October 16, 2024 |
FY 2024 |
|
300215104992000 |
June 27, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215104992000
Project ID: P00834963MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Camp Abendan PRO9, Barangay Mercedes, Zamboanga City
CW1 - Construction of Concrete Road: 0.89 Lane Km
Unit Cost: ₱ 11,663,368.60/ Lane Km CW2- Construction of Drainage Structure along Road: 746.00 Ln.m.
Unit Cost: ₱ 7,104.02/ Ln.m.
EAO: ₱ 320,000.00
Allocation: ₱ 16,000,000.00 |
October 16, 2024 |
FY 2024 |
|
300215104999000 |
June 11, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215104999000
Project ID: P00834970MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation/ Reconstruction of Road at Zone 3B, Brgy. Lumbangan, Zamboanga City
CW1 - Reconstruction to Concrete Pavement: 1.04 Lane Km
Unit Cost: ₱ 9,423,076.92/ Lane Km
EAO: ₱ 200,000.00
Allocation: ₱ 10,000,000.00 |
October 16, 2024 |
FY 2024 |
|
300215105000000 |
June 27, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215105000000
Project ID: P00834971MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Manicahan, Zamboanga City
CW1 - Construction of Concrete Road: 0.72 Lane Km
Unit Cost: ₱ 8,877,007.44/ Lane Km CW2- Construction of Slope Protection Structure: 478.88 sq.m.
Unit Cost: ₱ 7,117.79/ sq.m.
EAO: ₱ 200,000.00
Allocation: ₱ 10,000,000.00 |
October 16, 2024 |
FY 2024 |
|
300221106669000 |
June 27, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300221106669000 Project ID: P00837085MN Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Concrete Road at Sitio Camp Pilar, Barangay Curuan, Zamboanga City
CW1 - Construction of Concrete Road: 1.85 Lane-km
Unit Cost: ₱ 8,027,027.027/ Lane-km
EAO: ₱ 150,000.00
Allocation: ₱ 15,000,000.00 |
October 15, 2024 |
FY 2024 |
|
310106101060000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 310106101060000
Project ID: P00801258MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Bato-Bato-Tarawakan Rd - Chainage 0000 - Chainage 3780, Chainage 805.68 - Chainage 1680
CW1- Rehabilitation of Paved Road: 7.56 Lane-km
Unit Cost: ₱ 13,366,153.68/ Lane-km CW2- Road Widening: 1.75 Lane-km Unit Cost: ₱ 23,800,716.11/ Lane-km
EAO: ₱ 5,175,625.00
Allocation: ₱ 147,875,000.00 |
October 15, 2024 |
FY 2024 |
|
310105101053000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310105101053000
Project ID: P00801261MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Taglibi-Tiptipon Rd - Chainage 7000 - Chainage 7610
CW1- Rehabilitation of Paved Road: 1.220 Lane-km
Unit Cost: ₱ 19,774,590.16/ Lane-km
EAO: ₱ 875,000.00
Allocation: ₱ 25,000,000.00 |
October 15, 2024 |
FY 2024 |
|
310105101051000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310105101051000
Project ID: P00801262MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Indanan-Parang-Silangkan Rd - Chainage 11660 - Chainage 12740
CW1- Rehabilitation of Paved Road: 2.160 Lane-km
Unit Cost: ₱ 22,337,962.96/ Lane-km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
October 15, 2024 |
FY 2024 |
|
310105101047000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 310105101047000
Project ID: P00801264MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo Port-Bud Daho-Romadier Rd - Chainage 10450 - Chainage 12450
CW1- Rehabilitation of Paved Road: 4.00 Lane-km
Unit Cost: ₱ 15,269,787.21/ Lane-km CW2- Road Widening: 3.27 Lane-km Unit Cost: ₱ 16,734,205.24
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00 |
October 15, 2024 |
FY 2024 |
|
300221104832000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104832000
Project ID: P00833304MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities Construction of Road, Barangay Ipil, Maimbung, Sulu
CW1- Construction of Concrete Road: 1.460 Lane-km
Unit Cost: ₱ 23,732,876.71/ Lane-km
EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00 |
October 15, 2024 |
FY 2024 |
|
300221104849000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104849000
Project ID: P00833317MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Road, Siratang-Subah Mamah, Languyan, Tawi-Tawi
CW1- Construction of Concrete Road: 1.20 Lane-km
Unit Cost: ₱ 28,875,000.00/ Lane-km
EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00 |
October 15, 2024 |
FY 2024 |
|
300221104850000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104850000
Project ID: P00833318MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Road, Subah Mamah, Lower Siluan Section, Languyan, Tawi-Tawi
CW1- Construction of Concrete Road: 1.525 Lane-km
Unit Cost: ₱ 23,948,431.38/ Lane-km
EAO: ₱ 500,000.00 Excess: ₱ 1,250,000.00
Allocation: ₱ 50,000,000.00 |
October 15, 2024 |
FY 2024 |
|
300215103997000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215103997000
Project ID: P00834831MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Old Luna Logging Road (Phase 1), Barangay Marang-Marang, Languyan, Tawi-Tawi
CW1- Construction of Concrete Road: 1.720 Lane-km
Unit Cost: ₱ 28,052,325.58/ Lane-km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
October 15, 2024 |
FY 2024 |
|
300215104003000 |
June 11, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215104003000
Project ID: P00834837MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation of Sitio Mumang to Sitio Igangan Road Km. 0+000-km. 0+362 Brgy. Tanduh Bagua, Patikul
CW1- Rehabilitation of Paved Road: 0.724 Lane-km
Unit Cost: ₱ 13,328,729.28/ Lane-km
EAO: ₱ 350,000.00
Allocation: ₱ 10,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03554 |
310201101308000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101308000
Project ID: P00800039MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd - K1700 + 291.66 - K1702 + 950.59, K1717 + 917.74 - K1718 + 160.00
CW1- Road Widening: 5.802 Lane-km
Unit Cost: ₱ 29,037,226.75/ Lane-km CW2- ROW Acquisition: 500.00 sq.m. Unit Cost: ₱ 500.00/ sq.m.
