August 9, 2024 |
2024 |
310203100761000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0477 + 040
TO:
Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0476 + 220, K0476 + 220 - K0476 + 300 |
August 9, 2024 |
2024 |
310205101189000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase III |
August 9, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge – Widening of Permanent Bridges
AS PER GAA/ORIGINAL:
Apitong Br. (B00030LT) along Apitong – Paterno Rd
Physical Target: Allocation:
CW1- Widening of Bridge: P 19.6 M
24 Square Meters
EAO P .400 M
Total P 20.00 M
AS MODIFIED:
Apitong Br. (B00030LT) along Apitong – Paterno Rd
Physical Target: Allocation:
CW1- Widening of Bridge: P 19.6 M
123.84 Square Meters
EAO P .400 M
Total P 20.00 M
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 523, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
Road Widening;
Physical Target:
4.566 Lane Km;
Allocation:
Php 74,648,000"
"To:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 638, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
CW1: Road Widening
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.444 Lane Km
CW2: 2658 Square meters;
Allocation:
Php 74,648,000"
|
August 8, 2024 |
2024 |
WIN4E03592 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of Multi-Purpose Building, Barangay Payeo, Sagada, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"
"To:
Construction of Multi-Purpose Building, Barangay Payeo, Besao, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"
|
August 8, 2024 |
2024 |
WIN4E03627 |
SR2024-01-003964 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
11,442 Lineal meters;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
536 Number of units;
Allocation:
Php 125,000,000"
|
August 8, 2024 |
2024 |
WIN4E03626 |
SR2024-01-003953 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0334 + (-889) - K0353+2495 (S00387LZ);
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0348 + 000 - K0351+000 (S00378LZ);
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
387 Number of Units;
Allocation:
Php 100,000,000"
|
August 8, 2024 |
2024 |
WIN4E03625 |
SR2024-01-003967 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467, Mankayan, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0351+000 - K0353 + 2495, Mankayan, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of units;
Allocation:
Php 125,000,000"
|
August 8, 2024 |
2024 |
WIN4E03607 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 737, K0510 + 015 - K0510 + 084;
Type of Work:
Road Widening;
Physical Target:
0.892 Lane Km;
Allocation:
Php 65,054,000"
"To:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 075;
Type of Work:
CW1: Road Widening
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 5.566 Lane Km
CW2: 1500 Lineal meters;
Allocation:
Php 65,054,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.467 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
930 Lineal meters;
Allocation:
Php 100,000,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
3.552 Lane Km;
Allocation:
Php 80,000,000"
"To:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.2 Lane Km
CW2: 4566 Square meters;
Allocation:
Php 80,000,000"
|
August 8, 2024 |
2024 |
P00835023MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 1st District Engineering Office |
P00835023MN
300215105056000
Convergence and Special Support System - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
FROM:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.50 Lane Km
Allocation:
CW1: Php 14,435,400.00
EAO: Php 736,500.00
TO:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.40 Lane Km
CW2- 928.30 Square Meters
Allocation:
CW1: Php 26,594,164.94
CW2: Php 9,494,335.06
EAO: Php 736,500.00 |
August 8, 2024 |
2024 |
WIN4E03536 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
482.603 Lineal meters;
Allocation:
Php 5,000,000"
"To:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
89 Linear Meters;
Allocation:
Php 5,000,000"
|
August 8, 2024 |
2024 |
WIN4E03598 |
SR2024-03-012867 |
March 5, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"
"To:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
8.154 Lane Km;
Allocation:
Php 153,000,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0263 + 183, Barangay Caponga, Tublay, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
1200 Lineal meters;
Allocation:
Php 2,700,000"
"To:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0265 + 353, Barangay Caponga, Tublay, Benguet;
Type of Work:
CW1: Road Safety: Pavement Markings
CW2: Road Safety: Guardrails;
Physical Target:
CW1: 3400 Lineal meters
CW2: 451 Lineal meters;
Allocation:
Php 2,700,000"
|
August 8, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+115 (Left Side), Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
765 Lineal meters;
Allocation:
Php 50,000,000"
"To:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+200, Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
827 Lineal meters;
Allocation:
Php 50,000,000"
|
August 7, 2024 |
2024 |
WIN4XY00331 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800184LZ
