Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 13, 2025 GAA 2025 P00909448MN SR2025-02-003058 February 3, 2025 Region XII Regional Office XII
Contract ID:25M00175
UACS: 310202101892000
Amount: ₱ 130,000,000.00
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads

Project Name:
From: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 964 - K1645 + 062
To: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 1149 - K1645 + 057

Type of Work/ Physical Target:
From: CW1: Road Widening = 4.394 Lane Km
To: CW1: Road Widening = 3.956 Lane Km
CW2: Construction of Road Slope Protection Structure = 2,620.00 Square meters
CW3: Construction of Drainage Structure along Road = 2,886.00 lineal meters



June 13, 2025 GAA 2025 P00909163MN SR2025-02-002869 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00064
UACS: 310110100594000
Amount: ₱ 71,127,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 662
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 477
Type of Work: Construction of Drainage Structure along Road

Physical Target:
From: 2,371 Lineal meters
To: 2,186 Lineal meters

June 13, 2025 GAA 2025 P00920361MN SR2025-02-000300 February 1, 2025 Region XII Regional Office XII
Contract ID:
UACS: 320102107688000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase II, Barangay Ugalingan, Carmen, Cotabato

Type of Work: Construction of Flood Mitigation Structure

Physical Target:
From: 683.700 Lineal meters
To: 652.5 Lineal meters


June 13, 2025 GAA 2025 P00920362MN SR2025-02-000329 February 1, 2025 Region XII Regional Office XII
Contract ID:25M00007
UACS No.: 320102107689000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase III, Barangay Ugalingan, Carmen, Cotabato

Type of Work: Construction of Flood Mitigation Structure


Physical Target:
From: 683.700 Lineal meters
To: 634.000 Lineal meters

June 11, 2025 2025 SR2025-03-009235 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0764 + 400 - K0764 + 906

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,012 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 978 - K0762 + 137, K0762 + 755 - K0763 + 140, K0764 + 700 - K0765 + 050

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,180 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M
June 11, 2025 2025 SR2025-03-009211 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 936

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,872 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 978

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,845.40 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M
June 11, 2025 2025 SR2025-02-002360 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 000 - K0766 + 000

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,004 Lineal Meters
EAO P 2.277765M
Total P 65.079 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 050 - K0766 + 036, K0766 + 366 - K0766 + 720, K0770 + 365 - K0770 + 690, K0770 + 740 - K0770 + 860, K0772 + 179 - K0772 + 300

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,165 Lineal Meters
EAO P 2.277765M
Total P 65.079 M

June 9, 2025 2025 WIN5XY00506 SR2025-02-002968 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 700, K0866 + 700 - K0866 + 795, K0866 + 838 - K0866 + 909, K0866 + 1005 - K0867 + 302, K0867 + 302 - K0868 + 000, K0868 + 000 - K0869 + 044, K0869 + 044 - K0869 + 130, K0869 + 130 - K0869 + 793

Physical Target: Allocation:
CW1- Road Widening P 139.611375 M
8.355 Lane Km
EAO P 5.063625 M
Total P 144.675 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 795, K0866 + 838 - K0866 + 893, K0866 + 1005 - K0868 + 560

Physical Target: Allocation:
CW1- Road Widening P 76.78632325 M
5.966 Lane Km
CW2- Construction of Road Slope Protection P 62.82505175 M
Structure: 9,881.07 Square Meters
EAO P 5.063625 M
Total P 144.675 M
June 9, 2025 2025 WIN5XY00500 SR2025-03-009668 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 971

Physical Target: Allocation:
CW1- Road Widening P 14.728795 M
0.920 Lane Km
EAO P 0.534205 M
Total P 15.263 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 835

Physical Target: Allocation:
CW1- Road Widening P 8.51654151 M
0.648 Lane Km
CW2- Construction of Road Slope Protection P 6.21225349 M
Structure: 760.80 Square Meters
EAO P 0.534205 M
Total P 15.263 M
June 5, 2025 FY 2025 GAA P00901444MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00901444MN (Regional Office XI_01)
UACS No. 310101101790000
Project ID: P00901444MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1535 + 500 - K1536 + 560, K1436 + 753 - K1537 + 200
Physical Target:
CW1: 5.880 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1540 + 123 - K1541 + 163,
K1541 + 767 - K1542 + 838, K1542 + 941 - K1543 + 130, Davao del Sur
Physical Target:
CW1: 9.488 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
June 5, 2025 FY 2025 GAA P00901453MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00901453MN (Regional Office XI_02)
UACS No. 310101101805000
Project ID: P00901453MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1561 + 000 - K1562 + 410
Physical Target:
CW1: 5.680 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1560 + 746 - K1561 + 686
Physical Target:
CW1: 5.640 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 5, 2025 FY 2025 GAA P00909742MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00909742MN (Regional Office XI_03)
UACS No. 310101101797000
Project ID: P00909742MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1535 + 886 - K1535 + 034
Physical Target:
CW1: 2.160 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1534 + 886 - K1535 + 034
Physical Target:
CW1: 2.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00
June 5, 2025 FY 2025 GAA P00935251MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00935251MN (Regional Office XI_04)
UACS No. 300214101671000
Project ID: P00935251MN

MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1382 + 308 - K1384 + 352
Physical Target:
CW1: 4.070 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1403 + 897 - K1405 + 713
Physical Target:
CW1: 5.475 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00
June 5, 2025 FY 2025 GAA P00935179MN FY 2025 GAA RA 12116 January 1, 2024 Region XI Davao Oriental 1st District Engineering Office
P00935179MN (Davao Oriental 1st District Engineering Office_01)
UACS No. 300214102148000
Project ID: P00935179MN

MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1648 + 350 - K1649 + 350
Physical Target:
CW1: 992.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings)


TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1657 + 000 - K1658 + 703
Physical Target:
CW1: 1,702.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings)
June 5, 2025 CY 2024 WIN4F08103 UACS No. 300105201299000 July 10, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300105201299000
Project ID.: P00855193LZ

Local Program

Buildings and Other Structures – Multipurpose/Facilities – National Building Program

Retrofitting of NTC Hostel and Vertical Expansion, NTC Agham Road, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00

As Modified
As per GAA/Original

Local Program

Buildings and Other Structures – Multipurpose/Facilities – National Building Program

Retrofitting of NTC Hostel and Vertical Expansion, National Telecommunications Commission, Senator Miriam P. Defensor Santiago Avenue, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
Bar Code#WIN4F08103
June 5, 2025 2025 WIN5F08553 SR2025-04-012872 April 22, 2025 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310103101726000
Project ID.: P00900368LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 949.00 – K0007 + 421.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 2.220 lane km
Unit Cost (P’000) = P 21,734.23/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 473.00 – K0007 + 945.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.888 lane km
Unit Cost (P’000) = P 25,556.14/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00
WIN5F08553
June 5, 2025 2025 WIN5F08572 SR2025-03-011164 March 27, 2025 National Capital Region South Manila District Engineering Office
As per GAA/Original
UACS No. 310303102045000
Project ID.: P00900759LZ
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B03377LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B01348LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00
WIN5F08572
June 5, 2025 FY 2025 P00909522MN SR2025-03-009268 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00051
UACS: 310101101811000
Amount: ₱ 200,000,000.00

Project Name:
From:Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 000 - K1745 + 550
To: Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 789 - K1741 + 279, K1742 + 333 – K1743 + 233

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
From: 33.486 Lane Km
To: 8.580 Lane Km
June 5, 2025 FY 2025 P00920354MN SR2025-02-000262 February 1, 2025 Region XII Regional Office XII
Contract ID:25M00183
UACS Number: 320102107681000
Amount: ₱ 100,000,000.00
Project Name: Construction of Concrete Revetment, Lower Klinan-Mabuhay (Silway River Basin), Barangay Mabuhay, General Santos City, South Cotabato
Type of Work: Construction of Revetment

Physical Target:
From: 635.238 Lineal meters
To: 340.000 Lineal meters


June 5, 2025 FY 2025 P00936625MN GAA 2025 January 1, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID:25MB0044
UACS: 300226123301000
Amount: 5,000,000.00

Project Name:
From: Construction of Multi-Purpose Building (Covered Court), Polo Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato
To: Construction of Multi-Purpose Building (Covered Court), Polomolok Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato

Type of Work: Construction of Multi-Purpose Building
Physical target: 1 Number of Buildings
June 4, 2025 2025 SR2025-03-009255 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Palo- Carigara - Ormoc Rd - K0919 + 205- K0926 + 800, K0927 + 221 - K0927 + 600

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.808 Lane Km
EAO P 14.00 M
Total P 400.00 M

AS MODIFIED:

Palo- Carigara - Ormoc Rd - K0919 + 205 - K0923 + 000, K0926 + 000 - K0929 + 980

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.166 Lane Km
EAO P 14.00 M
Total P 400.00 M
June 4, 2025 2025 SR2025-02-001487 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 + 865 - K0951 + 1278

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 14.626 Lane Km
EAO P 5.30782 M
Total P 151.652 M

AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 +937 - K0948 + 811, K0948 + 850 - K0949 + 730, K0949 + 762 - K0951 + 690

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 13.164 Lane Km
EAO P 5.30782 M
Total P 151.652 M
June 4, 2025 2025 SR2025-03-009669 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 137

Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.274 Lane Km
EAO P .182875 M
Total P 5.225 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 180

Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.36 Lane Km
EAO P .182875 M
Total P 5.225 M
June 4, 2025 2025 WIN5F08560 SR2025-03-009673 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:
Maharlika Highway - K0975 + 155 - K0976 + 000, K0991 + 900 - K0992 + 432, K0996 + 148.60 - K0996 + 380, K0997 + 455 - K0997 + 610

Physical Target: Allocation:
CW1- Road Widening P 65.53122 M
3.587 Lane Km
EAO P 2.376780 M
Total P 67.908 M

AS MODIFIED:
Maharlika Highway - K0975+155 - K0976+000, K0991 + 900 - K0992 + 657, K0996 + 148.6 - K0996 + 155, K0997 + 455 - K0997 + 610

