July 23, 2025 |
FY 2025 |
P00909643MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Saranggani District Engineering Office |
Contract ID: 25ME0015
UACS: 310106101407000
Amount: ₱ 24,566,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Project Name:
From: Demoloc-Little Baguio-Alabel Rd - K1678 + 000 - K1678 + 700,K1679 + 200 - K1680 + 000
To: Demoloc- Little Baguio- Alabel Rd K1678+200- K1680+120
Type of Work: Reconstruction to Concrete Pavement
Physical Target:
From: 3.00 Lane Km
To: 2.524 Lane Km |
July 22, 2025 |
2025 |
|
GAA 2025 |
January 11, 2025 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS : 3102021081400
Project ID : P00915272LZ
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Pili-Tigaon-Albay Bdry Rd-K0457+499-K0459+323, K0459+355.13-K0459+974
Physical Target :
CW1 - Road Widening - 4.920 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Pili-Tigaon-Albay Bdry Rd-K0457+499-K0459+323, K0459+355.13-K0459+912
Physical Target :
CW1 - Road Widening - 4.712 Lane Km |
July 22, 2025 |
FY 2025 |
WIN5E03794 |
310201101600000 |
May 13, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101600000
Project ID: P00901379MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1766+048 - K1766+070, K1766+170 - K1767+000, K1768+090 - K1768+248.20
CW1- Road Widening: 2.021 Lane-Km
Unit Cost: ₱ 23,709,428.47/ Lane-km CW2 - Construction of Road Slope Protection Structure: 3,926.6 sq.m. Unit Cost: 1,299.73/sq.m. ROW Acquisition: 13,136.50 sq.m.
EAO: ₱ 2,108,120.00
Allocation: ₱ 60,232,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03812 |
310107100751000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 310107100751000
Project ID: P00909038MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1705+080 -K1705+113.75
CW1- Construction of Road Slope Protection Structure: 1,784.05 sq.m.
Unit Cost: ₱ 6,490.85/ sq.m.
EAO: ₱ 420,000.00
Allocation: ₱ 12,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03777 |
310107100753000 |
April 15, 2025 |
Region IX |
Regional Office IX |
UACS No. 310107100753000
Project ID: P00909041MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1735+754 - K1735+824, K1735+954 - K1736+008, K1736+328 - K1736+373, K1746+328 - K1746+530
CW1- Construction of Road Slope Protection Structure: 11,696.39 sq.m.
Unit Cost: ₱ 11,696.39/ sq.m. ROW Acquisition: 833.33 sq.m.
EAO: ₱ 842,905.00
Allocation: ₱ 24,083,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03760 |
310201101584000 |
April 24, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101584000
Project ID: P00909359MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Liloy-Siocon Rd - K1970+038.37 - K1971+220, K1971+440 - K1973+000, K1980+340 - K1981+000, K1986+000 - K1986+815, K1986+894 - K1987+309, K1987+331 -K1988+310
CW1- Road Widening: 11.075 Lane-Km
Unit Cost: ₱ 13,489,667.72/ Lane-km ROW Acquisition: 16,667.67 sq.m.
EAO: ₱ 5,599,930.00
Allocation: ₱ 159,998,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03822 |
310201101585000 |
April 21, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101585000
Project ID: P00909360MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Tucuran Jct-Karomatan Jct Rd) - K1652+730 - K1656+206.20
CW1- Road Widening: 7.244 Lane-Km
Unit Cost: ₱ 21,134,039.90/ Lane-km ROW Acquisition: 10,374.73 sq.m.
EAO: ₱ 5,734,015.00
Allocation: ₱ 163,829,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03820 |
310201101587000 |
April 21, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101587000
Project ID: P00909362MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1659+250 - K1660+960
CW1- Road Widening: 3.426 Lane-Km
Unit Cost: ₱ 26,672,504.38/ Lane-km ROW Acquisition: 10,622.4 sq.m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03821 |
310201101589000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101589000
Project ID: P00909364MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1684+752 - K1686+037.90
CW1- Road Widening: 2.56 Lane-Km
Unit Cost: ₱ 30,432,711.71/ Lane-Km CW1- Construction of Road Slope Protection Structure: 9,313.3 sq.m.
Unit Cost: ₱ 1,405.76/ sq.m. ROW Acquisition: 8,576 sq.m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03814 |
310201101591000 |
April 21, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101591000
Project ID: P00909366MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1694+918 - K1695+750
CW1- Road Widening: 1.665 Lane-Km
Unit Cost: ₱ 31,067,412.67/ Lane-Km CW2- Construction of Road Slope Protection Structure: 8,106.7 sq.m.
Unit Cost: ₱ 1,561.03/ sq.m. ROW Acquisition: 5,576.5 sq.m.
EAO: ₱ 2,443,910.00
Allocation: ₱ 69,826,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03769 |
310201101597000 |
May 25, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101597000
Project ID: P00909373MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1782+707 - K1782+838, K1783+215 - K1783+897, K1785+295 - K1786+120
CW1- Road Widening: 3.252 Lane-Km
Unit Cost: ₱ 12,433,106.57/ Lane-Km CW2- Construction of Drainage Structure along Road: 583.00 Lineal-meter
Unit Cost: ₱ 6,425.60/ Lineal-meter ROW Acquisition: 22,113.60 sq.m.
EAO: ₱ 1,747,410.00
Allocation: ₱ 49,926,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03795 |
310201101598000 |
May 13, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101598000
Project ID: P00909374MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1756+237.72 - K1757+725, K1757+753 - K1758+015
CW1- Road Widening: 3.526 Lane-Km
Unit Cost: ₱ 23,575,728.87/ Lane-Km ROW Acquisition: 23,976.8 sq.m.
