Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
September 5, 2024 2024 WIN4S03642 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 3, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 3, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 8.85205908 M
1.269 Lane Km

CW2-Construction of Drainage Structure: P 40.64794092 M
1,214 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 5, 2024 2024 WIN4S03646 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, New Hope Village, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, New Hope Village, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 14.03000831 M
1.560 Lane Km

CW2-Construction of Drainage Structure: P 35.46999169 M
1,520 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 5, 2024 2024 P00800055MN GAA2024 January 1, 2024 Region X Bukidnon 3rd District Engineering Office
P00800055MN
310201101449000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening- Primary Roads


FROM:
Sayre Highway - K1441+159 - K1441 + 358, K1444+480 - K1444+484
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.406 Lane Km
Allocation:
CW1: Php 9,947,000.00
EAO: Php 203,000.00

TO:
Sayre Highway - K1440+800 - K1440+890
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.180 Lane Km
CW2- 365.66 Square Meters
Allocation:
CW1: Php 5,997,600.00
CW2: Php 3,949,400.00
EAO: Php 203,000.00
September 5, 2024 2024 WIN4S03648 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, St. Francis 1 and St. Francis 2, Tacloban City, Leyte
Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, St. Francis 1 and St. Francis 2, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 1.44101465 M
0.120 Lane Km

CW2-Construction of Drainage Structure: P 48.05898535 M
2,075 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 5, 2024 2024 WIN4XY00372 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Stucture (Drainage), barangay 46, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Stucture: P 4.9 M
378.761 Lineal Meters

EAO P .100 M

Total P 5.00 M

AS MODIFIED:

Construction of Flood Control Stucture (Drainage), barangay 46, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Stucture: P 4.9 M
237 Lineal Meters

EAO P .100 M

Total P 5.00 M
September 5, 2024 2024 WIN4S03645 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Apitong-Paterno Rd - K0908 + 902 - K0909 + 000

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 1.927660 M
Along Road: 208.00 Lineal Meters

EAO P 0.03934 M

Total P 1.967 M

AS MODIFIED:

Apitong-Paterno Rd - K0908 + 983 - K0909 + 061

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 1.927660 M
Along Road: 84.00 Lineal Meters

EAO P 0.03934 M

Total P 1.967 M
September 5, 2024 2024 WIN4S03644 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
OO2: Protect Lives and Properties

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Shore Protection, Cancabato Bay (Astrodome Area), Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Shore Protection, Cancabato Bay (Astrodome Area), Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 515 Lineal Meters

EAO P 5.250 M

Total P 150.00 M
September 5, 2024 2024 WIN4XY00379 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System along Tigbao, Barangay 94, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure: P 49.00 M
2,300 Lineal Meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:
Construction of Drainage System along Tigbao, Barangay 94, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure: P 49.00 M
1,341 Lineal Meters

EAO P 1.00 M

Total P 50.00 M
September 5, 2024 2024 WIN4XY00360 FY 2024 GAA December 20, 2023 Region III Bulacan 3rd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structures along San Miguel River, Sta. 19+805 - Sta. 20+002.43, Right Side, San Miguel, Bulacan
September 5, 2024 2024 WIN4XY00351 FY 2024 GAA December 20, 2023 Region III Bulacan 3rd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structures along San Miguel River, Sta. 19+592.65 - Sta. 19+785, Right Side, San Miguel, Bulacan
September 5, 2024 2024 P00834883MN SR2024-04-015283 April 25, 2024 Region X Regional Office X
P00834883MN
300215104058000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:
Construction of Access Road, Jct. Don Carlos-Kadingilan Rd leading to Bukidnon Airport Terminal, Don Carlos, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-1.200 Lane Km
Allocation:
Total: Php 25,000,000.00
CW1: Php 24,125,000.00
EAO: Php 875,000.00

TO:
Construction of Access Road, Jct. Don Carlos-Kadingilan Rd leading to Bukidnon Airport Terminal, Don Carlos, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection
Physical Target:
CW1-1.20 Lane Km
CW2-800.00 Square meters
Allocation:
Total: Php 25,000,000.00
CW1: Php 18,782,263.75
CW2: Php 5,342,736.25
EAO: Php 875,000.00
September 4, 2024 2024 WIN4XY00349 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800212LZ
UACS No : 310201101270000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road - Daang Maharlika (LZ) - K0513 + (-344) - K0513 + 470

Physical Target :
CW1 - Road Widening - 1.628 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road - Daang Maharlika (LZ) - K0513 + 870 - K0513 + 966, K0514 + 000 - K0514 + 440, K0518 + 706 - K0519 + 000

Physical Target :
CW1 - Road Widening - 1.084 Lane Km
ROW - ROW Acquisition - 4095 Square Meters
September 4, 2024 2024 WIN4XY00348 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00802039LZ
UACS No : 310101101270000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Road - Daang Maharlika (LZ) - K00478 + 537.11 - K0479 + 014

Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 1.896 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Road - Daang Maharlika (LZ) - K0478 + 537.11 - K0478 + 861.00

Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 1.296 Lane Km
September 4, 2024 2024 WIN4F08102 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802546LZ
UACS No : 310105101165000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0031 + 756 - K0031 + 876, K0031 + 926 - K0032 + 274

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.836 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0031 + 756 - K0031 + 876, K0031 + 926 - K0032 + 020

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.328 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1099 Square meters
CW3 - Road Safety - Street Lightning - 18 Number of Units
September 4, 2024 2024 WIN4F08097 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802548LZ
UACS No : 310105101167000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 796 - K0039 + 942

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.294 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 606 - K0039 + 670

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.128 Lane Km
CW2 - Construction of Drainage Structure along Road - 128 Lineal meters
CW3 - Road Safety : Street Lightning - 6 Number of Units
September 4, 2024 2024 WIN4F08098 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802552LZ
UACS No : 310105101163000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 250 - K0036 + 419

Physical Target :
Rehabilitation of Paved Road - 0.338 Lane Km


TO
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 188 - K0036 + 252

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.128 Lane Km
CW2 - Construction of Drainage Structure along Road - 128 Lineal meters
CW3 - Road Safety - Street Lightning - 6 Number of Units
September 4, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805183LZ
UACS No : 310105101025000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0115 + 000 - K0117 + 000

Physical Target :
CW1 - Rehabilitation of Paved Road - 3.214 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0115 + 000 - K0117 + 000

Physical Target :
CW1 - Rehabilitation of Paved Road - 3.846 Lane Km
September 4, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805193LZ
UACS No : 310105101157000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0006 + 658 - K0007 + 074, K0007 + 106 - K0007 + 749

Physical Target :
CW1 - Rehabilitation of Paved Road - 2.316 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0006 + 558 - K0007 + 074, K0007 + 106 - K0007 + 749

Physical Target :
CW1 - Rehabilitation of Paved Road - 2.316 Lane Km
September 4, 2024 2024 GAA 2024 January 19, 2024 Region V Catanduanes District Engineering Office
Project ID : P00825144LZ
UACS No : 320102106473000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Structure, Macutal River (Rizal Section), Barangay Rizal, Baras, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 373 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Structure, Macutal River (Rizal Section), Barangay Rizal, Baras, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 311 Lineal meters
September 4, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00832416LZ
UACS No : 300214100757000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0500 + 210.00 - K0500 + 272.00, K0500 + 702.00 - K0501 + 313.00, K0501 + 313 - K0501 + 528.00 (L/S), ""501 + 600.00 - K0502 + 250.00, K0506 + 190.00 - K0506 + 961.00, K058 + 163.00 - K0508 + 382.00, K0483 + 000.00 - K0484 + 114.00, K0485 + 000.00 - K0485 + 959.00

Physical Target :
CW1 - Rehabilitation of Paved Road - 8.997 Lane Km

TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0482 + 600 - K0482 + 800, K0485 + 680 - K0485 + 696, K0485 + 767 - K0485 + 804, K0485 + 884 - K0485 + 959, K0489 + 399 - K0489 + 500, K0489 + 800 - K0489 + 914, K0498 + 000 - K0498 + 602, K0501 + 280 - K0501 + 360, K0501 + 650 - K0502 + 738, K0504 + 370 - K0505 + 078, K0505 + 088 - K0505 + 419, K0506 + 392 - K0506 + 872

Physical Target :
CW1 - Rehabilitation of Paved Road - 9.872 Lane Km
September 4, 2024 2024 WIN4XY00350 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00837422LZ
UACS No : 300214100764000

FROM :
Convergence and Special Support Program - Special Road Fund = Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Masbate Cataingan - Placer Rd - K0006 + 060 - K0006 + 941

Physical Target :
CW1 - Rehabilitation of Paved Road - 3.524 Lane Km


TO
Convergence and Special Support Program - Special Road Fund = Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Masbate - Cataingan - Placer Rd - K0006 + 060 - K0007 + 141, K0016 + 443 - K0016 + 644

Physical Target :
CW1 - Rehabilitation of Paved Road - 2.494 Lane Km
CW2 - Construction of Drainage Structure along Road - 1172 Lineal meters
CW3 - Road Safety - Street Lightning - 81 Number of Units
September 4, 2024 2024 WIN4XY00375 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800226LZ
UACS : 310201101262000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0373 + 910 - K0374 + 791, K0374 + 833 - K0375 + 712

Physical Target :
CW1 - Road Widening - 3.528 Lane Km
CW2 - Construction of Drainage Structure along Road - 2167 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3469.19 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0391 + 200 - K0392 + 301, K0392 + 323 - K0392 + 809

