Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 25, 2024 FY 2024 WIN4E03591 310204102640000 June 13, 2024 Region IX Regional Office IX
UACS No. 310204102640000
Project ID: P00800792MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Sumagdang-Menzi Bypass Road, Zamboanga del Norte
CW1- Road Widening: 0.706 Lane Km
Unit Cost: ₱ 18,161,122.03/ Lane Km CW2- Construction of Concrete Road: 0.726 Lane Km Unit Cost: ₱ 21,203,812.19/ Lane Km CW3- Construction of Road Slope Protection Structure: 1,960.20 sq.m. Unit Cost: ₱ 10,301.15/ sq.m. CW4- Off-Carriageway Improvement/Construction of Bike Lanes: 9,700.00 sq. m. Unit Cost: ₱ 2,452.78/ sq.m. ROW Acquisition: 62,204.00 sq.m. Unit Cost: ₱ 80.38/ sq.m.
EAO: ₱ 2,800,000.00
Allocation: ₱ 80,000,000.00
July 25, 2024 FY 2024 WIN4E03555 310201101314000 May 23, 2024 Region IX Regional Office IX
UACS No. 310201101314000
Project ID: P00800213MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1935+900 - K1935+984.31, K1935+900 - K1935+930, K1935+520 - K1935+594.32
CW1- Road Widening: 0.263 Lane Km
Unit Cost: ₱ 17,407,510.30/ Lane Km CW2- Construction of Drainage Structure along Road: 166.0 Lineal meters Unit Cost: ₱10,758.59/ sq.m. ROW Acquisition: 330.55 sq.m. Unit Cost: ₱ 16,655.26/ sq.m.
EAO: ₱ 430,500.00
Allocation: ₱ 12,300,000.00
July 25, 2024 FY 2024 WIN4E03554 310201101311000 May 23, 2024 Region IX Regional Office IX
UACS No. 310201101311000
Project ID: P00800021MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1784+900 - k1785+256
CW1- Road Widening: 0.712 Lane Km
Unit Cost: ₱ 18,455,955.52/ Lane Km ROW Acquisition: 2,000.00 sq.m. Unit Cost: ₱ 500.0/ sq.m.
EAO: ₱ 514,150.00 Excess: ₱ 42,329.67
Allocation: ₱ 14,690,000.00
July 25, 2024 FY 2024 WIN4E03551 320101111321000 May 23, 2024 Region IX Regional Office IX
UACS No. 320101111321000
Project ID: P00820895MN

OO2: Protect Lives and Properties Against Major Floods – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Tumaga River (Guiwan Section), Zamboanga City Package 1

CW1- Construction of Flood Mitigation Structure: 283.00 Lineal meters
Unit Cost: ₱ 340,897.41/ Lineal meters
EAO: ₱ 3,500,000.00 Excess: ₱ 26,032.91
Allocation: ₱ 100,000,000.00
July 25, 2024 FY 2024 300214100814000 June 18, 2024 Region IX Regional Office IX
UACS No. 300214100814000 Project ID: P00833110MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Pagadian City-Zamboanga City Rd- K1676+800 - K1677+800, Camanga, Dumalinao, Zamboanga del Sur

CW1 - Road Safety/Pavement Markings: 926.00 Lineal Meters
Unit Cost: ₱ 884.28/ Lineal Meters
Allocation: ₱ 810,000.00
July 25, 2024 FY 2024 WIN4E03563 310201101313000 May 23, 2024 Region IX Regional Office IX
UACS No. 310201101313000
Project ID: P00802689MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1648+(-273) - K1649+260
CW1- Road Widening: 3.044 Lane Km
Unit Cost: ₱ 36,298,153.48/ Lane Km ROW Acquisition: 1,425.00 sq.m. Unit Cost: ₱ 7,017.54/ sq.m.
EAO: ₱ 4,375,000.00 Excess: ₱ 133,420.81
Allocation: ₱ 125,000,000.00
July 25, 2024 FY 2024 WIN4E03597 310107100642000 May 23, 2024 Region IX Regional Office IX
UACS No. 310107100642000
Project ID: P00800404MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1703+790 - K1703+990, K1704+060 - K1704+161, K1721+200 - K1721+596.69
CW1- Construction of Road Slope Protection Structure: 5,390.00 sq.m.
Unit Cost: ₱ 20,307.014/sq.m. ROW Acquisition: 68.5788 sq.m.
EAO: ₱ 3,982,300.00
Allocation: ₱ 113,780,000.00
July 23, 2024 FY 2024 P00833081MN SR2024-01-000917 January 26, 2024 Region XII Regional Office XII
Contract ID: 24M00027
Project Cost: P58,677,000

From:
Project Name: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Marbel-Allah Valley-Cotabato Rd - K1810 + 1500 - K1812 + 900
Physical Target: 2.818 lane-km

To:
Project Name: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Marbel-Allah Valley-Cotabato Rd - K1809 + 972 - K1813 + 423.50
Physical Target: 6.903 lane-km
July 22, 2024 CY 2024 WIN4F08064 UACS No. 310101101446000 April 23, 2024 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 310101101446000
Project ID.: P00802172LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Primary Roads