EAO: ₱ 6,475,000.00 Excess: ₱ 51,010.37
Allocation: ₱ 185,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03545 |
310201101312000 |
June 18, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101312000
Project ID: P00800041MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1802+127 - K1803+000, K1813+847.37 - K1815+140
CW1- Road Widening: 4.33 Lane-km
Unit Cost: ₱ 23,064,982.68/ Lane-km CW2- ROW Acquisition: 449.00 sq.m. Unit Cost: ₱ 11,135.86/ sq.m.
EAO: ₱ 3,803,625.00 Excess: ₱ 84,603.24
Allocation: ₱ 108,675,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E036000 |
310204101586000 |
June 28, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204101586000
Project ID: P00800805MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte
CW1- Construction of Concrete Bridge: 1,445.31 sq.m.
Unit Cost: ₱ 26,464.91/ sq.m. ROW Acquisition: 819.00 sq.m. Unit Cost: ₱ 12,210.01/ sq.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4XW00129 |
310204102632000 |
June 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102632000
Project ID: P00800807MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Labangan-Pagadian City-Dumalinao By-Pass Road, Package 1, Zamboanga del Sur
CW1- Construction of Concrete Road: 2.00 Lane-Km
Unit Cost: ₱ 19,718,331.75/ Lane-Km CW2- Construction of Concrete Bridge: 294.786 sq.m.
Unit Cost: ₱ 160,419.10/ sq.m. CW3- Construction of Concrete Bridge: 294.786 sq.m.
Unit Cost: ₱ 195,647.11/ sq.m. ROW Acquisition: 665.60 sq.m. Unit Cost: ₱ 15,024.04/ sq.m.
EAO: ₱ 5,600,000.00
Allocation: ₱ 160,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03553 |
310201101315000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101315000
Project ID: P00802654MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd - K1900+640 - K1901+460, K1902+269.99 - K1902+314.98, K1902+346.09 - K1902+422.66
CW1- Road Widening: 1.883 Lane-km
Unit Cost: ₱ 26,576,352.81/ Lane-km ROW Acquisition: 10,528.00 sq.m. Unit Cost: ₱ 284.95/ sq.m.
EAO: ₱ 1,925,000.00 Excess: ₱ 31,727.64
Allocation: ₱ 55,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03567 |
320101111307000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 320101111307000
Project ID: P00820888MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | Construction of Flood Control Structure along Puliran River, Puliran Br. Section Package 1, Sibuco, Zamboanga del Norte CW1- Construction of Flood Mitigation Structure: 520.00 Ln.m.
Unit Cost: ₱ 315,114.65/ Ln.m.
EAO:₱ 5,950,000.00 Excess: ₱ 190,382.52
Allocation: ₱ 170,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03566 |
320102106697000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 320102106697000 Project ID: P00821184MN OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Sibuco River, Sibuco Br. Section Package 2, Sibuco, Zamboanga del Norte
CW1 - Construction of Flood Mitigation Structure: 504.76 Lineal Meters
Unit Cost: ₱ 305,190.96/ Lineal Meters
EAO: ₱ 5,600,000.00 Excess: ₱ 351,809.19
Allocation: ₱ 160,000,000.00 |
October 15, 2024 |
2024 |
WIN4F08250 |
GAA |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800202LZ
UACS : 310201101399000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0631 + 670 - K0632 + 470
Physical Target :
CW1 - Road Widening - 1.596 Lane Km
CW2 - Construction of Drainage Structure along Road - 1595 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0631 + 670 - K0632 + 470
Physical Target :
CW1 - Road Widening - 1.6 Lane Km
CW2 - Construction of Drainage Structure along Road - 678 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2,300.27 Square meters
ROW - Row Acquisition - 3,990 Square meters |
October 15, 2024 |
2024 |
WIN4XY00417 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800373LZ
UACS : 310207100311000
FROM :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0528 + 460 - K0529 + 941
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 3,690 Square meters
TO :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0528 + 460 - K0529 + 941
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 2,373.6 Square meters |
October 15, 2024 |
FY 2024 |
|
300217100272000 |
June 18, 2024 |
Region IX |
Regional Office IX |
UACS No. 300217100272000
Project ID: P00835099MN
Convergence and Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridge (or, roads that traverse multiple LGU jurisdictions)
Construction of Road along NRJ Barangay Camul - NRJ Barangay Lumbayao Package 2, Zamboanga del Norte
CW1- Construction of Concrete Road: 3.7942 Lane-km
Unit Cost: ₱ 15,579,501.76/ Lane-km CW2- Construction of Concrete Bridge: 665.388 sq.m.