UACS No : 310202101697000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 159
Physical Target :
CW1 - Road Widening - 0.208 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 076
Physical Target :
CW1 - Road Widening - 0.042 Lane Km
CW2 - Construction of Drainage Structure along Road - 42 Lineal meters |
August 7, 2024 |
2024 |
WIN4XY00330 |
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00800186LZ
UACS No : 310202101699000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 264 - K0009 + 367
Physical Target :
CW1 - Road Widening - 0.103 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 091 - K0009 + 101.5
Physical Target :
CW1 - Road Widening - 0.021 Lane Km
CW2 - Construction of Drainage Structure along Road - 21 Linear meters |
August 7, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00802553LZ
UACS No : 310106101181000
FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstructure/ Upgrading of Damaged Paved Roads - Tertiary Roads - Masbate Circumferential Rd - K0004 + 000 - K0004 + 175
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.7 Lane Km
TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstructure/ Upgrading of Damaged Paved Roads - Tertiary Roads - Masbate Circumferential Rd - K0004 + 444 - K0004 + 884
Physical Target :
CW1 - Rehabilitation of Paved Road - 0.88 Lane Km
CW2 - Road Safety - Street Lighting - 32 Number of Units |
August 7, 2024 |
2024 |
WIN4XY00339 |
GAA 2024 |
January 19, 2024 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00824785LZ
UACS No : 320101112028000
FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structure at Brgy. Benticayan, Baras, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 186 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structure at Brgy. Benticayan, Baras, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 149 Lineal meters
|
August 7, 2024 |
2024 |
WIN4XY00337 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00839453LZ
UACS ID : 3000224100036000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road, Barangay Población, Rapu-Rapu, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.968 Lane Km
CW2 - Construction of Road Slope Protection - 2,601.40
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road, Barangay Población, Rapu-Rapu, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.38 Lane Km
CW2 - Construction of Road Slope Protection - 2,033.20 Square meters
|
August 7, 2024 |
2024 |
WIN4XY00338 |
WIN4XY00338 |
January 19, 2024 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00848239LZ
UACS No : 300226113504000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multipurpose Buildings, Brgy. Mambungalon, Basud, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multipurpose Buildings, Brgy. Mambungalon, Mercedes, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings |
August 7, 2024 |
2024 |
|
SR2024-01-008076 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0906 + 569 – K0906 + 915
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 14.94206 M
Asphalt Overlay: 1.384 Lane Km
EAO P 0.54194 M
Total P 15.484 M
AS MODIFIED:
Daang Maharlika (LT) – K0906 + 520 – K0906 + 915
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 14.94206 M
Asphalt Overlay: 1.58 Lane Km
EAO P 0.54194 M
Total P 15.484 M
|
August 7, 2024 |
2024 |
|
SR2024-04-014756 |
April 12, 2024 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program
Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Installation of Solar LED Street Lights, and Signages along Tacloban City Bypass Road Extension, Phase 1, Barangay Tigbao, Tacloban City
Physical Target: Allocation:
CW1- Road Safety: P 46.575435 M
Road Lighting: 268.00 Number of Units
CW2- Road Safety:
Guardrails: 1,760.00 Lineal Meters P 49.924565 M
EAO P 3.5 M
Total P 100.00 M
AS MODIFIED:
Installation of Solar LED Street Lights, and Signages along Tacloban City Bypass Road Extension, Phase 1, Barangay Tigbao, Tacloban City
Physical Target: Allocation:
CW1- Road Safety: P 73.16921039 M
Road Lighting: 442.00 Number of Units
CW2- Road Safety:
Guardrails: 3,100.00 Lineal Meters P 23.33078961 M
EAO P 3.5 M
Total P 100.00 M
|
August 7, 2024 |
2024 |
WIN4E03584 |
SR2024-01-003732 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Installation of Road Safety Devices along Shilan-Beckel Road, K0261+(-392) - K0266+403, La Trinidad, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
5514 Lineal Meter;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Shilan-Beckel Road, K0261+(-392) - K0266+403, La Trinidad, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
535 Number of units;
Allocation:
Php 125,000,000"
|
August 7, 2024 |
2024 |
WIN4E03507 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
802 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
386 Lineal meters;
Allocation:
Php 100,000,000"
|
August 7, 2024 |
2024 |
WIN4E03515 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"
"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
|
August 7, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
Convergence and Special Support Program
SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Barangay Binolo, Tanauan Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 12.250 M
0.246 Lane Km
EAO P .250 M
Total P 12.50 M
AS MODIFIED:
Construction of Road, Barangay Binolo, Tanauan Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 12.250 M
1.20 Lane Km
EAO P .250 M
Total P 12.250 M
|
August 7, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
Convergence and Special Support Program
SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, San Antonio to Camire, Tanauan Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 12.250 M
0.246 Lane Km
EAO P .250 M
Total P 12.50 M
AS MODIFIED:
Construction of Road, San Antonio to Camire, Tanauan Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 12.250 M
1.50 Lane Km
EAO P .250 M
Total P 12.250 M
|
August 7, 2024 |
2024 |
WIN4XY00325 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Tertiary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd (Tanauan Sect) - K0921 + (-108.87) - K0921 + 356.69, K0921 + (-697) - K0921 + (-132)
Physical Target: Allocation:
CW1- Road Widening: P 23.69248 M
2.061 Lane Km
EAO P 0.48352 M
Total P 24.176 M
AS MODIFIED:
Tacloban-Baybay South Rd (Tanauan Sect) - K0921 + (-697) - K0921 + (-132)
Physical Target: Allocation:
CW1- Road Widening: P 13.20771917 M
1.130 Lane Km
CW2 – Construction of Drainage Structure: P 10.48476082 M
Along Road: 174 Lineal Meters
EAO P 0.48352 M
Total P 24.176 M
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"
"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"
"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"
"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
|
August 6, 2024 |
2024 |
WIN4E03556 |
SR2024-03-012873 |
March 5, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Sagpat, Kibungan, Benguet to Santol, La Union Road (Phase II), Kibungan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"
"To:
Construction of Sagpat, Kibungan, Benguet to Santol, La Union Road (Phase II), Kibungan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
6.858 Lane Km;
Allocation:
Php 153,000,000"
|
August 6, 2024 |
2024 |
WIN4E03557 |
SR2024-03-012871 |
March 5, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Poblacion Dalingoan - Sinacbat Road (Phase II), Bakun, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"
"To:
Construction of Poblacion Dalingoan - Sinacbat Road (Phase II), Bakun, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
6.30 Lane Km;
Allocation:
Php 153,000,000"
|
August 6, 2024 |
2024 |
WIN4E03559 |
SR2024-02-008368 |
February 2, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Loo Section, Sta. 0+432 - Sta. 1+836 (R.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1404 Lineal meters;
Allocation:
Php 65,000,000"
"To:
Construction of Flood Mitigation Structure along Agno River, Loo Section, Sta. 0+432 - Sta. 1+043 (LS), Sta. 0+767 - Sta. 1+021 (RS), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
865 Lineal meters;
Allocation:
Php 65,000,000"
|
August 6, 2024 |
2024 |
|
SR2024-05-016179 |
May 20, 2024 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Rehabilitation of Road, Bayabas Central - Calamay Road, Barangay Bayabas, Sablan, Benguet;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.240 Lane Km
CW2: 341.8 Square meter;
Allocation:
Php 5,000,000"
"To:
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National
Road/s leading to Major/ Strategic Public Buildings/ Facilities;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.240 Lane Km
CW2: 416.14 Square meters;
Allocation:
Php 5,000,000"
|
August 6, 2024 |
2024 |
WIN4E03541 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 280 - K0426 + 580;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
0.6 Lane Km;
Allocation:
Php 6,008,000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 280 - K0426 + 400;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.240 Lane Km
CW2: 360 Square meters;
Allocation:
Php 6,008,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
3.552 Lane Km;
Allocation:
Php 80,000,000"
"To:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.2 Lane Km
CW2: 4566 Square meters;
Allocation:
Php 80,000,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 722 - K0505 + 899, K0514 + 521 - K0514 + 621;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
277 Lineal meters;
Allocation:
Php 10501000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 722 - K0506 + 044 & K0506 + 080 - K0506 + 280, K0514 + 521 - K0514 + 621;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
652 Lineal meters;
Allocation:
Php 10,501,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 321 - K0523 + 100;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
760 Lineal meters;
Allocation:
Php 38,257,000"
"To:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 321 - K0523 + 640, K0522 + 121 - K0523 + 220;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
2418 Lineal Meters;
Allocation:
Php 38,257,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Flood Control Structure at Liwan East-Calaocan along Pangol Creek, Sta. 11+060-Sta. 11+160, Barangay Liwan East, Calaocan, Arsenio, Rizal, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
