Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 3rd District Engineering Office

UACS No. 310112100517000
Project ID: P00800314VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Tertiary Roads
Sara-Sn Dionisio Rd – K0207+396 – K0207+598

CW1-Construction of Drainage Structure along Road: 202 lineal meters – 3,857.28
EAO – 78.72


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Tertiary Roads
Sara-Sn Dionisio Rd – K0207+360 – K0207+598

CW1-Construction of Drainage Structure along Road: 238 lineal meters – 3,857.28
EAO – 78.72
July 4, 2024 2024 WIN4XY00246 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 3rd District Engineering Office

UACS No. 310109101605000
Project ID: P00800421VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Concepcion-Sn Dionisio Rd – K0222+781 – K0222+855

CW1-Construction of Road Slope Protection Structure: 1480 Square Meters – 24,656.80
EAO – 503.20


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Concepcion- Sn Dionisio Rd – K0223 +046 –K0223+116

CW1-Construction of Road Slope Protection Structure: 630.00 Square Meters – 24,656.80
EAO – 503.20
July 4, 2024 2024 WIN4XY00247 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 3rd District Engineering Office

UACS No. 310109101606000
Project ID: P00800423VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Concepcion-Sn Dionisio Rd – K0222+884 – K0222+928

CW1-Construction of Road Slope Protection Structure: 440 Square Meters – 1,293.60
EAO – 26.40


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Concepcion-Sn Dionisio Rd–K0223+138–K0223+182

CW1-Construction of Road Slope Protection Structure: 156.64 Square Meters – 1,293.60
EAO – 26.40
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 3rd District Engineering Office

UACS No. 310102101585000
Project ID: P00801031VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance- Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd – K0074+511 – K0078+369

CW1-Preventive Maintenance of Road: Asphalt Overlay: 15.56 lane km – 120,625.00
EAO –4,375.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance- Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd – K0074+511 – K0077+807

CW1-Preventive Maintenance of Road: Asphalt Overlay: 13.312 lane km – 120,625.00
EAO – 4,375.00
July 4, 2024 2024 WIN4XY00276 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 3rd District Engineering Office

UACS No. 310105101184000
Project ID: P008003024VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast – Capiz Rd – K0215+906

CW1-Reconstruction to Concrete Pavement: 0.78 lane km: – 7,840.00
EAO –160.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast – Capiz Rd – K0215+887–K0215+1118

CW1-
Reconstruction to Concrete Pavement: 0.462 lane km – 7,840.00
EAO –160.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101857000
Project ID: P00803025VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay - Cabatuan - New Lucena - Banga Bante Rd, K0041+(-200) - K0042+209, K0042+223-K0046+200

CW1-Preventive Maintenance of Road: Asphalt Overlay: 10.77 lane km– 90,650.00
EAO – 1,850.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay - Cabatuan - New Lucena - Banga Bante Rd, K0041+(-677) - K0042+309, K0042+326-K0045+620

CW1-Preventive Maintenance of Road: Asphalt Overlay: 10.556 lane km - 90,650.00
EAO – 1,850.00
July 4, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300215104141000
Project ID: P00834949MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road from Sitio Lomayaon - Sitio Haguimitan, Barangay Bolhoon, San Miguel, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.641 Lane Km

Allocation:
TOTAL: P 30,000,000
CW1: P 28,950,000
EAO: P 1,050,000

Unit Cost:
CW1: P 10,961,756.91/Lane Km

TO:

Construction of Road from Sitio Lomayaon - Sitio Haguimitan, Barangay Bolhoon, San Miguel, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1.671 Lane Km
CW2- 5,183.87 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 21,102,200
CW2: P 7,847,800
EAO: P 1,050,000

Unit Cost:
CW1: P 12,628,485.93/Lane Km
CW2: P 1,513.89/Square meters
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101858000
Project ID: P00803026VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay - Leganes - Sta. Barbara Rd., K0017+490-K0022+470

CW1-Preventive Maintenance of Road: Asphalt Overlay: 9.96 lane km– 83,790.00
EAO – 1,710.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay - Leganes - Sta. Barbara Rd., K0017 + 490 - K0022 + 297

CW1-Preventive Maintenance of Road: Asphalt Overlay: 9.614 lane km– 83,790.00
EAO – 1,710.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101859000
Project ID: P00803027VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Asphalt Overlay - Iloilo City - Leganes - Dumangas Coastal Rd., K0010+700 - K0013+568, K0013+664 - K0014+321

CW1-Preventive Maintenance of Road: Asphalt Overlay: 7.05 lane km– 96,530.00
EAO – 1,970.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Iloilo City - Leganes - Dumangas Coastal Rd., K0010+710 - K0013+530, K0013+644 - K0014+121

CW1-Preventive Maintenance of Road: Asphalt Overlay: 10.659 lane km– 96,530.00
EAO – 1,970.00
July 4, 2024 2024 WIN4XY00235 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101860000
Project ID: P00803028VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay – Iloilo East Coast – Capiz Rd., K0283 + 775 – K0284 + 777 – K0288 + 124

CW1-Preventive Maintenance of Road: Asphalt Overlay:
10.016 lane km– 130,830.00
EAO – 2,670.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Asphalt Overlay - Iloilo East Coast – Capiz Rd., K0286 + 280 – K0288 + 124

CW1-Preventive Maintenance of Road: Asphalt Overlay:
7.404 lane km– 76,981.94
CW2 – Off-Carriageway Improvement: Shoulder Paving: 2,778.10 sq. m. - 53,848.06
EAO – 2,670.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310103101630000
Project ID: P00803029VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Asphalt Overlay Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0014+491 - K0015+930 (with exception)

CW1-Preventive Maintenance of Road: Asphalt Overlay:
7.195 lane km– 61,250.00
EAO – 1,250.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0014 + 457 - K0016 + 166

CW1-Preventive Maintenance of Road: Asphalt Overlay:
6.346 lane km– 61,250.00
EAO – 1,250.00
July 4, 2024 2024 WIN4XY00199 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310103101631000
Project ID: P00803030VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Asphalt Overlay Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0018+300+1003, K0019+405 - K0021+460

CW1-Preventive Maintenance of Road: Asphalt Overlay:
11.335 lane km– 90,650.00
EAO – 1,850.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Asphalt Overlay Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0017+650 - K0018+400, K0021+054 - K0021+460, K0024+166 - K0024+305, K0025+988 - K0028+250