EAO: ₱ 3,199,980.00
Allocation: ₱ 91,428,000.00 |
July 22, 2025 |
FY 2025 |
WINE03772 |
310201101596000 |
May 13, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101596000
Project ID: P00909375MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1813+000 - K1813+160
CW1- Road Widening: 0.32 Lane-Km
Unit Cost: ₱ 15,081,931.25/ Lane-Km ROW Acquisition: 2,128 sq.m.
EAO: ₱ 195,055.00
Allocation: ₱ 5,573,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03793 |
310201101601000 |
May 13, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101601000
Project ID: P00909377MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1770+590 - K1771+576, K1774+000 - K1774+320
CW1- Road Widening: 2.62 Lane-Km
Unit Cost: ₱ 21,956,314.87/ Lane-Km CW2 - Construction of Road Slope Protection Structure: 3,400.80 sq.m. Unit Cost: ₱ 5,636.17 ROW Acquisition: 17,816 sq.m.
EAO: ₱ 2,962,960.00
Allocation: ₱ 84,656,000.00 |
July 22, 2025 |
FY 2025 |
|
310201101602000 |
April 21, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101602000
Project ID: P00909378MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1775+238.84 - K1776+000, K1777+846 - K1777+928, K1777+976 - K1778+580, K1778+662 - K1780+442
CW1- Road Widening: 6.58 Lane-Km
Unit Cost: ₱ 17,551,120.06/ Lane-Km ROW Acquisition: 23,443.79 sq.m.
EAO: ₱ 4,431,630.00
Allocation: ₱ 126,618,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03819 |
310201101609000 |
May 27, 2025 |
Region IX |
Regional Office IX |
UACS No. 310201101609000
Project ID: P00909486MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1760+092.68 - K1760+138.04, K1760+177.81 - K1760+244.13, K1780+471.30 - K1780+582.85, K1786+160 - K1786+302.63, K1786+390.72 - K1786+500
CW1- Road Widening: 0.84 Lane-Km
Unit Cost: ₱ 20,616,517.86/ Lane-Km ROW Acquisition: 5,460 sq.m.
EAO: ₱ 657,125.00
Allocation: ₱ 18,775,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03770 |
310204103108000 |
April 22, 2025 |
Region IX |
Regional Office IX |
UACS No. 310204103108000
Project ID: P00910061MN
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Brgy. Alvenda, Mutia - Pob. Sergio Osmeña Sr. Road, Zamboanga del Norte
CW1- Construction of Concrete Bridge: 963.44 sq.m.
Unit Cost: ₱ 60,097.15/ sq.m.
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03815 |
300214101634000 |
April 24, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101634000
Project ID: P00935221MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Pagadian City - Zamboanga City Rd) - K1928+000 - K1928+032, K1928+032 - K1928+972
CW1- Preventive Maintenance/Asphalt Overlay: 3.920 Lane-Km
Unit Cost: ₱ 18,423,868.62/ Lane-Km
EAO: ₱ 2,619,435.00
Allocation: ₱ 74,841,000.00 |
July 22, 2025 |
FY 2025 |
|
300214101640000 |
May 13, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101640000
Project ID: P00935223MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Tucuran Jct-Karomatan Jct Rd) - K1649+312.87 - K1649+742.25 (Intermittent Section), K1651+(-468) - K1652+400 (Intermittent Section), K1654+000 - K1655+242.25 (Intermittent Section)
CW1- Rehabilitation of Concrete Road: 3.596 Lane-Km
Unit Cost: ₱ 10,275,532.54/ Lane-Km
EAO: ₱ 1,340,185.00
Allocation: ₱ 38,291,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03748 |
310103102131000 |
May 5, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310103102131000
Project ID: P00901563MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads
Imelda-Payao-Siay Rd - K1761+000 - K1762+693
CW1- Preventive Maintenance of Road/ Asphalt Overlay: 3.386 Lane-km
Unit Cost: ₱ 14,471,352.62/ Lane-km
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5E03734 |
310203100911000 |
March 25, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100911000
Project ID: P00909319MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1765+000 - K1767+024.50
CW1- Road Widening: 4.049 Lane km
Unit Cost: ₱ 16,358,676.21/ Lane km CW2- Construction of Road Slope Protection Structure: 11,461.81 sq.m.
Unit Cost: ₱ 1,951.15/ sq.m. ROW Acquisition: 2,521.18 sq.m. Unit Cost: ₱ 3,133.45/ sq.m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 22, 2025 |
FY 2025 |
WIN5F08546 |
310203100916000 |
March 25, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100916000
Project ID: P00909509MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Diplahan Jct-Malangas Port Rd - K1742+000 - K1743+160, K1743+220 - K1744+563
CW1- Road Widening: 5.006 Lane km
Unit Cost: ₱ 14,729,336.80/ Lane km CW2- Construction of Road Slope Protection Structure: 10,148.46 sq.m.