Physical Target :
CW1 - Road Widening - 3.12 Lane Km
CW2 - Construction of Drainage Structure along Road - 3120 Lineal meters
September 4, 2024 2024 WIN4XY00378 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800227LZ
UACS : 310201101263000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0377 + 540 - K0377 + 756, K0384 + 1222 - K0385 + 012, K0386 + 239 - K0387 + 000, K0389 + 737 - K0389 + 876, K0391 + 000 - K0391 + 369

Physical Target :
CW1 - Road Widening - 3.102 Lane Km
CW2 - Construction of Drainage Structure along Road - 1809.76 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 4216.43 Square meters
ROW - ROW Acquisition - 31020 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0384 + 1215 - K0385 + 012, K0386 + 239 - K0387 + 000, K389 + 737 - K0389 + 876, K0391 + 000 - K0391 + 200

Physical Target :
CW1 - Road Widening - 2.346 Lane Km
CW2 - Construction of Drainage Structure along Road - 2213.5 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2512.09 Square meters
ROW - ROW Acquisition - 23460 Square Meters
September 4, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800396LZ
UACS : 310207100320000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0604 + 452 - K0605 + 000, K0605 + 167 - K0605 + 211

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 945 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0604 + 452 - K0605 + 000

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 788 Square meters
CW2 - Construction of Road Slope Protection Structure - 102.38
September 4, 2024 2024 P00834889MN SR2024-06-017216 June 14, 2024 Region X Regional Office X
P00834889MN
300215104064000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:
Construction of Road and Bridge and Approaches (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Upper Narulasan-Sitio Lower Narulasan- Jct. (Sinuda - Omonay) Bypass Road, Kitaotao, Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.694 Lane Km
Allocation:
Total: Php 130,000,000.00
CW1: Php 125,450,000.00
EAO: Php 4,550,000.00

TO:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.550 Lane Km
Allocation:
Total: Php 130,000,000.00
CW1: Php 125,450,000.00
EAO: Php 4,550,000.00
September 4, 2024 2024 P00834888MN SR2024-06-017206 June 14, 2024 Region X Regional Office X
P00834888MN
300215104063000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:
Construction of Jct. Sayre Highway (Jct. Bukidnon-Davao City Rd.- Cotabato Bdry) to Jct Sayre Highway Lourdes-Mc Arthur Road-Brgy. Kitaihon Road, Dangcagan, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.200 Lane Km
Allocation:
Total: Php 79,000,000.00
CW1: Php 76,235,000.00
EAO: Php 2,765,000.00

TO:
Construction of Jct. Sayre Highway (Jct. Bukidnon-Davao City Rd.- Cotabato Bdry) to Jct Sayre Highway Lourdes-Mc Arthur Road-Brgy. Kitaihon Road, Dangcagan, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection
Physical Target:
CW1-4.00 Lane Km
CW2-1,680.00 Square meters
Allocation:
Total: Php 79,000,000.00
CW1: Php 68,148,174.47
CW2: Php 8,086,825.53
EAO: Php 2,765,000.00
September 4, 2024 2024 WIN4XY00377 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800399LZ
UACS : 310207100323000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0633 + 480 - K0633 + 480 - K0633 + 778, K0635 + 024 - K0635 + 884

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 4999.6 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0633 + 480 - K0633 + 617, K0633 + 638 - K0633 + 778, K0633 + 820 - K0633 + 900, K0634 + 120 - K0634 + 471

Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 2578.66 Square meters
CW2 - Construction of Drainage Structure along Road - 277 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1143.69
September 4, 2024 2024 P00834900MN SR2024-07-018044 July 22, 2024 Region X Regional Office X
P00834900MN
300215104075000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:
Construction of Bridge including Approaches, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (Crossing Rawari River, West Dalurong-Sinaysayan Section), Kitaotao, Bukidnon (Package 2)
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Construction of Concrete Road
Physical Target:
CW1-572.400 Square meters
CW2-0.80 Lane Km
Allocation:
Total: Php 90,000,000.00
CW1: Php 69,480,000.00
CW2: Php 17,370,000.00
EAO: Php 3,150,000.00

TO:
Construction of Bridge including Approaches, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (Crossing Rawari River, West Dalurong-Sinaysayan Section), Kitaotao, Bukidnon (Package 2)
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-763.20 Square meters
Allocation:
Total: Php 90,000,000.00
CW1: Php 86,850,000.00
EAO: Php 3,150,000.00
September 4, 2024 2024 WIN4S03647 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Asset Preservation – Preventive Maintenance – Tertiary Roads

AS PER GAA/ORIGINAL:

Burgos St - (S00031LT) Chainage 233 - Chainage 845
Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 12.201 M
Asphalt Overlay: 2.448 Lane Km