Physical Target: Allocation:
CW1- Road Widening P 39.59917708 M
3.587 Lane Km
CW2- Construction of Drainage Structure P12.35883216 M
along Road: 994 Lineal Meters
CW3- Construction of Road Slope P 13.57321076 M
Protection Structure: 1,990.018 Square Meters
EAO P 2.376780 M
Total P 67.908 M
June 4, 2025 2025 WIN5XY00479 SR2025-03-009405 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120, K0784 + 160 - K0784 + 172.30

Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 967.01 Square Meters
EAO P .420 M
Total P 12.00 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120

Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 703.53 Square Meters
EAO P .420 M
Total P 12.00 M
June 4, 2025 2025 SR2025-009236 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 051 - K0770 + 181

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 260 Lineal Meters
EAO P .296345 M
Total P 8.467 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0772 + 300 - K0772 + 454

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 308 Lineal Meters
EAO P .296345 M
Total P 8.467 M
June 4, 2025 2025 SR2025-03-009237 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 525, K0731 + 387 - K0731 + 522

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 185 Lineal Meters
EAO P .350 M
Total P 10.00 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 360 - K0731 + 525

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 215 Lineal Meters
EAO P .350 M
Total P 10.00 M
June 4, 2025 2025 SR2025-03-009738 March 18, 2025 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0758 +000 - K0758 + 200, K0758 + 640 - K0758 + 690, K0781 + 230 - K0781 + 610

Physical Target: Allocation:
CW1- Rehabilitation of Concrete Road P 20.009275 M
1.26 Lane Km
EAO P .725725 M
Total P 20.735 M

AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) -K0758 +000 - K0758 + 200, K0758 + 600 - K0758 + 690, K0759 + 210 - K0759 + 671

Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement P 20.009275 M
1.502 Lane Km
EAO P .725725 M
Total P 20.735 M
June 4, 2025 2025 SR2025-03-009402 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 138 - K0777 + 200

Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,094 Square Meters
EAO P .525 M
Total P 15.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 106 - K0777 + 159

Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,145.19 Square Meters
EAO P .525 M
Total P 15.00 M
June 4, 2025 2025 WIN5XY00494 SARO-BMB-A-25-0008178 March 7, 2025 Region VI Iloilo 1st District Engineering Office
UACS No. 310202101995000
Project ID: P00906261VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123

CW1 - Road Widening: 0.456 lane km – 6,316.10
CW2 – Construction of Drainage Structure: 456 lineal meters – 2,503.90
ROW – ROW Acquisition: 549.33 Square Meters – 807.52
EAO – 196.48


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123

CW1 - Road Widening: 0.456 lane km – 8,803.52
ROW – ROW Acquisition: 549.33 Square Meters – 824.00
EAO – 196.48
June 3, 2025 2025 WIN5E0379 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310110100603000
Project ID: P00909206MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

FROM:

Maharlika Highway (Surigao-Agusan Sect) - K1234 + 534 - K1234 + 719

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 370 Lineal meters

Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415

Unit Cost:
CW1: P 10,090.77/Lineal meters

TO:

Maharlika Highway (Surigao-Agusan Sect) - K1222 + 647 - K1222 + 669

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 22 Lineal meters

Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415

Unit Cost:
CW1: P 169,708.41/Lineal meters

June 3, 2025 FY 2025 P00909745MN SR2025-02-002285 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00056
Amount: ₱ 60,000,000.00

Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270
To: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
From: 11.160 Lane Km
To: 3.720 Lane Km
June 3, 2025 FY 2025 P00909452MN SR2025-03-009479 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00061
Amount:₱ 78,882,000.00

Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1755 + 938
To: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1756 + 488

Type of Work/ Physical target:
From: CW1- Road Widening = 2.900 Lane Km
To: CW1- Road Widening = 4.010 Lane Km
CW-2 - Construction of Road Slope Protection Structure = 23,406.00 square meters

June 2, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310305102499000
Project ID: P00909995MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

FROM:

Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd

Type of Work:
CW1- Widening of Bridge

Physical Target:
CW1- 284.35 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 172,322.841568/Square meters

TO:

Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd

Type of Work:
CW1- Construction of Parallel Bridge

Physical Target:
CW1- 284.35 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 172,322.841568/Square meters
June 2, 2025 2025 WIN5XY00473 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0130+680 - K0131+000, K0135+900 - K0136+300, K0137+232 - K0137+920
June 2, 2025 2025 WIN5XY00474 FY2025 GAA November 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag - Burgos Rd - K0139+736 - K0141+050
June 2, 2025 2025 WIN5XY00475 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag - Burgos Rd - K0137+921 - K0138+517, K0139+000- K0139+736
June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03728 SR2025-03-008449 March 12, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00923067LZ
UACS: 320102107103000

FROM:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan), Sta. 115 + 741 - Sta. 115 + 941, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 125 Lineal meters
Allocation:
Php 8,000,000