Unit Cost: ₱ 1,500.22/ sq.m. ROW Acquisition: 2,662.63 sq.m. Unit Cost: ₱ 2,831.79/ sq.m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 22, 2025 |
FY 2025 |
|
300214102109000 |
March 10, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300214102109000
Project ID: P00935214MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/ Application of Road Safety Facilities (Roadway Lighting) along Lutiman-Guicam-Olutanga Rd - K1783+(-600) - K1787+219, K1789+791 - K1791+300
CW1- Road safety/ Roadway Lighting: 251 number of units
Unit Cost: ₱ 171,246.22/ number of units
EAO: ₱ 877,200.00
Allocation: ₱ 43,860,000.00 |
July 21, 2025 |
2025 |
WIN5XY00573 |
SR2025-02-001450 |
February 3, 2025 |
Region VI |
Regional Office VI |
UACS No. 310204103070000
Project ID: P00906959VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Roxas City Circumferential Road, C1 Section, Capiz
CW1 – Construction of Concrete Bridge: 1,001.7 sq. m. – 54,347.835
CW2 – Reconstruction to Concrete Pavement: 2.824 lane km – 32,151.870
ROW – ROW Acquisition: 1,824.47 sq. m. – 10,000.295
EAO – 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Roxas City Circumferential Road, C1 Section, Capiz
CW1 – Road Widening: 0.544 lane – 33,540.50
CW2 – Reconstruction to Concrete Pavement: 2.824 lane km – 23,617.72
CW3 – Construction of Road Slope Protection Structure: 1,632 square meters – 29,341.68
ROW – ROW Acquisition: 1,824.47 sq. m. – 10,000.000
EAO – 3,500.00 |
July 21, 2025 |
2025 |
WIN5XY00576 |
SR2025-03-009742 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0781 + 752 - K0782 + 000, K0759 + 656 - K0759 + 700
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.110565 M
: 0.592 Lane Km
EAO P 0.330435M
Total P 9.441 M
AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - , K0762 + 483 - K0762 + 828
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.110565 M
: 0.69 Lane Km
EAO P 0.330435M
Total P 9.441 M
|
July 21, 2025 |
2025 |
WIN5XY00575 |
SR2025-04-013435 |
April 24, 2025 |
Region VIII |
Leyte 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Cabungaan - Tabunok - Consuegra Road, K1027 + 044 - K1037 + 246
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 4,000 Square meters
EAO P 0.800 M
Total P 40.00 M
AS MODIFIED:
Cabungaan - Tabunok - Consuegra Road, K1027 + 112 - K1027 + 253
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 3,100.18 Square meters
EAO P 0.800 M
Total P 40.00 M |
July 21, 2025 |
FY 2025 |
P00909159MN |
SR2025-02-002420 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00010
UACS: 310107100774000
Amount: ₱ 8,575,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Project Name:
From: Maharlika Highway (Digos-Makar Rd) - K1616 + 520 - K1616 + 540, K1621 + 450 - K1621 + 465
To: Maharlika Highway (Digos-Makar Rd) - K1621 + 450 - K1621 + 459
Type of Work: Construction of Road Slope Protection Structure
Physical Target:
From: 571.67 Square Meters
To: 189 Square Meters |
July 21, 2025 |
FY 2025 |
P00909162MN |
SR2025-02-002633 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00052
UACS: 310109101691000
Amount: ₱ 100,000,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Project Name:
From: Surallah-Lake Sebu-Maitum Rd - K1812 + 125 - K1812 + 405, K1827 + 970 - K1828 + 050, K1828 + 605 - K1828 + 990, K1829 + 355 - K1829 + 778, K1829 + 925 - K1830 + 830, K1831 + 000 - K1831 + 570
To: Surallah-Lake Sebu-Maitum Rd - K1799 + 460 - K1799 + 580, K1827 + 970 - K1828 + 022
Type of Work: Construction of Road Slope Protection Structure
Physical Target:
From: 10,000.00 Square Meters
To: 3,227.00 Square Meters |
July 18, 2025 |
FY 2025 |
WIN5E038000 |
300203103071000 |
June 18, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300203103071000
Project ID: P00934897MN
Convergence and Special Support Program (CSSP) – Construction / Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program – TRIP)
National Road Junction Leading to Malangas Boulevard, Malangas, Zamboanga Sibugay
CW1- Construction of Concrete Road - 0.180 Lane-km
Unit Cost: ₱ 13,611,111.11/ Lane-km
EAO: ₱ 50,000.00
Allocation: ₱ 2,500,000.00 |
July 18, 2025 |
2025 |
310102102355000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0331 + 640 - K0333 + 000
TO:
Asset Preservation - Preventive Maintenance - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0331 + 640 - K0332 + 651
|
July 18, 2025 |
2025 |
310103102013000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Dumabato-Balligui Rd - K0372 + 877 - K0373 + 000, K0374 + 000 - K0375 + 000
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Dumabato-Balligui Rd - K0372 + 877 - K0373 + 000, K0374 + 000 - K0374 + 468 |
July 18, 2025 |
2025 |
310103102014000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Madella Rd (Villa Norte-Panang Sect) - K0377 + (-836) - K0377 + 612
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0377 + (-836) - K0377 + (-046) |
July 18, 2025 |
2025 |
310103102015000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Madella Rd (Villa Norte-Panang Sect) - K0377 + 612 - K0378 + 176
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0377 + 612 - K0377 + 918 |
July 18, 2025 |
2025 |
|
SR2025-02-002596 |
March 3, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 365 - K0696 + 411, K0696 + 481 - K0696 + 563, K0696 + 588 - K0696 + 660, K0696 + 851 - K0696 + 870, K0696 + 933 - K0696 + 972, K0697 + 202 - K0697 + 217, K0697 + 055 - K0697 + 220, K0698 + 300 - K0698 + 553, K0698 + 613 - K0698 + 720, K0699 + 034 - K0699 + 039, K0702 + 857 - K0703 + 000, K0705 + 101 - K0705 + 485, K0705 + 790 - K0705 + 811, K0705 + 872 - K0705 + 1110
Physical Target: Allocation:
CW1-Road Widening: 2.085 Lane Km P 31.699285 M
EAO P 1.149715 M
Total P 32.849 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 365 - K0696 + 411, K0696 + 481 - K0696 + 563, K0696 + 588 - K0696 + 692, K0696 + 851 - K0696 + 972, K0697 + 055 - K0697 + 217, K0698 + 300 - K0698 + 553, K0698 + 613 - K0698 + 720, K0699 + 034 - K0699 + 039, K0702 + 857 - K0703 + 000, K0705 + 101 - K0705 + 167, K0705 + 308 - K0705 + 485, K0705 + 790 - K0705 + 811, K0705 + 872 - K0705 + 1110
Physical Target: Allocation:
CW1-Road Widening: 1.469 Lane Km P 31.699285 M
EAO P 1.149715 M
Total P 32.849 M
|
July 18, 2025 |
FY 2025 |
WIN5E03804 |
310102102501000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310102102501000
Project ID: P00901522MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (S01060MN) – K1924+000 - K1924+725, K1924+968 - K1929+436, K1929+475 – K1929+750
CW1- Preventive Maintenance of Road: Asphalt Overlay - 10.922 Lane-km
Unit Cost: ₱ 8,972,715.62/ Lane-km
EAO: ₱ 2,000,000.00
Allocation: ₱ 100,000,000.00 |
July 18, 2025 |
FY 2025 |
|
310108102182000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310108102182000
Project ID: P00909011MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1945 + 370 - K1945 + 400
CW1- Rehabilitation/ Major Repair of Road Slope Protection Structure - 481.96 sq.m.