EAO P .249 M

Total P 12.450 M

AS MODIFIED:

Burgos St - (S00031LT) Chainage 233 - Chainage 845
Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 12.201 M
Asphalt Overlay: 1.224 Lane Km

EAO P .249 M

Total P 12.450 M
September 4, 2024 2024 P00835101MN SR2024-01-006005 January 30, 2024 Region X Regional Office X
P00835101MN
300217100275000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

FROM:
Construction of Road, Malaybalay City - Valencia City Bypass Link Road Package 1, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-14.914 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00

TO:
Construction of Road, Malaybalay City - Valencia City Bypass Link Road Package 1, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-8.00 Lane Km
CW2-8,484.79 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 146,750,311.28
CW2: Php 46,249,688.72
EAO: Php 7,000,000.00
September 4, 2024 2024 WIN4XY00368 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
OO2: Protect Lives and Properties

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Tigbao River, Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,074 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Tigbao River, Tacloban City

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 680 Lineal Meters

EAO P 5.250 M

Total P 150.00 M
September 4, 2024 2024 P00800317MN SR2024-01-004428 January 29, 2024 Region X Regional Office X
P00800317MN
310205101268000
OO1:Network Development Program - Construction of Missing Links/ New Roads

FROM:
Tubod-Ganassi Road, Package 3, Lanao Del Norte
Type of Work:
CW1- Construction of Gravel Road
ROW- ROW Acquisition
Physical Target:
CW1-6.00 Lane Km
ROW-10,000.00 Square meters
Allocation:
Total: Php 122,492,000.00
CW1: Php 106,384,495.00
ROW: Php 11,820,285.00
EAO: Php 4,287,220.00

TO:
Tubod-Ganassi Road, Package 3, Lanao Del Norte
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1-1,144.80 Square meters
Allocation:
Total: Php 122,492,000.00
CW1: Php 118,204,780.00
EAO: Php 4,287,220.00
September 4, 2024 2024 WIN4XY00371 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction of Road with Drainage, Purok 2, barangay 83-B, Cogon, San Jose, Tacloban City

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 19.6 M
1.00 Lane Km

EAO P .400 M

Total P 20.00 M

AS MODIFIED:

Construction of Road with Drainage, Purok 2, barangay 83-B, Cogon, San Jose, Tacloban City

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 3.31242646 M
0.510 Lane Km

CW2- Construction of Drainage Structure: P 16.28757354 M
715 Lineal Meters
EAO P .400 M

Total P 20.00 M
September 4, 2024 2024 WIN4XY00373 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, St. Francis Village 2, Tacloban City

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 4.9 M
0.213 Lane Km

EAO P .100 M

Total P 5.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, St. Francis Village 2, Tacloban City

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 1.25118460 M
0.160 Lane Km

CW2-Construction of Drainage Structure: P 3.64881540 M
158 Lineal Meters

EAO P .100 M

Total P 5.00 M
September 4, 2024 2024 WIN4F08139 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 1, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 1, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 9.49225583 M
1.495 Lane Km

CW2-Construction of Drainage Structure: P 40.00774417 M
1,350 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 4, 2024 2024 WIN4XY00369 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 3, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Greendale 3, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 12.12191622 M
1.018 Lane Km

CW2-Construction of Drainage Structure: P 24.51115611 M
659 Lineal Meters

CW3-Construction of Road Slope Protection P 12.86692767 M
Structure: 100 Square Meters

EAO P .500 M

Total P 50.00 M
September 4, 2024 2024 WIN4S03643 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 1, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 1, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 13.86663107 M
2.283 Lane Km

CW2-Construction of Drainage Structure: P 35.63336893 M
1,490 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 4, 2024 2024 WIN4XY00367 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

(BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 2, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P .500 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Guadalupe Heights 2, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 13.78269576 M
2.351 Lane Km