MacArthur H-way – K0017+216 – K0017+388
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 1.032 lane km
Unit Cost (P’000) = P 15,098.84/lane km
Allocation = P 15,582,000.00
EAO = P 318,000.00
Total = P 15,900,000.00

As Modified
As per GAA/Original
UACS No. 310101101446000
Project ID.: P00802172LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Primary Roads

MacArthur H-way – K0017+249 – K0017+388
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.556 lane km
Unit Cost (P’000) = P 26,502.71/lane km
Allocation = P 14,735,500.00
EAO = P 318,000.00
Excess = P 846,500.00
Total = P 15,900,000.00
Bar Code #WIN4F08064
July 22, 2024 2024 WIN4E03543 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 300221106980000
Project ID: P00837269MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road along Don Pedro, San Luis, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.320 Lane Km

Allocation:
TOTAL: P 15,000,000
CW1: P 14,850,000
EAO: P 150,000,000

Unit Cost:
CW1: P 11,250,000/Lane Km

TO:

Construction of Road along Don Pedro, San Luis, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0.95 Lane Km
CW2- 462.5 Square meters

Allocation:
TOTAL: P 15,000,000
CW1: P 11,680,457
CW2: P 3,169,543
EAO: P 150,000,000

Unit Cost:
CW1: P 12,295,218/Lane Km
CW2: P 6,853/Square meters

July 22, 2024 2024 WIN4F08072 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0917 + (-088.50) - K0917 + 000, K0917 + (-247) - K0917 + (-088.50), K0917 + (-263) - K0917 + (-247), K0917 + 000 - K0917 + 430

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 17.26074 M
Asphalt Overlay: 2.772 Lane Km

EAO P 0.35226 M

Total P 17.613 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0917 + (-263) - K0917 + 165

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 17.26074 M
Asphalt Overlay: 1.712 Lane Km

EAO P 0.35226 M


Total P 17.613 M
July 22, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Manlurip-MacArthur Park Rd - K0913 + 726 - K0914 + 761

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 52.772955 M
along Road: 2,056.00 Lineal Meters

EAO P 1.914045 M

Total P 54.687 M

AS MODIFIED:

Sn Jose-Manlurip-MacArthur Park Rd - K0913 + 726 - K0914 + 074, K0914+149 - K0914+761

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 52.772955 M
along Road: 1,906.00 Lineal Meters

EAO P 1.914045 M


Total P 54.687 M
July 22, 2024 2024 GAA FY 2024 March 21, 2024 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads

AS PER GAA/ORIGINAL:

Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0943 + 542 - K0943 + 893

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 7.69202 M
0.702 Lane Km

EAO P 0.15698 M

Total P 7.849 M

AS MODIFIED:

Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0943+542 - K0943+634, K0943+799 - K0943+808, K0943+825 - K0943+880, K0944+144 - K0944+153, K0944+348 - K0944+371, K0944+748 - K0944+781, K0945+909 - K0946+029, K0946+177 - K0946+187, K0946+221 - K0946+261, K0953+923 - K0953+946, K0954+012 - K0954+039, K0954+302 - K0954+344, K0955+400 - K0955+424, K0955+632 - K0955+660, K0957+344 - K0957+353, K0957+466 - K0957+484

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 7.69202 M
0.680 Lane Km

EAO P 0.15698 M


Total P 7.849 M
July 22, 2024 2024 GAA FY 2024 March 21, 2024 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0908 + 852 - K0909 + 000, K0909 + 759 - K0909 + 862, K0912 + 728 - K0912 + 828, K0916 + 320 - K0916 + 370, K0916 + 416 - K0916 + 466

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 9.92642 M
0.906 Lane Km

EAO P 0.20258 M

Total P 10.129 M

AS MODIFIED:

Wright-Taft-Borongan Rd – K0898 + 266 - K0898 + 338, K0901 + 475 - K0901 + 497, K0901 + 515 - K0901 + 529, K0905 + 525 - K0905 + 695, K0908 + 857 - K0908 + 875, K0908 + 884 - K0908 + 898, K0908 + 937 - K0908 + 944, K0908 + 957 - K0908 + 980, K0908 + 985 - K0908 + 998, K0909 + 805 - K0909 + 861, K0912 + 746 - K0912 + 798, K0916 + 320 - K0916 + 370, K0916 + 416 - K0916 + 466

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 9.92642 M
0.793 Lane Km

EAO P 0.20258 M

Total P 10.129 M

July 22, 2024 2024 GAA FY 2024 January 31, 2024 Region VIII Samar 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar

Physical Target: Allocation:

CW1- Construction of Food Mitigation Structure: P 49.00 M
175.00 Lineal Meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar

Physical Target: Allocation:

CW1- Construction of Food Mitigation Structure: P 49.00 M
159.00 Lineal Meters
EAO P 1.00 M


Total P 50.00 M
July 22, 2024 2024 GAA FY 2024 January 31, 2024 Region VIII Samar 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Danao CIS Protection Works along the Dam, Calbayog City, Samar

Physical Target: Allocation:

CW1- Construction of Food Mitigation Structure: P 9.8 M
40.00 Lineal Meters

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

Construction of Danao CIS Protection Works along the Dam, Calbayog City, Samar

Physical Target: Allocation:

CW1- Construction of Food Mitigation Structure: P 9.8 M
37.40 Lineal Meters
EAO P 0.20 M


Total P 10.00 M
July 22, 2024 2024 WIN4F08083 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Kiling-Tanauan-Tabontabon-Julita Rd – K0931 + 317 – K0931 + 363

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 4.9 M
0.230 Lane Km

EAO P 0.10 M

Total P 5.00 M

AS MODIFIED:

Kiling-Tanauan-Tabontabon-Julita Rd – K0931 + 304 – K0931 + 363

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 4.9 M
0.118 Lane Km
EAO P 0.10 M


Total P 5.00 M
July 22, 2024 2024 WIN4XY00323 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Salvacion Heights, Tacloban City, Leyte

Physical Target: Allocation:

CW1- Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km

EAO P 0.50 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation of Road with Drainage, Tacloban North Resettlement, Salvacion Heights, Tacloban City, Leyte

Physical Target: Allocation:

CW1- Rehabilitation of Paved Road : P 12.5832082 M
1.638 Lane Km

CW2 – Construction of Drainage Structure: P 36.9167918 M
2,212.00 Lineal Meters

EAO P 0.50 M


Total P 50.00 M
July 22, 2024 2024 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Rehabilitation of Multipurpose Building (Senior Citizens Center), Barangay Poblacion East II, Municipality of Aliaga, Nueva Ecija
July 22, 2024 2024 WIN4F08053 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0034+081 - K0034+313
July 22, 2024 2024 WIN4F08055 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bocaue - Sn Jose Rd - K0040+186 - K0040+430
July 22, 2024 2024 WIN4F08056 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bocaue - Sn Jose Rd - K0041+000 - K0041+396
July 22, 2024 2024 GAA FY 2024 March 21, 2024 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening – Secondary Roads

AS PER GAA/ORIGINAL:

Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0891 + (-501) - K0891 + 000, K0892 + 613 - K0894 + 100, K0895 + 200 - K0896 + 350, K0896 + 876 - K0897 + 014

Physical Target: Allocation:

CW1- Road Widening: P 48.82654 M
2.674 Lane Km

EAO P 0.99646 M

Total P 49.823 M

AS MODIFIED:

Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0891 + (-501) - K0891 + 000, K0892 + 613 - K0893 + 618

Physical Target: Allocation:

CW1- Road Widening: P 48.82654 M
2.674 Lane Km
EAO P 0.99646 M


Total P 49.823 M
July 22, 2024 2024 WIN4F08057 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Muzon-Tungkong Manga Rd - K0041+(-575) - K0041+(-205)
July 22, 2024 2024 WIN4F08058 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Muzon-Tungkong Manga Rd - K0041+649 - K0041+872
July 22, 2024 2024 WIN4F08065 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0036+890 - K0037+100, K0037+400 - K0037+670
July 22, 2024 2024 WIN4F08066 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0034+313 - K0034+536
July 20, 2024 2024 WIN4F08069 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Inter-Provl Rd - K0906 + 005 - K0906 + 760

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 18.80424 M
Asphalt Overlay: 3.020 Lane Km

EAO P 0.38376 M

Total P 19.188 M

AS MODIFIED:

Leyte-Samar Inter-Provl Rd - K0906 + 005 - K0906 + 435

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 18.80424 M
Asphalt Overlay: 1.720 Lane Km

EAO P 0.38376 M

Total P 19.188 M
July 20, 2024 2024 WIN4F08071 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Primary Roads

AS PER GAA/ORIGINAL:

Palo-Carigara-Ormoc Rd - K0918 + 006 - K0919 + 205

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 29.23928 M
Asphalt Overlay: 4.696 Lane Km

EAO P 0.59672 M

Total P 29.836 M

AS MODIFIED:

Palo-Carigara-Ormoc Rd - K0918 + 006 - K0918 + 743

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 29.23928 M
Asphalt Overlay: 2.948 Lane Km

EAO P 0.59672 M


Total P 29.836 M
July 19, 2024 2024 320102106171000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Yeban, Sta.0+329 - Sta. 0+987, Benito Soliven, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Yeban, (Sta. 0+000 - Sta. 0+690, Sta. 0+875 - Sta. 0+906, Benito Soliven, Isabela
July 19, 2024 2024 320102106199000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Brgy. Upi (Sta. 0+000 - Sta. 0+490), Gamu, Isabela


TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Brgy. Upi (Sta. 0+000 - Sta. 0+426.70), Gamu, Isabela
July 18, 2024 2024 WIN4XY00296 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0069+045 - K0069+410.64, K0071+614 - K0072+500, K0072+500 - K0072+590, K0072+590 - K0072+790, K0072+790 - K0074+351
July 18, 2024 2024 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Rio Chico River, Sta. 5+938.10 - Sta. 5+978.10, Brgy. Sto. Rosario Young, Zaragoza, Nueva Ecija
July 18, 2024 2024 WIN4XY00304 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package A, Capas, Tarlac, Sta. 0+000 - Sta. 0+382.80
July 18, 2024 2024 WIN4XY00312 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package C, Sta. 0+736.80 to Sta. 1+104.00
July 18, 2024 2024 WIN4XY00306 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package D, Sta. 2+350.00 to Sta. 2+704.40
July 18, 2024 2024 WIN4XY00309 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package E, Capas, Tarlac, Sta. 2+704.40 to Sta. 3+058.80
July 18, 2024 2024 WIN4XY00310 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package F, Capas, Tarlac, Sta. 3+058.80 to Sta. 3+412.40
July 18, 2024 2024 WIN4XY00311 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package G, Capas, Tarlac, Sta. 3+412.40 to Sta. 3+773.40
July 18, 2024 FY 2024 GAA P00834653MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1534 + (-983) - K1561 + 288
Physical Target:
CW1: 28,541.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Safety: Pavement Markings)
EAO: P 1,750,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1538 + 280 - K1538 + 507, K1538 + 527 - K1538 + 675,
K1538 + 983 - K1539 + 078, K1539 + 094 - K1539 + 714, K1539 + 734 - K1539 + 973, K1540 + 427 - K1540 + 594,
K1540 + 619 - K1540 + 815, K1540 + 834 - K1540 + 882, K1541 + 741 - K1541 + 812, K1541 + 822 - K1542 + 236,
K1542 + 259 - K1542 + 310, K1543 + 388 - K1543 + 435, K1543 + 443 - K1543 + 656, K1543 + 701 - K1543 + 792,
Davao del Sur
Physical Target:
CW1: 2,494.006 lineal meters (Road Safety: Pavement Markings)
CW2: 275.00 number of units (Road Safety: Roadway Lighting)
CW3: 2,992.807 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 10,455,000.00
CW1: P 5,052,401.00 (Road Safety: Pavement Markings)
CW2: P 25,606,330.00 (Road Safety: Roadway Lighting)
CW2: P 17,591,269.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 1,750,000.00
July 18, 2024 FY 2024 GAA P00803779MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1588 + 462 - K1591 + 160
Physical Target:
CW1: 5.858 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1568 + 687 - K1569 + 240,
K1570 + 263 - K1570 + 893, K1587 + 920 - K1587 + 960
Physical Target:
CW1: 5.063 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW2: 300.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 76,664,187.00 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 19,835,813.00
EAO: P 3,500,000.00
July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 23, 2023 Region XIII Regional Office XIII
UACS No. : 300203102325000
Project ID: P00830089MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

FROM:

NRJ Daang Maharlika Bunawan Brook - Tagbayangbang Road leading to Bulongbulungan Water Falls, Brgy. Bunawan Brook, Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.4 Lane Km

Allocation:
TOTAL: P 21,000,000
CW1: P 20,265,000
EAO: P 735,000

Unit Cost:
CW1: P 14,475,000/Lane Km

TO:

NRJ Daang Maharlika Bunawan Brook - Tagbayangbang Road leading to Bulongbulungan Water Falls, Brgy. Bunawan Brook, Bunawan, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0.79 Lane Km
CW2- 0.97 Lane Km
CW3- 2449.4 Square meters

Allocation:
TOTAL: P 21,000,000
CW1: P 10,975,910
CW2: P 5,140,555
CW3: P 4,148,535
EAO: P 735,000

Unit Cost:
CW1: P 14,254,428.57/Lane Km
CW2: P 5,192,479.8/Lane Km
CW3: P 1,693.69/Square meters


July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 23, 2023 Region XIII Regional Office XIII
UACS No. : 300214101343000
Project ID: P00833162MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Median Island, and Paved Shoulder along Daang Maharlika (Agusan-Davao Sect), (S00439MN) - K1327 + 260 - K1328 + 260, Barangay Sta Cruz, Rosario, Agusan del Sur

Type of Work:
CW1- Road Safety: Pavement Markings

Physical Target:
CW1- 1000 Lineal meters

Allocation:
TOTAL: P 9,720,000
CW1: P 9,525,600
EAO: P 194,400

Unit Cost:
CW1: P 9,525.6/Lineal meters

TO:

Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Median Island, and Paved Shoulder along Daang Maharlika (Agusan-Davao Sect), (S00439MN) - K1327 + 090 - K1328 + 392, Barangay Sta Cruz, Rosario, Agusan del Sur

Type of Work:
CW1- Off-Carriageway Improvement: Construction of Median/Center Island

Physical Target:
CW1- 1480.27 Square meters

Allocation:
TOTAL: P 9,720,000
CW1: P 9,379,800
EAO: P 340,200

Unit Cost:
CW1: P 6,336.54/Square meters
July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 23, 2023 Region XIII Regional Office XIII
UACS No. : 310101101430000
Project ID: P00803788MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Asphalt Overlay along Daang Maharlika (Surigao-Agusan Section) K1227+400 - K1230+041, K1230+279.7 - K1231+370.40

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 7.483 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 25,791,794.73/Lane Km

TO:

Asphalt Overlay along Daang Maharlika (Surigao-Agusan Section) K12225+650 - K1229+650, K1229+780 - K1230+000, K1230+200 - K1231+435, K1232+910 - K1233+210, K1234+583 - K1236+760, K1240+694 - K1240+863