CW1-Preventive Maintenance of Road: Asphalt Overlay:
9.386 lane km– 90,650.00
EAO – 1,850.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310103101632000
Project ID: P00803031VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Asphalt Overlay Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0021+600 - K0024+565 (with exception)

CW1-Preventive Maintenance of Road: Asphalt Overlay:
5.878 lane km– 53,900.00
EAO – 1,100.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Asphalt Overlay Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd., K0021+460 - K0024+166

CW1-Preventive Maintenance of Road: Asphalt Overlay:
5.36 lane km– 53,900.00
EAO – 1,100.00
July 4, 2024 2024 WIN4XY00202 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310202101728000
Project ID: P00800170VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
New Lucena-Sta. Barabara Rd – K0016+560 – K0017+048

CW1-Road Widening: 0.976 lane km – 26,446.28
EAO – 539.72


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
New Lucena-Sta. Barabara Rd – K0017+048 – K0017+454

CW1-Road Widening: 0.812 lane km – 26,446.28
EAO – 539.72
July 4, 2024 2024 WIN4XY00208 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310209100523000
Project ID: P00800255VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Tertiary Roads
Mandurriao- Sn Miguel- Alimodian- Maasin- Cabatuan Rd- K0023+316 – K0023+716

CW1-Off-Carriageway Improvement: Paving of Shoulders: 1,600 square meters – 14,700.00
EAO – 300.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Tertiary Roads
Mandurriao- Sn Miguel- Alimodian- Maasin- Cabatuan Rd- K0022+783 – K0023+089

CW1-Off-Carriageway Improvement: Paving of Shoulders: 1,172 square meters – 14,700.00
EAO – 300.00
July 4, 2024 2024 WIN4F07971 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310209100522000
Project ID: P00800256VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Tertiary Roads
Cabatuan-New Lucena-Banga-Bante Rd – K0036+000 – K0036+494

CW1-Off-Carriageway Improvement: Paving of Shoulders: 1,976 square meters – 14,700.00
EAO – 300.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Tertiary Roads
Cabatuan - New Lucena - Banga - Bante Rd – K0037+624 – K0038+000

CW1-Off-Carriageway Improvement: Paving of Shoulders: 1,452 square meters – 14,700.00
EAO – 300.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310109101608000
Project ID: P00800497VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd – K0046+893 – K0046+938

CW1-Construction of Road Slope Protection Structure: 333.33 Square Meters – 4,900.00
EAO – 100.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd – K0039+970 – K0040+107

CW1-Construction of Road Slope Protection Structure: 393.60 Square Meters – 4,900.00
EAO – 100.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101594000
Project ID: P00801029VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Iloilo East Coast – Capiz Rd – K0283+(-120) – K0284+000

CW1-Preventive Maintenance of Road - Asphalt Overlay:
4.48 lane km– 53,075.00
EAO – 1,925.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Iloilo East Coast-Capiz Rd - K0283 + (-120) - K0284 + 100, K0284 + 467 - K0284 + 700

CW1-Preventive Maintenance of Road - Asphalt Overlay: 5.812 lane km– 53,075.00
EAO – 1,925.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310103101420000
Project ID: P00801030VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Mandurriao- Sn Miguel- Alimodian-Maasin – Cabatuan Rd – K0018+492 – K0021+300

CW1-Preventive Maintenance of Road: Asphalt Overlay:
11.312 lane km– 94,087.50
EAO – 3,412.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Tertiary Roads
Mandurriao- Sn Miguel- Alimodian-Maasin – Cabatuan Rd – K0018+400 – K0021+040

CW1-Preventive Maintenance of Road: Asphalt Overlay: 10.64 lane km– 94,087.50
EAO – 3,412.00
July 4, 2024 2024 WIN4XY00197 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310106101184000
Project ID: P00801164VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd – K0027+990 – K0028+642

CW1-Rehabilitation of Paved Road: 1.288 lane km– 27,440.00
EAO – 560.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd – K0027+710 – K0028+200

CCW1-Rehabilitation of Paved Road: 0.964 lane km– 27,440.00
EAO – 560.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310104100740000
Project ID: P00801163VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Iloilo-Capiz Rd (New Route) – K0014+056 – K0014+213

CW1-Rehabilitation of Paved Road: 0.628 lane km– 13,377.00
EAO – 273.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Iloilo-Capiz Rd (New Route) – K0014+056 – K0014+213, K0014+248 – K0014+266

CW1-Rehabilitation of Paved Road: 0.70 lane km– 7,840.00
EAO –160.00
Excess - 5,650.00
July 4, 2024 2024 WIN4XY00216 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310102101595000
Project ID: P00801489VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Iloilo East Coast – Capiz Rd - K0284 + 777 – K0288 + 124

CW1-Preventive Maintenance of Road: Asphalt Overlay:
13.852 lane km– 120,625.00
EAO – 4,375.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Secondary Roads
Iloilo East Coast – Capiz Rd – K0284 + 777 – K0286 + 280

CW1-Preventive Maintenance of Road: Asphalt Overlay:
6.448 lane km– 63,289.525
CW2 – Off-Carriageway Improvement: Shoulder Paving: 2,831.40 sq. m. - 57,335.475
EAO – 4,375.00
July 4, 2024 2024 WIN4F07973 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo City District Engineering Office

UACS No. 310203100848000
Project ID: P00800172VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Molo Blvd – K0005 + 653 – K0006 + 135

CW1-Road Widening: 0.608 lane km – 11,083.80
CW2 – Construction of Drainage along Road: 608 l. m. - 15,316.42
ROW Acquisition: 323 sq. m. - 3,000.00
EAO – 600.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Molo Blvd – K0009 + 245 – K0009 + 471, K0006 + 807 – K0006 + 885

CW1-Road Widening: 0.608 lane km – 13,357.05
CW2 – Construction of Drainage along Road: 608 l. m. - 13,042.95
ROW Acquisition: 323 sq. m. - 3,000.00
EAO – 600.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo City District Engineering Office

UACS No. 310111100724000
Project ID: P00800354VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - K0018 + 028 - K0018 + 578

CW1-Construction of Drainage Structure along Road: 1,100 lineal meters – 49,000.00
EAO – 1,000.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. - K0018 + 028 - K0018 + 856

CW1-Construction of Drainage Structure along Road: 958 lineal meters – 49,000.00
EAO – 1,000.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo City District Engineering Office

UACS No. 310102101861000
Project ID: P00800938VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo City-Leganes-Dumangas Coastal Rd - K0003 + (-321) - K0003 + (-182)

CW1-Preventive Maintenance of Road: Asphalt Overlay -0.316 lane km – 3,888.64
EAO – 79.36