TO:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan),Sta.115+786 - Sta. 115+866, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 80 Lineal meters
Allocation:
Php 8,000,000"
June 2, 2025 2025 WIN5XY00472 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag-Burgos Rd - K0129+301 - K0130+650
June 2, 2025 2025 win5f08555 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0039+000- K0039+740, K0041+653 - K0042+000, K0048+000 - K0048+500
June 2, 2025 2025 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0111+385 - K0112+220
June 2, 2025 FY 2025 P00909495MN SR2025-003-009500 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00013
Amount: ₱ 49,552,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1618 + 526 - K1618 + 750
To: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1620 + 098 - K1620 + 322

Type of Work/ Physical target:
From: CW1 - Road Widening = 2.562 Lane Km
To: CW1 - Road Widening = 2.562 Lane Km, CW2 - Construction of Road Slope Protection Structure = 3,479.00 Square meters
June 2, 2025 FY 2025 P00909449MN SR2025-003-009465 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00014
Amount: ₱ 49,599,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1628 + 850 - K1630 + 142
To: Maharlika Highway( Digos-Makar Rd) - K1627 + 417 - K1628 + 617

Type of Work/ Physical Target:
From: CW1 - Road Widening = 2.523 Lane Km
To: CW1 - Road Widening = 2.400 Lane Km, CW2 = Construction of Road Slope Protection Structure = 3,910.00 Square meters
June 2, 2025 FY 2025 P00935914MN GAA 2025 January 1, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID: 25MB0043
Project Name: Construction of Drainage Structure, Marcos Avenue, Barangay Apopong, General Santos City
Amount: P10,000,000.00
Type of Work: Construction of Drainage Structure

Physical Target:
From: 485 Lineal meters
To: 493 Lineal meters
June 2, 2025 FY 2025 P00938513MN SARO-BMB-A-25-0008281 March 11, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID:25MB0017
Project Name: Construction of Road, National Highway to Purok Upper London, Barangay Siguel, General Santos City
Amount: P5,000,000.00
Type of Work: Construction of Concrete Road

Physical Target:
From: 0.273 Lane Km
To: 0.576 Lane Km
May 29, 2025 2025 WIN5XY00478 FY2025 GAA December 20, 2024 Region III Regional Office III
Network Development Program - Off-Carriageway Improvement - Primary Roads

Maharlika Highway - K0037+(-725) - K0037+(-668), K0037+(-618) - K0037+(-435), K0037+(-54) - K0037+242.00
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08552 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0251+282 - K0252+207, K0269+440 - K0269+817
May 29, 2025 2025 WIN5F08547 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads


Baler-Casiguran Rd (Baler-Dinadiawan) - K0248+105 - K0248+689, K0273+450 - K0274+450
May 28, 2025 2025 WIN5F08543 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0112+507.30 - K0112+807.30, K0112+733.30 - K0112+807.30
May 28, 2025 2025 WIN5XY00471 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102179000
Project ID: P00908626VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0171 + 781

CW1- Preventive Maintenance: Asphalt Overlay: 15.396 lane km – 100,360.00
EAO – 3,640.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0167 + 524

CW1- Preventive Maintenance: Asphalt Overlay: 10.446 lane km – 100,360.00
EAO – 3,640.00
May 28, 2025 2025 WIN5F08551 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102188000
Project ID: P00908634VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0125 + 743 - K0131 + 062

CW1- Preventive Maintenance: Asphalt Overlay: 10.140 lane km – 68,032.50
EAO – 2,467.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0126 + 117 - K0129 + 000

CW1- Preventive Maintenance: Asphalt Overlay: 7.280 lane km – 68,032.50
EAO – 2,467.50
May 28, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310107100777000
Project ID: P00909150MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 321 - K1316 + 630

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 11000 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 14,475/Square meters

TO:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 000 - K1316 + 120 , K1316 +250 - K1316 + 360, K1316 + 415 - K1316 + 470, K1316 + 590 - K1316 + 630, K1317 + 045 - K1317 + 200, K1317 + 250 - K1317 + 440, K1317 + 440 - K1317 + 540

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 12,313.01 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 12,931.44/Square meters
May 27, 2025 2025 WIN5E03732 GAA 2025 January 20, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914631LZ
UACS: 310105101374000

FROM:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Upgrading of Drainage Structure along Road
Physical Target:
CW1 - 0.39 Lane Km
CW2 - 509.70 Square meters
CW3 - 27 Lineal meters
Allocation:
Php 19,500,000

TO:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078, K0621 + 009.50 - K0621 + 028, K0621 + 073 - K0621 + 177
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1 - 0.6175 Lane Km
CW2 - 580.72 Square meters
CW3 - 916.50 Square meters
Allocation:
Php 19,500,000"
May 27, 2025 2025 WIN5E03731 GAA 2025 January 20, 2025 Cordillera Administrative Region CAR - Regional Office
"Project ID: P00900504LZ
UACS: 310105101275000

FROM:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 30.316 Lane Km
Allocation:
Php 100,000,000

TO:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 - 3.384 Lane Km
CW2 - 8.296 Lane Km
Allocation:
Php 100,000,000"
May 26, 2025 2025 GAA 2025 May 22, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914637LZ
UACS: 310109101710000