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 17.227 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 11,203,343.59/Lane Km

July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Butuan City District Engineering Office
UACS No. : 300204101507000
Project ID: P00832747MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)

FROM:

NRJ BCIR- Capitol-Bonbon Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.804 Lane Km

Allocation:
TOTAL: P 15,300,000
CW1: P 14,764,500
EAO: P 535,500

Unit Cost:
CW1: P 18,363,805.97/Lane Km

TO:

NRJ BCIR- Capitol-Bonbon Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 0.963 Lane Km

Allocation:
TOTAL: P 15,300,000
CW1: P 14,764,500
EAO: P 535,500

Unit Cost:
CW1: P 15,331,775.7/Lane Km
July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 300221104922000
Project ID: P00835945MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Circumferential Road along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 13)

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 26.406 Lane Km

Allocation:
TOTAL: P 300,000,000
CW1: P 297,000,000
EAO: P 3,000,000

Unit Cost:
CW1: P 11,247,443.76/Lane Km

TO:

Construction of Circumferential Road along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 13)

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Bridge
CW3- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4.746 Lane Km
CW2- 1908 Square meters
CW3- 41124 Square meters

Allocation:
TOTAL: P 300,000,000
CW1: P 76,978,440
CW2: P 137,146,680
CW3: P 82,874,880
EAO: P 3,000,000

Unit Cost:
CW1: P 16,219,646.02/Lane Km
CW2: P 71,879.81/Square meters
CW3: P 2,015.24/Square meters


July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Butuan City District Engineering Office
UACS No. : 310103101713000
Project ID: P00801068MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1241 + 384 - K1241 + 500

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.348 Lane Km

Allocation:
TOTAL: P 2,988,000
CW1: P 2,928,240
EAO: P 59,760

Unit Cost:
CW1: P 8,414,482.76/Lane Km

TO:

Butuan City-Malaybalay Rd - K1247 + 078.00 – K1247 + 163.5

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.3195 Lane Km

Allocation:
TOTAL: P 2,988,000
CW1: P 2,928,240
EAO: P 59,760

Unit Cost:
CW1: P 9,165,070.42/Lane Km

July 17, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Butuan City District Engineering Office
UACS No. : 300203102547000
Project ID: P00832596MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

FROM:

NRJ leading to Mt. Mayapay (Delta Discovery Park), Bit-os Section, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.65 Lane Km

Allocation:
TOTAL: P 18,126,000
CW1: P 17,491,590
EAO: P 634,410

Unit Cost:
CW1: P 6,600,600/Lane Km

TO:

NRJ leading to Mt. Mayapay (Delta Discovery Park), Bit-os Section, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Bridge

Physical Target:
CW1- 126.62 Square meters

Allocation:
TOTAL: P 18,126,000
CW1: P 17,491,590
EAO: P 634,410

Unit Cost:
CW1: P 138,142.39/Square meters
July 17, 2024 2024 310202101516000 GAA 2024 January 3, 2024 Region II Quirino District Engineering Office
FROM:

Network Development - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0324 + 430 - K0324 + 501, K0324 + 541 - K0325+725

TO:

Network Development - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0323 + 781 - K0324 + 501, K0324 + 541 - K0325+325
July 16, 2024 CY 2024 WIN4XY00322 UACS No. 310101101148000 April 23, 2024 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 310101101148000
Project ID.: P00802169LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Primary Roads

Bonifacio Monument Circle-K0009+097 – K0009+209
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.448 lane km
Unit Cost (P’000) = P 8,204.65/lane km
Allocation = P 3,675,685.00
EAO = P 133,315.00
Total = P 3,809,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Primary Roads

Bonifacio Monument Circle-K0009+(-014) – K0009+011.50, K0009+047-K0009+153, K0009+194 – K0009+209
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking– 0.187 lane km
Unit Cost (P’000) = P 18,836.95/lane km
Allocation = P 3,522,509.00
EAO = P 133,315.00
Total = P 3,809,000.00
Bar Code #WIN4XY00322
July 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0086+000 - K0086+588, K0087+460 - K0088+000, K0088+000 - K0089+000, K0089+000 - K0089+763
July 15, 2024 2024 WIN4XY00315 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Road - K0071+085 - K0071+166, K0071+178 - K0073+187, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08039 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0075+218 - K0075+628, K0077+000 - K0078+641, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08036 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0073+187 - K0074+226, K0074+280 - K0074+909, K0074+924 - K0075+156, K0075+171 - K0075+218, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08050 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0068+800 - K0069+173, K0069+209 - K0070+554, K0070+575 - K0070+780, K0070+805 - K0071+085, San Ildefonso, Bulacan
July 15, 2024 2024 WIN4XY00288 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0066+037.50 - K0066+339.10
July 15, 2024 2024 P00820110MN SR2024-01-000507 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Contract ID: 24MD0051
UACS: 320101111447000
Project Name: Libungan River Flood Control Project (Abaga Section - Phase VIII), Abaga, Libungan, Cotabato
Project Amount: ₱ 60,000,000.00
TOW: Construction of Flood Mitigation Structure
Physical Target:
From: 467.742 lineal meters
To: 326.80 lineal meters
July 15, 2024 2024 P00820111MN SR2024-01-000565 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Contract ID: 24MD0052
UACS: 320101111448000
Project Name: Libungan River Flood Control Project (Purok 3 Section), Nalin, Midsayap, Cotabato
TOW: Construction of Flood Mitigation Structure
Physical target:
From: 444.60 lineal meters
To: 381.92 lineal meters
July 15, 2024 2024 WIN4E03456 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310202101619000
Project ID: P00800156MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1185 + 000 - K1186 + 300