82.05 Lineal meter;
Allocation:
Php 10,000,000"
"To:
Construction of Flood Control Structure at Liwan East-Calaocan along Pangol Creek, Sta. 11+060-Sta. 11+320, Barangay Liwan East, Calaocan, Arsenio, Rizal, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
260 Lineal meters;
Allocation:
Php 10,000,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Rehabilitation of Flood Control Structure, Purok Riverside, Poblacion Taga, Pinukpuk, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
205.124 Lineal meters;
Allocation:
Php 25,000,000"
"To:
Rehabilitation of Flood Control Structure, Purok Riverside, Poblacion Taga, Pinukpuk, Kalinga;
Type of Work:
Rehabilitation/ Major Repair of Flood Control Structure;
Physical Target:
322 Lineal Meters;
Allocation:
Php 25,000,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Bulo-Makilo Road (Bulo Section), Barangay Bulo, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.871 Lane Km;
Allocation:
Php 50,000,000"
"To:
Construction of Bulo-Makilo Road (Bulo Section), Barangay Bulo, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
6.032 Lane Km;
Allocation:
Php 50,000,000"
|
August 6, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Seet-Mabaca-Taloctoc-Mangali Road, Tanudan, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.644 Lane Km;
Allocation:
Php 37,000,000"
"To:
Construction of Seet-Mabaca-Taloctoc-Mangali Road, Tanudan, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2.124 Lane Km
CW2: 1112 Square meters;
Allocation:
Php 37,000,000"
|
August 6, 2024 |
2024 |
WIN4E03544 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Banagao-Mangali Road, Tanudan, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.348 Lane Km;
Allocation:
Php 20,000,000"
"To:
Construction of Banagao-Mangali Road, Tanudan, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: .2 Lane Km
CW2: 9.858 Square meters;
Allocation:
Php 20,000,000"
|
August 6, 2024 |
2024 |
WIN4E03578 |
SR2024-01-005186 |
January 30, 2024 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0345 + 240 - K0345 + 445;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
5882.353 Square meters;
Allocation:
Php 100,000,000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0345 + 240 - K0345 + 340;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
3850 Square meters;
Allocation:
Php 100,000,000"
|
August 6, 2024 |
2024 |
WIN4E03596 |
SR2024-01-003715 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Installation of Road Safety Devices along Pico-Lamtang Road, K0256 + 000 - K0261 + 000 - K0261 + 1965, La Trinidad, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
6928 Lineal Meter;
Allocation:
Php 125,000,000"
"To:
Installation of Road Safety Devices along Pico-Lamtang Road, K0255+(-555) - K0261 + 000 - K0261 + 1965, La Trinidad, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
525 Number of units;
Allocation:
Php 125,000,000"
|
August 5, 2024 |
2024 |
WIN4XY00332 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0018+541 - K0018+1059, K0019+000 - K0019+329 |
August 5, 2024 |
2024 |
WIN4XY00336 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0021+587 - K0021+877, K0022+000- K0022+060, K0022+125 - K0022+492, K0023+801 - K0023+931 |
August 5, 2024 |
2024 |
WIN4F08059 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bocaue - Sn Jose Rd - K0037+825 - K0038+173 |
August 5, 2024 |
2024 |
WIN4F08081 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads
Sn Fernando-Lubao Rd - K0075+254 - K0075+538.64, K0081+531 - K0081+562, K0082+911 - K0083+106.51, K0085+029 - K0085+098.60, K0085+351.60 -K0085+458.75 |
August 5, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0084+391 - K0084+540, K0084+540 - K0085+000, K0085+000 - K0085+088.50 |
August 5, 2024 |
2024 |
WIN4F08070 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - K0913 + (-029.36) - K0913 + 000, K0913 + (-157) - K0913 + (-029.36), K0913 + 000 - K0913 + 730
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 22.09312 M
Asphalt Overlay: 3.548 Lane Km
EAO P 0.45088 M
Total P 22.544 M
AS MODIFIED:
Govt Ctr Rd Network - K0913 + (-157) - K0913 + 395
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 22.09312 M
Asphalt Overlay: 2.208 Lane Km
EAO P 0.45088 M
Total P 22.544 M
|
August 2, 2024 |
CY 2024 |
WIN4XY00341 |
UACS No. 300226110827000 |
June 11, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300226110827000
Project ID.: P00846706LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Rehabilitation of Multi-Purpose Buildingm (College of Economics) at U.P. Diliman, Quezon City
Physical Target: CW1 = Rehabilitation/ Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 29,700.00/no. of bldgs..
Allocation (P’000)= P 29,700.00
EAO (P’000) = P 300.00
Total (P’000)= P 30,000.00
As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Rehabilitation of Multi-Purpose Buildingm (School of Economics) at U.P. Diliman, Quezon City
Physical Target: CW1 = Rehabilitation/ Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 29,700.00/no. of bldgs..