FROM:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0618 + 840 - K0619 + 042, K0622 + 577 - K0622 + 628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,629.00 Square meters
Allocation:
Php 29,900,000

TO:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0622+577 - K0622+628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,924.49 Square meters
Allocation:
Php 29,900,000"
May 26, 2025 2025 SR2025-02-001881 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,280 Square meters

EAO P 0.875 M

Total P 25.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + (-054)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,190 Square meters

EAO P 0.875 M

Total P 25.00 M
May 26, 2025 2025 SR2025-03-009399 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 090 - K0777 + 138

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 850.01 Square meters

EAO P 0.420 M

Total P 12.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 065 - K0777 + 106

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 900.18 Square meters

EAO P 0.420 M

Total P 12.00 M
May 26, 2025 2025 SR2025-03-009501 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 355

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.036 Lane Km

EAO P 0.700 M

Total P 20.00 M

AS MODIFIED:


Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0797 + 210, K0802 + 210 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 369

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.476 Lane Km

EAO P 0.700 M

Total P 20.00 M
May 26, 2025 2025 SR2025-03-009496 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0699 + 071 - K0700 + 000, K0675 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163.5

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 1.991 Lane Km

EAO P 1.225 M

Total P 35.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163, K0699 + 071 - K0700 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 2.114 Lane Km

EAO P 1.225 M

Total P 35.00 M
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Guimaras District Engineering Office
UACS No. 310102102194000
Project ID: P00908638VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd (S00028GR) K0101 + 392 - K0102 + 494, K0103 + 376 - K0104 +348

CW1- Preventive Maintenance: Asphalt Overlay: 8.312 lane km – 96,017.50
EAO – 3,482.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads
Guimaras Circumferential Rd (S00028GR) K0098 + 732 - K0098 + 801, K0103 + 376 - K0104 +380, K0105 + 800 - K0106 + 800

CW1- Preventive Maintenance: Asphalt Overlay: 7.874 lane km – 96,017.50
EAO – 3,482.50
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102455000
Project ID: P00908657VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0118 + 100

CW1- Preventive Maintenance: Asphalt Overlay: 3.982 lane km – 35,770.00
EAO – 730.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0117 + 080

CW1- Preventive Maintenance: Asphalt Overlay: 3.817 lane km – 35,770.00
EAO – 730.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310103101857000
Project ID: P00908675VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0115 + 110 - K0118 + 000, K0118 + 402 - K0120 + 850

CW1- Preventive Maintenance: Asphalt Overlay: 14.164 lane km – 141,855.00
EAO – 5,145.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0116 + 606 - K0118 + 000, K0118 + 402 - K0118 + 920

CW1- Preventive Maintenance: Asphalt Overlay: 14.382 lane km – 141,855.00
EAO – 5,145.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Iloilo 1st District Engineering Office
UACS No. 300214102007000
Project ID: P00934901VS


FROM:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0038 + 000 - K0040 + 253

CW1- Road Safety: Roadway Lighting: 226 number of units – 29,400.00
EAO – 600.00


TO:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 500 - K0043 + 000

CW1- Road Safety: Roadway Lighting: 250 number of units – 29,400.00
EAO – 600.00
May 22, 2025 2025 SR2025-02-003246 February 3, 2025 Region VIII Regional Office VIII

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 881 - K0935 + 058, K0935 + 205 - K0935 + 404 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
1,116 Square meters

EAO P 0.371070 M

Total P 10.602 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 900 - K0936 + 000 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
3,273 Square meters

EAO P 0.371070 M

Total P 10.602 M
May 22, 2025 2025 SR2025-02-001694 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0703 + 459 - K0703 + 853, K0705 + 122 - K0705 + 167, K0705 + 790 - K0705 + 811, K0706 + 000 - K0706 +500, K0707
+ 108 + K0707+ 267, K0707 + 830 - K0708 + 000, K0709 + 203 - K0709 + 240, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713 + 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.734 Lane Km

EAO P 2.940 M

Total P 84.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0705 + 122 - K0705 + 167, K0706 + 000 - K0706 + 500, K0707 + 830 - K0708 + 000, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713+ 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.166 Lane Km

EAO P 2.940 M

Total P 84.00 M
May 21, 2025 2025 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
Project ID: P00921762LZ
UACS: 320102107791000

FROM:
Project Name:
Rehabilitation of Flood Control Structure along Chico River, Sta. 104+937 - Sta. 104+237, Barangay Amlao, Tabuk City, Kalinga
Type of Work:
CW1 - Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1 - 194.92 Lineal meters
Allocation:
Php 20,000,000

TO:
Project Name:
Rehabilitation of Flood Control Structure along Chico River, Sta. 104 + 937 - Sta. 105 + 027 and Sta. 105 + 074 - Sta. 105 + 206 , Barangay Amlao, Tabuk City, Kalinga
Type of Work:
CW1 - Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1 - 222 Lineal meters
Allocation:
Php 20,000,000
May 21, 2025 2025 SR2025-02-001182 February 1, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
Project ID: P00914681LZ
UACS: 310108101979000