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 2.578 Lane Km

Allocation:
TOTAL: P 57,130,000
CW1: P 55,130,450
EAO: P 1,999,550

Unit Cost:
CW1: P 21,384,968.968/Lane Km

TO:

Surigao-Davao Coastal Rd - K1185 + 000 - K1186 + 300

Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
CW3- Off-Carriageway Improvement: Shoulder Paving / Construction

Physical Target:
CW1- 2.578 Lane Km
CW2- 2901.020 Square meters
CW3- 2760 Square meters

Allocation:
TOTAL: P 57,130,000
CW1: P 39,508,110
CW2: P 7,556,210
CW3: P 8,066,130
EAO: P 1,999,550

Unit Cost:
CW1: P 15,325,100.853/Lane Km
CW2: P 2,604.674/Square meters
CW2: P 2,922.511/Square meters
July 15, 2024 2024 P00835807MN SR2024-01-001234 January 27, 2024 Region XII Regional Office XII
Contract ID: 24M00234
UACS: 300219102705000
Project Name: Construction of Riverbank Protection Structure along Rio Grande de Mindanao, Barangay Salimbao (Phase II), Sultan Kudarat, Maguindanao del Norte
Project Cost: ₱ 70,000,000.00
TOW: Construction of Flood Mitigation Structure
Physical target:
From: 469.000 lineal meters
To: 340.000 lineal meters
July 15, 2024 FY 2024 GAA P00835783MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte
Physical Target:
CW1: 450.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte
Physical Target:
CW1: 974.27 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00
July 15, 2024 FY 2024 GAA WIN4E03547 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Sta. Teresita Bridge, Malalag, Davao del Sur
Physical Target:
CW1: 333.900 square meters (Construction of Bridge)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Bridge)
EAO: P 600,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Sta. Teresita Bridge, Malalag, Davao del Sur
Physical Target:
CW1: 240.024 square meters (Construction of Bridge)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Bridge)
EAO: P 600,000.00
July 15, 2024 FY 2024 310101101320000 April 30, 2024 Region IX Regional Office IX
UACS No. 310101101320000
Project ID: P00800981MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1689+000 - K1689+191.96, K1689+239.63 - K1689+625, K1690+871 - K1691+000, K1691+850 - K1692+000, K1692+896 - K1694+000, K1696+000 - K1697+108.60
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 12.280 Lane km
Unit Cost: ₱ 13,520,058.63/ Lane-km
EAO: ₱ 6,021,680.00
Allocation: ₱ 172,048,000.00
July 15, 2024 FY 2024 310101101319000 May 23, 2024 Region IX Regional Office IX
UACS No. 310101101319000
Project ID: P00801125MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1675+000 - K1676+000, K1677+000 - K1677+853, K1699+246 - K1699+593
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 7.110 Lane km
Unit Cost: ₱ 13,845,374.82/ Lane-km
EAO: ₱ 3,570,385.00
Allocation: ₱ 102,011,000.00
July 15, 2024 FY 2024 310101101309000 April 30, 2024 Region IX Regional Office IX
UACS No. 310101101309000
Project ID: P00802718MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd (S01113MN) K1793+870 - K1794+000, K1796+000 - K1796+981.84, K1797+055.71 - K1800+183.00
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 11.023 Lane km
Unit Cost: ₱ 13,131,633.86/ Lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 15, 2024 FY 2024 GAA WIN4E03549 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1736 + 248
Physical Target:
CW1: 1.000 lane km (Road Widening)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Road Widening)
EAO: P 300,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1736 + 100 - K1736 + 300
Physical Target:
CW1: 0.120 lane km (Road Widening)
CW2: 429.00 square meters (Construction of Road Slope Protection Structure)
CW3: 200.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 6,851,122.80 (Road Widening)
CW2: P 6,496,347.26 (Construction of Road Slope Protection Structure)
CW3: P 894,271.67 (Construction of Drainage Structure along Road)
EAO: P 300,000.00
EXC: P 467,610.48 (Excess)
July 15, 2024 FY 2024 WIN4E03409 310107100643000 April 15, 2024 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100643000
Project ID: P00802687MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao – Pagadian – Zamboanga City Road (RN9) K1640+519 – K1640+541.50 L/S