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo City-Leganes-Dumangas Coastal Rd - K0003 + (-321) - K0003 + (-242)

CW1-Preventive Maintenance of Road: Asphalt Overlay -0.316 lane km – 3,888.64
EAO – 79.36
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo City District Engineering Office

UACS No. 310102101863000
Project ID: P00800939VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
President Corazon C. Aquino Ave. - K0008 + 011 - K0008 + 841

CW1-Preventive Maintenance of Road: Asphalt Overlay - 2.468 lane km – 21,514.92
EAO – 439.08


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
President Corazon C. Aquino Ave. - K0008 + 011 - K0008 + 628

CW1-Preventive Maintenance of Road: Asphalt Overlay - 2.468 lane km – 21,514.92
EAO – 439.08
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310202101733000
Project ID: P00800188VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - K0042 + 009 - K0042 + 176

CW1-Road Widening: 0.334 lane km – 5,880.00
EAO – 120.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - K0042 + 009 - K0042 + 150

CW1-Road Widening: 0.282 lane km – 5,250.00
ROW Acquisition:1,800 sq. m. - 630.00
EAO – 120.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310209100524000
Project ID: P00800190VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0044 + 000 - K0045 + 888, K0045 + 943 - K0046 +065

CW1-Off-carriageway Improvement – Paving of Shoulders: 7,605.50 sq. m. – 30,870.00
EAO – 630.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0042 + 600 - K0045 + 862, K0045 + 920 - K0045 + 962

CW1-Off-carriageway Improvement – Paving of Shoulders: 10,791.23 sq. m. – 30,870.00
EAO – 630.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310110100520000
Project ID: P00800361VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0031 + 403 - K0031 + 580

CW1-Construction of Drainage along Road: 354 lineal meters – 16,094.54
EAO – 328.46


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0031 + 392.50 - K0031 + 677

CW1-Construction of Drainage along Road: 554 lineal meters – 16,094.54
EAO – 328.46
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310101101535000
Project ID: P00800979VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0029+272 - K0030 + 012

CW1-Preventive Maintenance – Asphalt Overlay: 2.96 lane km – 26,365.92
EAO – 538.08


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0029+129 - K0030 + 012

CW1-Preventive Maintenance – Asphalt Overlay: 3.52 lane km – 26,365.92
EAO – 538.08
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310103101640000
Project ID: P00800982VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Bacolod South Rd (Old Road) - K0021 + 425 - K0021 + 627

CW1-Preventive Maintenance – Asphalt Overlay: 0.808 lane km – 7,265.72
EAO –148.28


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Bacolod South Rd (Old Road) - K0021 + 425 - K0021 + 672

CW1-Preventive Maintenance – Asphalt Overlay: 0.988 lane km – 7,265.72
EAO –148.28
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310103101642000
Project ID: P00800984VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Pontevedra-La Castellana Rd - K0052 + 000 - K0052+680

CW1-Preventive Maintenance – Asphalt Overlay: 1.36 lane km – 12,367.60
EAO –252.40


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Pontevedra-La Castellana Rd - K0052 + 000 - K0052+798

CW1-Preventive Maintenance – Asphalt Overlay: 1.596 lane km – 12,367.60
EAO –252.40
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310105101188000
Project ID: P00801168VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Pulupandan-Pulupandan Pier Rd - K0025 + 803 - K0027+898

CW1-Rehabilitation of Paved Road: 4.196 lane km – 45,817.94
EAO –935.06


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Pulupandan-Pulupandan Pier Rd - K0025 +(-653) - K0025 + 880, K0026+920 – K0026+923

CW1-
Reconstruction to Concrete Pavement: 4.332 lane km – 45,817.94
EAO –935.06
July 4, 2024 2024 WIN4XY00300 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 4th District Engineering Office

UACS No. 310101101278000
Project ID: P00803097VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance –
Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 000 - K0042 + 000

CW1-Preventive Maintenance – Asphalt Overlay: 20.002 lane km – 96,500.00
EAO –3,500.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance –
Primary Roads
Bacolod South Rd (S00127NR) - K0033+009 – K0035+830

CW1-Preventive Maintenance – Asphalt Overlay: 11.20 lane km – 96,500.00
EAO –3,500.00
July 4, 2024 2024 WIN4F07972 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 3rd District Engineering Office

UACS No. 310203100853000
Project ID: P00800185VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd - K0107 + 867 - K0108 + 871

CW1-Road Widening: 1.988 lane km –33,070.10
EAO – 674.90


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd - K0107 + 867 - K0108 + 643

CW1-Road Widening: 1.532 lane km –33,070.10
EAO – 674.90
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 3rd District Engineering Office

UACS No. 310207100365000
Project ID: P00800263VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Primary Roads
Kabankalan - Bais Rd – K0089+(-805) – K0089+000

CW1-Off-Carriageway Improvement – Construction of Sidewalk: 3,217.696 sq. m. –33,899.18
EAO –691.82


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement – Primary Roads
Kabankalan - Bais Rd – K0089+(-805) – K0090+170

CW1-Off-Carriageway Improvement – Construction of Sidewalk: 3,840.13 sq. m. –33,899.18
EAO –691.82
July 4, 2024 2024 WIN4XY00218 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 3rd District Engineering Office

UACS No. 310109101472000
Project ID: P00801196VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd - K0102 + 050 - K0102 + 120, K0103 + 750 - K0103 + 800, K0105 + 400 - K0105 + 650, K0120 + 180 - K0120 + 255

CW1-Construction of Road Slope Protection Structure: 3,401.09 sq.m. –63,999.765
CW2-Rehabilitation/Major Repair of Road Slope Protection Structure: 634.82 sq. m. - 11,945.735
EAO –2,754.50


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd - K0102 + 000 – K0102+167, K0103+430 – K0103+521, K0105+431 – K0105+703, K0120+120 – K0120+330

CW1-Construction of Road Slope Protection Structure: 6,478.27 sq.m. –75,945.50
EAO –2,754.50
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 2nd District Engineering Office

UACS No. 300214100773000
Project ID: P00832012VS


FROM:

Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Bacolod South Rd - K0059 + 117 - K0059 + 909, K0059 + 945 - K0060 + 134, K0062 + 600 - K0063 + 560, K0063 + 747 - K0064 + 000, K0068 + K0069 + 121, K0071 + 632 - K0071 + 847

CW1- Rehabilitation of Paved Road - 5.908 lane km – 74,760.48
EAO – 2,711.52


TO:

Convergence and Special Support Program
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Bacolod South Rd - K0062 + 522 - K0062 + 546, K0062 + 614 - K0063 + 580, K0063 + 747 - K0064 + 538, K0068 + 760 – K0069 +121, K0071 + 632 - K0071 + 847, K0072 + 283 – K0072 + 692

CW1-Reconstruction to Concrete Pavement - 5.564 lane km – 74,760.48
EAO – 2,711.52
July 4, 2024 2024 WIN4XY00221 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310201101404000
Project ID: P00800174VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Roads
Bacolod North Rd – K0082+804 – K0082+893

CW1-Road Widening: 0.178 lane km – 4,431.56
EAO – 90.44


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Primary Roads
Bacolod North Rd – K0082+804 – K0082+140

CW1-Road Widening: 0.200 lane km – 2,681.55710
ROW Acquisition: 500 Square Meters - 1,750.00
EAO – 90.44
July 4, 2024 2024 WIN4XY00210 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310202101544000
Project ID: P00800175VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0092 + 000 - K0093 + 000

CW1-Road Widening: 1.952 lane km – 57,900.00
EAO – 2,100.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Natl Sagay-Bato-Dian-Marcelo-Balea Jct Rd – K0085 + 776 - K0087+262

CW1 - Road Widening:2.850 Lane KM – 36,944.11008
ROW Acquisition: 17,100 Square Meters - 20,955.8435
EAO – 2,100.00
July 4, 2024 2024 WIN4XY00189 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310202101729000
Project ID: P00800176VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0094 + 000 - K0094 + 758

CW1- Road Widening:1.516 Lane KM – 15,747.62
EAO – 321.38


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jct Natl Sagay-Bato-Dian-Marcelo-Balea Jct Rd - K0087 + 262 - K0087 + 614

CW1- Road Widening:0.704 Lane KM – 10,571.14484
ROW Acquisition: 3,520 Square meters - 5,176.360
EAO – 321.38
July 4, 2024 2024 WIN4F07968 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310203100850000
Project ID: P00800177VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0085 + 055 - K0085 + 320

CW1 - Road Widening: 0.265 Lane KM – 4,579.54
EAO – 93.46


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Jct New Sagay-Old Sagay Rd - K0084 + (-790) - K0084 + (-755), K0084 + 000 - K0084 + 062, K0085 + 055 - K0085 + 280

CW1 - Road Widening:0.322 Lane KM – 3,779.54
ROW Acquisition: 1,610 Square Meters - 800.00
EAO – 93.46
July 4, 2024 2024 WIN4XY00272 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310203100849000
Project ID: P00800178VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bulanon Rd - K0088 + (-138) - K0088 + 471

CW1- Road Widening 1.218 Lane KM – 19,278.56
EAO – 393.44


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bulanon Rd - K0088+(-138) - K0088 + 312

CW1- Road Widening 0.900 Lane KM – 17,028.56
ROW Acquisition: 2,250 Square Meters - 2,250.00
EAO – 393.44
July 4, 2024 2024 WIN4XY00298 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310110100466000
Project ID: P00800355VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0084 + 000 - K0086 + 000

CW1- Rehabilitation / Major Repair of Drainage Structure along Road: 3,900 lineal meter – 51,145.00
EAO – 1,855.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0082 + 893, K0083 + 692, K0083 + 936, K0084 + 200

CW1- Rehabilitation / Major Repair of Drainage Structure along Road: 1,157 lineal meter – 51,145.00
EAO – 1,855.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310110100518000
Project ID: P00800356VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0086 + 000 - K0086 + 358, K0088 + 327 - K0088 + 362

CW1- Rehabilitation / Major Repair of Drainage Structure along Road:1,480.00 Lineal Meters – 19,151.16
EAO – 390.84


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0081 + 558 - K0083 + 000

CW1- Rehabilitation / Major Repair of Drainage Structure along Road:1,254.00 Lineal Meters – 19,151.16
EAO – 390.84
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310112100518000
Project ID: P00800358VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Manapla By-Pass Rd - K0042 + (-126) - K0042 + 054

CW1- Rehabilitation / Major Repair of Drainage Structure along Road: 798.253 Lineal Meters – 9,800.00
EAO – 200.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Manapla By-Pass Rd - K0042 + (-126) - K0043 + 000

CW1- Rehabilitation / Major Repair of Drainage Structure along Road: 909.72 Lineal Meters – 9,800.00
EAO – 200.00
July 4, 2024 2024 WIN4XY00211 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310107100677000
Project ID: P00800499VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod North Rd - (S00408NR) Chainage 000 - Chainage 400

CW1- Construction of Road Slope Protection Structure:
2,400 Square Meters – 23,520
EAO – 480.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod North Rd - (S00409NR) Chainage 000 - Chainage 400

CW1- Construction of Road Slope Protection Structure:
1,999.10 Square Meters – 23,520
EAO – 480.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310103101637000
Project ID: P00800960VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM – Preventive Maintenance – Tertiary Road
Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd – K0017+(-386) – K0017+(-326), K0020+200 – K0020+677

CW1-Preventive Maintenance- Asphalt Overlay 2.088 lane km – 27,440.00
EAO – 560.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM – Preventive Maintenance – Tertiary Road
Jct Murcia-Cansilayan-Damsite-Abuanan-Bago City Rd – K0017+(-386)–K0017+(-276), K0020+428 – K0021+120

CW1-Preventive Maintenance- Asphalt Overlay 3.208 lane km – 27,440.00
EAO – 560.00
July 4, 2024 2024 WIN4XY00158 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101526000
Project ID: P00803048VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM – Preventive Maintenance – Primary Road
Bacolod North Rd – (S00406NR) K0029+000 – K0029+975, K0033+728 – K0034+383

CW1-Preventive Maintenance- Asphalt Overlay 5.466 lane km – 37,242.94
EAO – 760.060


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM – Preventive Maintenance – Primary Road
Bacolod North Rd – (S00406NR) K0029+273 – K0029+975, K0033+728 – K0034+330

CW1-Preventive Maintenance- Asphalt Overlay 4.162 lane km – 37,242.94
EAO – 760.060
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310207100364000
Project ID: P00803051VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program – Off-Carriageway Improvement - Primary Roads
Bacolod North Rd – K0005+(-790) – K0005+(-135), K0006+(-174) – K0006+(-100), K0005+(107) – K0005+772

CW1-Off-Carriageway Improvement: Construction of Traffic Island 2,788 Square Meters – 20,090.98
EAO – 410.02