FROM:
Project Name:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0471 + (-497) - K0471 + (-460), K0471 +020 - K0471 + 096, K0472 + 294 - K0472 + 410, K0473 + 384 - K0473 + 470, K0475 + 389 - K0475 + 470, K0475 + 782 - K0475 + 842, K0476 +613 - K0476 + 697, K0477 + 341 - K0477 + 422, K0479 + 000 - K0479 + 146, K0480 + 071 - K0480 + 181, K0480 + 262 - K0480 + 351, K0481 + 215 - K0481 + 254, K0484 + 670 - K0484 + 724, K0484 + 734 - K0484 + 864
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 5378 Square meters
Allocation:
Php 52,800,000

TO:
Project Name:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0471 + (-497) - K0471 + (-460), K0471 +020 - K0471 + 096, K0472 + 294 - K0472 + 410, K0473 + 384 - K0473 + 470, K0475 + 389 - K0475 + 470, K0475 + 782 - K0475 + 860, K0476 +613 - K0476 + 697, K0477 + 341 - K0477 + 422, K0479 + 000 - K0479 + 146, K0480 + 071 - K0480 + 181, K0480 + 262 - K0480 + 351, K0481 + 215 - K0481 + 254
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4672 Square meters
Allocation:
Php 52,800,000
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Sifu River Flood Control Project, Sta. 0+600 - Sta. 1+400, Phase II, Barangay San Jose, Quirino, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Siffu River Flood Control Project, Sta. 1+400 - Sta. 2+069.94, Phase II, Barangay San Jose, Quirino, Isabela
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Sifu River Flood Control Project, Sta. 0+600 - Sta. 1+400, Phase II, Barangay San Juan, Quirino, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Siffu River Flood Control Project, Sta. 1+400 - Sta. 2+044.50, Phase II, Barangay San Juan, Quirino, Isabela
May 9, 2025 2024 409903000000000 SR200-11-021202 November 19, 2024 Region II Isabela 2nd District Engineering Office
FROM:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Mallig River Flood Control Project, Sta. 0+960 - Sta. 1+760, Phase II, Barangay Imbiao, Roxas, Isabela

TO:

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Mallig River Flood Control Project, Sta. 1+760 - Sta. 2+455.36, Phase II, Barangay Imbiao, Roxas, Isabela
April 15, 2025 2025 WIN5F08487 FY2025 GAA December 30, 2024 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Road Safety Devices and Facilities along Manila North Road (S01366LZ) - K0021+343 - K0022+060, K0022+125+K0022+1931, Barangay Abangan Sur, Marilao, Bulacan
April 15, 2025 2025 WIN5F08486 FY2025 GAA December 30, 2024 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Road Safety Devices and Facilities along Manila North Road (S01366LZ) - K0018+201 - K0018+457, K0018+541 - K0021+343
March 28, 2025 FY 2024 P00800818MN SR2024-01-00359 January 26, 2024 Region XII Cotabato 1st District Engineering Office
24MD0049:
Project name: Midsayap - Libungan Bypass Road, Cotabato
Project Amount: P150M
Type of Work:
From:
CW1 - Construction of Concrete Bridge = 1,686 square meters
ROW Acquisition = 39,270.00 square meters
To:
CW1 - Construction of Concrete Bridge = 1489.5 square meters
ROW Acquisition = 39,270.00 square meters

March 28, 2025 FY 2024 P00820926MN SR2024-01-002591 January 27, 2024 Region XII Saranggani District Engineering Office
Project name: Construction of Glan River Flood Control Structure, Glan, Sarangani Province, Phase II
Project Amount: P100M
Type of Work: Construction of Flood Mitigation Structure
physical Traget:
From:720.944 Lineal meters
To: 450 Lineal meters
March 26, 2025 FY 2024 WIN4E03680 310205101246000 January 27, 2025 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 409903000000000
Project ID: P00860425MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Jct. Imelda-Alicia Rd (S01114MN) - K1765+005.50 - K1765+550, K1765+550 - K1766+052, K1766+052 - K1766+525, K1766+561 - K1767+755.50
CW1- Preventive Maintenance of Road/Asphalt Overlay: 8.649 Lane-km
Unit Cost: ₱ 16,736,038.85/ Lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
March 26, 2025 FY 2024 WIN4E03680 310205101246000 September 30, 2024 Region IX Regional Office IX
UACS No. 310205101246000 Project ID: P00800269MN
OO1: Ensure Safe and Reliable National Road SYstem - Network Development - Construction of Missing Links/New Roads
Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Norte

CW1 - Construction of Concrete Road: 3.043 Lane-km
Unit Cost: ₱ 45,676,815.52/ Lane-km CW2 - Construction of Road Slope Protection Structure: 41,318.50 sq.m.
Unit Cost: ₱ 392.83/sq.n.
EAO: ₱ 5,635,000.00 EXCESS: ₱ 139,437.48
Allocation: ₱ 161,000,000.00
March 26, 2025 FY 2024 WIN4B01255 310306100265000 July 2, 2024 Region IX Regional Office IX
UACS No. 310306100265000
Project ID: P00800760MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Construction of New Bridges

Seit-Tayungan-Camp Andres Br. along Seit-Tayungan-Camp Andres Rd

CW1- Construction of Concrete Bridge: 397.63 sq.m.
Unit Cost: ₱ 174,735.306/ sq.m.
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00
March 26, 2025 FY 2024 310302100482000 July 2, 2024 Region IX Regional Office IX
UACS No. 310302100482000
Project ID: P00800759MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Replacement of Permanent Weak Bridges

Suang Kagang Br. (B00003TW) along Bongao - Pahut - Sanga-Sanga National Road, Bongao, Tawi-Tawi

CW1- Replacement of Bridge: 294.786 sq.m.
Unit Cost: ₱ 130,942.44/ sq.m.
EAO: ₱ 1,400,000.00
Allocation: ₱ 40,000,000.00
March 26, 2025 FY 2024 300225101692000 August 3, 2024 Region IX Regional Office IX
UACS No. 300225101692000
Project ID: P00836149MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

Construction of Shore Protection at Sapang Beach, Brgy. kan Mindus, Luuk, Sulu

CW1- Construction of Flood Mitigation Structure: 50 ln.m.
Unit Cost: ₱ 90,000.00/ ln.m.
EAO: ₱ 4,950,000.00
Allocation: ₱ 5,000,000.00
March 26, 2025 FY 2024 310201101316000 May 23, 2024 Region IX Regional Office IX
UACS No. 310201101316000
Project ID: P00802666MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd - K1919+514 - K1920+650.77, K1920+793 - K1920+905.61, K1921+500 - K1921+580
CW1- Road Widening: 2.659 Lane-km
Unit Cost: ₱ 29,037,226.75/ Lane-km ROW Acquisition: 306.012 sq.m.
EAO: ₱ 1,925,000.00
Allocation: ₱ 55,000,000.00
March 21, 2025 FY 2024 GAA WIN4XW00159 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1576 + 975
Physical Target:
CW1: 1 number of intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
EAO: P 700,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1576 + 975
Physical Target:
CW1: 1 number of intersection (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: 1,525.706 square meterss (ROW Acquisition)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 16,405,000.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
ROW: P 2,895,000.00 (ROW Acquisition)
EAO: P 700,000.00
March 21, 2025 FY 2024 GAA WIN5E03699 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1456 + 051 - K1456 + 836
Physical Target:
CW1: 2,767.242 lineal meters (Construction of Drainage Structure along Road)
CW2: 1 number of intersections (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: 0.896 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 89,133,000.00
CW1: P 52,885,860.00 (Construction of Drainage Structure along Road)
CW2: P 15,853,020.00 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: P 17,274,465.00 (Reconstruction to Concrete Pavement)
EAO: P 3,119,655.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1456 + 051 - K1456 + 836
Physical Target:
CW1: 1,344.295 lineal meters (Construction of Drainage Structure along Road)
CW2: 1 number of intersections (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: 1.338 lane km (Reconstruction to Concrete Pavement)
CW4: 2,163.348 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW5: 572.85 square meters (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 89,133,000.00
CW1: P 40,035,161.80 (Construction of Drainage Structure along Road)
CW2: P 14,711,692.15 (Off-Carriageway Improvement: Flaring of Intersections/Improvement of Intersections)
CW3: P 12,756,404.99 (Reconstruction to Concrete Pavement)
CW4: P 15,367,484.34 (Off-Carriageway Improvement: Construction of Traffic Island)
CW5: P 1,602,770.63 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 3,063,806.39
EXC: P 1,595,674.70 (Excess)
March 21, 2025 FY 2024 GAA WIN5E03699 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1511 + (-235) - K1511 + 695, K1519 + 656 - K1519 + 720,
K1520 + 428 - K1520 + 500, K1520 + 920 - K1520 + 960,
K1520 + 030 - K1520 + 050, K1521 + 505 - K1521 + 524
Physical Target:
CW1: 5,432.75 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 133.50 square meters (ROW Acquisition)
Allocation:
TOTAL: P 28,800,000.00
CW1: P 20,458,000.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 7,334,000.00 (ROW Acquisition)
EAO: P 700,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1511 + (-235) - K1511 + (-127), K1511 + (-125) - K1511 + (-085), K1511 + (-061) - K1511 + 047,
K1511 + 177 - K1511 + 205, K1511 + 213 - K1511 + 243, K1511 + 287 - K1511 + 332, K1511 + 523 - K1511 + 576, K1511 + 585 - K1511 + 600,
K1511 + 609 - K1511 + 647, K1511 + 676 - K1511 + 785, K1518 + 226 - K1518 + 361, K1519 + 385 - K1519 + 412, K1519 + 655 - K1519 + 716,
K1520 + 030 - K1520 + 050, K1520 + 166 - K1520 + 195, K1520 + 428 - K1520 + 500, K1520 + 920 - K1520 + 964, K1521 + 306 - K1521 + 416,
K1521 + 433 - K1521 + 480, K1521 + 485 - K1521 + 524
Physical Target:
CW1: 3,195.90 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 45.92 square meters (ROW Acquisition)
Allocation:
TOTAL: P 28,800,000.00
CW1: P 13,896,000.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 1,544,000.00 (ROW Acquisition)
EAO: P 560,000.00
EXC: P 12,800,000.00 (Excess)
March 21, 2025 FY 2024 GAA WIN5XW00177 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Jct. Mamay-La Verna Bypass Road-Davao City Diversion Road (Jct. Airport Cargo Section),
Physical Target:
CW1: 0.569 lane km (Construction of Concrete Road)
CW2: 0.569 square meters (Construction of Road Slope Protection Structure)
ROW: 1,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 28,950,000.00 (Construction of Road Slope Protection Structure)
ROW: P 43,425,000.00 (ROW Acquisition)
EAO: P 3,675,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Jct. Mamay-La Verna Bypass Road-Davao City Diversion Road (Jct. Airport Cargo Section),
Physical Target:
CW1: 0.183 lane km (Construction of Concrete Road)
CW2: 183.00 lineal meters (Construction of Drainage Structure along Road)
CW3: 1,333.208 lineal meters (Road Safety: Pavement Markings)
CW4: 784.14 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 51,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 2,029,698.00 (Construction of Concrete Road)
CW2: P 4,207,160.00 (Construction of Drainage Structure along Road)
CW3: P 2,204,963.00 (Road Safety: Pavement Markings)
CW4: P 2,501,279.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 1,215,900.00 (ROW Acquisition)
EAO: P 441,000.00
EXC: P 92,400,000.00 (Excess)
March 21, 2025 FY 2024 GAA WIN5XW00176 FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Panacan Bypass Road, Package 2, Davao City
Physical Target:
CW1: 1.339 lane km (Construction of Concrete Road)
ROW: 13,393.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 130,400,000.00
CW1: P 62,416,200.00 (Construction of Concrete Road)
ROW: P 63,419,800.00 (ROW Acquisition)
EAO: P 4,564,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Panacan Bypass Road, Package 2, Davao City
Physical Target:
CW1: 1.672 lane km (Construction of Concrete Road)
CW2: 183.00 lineal meters (Construction of Road Slope Protection Structure)
ROW: 51,780.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 130,400,000.00
CW1: P 39,260,223.00 (Construction of Concrete Road)
CW2: P 36,299,277.00 (Construction of Road Slope Protection Structure)
ROW: P 8,3959,500.00 (ROW Acquisition)
EAO: P 3,045,000.00
EXC: P 43,400,000.00 (Excess)
March 20, 2025 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00832313LZ
UACS : 300207101063000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Barracks and Other Military Camps Facilities at Barangay Lamon, Goa, Camarines Sur,