CW2-Construction of Drainage Structure: P 35.71730424 M
1,586 Lineal Meters

EAO P .500 M

Total P 50.00 M
September 3, 2024 FY 2024 GAA P00833130MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Island along Davao-Cotabato Rd (Davao City-Jct Digos Sect) (S00039MN) - K1516 + 632 - K1517 + 657, Talomo (Poblacion), Davao City
Physical Target:
CW1: 1,000.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 4,920,000.00
CW1: P 4,821,600.00 (Road Safety: Pavement Markings)
EAO: P 98,400.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Island along Davao-Cotabato Rd (Davao City-Jct Digos Sect) (S00039MN) - K1512 + 223 - K1521 + 345, (S01455MN) Chainage 2488-3792, Talomo (Poblacion), Davao City
Physical Target:
CW1: 6,737.41 lineal meters (Road Safety: Pavement Markings)
CW2: 275.00 no. of road signs (Road Safety: Road Signs)
Allocation:
TOTAL: P 4,920,000.00
CW1: P 1,253,099.00 (Road Safety: Pavement Markings)
CW2: P 3,494,701.00 (Road Safety: Road Signs)
EAO: P 172,200.00
September 3, 2024 FY 2024 GAA WIN4E03649 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1417 + 000 - K1419 + 835
Physical Target:
CW1: 5.546 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Reconstruction to Concrete Pavement)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1414 + 267 - K1414 + 309,
K1414 + 837 - K1414 + 847, K1417 + 000 - K1522 + 204
Physical Target:
CW1: 10.385 lane km (Reconstruction to Concrete Pavement)
CW2: 1,700.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 117,276,389.00 (Reconstruction to Concrete Pavement)
CW2: P 27,473,611.00 (Construction of Drainage Structure along Road)
EAO: P 5,250,000.00
September 3, 2024 FY 2024 P00800366MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
From: Magpet-Nowa-Doroluman-Greenfield Rd –
K1632 + 080 - K1632 + 094
To: Magpet-Nowa-Doroluman-Greenfield Rd –
K1632 + 080 - K1632 + 094,
K1642 + 263 - K1642 + 277
Amount: ₱12,000,000.00
August 30, 2024 FY 2024 P00800267MN SR2024-01-000428 January 26, 2024 Region XII Regional Office XII
From: Marbel-Makar Rd - K1688 + 370 - K1690 + 370
To: Marbel-Makar Rd - K1686 + 793 - K1690 + 800
Amount: 100,000,000.00
August 30, 2024 FY 2024 P00800505MN SR2024-01-004634 January 29, 2024 Region XII Regional Office XII
From: General Santos City-T'Boli-Surallah Rd - (S01483MN) - K1686+701 - K1686+875
To: General Santos City-T'Boli-Surallah Rd - (S01483MN) - K1685 + 880 - K1685 + 950, K1685 + 910 - K1685 + 970, K1685 + 970 - K1686 + 040
Amount: 141,750,000.00
August 30, 2024 FY 2024 P00801203MN SR2024-01-004559 January 29, 2024 Region XII Regional Office XII
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1603 + 607 - K1605 + 863
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1603+607 - K1605+863, K1623+389 - K1623+793, K1626+534 - K1626+854, K1628+400 - K1629+320, K1632+420 - K1633+393
August 30, 2024 FY 2024 P00800374MN SR2024-01-004667 January 29, 2024 Region XII Regional Office XII
From: Marbel-Makar Rd - K1693 + 586 - K1695 + 596
To: Marbel-Makar Rd - K1692 + 000 - K1692 + 835, K1693 + 586 - K1693 + 827, K1694 + 414 - K1695 + 596
August 30, 2024 FY 2024 P00820925MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Improvement of Poblacion Alabel Drainage System, Alabel Sarangani Province
Amount: 80,000,000.00
August 28, 2024 2024 WIN4XY00343 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00801605LZ
UACS No: 310204102554000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Package 1, Camarines Sur

Physical Target :
CW1 - Construction of Viaduct - 7441.2 Square meters
CW1 - Construction of Asphalt Road - 4.183 Lane Km

TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Package 1, Camarines Sur

Physical Target :
CW1 - Construction of Viaduct - 7441.2 Square meters
CW1 - Construction of Asphalt Road - 2.0917 Lane Km
August 28, 2024 2024 WIN4XY00344 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00802029LZ
UACS No : 310101101268000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0467 + 000 - K0467 + 541

Physical Target :
CW1 - Preventive Maintenance of Road : Asphalt Overlay - 2.164 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0467 + 000 - K0467 + 339.58

Physical Target :
CW1 - Preventive Maintenance of Road : Asphalt Overlay - 1.358 Lane Km
August 28, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805203LZ
UACS No : 3101081201874000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0156 + 550 - K0156 + 620

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 3500 Square meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0156 + 565 - K0156 + 680

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 3157.9 Square meters
August 28, 2024 2024 WIN4XY00345 GAA 2024 January 19, 2024 Region V Albay 3rd Engineering Office
Project ID : P00846111LZ
UACS No : 300225102074000

FROM :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structure protecting Public Infrastructures/Facilities - Construction of Nasisi River Flood Mitigation Structure, Barangay Nabonoton, Ligao City, Albay

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 659.86 Lineal meters


TO :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structure protecting Public Infrastructures/Facilities - Construction of Nasisi River Flood Mitigation Structure, Barangay Nabonton, Ligao City, Albay

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 659.86 Lineal meters
August 28, 2024 2024 320102106233000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 1+500), Ramon, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 0+520.80), Ramon, Isabela
August 28, 2024 2024 WIN4E03606 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310201101373000
Project ID: P00800153MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.278 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 19,300,000/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.190 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 28,328,947.37/Lane Km
August 28, 2024 2024 WIN4E03582 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102106736000
Project ID: P00821204MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.724 Lineal meters

Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000

Unit Cost:
CW1: P 138,940.88/Lineal meters

TO:

Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 91.600 Lineal meters

Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000

Unit Cost:
CW1: P 632,096.07/Lineal meters

August 28, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 300225102255000
Project ID: P00836196MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
FROM:

Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 138.908 Lineal meters

Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000

Unit Cost:
CW1: P 142,540.39/Lineal meters

TO:

Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 52 Lineal meters

Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000

Unit Cost:
CW1: P 380,769.23/Lineal meters


August 28, 2024 2024 WIN4E03581 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102107025000
Project ID: P00820426MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 242.547 Lineal meters

Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440

Unit Cost:
CW1: P 141,100.735/Lineal meters

TO:

Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 87.01 Lineal meters

Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440

Unit Cost:
CW1: P 393,329,0426/Lineal meters
August 28, 2024 2024 WIN4E03587 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310102101935000
Project ID: P00801071MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Preventive Maintenance - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000

Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.826 Lane Km

Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000

Unit Cost:
CW1: P 16,257,796.61/Lane Km

TO:

Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000

Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.826 Lane Km

Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000

Unit Cost:
CW1: P 16,257,796.61/Lane Km
August 28, 2024 2024 320102106901000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 398 - Sta 0 + 796, Alicia, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 000 - Sta 0 + 188.30), Alicia, Isabela
August 28, 2024 2024 320102106143000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+600, Naguillian, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+398.30, Naguillian, Isabela
August 28, 2024 2024 WIN4E03632 SR2024-01-003973 January 29, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
894 Number of Units;
Allocation:
Php 125,000,000"

"To:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0347+000;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of Units;
Allocation:
Php 125,000,000"
August 28, 2024 2024 WIN4XW00132 SR2024-01-004588 January 29, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0056 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
27.214 Lane Km;
Allocation:
Php 150,000,000"

"To:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0516 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.03063 Lane Km;
Allocation:
Php 150,000,000"
August 28, 2024 2024 310205101188000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase II
August 28, 2024 2024 WIN4XW00131 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
21.768 Lane Km;
Allocation:
Php 125,000,000"

"To:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
6.93154 Lane Km;
Allocation:
Php 125,000,000"
August 28, 2024 2024 WIN4E03643 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
15.204 Lane Km;
Allocation:
Php 150,000,000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.13557 Lane Km;
Allocation:
Php 150,000,000"
August 28, 2024 2024 310106101031000 GAA 2024 January 3, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+330 - K0519+591, K0521+518 - K0521+803, K0522+469 - K0523+300 ,K0525+513 - K0525+720, K0533+222 - K0533+308, K0533+394 - K0533+508, K0541+123 - K0542+000, K0545+950 - K0548+000

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+331 - K0519+600.5, K0521+381 - K0521+795, K0522+466.5 - K0523+322, K0531+375 - K0531+470, K0533+130 - K0533+290.46, K0533+376.14 - K0533+538.62, K0541+(-195.5) - K0541+1001.5, K0546+000 - K0547+1012.5
August 28, 2024 2024 310204102442000 GAA 2024 January 3, 2024 Region II Regional Office II
Network Development - Construction of By-Pass and Diversion Roads - Ramon-Cordon-Diadi Bypass Road, Diadi, Nueva Vizcaya
August 27, 2024 2024 WIN4F08105 SR2024-02-008173 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 795, K0706 + 447 - K0706 + 504, K0707 + 108 - K0708 + 000, K0712 + 000 - K0712 + 050, K0718 + 637 - K0718 + 734, K0727 + (-355) - K0727 + 280, K0734 + 150 - K0734 + 558, K0734 + 595 - K0734 + 650, K0735 + 000 - K0735 + 526

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 76.578540 M
6.064 Lane Km

EAO P 2.777460 M

Total P 79.356 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0707 + 108 - K0707 + 808, K0734 + 137 - K0734 + 539, K0777 + 389 - K0778 + 000, K0781 + 240 - K0781 + 780

Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 76.578540 M
4.516 Lane Km

EAO P 2.777460 M

Total P 79.356 M
August 22, 2024 FY 2024 GAA WIN4XW00118 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1576 + 768 - K1578 + 158
Physical Target:
CW1: 2.800 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 634 - K1578 + 929,
K1589 + 046 - K1589 + 096, K1590 + 000 - K1591 + 173, K1591 + 300 - K1591 + 522.50,
K1591 + 545 - K1591 + 600, K1591 + 654 - K1591 + 880
Physical Target:
CW1: 3.445 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 29,037,760.00 (Reconstruction to Concrete Pavement)
CW2: P 19,212,240.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
August 22, 2024 FY 2024 GAA P00835786MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure long Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 450.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 855.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00
August 21, 2024 FY 2024 GAA P00803806MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1519 + 000 - K1522 + 000, Davao del Norte
Physical Target:
CW1: 6.558 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1501 + 825 - K1504 + 140, Davao del Norte
Physical Target:
CW1: 6.852 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
August 21, 2024 FY 2024 GAA WIN4XW00120 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1572 + 000 - K1573 + 400
Physical Target:
CW1: 2.810 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 339 - K1578 + 634,
K1583 + 237 - K1583 + 597, K1583 + 900 - K1584 + 058,
K1584 + 118 - K1584 + 763, K1588 + 009 - K1588 + 426
Physical Target:
CW1: 3.204 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 28,800,868.00 (Reconstruction to Concrete Pavement)
CW2: P 19,449,132.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0944 + 000 - K0945 + 000

Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.002 Lane Km

EAO P .770 M

Total P 38.50 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0947 + 240 - K0947 + 835, K0948 + 240 - K0948 + 1000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.71 Lane Km

EAO P .770 M

Total P 38.50 M
August 16, 2024 2024 SR2024-01-005072 January 30, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0926 + 428 - K0927 + 700, K0928 + 524 - K0930 + 000

Physical Target: Allocation:
CW1- Reconstruction to Concrete P 53.075 M
Pavement: 5.36 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd – Basey-Marabut-Pinamitinan Rd - K0915 + 958 - K0916 + 020, K0916 + 580 - K0916 + 651, K0917 + 039 - K0917 + 055, K0917 + 384 - K0917 + 412, K0917 + 503 - K0917 + 512, K0917 + 538 - K0917 + 602, K0927 + 005 - K0927 + 180, K0927 + 220 - K0927 + 260, K0927 + 374 - K0927 + 460, K0927 + 620 - K0927 + 700, K0927 + 780 - K0928 + 400, K0928 + 420 - K0928 + 500, K0929 + 020 - K0929 + 414, K0929 + 420 - K0929 + 724, K0929 + 770 - K0929 + 994
Physical Target: Allocation:

CW1- Reconstruction to Concrete P 53.075 M
Pavement: 4.522 Lane Km

EAO P 1.925 M

Total P 55.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:
Sn Juanico-Basey-Sohoton Rd - K0916 + 000 - K0916 + 1009, K0914 + 000 - K0914 + 066

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.15 Lane Km

EAO P .700 M

Total P 35.00 M

AS MODIFIED:

Sn Juanico-Basey-Sohoton Rd - K0913 + 480 - K0913 + 540, K0913 + 623 - K0913 + 663, K0913 + 740 - K0913 + 800, K0916 +180 - K0916 + 280, K0916 +360 - K0916 + 480, K0916 + 560 - K0916 + 951, K0917 + 849 - K0917 + 970, K0918 + 080 - K0918 + 340, K0918 + 420 - K0918 + 580, K0918 + 600 - K0918 + 620, K0918 + 640 - K0918 + 680, K0918 + 820 - K0918 + 860, K0918 + 940 - K0918 + 1013

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.97 Lane Km

EAO P .700 M

Total P 35.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0942 + 000 - K0943 + 000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.158 Lane Km

EAO P .800 M

Total P 40.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0936 + 803 - K0936 + 840, K0936 + 867 - K0936 + 1266, K0942 + 000 - K0942 + 634, K0946 + 078 - K0946 + 090, K0946 + 382 - K0946 + 434, K0947 +119 - K0947 + 240

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.510 Lane Km

EAO P .800 M

Total P 40.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0943 + 000 - K0944 + 000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.012 Lane Km

EAO P .760 M

Total P 38.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0932 + 028 - K0932 + 180, K0932 + 185 - K0932 + 286, K0932 + 317 - K0932 + 612, K0936 + 000 - K0936 + 803

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.706 Lane Km

EAO P .760 M

Total P 38.00 M
August 16, 2024 2024 WIN4XY00354 SR2024-01-002132 January 24, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 637.00 Lineal Meters

EAO P 5.250 M

Total P 150.00 M
August 16, 2024 2024 WIN4XY00355 SR2024-02-008114 February 1, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:
Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete P 168.875 M
Road: 3.439 Lane Km

EAO P 6.125 M

Total P 175.00 M

AS MODIFIED:

Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete P 94.48471399 M
Road: 6.34 Lane Km

CW2- Construction of Road Slope Protection P 53.79930409 M
Structure: 31,891.80 Square Meters

CW3- Construction of Drainage Structure P 20.59098192 M
Along Road: 3,000 Lineal Meters

EAO P 6.125 M

Total P 175.00 M
August 16, 2024 2024 WIN4XY00358 SR2024-01-002141 January 27, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters

EAO P 5.520 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 658.00 Lineal Meters

EAO P 5.520 M

Total P 150.00 M
August 16, 2024 2024 WIN4F08100 SR2024-02-008228 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0908 + 605 – K0909 + 274
Physical Target: Allocation:

CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,556 Lineal Meters

EAO P .961240 M

Total P 27.464 M

AS MODIFIED:

Daang Maharlika (LT) – K0908 + 605 – K0909 + 017

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,042 Lineal Meters

EAO P .961240 M

Total P 27.464 M
August 15, 2024 2024 WIN4XY00352 FY 2024 GAA December 20, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dingalan-Doña Remedios Trinidad Road (Phase III), Aurora
August 15, 2024 2024 WIN4XY00353 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0077+617 - K0078+990
August 15, 2024 2024 WIN4XY00356 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0074+537 K0075+983, K0076+162 - K0076+374
August 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0069+410 - K0069+746, K0071+384 - K0071+614, K0074+351 - K0074+537, K0080+443.50 - K0080+837.60
August 15, 2024 FY 2024 P00820100MN GAA 2024 January 1, 2024 Region XII Cotabato 3rd District Engineering Office
Construction of M'lang River Flood Control Project (Downstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato
Amount: ₱ 132,000,000.00
August 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0078+990 - K0080+024
August 15, 2024 FY 2024 P00821224MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Construction of Riverbank Protection along Matampay River at Barangay Kabuntulan, Sultan Kudarat, Maguindanao del Norte
Amount: 50,000,000.00
August 15, 2024 2024 WIN4XY08080 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads

Sto. Tomas - Minalin Rd (Minalin-Macabebe Section) - K0064+748 - K0065+39350, K0065+740 - K0066+037.50
August 15, 2024 FY 2024 P00834938MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Buluan Bridge, Buluan, Maguindanao del Sur
Amount: ₱ 80,000,000.00
August 15, 2024 FY 2024 P00834939MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Kabulnan Bridge, Datu Hoffer Ampatuan, Maguindanao del Sur
Amount: ₱ 80,000,000.00
August 15, 2024 2024 WIN4XW00116 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + 088;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
1.314 Lane Km;
Allocation:
Php 12,000,000"

"To:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + (-092.871);
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
CW1: 0.96292 Lane Km;
Allocation:
Php 12,000,000"
August 15, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.087 Lane Km;
Allocation:
Php 5,000,000"

"To:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.552 Lane Km
CW2: 365 Square meters;
Allocation:
Php 5,000,000"
August 15, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.0+000 -Sta.0+500 (R/S Upstream) Sta.00+000-Sta.00+500(R/S), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.497 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.1+865 - Sta.2+228.33 (R/S Upstream), Sta. 0+915 - Sta. 1+833.87 (R/S), Sta. 1+862-Sta. 2+259.56 (L/S), Sta. 0+915 - Sta. 1+105 (L/S), Sta. 1+075 - Sta. 1+820 (L/S), Kalinga;
Type of Work:
CW1: Construction of Flood Mitigation Structure;
Physical Target:
2518.39 Lineal meters;
Allocation:
Php 100,000,000"
August 14, 2024 2024 WIN4E03606 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310201101373000
Project ID: P00800153MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.278 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 19,300,000/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.190 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 28,328,947.37/Lane Km
August 14, 2024 2024 WIN4E03580 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320101112264000
Project ID: P00820210MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 208.362 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000

Unit Cost:
CW1: P 141,100.58/Lineal meters

TO:

Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 74.80 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000

Unit Cost:
CW1: P 393,048.13/Lineal meters


August 12, 2024 2024 WIN4E03633 SR2024-01-005298 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Dalimuno, Bantay Flood Control Along Chico River (Sta. 1+160 - Sta. 2+110), Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
869 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Dalimuno, Bantay Flood Control along Chico River (Sta. 100+023 - Sta. 100+430) Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
449 Lineal meters;
Allocation:
Php 100,000,000"
August 12, 2024 2024 WIN4XY00346 GAA FY 2024 January 31, 2024 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:
Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar

Physical Target: Allocation:

CW1- Construction of Gravel Road: P 20.7475 M
1.300 Lane Km

EAO P .7525 M

Total P 21.50 M

AS MODIFIED:

Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 17.28461259 M
1.258 Lane Km

CW2- Construction of Road Slope Protection: P 3.46288741 M
Structure: 1,736.00 Square Meters

EAO P .75250 M

Total P 21.50 M
August 10, 2024 2024 310204102804000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads - Solana Diversion Road Phase II, Solana, Cagayan
August 9, 2024 2024 300215104469000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Sitio San Juan, Brgy. Villa Maria- Brgy. Batu, Enrile, Cagayan
August 9, 2024 2024 300215104478000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Bridge and Approaches, Brgy. Maguirig, Solana, Cagayan
August 9, 2024 2024 310204102444000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads - Construction of Bypass/Diversion Road, Tuguegarao North Diversion Road