Unit Cost: ₱ 129,607.91/ sq.m. CW3- Construction of Gravel Road: 6.9077 Lane-km Unit Cost: ₱ 4,103,928.02/ Lane-km
EAO: ₱ 6,300,000.00
Allocation: ₱ 180,000,000.00 |
October 15, 2024 |
FY 2024 |
WIN4E03608 |
300224100044000 |
July 2, 2024 |
Region IX |
Regional Office IX |
UACS No. 300224100044000
Project ID: P00837280MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Coastal Roads/ Causeway for environmental protection/conservation
Construction of Mampang-Rio Hondo Coastal Road, Zamboanga City (Package 3)
CW1- Construction of Gravel Road: 2.092 Lane-km
Unit Cost: ₱ 37,468,169.25/ Lane-km CW2- Construction of Road Slope Protection Structure: 2,521.853 sq.m.
Unit Cost: ₱ 8,155.06/ sq.m.
EAO: ₱ 1,000,000.00 Excess: ₱ 50,739.52
Allocation: ₱ 100,000,000.00 |
October 15, 2024 |
2024 |
WIN4F08249 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800383LZ
UACS : 310207100316000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 765, K0499 + 865
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0495 + 928, k0496 + 984, k0499 + 642
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
CW2 - Construction of Road Slope Protection Structure - 281.81 Square meters |
October 15, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800387LZ
UACS : 310207100312000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement Primary Roads - Daang Maharlika (LZ) - K0491 + 635, K0491 + 735
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement Primary Roads - Daang Maharlika (LZ) - K0483 + 713, K0490 + 072
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Construction of Road Slope Protection Structure - 233.77 Square meters |
October 15, 2024 |
2024 |
WIN4F08247 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00801611LZ
UACS : 310204102834000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 19, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 3.72 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 19, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 670.02 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1795.89 |
October 15, 2024 |
FY 2024 |
WIN4E03565 |
310204102630000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102630000
Project ID: P00801296MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Construction of Bungiao-Quiniput Road, Zamboanga City, Phase 2
CW1- Construction of Concrete Road: 4.21 Lane-km
Unit Cost: ₱ 21,288,810.82/ Lane-km ROW Acquisition: 54,773.00 sq.m. Unit Cost: ₱ 124.63/ sq.m.
EAO: ₱ 3,500,000.00 Excess: ₱ 47,877.22
Allocation: ₱ 100,000,000.00 |
October 14, 2024 |
2024 |
WIN4XY00414 |
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00836901LZ
UACS : 300203102635000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Daet - Vinzons leading to Mantigbi - Sula - Sabang - Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 0.059 Lane Km
CW2 - Construction of Road Slope Protection Structure - 476.46 Square Meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Daet - Vinzons leading to Mantigbi - Sula - Sabang - Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 0.0686 Lane Km
CW2 - Construction of Road Slope Protection Structure - 394.491 Square Meters
|
October 14, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00800183LZ
UACS : 310202101694000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Catanduanes Circumferential Road - K0198 + 953 - K0201 + 550, K0202 + 361
Physical Target :
CW1 - Road Widening - 0.178 Lane km
CW2 - Construction of Road Slope Protection Structure - 990.00 Square meter
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Catanduanes Circumferential Road - K0198 + 224 - K0198 + 246, K0198 + 390 - K0198 + 390 - K0198 + 422, K0198 + 982 - K0199 + 019, K0202 + 300 - K0202 + 361
Physical Target :
CW1 - Road Widening - 0.178 Lane km
CW2 - Construction of Road Slope Protection Structure - 337.60 Square meter |
October 14, 2024 |
2024 |
WIN4F08239 |
GAA 2024 |
January 24, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800185LZ
UACS : 310202101698000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 159 - K0009 + 263
Physical Target :
CW1 - Road Widening - 0.208 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 076 - K0009 + 091
Physical Target :
CW1 - Road Widening - 0.03 Lane Km
CW2 - Construction of Drainage Structure along Road - 3 Lineal meters
CW3 - Road Safety : Street Lightning - 2 Number of Units |
October 14, 2024 |
2024 |
WIN4XY00430 |
GAA 2024 |
December 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800254LZ
UACS : 31020210696000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Masbate - Cataingan - Placer Rd - K0002 + 502.80 - K0003 + 918, K0003 + 963.60 - K0003 + 1316
Physical Target :
CW1 - Road Widening 2.918 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Masbate - Cataingan - Placer Rd - K0002 + 503 - K0003 + 275
Physical Target :
CW1 - Road Widening 0.984 Lane Km
CW2 - Construction of Drainage Structure along Road - 990 Lineal meters
CW3 - Road Safety : Street Lightning - 31 Number of Units |
October 14, 2024 |
2024 |
WIN4XY00418 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800255LZ
UACS : 310202101534000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Milagros Rd - K0002 + (-711) - K0003 + 255