Unit Cost: ₱ 10,166.822/ sq.m.
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03771 |
310110100631000 |
May 26, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310110100631000
Project ID: P00909016MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Dipolog-Oroquieta National Rd – K1827+000 – K1829+000
CW1- Construction of Drainage Structure along Road: 2,105.00 Ln.m.
Unit Cost: ₱ 4,998.99/ ln.m.
CW2- Off-Carriadgeway Improvement/ Paving of Shoulders: 4,165.100 sq.m.
Unit Cost: ₱ 970.60/ sq.m. ROW Acquisition: 333.333 sq.m. EAO: ₱ 307,460.00
Allocation: ₱ 15,373,000.00 |
July 18, 2025 |
FY 2025 |
|
310109101679000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310109101679000
Project ID: P00909033MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Sindangan-Bayog-Lakewood Rd - K1936 + 660 - K1936 + 780
CW1- Construction of Road Slope Protection Structure: 3,228.92 sq.m.
Unit Cost: ₱ 17,931.69/ sq.m.
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03825 |
310109101678000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310109101678000
Project ID: P00909034MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Sindangan-Bayog-Lakewood Rd – K1934+640 – K1934+690, K1946+780 – K1946+860
CW1- Construction of Road Slope Protection Structure: 3,544.38 sq.m.
Unit Cost: ₱ 21,018.08/ sq.m.
EAO: ₱ 2,701,930.00
Allocation: ₱ 77,198,000.00 |
July 18, 2025 |
FY 2025 |
|
310201101696000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310201101696000
Project ID: P00909353MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Sindangan-Liloy Rd – K1923+904 – K1924+540
CW1- Road Widening: 1.272 Lane km
Unit Cost: ₱ 24,530,047.17/ Lane km
EAO: ₱ 636,780.00
Allocation: ₱ 31,839,000.00 |
July 18, 2025 |
FY 2025 |
|
310201101582000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310201101582000
Project ID: P00909354MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Sindangan-Liloy Rd - K1861 + 760 - K1863+660
CW1- Road Widening: 3.772 Lane km
Unit Cost: ₱ 19,170,946.30/ Lane km CW2- Construction of Drainage Structure along Road: 2,592.69 ln.m.
Unit Cost: ₱ 12,367.27/ Ln.m.
EAO: ₱ 3,785,705.00
Allocation: ₱ 108,163,000.00 |
July 18, 2025 |
FY 2025 |
|
310103102130000 |
May 16, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310103102130000
Project ID: P00909759MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads
Katipunan By-Pass Rd (S01058MN) Chainage 1393.50 – Chainage 1631
CW1- Preventive Maintenance of Road: Asphalt Overlay - 0.475 Lane-km
Unit Cost: ₱ 8,029,810.53/ Lane-km
EAO: ₱ 77,840.00
Allocation: ₱ 3,892,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03766 |
310305102484000 |
May 26, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310305102484000
Project ID: P00910040MN
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges
Guinles Parallel Br. Along Dipolog-Polanco- Piñan-Jct Oroquieta Rd
CW1- Construction of Parallel Bridge: 246.514 sq.m.
Unit Cost: ₱ 108,711.94/ sq.m.