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program – Off-Carriageway Improvement - Primary Roads
Bacolod North Rd – K0005+(-790) – K0006+157, K0006+(-174) – K0005+772

CW1-Off-Carriageway Improvement: Construction of Traffic Island 3,829 Square Meters – 20,090.98
EAO – 410.02
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101523000
Project ID: P00803056VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd - K0009 + (-860) - K0009 + 100, K0010 + 900 - K0009 + 300

CW1- Preventive Maintenance – Asphalt Overlay 3.231 Lane KM – 25,676.00
EAO – 524.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd (S00389NR) - K0009 + (-860) - K0009 + 100, (S00393NR) - K0010 + 508 - K0009 + 000

CW1- Preventive Maintenance – Asphalt Overlay 2.8035 Lane KM – 25,676.00
EAO – 524.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101522000
Project ID: P00803057VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd (S00024NR) - K0005 + (-135) - K0006 + 157, (S00025NR) - K0006 + (-100) - K0005 + 107

CW1- Preventive Maintenance – Asphalt Overlay 4.870 Lane KM – 39,200.00
EAO – 800.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd (S00024NR) - K0005 + (-135) - K0006 + 157, (S00025NR) - K0006 + 022 - K0006 + 894

CW1- Preventive Maintenance – Asphalt Overlay 4.244 Lane KM – 39,200.00
EAO – 800.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101521000
Project ID: P00803058VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd K0023 + 578 - K0024 + 000

CW1- Preventive Maintenance – Asphalt Overlay 1.840 Lane KM – 15,680.00
EAO – 320.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd - K0023 + 578 - K0024 + 057

CW1- Preventive Maintenance – Asphalt Overlay 1.764 Lane KM – 15,680.00
EAO – 320.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101520000
Project ID: P00803059VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd - (S00411NR) Chainage 0 - Chainage 500

CW1- Preventive Maintenance – Asphalt Overlay 1.00 Lane KM – 8,330.00
EAO – 170.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
ASSET PRESERVATION PROGRAM - Preventive Maintenance – Primary Road
Bacolod North Rd - (S00411NR) Chainage 53 - Chainage 500

CW1- Preventive Maintenance – Asphalt Overlay 0.894 Lane KM – 8,330.00
EAO – 170.00
July 4, 2024 2024 WIN4XY00260 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 310101101524000
Project ID: P00803073VS


FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Asphalt Overlay along Bacolod North Rd - K0068+447 - K0071+035, K0086+358 - K0087+000 (with exception)

CW1- Preventive Maintenance: Asphalt Overlay: 6.648 Lane KM – 51,450
EAO – 1,050


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Asphalt Overlay along Bacolod North Rd - K0068+447 - K0071+035, K0086+358 - K0087+000 (with exception)

CW1- Preventive Maintenance: Asphalt Overlay: 5.148
Lane KM– 51,450
EAO – 1,050
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 300203102781000
Project ID: P00830038VS


FROM:

Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Access Road leading to Lakawon Island Resort, Cadis City, Negros Occidental

CW1-Construction of Concrete Road: 1.066 lane km – 24,500.00
EAO – 500.00


TO:

Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Access Road leading to Lakawon Island Resort, Cadiz City, Negros Occidental

CW1-Construction of Concrete Road: 2.8182 lane km – 24,500.00
EAO – 500.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 300203102782000
Project ID: P00830039VS


FROM:

Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Construction of Access Road leading to Pacol Falls, Alimotic Rice Terraces & Prayer Mountain, Cadiz City, Negros Occidental

CW1-Construction of Concrete Road: 1.066 lane km – 24,500.00
EAO – 500.00


TO:

Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Construction of Access Road leading to Pacol Falls, Alimatoc Rice Terraces & Prayer Mountain, Cadiz City, Negros Occidental

CW1-Construction of Concrete Road: 1.432 lane km – 24,500.00
EAO – 500.00
July 4, 2024 2024 WIN4XY00217 FY 2024 GAA RA 11975 January 1, 2024 Region VI Negros Occidental 1st District Engineering Office

UACS No. 300221106310000
Project ID: P00835872VS


FROM:

Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Hda. Pilar, Barangay Dos Hermanas, Talisay City, Negros Occidental

CW1- Construction of Concrete Road 0.950 Lane km – 9,900.00
EAO – 100.00


TO:

Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Hda. Pilar, Barangay Katilingban, Talisay City, Negros Occidental

CW1- Construction of Concrete Road 0.950 Lane km – 9,900.00
EAO – 100.00
July 4, 2024 2024 FY 2024 GAA RA 11975 January 1, 2024 Region VI Bacolod City District Engineering Office

UACS No. 310203100842000
Project ID: P00800007VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bacolod-City Bdry Rd - K0001 + 220 - K0001 + 390

CW1-Road Widening:0.170 lane km – 4,900.00
EAO – 100.00


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bacolod-City Bdry Rd – K0013 + 641 – K0013 + 806, K0013 + 836 – K0013 + 903

CW1-Road Widening:0.232 lane km – 4,900.00
EAO – 100.00
July 4, 2024 2024 WIN4XY00191 FY 2024 GAA RA 11975 January 1, 2024 Region VI Bacolod City District Engineering Office

UACS No. 310203100772000
Project ID: P00800208VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bacolod-City Bdry Rd - K0009 + 964 - K0010 + 374, K0015 + 856.40 - K0015 + 896, K0016 + 616 - K0018 + 642

CW1-Road Widening: 4.614 lane km – 83,112.56
EAO – 3014.45


TO:

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Bacolod-City Bdry Rd - K0001 + 220 - K0001 + 390, K0015 + 258 - K0015 + 812, K0016 + 305 - K0016 + 625, K0016 + 625 – K0017 + 500

CW1-Road Widening: 2.432 lane km – 55,520.75511
ROW Acquisition: 6,596.299 sq. m. - 28,592.52838
EAO – 3,014.445
July 4, 2024 2024 WIN4XY00227 FY 2024 GAA RA 11975 January 1, 2024 Region VI Aklan District Engineering Office
UACS No.: 310102101591000
Project ID: P00802928VS

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Aklan East Rd - K0278 + 564 - K0282 + 000

CW1-Preventive Maintenance of Road –Asphalt Overlay: 13.256 lane km - 73,685.47
EAO - 2,672.53

TO

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan East Rd - K0278 + 932 - K0281 + 000
CW1-
Preventive Maintenance of Road – Asphalt Overlay: 7.920 lane km - 73,685.47
EAO - 2,672.53
July 4, 2024 2024 WIN4XY00259 FY 2024 GAA RA 11975 January 1, 2024 Region VI Iloilo 4th District Engineering Office