Physical Target :
CW1 - Road Widening - 3.92 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Milagros Rd - K0002 + 925 - K0003 + 250, K0005 + 894 - K0006 + 115 Rd - K0002 + 503 - K0003 + 275
Physical Target :
CW1 - Road Widening - 1.092 Lane Km
CW2 - Cosntruction of Drainage Structure along Road - 1092 Lineal meters
CW3 - Road Safety : Street Lightning - 54 Number of Units
Physical Target :
CW1 - Road Widening - 3.92 Lane Km
|
October 14, 2024 |
2024 |
WIN4F08252 |
GAA FY 2024 |
December 29, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO2: Protect Lives and Properties against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Baybay City Breakwater, Poblacion, Baybay City, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 109.238 M
Structure: 806.703 Lineal Meters
EAO P 3.962 M
Total P 113.200 M
AS MODIFIED:
Construction of Baybay City Breakwater, Poblacion, Baybay City, Leyte
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 109.238 M
Structure: 143.5 Lineal Meters
EAO P 3.962 M
Total P 113.200 M
|
October 14, 2024 |
2024 |
WIN4XY00428 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802547LZ
UACS : 310105101166000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 453 - K0039 + 795
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.684 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Tawad - Balud Rd - K0039 + 453 - K0039 + 606
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.306 Lane Km
CW2 - Construction of Drainage Structure along Road - 306 Lineal meters
CW3 - Road Safety : Street Lightning - 16 Number of Units |
October 14, 2024 |
2024 |
WIN4F08238 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802551LZ
UACS : 310105101162000
FROM :
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 075.50 - K0036 + 250
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.349 Lane Km
TO :
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Jct Milagros - Baleno - Lagta Rd - K0036 + 120 - K0036 + 188
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.136 Lane Km
CW2 - Construction of Drainage Structure along Road - 136 Lineal meters
CW3 - Road Safety : Street Lightning - 8 Number of Units |
October 14, 2024 |
2024 |
WIN4XY00388 |
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Sur 4th District Engineering Office |
Project ID : P00823636LZ
UACS : 320101111015000
FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Mitigation Structure along Kulasi River (Upstream - Dahat Section), Package 1, Lagonoy, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 1,032.21 Lineal Meters
TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Mitigation Structure along Kulasi River (Upstream - Dahat Section), Package 1, Lagonoy, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 632 Lineal Meters |
October 14, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00832295LZ
UACS : 300204101525000
FROM ;
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines
Physical Target :
CW1 - Construction of Concrete Road - 6.667 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Construction of Road leading to New Camarines Sur Iconic Capitol Building and Business Centers, Brgy. Cadlan, Pili, Camarines
Physical Target :
CW1 - Construction of Concrete Road - 3.127 Lane Km
CW2 - Construction of Drainage Structure along Road - 824.54 Lineal meters
CW3 - Construction of Slope Protection Structure - 6708.41 Square meters |
October 14, 2024 |
2024 |
WIN4XY00429 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00837423LZ
UACS : 300214101181000
FROM :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 225.60 - K0099 + 925
Physical Target :
CW1 - Rehabilitation of Paved Road - 1.399 Lane Km
TO :
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lagta-Crossing Malinta Rd - K0099 + 235 - K0099 + 520
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.57 Lane Km
CW2 - Construction of Drainage Structure along Road - 576 Lineal meters
CW3 - Road Safety : Street Lightning - 30 Number of Units |
October 14, 2024 |
2024 |
WIN4XY00387 |
GAA 202 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00842625LZ
UACS : 300215103855000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay
Physical Target :
CW1 - Construction of Concrete Road - 4.64 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Marcial O. Rañola - Balanac, Guinobatan, Albay
Physical Target :
CW1 - Construction of Concrete Road - 3.096 Lane Km
CW2 - Construction of Gravel Road 0.0729 Lane Km |
October 14, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00846331LZ
UACS : 300226109804000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buldings
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Buildings of TESDA Provincial Training Center Building, Ligao City, Albay (Phase 2)
Physical Target :
CW1 - Construction of Multi Purpose Building - 2 Number of Buldings |
October 14, 2024 |
FY 2024 |
|
310111100640000 |
May 13, 2024 |
Region IX |
Regional Office IX |
UACS No. 310111100640000
Project ID: P00800392MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads
Seit-Tayungan-Camp Andres Rd - (S00020SL) K38+000 - K39+830, K39+830 - K40+510
CW1- Construction of Drainage Structure along Road: 4,960.00 ln.m.