CW2- Construction of Bridge Approach: 0.47832 Lane Km
Unit Cost: ₱ 16,685,451.16/ Lane Km ROW Acquisition: 333.333 sq.m. EAO: ₱ 720,000.00
Allocation: ₱ 36,000,000.00 |
July 18, 2025 |
FY 2025 |
|
300214102102000 |
April 22, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300214102102000
Project ID: P00935126MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Roadway Signs, Roadway Lighting) along Dipolog-Oroquieta National Rd – K1795+(-415) – K1802+500
CW1- Road Safety/ Road Signs: 110 Number of Signs
Unit Cost: ₱ 23,334.60/ Number of Signs
CW2- Road Safety/ Street Lighting: 61 Number of Units
Unit Cost: ₱ 153,921.21/ Number of Signs EAO: ₱ 244,000.00
Allocation: ₱ 12,200,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03758 |
310102102233000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310102102233000
Project ID: P00901471MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Rizal-Dakak-Dapitan Coastal Lood Road - K1823+899 - K1824+000, K1824+000 - K1825+000, K1827+000 - K1829+000, K1828+000 - K1828+673.20
CW1- Preventive Maintenance of Road: Asphalt Overlay - 4.8964 Lane-km
Unit Cost: ₱ 19,708,357.16/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03750 |
310102102234000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310102102234000
Project ID: P00901472MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Rizal-Dakak-Dapitan Coastal Lood Road - K1828+673.20 - K1829+000, K1829+000 - K1830+000, K1830+000 - K1831+000, K1831+000 - K1831+208.31
CW1- Preventive Maintenance of Road: Asphalt Overlay - 4.9762 Lane-km
Unit Cost: ₱ 19,392,307.38/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03759 |
310103101883000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101883000
Project ID: P00901531MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Piñan-Mutia Road - K1823+266 - K1824+000, K1825+000 - K1826+000, K1828+000 - K1828+799, K1829+777 - K1830+000
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.510 Lane-km
Unit Cost: ₱ 17,513,611.62/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
2025 |
|
SR2025-03-009635 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Network Development Program - Off-Carriageway Improvement - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 578 - K0735 + 526, K0736 + 030 - K0736 + 254, K0738 + 215 - K0738 + 384, K0742 + 108 - K0742 + 430
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 16.815125 M
Paving of Shoulders: 4,340 Square meters
EAO P .609875 M
Total P 17.425 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 578 - K0735 + 526, K0736 + 030 - K0736 + 254, K0738 + 215 - K0738 + 384, K0740 + 000 - K0740 + 170, K0742 + 108 - K0742 + 430
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 14.69375366 M
Paving of Shoulders: 4,066 Square meters
CW2-Costruction of Drainage Structure along P 2.12137134 M
Road: 214.00 Lineal meters
EAO P .609875 M
Total P 17.425 M
|
July 17, 2025 |
2025 |
|
SR2025-03-009490 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 411 - K0696 + 563, K0705 + 045 - K0705 + 108
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 8.223730 M
: 0.430 Lane Km
EAO P 0.298270 M
Total P 8.522 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 411 - K0696 + 563, K0705 + 055 - K0705 + 108
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 8.223730 M
: 0.508 Lane Km
EAO P 0.298270 M
Total P 8.522 M
|
July 17, 2025 |
FY 2025 |
WIN5E03752 |
310103101884000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101884000
Project ID: P00901532MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1832+013.40 - K1833+000, K1833+000 - K1834+704.10
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0833 Lane-km
Unit Cost: ₱ 18,983,731.04/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03752 |
310103101884000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101884000
Project ID: P00901532MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1832+013.40 - K1833+000, K1833+000 - K1834+704.10
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0833 Lane-km
Unit Cost: ₱ 18,983,731.04/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03751 |
310103101885000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101885000
Project ID: P00901533MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1834+704.10 - K1835+000, K1837+000 - K1838+000, K1839+000 - K1840+302.90
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0496 Lane-km
Unit Cost: ₱ 19,110,424.59/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03755 |
310103101886000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101886000
Project ID: P00901534MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1840+302.90 - K1841+000, K1841+000 - K1842+000, K1842+000-K1843+000
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.07855 Lane-km
Unit Cost: ₱ 19,001,486.64/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
|
310101101750000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310101101750000
Project ID: P00909572MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Dipolog-Punta-Dansullan- S Osmena-Zamboanga del Noerte/Sur Bdry Rd - K1872+402 - K1873+887.70
CW1- Preventive Maintenance of Road: Asphalt Overlay - 2.7094 Lane-km
Unit Cost: ₱ 19,777,264.34/ Lane-km
EAO: ₱ 1,943,480.00
Allocation: ₱ 58,528,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101645000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101645000
Project ID: P00935228MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1769+845 - K1769+900, K1813+000 - K1813+817, K1816+975 - K1817+061, K1842+000 - K1843+000, K1843+561 - K1844+193
CW1- Reconstruction to Concrete Pavement: 5.234 Lane-km
Unit Cost: ₱ 8,182,587.88/ Lane-km
EAO: ₱ 1,553,335.00
Allocation: ₱ 44,381,000.00 |
July 17, 2025 |
FY 2025 |
|
300211401644000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300211401644000
Project ID: P00935227MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1757 + (-757) - K1757+740, K1757+780 - K1757+831
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.910 Lane-km
Unit Cost: ₱ 13,602,581.22/ Lane-km
EAO: ₱ 2,915,745.00
