July 11, 2024 |
FY 2024 |
WIN4E03498 |
300215104984000 |
June 11, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215104984000
Project ID: P00834955MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Pasilmanta, Zamboanga City
CW1 - Construction of Concrete Road: 2.54 Lane Km
Unit Cost: ₱ 8,058,746.59/Lane Km CW2- Construction of Road Slope Protection Structure: 515.685 sq.m.
Unit Cost: ₱ 7,816.37/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
July 11, 2024 |
FY 2024 |
WIN4E03502 |
300215104987000 |
June 11, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215104987000
Project ID: P00834958MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Busay, Zamboanga City
CW1 - Construction of Concrete Road: 2.56 Lane Km
Unit Cost: ₱ 8,416,037.34/ Lane Km CW2- Construction of Road Slope Protection Structure: 776.44 sq.m.
Unit Cost: ₱ 3,805.76/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
July 11, 2024 |
FY 2024 |
WIN4E03517 |
300215104986000 |
June 11, 2024 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300215104986000
Project ID: P00834957MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Landang Laum, Zamboanga City
CW1 - Construction of Concrete Road: 2.42 Lane Km
Unit Cost: ₱ 8,422,650.94/ Lane Km CW2- Construction of Road Slope Protection Structure: 1,395.64 sq.m.
Unit Cost: ₱ 2,950.03/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
July 11, 2024 |
FY 2024 |
|
300214100810000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100810000 Project ID: P00833086MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City Rd - K1864+245 - K1864+670, K1871+351 - K1872+000, K1879+000 - K1880+000, K1882+000 - K1882+449, K1882+449 - K1882+996.46, K1922+763 - K1923+700
CW1 - Rehabilitation of Paved Road: 8.01 Lane Km
Unit Cost: ₱ 8,734,394.506/ Lane Km
EAO: ₱ 2,537,500.00
Allocation: ₱ 72,500,000.00 |
July 11, 2024 |
FY 2024 |
|
300214100815000 |
May 29, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100815000 Project ID: P00833093MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City Rd -Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City-Zamboanga City Rd
K1680+721.87 - K1680+735.37,
К1681+176.89 - К1681+181.24,
K1680+739.76 - K1680+762.23 (Inner R.S), K1680+753.15 -K1680+762.14 (Inner LS), K1680+781.35 - K1680+784.97 (Inner RS), K1680+769.12 - K1680+784.97 (Inner LS), K1680+780.49 - K1680+784.97 (Outer LS), K1680+796.92 - K1680+801.39 (Inner RS), K1680+805.56 - K1680+810.61 (Inner LS), K1680+803.68 - K1680+806 (Outer LS), K1680+819.64 - K1680+822.34 (Outer LS), K1680+868.68 - K1680+873.72 (Inner LS), K1680+886.21 - K1680+888.27 (Outer LS), K1681+035.02 - K1681+051.07 (Inner RS), K1681+067.66 -K1681+082.37 (Outer RS), K1681+104.95 - K1681+120.99 (Outer RS), K1681+118.49 - K1681+122.95 (Inner RS), K1681+121.06 - K1681+122.97 (Outer LS), K1681+131.91 - K1681+145.46 (Inner RS), K1681+154.46 - K1681+163.34 (Inner RS), K1681+219.11 - K1681+244.09 (Outer LS), К1676+831 - K1677+000,
K1689+910 - K1689+998
CW1 - Rehabilitation of Paved Road: 0.762 Lane Km
Unit Cost: ₱ 10,223,681.10/ Lane Km
EAO: ₱ 282,555.00
Allocation: ₱ 8,073,000.00 |
July 11, 2024 |
FY 2024 |
|
310107100642000 |
April 1, 2024 |
Region IX |
Regional Office IX |
UACS No. 310107100642000
Project ID: P00800405MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1704+161 - K1704+229, K1721 + 900 - K1722+000
CW1- Construction of Road Slope Protection Structure: 2,768.7 sq.m.
Unit Cost: ₱ 10,456.17/sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00 |
July 11, 2024 |
FY 2024 |
|
310102101627000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310102101627000
Project ID: P00800972MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Zamboanga City-Labuan-Limpapa Rd-
K1955+700.00 - 1955+900.00, K1956+200.00 - 1956+500.00, К1956+700.00 - K1956+755.41, K1956+755.41 - K1956+757.49, K1956+757.49 - K1957+080.00, К1957+080.00 - К1957+957.01, К1957+957.01 - K1958+000.00, K1958+000.00 - K1958+230.82, K1945+539.00 - K1946+779.00, K1946+825.00 - K1947+101.00, K1947+101.00 - K1948+748.00
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 15.455 Lane km
Unit Cost: ₱ 11,663,668.71/ Lane-km
EAO: ₱ 6,538,000.00
Allocation: ₱ 186,800,000.00 |
July 11, 2024 |
FY 2024 |
UACS No. 310102101627000 Project ID: P00800972MN OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Prev |
310204102631000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102631000
Project ID: P00801297MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Construction of NRJ Sangali Bypass Road, Zamboanga City
CW1- Construction of Concrete Road: 2.27 Lane Km
Unit Cost: ₱ 29,747,969.06/ Lane Km
EAO: ₱ 2,450,000.00 Excess: 22,110.23
Allocation: ₱ 70,000,000.00 |
July 11, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310205101298000
Project ID: P00800275MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
NRJ Maug-La Purisima-New Tubigon, Package 5, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.34 Lane Km
Allocation:
TOTAL: P 89,000,000
CW1: P 85,885,000
EAO: P 3,115,000
Unit Cost:
CW1: P 16,083,333.33/Lane Km
TO:
NRJ Maug-La Purisima-New Tubigon, Package 5, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.85 Lane Km
Allocation:
TOTAL: P 89,000,000
CW1: P 85,885,000
EAO: P 3,115,000
Unit Cost:
CW1: P 14,681,196.58/Lane Km
|
July 11, 2024 |
2024 |
WIN4E03441 |
FY 2024 GAA, R.A 11975 |
December 25, 2024 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310105101068000
Project ID: P00801215MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - K1311 + 776 - K1312 + 079, K1314 + 396 - K1314 + 963, K1314 + 1006 - K1317 + 138
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 6.574 Lane Km
Allocation:
TOTAL: P 73,634,000
CW1: P 71,056,810
EAO: P 2,577,190
Unit Cost:
CW1: P 10,808,763.31/Lane Km
TO:
NJR Bah-Bah-Talacogon Rd – K1311+776 – K1312+079, K1312+112.00 – K1312+364.20, K1312+620 – K1313+450, 1313+640 – K1313+718, K1314+387 – K1314+450, K1314+560 – K1314+890, K1315+677.00 – K1315+718.20, K1316+724.00 – K1316+900.80
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 4.24 Lane Km
Allocation:
TOTAL: P 73,634,000
CW1: P 69,834,185.04
EAO: P 2,532,814.96
EXCESS: P1,267,000
Unit Cost:
CW1: P 16,470,326.66/Lane Km
|
July 11, 2024 |
2024 |
310303101595000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Bridge - Retrofitting/ Strengthening of Permanent Bridges - Magapit Suspension Br. (B01113LZ) along Bangag-Magapit Rd
TO:
Bridge - Retrofitting/ Strengthening of Permanent Bridges - Magapit Suspension Br. (B01113LZ) along Jct Logac-Magapit Rd |
July 11, 2024 |
2024 |
WIN4F08041 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road with Drainage, Barangay 97 Cabalawan, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 9.9 M
0.750 Lane Km
EAO P 0.1 M
Total P 10.00 M
AS MODIFIED:
Construction of Road with Drainage, Barangay 97 Cabalawan, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 3.18368755 M
0.78 Lane Km
CW2- Construction of Drainage Structure: P 6.71631245 M
655 Lineal Meters
EAO P 0.1 M
Total P 10.00 M
|
July 10, 2024 |
2024 |
310202101639000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0634 + 000 - K0635 + 200
TO:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0634 + 689 - K0635 + 833 |
July 10, 2024 |
2024 |
|
SR2024-02-008119 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0810 + 134 - K0812 + 000, K0812 + 839 - K0813 + 120, K0813 + 600 - K0815 + 550, K0817 + 500 - K0817 + 648
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 332.64322 M
13.632 Lane Km
EAO P 12.06478 M
Total P 334.708 M
AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0810 + 134 - KO810 + 500, K0815 + 000 - K0815 + 550, K0817 + 500 - K0817 + 648, K0818 + 000 - K0819 + 000, K0821 + 800 - K0822 + 000, K0827 + 305 - K0828 +000, K0829 + 200 - K0829 + 632, K0832 + 000 - K0833 + 000, K0864 + 400 - K0865 + 779, K0865 + 804 - K0866 + 802, K0866 + 841 - K0867 + 402, K0867 + 536 - K0868 + 928, K0869 + 426 - K0869 + 790, K0870 + 152 - K0870 + 606, K0870 +622 - K0870 + 647, K0870 + 688 - K0870 + 704, K0870 + 749 - K0870 + 817, K0870 + 821 - K0870 +842, K0871 +165 - K0871 + 233, K0871 + 410 - K0871 + 459, K0871 + 515 - K0871 + 953, K0872 + 099 - K0872 + 760
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 332.64322 M
21.966 Lane Km
EAO P 12.06478 M
Total P 334.708 M
|
July 10, 2024 |
2024 |
WIN4F08035 |
SR2024-01-002146 |
January 27, 2024 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Dapdap River, Brgy Dapdap, Alangalang, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.5 M
Structure: 712.635 Lineal Meters
EAO P 3.5 M
Total P 100.00 M
AS MODIFIED:
Construction of Flood Control Structure along Dapdap River, Brgy Dapdap, Alangalang, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.5 M
Structure: 567 Lineal Meters
EAO P 3.5 M
Total P 100.00 M
|
July 10, 2024 |
2024 |
310109101552000 |
GAA 2024 |
January 2, 2024 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - San Vicente-Gutan-Lubac-Anguib Rd - K0649 + 200 - K0649 + 265
TO:
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - San Vicente-Gutan-Lubac-Anguib Rd - K0644 + 089 - K0644 + 150, K0649 + 200 - K0649 + 265 |
July 10, 2024 |
2024 |
310202101638000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Dugo-Mission Sect) - K0576 + 448 - K0576 + 798, K0579 + 122 - K0579 + 407, K0579 + 549 - K0580 + 000
TO:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Dugo-Mission Sect) - K0576 + 448 - K0576 + 794, K0579 + 080 - K0579 + 111.57, K0579 + 140.18 - K0579 + 411.53, K0579 + 439.94 - K0579 + 664.94 |
July 10, 2024 |
2024 |
P00800042MN |
SR2024-01-000099 |
January 24, 2024 |
Region X |
Bukidnon 1st District Engineering Office |
P00800042MN
310201101327000
OO1: Ensure Safe and Reliable National Road System- Network Development - Road Widening - Primary Roads
FROM:
Sayre Highway - K1482 + 453 - K1483 + 636
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 2.358 Lane Km
Allocation:
CW1: Php 69,576,500.00
EAO: Php 2,523,500.00
TO:
Sayre Highway - K1481 + 883 - K1482 + 049, K1482 + 453 - K1483 + 636
Type of Work:
CW1- Road Widening
Physical Target:
CW1 - 2.696 Lane Km
ROW Aquisition - 21,659 Square Meters
Allocation:
CW1: Php 67,076,500.00
ROW Acquisition: Php 2,500,000.00
EAO: Php 2,523,500.00
|
July 10, 2024 |
2024 |
P00800043MN |
SR2024-01-000108 |
January 24, 2024 |
Region X |
Bukidnon 1st District Engineering Office |
P00800043MN
310202101599000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
FROM:
Kalapong- Talaingod- Valencia (Bukidnon) Rd - K1543+000 - K1545+000
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 4.00 Lane Km
Allocation
CW1: Php 75,986,030.00
EAO: Php 2,755,970.00
TO:
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1543 + 000 - K1544 + 506
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 3.012 Lane Km
Allocation:
CW1: Php 75,986,030.00
EAO: Php 2,755,970.00
|
July 10, 2024 |
2024 |
P00800438MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00800438MN
310107100696000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Linamon-Zamboanga Rd - K1557 + 250 - K1557 + 315
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 780.00 Square Meter
Allocation:
CW1 - Php 19,600,000.00
EAO - Php 400,000.00
TO:
Linamon-Zamboanga Rd - K1557 + 230 - K1557 + 315
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,020.00 Square Meter
Allocation:
CW1 - Php 19,600,000.00
EAO - Php 400,000.00
|
July 10, 2024 |
2024 |
300204101351000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 1st District Engineering Office |
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Access Road leading to Fish Landing and Bagoong Processing, Sitio Namuyucan, San Jose, Gonzaga, Cagayan |
July 10, 2024 |
2024 |
P00800046MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Bukidnon 2nd District Engineering Office |
P00800046MN
310201101448000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Bukidnon Davao City Rd - K1598 + 323 - K1598 + 646
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 0.646 Lane Km
Allocation
CW1: Php 12,740,000.00
EAO: Php 260,000.00
TO:
Bukidnon Davao City Rd - K1598 + 297 - K1598 + 585
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 0.576 Lane Km
Allocation
CW1: Php 12,740,000.00
EAO: Php 260,000.00
|
July 10, 2024 |
2024 |
P00830297MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00830297MN
300214101301000
CSSP - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - -
FROM:
Installation of Roadway Lighting Structures along Linamon-Zamboanga National Highway, Maigo, Lanao del Norte
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 – 50.00 Number of Units
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
TO:
Installation of Roadway Lighting Structures along Linamon-Zamboanga National Highway, Maigo, Lanao del Norte
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 – 44.00 Number of Units
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
|
July 10, 2024 |
2024 |
P00800336MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Bukidnon 2nd District Engineering Office |
P00800336MN
310110100539000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Sayre Highway - K1547 + 750 - K1548 + 000, K1548 + 200 - K1548 + 300
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 818 Lineal Meters
Allocation:
CW1: Php 8,820,000.00
EAO: Php 180,000.00
TO:
Sayre Highway - K1547 + 711 - K1548 + 000, K1548 + 280 - K1548 + 350
Type of Work:
CW1- Construction of Drainage Structure along Road
CW2- Off-Carriageway Improvement: Shoulder Paving/ Construction
Physical Target:
CW1- 610 Lineal Meters
CW2- 590.50 Square Meters
Allocation:
CW1: Php 6,659,889.54
CW2: Php 2,160,110.46
EAO: Php 180,000.00 |
July 10, 2024 |
2024 |
P00800997MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Bukidnon 2nd District Engineering Office |
P00800997MN
310101101327000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Bukidnon-Davao City Rd - K1588 + 000 - K1589 + 588
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.260 Lane Km
Allocation:
CW1: Php 85,885,000.00
EAO: Php 3,115,000.00
TO:
Bukidnon-Davao City Rd - K1587 + 714 - K1588 + 000, K1589+443 - K1590 + 111, K1590 + 126 - K1590 + 380
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.244 Lane Km
Allocation:
CW1: Php 85,885,000.00
EAO: Php 3,115,000.00
|
July 10, 2024 |
2024 |
P00803757MN |
SR2024-03-013346 |
March 16, 2024 |
Region X |
Regional Office X |
P00803757MN
310101101333000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1476 + 026 - K1479 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.844 Lane Km
Allocation:
Total: Php 114,750,000.00
CW1: Php 110,733,750.00
EAO: Php 4,016,250.00
TO:
Sayre Highway K1482+432 - K1483+000, K1483 + 659 - K1487+000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-7.790 Lane Km
Allocation:
Total: Php 114,750,000.00
CW1: Php 110,733,750.00
EAO: Php 4,016,250.00 |
July 10, 2024 |
2024 |
310101101184000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0329+164-K0331+000
TO:
Asset Preservation - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0329+911-K0331+675
|
July 10, 2024 |
2024 |
P00800073MN |
SR2024-01-002830 |
January 27, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00800073MN
310201101321000
OO1 - Network Development Program - Road Widening - Primary Roads
FROM:
Linamon-Zamboanga Rd - K1545 +
651 - K1545 + 660, K1547 + 543 -
K1547 + 547, K1547 + 569 - K1547
+ 584, K1550 + 000 - K1551 + 600,
K1551 + 601 - K1554 + 140, K1554
+ 142 - K1555 + 926, K1555 + 928 -
K1556 + 008, K1556 + 009 - K1558
+ 374, K1558 + 479.80 - K1558 +
618, K1558 + 619 - K1560 + 096,
K1560 + 134.15 - K1561 + 014,
K1561 + 030.30 - K1562 + 527,
K1562 + 528 - K1562 + 532, K1562
+ 610.20 - K1563 + 215, K1564 +
680 - K1566 + 257, K1566 + 258 -
K1566 + 261, K1566 + 299.70 -
K1566 + 590, K1566 + 646.65 -
K1566 + 752, K1568 + 346 - K1568
+ 919, K1568 + 921 - K1568 + 925,
K1569 + 000 - K1570 + 034, K1570
+ 035 - K1570 + 039, K1570 + 100 -
K1570 + 104, K1571 + 590 - K1573
+ 257
Type of Work:
CW1 - Road Widening
ROW – ROW Acquisition
Physical Target:
CW1 – 3.192 lane km
ROW – 33.497 lane km
Allocation:
CW1 - Php 83,711,820.00
ROW – Php 2,904,650.00
EAO - Php 3,141,530.00
TO:
Linamon-Zamboanga Rd K1547+516 - K1547+547, K1547+569 - K1547+580, K1550+000 - K1550+391, K1551+212 - 1551+277, K1553+647 - K1553+693, K1571+590 - K1572+235, K1572+944 - K1573+257
Type of Work:
CW1 - Road Widening
CW2 - Construction of Road Slope Protection Structure
ROW – ROW Acquisition
Physical Target:
CW1 – 2.823 lane km
CW2 – 2,307.95 Square meter
ROW – 1,970.00 Square meter
Allocation:
CW1 - Php 65,897,450.00
ROW – Php 17,814,370.00
EAO - Php 3,141,530.00
|
July 10, 2024 |
2024 |
P00800074MN |
SR2024-01-002832 |
January 27, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00800074MN
310201101322000
OO1 - Network Development Program - Road Widening - Primary Roads
FROM:
Linamon-Zamboanga Rd - K1573 + 257 - K1573 + 860, K1573 + 885 - K1574 + 042, K1574 + 122 - K1574 + 250, K1575 + 641 - K1575 + 643
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 1.780 lane km
Allocation:
CW1 - Php 49,015,245.00
EAO – Php 1,777,755.00
TO:
Linamon-Zamboanga Rd - K1573 + 257 - K1573 + 860, K1573 + 885 - K1574 + 042, K1574 + 122 - K1574 + 250
Type of Work:
CW1 - Road Widening
CW2 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 1.776 lane km
CW2 – 1,451.90 Square meter
Allocation:
CW1 - Php 42,073,440.00
CW2 – Php 6,941,800.00
EAO – Php 1,777,755.00
|
July 10, 2024 |
2024 |
P00800057MN |
SR2024-01-001817 |
January 27, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800057MN
310201101326000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Sayre Highway - K1445 + 075 - K1446 + 483
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.91 Lane Km
Allocation:
CW1: Php 70,203,750.00
EAO: Php 2,546,250.00
TO:
Sayre Highway - K1445 + 075 - K1445 + 885
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure
Physical Target:
CW1- 1.62 Lane Km
CW2- 1,400.20 Lineal Meters
Allocation:
CW1: Php 52,619,750.00
CW2: Php 17,584,000.00
EAO: Php 2,546,250.00 |
July 10, 2024 |
2024 |
P00803759MN |
SR2024-03-013348 |
March 16, 2024 |
Region X |
Regional Office X |
P00803759MN
310101101335000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1488 + 324 - K1490 + 106, K1490 + 122 - K1490 + 970, K1491 + 175 - K1492 + 000, K1493 + 805 - K1494 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-2.420 Lane Km
Allocation:
Total: Php 144,885,000.00
CW1: Php 139,814,025.00
EAO: Php 5,070,975.00
TO:
Sayre Highway K1488 + 324 - K1490 + 088, K1490 + 122 - K1490 + 970, K1491 + 175 - K1492 + 000, K1493 + 805 - K1494 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-10.680 Lane Km
Allocation:
Total: Php 144,885,000.00
CW1: Php 139,814,025.00
EAO: Php 5,070,975.00 |
July 10, 2024 |
2024 |
P00801163MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00801163MN
310104100686000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Linamon-Zamboanga Rd - K1546 + 306 - K1546 + 401, K1546 + 958 - K1547 + 153, K1566 + 000 - K1566 + 261, K1566 + 728 - K1566 + 762, K1567 + 710 - K1567 + 738, K1567 + 750.82 - K1567 + 773, K1568 + 387 - K1568 + 404, K1569 + 000 - K1570 + 039, K1574 + 996 - K1575 + 379, K1585 + 871 - K1586 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 4.738 lane km
Allocation:
CW1 - Php 59,958,345.00
EAO – Php 2,174,655.00
TO:
Linamon-Zamboanga Rd - K1546 + 000 - K1546 + 306, K1547 + 775 - K1548 + 000, K1566 + 000 - K1566 + 261, K1566 + 728 - K1566 + 759, K1567 + 710 - K1567 + 734, K1567 + 754.50 - K1567 + 769, K1569 + 000 - K1569 + 800, K1585 + 571 - K1585 + 728
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 3.661 lane km
Allocation:
CW1 - Php 59,958,345.00
EAO – Php 2,174,655.00
|
July 10, 2024 |
2024 |
310103101375000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Santiago-Baluarte-Quirino Bdry - K0326 + 500 - K0335 + 640
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Santiago-Baluarte-Quirino Bdry - K0326 + 215 - K0333 + 761
|
July 10, 2024 |
2024 |
P00803758MN |
SR2024-03-013347 |
March 16, 2024 |
Region X |
Regional Office X |
P00803758MN
310101101334000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1480 + 000 - K1480 + 881, K1480 + 917 - K1481 + 783, K1486 + 048 - K1486 + 319, K1486 + 740 - K1487 + 236
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.160 Lane Km
Allocation:
Total: Php 101,145,000.00
CW1: Php 97,604,925.00
EAO: Php 3,540,075.00
TO:
Sayre Highway K1487 + 000 - K1488 + 324, K1492 + 000 - K1493 + 000, K1494 + 000 - K1496 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.620 Lane Km
Allocation:
Total: Php 101,145,000.00
CW1: Php 97,604,925.00
EAO: Php 3,540,075.00 |
July 10, 2024 |
2024 |
P00800056MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00800056MN
310201101450000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Sayre Highway - K1441 + 812 - K1442 + 100
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.430 Lane Km
Allocation:
CW1: Php 22,050,980.00
EAO: Php 450,020.00
TO:
Sayre Highway - K1441 + 1063 - K1442 + 100
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.358 Lane Km
CW2- 1,255.76 Lineal Meters
Allocation:
CW1: Php 14,944,980.00
CW2: Php 7,106,000.00
EAO: Php 450,020.00 |
July 10, 2024 |
2024 |
P00801164MN |
SR2024-01-002827 |
January 27, 2024 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00801164MN
310104100685000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Iligan City-Marawi City Rd - K1536 + (-082) - K1536 + 000, K1536 + (-116) - K1536 + (-082),
K1536 + (-129) - K1536 + (-116), K1536 + (-162) - K1536 + (-129), K1536 + (-175) - K1536 +
(-162), K1536 + (-181) - K1536 + (-175), K1536 + (-188) - K1536 + (-181), K1536 + (-206) - K1536
+ (-188), K1536 + (-218) - K1536 + (-206), K1536 + (-228) - K1536 + (-218), K1536 + (-238) -
K1536 + (-228), K1536 + (-308) - K1536 + (-238), K1536 + (-332) - K1536 + (-308), K1536 + (-342)
- K1536 + (-332), K1536 + (-344) - K1536 + (-342), K1536 + (-384) - K1536 + (-344), K1536 +
(-389) - K1536 + (-384), K1536 + (-432) - K1536 + (-389), K1536 + (-527) - K1536 + (-432), K1536
+ (-542) - K1536 + (-527), K1536 + (-635) - K1536 + (-542), K1536 + (-682) - K1536 + (-635),
K1536 + 000 - K1539 + 840
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 8.90 lane km
Allocation:
CW1 - Php 71,681,165.00
EAO – Php 2,599,835.0
TO:
Iligan City-Marawi City Rd - K1536+(-635) - K1536+500, K1545+312 - K1546+000 , K1553+665 - K1554+207, K1554+281 - K1554+331
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road
Physical Target:
CW1 – 4.086 lane km
CW2 – 688 lineal meters
Allocation:
CW1 - Php 58,873,548.18
CW2 – 12,807,616.82
EAO – Php 2,599,835.0
|
July 10, 2024 |
2024 |
P00803770MN |
SR2024-03-013391 |
March 16, 2024 |
Region X |
Regional Office X |
P00803770MN
310101101356000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1521+862-K1523
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.102 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Sayre Highway K1512 + 366 - K1514 + 000, K1518 + 000 - K1519 + 285
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.390 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 10, 2024 |
2024 |
P00833111MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Bukidnon 3rd District Engineering Office |
P00833111MN
300214101277000
CSSP - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Installation/Application of Signage and Pavement Markings along Jct. SH- Manolo Fortich-Libona-Indahag Road - K1481 + 000 - K1482 + 000, Barangay Agusan Canyon, Manolo Fortich Bukidnon and Barangay Crossing, Libona, Bukidnon
Type of Work:
CW1- Road Safety- Pavement Markings
Physical Target:
CW1- 990.00 Lineal Meters
Allocation:
CW1: Php 1,641,500.00
EAO: Php 33,500.00
TO:
Installation/Application of Signage and Pavement Markings along Jct. SH- Manolo Fortich-Libona-Indahag Road - K1460 + 366 - K1460 + 736, K1460 + 787.50 - K1461 + 450.50 Barangay Agusan Canyon, Manolo Fortich Bukidnon and Barangay Crossing, Libona, Bukidnon
Type of Work:
CW1- Road Safety- Pavement Markings
Physical Target:
CW1- 990.00 Lineal Meters
Allocation:
CW1: Php 1,641,500.00
EAO: Php 33,500.00 |
July 10, 2024 |
2024 |
P00800536MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00800536MN
310107100702000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Ozamis-Pagadian Rd - K1668 + 100 - K1668 + 150
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 2,149.610 Square meter
Allocation:
CW1 - Php 24,500,000.00
EAO – Php 500,000.00
TO:
Ozamis-Pagadian Rd - K1668 + 020 - K1668 + 170
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 6,448.830 Square meter
Allocation:
CW1 - Php 24,500,000.00
EAO – Php 500,000.00
|
July 10, 2024 |
2024 |
P00800390MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00800390MN
310110100543000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage - Primary Roads
FROM:
Overton-Buru-un Bdry Rd - K1535 + 073 - K1535 + 330, K1535 + 575 - K1535 + 877
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 559.00 Lineal Meters
Allocation:
CW1: Php 19,600,000.00
EAO: Php 400,000.00
TO:
Overton-Buru-un Bdry Rd - K1535 + 073 - K1535 + 370, K1535 + 534 - K1535 + 877
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 640.00 Lineal Meters
Allocation:
CW1: Php 19,600,000.00
EAO: Php 400,000.00 |
July 10, 2024 |
2024 |
P00801236MN |
SR2024-01-002893 |
January 27, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00801236MN
310104100688000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Ozamis-Oroquieta Rd - K1702 + 835 - K1703 + 000, K1709 + 960 - K1711 + 000, K1717 + 589 - K1718 + 398
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 4.026 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO – Php 2,100,000.00
TO:
Ozamis-Oroquieta Rd - K1709 + 000 - K1711 + 000, K1717 + 589 - K1718 + 398
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 5.620 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO – Php 2,100,000.00
|
July 10, 2024 |
2024 |
P00803771MN |
SR2024-01-002891 |
January 27, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803771MN
310101101357000
OO1 - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Asphalt Overlay Ozamis - Pagadian Road (Ozamiz Section) , K1695 + 409 K1696 + 687, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.556 lane km
Allocation:
CW1 - Php 144,750,000.00
EAO - Php 5,250,000.00
TO:
Asphalt Overlay Ozamis - Pagadian Road (Ozamiz Section), K1695 + 000 - K1695 + 391, K1695 + 421 - K1699 + 831.70, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 13.033 lane km
Allocation:
CW1 - Php 144,750,000.00
EAO - Php 5,250,000.00
|
July 10, 2024 |
2024 |
P00800543MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00800543MN
310107100695000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Overton-Buru-un Bdry Rd - K1534 + 846 - K1534 + 939
Type of Work:
CW1- Construction of Road Slope Protection/ Structure
Physical Target:
CW1- 2,369.67 Square Meters
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00
TO:
Overton-Buru-un Bdry Rd - K1533 + 313 - K1533 + 380 - K1534 + 840 - K1535 + 000
Type of Work:
CW1- Construction of Road Slope Protection/ Structure
Physical Target:
CW1- 2,060.00 Square Meters
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00
|
July 10, 2024 |
2024 |
P00803773MN |
SR2024-01-002890 |
January 27, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803773MN
310101101359000
OO1 - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Asphalt Overlay Ozamis - Oroquieta Road (Ozamiz - Clarin Section), K1703 + 000 - K1704 + 252, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.50 lane km
Allocation:
CW1 - Php 135,100,000.00
EAO - Php 4,900,000.00
TO:
Asphalt Overlay Ozamis - Oroquieta Road (Ozamiz - Clarin Section), K1701 + 526.000 - K1705 + 022.00, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 12.850 lane km
Allocation:
CW1 - Php 135,100,000.00
EAO - Php 4,900,000.00
|
July 10, 2024 |
2024 |
P00803816MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803816MN
310102101923000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Asphalt Overlay Ozamis Port Road, 0 - 105, 117 - 556, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 1.088 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
TO:
Asphalt Overlay Ozamis Port Road, 10.40 - 105, 117 - 428, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 0.811 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
|
July 10, 2024 |
2024 |
P00803817MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803817MN
310102101924000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Asphalt Overlay Ozamis Port Road Dual, 0 - 439, 451 - 556, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 1.088 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
TO:
Asphalt Overlay Ozamis Port Road Dual, 130 - 439, 451 - 545.60, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 0.807 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
|
July 10, 2024 |
2024 |
P00801244MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00801244MN
310104100777000
OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Misamis Oriental-Ma Cristina Bdry Rd - K1512+(-140) - K1512+040
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 0.360 Lane Km
Allocation:
CW1: Php 7,288,260.00
EAO: Php 148,740.00
TO:
Misamis Oriental-Ma Cristina Bdry Rd - K1512+(-140) - K1512+135
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.550 Lane Km
Allocation:
CW1: Php 7,288,260.00
EAO: Php 148,740.00 |
July 10, 2024 |
2024 |
P00803828MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803828MN
310103101705000
OO1 - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
FROM:
Asphalt Overlay Tan Avenue Road, K1686 + 669 - K1687 + 1071, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.824 lane km
Allocation:
CW1 - Php 39,200,000.00
EAO - Php 800,000.00
TO:
Asphalt Overlay Tan Avenue Road, K1686 + 669 - K1687 + 610, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 3.804 lane km
Allocation:
CW1 - Php 39,200,000.00
EAO - Php 800,000.00
|
July 10, 2024 |
2024 |
P00803874MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00803874MN
310204102863000
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Construction of Bypass and Diversion Roads Iligan City-Cagayan de Oro City Alternate Route (Digidaan – Bulua Section) Package II, Iligan City, Lanao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.64 Lane Km
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00
TO:
Construction of Bypass and Diversion Roads Iligan City-Cagayan de Oro City Alternate Route (Digkilaan – Bulua Section) Package II, Iligan City, Lanao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.64 Lane Km
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00
|
July 10, 2024 |
2024 |
P00803844MN |
SR2024-01-002894 |
January 27, 2024 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00803844MN
310201101320000
OO1 - Network Development Program - Road Widening - Primary Roads
FROM:
Ozamis - Oroquieta Rd - K1707 + 535 - K1708 +200, K1715 + 968 - K1717 + 407, K1717 + 425 - K1717 + 589, K1720 + 184 - K1720 + 665, K1720 + 692 - K1721 + 184
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 6.478 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO - Php 2,100,000.00
TO:
Ozamis - Oroquieta Rd - K1707 + 535 - K1708 +200, K1715 + 968 - K1717 + 402.5
Type of Work:
CW1 – Road Widening
CW2 – Construction of Drainage Structure along Road
CW3 – Construction of Road Slope Protection Structure
Physical Target:
CW1 – 4.195 lane km
CW2 – 892.359 lm
CW3 – 2,781.930 Square meter
Allocation:
CW1 – Php 36,267,939.180
CW2 – Php 9,808,678.187
CW3 – Php 11,823,382.633
EAO – Php 2,100,000.00
|
July 10, 2024 |
2024 |
P00803792MN |
SR2024-01-002930 |
January 27, 2024 |
Region X |
Misamis Oriental 1st District Engineering Office |
P00803792MN
310102101629000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Gingoog-Claveria-Villanueva Rd - K1316 + 040 - K1317 + 269, K1329 + 775 - K1329 + 850
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.614 lane km
Allocation:
CW1 - Php 96,500,000.00
EAO - Php 3,500,000.00
TO:
Gingoog-Claveria-Villanueva Rd - K1316 + (-320) - K1317 + 886
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 8.836 lane km
Allocation:
CW1 - Php 96,500,000.00
EAO - Php 3,500,000.00
|
July 10, 2024 |
2024 |
P00803796MN |
SR2024-01-002932 |
January 27, 2024 |
Region X |
Misamis Oriental 1st District Engineering Office |
P00803796MN
310102101633000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Gingoog-Claveria-Villanueva Road-K1316+040-K1317+839, K1318+011-K1318+705
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 4.992 lane km
Allocation:
CW1 - Php 96,500,000.00
EAO - Php 3,500,000.00
TO:
Gingoog-Claveria-Villanueva Road - K1318 + 011 - K1318 + 705, K1325 + 500 – K1327 + 000
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 8.692 lane km
Allocation:
CW1 - Php 96,500,000.00
EAO - Php 3,500,000.00
|
July 10, 2024 |
2024 |
P00820035MN |
SR2024-01-004798 |
January 27, 2024 |
Region X |
Iligan City District Engineering Office |
P00820035MN
320101111349000
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structure along Mandulong River, Barangay Mandulog, Iligan City
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 320.0 Linear Meters
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Construction of Flood Mitigation Structure along Mandulog River, Barangay Mandulog, Iligan City
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 320.0 Linear Meters
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 10, 2024 |
2024 |
P00836526MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Oriental 1st District Engineering Office |
P00836526MN
300226115528000
CSSP - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
FROM:
Construction (Completion) of Multi-Purpose Building, (Mahayhay Elementary School), Magsaysay, Misamis Oriental
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 – 2.00 Number of Building
Allocation:
CW1 - Php 19,800,000.00
EAO - Php 200,000.00
TO:
Construction (Completion) of Multi-Purpose Building, (Mahayahay Elementary School), Magsaysay, Misamis Oriental
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 – 2.00 Number of Building
Allocation:
CW1 - Php 19,800,000.00
EAO - Php 200,000.00
|
July 10, 2024 |
2024 |
P00803653MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Misamis Oriental 2nd District Engineering Office |
P00803653MN
310201101462000
OO1 - Network Development Program - Road Widening - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1419 + 532 - K1419 + 645
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 0.226 lane km
Allocation:
CW1 - Php 4,488,400.00
EAO - Php 91,600.00
TO:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1418 + 801 - K1419 + 018
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 0.226 lane km
Allocation:
CW1 - Php 4,488,400.00
EAO - Php 91,600.00
|
July 10, 2024 |
2024 |
P00833120MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00833120MN
300214101298000
CSSP - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Installation of Road Safety Devices and Facilities along Misamis Oriental-Ma. Cristina Bdry Rd - K1521 + 757 - K1522 + 753, Iligan City, Lanao del Norte
Type of Work:
CW1- Road Safety: Pavement Markings
Physical Target:
CW1- 1,000.00 Linear Meters
Allocation:
CW1: Php 17,150,000.00
EAO: Php 350,000.00
TO:
Installation of Road Safety Devices and Facilities along Misamis Oriental-Ma. Cristina Bdry Rd - K1521 + 757 - K1522 + 753, Iligan City, Lanao del Norte
Type of Work:
CW1- Road Safety: Roadway Lighting
CW2- Off- Carriageway: Construction of Traffic Island
CW3- Road Safety: Traffic Signals
Physical Target:
CW1-25 Units
CW2- 447.44 Square Meters
CW3- 4 Number of Traffic Signals
Allocation:
CW1: Php 8,901,544.01
CW2- Php 5,189,774.49
CW3- Php 3,058,681.50
EAO: Php 350,000.00
|
July 10, 2024 |
2024 |
P00837175MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00837175MN
300221106802000
CSSP - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road along Sitio Sinicabog, Brgy. Rongongon, Iligan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.20 Lane Km
Allocation:
CW1: Php 49,500,000.00
EAO: Php 500,000.00
TO:
Construction of Road along Sitio Sinicabog, Brgy. Rogongon, Iligan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.20 Lane Km
Allocation:
CW1: Php 49,500,000.00
EAO: Php 500,000.00
|
July 10, 2024 |
2024 |
P00837176MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Iligan City District Engineering Office |
P00837176MN
300221106803000
CSSP - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road with Box Culvert along Purok Poblacion, Brgy. Rongongon, Iligan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.30 Lane Km
Allocation:
CW1: Php 49,500,000.00
EAO: Php 500,000.00
TO:
Construction of Road with Box Culvert along Purok Poblacion, Brgy. Rogongon, Iligan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.30 Lane Km
Allocation:
CW1: Php 49,500,000.00
EAO: Php 500,000.00 |
July 10, 2024 |
2024 |
P00800346MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Lanao del Norte 2nd District Engineering Office |
P00800346MN
310110100544000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Linamon-Zamboanga Rd – K1600 + 970 - K1600 + 993, K1600 + 994 - K1601 + 155, K1601 + 156 - K1601 + 744
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 824.00 Linear Meters
Allocation:
CW1: Php 10,497,760.00
EAO: Php 214,240.00
TO:
Linamon-Zamboanga Rd – K1600 + 970 - K1601 + 674
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 756.00 Linear Meters
Allocation:
CW1: Php 10,497,760.00
EAO: Php 214,240.00 |
July 10, 2024 |
2024 |
P00803617MN |
GAA FY 2024 |
January 1, 2024 |
Region X |
Lanao del Sur 2nd District Engineering Office |
P00803617MN
310109101639000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Dobleston-Butadon Rd - K1996 + 273 - K1996 + 358
Type of Work:
CW1- Rehabilitation/ Major Repair of Road Slope Protection Structure
Physical Target:
CW1- 595.00 Square Meters
Allocation:
CW1: Php 11,237,660.00
EAO: Php 229,340.00
TO:
Dobleston-Butadon Rd - K1996 + 160 - K1996 + 220, K1996 + 245 - K1996 + 272
Type of Work:
CW1- Rehabilitation/ Major Repair of Road Slope Protection Structure
CW2- Rehabilitation of Paved Road
Physical Target:
CW1- 1,015.68 Square Meters
CW2- 0.141 Lane Km
Allocation:
CW1: Php 7,046,629.12
CW2: Php 4,191,030.88
EAO: Php 229,340.00 |
July 5, 2024 |
2024 |
WIN4XY00250 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00838587LZ
UACS : 300221104732000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Barangay Morocborocan to Barangay Poblacion, Rapu-Rapu, Albay
Physical Target :
CW1 - Construction of Gravel Road - 2.922 Lane Km
CW2 - Construction of Concrete Road - 2.96 Lane Km
CW3 - Construction of Drainage Structure along Road - 2780 Lineal meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Barangay Morocborocan to Barangay Poblacion, Rapu-Rapu, Albay
Physical Target :
CW1 - Construction of Gravel Road - 2.922 Lane Km
CW2 - Construction of Concrete Road - 2.96 Lane Km |
July 5, 2024 |
2024 |
WIN4XY00256 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00842598LZ
UACS : 300215103828000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Namantao - Mapulang Daga Road, Bacacay, Albay
Physical Target :
CW1 - Construction of Gravel Road - 4.682 Lane Km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Namantao - Mapulang Daga Road, Bacacay, Albay
Physical Target :
CW1 - Construction of Gravel Road - 3.6 Lane Km |
July 5, 2024 |
2024 |
WIN4E03501 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310106101214000
Project ID: P00801219MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Tertiary Roads
FROM:
NRJ Bayugan-Calaitan-Tandag Rd - K1273 + 451 - K1273 + 529, K1275 + 145 - K1275 + 370, K1291 + 000 - K1291 + 200, K1291 + 714 - K1291 + 777, K1292 + 050- K1292 + 324, K1292 + 850 - K1292 + 886, K1293 + 153 - K1293 + 292
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 3.548 Lane Km
Allocation:
TOTAL: P 41,611,000
CW1: P 40,778,780
EAO: P 832,220
Unit Cost:
CW1: P 11,493,455.47/Lane Km
TO:
NRJ Bayugan-Calaitan-Tandag Rd – K1291+714 – K1291+776.92, K1292+166 – K1292+409.50, K1293+753 – K1293+780.10
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 0.67 Lane Km
CW2- 455 Square meters
Allocation:
TOTAL: P 41,611,000
CW1: P 20,944,649.97
CW2: P 19,834,130.03
EAO: P 832,220
Unit Cost:
CW1: P 31,260,671.60/Lane Km
CW2: P 43,591.49/Square meters
|
July 4, 2024 |
2024 |
WIN4XY00308 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Brdy-Bigte-Ipo Dam Rd K0031+422 - K0031+635 |
July 4, 2024 |
2024 |
WIN4XY00314 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Brdy - Bigte -Ipo Dam Rd - K0036+239 - K0036+600 |
July 4, 2024 |
2024 |
WIN4E03472 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101372000
Project ID: P00800152MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 680 - K1176 + 960
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.56 Lane Km
Allocation:
TOTAL: P 11,200,000
CW1: P 10,808,000
EAO: P 392,000
Unit Cost:
CW1: P 19,300,000/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 750 - K1176 + 960
Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.42 Lane Km
CW1- 283.800 Square meters
Allocation:
TOTAL: P 11,200,000
CW1: P 8,769,920
CW1: P 2,038,080
EAO: P 392,000
Unit Cost:
CW1: P 20,880,761.90/Lane Km
CW2: P 7,181.39/Square meters
|
July 4, 2024 |
2024 |
WIN4E03472 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101372000
Project ID: P00800152MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 680 - K1176 + 960
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.56 Lane Km
Allocation:
TOTAL: P 11,200,000
CW1: P 10,808,000
EAO: P 392,000
Unit Cost:
CW1: P 19,300,000/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1176 + 750 - K1176 + 960
Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.42 Lane Km
CW1- 283.800 Square meters
Allocation:
TOTAL: P 11,200,000
CW1: P 8,769,920
CW1: P 2,038,080
EAO: P 392,000
Unit Cost:
CW1: P 20,880,761.90/Lane Km
CW2: P 7,181.39/Square meters
|
July 4, 2024 |
2024 |
WIN4E03504 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101424000
Project ID: P00801065MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 938
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.292 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 8,324,245.36/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 787.5
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.991 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 10,852,598.39/Lane Km
|
July 4, 2024 |
2024 |
WIN4E03504 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101424000
Project ID: P00801065MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 938
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.292 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 8,324,245.36/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 787.5
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.991 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 10,852,598.39/Lane Km
|
July 4, 2024 |
2024 |
WIN4E03504 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101424000
Project ID: P00801065MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 938
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.292 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 8,324,245.36/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1258 + 292 - K1258 + 787.5
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.991 Lane Km
Allocation:
TOTAL: P 11,145,000
CW1: P 10,754,925
EAO: P 390,075
Unit Cost:
CW1: P 10,852,598.39/Lane Km
|
July 4, 2024 |
2024 |
WIN4XY00307 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems –
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package B, Capas, Tarlac, Sta. 0+382.80 to Sta. 0+736.80 |
July 4, 2024 |
2024 |
WIN4XY00206 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101713000
Project ID: P00800196VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0293+600 - K00294+682.5
CW1- Road Widening: 2.156 lane km. – 27,672.26
EAO – 564.74
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0293+600 - K00294+332.45
CW1- Road Widening: 1.4549 lane km. – 22,366.9565
ROW Acquisition: 3,662.25 sq. m. – 5,305.3035
EAO – 564.74 |
July 4, 2024 |
2024 |
WIN4XY00185 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310105101173000
Project ID: P00801050VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0261+560 - K0263+030, K0264+290 - K0265+317
CW1- Rehabilitation of Paved Road: 4.696 lane km. – 48,110.16
EAO – 981.84
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0261+560 - K0262+490, K0264+290 - K0265+311
CW1- Rehabilitation of Paved Road: 4.696 lane km. – 48,110.16
EAO – 981.84 |
July 4, 2024 |
2024 |
WIN4X700237 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310102101593000
Project ID: P00801028VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Jaime Cardinal Sin Ave (S00335PN) - K0278 + (-150) - K0280+000
CW1- Preventive Maintenance of Road - Asphalt Overlay: 8.22 lane km. – 45,240.165
EAO – 1,640.835
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Jaime Cardinal Sin Ave (S00536PN) - K0278 + (-391) - K0278+839
CW1- Preventive Maintenance of Road - Asphalt Overlay: 4.92 lane km. – 45,240.165
EAO – 1,640.835 |
July 4, 2024 |
2024 |
WIN4XY00226 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310102101586000
Project ID: P00801192VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0260 + 781 - K0271 + 000
CW1- Preventive Maintenance of Road - Asphalt Overlay: 19.96 lane km. – 142,337.50
EAO – 5,162.50
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0205+811 - K0257+368, K0258+145 - K0260+335
CW1- Preventive Maintenance of Road - Asphalt Overlay: 14.84 lane km. – 142,337.50
EAO – 5,162.50
|
July 4, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101385000
Project ID: P00803783MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Surigao-Davao Coastal Rd, Lianga, Surigao del Sur
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.524 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 19,263,015.01/Lane Km
TO:
Surigao-Davao Coastal Rd, Lianga, Surigao del Sur
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 20.952 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 11,514,413.90/Lane Km
|
July 4, 2024 |
2024 |
WIN4XY00186 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310102101587000
Project ID: P00801193VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0250 + 800 - K0260 + 781
CW1- Preventive Maintenance of Road - Asphalt Overlay: 20.006 lane km. – 142,337.50
EAO – 5,162.50
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0247+664 - K0250+012, K0252+020 - K0252+412, K0252+957 - K0255+838
CW1- Preventive Maintenance of Road - Asphalt Overlay: 15.116 lane km. – 142,337.50
EAO – 5,162.50
|
July 4, 2024 |
2024 |
WIN4XY00200 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101538000
Project ID: P00802922VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Aklan East Rd - K0294+144 - K0296+559, K0296+884 - K0296+952, K0296+1017 - K0297+031
CW1- Road Widening: 5.034 lane km. – 113,387.50
ROW Acquisition: 24,110 sq. m
EAO – 5,162.50
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Aklan East Rd - K0294+144 - K0296+559, K0296+884 - K0296+952, K0296+1017 - K0297+031, K0301+000 - K0302+476
CW1- Road Widening: 5.034 lane km. – 101,388.578
CW2- Off Carriageway Improvement: Shoulder Paving: 4,428.00 sq. m. - 11,998.922
ROW Acquisition: 24,110 sq. m
EAO – 5,162.50
|
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310105101172000
Project ID: P00802926VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan East Rd - K0321+115 - K0322+766
CW1- Reconstruction to Concrete Pavement: 3.418 lane km. – 31,375.68
EAO – 640.32
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Aklan East Rd - K0321+344 - K0322+748
CW1- Reconstruction to Concrete Pavement: 2.924 lane km. – 30,895.44
EAO – 640.32
Excess - 480.24 |
July 4, 2024 |
2024 |
WIN4X700237 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310102101592000
Project ID: P00803395VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0271+000 - K0275+499
CW1- Preventive Maintenance of Road - Asphalt Overlay: 17.188 lane km. – 96,500.00
EAO – 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan West Rd - (S00324PN) - K0271+000 - K0275+499
CW1- Preventive Maintenance of Road - Asphalt Overlay: 17.188 lane km. – 96,500.00
EAO – 3,500.00
|
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310214100770000
Project ID: P00830325VS
FROM:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan East Rd - K0286+349 - K0287+430, K0287+600 - K0287+890, K0288+174 - K0288+840, K0290+000 - K0290+174, K0290+223 - K0290+671, K0291+387 - K0293+649, K0294+112 - K0296+559
CW1-Rehabilitation of Paved Road: 17.734 lane km. – 133,364.93
EAO – 4,837.07
TO:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan East Rd - K0286+349 - K0287+430, K0287+600 - K0287+890, K0288+174 - K0288+840, K0290+000 - K0290+174, K0290+223 - K0290+671, K0291+387 - K0293+649, K0294+112 - K0296+559, K0296+800 - K0296+952, K0297+000 - K0297+340, K0298+000 - K0298+332, K0298+370 - K0299+146, K0299+223 - K0299+472, K0299+740 - K0300+000, K0300+600 - K0300+882, K0301+160 - K0301+585
CW1-Rehabilitation of Paved Road: 12.636 lane km. – 133,364.93
EAO – 4,837.07
Excess - 3,000
|
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310214100772000
Project ID: P00832006VS
FROM:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan West Rd (Kalibo-Nabas) - K0252 + 900 - K0254 + 590, K0258 + 730 - K0259 + 000, K0259 + 920 - K0260 + 890, K0261 + 230 - K0261 + 650, K0265 + 954 - K0266 + 227, K0267 + 750 - K0269 + 575
CW1-Rehabilitation of Paved Road: 12.228 lane km. – 110,899.73
EAO – 4,022.27
TO:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan West Rd (Kalibo-Nabas) - K0234 + (-920) - K0234 + 426, K0235 + 300 - K0238 + 078, K0254 + 450 - K0255 + 340
CW1-Rehabilitation of Paved Road: 10.262 lane km. – 110,899.73
EAO – 4,022.27
|
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Aklan District Engineering Office |
UACS No. 310214100771000
Project ID: P00830326VS
FROM:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan East Rd - K0296 + 800 - K0296 + 952, K0297 + 000 - K0297 + 340, K0298 + 000 - K0298 + 332, K0298 + 370 - K0299 + 146, K0299 + 223 - K0299 + 472, K0299 + 740 - K0300 + 000, K0300 + 600 - K0300 + 882, K0301 + 160 - K0302 + 733, K0303 + 380 - K0304 + 270, K0304 + 450 - K0304 + 788, K0305 + 800 - K0306 + 000, K0306 + 400 - K0306 + 517, K0307 + 070 - K0307 + 189, K0307 + 500 - K0308 + 238, K0308 + 419 - K0309 + 654, K0309 + 654 - K0309 + 760
CW1-Rehabilitation of Paved Road: 15.184 lane km. – 137,441.09
EAO – 4,984.91
TO:
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Aklan East Rd - K0286 + 349 - K0287 + 430, K0287 + 600 - K0287 + 890, K0288 + 174 - K0288 + 840, K0290 + 000 - K0290 + 174, K0301 + 585 - K0302 + 733, K0303 + 380 - K0304 + 270, K0304 + 450 - K0304 + 788, K0305 + 800 - K0306 + 000, K0306 + 400 - K0306 + 517, K0307 + 070 - K0307 + 189, K0307 + 500 - K0308 + 238, K0315 + 919 - K0316 + 660
CW1-Rehabilitation of Paved Road: 13.206 lane km. – 137,441.09
EAO – 4,984.91
|
July 4, 2024 |
2024 |
WIN4XY00240 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Antique District Engineering Office |
UACS No. 310103101422000
Project ID: P00801493VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Odiong-Sibalom-Sn Remigio-Leon Rd - K0104 + 072 - K0109 + 147, K0111 + 645 - K0117 + 000
CW1-Preventive Maintenance: Asphalt Overlay : 21.236 lane km. – 96,500.00
EAO – 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Odiong-Sibalom-Sn Remigio-Leon Rd - K0104 + 079 – K0108 + 840
CW1-Preventive Maintenance: Asphalt Overlay : 9.754 lane km. – 96,500.00
EAO – 3,500.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310110100516000
Project ID: P00802945VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads
Iloilo Capiz Rd (New Route) – K0108+177.50 – K0108+535, K0110+791.50 – K0110+876.50
CW1-Construction of Drainage Structure along Road: 442.50 l.m.– 5,292.00
EAO – 108.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads
Iloilo-Capiz Rd (New Route) - K0108 + 177.50 – K0108 + 490, K0110 + 791.50 –KO110 + 876.50
CW1-Construction of Drainage Structure along Road: 397.50 l.m.– 5,292.00
EAO – 108.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310104100739000
Project ID: P00802953VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Iloilo Capiz Rd (New Route) – K0106+612 – K0107+461
CW1-Rehabilitation of Paved Road: 1.710 Lane Km– 18,032.00
EAO – 368.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Iloilo Capiz Rd (New Route) – K0106+190 – K0106+995.50
CW1-Rehabilitation of Paved Road: 1.610 Lane Km – 15,079.16
CW2- Construction of Drainage Structure along Road:
169.740 Lineal Meters - 2,952.84
EAO – 368.00 |
July 4, 2024 |
2024 |
WIN4F07935 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 300221106238000
Project ID: P00832266VS
FROM:
Convergence and Special Support Program
BIP – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Barangay Manoling, Pilar, Capiz
CW1-Construction of Concrete Road: 0.580 lane km– 4,950.00
EAO – 50.00
TO:
Convergence and Special Support Program
BIP – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Barangay Manoling, President Roxas, Capiz
CW1-Construction of Concrete Road: 0.441 lane km– 4,950.00
EAO – 50.00 |
July 4, 2024 |
2024 |
WIN4XY00222 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310108101882000
Project ID: P00800380VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slis, Slope Collapse, and Landslide - Secondary Roads
Maayon-Jct Bailan Rd – K0122+185 – K0122+225, K0123+612 – K0123+654, K0127+255.70 - K0127+289.85
CW1-Construction of Road Slope Protection Structure: 349.80 sq. m.– 2,589.16
CW2-Off-Carriageway Improvement: Paving of Shoulders: 328.00 sq. m. - 644.84
EAO – 66.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slis, Slope Collapse, and Landslide - Secondary Roads
Maayon-Jct Bailan Rd – K0122+200 – K0122+225, K0123+600 – K0123+717, K0127+304 - K0127+319
CW1-Construction of Road Slope Protection Structure: 381.02 sq. m.– 3,234.00
EAO – 66.00 |
July 4, 2024 |
2024 |
WIN4XY00187 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310105101176000
Project ID: P00801051VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast – Capiz Rd – K0119 +157 – K0120 + 300
CW1-Rehabilitation of Paved Road: 2.196 Lane Km– 19,600.00
EAO – 400.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast – Capiz Rd – K0119 +413.5 – K0120 + 300
CW1-Rehabilitation of Paved Road: 1.680 Lane Km– 19,600.00
EAO – 400.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310105101175000
Project ID: P00801052VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast–Capiz Rd– K0117+113 – K0118+090
CW1-Rehabilitation of Paved Road: 1.846 Lane Km– 16,660.00
EAO – 340.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast – Capiz Rd – K0117+113–K0117+908.5
CW1-Rehabilitation of Paved Road: 1.560 Lane Km– 16,660.00
EAO – 340.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 1st District Engineering Office |
UACS No. 310105101178000
Project ID: P00801053VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast–Capiz Rd – K0127+837.38 – K0128+360
CW1-Rehabilitation of Paved Road: 1.107 Lane Km– 9,800.00
EAO – 200.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Iloilo East Coast–Capiz Rd– K0127+837.38 – K0128+309
CW1-Rehabilitation of Paved Road: 1.01 Lane Km– 9,800.00
EAO – 200.00 |
July 4, 2024 |
2024 |
WIN4XY00188 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310203100773000
Project ID: P00802955VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Iloilo-Capiz Road (Old Route) K0084+450 - K0084 + 572, K0084+603 - K0086 + 678
CW1-Road Widening: 4.134 lane km. – 48,250.00
EAO – 1,750.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Iloilo-Capiz Road (Old Route) K0087+820 - K0088 + 176, K0088+214 - K0088 + 474
CW1-Road Widening: 1.134 lane km – 25,593.33
CW2 – Construction of Road Slope Protection Structure: 2,754.46 sq. m - 17,206.67
ROW Acquisition: 1,593.71 sq. m. - 5,450.00
EAO – 1,750.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310201101287000
Project ID: P00801508VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Guimaras Circumferential Rd (S000028GR) - K0023+654 - K0024+537, K0029+848 - K0030+000
CW1-Road Widening: 1.778 lane km. – 91,675.00
EAO – 3,325.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Guimaras Circumferential Rd (S000028GR) - K0020+490 - K0020+740, K0023+654 - K0024+000, K0029+859 - K0029+1000, K0039+214 - K0040+280
CW1-Road Widening: 3.051 lane km. – 81,675.00
ROW Acquisition: 7,628 sq. m. - 10,000.00
EAO – 3,325.00 |
July 4, 2024 |
2024 |
WIN4XY00230 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310102101847000
Project ID: P00802958VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asst Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0045+207 - K0046+492
CW1-Preventive Maintenance of Road: Asphalt Overlay: 2.58 lane km. – 14,700.00
EAO – 300.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asst Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0001+000 - K0001+217, K0005+732 - K0005+795
CW1-Preventive Maintenance of Road: Asphalt Overlay: 1.12 lane km. – 14,700.00
EAO – 300.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202101540000
Project ID: P00802959VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0082+942 - K0084+278
CW1-Road Widening: 2.72 lane km. – 53,075.00
EAO – 1,925.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0083+660 - K0084+460
CW1-Road Widening: 1.538 lane km. – 38,062.175
CW2 - Construction of Drainage Structure along Road: 605 Lineal meters- 12,512.825
ROW Acquisition: 3,845 sq. m. - 2,500.00
EAO – 1,925.00 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202101720000
Project ID: P00802960VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0025+358 - K0025+525
CW1-Road Widening: 0.540 lane km. – 14,896.00
ROW Acquisition: 840 sq. m. - 3,920.00
EAO – 304.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0025+363 - K0025+547
CW1-Road Widening: 0.575 lane km. – 14,582.03275
ROW Acquisition: 920 sq. m. - 313.96725
EAO – 304.00 |
July 4, 2024 |
2024 |
WIN4F07936 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310102101588000
Project ID: P00802963VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - (S00028GR) K0000+ (-114) - K0000+451, K0001+100 - K0002+268, K0005+732 - K0005+795, K0005+944 - K0006+018, K0006+296 - K0006+354, (S00029GR) K0000+(-449) - K0000+370
CW1-Preventive Maintenance of Road: Asphalt Overlay: 4.988 lane km. – 58,512.775
EAO – 2,122.225
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - (S00028GR) K0001+250 - K0001+795, K0006+944 - K0006+018, K0006+290 - K0006+410, K0006+508 - K0006+593
CW1-Preventive Maintenance of Road: Asphalt Overlay: 3.296 lane km. – 58,512.775
EAO – 2,122.225 |
July 4, 2024 |
2024 |
WIN4XY00215 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310202101543000
Project ID: P00800018VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo-Antique Rd - K0032 + 083 - K0032 + 724, K0035 + 000 - K0035 + 056, K0035 + 205 - K0035 + 828
CW1-Road Widening: 2.64 lane km – 48,593.54
EAO – 1,762.46
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo-Antique Rd – K0032+083 - K0032+724, K0039+000 - K0039+094, K0039+658 - K0039+696, K0039+852 - K0040+105
CW1-Road Widening: 2.024 lane km – 48,593.54
EAO – 1,762.46 |
July 4, 2024 |
2024 |
|
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310101101514000
Project ID: P00800780VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) - K0035 + 849 - K0036 + 063, K0043 + 675 - K0044 + 400
CW1-Preventive Maintenance of Road: Asphalt Overlay -3.724 lane km – 33,611.06
EAO – 685.94
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) - K0035 + 849 - K0036 + 063, K0047 + 000 - K0047 + 199, K0047 + 606 - K0048 + 006, K0048 + 283 - K0048 + 404
CW1-Preventive Maintenance of Road: Asphalt Overlay - 3.20 lane km – 33,611.06
EAO – 685.94 |
July 4, 2024 |
2024 |
WIN4XY00184 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region VI |
Iloilo 2nd District Engineering Office |
UACS No. 310203100844000
Project ID: P00802989VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Tertiary Roads
Pototan-Tina-Lambunao Rd - K0036 + 500 - K0038 + 500
CW1-Construction of Drainage Structure along Road - 3,704 linear meter – 12,677.28
ROW Acquisition: 10,000.00 sq.m. - 9,800.00
EAO – 458.72
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Tertiary Roads
Pototan-Tina-Lambunao Rd - K0037 + 530 - K0038 + 500
CW1-Road Widening: 0.894 lane km – 7,502.68
CW2-Construction of Drainage Structure along Road : 681.00 linear meter - 7,134.60
ROW Acquisition: 8,000.00 sq.m. - 7,840.00
EAO – 458.72 |