CW1- Construction of Road Slope Protection Structure: 85.04 sq.m.
Unit Cost: ₱ 29,098.31/ sq.m. CW2- Preventive Maintenance of Road/Concrete Reblocking: 0.045 Lane km
Unit Cost: ₱ 9,344,000.00/ Lane km.
EAO: ₱ 105,000.00
Allocation: ₱ 3,000,000.00
July 15, 2024 FY 2024 WIN4E03460 310103101435000 April 24, 2024 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310103101435000
Project ID: P00802711MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Jct Imelda-Alicia Road, Zamboanga Sibugay (S01114MN) K1751 +756 – K1751+847, K1753+424 – K1754+016, K1756+537.50 – K1756+788.50, K1762+000 – K1762+363.50, K1762+400.50 – K1764+198.50

CW1 - Preventive Maintenance - Asphalt Overlay: 8.740 Lane km
Unit Cost: ₱ 13,583,474.83/ Lane km CW2- Preventive Maintenance of Road - Concrete Reblocking: 2.513 Lane km Unit Cost: ₱ 10,358,308.79/ Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2024 2024 WIN4E03507 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
802 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
386 Lineal meters;
Allocation:
Php 100,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4XY00321 SR2024-01-006556 January 30, 2024 Region VIII Southern Leyte Sub-District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1060 + 351 - K1061 + 000, K1061 + 416 - K1062 + 402

Physical Target: Allocation:

CW1-Road Widening: P 48.250965 M
3.282 Lane Km

EAO P 1.750035 M

Total P 50.001 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1060 + 476 - K1061 + 000, K1061 + 416 - K1062 + 402

Physical Target: Allocation:

CW1-Road Widening: P 42.07381438 M
3.032 Lane Km

CW2- Construction of Drainage Structure P 6.17715062 M
along the road: 856 Lineal Meters

EAO P 1.750035 M

Total P 50.001 M
July 13, 2024 2024 WIN4F08049 GAA 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of River Capacity Enhancement Structure, Brgy. Odiong, Javier, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 99.00 M
Structure: 544.800 Lineal Meters

EAO P 1.00 M

Total P 100.00 M

AS MODIFIED:

Construction of River Capacity Enhancement Structure, Brgy. Odiong, Javier, Leyte

Physical Target: Allocation:

CW1 Construction of Flood Mitigation P 99.00 M
Structure: 440.00 Lineal Meters

EAO P 1.00 M

Total P 100.00 M
July 13, 2024 2024 WIN4F08048 SR2024-01-002174 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.5 M
Structure: 712.635 Lineal Meters

EAO P 3.5 M

Total P 100.00 M

AS MODIFIED:

Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte

Physical Target: Allocation:

CW1 Construction of Flood Mitigation P 96.5 M
Structure: 530.00 Lineal Meters

EAO P 3.5 M

Total P 100.00 M
July 13, 2024 2024 WIN4XY00320 FY 2024 GAA January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + 447 - K0907 + 464

Physical Target: Allocation:

CW1-Upgrading of Drainage Structure P 14.7 M
along Road: 17.00 Lineal Meters

EAO P 0.3 M

Total P 15.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + 430 - K0907 + 464, K0924 + 985 – K0924 + 993, K0925 + 1188 – K0925 + 1222

Physical Target: Allocation:

CW1 Upgrading of Drainage Structure P 14.7 M
along Road: 76.00 Lineal Meters

EAO P 0.3 M

Total P15.00 M
July 12, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System, San Jose National High School, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 4.9 M
220 Lineal Meters

EAO P 0.1 M

Total P 5.00 M

AS MODIFIED:

Construction of Drainage System, San Jose National High School, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 4.9 M
464 Lineal Meters

EAO P 0.1 M

Total P 5.00 M
July 12, 2024 2024 WIN4F08042 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure (Drainage), barangay 62-B, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 29.4 M
2,275.565 Lineal Meters

EAO P 0.6 M

Total P 30.00 M

AS MODIFIED:

Construction of Flood Control Structure (Drainage), barangay 62-B, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 29.4 M
1,706 Lineal Meters

EAO P 0.6 M

Total P 30.00 M
July 12, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage Structure, Barangay 50, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure: P 9.8 M
450.00 Lineal Meters

EAO P 0.2 M

Total P 10.00 M

AS MODIFIED:

Construction of Drainage Structure, Barangay 50, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure: P 9.8 M
519.00 Lineal Meters

EAO P 0.2 M

Total P 10.00 M
July 12, 2024 FY 2024 P00821202MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00224
Amount: 100,000,000.00
Construction of Concrete Revetment along Silway River, Barangay Apopong, General Santos City
July 12, 2024 FY 2024 P00800175MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00181
Amount: 121,791,000.00
From: Surallah-Lake Sebu-Maitum Rd - K1783 + 559 - K1784 + 944
To: Surallah-Lake Sebu-Maitum Rd - K1783 + 559 - K1785 + 469
July 12, 2024 FY 2024 P00801041MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Amount: ₱ 83,887,000.00
Davao-Cotabato Rd (Dual) - Chainage 0 - Chainage 1421
July 12, 2024 2024 WIN4XY00316 GAA FY 2024 January 23, 2024 Region VIII Leyte 4th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Multi Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building, Poblacion, Barangay Minuyan Proper, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 49.5 M
1.00 Number of Building