Allocation: ₱ 83,307,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101643000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101643000
Project ID: P00935226MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1773+361 - K1775+181
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.29 Lane-km
Unit Cost: ₱ 15,242,896.43/ Lane-km
EAO: ₱ 4,030,285.00
Allocation: ₱ 115,151,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101642000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101642000
Project ID: P00935225MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1726+098 - K1726+253, K1726+253 - K1726+298, K1749+000 - K1749+635
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.94 Lane-km
Unit Cost: ₱ 14,242,940.48/ Lane-km
EAO: ₱ 41,874,245.00
Allocation: ₱ 43,393,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101641000 |
May 30, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101641000
Project ID: P00935224MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1676+722 - K1677+000, K1677+853 - K1678+091, K1680+380 - K1680+603
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.956 Lane-km
Unit Cost: ₱ 14,179,558.53/ Lane-km
EAO: ₱ 1,520,225.00
Allocation: ₱ 43,435,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101639000 |
May 28, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101639000
Project ID: P00935222MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1651+060 - K1653+244.03
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.759 Lane-km
Unit Cost: ₱ 14,068,926.41/ Lane-km
EAO: ₱ 3,959,200.00
Allocation: ₱ 113,120,000.00 |
July 17, 2025 |
FY 2025 |
|
310101101753000 |
May 28, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101753000
Project ID: P00909576MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1684+300 - K1684+597.68, K1688+500 - K1689+000, K1700+360 - K1702+561.50
CW1- Preventive Maintenance of Road: Asphalt Overlay: 6.998 Lane-km
Unit Cost: ₱ 13,789,654.19/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
2025 |
P00920332MN |
SR2025-02-000327 |
February 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0049
UACS: 320102107661000
Amount: ₱ 100,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Flood Control Structure, Libungan River, Camansi Bridge (Upstream, Downstream and Both Sides), Camansi, Alamada, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 1,307.740 Lineal meters
To: 1,179.740 Lineal meters |
July 17, 2025 |
2025 |
P00920417MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0062
UACS: 320102107918000
Amount: ₱ 15,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Maridagao RIS Protection dike at Pulangi River, Nabundas, Pikit, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 196.161 Lineal meters
To: 39.270 Lineal meters |
July 17, 2025 |
2025 |
P00920584MN |
SR2025-03-009554 |
March 17, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0065
UACS: 320102107657000
Amount: ₱ 80,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Libungan River Flood Control Project (Upstream and Downstream of Mapurok Bridge - Polayagan Section), Polayagan, Alamada, North Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 966.732 Lineal meter
To: 722.25 Lineal meter
|
July 17, 2025 |
2025 |
|
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0174+090 - K0174+200 |
July 17, 2025 |
2025 |
P00938055MN |
SR2025-03-009689 |
March 18, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0039
UACS: 300215106108000
Amount: ₱ 60,000,000.00
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Project Name: Construction of Bridge Approaches connecting Camansi and Barangay Pacao, Alamada, North Cotabato
Type of Work:
From:
CW1 - Construction of Bridge Approach
To:
CW1 - Construction of Bridge Approach
CW2 - Construction of Road Slope Protection Structure
Physical Target:
From: 6.058 Lane Km
To:
CW1 - 2.7134 Lane Km
CW2 - 5,016.20 Square Meter |
July 17, 2025 |
2025 |
P00938489MN |
SARO-BMB-A-25-0008277 |
March 11, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0044
UACS: 300221109044000
Amount: ₱ 5,000,000.00
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Project Name: Construction of Road, Sitio Pinamulaan - Barangay North Manuangan - Barangay South
Manuangan, Pigcawayan, North Cotabato
Type of Work: Construction of Concrete Road
Physical Target:
From: 0.647 Lane Km
To: 0.443 Lane Km
|
July 16, 2025 |
2025 |
WIN5XY00551 |
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0199+684.80 - K0199+761.40, K0199+745 - K0199+749.50, K0199+824.50 - MK0199+829, K0200+000 - K0200+380, K0199+889 - K0200+000
|
July 16, 2025 |
2025 |
WIN5E03802 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300214102161000
Project ID: P00935205MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
FROM:
Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Sampaguita Rd - K1373 + 000 - K1375 + 389
Type of Work:
CW1- Road Safety: Roadway Lighting
Physical Target:
CW1- 150 Number of Units
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 196,000/ Number of Units
TO:
Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Sampaguita Rd - K1373 + 212 - K1373 + 912
Type of Work:
CW1- Road Safety: Roadway Lighting
Physical Target:
CW1- 72 Number of Units
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 408,333.33/ Number of Units
|
July 16, 2025 |
2025 |
WIN5XY00547 |
FY2025 GAA |
December 20, 2024 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) - K0097+(-062) - K0097+(-044), K0097+792 - K0097+956 |
July 16, 2025 |
FY 2025 |
P00909158MN |
SR2025-02-002399 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: P00909158MN
UACS: 310107100773000
Amount: ₱ 32,000,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Project Name:
From: Maharlika Highway (Digos-Makar Rd) - K1600 + 500 - K1600 + 525, K1603 + 060 - K1603 + 090, K1603 + 200 - K1603 + 250, K1603 + 650 - K1603 + 670
To: Maharlika Highway (Digos-Makar Rd) - K1603 + 200 - K1603 + 229
Type of Work: Construction of Road Slope Protection Structure
Physical Target:
From: 2133.330 Square Meters
To: 754.000 Square Meters |
July 15, 2025 |
FY 2025 |
|
310104100860000 |
April 25, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100860000