Allocation (P’000)= P 29,700.00
EAO (P’000) = P 300.00
Total (P’000)= P 30,000.00
Bar Code #WIN4XY00341
|
August 2, 2024 |
FY 2024 |
P00820198MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Saranggani District Engineering Office |
Construction of Bagacay Flood Mitigation Structure, Alabel, Sarangani
Construction of Flood Mitigation Structure
Amount: ₱ 47,254,000.00 |
August 2, 2024 |
FY 2024 |
P00800499MN |
SR2024-01-002300 |
January 27, 2024 |
Region XII |
Saranggani District Engineering Office |
From: Sarangani-Davao Del Sur Coastal Rd - K1749 + 100 - K1749 + 300
To: Rehabilitatio/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Sarangani- Davao del Sur Coastal Rd- K1696+915- K1697+012, K1697+135- K1697+290, K1749+110-K1749+300
Amount: ₱ 75,000,000.00 |
August 2, 2024 |
2024 |
P00803766MN |
SR2024-01-001925 |
January 27, 2024 |
Region X |
Regional Office X |
P00803766MN
310101101342000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1525 + 274 - K1527 + 520, K1538 + 1014 - K1539 + 683
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-6.218 Lane Km
Allocation:
Total: Php 122,720,000.00
CW1: Php 118,424,800.00
EAO: Php 4,925,200.00
TO:
Sayre Highway K1526 + (-726) - K1527 + 000, K1539 + 000 - K1539 + 681
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-9.748 Lane Km
Allocation:
Total: Php 122,720,000.00
CW1: Php 118,424,800.00
EAO: Php 4,925,200.00 |
August 2, 2024 |
2024 |
P00800006MN |
SR2024-01-003092 |
January 27, 2024 |
Region X |
Regional Office X |
P00800006MN
310203100788000
OO1:Ensure Safe and Reliable National Road System - Network Development- Road Widening - Tertiary Roads
FROM:
Mulondo-Wao Rd - (S01604MN) Chainage 9300 - Chainage 11300
Type of Work:
CW1- Road Widening
Physical Target:
CW1-4.000 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00
TO:
Mulondo-Wao Rd - (S01604MN) Chainage 40 - Chainage 2040
Type of Work:
CW1-Road Widening
Physical Target:
CW1-4.000 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00 |
August 2, 2024 |
2024 |
P00834899MN |
SR2024-07-01803 |
July 22, 2024 |
Region X |
Regional Office X |
P00834899MN
300215104074000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (East Dalurong Section and West Dalurong Section), Kitaotao,Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.200 Lane Km
Allocation:
Total: Php 140,000,000.00
CW1: Php 135,100,000.00
EAO: Php 4,900,000.00
TO:
Construction of Road, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (East Dalurong Section and West Dalurong Section), Kitaotao,Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-5.200 Lane Km
CW2-4,940.00 Square meters
Allocation:
Total: Php 140,000,000.00
CW1: Php 108,376,592.01
CW2: Php 26,723,407.99
EAO: Php 4,900,000.00 |
August 2, 2024 |
2024 |
P00834902MN |
SR2024-07-018042 |
July 22, 2024 |
Region X |
Regional Office X |
P00834902MN
300215104077000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.000 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-4.040 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 31, 2024 |
2024 |
310109101450000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0477+(-158)- K0477+(-258)
|
July 31, 2024 |
2024 |
310201101389000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 2nd District Engineering Office |
FROM:
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0388 + 1075.62 - K0390 + 000
TO:
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0389 + 240 - K0389 + 776 |
July 31, 2024 |
2024 |
310103101374000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Ipil-Quirino Bdry Rd - K0365 + 500 - K0376 + 500 - K0376 + 211
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Ipil-Quirino Bdry Rd - K0365 + 974 - K0373 + 763 |
July 31, 2024 |
2024 |
310105101009000 |
GAA 2024 |
January 3, 2024 |
Region II |
Nueva Vizcaya District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Nueva Vizcaya-Ifugao Rd - K0283 + (-463) - K0289 + 010
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Nueva Vizcaya-Ifugao Rd - K0283 + (-463) - K0283 + 073, K0284 + 365 - K0289 + 010 |
July 31, 2024 |
2024 |
310204102443000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
Network Development - Construction of By-Pass and Diversion Roads - Tuguegarao West Diversion Road (Jct. Carig-Linao-Atuluyan-Bagay-Buntun), Package 1, Cagayan |
July 31, 2024 |
2024 |
300215104461000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Maddarulug Sur, Enrile, Cagayan |
July 31, 2024 |
2024 |
300215104464000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Bridge and Approaches, Brgy. Dassun, Solana, Cagayan |
July 31, 2024 |
2024 |
300216100032000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of Access Road, Leading to Indigenous People of Peñablanca, Cagayan |
July 31, 2024 |
2024 |
300215104480000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or ridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities - Construction of Nattallag Bridges & Approaches, Brgy. Mangga, Peñablanca, Cagayan, Phase II |
July 31, 2024 |
2024 |
310201101247000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0271 + 000 - K0272 + 379, K0273 + 392 - K0276 + 000, K0277 + 580 - K0279 + 000
TO:
Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0271 + 940 - K0272 + 376.30, K0273 + 408.70 - K0275 + 158.10 |
July 30, 2024 |
2024 |
WIN4F08073 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800214LZ