EAO P 0.5 M

Total P 50.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Poblacion, Kananga, Leyte

Physical Target: Allocation:

CW1- Construction of Multi Purpose Building: P 49.5 M
1.00 Number of Building

EAO P 0.5 M

Total P 50.00 M
July 11, 2024 FY 2024 P00800364MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱6,000,000.00
From: Makilala-Allah Valley Rd -K1611 + 600 - K1611 + 614
To: Makilala-Allah Valley Rd -K1618 + 103 - K1618 + 117
July 11, 2024 FY 2024 P00800497MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amoun: ₱100,000,000.00
From: Paco- Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd - K1683 + 430 - K1683 + 595
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1684 + 475 – K1684 + 617
July 11, 2024 FY 2024 P00800531MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 21,245,000.00
From: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd – K1642 + 571 – K1642 + 602
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd – K1642 + 546 – K1642 + 628
July 11, 2024 FY 2024 P00801042MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 46,046,000.00
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) – K1618+000 - K1618+650
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) – K1617+610 - K1618 + 090
July 11, 2024 CY 2024 WIN4F08038 UACS No. 310102101702000 March 19, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310102101702000
Project ID.: P00801743LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0014 + 404 – K0014 + 815
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 3.288 lane km
Unit Cost (P’000) = P 4,470.80/lane km
Allocation (P’000) = P 14,700.00
EAO (P’000) = P 300.00
Total (P’000) = P 15,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0013 + (-030) – K0013 + 222
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 1.580 lane km
Unit Cost (P’000) = P 9,303.80/lane km
Allocation (P’000) = P 14,700.00
EAO (P’000) = P 300.00
Total (P’000) = P 15,000.00
Bar Code #WIN4F08038
July 11, 2024 CY 2024 WIN4F08040 UACS No. 310102101703000 March 19, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310102101703000
Project ID.: P00801742LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0016 + 600 – K0016 + 846
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 2.214 lane km
Unit Cost (P’000) = P 4,426.38/lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total (P’000) = P 10,000.00

As Modified
As per GAA/Original
UACS No. 310102101703000
Project ID.: P00801742LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0016 + 735 – K0016 + 801
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.659 lane km
Unit Cost (P’000) = P 14,871.02/lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total (P’000) = P 10,000.00
Bar Code #WIN4F08040
July 11, 2024 FY 2024 P00801047MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 18,152,000.00
From: Magpet – Nowa – Doroluman - Greenfield Rd – K1629+366 - K1630+000, K1634+000 - K1634+726
To: Magpet – Nowa – Doroluman - Greenfield Rd –
K1629 + (-212) - K1629 + 768
July 11, 2024 2024 310104100633000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0292 + 000 - K0293 + 225, K0293 + 356 - K0294 + 100, K0294 + 152 - K0294 + 407, K0294 + 660 - K0295 + 980

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0292 + 000 - K0293 + 225, K0293 + 356 - K0294 + 100, K0294 + 152 - K0294 + 407, K0294 + 660 - K0295 + 980, K0296 + 000 - K0299 + 000
July 11, 2024 2024 300214100662000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0309 + (-890) - K0309 + (-606), K0310 + 522 - K0310 + 814, K0317 + 000 - K0318 + 131

TO:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0309 + (-890) - K0309 + (-606), K0310 + 522 - K0310 + 814, K0316 + 003 - K0317 + 247
July 11, 2024 2024 310104100632000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Daang Maharlika (LZ) - K0246 + 504 - K0248 + 000, K0253 + 000 - K0253 + 643, K0254 + 652 - K0255 + 766

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads -Daang Maharlika (LZ) – K0248 + 000 - K0249 + 000, K0252 + 000 - K0253 + 000, K0253 + 000 - K0253 + 643, K0253 + 643 - K0254 + 652, K0254 + 652 - K0255 + 766, K0256 + 406 - K0257 + 000, K0260 + 081 - K0262 + 000
July 11, 2024 2024 300214100995000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 - Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Street Lights along Daang Maharlika (LZ) (S00857LZ) - K0252 + 272 - K0253 + 270, Barangay Macate, Bambang, Nueva Vizcaya

TO:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 - Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Street Lights – Daang Maharlika (LZ) – K0252 + 002 – K0253 + 000, Barangay Macate, Bambang, Nueva Vizcaya
July 11, 2024 2024 310110100500000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Cagayan Valley Road K0477 + 331 - K0478 + 580

TO:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Cagayan Valley Road K0477 + 230.40 - K0477 + 714.70
July 11, 2024 2024 310101101187000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0318 + 600 - K0323 + 000, K0324 + 000 - K0324 + 722, K0328 + 492 - K0330 + 000

TO:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0318 + 600 - K0321 + 497, K0366 + 337 - K0367 + 431.50
July 11, 2024 FY 2024 300215104985000 June 7, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300215104985000
Project ID: P00834956MN


Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Landang Gua, Zamboanga City

CW1 - Construction of Concrete Road: 2.72 Lane Km
Unit Cost: ₱ 7,807,503.82 CW2- Construction of Road Slope Protection Structure: 869.04 sq.m.
Unit Cost: ₱ 3,755.40/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00

Pages