Unit Cost: ₱ 14,008.06/ ln.m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00 |
October 11, 2024 |
2024 |
WIN4XY00207 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo - Bugallon Rd - K0153+387 - K0153+944 |
October 11, 2024 |
CY 2024 |
WIN4F08126 |
CAA No. 2024-04-0035 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 310102101679000
Project ID.: P00801687LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Gen Santos Ave – K0025 + (-879) – K0025 + (-830), K0025 + (-830) – K0025 +
(-786), K0025 + (-786) – K0025 + (-528), K0025 + (-450) – K0025 + (-320)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.672 lane km
Unit Cost (P’000) = P 7,737.919/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00
As Modified
UACS No. 310102101679000
Project ID.: P00801687LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
General Santos Ave – K0025 + 480 – K0025 + 670 (Westbound), K0025 + 632 – K0025 +
668 (Eastbound)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.226 lane km
Unit Cost (P’000) = P 23,008.318/ lane km
Allocation = P 5,199,880.00
EAO = P 106,120.00
Total = P 5,306,000,00
Bar Code #WIN4F08126
|
October 11, 2024 |
CY 2024 |
WIN4XY00365 |
CAA No. 2024-04-0030 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Gen Santos Ave – K0025 + (-180) – K0025 + (-060)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 10,722.833/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00
As Modified
As per GAA/Original
UACS No. 310102101678000
Project ID.: P00801686LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
General Santos Ave – K0025 + 480 – K0025 + 632
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.240 lane km
Unit Cost = P 16,930.789/ lane km
Allocation = P 2,573, 480.00
EAO = P 52,520.00
Total = P 2,626,000,00
Bar Code #WIN4XY00365
|
October 11, 2024 |
CY 2024 |
WIN4F08125 |
CAA No. 2024-04-0030 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Dela Paz, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 320 linear meters
Unit Cost (P’000) = P 36.75/linear meters
Allocation (P’000)= P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00
As Modified
As per GAA/Original
UACS No. 320101111513000
Project ID.: P00824584LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Drainage System at Sta. Maria and Vicinity, Brgy. Santolan, Pasig City
Physical Target: CW1 = Rehabilitation/ Major Repair of Drainage Strcucture – 188 linear meters
CW2 = Rehabilitation of Paved Road – 0.188 lane km
Unit Cost (P’000) = P 47.11/linear meters
= P 15,441.86/ lane km
Estimated Cost (P’000) = P 8,856.93
(P’000) = P 2,903.07
EAO (P’000) = P 240.00
Total (P’000) = P 12,000,00
Bar Code #WIN4F08125
|
October 10, 2024 |
2024 |
WIN4XY00407 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800891LZ
UACS : 310107100613000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 522.4 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 720 - K0520 + 815
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 127.32 Square meters
|
October 10, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Sur 5th District Engineering Office |
Project ID : P00800897LZ
UACS : 310109101589000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0453 + 980 - K0454 + 042
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 200 Square meters
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Albay Diversion Rd - K0444 + 255 - K0444 + 305
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 344.2 Square meters |
October 10, 2024 |
2024 |
WIN4XY00408 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805162LZ
UACS : 310101101257000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570
Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 1.019 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570
Physical Target :
CW1 - Preventive Maintenance of Road - Concrete Reblocking - 0.699 Lane Km |
October 10, 2024 |
2024 |
300207101112000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Regional Office II |
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Road Network (Training Ground), Mt. Leson, San Vicente, Sta. Ana, Cagayan,
Phase III
|
October 9, 2024 |
FY 2024 GAA |
P00834662MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1722 + 596
Physical Target:
CW1: 9,005.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Safety: Pavement Markings)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices along Jct. Maniklin-Gov. Generoso Rd - K1744 + (-422) - K1772 + 596
Physical Target:
CW1: 29,116.00 lineal meters (Road Safety: Pavement Markings)
CW2: 170.00 number of units (Road Safety: Roadway Lighting)
CW3: 341.00 number of signs (Road Safety: Road Signs)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 21,017,270.26 (Road Safety: Pavement Markings)
CW2: P 18,585,245.35 (Road Safety: Roadway Lighting)
CW2: P 9,397,484.39 (Road Safety: Road Signs)
EAO: P 1,000,000.00 |
October 8, 2024 |
2024 |
310204102803000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Regional Office II |
Network Development - Construction of By-Pass and Diversion Roads - Construction of Tuguegarao West Diversion Road (Jct. Carig-Linao-Atulayan-Bagay-Buntun) Cagayan, Package 4 |
October 8, 2024 |
2024 |
310106101100000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - K0483+550- K0484+020 |
October 8, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800390LZ
UACS : 310207100318000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0508 + 778, K0508 + 878
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0502 + 575, K0509 + 805
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersection |
October 8, 2024 |
2024 |
310203100798000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 1434
TO:
Network Development - Road Widening - Tertiary Roads - CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 000 - Chainage 297 |
October 8, 2024 |
2024 |
300215104458000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of La Suerte- Nabbialan- Cordova Road, Amulung, Cagayan (Phase V)
|
October 8, 2024 |
2024 |
300215104470000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Maguirig, Solana, Cagayan |