Project ID: P00900589MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1839+364.13 - K1840+026.49, K1840+183.29 - K1840+440.00, K1840+512.61 - K1841+234.90, K1841+440.00, K1842+392.40, K1843+171.89 - K1843+200, K1843+221.18 - K1843+270.95, K1843+573.10 - K1843+972.23, K1844+260.00 - K1844+678.32, K1844+789.79 - K1845+911.52, K1845+969.91 - K1846+825.77, K1846+868.13 - K1847+145.83, K1847+421.13 - K1847+578.00
CW1- Reconstruction to Concrete Pavement: 11.93 Lane-km
Unit Cost: ₱ 8,364,034.37/ Lane-km
EAO: ₱ 3,619,070.00
Allocation: ₱ 103,402,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100859000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100859000
Project ID: P00909571MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1879+000 - K1879+057, K1896+906 - K1897+048, K1899+868 - K1899+968
CW1- Reconstruction to Concrete Pavement: 0.415 Lane-km
Unit Cost: ₱ 12,031,108.43/ Lane-km
EAO: ₱ 181,090.00
Allocation: ₱ 5,174,000.00 |
July 15, 2025 |
FY 2025 |
|
310101101754000 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101754000
Project ID: P00909577MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1711+000 - K1712+810, K1712+810 - K1712+834
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.224 Lane-km
Unit Cost: ₱ 13,358,250.28/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 15, 2025 |
FY 2025 |
|
POSTED APPROVED MODIFICATIONS 2019 Revised POSTED APPROVED MODIFICATIONS 2019 Revised 100% 10 D6 310101101755000 310101 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101755000
Project ID: P00909578MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1813+842 - K1814+000, K1829+364 - K1830+300, K1830+375 - K1832+010
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.374 Lane-km
Unit Cost: ₱ 14,362,979.40/ Lane-km CW2- Reconstruction to Concrete Pavement: 1.521 Lane-km Unit Cost: ₱ 9,349,164.18
EAO: ₱ 3,315,270.00
Allocation: ₱ 94,722,000.00 |
July 15, 2025 |
FY 2025 |
|
310101101756000 |
April 22, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101756000
Project ID: P00909580MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1794+215 - K1794+582, K1800+642.30 - K1800+699.90, K1800+780.30 - K1800+835.10, K1800 + 930.40 - K1801+006.40, K1801+072.50 - K1801+135.50, K1801+163 - K1801+301, K1801+301 - K1801+565, K1808+000 - K1809+313, K1810+460 - K1811+000
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.504 Lane-km
Unit Cost: ₱ 14,348,432.46/ Lane-km CW2- Reconstruction to Concrete Pavement: 2.177 Lane-km
Unit Cost: ₱ 8,136,627.34/ Lane-km
EAO: ₱ 3,506,790.00
Allocation: ₱ 100,194,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100861000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100861000
Project ID: P00909582MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1758 + 370.51 - K1758 + 649.61, K1764+187 - K1764+330, K1768+000 - K1768+042, K1816+310 - K1816+975
CW1- Reconstruction to Concrete Pavement: 2.258 Lane-km
Unit Cost: ₱ 10,019,247.12/ Lane-km
EAO: ₱ 820,540.00
Allocation: ₱ 23,444,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100862000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100862000
Project ID: P00909583MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1846+858 - K1848+000, K1849+352 - K1849+407, K1849+607 -K1849+735
CW1- Reconstruction to Concrete Pavement: 2.632 Lane-km
Unit Cost: ₱ 9,413,516.34/ Lane-km
EAO: ₱ 898,625.00
Allocation: ₱ 25,675,000.00 |
July 15, 2025 |
FY 2025 |
|
300214101648000 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101648000
Project ID: P00935254MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1768+090 - K1768+407, K1794+000 - K1794+215
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.128 Lane-km
Unit Cost: ₱ 15,191,494.36/ Lane-km
EAO: ₱ 1,172,500.00
Allocation: ₱ 33,500,000.00 |
July 14, 2025 |
2025 |
WIN5E03823 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"Project ID: P00916209LZ
UACS: 310105101381000
FROM:
Project Name:
Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 6053 - Chainage 6510, Chainage 8652 - Chainage 9144
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 1.898 Lane Km
Allocation:
Php 19,740,000
TO:
Project Name:
Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 8760 - Chainage 9110
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 0.700 Lane Km
CW2 - 1061.500 Square meters
Allocation:
19740000"
|
July 14, 2025 |
2025 |
WIN5XY00518 |
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway - K0048+458 - K0048+640 |
July 14, 2025 |
2025 |
WIN5XY00514 |
FY2025 GAA |
December 20, 2024 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo-Bugallon Rd - K0224+684 - K0225+330, K0225+369 - K0225+620, K0258+000 - K0258+546, K0258+866 - K0259+304 |
July 14, 2025 |
2025 |
WIN5E03809 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101653000
Project ID: P00909429MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Agusan-Davao Sect) - K1241 + (-321) - K1241 + 098
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.838 Lane Km
Allocation:
TOTAL: P 11,421,000
CW1: P 11,021,265
EAO: P 399,735
Unit Cost:
CW1: P 13,151,867.542/Lane Km
TO:
Maharlika Highway (Agusan- Davao Sect) K1241 + (-321) - K1241 +040
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 0.722 Lane Km
ROW - 3723.6 Square meters
Allocation:
TOTAL: P 11,421,000
CW1: P 10,249,265
ROW: P 772,000
EAO: P 399,735
Unit Cost:
CW1: P 14,195,657.895/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03806 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101673000
Project ID: P00909502MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Agusan-Davao Sect) - K1241 + 098 - K1241 + 498, K1242 + 983 - K1243 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.438 Lane Km
Allocation:
TOTAL: P 33,227,000
CW1: P 32,064,055
EAO: P 1,162,945
Unit Cost:
CW1: P 13,151,786.300/Lane Km
TO:
Maharlika Highway (Agusan Davao Sect) K1241 + 040 - K1241 + 498, K1242 + 983 - K1243 + 530
Type of Work:
CW1- Road Widening
ROW- ROW Acquisition
Physical Target:
CW1- 2.014 Lane Km
ROW- 13773.900 Square meters
Allocation:
TOTAL: P 33,227,000
CW1: P 30,906,055
ROW: P 1,158,000
EAO: P 1,162,945
Unit Cost:
CW1: P 15,345,605.242/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03816 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101676000
Project ID: P00909505MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1150 + 571 - K1150 + 993, K1158 + 580 - K1158 + 583.02, K1160 + 500 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 326 - K1163 + 489, K1164 + 317 - K1164 + 388, K1164 + 638 - K1164 + 773, K1165 + 645 - K1165 + 700, K1165 + 745 - K1165 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 7.330 Lane Km
Allocation:
TOTAL: P 99,901,000
CW1: P 96,404,465
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
TO:
Maharlika Highway (Surigao - Agusan Sect) – 1150 + 571 - K1150 + 993, K1160 + 784 - K1162 + 180, K1162 + 440 - K1162 + 640
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 7.330 Lane Km
ROW – 33,642 Square meters
Allocation:
TOTAL: P 99,901,000
CW1: P 87,719,465
ROW: P 8,685,000
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03816 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101676000
Project ID: P00909505MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1150 + 571 - K1150 + 993, K1158 + 580 - K1158 + 583.02, K1160 + 500 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 326 - K1163 + 489, K1164 + 317 - K1164 + 388, K1164 + 638 - K1164 + 773, K1165 + 645 - K1165 + 700, K1165 + 745 - K1165 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 7.330 Lane Km
Allocation:
TOTAL: P 99,901,000
CW1: P 96,404,465
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
TO:
Maharlika Highway (Surigao - Agusan Sect) – 1150 + 571 - K1150 + 993, K1160 + 784 - K1162 + 180, K1162 + 440 - K1162 + 640
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 7.330 Lane Km
ROW – 33,642 Square meters
Allocation:
TOTAL: P 99,901,000
CW1: P 87,719,465
ROW: P 8,685,000
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
ROW: - |
July 14, 2025 |
GAA 2025 |
P00938257MN |
SR2025-03-009691 |
March 18, 2025 |
Region XII |
South Cotabato 1st District Engineering Office |
Contract ID: 25MB0010
UACS No.: 300234100358000
Amount: ₱ 81,443,000.00
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
Project Name: Construction of Revetment along Silway River Boulevard, General Santos City, South Cotabato
Type of Work: Construction of Revetment
Physical target:
From: 636.00 Lineal meters
To: 608.00 Lineal meters |
July 11, 2025 |
2024 |
300214101833000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Magapit-Capissayan Rd - K0557 + (-265) - K0563 + 010
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Magapit-Capissayan Rd – K0557 + (- 234.80) – K0569 + 621.30 |
July 11, 2025 |
2025 |
300214101834000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554 + (-334) - K0557 + 735
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Cagayan Valley Rd (Magapit – Jct Aparri Airport Sect) – K0564 + 096 – K0571 + 525 |
July 11, 2025 |
2025 |
310106101299000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Magapit-Capissayan Rd - K0560 + 283 - K0562 + 006
TO:
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads – Jct Magapit – Capissayan Rd – K0560+000 – K0562+672.60, K0563+030.80 – K0564+257.40 |
July 11, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2025 |
Region XIII |
Regional Office XIII |
UACS No. : 310103101906000
Project ID: P00909516MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd (S00431MN) - K1241 + (-435) - K1240 + 954, (S00433MN) - K1240 + (-995) - K1240 + (-535), K1240 + 390 - K1241 + 000, K1241 + 183 - K1241 + 384, K1266 + 000 - K1269 + 000
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 18.849 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 10,239,269.99/Lane Km
TO:
Butuan City-Malaybalay Rd (S00431MN) - K1241 + 336 - K1241 + 401, (S00433MN) - K1241 + 398 - K1241 + 500, K1261 + 600 - K1261 + 942, K1262 + 000 - K1263 + 384, K1263 + 455 - K1264 + 405, K1264 + 476 - K1265 + 480, K1266 + 000 - K1268 + 100
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 20.067 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 9,617,780.43/Lane Km
|
July 11, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310109101784000
Project ID: P00909131MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1280 + 955 - K1280 + 987, K1292 + 482 - K1292 + 495.70
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1000 Square meters
Allocation:
TOTAL: P 25,000,000
CW1: P 24,500,000
EAO: P 500,000
Unit Cost:
CW1: P 24,500/Square meters
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1281 + 955 - K1281 + 991, K1292 + 482 - K1292 + 495.70
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1044.77 Square meters
Allocation:
TOTAL: P 25,000,000
CW1: P 24,500,000
EAO: P 500,000
Unit Cost:
CW1: P 23,450.14/Square meters
|
July 11, 2025 |
2025 |
310105101385000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Magapit-Mission Rd - K0585 + 1139 - K0587 + 887
TO:
Damaged Paved Roads –Secondary Roads – Magapit-Mission Rd – K0554 + (-267.50) – K0555+275.50, K0556+205.40, K0557+298.20, K0584+018 - K0584+765.50, K0587+279 – K0587+1482
|
July 11, 2025 |
2025 |
310202101908000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0633 + 094 - K0634 + 689
TO:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission – Sta. Ana Sect) – K0632+324.48 – K0634+689 |
July 11, 2025 |
2025 |
310106101300000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0525 + 087- K0526 + 658.6, K0542 + 000 - K0542 + 702
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd. – K0525+087.70 – 0526+729.40, K0527+389.70– K0527+465.70, K0531+142.70 –K0531+987.30,K0532+543–K0533+125.50, K0542+000 – K0542+208 |
July 11, 2025 |
2025 |
WIN5E03827 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"Project ID: P00917186LZ
UACS: 310108101983000
FROM:
Project Name:
Mt Prov-Cagayan via Tabuk-Enrile Rd - K0396 + 800 - K0396 + 900
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 3000 Square meters
Allocation:
Php 75,000,000
TO:
Project Name:
Mt Prov-Cagayan via Tabuk-Enrile Rd - K0396 + 800 - K0396 + 900
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 2714 Square meters
Allocation:
Php 75,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|