UACS No: 310108101265000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0414 + 385 - K0416 + 000, K0416 + 760 - K0416 + 836, K0423 + 970 - K0424 + 757, K0425 + 131 - K0426 + 722, K0429 + 597 - K0429 + 893, K0432 + 527 - K0432 + 528
Physical Target :
CW1 - Road Widening - 8.738 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0414 + 385 - K0415 + 360, K0423 + 970 - K0424 + 757, K0425 + 131 - K0426 + 722, K0429 + 632 - K0429 + 893
Physical Target :
CW1 - Road Widening - 7.21 Lane Km
ROW - ROW Acquisition - 18025 Square meter |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800901LZ
UACS No: 310108101873000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0168 + 650 - K0168 + 675
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 575 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0168 + 620 - K0168 + 705
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 681 Square meters |
July 30, 2024 |
2024 |
WIN4X700328 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800218LZ
UACS No: 310201101279000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - Daang Maharlika (LZ) - K0580 + 939 - K0580 + 968, K0580 + 994 - K0581 + 000, K0581 + 024 - K0581 + 269, K0581 + 269 - K0581 + 279, K0581 + 279 - K0581 + 375, K0581 + 432 - K0581 + 444, K0581 + 528 - K0581 + 571, K0581 + 707 - K0581 + 761
Physical Target :
CW1 - Road Widening - 0.381 Lane Km
CW2 - Construction of Drainage Structure along Road - 386 Lineal meters
ROW - ROW Acquisition - 24.27 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0585 + 757 - K0586 + 322
Physical Target :
CW1 - Road Widening - 0.852 Lane Km
CW2 - Construction of Slope Protection Structure - 2191.34 Square meters |
July 30, 2024 |
2024 |
WIN4F08047 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800225LZ
UACS No: 310201101259000
FROM :
Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0267 + 145 - K0270 + 089
Physical Target :
CW1 - Road Widening - 5.912 Lane Km
ROW - ROW Acquisition - 59,120 Square meters
TO :
Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0267 + 145 - K0270 + 089
Physical Target :
CW1 - Road Widening - 5.077 Lane Km
CW2 - Construction of Road Slope Protection Structure - 4,199.92 Square Meters |
July 30, 2024 |
2024 |
WIN4F08045 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00802127LZ
UACS No: 310101101263000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0443 + (-420) - K0448 + 565 Phase II
Physical Target :
CW1 - Preventive Maintenance of Road Asphalt Overlay - 22.812 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0444 + 159 - K0447 + 152.50
Physical Target :
CW1 - Preventive Maintenance of Road Asphalt Overlay - 11.822 Lane Km |
July 30, 2024 |
2024 |
WIN4XY00327 |
2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800890LZ
UACS No: 310107100614000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0526 + 041 - K0526 + 057
Physical Target :
CW1 - Construction of Road Slope Protection Structure
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 744.16 - K0520 + 767.80, K0526 + 041.00 - K0526 + 057.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 210.980 Square meters |
July 30, 2024 |
2024 |
WIN4XY00318 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800913LZ
UACS No: 310107100612000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0367 + 825 - K0367 + 875
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1108 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0338 + 475 - K0338 + 560
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 570.18 Square meters |
July 30, 2024 |
2024 |
WIN4XY00319 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800911LZ
UACS No: 310107100610000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) K0354 + 878 - K0355 + 000
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 4000 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0358 + 860 - K0358 + 950, K0359 + 915 - K0359 + 975
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1866.06 Square meters |
July 30, 2024 |
2024 |
WIN4XY00317 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800912LZ
UACS No: 310107100611000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0365 + 100 - K0365 + 130
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1560 Square meter
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0365 + 100 - K0365 + 130, K0367 + 825 - K0367 + 875
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 676.39 Square meters |
July 30, 2024 |
2024 |
WIN4XY00289 |
GAA 2024 |
December 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800542LZ
UACS No: 310205101228000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Pasacao - Balatan Tourism Coastal Highway (Pasacao - Minalabac Section), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 10.477 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Pasacao - Balatan Tourism Coastal Highway (Pasacao - Minalabac Section), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 4.769 Lane Km
CW2 - Construction of Road Slope Protection Structure - 3651.7 Square |
July 30, 2024 |
2024 |
WIN4F08046 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837427LZ
UACS No: 300214100758000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0515 + 659 -K0516 + 005, K0516 + 596 - K0518 + 706, K0521 + 128 - 522 + 434, K0522 + 800 - K0522 + 922, K0524 + 046 - K0524 + 480, K0527 + 627 - K0528 + 432
Physical Target :
CW1 - Rehabilitation of Paved Road - 9.418 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0516 + 596 - K0518 + 809, K0521 + 128 - 522 + 434 |