October 8, 2024 |
2024 |
WIN4XY00411 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800400LZ
UACS :3102071003240000
FROM :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 979, K0638 + 788 K0639 + 182
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 3282.7 Square meters
TO :
ORGANIZATIONAL OUTCOME 1- Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0636 + 777 - K0636 + 983
Physical Target :
CW1 - Off-Carriageway Improvement - Paving of Shoulders - 1236 Square meters
CW2 - Construction of Road Slope Protection Structure - 1407.85 Square meters |
October 8, 2024 |
FY 2024 GAA |
WIN4XW00156 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + 195 - K1459 + 000, K1459+ 310 - K1459 + 535,
K1460 + 001 - K1461 + 640, K1462 + 000 - K1462 + 705, K1463 + 000 - K1464 + 197, Davao del Norte
Physical Target:
CW1: 10.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Diversion Road, K1458 + (-573) - K1456 + 135,
K1461 + 090 - K1461 + 115, Davao del Norte
Physical Target:
CW1: 3.589 lane km (Road Widening)
CW2: 3,589.00 lineal meters (Construction of Drainage Structure along Road)
CW3: 49.00 no. of units (Road Safety: Roadway Lighting)
ROW: 909.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 58,649,636.00 (Road Widening)
CW2: P 20,683,329.00 (Construction of Drainage Structure along Road)
CW3: P 9,212,035.00 (Road Safety: Roadway Lighting)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
October 8, 2024 |
2024 |
320101111776000 |
FY 2024 GAA |
January 2, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 1+330), Cabatuan, Isabela
TO:
FROM:
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Flood Control Project, Barangay Rang - Ay (Sta. 0+000 - Sta. 0+674), Cabatuan, Isabela |
October 7, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800380LZ
UACS : 31020710031400
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 655, K0498 + 755
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0498 + 759, K0500 + 655.50
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Constructions of Drainage Structure along Road - 220 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 240 Square meters |
October 7, 2024 |
2024 |
WIN4XY00409 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800382LZ
UACS : 310207100315000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 390, K0499 + 490
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0499 + 230, K0499 + 381
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 2 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 399 Lineal meters |
October 7, 2024 |
2024 |
WIN4F08211 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800389LZ
UACS : 310207100313000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0496 + 615, K0496 + 715, K0497 + 914
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0489 + 695, K0490 + 853, K0490 + 914
Physical Target :
CW1 - Off-Carriageway Improvement - Flaring of Intersections/ Improvement of Intersections - 3 Number of Intersections
CW2 - Construction of Drainage Structure along Road - 305.82 Lineal meters |
October 4, 2024 |
2024 |
WIN4F08209 |
SR2024-01- 007243 |
January 31, 2024 |
Region VIII |
Southern Leyte Sub-District Engineering Office |
Convergence and Special Support Program
Basic Infrastruture Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Brgy. Dayanog Road, St. Bernard, Southern Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 9.900 M
0.197 Lane Km
EAO P .100 M
Total P 10.00 M
AS MODIFIED:
Construction of Brgy. Dayanog Road, San Juan, Southern Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 6.26864138 M
0.664 Lane Km
CW2- Construction of Drainage Structure P 2.31241121 M
along Road: 336.00 Lineal Meters
CW3- Construction of Road Slope Protection: P 1.31894741 M
267.36 Square Meters
EAO P .100 M
Total P 10.00 M
|
October 4, 2024 |
2024 |
WIN4XY00410 |
GAA FY 2024 |
March 21, 2024 |
Region VIII |
Eastern Samar District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
AS PER GAA/ORIGINAL:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 4.900 M
0.400 Lane Km
EAO P .100 M
Total P 5.00 M
AS MODIFIED:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 2.02132236 M
0.0556 Lane Km
CW2- Construction of Road Slope : P 2.87867764 M
Protection Structure 128.42 Square Meters
EAO P .100 M
Total P 5.00 M
|
October 4, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 4.950 M
Purpose Building: 1.00 Building
EAO P .50 M
Total P 5.00 M
AS MODIFIED:
Rehabilitation of Multi-Purpose Building, Barangay 23, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 1.585 M
Purpose Building: 1.00 Building
EAO P .50 M
EXC P 3.365
Total P 5.00 M
|
October 4, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Buildings and Other Structures – Multipurpose/ Facilities – National Building Program
AS PER GAA/ORIGINAL:
Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 4.825 M
Purpose Building: 1.00 Building
EAO P .175 M
Total P 5.00 M
AS MODIFIED:
Repair/improvement of Multipurpose Building, DBM RO VIII, Tacloban City
Physical Target: Allocation:
CW1- Rehabilitation/Major Repair of Multi P 3.225 M
Purpose Building: 1.00 Building
EAO P .175 M
EXC P 1.6 M
Total P 5.00 M
|
October 4, 2024 |
2024 |
WIN4F08210 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Road
Roman Expressway - K0102+173 - K0102+825 |
October 4, 2024 |
2024 |
WIN4XY00400 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija |
September 27, 2024 |
2024 |
WIN4XY00389 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Bridge at Barangay Wawa, Pilar, Bataan |
September 27, 2024 |
2024 |
WIN4F08116 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 3rd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Along Eastern Bulacan Rd - K0075+416 - K0077+783, Doña Remedios Trinidad, Bulacan |
September 25, 2024 |
2024 |
P00800059MN |
GAA2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800059MN
310202101759000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Secondary Road
FROM:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 +736