UACS No. 310101101518000
Project ID: P00800935VS


FROM:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Primary Roads
Iloilo-Capiz Rd (New Route) - K0013 + 087 - K0013 + 988

CW1-Preventive Maintenance of Road: Asphalt Overlay:
3.604 lane km– 19,600.00
EAO – 400.00


TO:

OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Preventive Maintenance – Primary Roads
Iloilo-Capiz Rd (New Route) - K0012 + 993 - K0013 + 543

CW1-Preventive Maintenance of Road: Asphalt Overlay:
2.26 lane km– 19,600.00
EAO – 400.00
July 3, 2024 2024 WIN4FO8015 SR2024-01-008059 January 31, 2024 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0898 + 463 – K0898 + 658

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt Overlay: P 8.740005 M
0.780 Lane Km

EAO P 0.316995 M

Total P 9.057 M

AS MODIFIED:

Daang Maharlika (LT) – K0898 + 501 – K0898 + 658

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt Overlay: P 8.740005 M
0.628 Lane Km

EAO P 0.316995 M

Total P 9.057 M
July 3, 2024 2024 310101101177000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0521 + 000 - K0523 + 400, K0524 + 722 - K0525 + 000, K0525 + 432 - K0525 + 858, K0525 + 932 - K0527 + 325, K0527 + 325 - K0527 + 750

TO:

Asset Preservation Program – Preventive Maintenance – Primary Roads – Cagayan Valley Rd – Cagayan Valley Rd – K0521 + 901 – K0523 + 400, K0525 + 432 – K0525 + 858, K0525 + 932 – K0527 + 000
July 3, 2024 2024 310201101250000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Network Development - Road Widening - Primary Roads - Jct Logac-Magapit Rd - K0708 + 050 - K0708 + 549

TO:

Network Development - Road Widening - Primary Roads - Jct Logac-Magapit Road – K0708 + 050 – K0708 + 346.60
July 3, 2024 2024 310101101178000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0373 + (-583) - K0374 + 000, K0378 + 879 - K0379 + 000, K0382 + 000 - K0383 + 003, K0386 + 000 - K0386 + 460, K0388 + 105 - K0388 + 305

TO:

Asset Preservation - Preventive Maintenance - Primary Roads -Daang Maharlika (LZ) - K0373 + (-583) - K0373 + 919
July 3, 2024 2024 310201101253000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0219 + 429 - K0219 + 894, K0219 + 961 - K0220 + 000, K0233 + 183 - K0233 + 261, K0225 + 174 - K0225 + 459, K0235 + 210 - K0236 + 190, K0239 + 000 - K0239 + 268, K0239 + 296 - K0240 + 700

TO:

Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - – K0215+ 398.70 – K0216 + 471.30, K0219 + 370.90 – K0219 + 897.30, K0219 + 967.10 – K0220 + 000.00, K0225 + 174 – K0225 + 459.71, K0233 + 182.30 – K0233 + 268.70
July 3, 2024 2024 WIN4XY00291 SR2024-01-006525 January 30, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1057 + 477 - K1058 + 612, K1058 + 627 - K1059 + 087

Physical Target: Allocation:

CW1-Road Widening: 3.186 Lane Km P 46.11735 M

EAO P 1.67265 M

Total P 47.79 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1057 + 477 - K1058 + 562, K1058 + 667 - K1059 + 047

Physical Target: Allocation:

CW1-Road Widening: 2.926 Lane Km P 40.62099356 M

CW2-Construction of Road Slope Protection P 5.49635644 M
Structures: 969.61 Square meters

EAO P 1.67265 M

Total P 47.79 M
July 3, 2024 2024 SR2024-02-008333 January 2, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1059 + 112 - K1060 + 333

Physical Target: Allocation:

CW1-Road Widening: 2.448 Lane Km P 32.409525 M

EAO P 1.175475 M

Total P 33.585 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1059 + 200 – K1060 + 220

Physical Target: Allocation:

CW1-Road Widening: 2.046 Lane Km P 32.409525 M

EAO P 1.175475 M

Total P 33.585 M
July 3, 2024 2024 WIN4XY00293 SR2024-01-006600 January 30, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1062 + 402 - K1062 + 513, K1062 + 539 - K1062 + 827, K1062 + 842 - K1063 + 806, K1063 + 831 - K1064 + 312

Physical Target: Allocation:

CW1-Road Widening: 3.700 Lane Km P 48.250965 M

EAO P 1.750035 M

Total P 50.001 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1062 + 402 - K1062 + 472, K1062 + 585 - K1062 + 780, K1062 + 880 - K1063 +740, K1063 + 920 - K1064 + 312

Physical Target: Allocation:

CW1-Road Widening: 3.046 Lane Km P 48.250965 M

EAO P 1.750035 M

Total P 50.001 M
July 3, 2024 2024 310101101180000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0345 + 000 - K0346 + 771, K0347 + 000 - K0347 + 857

TO:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) – K0345 + 000 – K0345 + 894.70
July 3, 2024 2024 WIN4XY00287 SR2024-01-006467 January 30, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika - K1208 + 971 - K1210 + 601, K1210 + 628 - K1212 + 090, K1212 + 136 - K1212 + 980

Physical Target: Allocation:

CW1-Road Widening: 7.304 Lane Km P 100.573265 M

EAO P 3.647735 M

Total P 104.221 M

AS MODIFIED:

Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika – K1208 + 396 – K1209 + 000, K1210 + 787 – K1212 + 090, K1212 + 136 - K1212 + 1186, K1212 + 1253 – K1213 + 232

Physical Target: Allocation:

CW1-Road Widening: 6.00 Lane Km P 88.92512180 M

CW2-Construction of Road Slope Protection P 11.64814320 M
Structure: 2,601.00 Square meters

EAO P 3.647735 M

Total P 104.221 M
July 3, 2024 2024 WIN4XY00302 SR2024-01-007429 January 31, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of San Roque-Milagrosa Road, Sogod, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 1.15 Lane Km P 19.8 M

EAO P 0.2 M

Total P 20.0 M

AS MODIFIED:

Construction of San Roque-Milagroso Road, Sogod, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 12.98864049 M
1.15 Lane Km

CW2- Construction of Drainage Structure P 6.81135951 M
along Road: 1,021.00 lineal meter

EAO P 0.2 M

Total P 20.0 M
July 3, 2024 2024 310101101179000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads- Daang Maharlika (LZ) - K0309 + (-496) - K0309 + (-423), K0309 + 000 - K0309 + 990, K0318 + 131 - K0323 + 000, K0324 + 000 - K0324+722, K0328 + 492 - K0330 + 000

TO:

Asset Preservation - Preventive Maintenance - Primary Roads-Daang Maharlika (LZ) – K0309 + (-496) – K0309 + (-423), K0309 + 000 – K0309 + 828
July 3, 2024 2024 WIN4XY00301 SR2024-01-007404 January 31, 2024 Region VIII Southern Leyte Sub-District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Pinamudlan Sitio Katibayan Road, San Francisco, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 0.7 Lane Km P 4.95 M

CW2- Construction of Drainage Structure along Road: P 4.95 M
530 lineal meter

EAO P 0.1 M

Total P 10.0 M

AS MODIFIED:

Construction of Pinamudlan - Mount Kabitajan Road, San Francisco, Southern Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 6.38496872 M
0.7 Lane Km

CW2- Construction of Drainage Structure P 3.51503128 M
along Road: 530 lineal meter

EAO P 0.1 M

Total P 10.0 M
July 3, 2024 2024 WIN4XY00225 R.A. 11975 December 29, 2023 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

AS PER GAA/ORIGINAL:

Construction of Road leading to Santilmohan Water Spring, Brgy. Caminlo, Inopacan, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 2 Lane Km P 24.125 M

EAO P 0.875 M

Total P 25.0 M

AS MODIFIED:

Construction of Road leading to Santilmohan Water Spring, Brgy. Caminto, Inopacan, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 16.66007786 M
1.366 Lane Km

CW2- Construction of Road Slope Protection P 7.46492214 M
Structure: 423 square meters

EAO P 0.875 M

Total P 25.0 M
July 3, 2024 2024 SR2024-01-002344 January 27, 2024 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
AS PER GAA/ORIGINAL:

Construction of Alangalang By-pass Road (barangay Mudboron to barangay San Vicente), Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 4.285 Lane Km P 144.75 M

EAO P 5.25 M

Total P 150.00 M

AS MODIFIED:

Construction of Alangalang By-pass Road (Barangay Mudboron to Barangay San Vicente), Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 4.079 Lane Km P 144.75 M

EAO P 5.25 M

Total P 150.00 M
July 3, 2024 2024 WIN4XY00290 SR2024-01-002364 January 27, 2024 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
AS PER GAA/ORIGINAL:

Construction of Tanauan By-pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 4.285 Lane Km P 144.75 M

EAO P 5.25 M

Total P 150.00 M

AS MODIFIED:

Construction of Tanauan By-pass Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: 3.430 Lane Km P 144.75 M

EAO P 5.25 M

Total P 150.00 M
July 3, 2024 2024 300214100982000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Signage and Pavement Markings along Daang Maharlika (LZ) - K0330 + 030 - K0331 + 030, Barangay Batal, Santiago City, Isabela

TO:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 – Installation/Application of Signage and Pavement Markings – Daang Maharlika (LZ) - K0331 + 700 - K0332 + 700, Barangay Batal, Santiago City, Isabela
July 3, 2024 2024 300214100997000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Signage-Warning, Advisory and Regulatory Signs and Pavement Markings along Daang Maharlika (LZ) - K0268 + 130 - K0269 + 131, Solano, Nueva Vizcaya

TO:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 - Installation/Application of Signage-Warning, Advisory and Regulatory Signs, and Pavement Markings along Daang Maharlika (LZ) - K0269 + 339 - K0270+151, Solano, Nueva Vizcaya
July 3, 2024 2024 300214100981000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation of Signage-Warning and Regulatory Signs, Pavement Markings, and Street Lights along Daang Maharlika (LZ) (S00795LZ) - K0369 + 000 - K0370 + 000 (Chainage 25010 - 26010), Barangay Cabarubuan, Cauayan, Isabela

TO:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation of Signage-Warning and Regulatory Signs, Pavement Markings, and Street Lights along Daang Maharlika (LZ) (S00828LZ) - K0369 + 000 - K0370 + 000 (Chainage 10322 – 11317), Barangay Cabaruan, Cauayan, Isabela
July 3, 2024 2024 310203100756000 FY 2024 GAA January 3, 2024 Region II Quirino District Engineering Office
FROM:

Network Development - Road Widening - Tertiary Roads - Dumabato-Balligui Rd - K0373 + 836 - K0375 + 390

TO:

Network Development - Road Widening - Tertiary Roads - Dumabato-Balligui Rd - K0373 + 836 - K0374 + 933
July 2, 2024 2024 WIN4XY00252 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00800220LZ
UACS : 3102011010271000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0519 + 000 - K0521 + 000, K0530 + 000 - K0530 + 360, K0538 + 400 - K0539 + 000

Physical Target :
CW1 - Road Widening - 5.926 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0520 + 251 - K0520 + 501, K0520 + 599 - K0521 + 081, K0530 + 267 - K0530 + 416, K0538 + 400 - K0539 + 000

Physical Target :
CW1 - Road Widening - 2.817 Lane Km
CW2 - Construction of Road Slope Protection Structure - 3363.68 Square meters
ROW - ROW Acquisition - 7415 Square Meters
July 2, 2024 2024 WIN4XY00255 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805224LZ
UACS : 310201101272000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0606 + 414 - K0606 + 513, K0607 + 542 - K0607 + 700, K0608 + 400 - K0608 + 493, K0610 + 100 - K0610 + 909.90

Physical Target :
CW1 - Road Widening - 2.32 Lane Km
CW2 - Construction of Drainage Structure along Road - 1159.9 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0606 + 414 - K0606 + 513, K0607 + 542 - K0607 + 700, K0608 + 400 - K0608 + 493, K0610 + 100 - K0610 + 909.90

Physical Target :
CW1 - Road Widening - 2.2268 Lane Km
CW2 - Construction of Drainage Structure along Road - 809.9 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1855.55 Square
ROW - ROW Acquisition - 5799.5 Square Meters
July 2, 2024 2024 WIN4XY00254 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837431LZ
UACS : 3002141000760000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0601 + 240 - K0602 + 000, K0607 + 542 - K0607 + 700

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.832 Lane Km
CW2 - Road Widening - 1.832 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0601 + 240 - K0602 + 000, K0605 + 414 - K0606 + 420, K0606 + 739 - K0607 + 543.60, K0609 + 095 - K0609 + 600

Physical Target :
CW1 - Rehabilitation of Paved Road - 6.147 Lane Km
July 2, 2024 2024 310207100304000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Network Development - Off-Carriageway Improvement - Primary Roads - Cagayan Valley Rd - K0493 + 400 - K0493 + 640

TO:

Network Development Program: Off-Carriageway Improvement - Primary Roads - Cagayan Valley Rd - K0492 + 1025 - K0492 + 1181, K0492 + 1252 - K0492 + 1399
July 2, 2024 2024 300214100667000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Manila North Rd - K0590 + (-954) - K0592 + 500

TO:

Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239 – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Manila North Rd - K0590 + ( -784) – K0593 + 608, K0593 + 637 – K0595 + 000, K0649 + 217 - K0649 + 687, K0651 + 000 – K0654 + 387.30
July 2, 2024 2024 310101101181000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0404 + 000 - K0404 + 810, K0415 + 177 - K0417 + 000, K0419 + 000 - K0419 + 992, K0421 + 000 - K0423 + 144, K0423 + 1428 - K0429 + 700

TO:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0399 + 008 - K0400 + 009, K0405 + 885 - K0406 + 340, K0439 + 000 - K0439 + 557, K0444 + 230 - K0447 + 200, K0447 + 720 - K0448 + 733, K0451 + 000 - K0452 + 942.5
July 2, 2024 2024 310101101189000 FY 2024 GAA January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0215 + 116 - K0215 + 395, K0219 + 173 - K0220 + 000, K0230 + 000 - K0230 + 605

TO:

Asset Preservation Program – Preventive Maintenance – Primary Roads – Daang Maharlika (LZ) – Daang Maharlika (LZ) - K0215 + 131.67 - K0215 + 395, K0219 + 370.90 - K0219 + 899, K0219 + 961.00 - K0220 + 000
TO:

July 1, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Network Development Program - Off-Carriageway Improvement - Primary Roads

Daang Maharlika (LZ) - K0095+451 - K0097+421
July 1, 2024 2024 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Gen Alejo Santos Highway - K0060+819 - K0061+074, K0066+100 - K006++700, K0067+894 - K0068+250
July 1, 2024 2024 WIN4XY00269 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Tarlac - Sta. Rosa Rd - K0134+540 - K0134+937.60
July 1, 2024 2024 WIN4E03480 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108101788000
Project ID: P00800519MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0065 + 860 - K0066 + 320

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,616.67 Square meters

Allocation:
TOTAL: P 54,250,000
CW1: P 52,351,250
EAO: P 1,898,750

Unit Cost:
CW1: P 14,474.99/Square meters

TO:

Dinagat-Loreto Rd - K0071 + 250 – K0071 + 420

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,124.13 Square meters

Allocation:
TOTAL: P 54,250,000
CW1: P 52,351,250
EAO: P 1,898,750

Unit Cost:
CW1: P 46,570.46/Square meters
July 1, 2024 2024 WIN4E03486 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108101972000
Project ID: P00800518MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0065 + 400 - K0065 + 740

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,833.33 Square meters

Allocation:
TOTAL: P 42,500,000
CW1: P 41,650,000
EAO: P 850,000

Unit Cost:
CW1: P 14,700/Square meters

TO:

Dinagat-Loreto Rd - K0067 + 340 - K0067 + 600

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1344.738 Square meters

Allocation:
TOTAL: P 42,500,000
CW1: P 41,650,000
EAO: P 850,000

Unit Cost:
CW1: P 30,972.58/Square meters
July 1, 2024 2024 WIN4E03476 FY 2024 GAA, R.A 11975 December 25, 2024 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108101973000
Project ID: P00800520MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0067 + 030 - K0067 + 340

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,223.67 Square meters

Allocation:
TOTAL: P 33,355,000
CW1: P 41,650,000
EAO: P 850,000

Unit Cost:
CW1: P 14,700/Square meters

TO:

Dinagat-Loreto Rd - K0067 + 340 - K0067 + 600

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1344.738 Square meters

Allocation:
TOTAL: P 42,500,000
CW1: P 41,650,000
EAO: P 850,000

Unit Cost:
CW1: P 30,972.58/Square meters
July 1, 2024 2024 WIN4E03497 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 310111100772000
Project ID: P00800381MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads

FROM:

Surigao-Davao Coastal Rd - K1361 + 630 - K1362 + 330

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 700 Lineal meters

Allocation:
TOTAL: P 10,500,000
CW1: P 10,290,000
EAO: P 210,000

Unit Cost:
CW1: P 14,700/Lineal meters

TO:

Surigao-Davao Coastal Rd - K1361 + 630 – K1361 + 935

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 325 Lineal meters

Allocation:
TOTAL: P 10,500,000
CW1: P 10,290,000
EAO: P 210,000

Unit Cost:
CW1: P 31,661.54/Lineal meters
July 1, 2024 FY 2024 310101101316000 April 30, 2024 Region IX Regional Office IX
UACS No. 310101101316000
Project ID: P00801280MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1751+000 - K1752+000, K1752+000 - K1753+331.94, K1753+331.94 - K1754+415.82, K1755+000 - K1755+528.00
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 12.552 Lane km
Unit Cost: ₱ 12,300,828.55/ Lane-km
EAO: ₱ 5,600,000.00
Allocation: ₱ 160,000,000.00
July 1, 2024 2024 WIN4XY00303 SR2024-01-008064 January 31, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0898 + 658 - K0899 + 188

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 24.125 M
Asphalt Overlay: 2.120 Lane Km

EAO P 0.875 M

Total P 25.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0898 + 658 - K0899 + 079

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 24.125 M
Asphalt Overlay: 1.684 Lane Km

EAO P 0.875 M

Total P 25.00 M
July 1, 2024 2024 WIN4XY00294 SR2024-01-008055 January 31, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0898 + 429 - K0898 + 463

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 1.80841 M
Asphalt Overlay: 0.136 Lane Km

EAO P 0.6559 M

Total P 1.874 M

AS MODIFIED:

Daang Maharlika (LT) - K0898 + 474 - K0898 + 501

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 1.80841 M
Asphalt Overlay: 0.108 Lane Km

EAO P 0.6559 M

Total P 1.874 M
July 1, 2024 2024 SR2024-01-008072 January 31, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0899 + 188 - K0899 + 314

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 7.27417 M
Asphalt Overlay: 0.504 Lane Km

EAO P 0.26383 M

Total P 7.538 M

AS MODIFIED:

Daang Maharlika (LT) - K0899 + 079 - K0899 + 215

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 7.27417 M
Asphalt Overlay: 0.544 Lane Km

EAO P 0.26383 M

Total P 7.538 M

Pages