction of Jct. Sayre Highway to Jct. Don Carlos-Kadingilan Rd (Poblacion, Kitaotao-Calao-calao, Don Carlos), Bukidnon, Package 2
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-5.088 Lane Km
CW2-5,950 Square meters
Allocation:
Total: Php 180,000,000.00
CW1: Php 143,952,301.32
CW2: Php 29,747,698.68
EAO: Php 6,300,000.00
September 16, 2024 2024 SR2024-02-011569 February 24, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0840 + 000 - K0840 + 200, K0846 + 081 - K0846 + 808

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 48.422735 M
1.854 Lane Km

EAO P 1.756265 M

Total P 50.179 M

AS MODIFIED:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0840 + 000 - K0840 + 107, K0840 + 850 - K0841 + 400, K0841 + 900 - K0842 + 000, K0853 + 000 - K0853 +520, K0853 + 541 - K0854 + 000

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 48.422735 M
3.711 Lane Km

EAO P 1.756265 M

Total P 50.179 M
September 16, 2024 2024 SR2024-02-008265 February 24, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Bridge – Widening of Permanent Bridges

AS PER GAA/ORIGINAL:

Mayuga Br. (B00607LT) along Daang Maharlika (LT)

Physical Target: Allocation:

CW1- Widening of Bridge: P 28.950 M
146.400 Square Meters

EAO P 1.050 M

Total P 30.00 M

AS MODIFIED:

Mayuga Br. (B00607LT) along Daang Maharlika (LT)

Physical Target: Allocation:

CW1- Widening of Bridge: P 28.950 M
198.432 Square Meters

EAO P 1.050 M

Total P 30.00 M
September 16, 2024 2024 SR2024-02-008224 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads -Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0905 + 604 - K0906 + 505

Physical Target: Allocation:

CW1- Construction of Drainage Structure : P 45.208320 M
along Road: 1,580.00 Lineal Meters

EAO P 1.639680 M

Total P 46.848 M

AS MODIFIED:

Daang Maharlika (LT) – K0904 + 689 – K0905 + 007, K0905 + 984 - K0906 + 505, K0909 + 017 – K0909 + 274

Physical Target: Allocation:

CW1- Construction of Drainage Structure: P 45.208320 M
along Road: 1,707.50 Lineal Meters

EAO P 1.639680 M

Total P 46.848 M
September 16, 2024 2024 WIN4XY00376 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800541LZ
UACS : 310205101028000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Palanas - San Isidro Road, Jovellar, Albay

Physical Target :
CW1 - Construction of Concrete Road - 12.192 Lane Km


TO
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Palanas - San Isidro Road, Jovellar, Albay

Physical Target :
CW1 - Construction of Concrete Road - 7.9633 Lane Km
CW2 - Construction of Gravel Road - 5.31366 Lane Km
CW3 - Construction of Road Slope Protection Structure - 4017..18 Square meters
September 16, 2024 2024 WIN4XY00370 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800684LZ
UACS : 310110100464000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road - System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0521 + 100 - K0522 + 035

Physical Target :
CW1 - Construction of Drainage Structure along Road - 1868 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road - System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0521 + 090.50 - K0521 + 847.30

Physical Target :
CW1 - Construction of Drainage Structure along Road - 1510 Lineal meters
CW2 - Construction of Road Slope Protection Structure - 659 Square meters
September 16, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837430LZ
UACS : 300214100743000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road - Motor Vehicles User's Charge (MVUC) as per R..A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0371 + (-260) - K0371 + (-191), K0392 + 000 - K0392 + 301, K0395 + 832 - K0395 + 897, K0396 + 473 - K0396 + 638

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.2 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road - Motor Vehicles User's Charge (MVUC) as per R..A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0371 + (-260) - K0371 + (-191), K0392 + 000 - K0392 + 301, K0395 + 832 - K0395 + 1089.65

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.2553 Lane Km
September 16, 2024 2024 WIN4XY00374 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00842597LZ
UACS : 300215103827000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Improvement of Cagbulacao - Tanagan Ridge Road (Package 1), Bacacay, Albay

Physical Target :
CW1 - Construction of Concrete Road - 5.2 Lane Km



TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Improvement of Cagbulacao - Tanagan Ridge Road (Package 1), Bacacay, Albay

Physical Target :
CW1 - Construction of Concrete Road - 2.8 Lane Km
Cw2 - Construction of Road Slope Protection Structure - 12194.32 Square meters
September 11, 2024 2024 WIN4XY00362 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Plaridel Bypass Rd - K0035+(-061) - K0035+(-034), K0036+195 - K0036+213, K0037+267 - K0037+276, K0039+226 - K0039+536, K0043+284.5 - K0043+302.5, K0043+380 - K0043+500, K0043+500 - K0044+390, K0046+291.5 - K0046+345.5
September 11, 2024 2024 WIN4XY00334 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Sn Simon - Baliwag Rd - K0074+610 K0074+767.4
September 11, 2024 2024 WIN4F08140 FY 2024 GAA December 20, 2023 Region III Bulacan 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Gen Alejo Santos Highway - K0050+521 - K0051+796
September 11, 2024 2024 WIN4XY00366 GAA FY 2024 January 24, 2024 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

SIPAG – Flood Mitigation Structures Protecting Public
Infrastructures/Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System, Barangay Olot, Tolosa Leyte
Physical Target: Allocation:

CW1-Construction of Drainage Structure P 9.8 M
: 757.522 Lineal Meters

EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Construction of Drainage System, Barangay Olot, Tolosa Leyte
Physical Target: Allocation:

CW1-Construction of Drainage Structure P 9.8 M
: 338.00 Lineal Meters

EAO P 0.200 M

Total P 10.00 M
September 11, 2024 2024 WIN4XY00386 GAA FY 2024 January 24, 2025 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0919 + 000 - K0920 + 000

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 49.00 M
Structure: 3,333.33 Square Meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0918 + 000 - K0920 + 000

Physical Target: Allocation:

CW1- Construction of Road Slope Protection P 31.91046066 M
Structure: 3,333.33 Square Meters

CW2- Upgrading of Drainage Structure along P 17.08953934 M
Road: 21.48 Lineal Meters

EAO P 1.00 M

Total P 50.00 M
September 11, 2024 2024 WIN4XY00380 GAA FY 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

SIPAG – Flood Mitigation Structures Protecting Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Salog River, Brgy Tambis, Hilongos, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 29.40 M
Structure: 468.00 Lineal Meters

EAO P .600M

Total P 30.00 M

AS MODIFIED:

Construction of Flood Control Structure along Salog River, Brgy Tambis, Hilongos, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 29.15007534 M
Structure: 205.600 Lineal Meters

EXC P .24992466 M

EAO P .600M

Total P 30.00 M
September 6, 2024 FY 2024 GAA WIN4XW00133 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1422 + 204 - K1425 + 000
Physical Target:
CW1: 5.546 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Reconstruction to Concrete Pavement)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1422 + 204 - K1425 + 000
Physical Target:
CW1: 5.594 lane km (Reconstruction to Concrete Pavement)
CW2: 3,816.158 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 62,594,470.00 (Reconstruction to Concrete Pavement)
CW2: P 45,968,030.00 (Construction of Drainage Structure along Road)
EAO: P 3,937,500.00
EXC: P 37,500,000.00 (Excess)