Physical Target :
CW1 - Construction of Other Facilities - 1 Number of Facilities
CW2 - Construction of Other Facilities - 1 Number of Facilities
CW3 - Construction of Other Facilities - 1 Number of Facilities
CW4 - Construction of Other Facilities - 1 Number of Facilities


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS) - Construction of Barracks and Other Military Camps Facilities at Barangay Lamon, Goa, Camarines Sur

Physical Target :
CW1 - Construction of Other Facilities - 9 Number of Facilities
March 20, 2025 2024 300215103578000 FY 2024 GAA January 3, 2024 Region II Regional Office II
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ilagan-Divilacan Road, Ilagan-Divilcan, Isabela
March 19, 2025 2024 310103101524000 FY 2024 GAA January 3, 2024 Region II Batanes District Engineering Office
FROM:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + 264 - K0009 + 618

TO:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + (-372.00) - K0009 + (291.90)
March 19, 2025 2024 300215104441000 FY 2024 GAA January 3, 2024 Region II Batanes District Engineering Office
FROM:
Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sumnanga Diversion Road, Sabtang, Basco, Batanes

TO:
Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sumnanga Diversion Road, Sabtang, Batanes
March 19, 2025 2024 310109101437000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:
Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Aritao-Quirino Rd – K0274+847-K0274+870

TO:
Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Aritao-Quirino Rd – K0274+378-K0274+770, K0274+850-K0275+069
March 19, 2025 2024 310109101455000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Bambang-Kasibu-Solano Rd – K0265+796-K0265+946

TO:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Bambang-Kasibu-Solano Rd – K0283+031-K0283+481
March 19, 2025 2024 310109101558000 FY 2024 GAA January 3, 2024 Region II Nueva Vizcaya 2nd District Engineering Office
FROM:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd – K0295+256 - K0295+270, K0297+889 - K0297+920, K0302+134 - K0302+149, K0305+615 - K0305+635, K0306+489 - K0306+503, K0306+528 - K0306+541

TO:

Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd – K0309+488 - K0309+681 & K0310+760 - K0311+180
March 19, 2025 2024 310109101447000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0478+(-260)- K478+(-287), K0483+000- K0483+(-068)
March 19, 2025 2024 310109101448000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0480+200- K0480+300
March 19, 2025 2024 310109101449000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0478+(-160)- K478+(-260)
March 19, 2025 2024 310109101451000 FY 2024 GAA January 3, 2024 Region II Cagayan 3rd District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0479+898- K480+024