July 30, 2024 |
2024 |
WIN4XY00292 |
GAA 2024 |
January 19, 2024 |
Region V |
Sorsogon 2nd District Engineering Office |
Project ID : P00848321LZ
UACS No: 300226113671000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Multipurpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Brgy. Bulawan, Sta. Magdalena, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 No. of Building
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Multipurpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Brgy. Bulawan, Prieto Diaz, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 No. of Building |
July 30, 2024 |
2024 |
WIN4XY00283 |
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00846365LZ
UACS No: 300226109838000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program(BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Completion of Multi-Purpose Buildings Mangamagong Elementary School Barangay Mangamagong Phase 2 Daet, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program(BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Completion of Multi-Purpose Buildings Mangcamagong Elementary School (Phase 2), Barangay Mangcamagong, Basud, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings |
July 30, 2024 |
2024 |
WIN4XY00251 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00844598LZ
UACS : 300219102533000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps(SIPAG) - SIPAG - Flood Mitigation Structure protecting Major/ Strategic Public Buildings/ Facilities - Construction of Sagñay River Flood Mitigation Structure along Barangay Tarague and Barangay Minangdongjol Sagñay, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 551 lineal meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps(SIPAG) - SIPAG - Flood Mitigation Structure protecting Major/ Strategic Public Buildings/ Facilities - Construction of Sagñay River Flood Mitigation Structure along Barangay Tarague and Barangay Minadongjol Sagñay, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 551 lineal meters |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805178LZ
UACS : 310104100661000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0554 + 630 - K0555 + 074
Physical Target :
CW1 - Rehabilitation of Paved Roads - 0.888 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0554 + 630 - K0554 + 900, K0557 + 625 - K0557 + 940, K0562 + 143 - K0562 + 465
Physical Target :
Rehabilitation of Paved Road - 1.177 Lane Km |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837978LZ
UACS : 300215103870000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Tinocawan - Maninila - Caracan, Rapu-Rapui, Albay
Physical Target :
CW1 - Construction of Gravel Road - 4.498 Lane km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Tinocawan - Manila - Caracan, Rapu-Rapui, Albay
Physical Target :
CW1 - Construction of Gravel Road - 4.241 Lane Km
Cw2 - Construction of Road Slope Protection Structure - 5,788 Square meters |
July 29, 2024 |
2024 |
|
SR2024-01-008087 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0939 + 000 - K0941 + 000
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 132.74926 M
Asphalt Overlay: 8.092 Lane Km
EAO P 4.81474 M
Total P 137.564 M
AS MODIFIED:
Daang Maharlika (LT) – K0939 + 770 – K0941 + 000, K0946 + 000 – K0947 + 000
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 132.74926 M
Asphalt Overlay: 9.088 Lane Km
EAO P 4.81474 M
Total P 137.564 M
|
July 26, 2024 |
FY 2024 |
P00833593MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 1st District Engineering Office |
Basic
Infrastructure Program (BIP) - Flood Mitigation Structures
protecting Public Infrastructures/Facilities
Construction of Drainage Canal along Kitao Creek, Central
Katingawan, Midsayap, Cotabato
Basic
₱ 5,000,000.00
|
July 26, 2024 |
FY 2024 |
P00800498MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
From:Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1683 + 808 - K1683 + 929
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1684 + 820 - K1684 + 892
Amount: ₱100,000,000.00 |
July 25, 2024 |
2024 |
WIN4E03573 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101368000
Project ID: P00800223MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1168 + (-823) - K1168 + 009, K1168 + 368 - K1169 + 000, K1171 + 000 - K1174 + 701, K1175 + 133 - K1175 + 240, K1175 + 270 - K1175 + 642
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 11.284 Lane Km
Allocation:
TOTAL: P 216,616,000
CW1: P 209,034,440
EAO: P 7,581,560
Unit Cost:
CW1: P 18,524,852.89/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1168 + (-823) - K1168 + (-036.09), K1168 + 380 - K1169 + 006.33, K1171 + 000 - K1171 + 640, K1171 + 860 - K1172 + 120, K1172 + 480 - K1172 + 625
Type of Work:
CW1- Road Widening
CW2- ROW Acquisition
Physical Target:
CW1- 4.916 Lane Km
CW2- 45,000 Square meters
Allocation:
TOTAL: P 216,616,000
CW1: P 199,384,440
CW2: P 9,650,000
EAO: P 7,581,560
Unit Cost:
CW1: P 40,558,266.88/Lane Km
CW2: P 214,.44/Square meters
|
July 25, 2024 |
2024 |
WIN4E03572 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300215104139000
Project ID: P00834947MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Salaysayon - Jagimitan Road, (Sta K1+570 - K6+070) Package 2, Nasipit, Agusan Del Nore
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 17.604 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 52,445,652.17/Lane Km