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.91 Lane Km
Allocation:
CW1: Php 39,200,000.00
EAO: Php 800,000.00
TO:
Barandias-Dominorog Rd - K1610 + (-219) - K1610 + 551
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.54 Lane Km
CW2- 641.6 Linear Meter
Allocation:
CW1: Php 32,880,294.27
CW2: Php 6,319,705.73
EAO: Php 800,000.00 |
September 25, 2024 |
2024 |
P00800063MN |
GAA2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800063MN
310203100884000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Tertiary Roads
FROM:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 +200
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.70 Lane Km
Allocation:
CW1: Php 33,138,700.00
EAO: Php 676,300.00
TO:
Jct SH-Aglayan-Alanib-Ticlaan Road (Ticlaan-Paganan Sect) - K1515 + 320 - K1516 + 720
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.80 Lane Km
CW2- 553.94 Square Meter
Allocation:
CW1: Php 26,413,150.00
CW2: Php 6,725,550.00
EAO: Php 676,300.00 |
September 24, 2024 |
2024 |
P00803857MN |
SR2024-01-003689 |
January 29, 2024 |
Region X |
Regional Office X |
P00803857MN
310204102715000
OO1: Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.00 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Construction of Bypass Road Extension (Sugod-Kahaponan Section), Bukidnon, Package 10
Type of Work:
CW1- Construction of Concrete Bridge
CW2- Off-Carriageway Improvement: Paving of Shoulders
ROW- ROW Acquisition
Physical Target:
CW1-2,361.15 Square meters
CW2-15,360.00 Square meters
ROW-5,000.00 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 115,800,000.00
CW2: Php 67,550,000.00
ROW: Php 9,650,000.00
EAO: Php 7,000,000.00 |
September 24, 2024 |
2024 |
P00803888MN |
SR2024-03-013788 |
March 20, 2024 |
Region XII |
Regional Office XII |
Contract ID: 24M00217
Project Name: Saldua Bridge in Polomolok, South Cotabato
Type of Work: Replacement of Bridge
Physical Target
From: 333.900 Square meters
To: 477.0 Square meters |
September 23, 2024 |
2024 |
300219102208000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 3, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102201000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dimaluade Flood Control Structure, Section 1, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102209000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Bucal Norte Flood Control Structure, Section 4, Dinapigue, Isabela |
September 23, 2024 |
2024 |
300219102136000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Dedekkel Flood Control Structure, Section 1, Dinapigue, Isabela |
September 20, 2024 |
CY 2024 |
WIN4F08181 |
UACS No. 300225101728000 |
March 20, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Makati City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 796 lineal meters
Unit Cost (P’000) = P 18.6558/lineal meters
Allocation (P’000) = P 14,850.000
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
As Modified
UACS No. 300225101728000
Project ID.: P00845860LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Rehabilitation of Drainage System along C-5 Service Road (Phase II), Brgy. East Rembo, Taguig City
Physical Target: CW1 = Rehabilitation/Major Repair of Drainage Structure along Road – 515 lineal meters
CW2 = Rehabilitation of Paved Road = 1.03 lane km
Unit Cost (P’000) = P 23.5933/lineal meters
= P 2,601.154/lane km
Allocation (P’000)= P 12,150.539
P 2,679.188
Excess (P’000) = P 20.272
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4F08181
|
September 20, 2024 |
CY 2024 |
WIN4XY00396 |
UACS No. 300221104954000 |
March 20, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Makati City
Physical Target: CW1 = Rehabilitation of Paved Road – 1.4 lane km
Unit Cost (P’000) = P 10,607.142/lane km
Allocation (P’000)= P 14,850.00
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
As Modified
UACS No. 300221104954000
Project ID.: P00844960LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Xyris Street including Slope Protection of Xyris Creek, Brgy. Rizal, Taguig City
Physical Target: CW1 = Rehabilitation of Paved Road – 0.571 lane km
CW2 = Rehabilitation/Major Repair of Slope Protection Structure = 2,568.87 sqm.
Unit Cost (P’000) = P 15,843.850/lane km
= P 2.258/sqm.
Estimated Cost (P’000)= P 9,046.838
P 5,800.578
Excess (P’000) = P 2.583
EAO (P’000) = P 150.00
Total (P’000) = P 15,000,00
Bar Code #WIN4XY00396
|
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837418LZ
UACS :
FROM :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550
Physical Target :
CW1 - Rehabilitation of Paved Road - 4.542 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km
TO :
CONVERGENCE AND SPECIAL PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0514 + 981 - K0515 + 248, K0524 + 480 - K0525 + 000, K0533 + 600 - K0534 + 300, K0536 + 190 - K0536 + 500, K0537 + 243 - K0537 + 840, K0537 + 847 - K0538 + 550
Physical Target :
CW1 - Rehabilitation of Paved Road - 5.574 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay - 1.032 Lane Km
|
September 20, 2024 |
2024 |
WIN4F08182 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00820435LZ
UACS : 320101111025000
FROM :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II, San Antonio, Labo, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 244.14 Lineal Meters
TO :
OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilo II and Brgy. San Antonio, Labo, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 227.26 Lineal Meters |
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00821005LZ
UACS : 320101111049000
FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog 11, San Antonio, Labo (Phase II), Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 137.49 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Matogdon River Flood Mitigation Structure in Brgy. Mabilog II and Brgy. San Antonio, Labo (Phase II), Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 143.88 Lineal meters
|
September 20, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00832311LZ
UACS : 300207101061000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur
Physical Target :
CW1 - Construction of Other Facilities - 1 Number of Facilities
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction/ Improvement of Various Infrastructure Projects 9th Infantry (Spear) Division, Philippine Army, Cap Elias Angeles, San Jose, Pili, Camarines Sur
Physical Target :
CW1 - Construction of Other Facilities - 23 Number of Facilities |
September 19, 2024 |
2024 |
WIN4XY00406 |
SR2024-01-002054 |
January 24, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL:
Palo – Pastrana – Sta Fe By-Pass Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 144.750 M
15.00 Lane Km
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Palo – Pastrana – Sta Fe By-Pass Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 107.97176206 M
4.20 Lane Km
CW2- Construction of Road Slope Protection P 36.77823794 M
Structure: 7,067.95 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 19, 2024 |
2024 |
WIN4XW00153 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
"From:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-260) - K0249 + 100,
Loakan Rd - K0246 + 323 - K0246 + 940, K0249 + 875 - K0250 + 096, K0250 + 380 - K0250 + 842,
Magsaysay Ave. (Trinidad Rd) - K0251 + (-120) - K0251 + 180, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 34,
Lt Tacay Rd - K0308 + 000 - K0308 + 400,
South Drive - K0251 + 120 - K0251 + 860,
Harrison Rd No 1 (S04713LZ) - Chainage 360 - Chainage 780, (S04714LZ) Chainage 0 - Chainage 780,
Legarda Rd - K0251 + (-160) - K0251 + 080;
Type of Work:
Road Safety: Solar / Reflectorized Pavement Studs;
Physical Target:
2761 Number of Units;
Allocation:
Php 45,000,000"
"To:
Installation of Road Safety Devices along
Govt Ctr Cut-Off Rd - K0249 + (-291) - K0249 + 284,
Loakan Rd - K0245 + (-162) - K0250 + 842
Magsaysay Ave. (Trinidad Rd) - K0251 + (-463) - K0252 + 444, (S00485LZ) Chainage 0 - Chainage 195,
Magsaysay Ave (Trinidad Rd) West Service Rd (S00486LZ) - Chainage 0 - Chainage 244,
Lt Tacay Rd - K0308 + (-599) - K0308 + 754,
South Drive - K0251 + (-295) - K0252 + 755,
Harrison Rd No 1 (S04713LZ) - Chainage 0 - Chainage 807, (S04714LZ) Chainage 0 - Chainage 807,
Legarda Rd - K0251 + (-360) - K0251 + 980;
Type of Work:
CW1: Road Safety: Roadway Lighting
CW2: Road Safety: Pavement markings;
Physical Target:
CW1: 124 Number of Units
CW2: 15,496 Lineal meters;
Allocation:
Php 45,000,000"
|
September 18, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo-Bugallon Rd - K0164+149 - K0164+930, K0232+000 - K0234+026, K0234+128 - K0235+000, K0243+000 - K0244+000 |
September 18, 2024 |
2024 |
WIN4XY00400 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Sto. Rosario - Carmen Road, Zaragoza By-pass, Package 1, Nueva Ecija |
September 18, 2024 |
2024 |
WIN4XY00399 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Arayat-Magalang Rd - K0095+000 - K0097+308 |
September 18, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads
Lubao Div Rd - K0084+250 - K0084+447.84, K0084+499.84 - K0084+627.84, K0084+676.74 - K0084+760, K0084+780 - K0085+238 |
September 18, 2024 |
2024 |
WIN4XY00392 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0040+726 - K0040+970 |
September 18, 2024 |
2024 |
WIN4XY00398 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0044+500 - K0044+563, K0047+770 - K0047+860, K0047+885 - K0047+945, K0048+000 - K0048+090 |
September 18, 2024 |
2024 |
WIN4XY00401 |
SR2024-01-002085 |
January 27, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 606 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Bagahupi - Babatngon - Sta.Cruz-Barugo - Carigara Rd. (S00064LT) K0924+664 - K0924+800, K0925+154 - K0925+220, K0925+1240-K0925+1280
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 1.749361 M
Paving of Shoulders: 726 Square Meters
CW2- Construction of Road Slope Protection P 143.000639 M
Structure: 5,611 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00402 |
SR2024-01-004759 |
January 29, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+840 - K0810+948
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 4.328339 M
Paving of Shoulders: 216 Square Meters
CW2- Construction of Road Slope Protection P 140.421661 M
Structure: 6,026 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00391 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0085+065 - K0085+758, K0086+331 - K0087+076 |
September 18, 2024 |
2024 |
WIN4XY00403 |
SR2024-01-004759 |
January 29, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0810+751 - K0810+840
Physical Target: Allocation:
CW1- Off-Carriageway Improvement: P 144.750 M
Paving of Shoulders: 267 Square Meters
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Road - K0812+312 - K0812+392
Physical Target: Allocation:
CW1- Off-Carriageway Improvement P 11.474981 M
Paving of Shoulders: 240 Square Meters
CW2- Construction of Road Slope Protection P 133.275019 M
Structure: 5,744 Square Meters
EAO P 5.250 M
Total P 150.00 M
|
September 18, 2024 |
2024 |
WIN4XY00390 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road in Baliuag, Bulacan (Phase 1) |
September 18, 2024 |
2024 |
WIN4XY00395 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
Construction of Bypass/Alternate/Diversion Road - Baliuag Diversion Road, Baliuag, Bulacan (Phase 2) |
September 18, 2024 |
FY 2024 GAA |
P00834654MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1564 + (-478) - K1593 + 057, Davao del Sur
Physical Target:
CW1: 29,696.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Safety: Pavement Markings)
EAO: P 1,750,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1556 + 700 - K1556 + 885,
K1557 + 761 - K1559 + 201, K1560 + 002 - K1560 + 917, Davao del Sur
Physical Target:
CW1: 2,551.020 lineal meters (Road Safety: Pavement Markings)
CW2: 261.00 no. of road signs (Road Safety: Roadway Lighting)
CW3: 2,910.72 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 5,524,371.00 (Road Safety: Pavement Markings)
CW2: P 24,309,840.00 (Road Safety: Roadway Lighting)
CW3: P 18,415,790.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 1,750,000.00 |