TO:
Construction of Road, Salaysayon - Jaguimitan Road, (Sta K1+570 - K3+410) Package 2, Nasipit, Agusan Del Norte
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 3.68 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 52,445,652.17/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300219102729000
Project ID: P00835851MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Jiabong-San Isidro River Control Project, Kitcharao, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 900.00 Lineal meters
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 268,055.55/Lineal meters
TO:
Construction of Jaliobong-San Isidro River Control Project, Kitcharao, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 900.00 Lineal meters
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 268,055.55/Lineal meters
|
July 25, 2024 |
2024 |
WIN4E03571 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101426000
Project ID: P00801114MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Bayugan Rotunda) - Chainage 0 - Chainage 220
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.66 Lane Km
Allocation:
TOTAL: P 5,665,000
CW1: P 5,466,725
EAO: P 198,275
Unit Cost:
CW1: P 8,282,920/Lane Km
TO:
Daang Maharlika (Bayugan Rotunda) - Chainage 0 - Chainage 99
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.297 Lane Km
Allocation:
TOTAL: P 5,665,000
CW1: P 5,466,725
EAO: P 198,275
Unit Cost:
CW1: P 18,406,481/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310205101288000
Project ID: P00803885MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
East-West Lateral Road connecting Agusan del Sur/Bukidnon Agusan-Malaybalay Road, Package 8, Agusan Del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 6.6 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 29,242,424.24/Lane Km
TO:
East-West Lateral Road connecting Agusan del Sur/Bukidnon Agusan-Malaybalay Road, Package 10, Agusan Del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 6.6 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 29,242,424.24/Lane Km
|
July 25, 2024 |
2024 |
WIN4E03570 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101428000
Project ID: P00801130MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1336 + 234 - K1336 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.864 Lane Km
Allocation:
TOTAL: P 16,000,000
CW1: P 15,440,000
EAO: P 560,000
Unit Cost:
CW1: P 8,283,261.8/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1336 + 200 - K1336 + 455
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.02 Lane Km
Allocation:
TOTAL: P 16,000,000
CW1: P 15,440,000
EAO: P 560,000
Unit Cost:
CW1: P 15,137,254.9/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100707000
Project ID: P00801252MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1320 + 666 - K1321 + 522, K1326 + 000 - K1326 + 300, K1328 + 400 - K1329 + 000, K1330 + 669 - K1330 + 802, K1330 + 989 - K1331 + 075, K1334 + 058 - K1334 + 135, K1335 + 000 - K1335 + 102, K1335 + 300 - K1336 + 200, K1337 + 218 - K1337 + 785, K1351 + 900 - K1351 + 961
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.364 Lane Km
Allocation:
TOTAL: P 220,920,000
CW1: P 213,187,800
EAO: P 7,732,200
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1320 + 666 - K1320 +932, K1321 + 015.946 - K1321 + 522, K1326 + 000 - K1326 + 300, K1328 + 400 - K1329 + 000, K1335 + 000 - K1335 + 102, K1335 + 300 - K1336 + 200, K1337 + 218 - K1337 + 785, K1351 + 900 - K1351 + 961
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.032 Lane Km
Allocation:
TOTAL: P 220,920,000
CW1: P 213,187,800
EAO: P 7,732,200
Unit Cost:
CW1: P 30,316,808.87/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310204102791000
Project ID: P00803871MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Construction of Lake Mainit Circumferential Road Bypass Road to Wind Power Butuan City Surigao Norte
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.374 Lane Km
CW2- 3,692.4 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 19,669,595
CW2: P 28,580,405
EAO: P 1,750,000
Unit Cost:
CW1: P 52,592,500/Lane Km
CW2: P 7,740.33/Square meters
TO:
Construction of Lake Mainit Circumferential Road Bypass Road to Wind Power, Surigao del Norte
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.374 Lane Km
CW2- 3,692.4 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 19,669,595
CW2: P 28,580,405
EAO: P 1,750,000
Unit Cost:
CW1: P 52,592,500/Lane Km
CW2: P 7,740.33/Square meters
|
July 25, 2024 |
FY 2024 |
WIN4E03589 |
320101111308000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 320101111308000
Project ID: P00820889MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Puliran River, Puliran Br. Section Package 2, Sibuco, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 520 Lineal meters
Unit Cost: ₱ 315,369.11/ Lineal meters
EAO: ₱ 5,950,000.00 Excess: ₱ 58,059.63
Allocation: ₱ 170,000,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03594 |
310204102625000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102625000
Project ID: P00800804MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Airport-Turno-Sinaman Bypass Road, Zamboanga del Norte
CW1- Road Widening: 1.76 Lane Km
Unit Cost: ₱ 15,785,191.55/ Lane Km CW2- Construction of Road Slope Protection Structure: 5,123.79 sq.m. Unit Cost: ₱ 3,018.87/ sq.m. ROW Acquisition: 4,145.07 sq.m. Unit Cost: ₱ 1,206.25/ sq.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |