Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 25, 2025 2025 WIN5E03788 GAA 2025 January 21, 2025 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"Project ID: P00914690LZ
UACS: 310109000000000

FROM:
Project Name:
Mountain Province-Isabela Road- Chainage 4208 - Chainage 4216, Chainage 4250 - Chainage 4266, Chainage 8745 - Chainage 8754, Chainage 10895 - Chainage 10925, Chainage 11097 - Chainage 11110, Chainage 12321 - Chainage 12330, Chainage 13225 - Chainage 13262
Type of Work:
CW1 - Construction of Road Slope Protection Structures
Physical Target:
CW1 - 488.84 Square meters
Allocation:
Php 8,990,000

TO:
Project Name:
Mountain Province-Isabela Road- K0467+970 - K0467+997, K0470+337 - K0470+367, K0470+537 - K0470+552, K0472+242 - K0474+445 - K0474+475, K0474+677 - K0474+690, K0475+899 - K0475+919, K0476+795 - K0476+834
Type of Work:
CW1 - Construction of Road Slope Protection Structures
Physical Target:
CW1 - 742.5 Square meters
Allocation:
Php 8,990,000"
June 24, 2025 2025 WIN5XY00538 SR2025-03-009206 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0709 + 373 - K0710 + 840

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 32.7135 M
along Road: 2,840 Lineal Meters
EAO P 1.1865 M
Total P 33.9 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0709 + 373 - K0709 + 911

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 32.7135 M
along Road: 963 Lineal Meters
EAO P 1.1865 M
Total P 33.9 M
June 24, 2025 2025 WIN5XY00537 SR-2025-03-009666 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0768 + 000 - K0768 + 777

Physical Target: Allocation:
CW1- Road Widening P 23.287380 M
1.554 Lane Km
EAO P .844620 M
Total P 24.132 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0768 + 000 - K0768 + 512

Physical Target: Allocation:
CW1- Road Widening P 13.14107526 M
1.024 Lane Km
CW2- Construction of Road Slope Protection P 10.14630474 M
Structure: 934 Square meters
EAO P .844620 M
Total P 24.132 M
June 24, 2025 2025 WIN5XY00532 SR2025-03-009662 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 100 - K0753 + 284, K0757 + 000 - K0757 + 241

Physical Target: Allocation:
CW1- Road Widening P 13.756075 M
0.85 Lane Km
EAO P .498925 M
Total P 14.255 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 100 - K0753 + 284, K0757 + 000 - K0757 + 129

Physical Target: Allocation:
CW1- Road Widening P 8.17052369 M
0.626 Lane Km
CW2- Construction of Road Slope Protection P 5.58555131 M
Structure: 426 Square meters
EAO P .498925 M
Total P 14.255 M
June 23, 2025 2025 WIN5E03747 SARO-BMB-25-0008049 March 7, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00938052LZ
UACS: 300214101822000

FROM:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Ayaga-Sta. Marcela-Flora-Lasam Rd - K0672 + (-945) - K0691+ 600
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1- 390 Number of Units
Allocation:
Php 35,000,000

TO:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Ayaga-Sta. Marcela-Flora-Lasam Rd - K0679+500 - K0686+875
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1- 213 Number of Units
Allocation:
Php 35,000,000"
June 23, 2025 2025 WIN5E03745 SARO-BMB-25-0008049 March 7, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00938053LZ
UACS: 300214101823000

FROM:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0640 + 000 - K0669 + 850
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 - 465 Number of Units
Allocation:
Php 40,000,000

TO:
Project Name:
Installation/Application of Road Safety Facilities (Roadway Lighting) along Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0669+850 - K0679+070
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 - 244 Number of Units
Allocation:
Php 40,000,000"
June 23, 2025 2025 GAA 2025 January 21, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00952137LZ
UACS: 300226118496000

FROM:
Project Name:
Construction of Multi-Purpose Building- Barangay Health Station, Barangay San Carlos/Marcela/Bagutong, Sta. Marcela/Flora, Apayao
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 - 1 No. of Building
Allocation:
Php 8,000,000

TO:
Project Name:
Construction of Multi-Purpose Building- Barangay Health Station, Barangay San Carlos/Marcela/Bagutong, Sta. Marcela/Flora, Apayao
Type of Work:
CW1 - Construction of Multi Purpose Building
Physical Target:
CW1 - 3 No. of Buildings
Allocation:
Php 8,000,000"
June 19, 2025 2025 WIN5E03775 GAA 2025 January 20, 2025 Cordillera Administrative Region Benguet 1st District Engineering Office
"Project ID: P00915518LZ
UACS: 310104100888000

FROM:
Project Name:
Reconstruction to Concrete
Pavement - Baguio-Bauang Rd - K0291 + 150 - K0291 + 460
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 0.620 Lane Km
Allocation:
Php 16,380,000

TO:
Project Name:
Reconstruction to Concrete
Pavement - Baguio-Bauang Rd - K0291 + 150 - K0291 + 480
Type of Work:
CW1 - Rehabilitation of Paved Road
Physical Target:
CW1 - 0.660 Lane Km
Allocation:
Php 16,380,000"
June 19, 2025 2025 GAA 2025 January 20, 2025 Cordillera Administrative Region Benguet 1st District Engineering Office
"Project ID: P00914649LZ
UACS: 310111100801000

FROM:
Project Name:
Baguio-Bontoc Rd - K0257 + 512 - K0257 + 567, K0260 + 580 -K0261+572
Type of Work:
Construction of Drainage Structure along Road
Physical Target:
CW1 - 1091 Lineal meters
Allocation:
Php 19,000,000

TO:
Project Name:
Baguio-Bontoc Rd - K0257 + 500.00 - K0257 + 604.00, K0260 + 580 - K0260 + 853.25, K0260 + 894.89 - K0261 + 750.00
Type of Work:
CW1 - Construction of Drainage Structure along Road
Physical Target:
CW1 - 1760.29 Lineal meters
Allocation:
Php 19,000,000"
June 19, 2025 GAA 2025 P00909110MN GAA 2025 January 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID: 25MD0048
UACS: 310109101780000
Amount: ₱ 20,000,000.00

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Project Name:
From: Dualing-New Panay-Midsayap Rd - K1718 + 490 - K1718 + 540
To: Dualing-New Panay-Midsayap Rd - K1718 + 490.00 - K1718 + 540.50, K1714 + 072.20 – K1714 + 118.70

Type of Work: Construction of Road Slope Protection Structure

Physical Target:
From: 571.430 Square Meter
To: 1,429.86 Square Meter

June 19, 2025 2025 WIN5F08599 SR2025-02-003902 February 4, 2025 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300105201538000
Project ID.: P00955008LZ
Local Program
Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Construction (Completion) of National Labor Relations Commission (NLRC) Office Building,
Agham Road corner North Avenue, Quezon City
Physical Target: CW1 = Construction of Multipurpose Building = 1 bldg.
Unit Cost (P’000) = P 144,750,000.00/no. of bldgs..
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00

As Modified
Local Program
Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Construction of National Labor Relations Commission (NLRC) Office Building,
Senator Miriam P. Defensor-Santiago Avenue corner North Avenue, Quezon City
Physical Target: CW1 = Construction of Multipurpose Building = 1 bldg.
Unit Cost (P’000) = P 144,750,000.00/no. of bldgs..
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00
WIN5F08599
June 19, 2025 GAA 2025 P00909108MN SR2025-02-000223 February 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID: 25MD0033
UACS: 310107100770000
Amount: ₱ 56,200,000.00

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Project Name:
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713 + 235 - K1713 + 355
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1713 + 220.00 - K1713 + 325.00, K1682 + 370.00 - K1682 + 518.00

Type of Work: Construction of Road Slope Protection Structure

Physical target:
From: 2,248.00 Square Meter
To: 3,261.17 Square Meter
June 19, 2025 GAA 2025 P00935770MN GAA 2025 January 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID: 25MD0043
UACS: 300221109040000
Amount: ₱ 5,000,000.00

Convergence and Special Support Program: Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Project Name: Construction of Road Jct. Highway - Central Katingawan-San Isidro, Barangay Central Katingawan, Midsayap, North Cotabato
Type of Work: Construction of Concrete Road

Physical target:
From: 0.900 Lane Km
To: 0.736 Lane Km
June 19, 2025 GAA 2025 P00937599MN SR2025-02-000338 February 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID:
UACS No.: 300204101669000
Amount: ₱ 70,000,000.00

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)

Project Name: Jct. Davao-Cotabato (crossing Baguer)-Sitio Dalumangkom-Sitio Lampaki Road, Pigkawayan,North Cotabato

Type of Work/Physical Target:
From: CW1- Replacement of Bridge: 286.20 Square Meter
To: CW1- Construction of Concrete Bridge: 286.20 Square Meter, CW2- Construction of Concrete Road: 0.675 Lane Km



June 19, 2025 GAA 2025 P00909156MN SR2025-02-002539 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00179
UACS: 310108102051000
Amount: ₱ 78,750,000.00

OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Project Name:
From: General Santos City-T'Boli-Surallah Rd - K1681 + 969 - K1682 + 014
To: General Santos City-T'Boli-Surallah Rd - K1680 + 997 - K1681 + 030, K1681 + 050 - K1681 + 085, K1681 + 969 - K1682 + 014, K1681 + 986 - K1682 + 020

Type of Work: Construction of Road Slope Protection Structure

Physical target:
From: 3,150.00 Square meters
To: 2,120.00 Square meters




June 19, 2025 GAA 2025 P00909170MN SR2025-02-002496 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00027
UACS: 310108102053000
Amount: ₱ 200,000,000.00

OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Project Name:
From: General Santos City-T'Boli-Surallah Rd - (S01483MN) Chainage 17668 - Chainage 17683, Chainage 18484 - Chainage 18514, Chainage 18550 - Chainage 18595, Chainage 18692 - Chainage 18710

To: General Santos City-T'Boli-Surallah Rd - (S01483MN) K1682 + 674 – K1682 + 748.98, K1683 + 915 – K1684 + 012, K1685 + 106 – K1685 + 204, K1686 + 113 – K1686 + 136, K1686 + 184 – K1686 + 232

Type of Work: Construction of Road Slope Protection Structure

Physical target:
From: 8,000.00 Square meters
To: 6,432.50 Square meters

June 19, 2025 GAA 2025 P00909542MN SR2025-02-001036 February 1, 2025 Region XII Regional Office XII
Contract ID:25M00161
UACS No. 310101101819000
Amount: ₱ 129,927,000.00

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1782 + 000 - K1785 + 000
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) – K1781 + 598 - K1783 + 198

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical target:
From: 6.000 lane-km
To: 6.400 lane-km
June 19, 2025 GAA 2025 P00909543MN SR2025-02-001043 February 1, 2025 Region XII Regional Office XII
Contract ID: 25M00162
UACS No. 310101101820000
Amount: ₱ 129,928,000.00

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1789 + 000 - K1792 + 000
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1783 + 198 - K1784 + 798

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical target:
From: 6.000 lane-km
To: 6.400 lane-km
June 18, 2025 FY 2025 P00909109MN GAA 2025 January 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID: 25MD0047
UACS: 310108102210000
Amount:₱ 18,600,000.00

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Project Name:
From: Banisilan-Guiling-Alamada-Libungan Rd - K1674 + 550 - K1674 + 860
To:Banisilan-Guiling-Alamada-Libungan Rd - K1675 + 339.00 - K1675 + 430.00, K1675 + 470.00 - K1675 + 560.00, K1675 + 570.00 - K1675 + 584.00, K1675 + 610.00 - K1675 + 640.00, K1675 + 680.00 - K1675 + 769.00
Type of Work: Construction of Road Slope Protection Structure
Physical target:
From:1,550.00 Square Meter
To: 1,579.15 Square Meter



June 18, 2025 2025 GAA 2025 January 1, 2025 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Govt Ctr Rd Network - K0913 + 395 - K0913 + 730

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.527520 M
Asphalt Overlay: 1.34 Lane Km

EAO P 0.296480 M

Total P 14.824 M

AS MODIFIED:

Govt Ctr Rd Network - K0913 + 344.9 - K0913 + 705

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.527520 M
Asphalt Overlay: 1.44 Lane Km

EAO P 0.296480 M

Total P 14.824 M

June 18, 2025 2025 WIN5XY00507 GAA FY 2025 January 31, 2025 Region VIII Samar 1st District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Calbayog Diversion Rd - K0739 + 344 - K0740 + 467, K0740 + 619 - K0741 + 306

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 34.475420 M
Pavement: 3.62 Lane Km
EAO P .703580 M
Total P 35.179 M

AS MODIFIED:

Calbayog Diversion Rd - K0739 + 000 - K0740 + 000

Physical Target: Allocation:
CW1- Reconstruction to Concrete P 27.71731589 M
Pavement: 2.00 Lane Km

CW2- Construction of Slope Protection P 6.75810392
Structure: 1,425.6 Square meter
EAO P .703580 M
Total P 35.179 M
June 18, 2025 FY 2025 P00935142MN GAA 2025 January 1, 2025 Region XII Cotabato 1st District Engineering Office
Contract ID: 25MD0046
UACS: 300214102150000
Amount: ₱ 5,000,000.00

Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Project Name:
From: Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Guardrails) along Midsayap-Makar Rd - K1694 + (-327) - K1694 + 673
To: Installation/Application of Road Safety Facilities (Pavement Markings, Road Signs, Guardrails) along Midsayap-Makar Rd - K1694 + (-902) - K1694 + 673
Type of Work: Road Safety: Pavement markings
Physical Target:
From: 348.00 Lineal Meter
To: 1,692.64 Lineal Meter
June 17, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310107100778000
Project ID: P00909152MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Maharlika Highway (Surigao-Agusan Sect) - K1135 + 800 - K1135 + 850, K1152 + 000 - K1152 + 100

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3635.53 Square meters

Allocation:
TOTAL: P 54,533,000
CW1: P 52,624,345
EAO: P 1,908,655

Unit Cost:
CW1: P 14,475.01327/Square meters

TO:

Maharlika Highway (Surigao-Agusan Sect) - K1135 + 580 - K1135 + 731

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,357.490 Square meters

Allocation:
TOTAL: P 54,533,000
CW1: P 52,624,345
EAO: P 1,908,655

Unit Cost:
CW1: P 15,673.71608/Square meters
June 17, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 300214101694000
Project ID: P00935236MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

FROM:

Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1160 + 600 - K1162 + 701

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.304 Lane Km

Allocation:
TOTAL: P 45,717,000
CW1: P 44,116,905
EAO: P 1,600,095

Unit Cost:
CW1: P 10,250,210.27/Lane Km

TO:

Preventive Maintenance - Primary Roads along Maharlika Highway (Surigao-Agusan Sect) - K1162 + 085 - K1163+ 335

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.820 Lane Km

Allocation:
TOTAL: P 45,717,000
CW1: P 44,116,905
EAO: P 1,600,095

Unit Cost:
CW1: P 9,152,884.85/Lane Km

June 17, 2025 2025 SR2025-03-009238 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0754 + 000 - K0755 + 059, K0761 + 936 - K0762 + 386

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 86.850 M
Road: 2,992 Lineal meters

EAO P 3.150 M

Total P 90.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0753 + 635 - K0754 + 125, K0754 + 305 - K0755 + 059, K0759 + 900 - K0760 + 200, K0760 + 220 - K0760 + 640

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 86.850 M
Road: 3,110.80 Lineal meters

EAO P 3.150 M

Total P 90.00 M
June 17, 2025 2025 SR2025-03-009213 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 220, K0731 + 187 - K0731 + 217

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.650 M
Road: 115 Lineal meters

EAO P 0.350 M

Total P 10.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 160 - K0731 + 220

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.650 M
Road: 145 Lineal meters

EAO P 0.350 M

Total P 10.00 M
June 17, 2025 2025 SR2025-02-002036 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0752 + 816 - K0753 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 5.790 M
Structure: 541.26 Square meters

EAO P 0.210 M

Total P 6.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0752 + 880 - K0753 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 5.790 M
Structure: 553.83 Square meters

EAO P 0.210 M

Total P 6.00 M
June 17, 2025 2025 SR2025-03-009343 March 17, 2025 Region VIII Leyte 1st District Engineering Office

OO1: Ensure Safe and Reliable National Road System

Asset Preservation -Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Mainit-Sn Miguel-Santol Rd - K0938 + 854 - K0941 + 726

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 134.284575 M
Asphalt Overlay: 9.004 Lane Km

EAO P 4.870425M

Total P 139.155 M

AS MODIFIED:

Mainit-Sn Miguel-Santol Rd - K0938 + 854 - K0942 + 208

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 134.284575 M
Asphalt Overlay: 10.924 Lane Km

EAO P 4.870425M

Total P 139.155 M
June 17, 2025 FY 2025 GAA P00901443MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00901443MN (Regional Office XI_05)
UACS No. 310101101789000
Project ID: P00901443MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 087 - K1535 + 550, Davao del Sur
Physical Target:
CW1: 5.868 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1537 + 200 - K1538 + 391,
K1538 + 985 - K1540 + 123, Davao del Sur
Physical Target:
CW1: 9.380 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
June 17, 2025 FY 2025 GAA P00909459MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00909459MN (Regional Office XI_06)
UACS No. 310201101619000
Project ID: P00909459MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1554 + 464 - K1554 + 835, K1555 + 099 - K1555 + 133,
K1555 + 167 - K1555 + 191, K1557 + 466 - K1557 + 533, K1561 + 860 - K1561 + 872
Physical Target:
CW1: 1.250 lane km (Road Widening)
ROW: 5,203.50 square meters (ROW Acquisition)
Allocation:
TOTAL: P 64,240,000.00
CW1: P 30,995,800.00 (Road Widening)
CW2: P 6,424,000.00 (ROW Acquisition)
EAO: P 2,248,400.00
EXC: P 24,571,800.00 (Excess)

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1546 + 954 - K1547 + 499, K 1547 + 611 - K1548 + 178,
K1548 + 259 - K1548 + 280, K1554 + 464 - K1554 + 835, K1555 + 099 - K1555 + 133,
K1555 + 167 - K1555 + 191, K1557 + 466 - K1557 + 533, K1561 + 860 - K1561 + 872
Physical Target:
CW1: 2.929 lane km (Road Widening)
ROW: 15,408.11 square meters (ROW Acquisition)
Allocation:
TOTAL: P 64,240,000.00
CW1: P 55,792,440.00 (Road Widening)
ROW: P 6,119,160.00 (ROW Acquisition)
EAO: P 2,248,400.00
June 13, 2025 GAA 2025 P00909168MN SR2025-02-002826 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00029
UACS: 310110100597000
Amount: ₱ 27,000,000.00
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1650 + 624 - K1651 + 196, K1650 + 525 - K1650 + 624

To: Maharlika Highway( Digos-Makar Rd) - K1643 + 705 - K1644 + 218, K1644 + 218 - K1644 + 300, K1647 + 010 - K1647 + 460

Type of Work: Construction of Drainage Structure along Road

Physical Target:
From: 450.00 Lineal meters
To: 1,129.00 Lineal meters
June 13, 2025 GAA 2025 P00909448MN SR2025-02-003058 February 3, 2025 Region XII Regional Office XII
Contract ID:25M00175
UACS: 310202101892000
Amount: ₱ 130,000,000.00
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads

Project Name:
From: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 964 - K1645 + 062
To: Banisilan-Guiling-Alamada-Libungan Rd - K1642 + 1149 - K1645 + 057

Type of Work/ Physical Target:
From: CW1: Road Widening = 4.394 Lane Km
To: CW1: Road Widening = 3.956 Lane Km
CW2: Construction of Road Slope Protection Structure = 2,620.00 Square meters
CW3: Construction of Drainage Structure along Road = 2,886.00 lineal meters



June 13, 2025 GAA 2025 P00909163MN SR2025-02-002869 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00064
UACS: 310110100594000
Amount: ₱ 71,127,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Project Name:
From: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 662
To: Maharlika Highway( Marbel-Allah Valley-Cotabato Rd) - K1768 + 314 - K1770 + 477
Type of Work: Construction of Drainage Structure along Road

Physical Target:
From: 2,371 Lineal meters
To: 2,186 Lineal meters

June 13, 2025 GAA 2025 P00920361MN SR2025-02-000300 February 1, 2025 Region XII Regional Office XII
Contract ID:
UACS: 320102107688000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase II, Barangay Ugalingan, Carmen, Cotabato

Type of Work: Construction of Flood Mitigation Structure

Physical Target:
From: 683.700 Lineal meters
To: 652.5 Lineal meters


June 13, 2025 GAA 2025 P00920362MN SR2025-02-000329 February 1, 2025 Region XII Regional Office XII
Contract ID:25M00007
UACS No.: 320102107689000
Amount: ₱ 179,139,000.00
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Project Name: Construction of Pulangi Riverbank Protection (Downstream of Carmen Br., Right Bank), Phase III, Barangay Ugalingan, Carmen, Cotabato

Type of Work: Construction of Flood Mitigation Structure


Physical Target:
From: 683.700 Lineal meters
To: 634.000 Lineal meters

June 11, 2025 2025 SR2025-03-009235 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0764 + 400 - K0764 + 906

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,012 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 978 - K0762 + 137, K0762 + 755 - K0763 + 140, K0764 + 700 - K0765 + 050

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 31.684810 M
along Road: 1,180 Lineal Meters
EAO P 1.149190 M
Total P 32.834 M
June 11, 2025 2025 SR2025-03-009211 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 936

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,872 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0761 + 000 - K0761 + 978

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 55.728750 M
along Road: 1,845.40 Lineal Meters
EAO P 2.021250 M
Total P 57.750 M
June 11, 2025 2025 SR2025-02-002360 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 000 - K0766 + 000

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,004 Lineal Meters
EAO P 2.277765M
Total P 65.079 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0765 + 050 - K0766 + 036, K0766 + 366 - K0766 + 720, K0770 + 365 - K0770 + 690, K0770 + 740 - K0770 + 860, K0772 + 179 - K0772 + 300

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 62.801235 M
along Road: 2,165 Lineal Meters
EAO P 2.277765M
Total P 65.079 M

June 9, 2025 2025 WIN5XY00506 SR2025-02-002968 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 700, K0866 + 700 - K0866 + 795, K0866 + 838 - K0866 + 909, K0866 + 1005 - K0867 + 302, K0867 + 302 - K0868 + 000, K0868 + 000 - K0869 + 044, K0869 + 044 - K0869 + 130, K0869 + 130 - K0869 + 793

Physical Target: Allocation:
CW1- Road Widening P 139.611375 M
8.355 Lane Km
EAO P 5.063625 M
Total P 144.675 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0865 + 000 - K0865 + 150, K0865 + 337 - K0865 + 779, K0865 + 804 - K0866 + 795, K0866 + 838 - K0866 + 893, K0866 + 1005 - K0868 + 560

Physical Target: Allocation:
CW1- Road Widening P 76.78632325 M
5.966 Lane Km
CW2- Construction of Road Slope Protection P 62.82505175 M
Structure: 9,881.07 Square Meters
EAO P 5.063625 M
Total P 144.675 M
June 9, 2025 2025 WIN5XY00500 SR2025-03-009668 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 971

Physical Target: Allocation:
CW1- Road Widening P 14.728795 M
0.920 Lane Km
EAO P 0.534205 M
Total P 15.263 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0771 + 511 - K0771 + 835

Physical Target: Allocation:
CW1- Road Widening P 8.51654151 M
0.648 Lane Km
CW2- Construction of Road Slope Protection P 6.21225349 M
Structure: 760.80 Square Meters
EAO P 0.534205 M
Total P 15.263 M
June 5, 2025 FY 2025 GAA P00901444MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00901444MN (Regional Office XI_01)
UACS No. 310101101790000
Project ID: P00901444MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1535 + 500 - K1536 + 560, K1436 + 753 - K1537 + 200
Physical Target:
CW1: 5.880 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1540 + 123 - K1541 + 163,
K1541 + 767 - K1542 + 838, K1542 + 941 - K1543 + 130, Davao del Sur
Physical Target:
CW1: 9.488 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
June 5, 2025 FY 2025 GAA P00901453MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00901453MN (Regional Office XI_02)
UACS No. 310101101805000
Project ID: P00901453MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1561 + 000 - K1562 + 410
Physical Target:
CW1: 5.680 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1560 + 746 - K1561 + 686
Physical Target:
CW1: 5.640 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
June 5, 2025 FY 2025 GAA P00909742MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00909742MN (Regional Office XI_03)
UACS No. 310101101797000
Project ID: P00909742MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1535 + 886 - K1535 + 034
Physical Target:
CW1: 2.160 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Maharlika Highway (Davao City-Jct. Digos Sect) - K1534 + 585 - K1534 + 813, K1534 + 886 - K1535 + 034
Physical Target:
CW1: 2.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 39,319,000.00
CW1: P 37,941,835.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,376,165.00
June 5, 2025 FY 2025 GAA P00935251MN FY 2025 GAA RA 12116 January 1, 2025 Region XI Regional Office XI
P00935251MN (Regional Office XI_04)
UACS No. 300214101671000
Project ID: P00935251MN

MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1382 + 308 - K1384 + 352
Physical Target:
CW1: 4.070 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway - K1403 + 897 - K1405 + 713
Physical Target:
CW1: 5.475 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 45,422,000.00
CW1: P 43,832,230.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,589,770.00
June 5, 2025 FY 2025 GAA P00935179MN FY 2025 GAA RA 12116 January 1, 2024 Region XI Davao Oriental 1st District Engineering Office
P00935179MN (Davao Oriental 1st District Engineering Office_01)
UACS No. 300214102148000
Project ID: P00935179MN

MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1648 + 350 - K1649 + 350
Physical Target:
CW1: 992.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings)


TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Pavement Markings) along Surigao del Sur Bdry-Davao Or Coastal Rd - K1657 + 000 - K1658 + 703
Physical Target:
CW1: 1,702.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 650,000.00
CW1: P 650,000.00 (Road Safety: Pavement Markings)
June 5, 2025 CY 2024 WIN4F08103 UACS No. 300105201299000 July 10, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 300105201299000
Project ID.: P00855193LZ

Local Program

Buildings and Other Structures – Multipurpose/Facilities – National Building Program

Retrofitting of NTC Hostel and Vertical Expansion, NTC Agham Road, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00

As Modified
As per GAA/Original

Local Program

Buildings and Other Structures – Multipurpose/Facilities – National Building Program

Retrofitting of NTC Hostel and Vertical Expansion, National Telecommunications Commission, Senator Miriam P. Defensor Santiago Avenue, Quezon City
Physical Target: CW1 = Rehabilitation/Major Repair of Other Building – 1 building
Unit Cost (P’000) = P 39,200.00 / no. of building
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
Bar Code#WIN4F08103
June 5, 2025 2025 WIN5F08553 SR2025-04-012872 April 22, 2025 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310103101726000
Project ID.: P00900368LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 949.00 – K0007 + 421.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 2.220 lane km
Unit Cost (P’000) = P 21,734.23/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Preventive Maintenance (Asphalt Overlay) along H. Lopez Blvd., Manila City
K0006 + 473.00 – K0007 + 945.00
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.888 lane km
Unit Cost (P’000) = P 25,556.14/lane km
Allocation = P 48,250,000.00
EAO = P 1,750,000.00
Total = P 50,000,000.00
WIN5F08553
June 5, 2025 2025 WIN5F08572 SR2025-03-011164 March 27, 2025 National Capital Region South Manila District Engineering Office
As per GAA/Original
UACS No. 310303102045000
Project ID.: P00900759LZ
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B03377LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Bridge - Retrofitting/Strengthening of Permanent Bridges
Liwasang Bonifacio West Overpass (Flvover) (B01348LZ), Manila City
Physical Target: CW1 = Retrofitting/Strengthening of Permanent Bridges = 1 Bridge
Unit Cost (P’000) = P 147,000.00/bridge
Allocation = P 147,000,000.00
EAO = P 3,000,000.00
Total = P 150,000,000.00
WIN5F08572
June 5, 2025 FY 2025 P00909522MN SR2025-03-009268 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00051
UACS: 310101101811000
Amount: ₱ 200,000,000.00

Project Name:
From:Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 000 - K1745 + 550
To: Maharlika Highway( Cotabato-Marbel Rd) - K1740 + 789 - K1741 + 279, K1742 + 333 – K1743 + 233

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
From: 33.486 Lane Km
To: 8.580 Lane Km
June 5, 2025 FY 2025 P00920354MN SR2025-02-000262 February 1, 2025 Region XII Regional Office XII
Contract ID:25M00183
UACS Number: 320102107681000
Amount: ₱ 100,000,000.00
Project Name: Construction of Concrete Revetment, Lower Klinan-Mabuhay (Silway River Basin), Barangay Mabuhay, General Santos City, South Cotabato
Type of Work: Construction of Revetment

Physical Target:
From: 635.238 Lineal meters
To: 340.000 Lineal meters


June 5, 2025 FY 2025 P00936625MN GAA 2025 January 1, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID:25MB0044
UACS: 300226123301000
Amount: 5,000,000.00

Project Name:
From: Construction of Multi-Purpose Building (Covered Court), Polo Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato
To: Construction of Multi-Purpose Building (Covered Court), Polomolok Creek Integrated School, Barangay Magsaysay, Polomolok, South Cotabato

Type of Work: Construction of Multi-Purpose Building
Physical target: 1 Number of Buildings
June 4, 2025 2025 SR2025-03-009255 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Palo- Carigara - Ormoc Rd - K0919 + 205- K0926 + 800, K0927 + 221 - K0927 + 600

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.808 Lane Km
EAO P 14.00 M
Total P 400.00 M

AS MODIFIED:

Palo- Carigara - Ormoc Rd - K0919 + 205 - K0923 + 000, K0926 + 000 - K0929 + 980

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 386.00 M
Asphalt Overlay: 31.166 Lane Km
EAO P 14.00 M
Total P 400.00 M
June 4, 2025 2025 SR2025-02-001487 February 3, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 + 865 - K0951 + 1278

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 14.626 Lane Km
EAO P 5.30782 M
Total P 151.652 M

AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0944 + 101 - K0945 + 000, K0945 +937 - K0948 + 811, K0948 + 850 - K0949 + 730, K0949 + 762 - K0951 + 690

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 146.34418 M
Asphalt Overlay: 13.164 Lane Km
EAO P 5.30782 M
Total P 151.652 M
June 4, 2025 2025 SR2025-03-009669 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 137

Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.274 Lane Km
EAO P .182875 M
Total P 5.225 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0778 + 000 - K0778 + 180

Physical Target: Allocation:
CW1- Road Widening P 5.042125 M
0.36 Lane Km
EAO P .182875 M
Total P 5.225 M
June 4, 2025 2025 WIN5F08560 SR2025-03-009673 March 18, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:
Maharlika Highway - K0975 + 155 - K0976 + 000, K0991 + 900 - K0992 + 432, K0996 + 148.60 - K0996 + 380, K0997 + 455 - K0997 + 610

Physical Target: Allocation:
CW1- Road Widening P 65.53122 M
3.587 Lane Km
EAO P 2.376780 M
Total P 67.908 M

AS MODIFIED:
Maharlika Highway - K0975+155 - K0976+000, K0991 + 900 - K0992 + 657, K0996 + 148.6 - K0996 + 155, K0997 + 455 - K0997 + 610

Physical Target: Allocation:
CW1- Road Widening P 39.59917708 M
3.587 Lane Km
CW2- Construction of Drainage Structure P12.35883216 M
along Road: 994 Lineal Meters
CW3- Construction of Road Slope P 13.57321076 M
Protection Structure: 1,990.018 Square Meters
EAO P 2.376780 M
Total P 67.908 M
June 4, 2025 2025 WIN5XY00479 SR2025-03-009405 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120, K0784 + 160 - K0784 + 172.30

Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 967.01 Square Meters
EAO P .420 M
Total P 12.00 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0783 + 089 - K0783 + 120

Physical Target: Allocation:
CW1- Construction of Road Slope P 11.580 M
Protection Structure: 703.53 Square Meters
EAO P .420 M
Total P 12.00 M
June 4, 2025 2025 SR2025-009236 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0770 + 051 - K0770 + 181

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 260 Lineal Meters
EAO P .296345 M
Total P 8.467 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0772 + 300 - K0772 + 454

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 8.170655 M
along Road: 308 Lineal Meters
EAO P .296345 M
Total P 8.467 M
June 4, 2025 2025 SR2025-03-009237 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 525, K0731 + 387 - K0731 + 522

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 185 Lineal Meters
EAO P .350 M
Total P 10.00 M

AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0731 + 360 - K0731 + 525

Physical Target: Allocation:
CW1- Construction of Drainage Structure P 9.650 M
along Road : 215 Lineal Meters
EAO P .350 M
Total P 10.00 M
June 4, 2025 2025 SR2025-03-009738 March 18, 2025 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0758 +000 - K0758 + 200, K0758 + 640 - K0758 + 690, K0781 + 230 - K0781 + 610

Physical Target: Allocation:
CW1- Rehabilitation of Concrete Road P 20.009275 M
1.26 Lane Km
EAO P .725725 M
Total P 20.735 M

AS MODIFIED:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Sn Isidro-Sn Juanico Br) -K0758 +000 - K0758 + 200, K0758 + 600 - K0758 + 690, K0759 + 210 - K0759 + 671

Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement P 20.009275 M
1.502 Lane Km
EAO P .725725 M
Total P 20.735 M
June 4, 2025 2025 SR2025-03-009402 March 17, 2025 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 138 - K0777 + 200

Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,094 Square Meters
EAO P .525 M
Total P 15.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 106 - K0777 + 159

Physical Target: Allocation:
CW1- Construction of Road Slope P 14.475 M
Protection Structure: 1,145.19 Square Meters
EAO P .525 M
Total P 15.00 M
June 4, 2025 2025 WIN5XY00494 SARO-BMB-A-25-0008178 March 7, 2025 Region VI Iloilo 1st District Engineering Office
UACS No. 310202101995000
Project ID: P00906261VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123

CW1 - Road Widening: 0.456 lane km – 6,316.10
CW2 – Construction of Drainage Structure: 456 lineal meters – 2,503.90
ROW – ROW Acquisition: 549.33 Square Meters – 807.52
EAO – 196.48


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening - Secondary Roads
Iloilo-Antique Rd - K0023 + 734 - K0023 + 757, K0023 + 912 - K0024 + 079, K0024 + 079 - K0024 + 123

CW1 - Road Widening: 0.456 lane km – 8,803.52
ROW – ROW Acquisition: 549.33 Square Meters – 824.00
EAO – 196.48
June 3, 2025 2025 WIN5E0379 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310110100603000
Project ID: P00909206MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

FROM:

Maharlika Highway (Surigao-Agusan Sect) - K1234 + 534 - K1234 + 719

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 370 Lineal meters

Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415

Unit Cost:
CW1: P 10,090.77/Lineal meters

TO:

Maharlika Highway (Surigao-Agusan Sect) - K1222 + 647 - K1222 + 669

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 22 Lineal meters

Allocation:
TOTAL: P 3,869,000
CW1: P 3,733,585
EAO: P 135,415

Unit Cost:
CW1: P 169,708.41/Lineal meters

June 3, 2025 FY 2025 P00909745MN SR2025-02-002285 February 3, 2025 Region XII Regional Office XII
Contract ID: 25M00056
Amount: ₱ 60,000,000.00

Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270
To: Maharlika Highway( Cotabato-Marbel Rd) - K1728 + 418 - K1730 + 270

Type of Work: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
From: 11.160 Lane Km
To: 3.720 Lane Km
June 3, 2025 FY 2025 P00909452MN SR2025-03-009479 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00061
Amount:₱ 78,882,000.00

Project Name:
From: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1755 + 938
To: Maharlika Highway( Cotabato-Marbel Rd) - K1754 + 495 - K1756 + 488

Type of Work/ Physical target:
From: CW1- Road Widening = 2.900 Lane Km
To: CW1- Road Widening = 4.010 Lane Km
CW-2 - Construction of Road Slope Protection Structure = 23,406.00 square meters

June 2, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310305102499000
Project ID: P00909995MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

FROM:

Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd

Type of Work:
CW1- Widening of Bridge

Physical Target:
CW1- 284.35 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 172,322.841568/Square meters

TO:

Mat-i Br. (B01857MN) along Agusan-Malaybalay Rd

Type of Work:
CW1- Construction of Parallel Bridge

Physical Target:
CW1- 284.35 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 172,322.841568/Square meters
June 2, 2025 2025 WIN5XY00473 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0130+680 - K0131+000, K0135+900 - K0136+300, K0137+232 - K0137+920
June 2, 2025 2025 WIN5XY00474 FY2025 GAA November 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag - Burgos Rd - K0139+736 - K0141+050
June 2, 2025 2025 WIN5XY00475 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag - Burgos Rd - K0137+921 - K0138+517, K0139+000- K0139+736
June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03729 GAA 2025 January 20, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00914687LZ
UACS: 310109101731000

FROM:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0502 + (-016) - K0502 + 001
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 153 Square meters
Allocation:
Php 2,500,000

TO:
Project Name:
Bulo National Rd (Agbannawag-Bulo-Callagdao Sect) - K0508+178 - K0508+208
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 180 Square meters
Allocation:
Php 2,500,000"
June 2, 2025 2025 WIN5E03728 SR2025-03-008449 March 12, 2025 Cordillera Administrative Region Lower Kalinga District Engineering Office
"Project ID: P00923067LZ
UACS: 320102107103000

FROM:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan), Sta. 115 + 741 - Sta. 115 + 941, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 125 Lineal meters
Allocation:
Php 8,000,000

TO:
Project Name:
Construction of Flood Control Structure along Chico River (Buenan),Sta.115+786 - Sta. 115+866, Barangay Dupag, Tabuk City, Kalinga
Type of Work:
CW1 - Construction of Flood Mitigation Structure
Physical Target:
CW1 - 80 Lineal meters
Allocation:
Php 8,000,000"
June 2, 2025 2025 WIN5XY00472 FY2025 GAA December 20, 2024 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Tarlac City - San Jose via Tibag-Burgos Rd - K0129+301 - K0130+650
June 2, 2025 2025 win5f08555 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0039+000- K0039+740, K0041+653 - K0042+000, K0048+000 - K0048+500
June 2, 2025 2025 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0111+385 - K0112+220
June 2, 2025 FY 2025 P00909495MN SR2025-003-009500 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00013
Amount: ₱ 49,552,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1618 + 526 - K1618 + 750
To: Maharlika Highway( Digos-Makar Rd) - K1612 + 961 - K1613 + 532, K1613 + 590 - K1613 + 996, K1620 + 098 - K1620 + 322

Type of Work/ Physical target:
From: CW1 - Road Widening = 2.562 Lane Km
To: CW1 - Road Widening = 2.562 Lane Km, CW2 - Construction of Road Slope Protection Structure = 3,479.00 Square meters
June 2, 2025 FY 2025 P00909449MN SR2025-003-009465 March 17, 2025 Region XII Regional Office XII
Contract ID: 25M00014
Amount: ₱ 49,599,000.00

Project Name:
From: Maharlika Highway( Digos-Makar Rd) - K1628 + 850 - K1630 + 142
To: Maharlika Highway( Digos-Makar Rd) - K1627 + 417 - K1628 + 617

Type of Work/ Physical Target:
From: CW1 - Road Widening = 2.523 Lane Km
To: CW1 - Road Widening = 2.400 Lane Km, CW2 = Construction of Road Slope Protection Structure = 3,910.00 Square meters
June 2, 2025 FY 2025 P00935914MN GAA 2025 January 1, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID: 25MB0043
Project Name: Construction of Drainage Structure, Marcos Avenue, Barangay Apopong, General Santos City
Amount: P10,000,000.00
Type of Work: Construction of Drainage Structure

Physical Target:
From: 485 Lineal meters
To: 493 Lineal meters
June 2, 2025 FY 2025 P00938513MN SARO-BMB-A-25-0008281 March 11, 2025 Region XII South Cotabato 1st District Engineering Office
Contract ID:25MB0017
Project Name: Construction of Road, National Highway to Purok Upper London, Barangay Siguel, General Santos City
Amount: P5,000,000.00
Type of Work: Construction of Concrete Road

Physical Target:
From: 0.273 Lane Km
To: 0.576 Lane Km
May 29, 2025 2025 WIN5XY00478 FY2025 GAA December 20, 2024 Region III Regional Office III
Network Development Program - Off-Carriageway Improvement - Primary Roads

Maharlika Highway - K0037+(-725) - K0037+(-668), K0037+(-618) - K0037+(-435), K0037+(-54) - K0037+242.00
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08570 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Maharlika Highway - K0046+463 - K0046+746
May 29, 2025 2025 WIN5F08552 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0251+282 - K0252+207, K0269+440 - K0269+817
May 29, 2025 2025 WIN5F08547 FY2025 GAA December 20, 2024 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads


Baler-Casiguran Rd (Baler-Dinadiawan) - K0248+105 - K0248+689, K0273+450 - K0274+450
May 28, 2025 2025 WIN5F08543 FY2025 GAA December 20, 2024 Region III Regional Office III
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Maharlika Highway - K0112+507.30 - K0112+807.30, K0112+733.30 - K0112+807.30
May 28, 2025 2025 WIN5XY00471 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102179000
Project ID: P00908626VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0171 + 781

CW1- Preventive Maintenance: Asphalt Overlay: 15.396 lane km – 100,360.00
EAO – 3,640.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd – K0163 + 760 – K0167 + 524

CW1- Preventive Maintenance: Asphalt Overlay: 10.446 lane km – 100,360.00
EAO – 3,640.00
May 28, 2025 2025 WIN5F08551 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102188000
Project ID: P00908634VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0125 + 743 - K0131 + 062

CW1- Preventive Maintenance: Asphalt Overlay: 10.140 lane km – 68,032.50
EAO – 2,467.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Maayon-Jct Bailan Rd - K0126 + 117 - K0129 + 000

CW1- Preventive Maintenance: Asphalt Overlay: 7.280 lane km – 68,032.50
EAO – 2,467.50
May 28, 2025 2025 FY 2025 GAA, RA 12116 December 30, 2024 Region XIII Regional Office XIII
UACS No. : 310107100777000
Project ID: P00909150MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 321 - K1316 + 630

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 11000 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 14,475/Square meters

TO:

Maharlika Highway (Agusan-Davao Sect) - K1316 + 000 - K1316 + 120 , K1316 +250 - K1316 + 360, K1316 + 415 - K1316 + 470, K1316 + 590 - K1316 + 630, K1317 + 045 - K1317 + 200, K1317 + 250 - K1317 + 440, K1317 + 440 - K1317 + 540

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 12,313.01 Square meters

Allocation:
TOTAL: P 165,000,000
CW1: P 159,225,000
EAO: P 5,775,000

Unit Cost:
CW1: P 12,931.44/Square meters
May 27, 2025 2025 WIN5E03732 GAA 2025 January 20, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914631LZ
UACS: 310105101374000

FROM:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Upgrading of Drainage Structure along Road
Physical Target:
CW1 - 0.39 Lane Km
CW2 - 509.70 Square meters
CW3 - 27 Lineal meters
Allocation:
Php 19,500,000

TO:
Project Name:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0617 + 420.50 - K0618 + 078, K0621 + 009.50 - K0621 + 028, K0621 + 073 - K0621 + 177
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1 - 0.6175 Lane Km
CW2 - 580.72 Square meters
CW3 - 916.50 Square meters
Allocation:
Php 19,500,000"
May 27, 2025 2025 WIN5E03731 GAA 2025 January 20, 2025 Cordillera Administrative Region CAR - Regional Office
"Project ID: P00900504LZ
UACS: 310105101275000

FROM:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 30.316 Lane Km
Allocation:
Php 100,000,000

TO:
Project Name:
Baguio-Bontoc Rd - K0376 + 000 - K0391 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 - 3.384 Lane Km
CW2 - 8.296 Lane Km
Allocation:
Php 100,000,000"
May 26, 2025 2025 GAA 2025 May 22, 2025 Cordillera Administrative Region Apayao 2nd District Engineering Office
"Project ID: P00914637LZ
UACS: 310109101710000

FROM:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0618 + 840 - K0619 + 042, K0622 + 577 - K0622 + 628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,629.00 Square meters
Allocation:
Php 29,900,000

TO:
Project Name:
Apayao (Calanasan)-Ilocos Norte Rd - K0622+577 - K0622+628, K0629 + 000 - K0629 + 045
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,924.49 Square meters
Allocation:
Php 29,900,000"
May 26, 2025 2025 SR2025-02-001881 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,280 Square meters

EAO P 0.875 M

Total P 25.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + (-124) - K0697 + (-054)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 24.125 M
Structure: 1,190 Square meters

EAO P 0.875 M

Total P 25.00 M
May 26, 2025 2025 SR2025-03-009399 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 090 - K0777 + 138

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 850.01 Square meters

EAO P 0.420 M

Total P 12.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0777 + 065 - K0777 + 106

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 11.580 M
Structure: 900.18 Square meters

EAO P 0.420 M

Total P 12.00 M
May 26, 2025 2025 SR2025-03-009501 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 355

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.036 Lane Km

EAO P 0.700 M

Total P 20.00 M

AS MODIFIED:


Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0794 + 800 - K0794 + 873, K0797 + 140 - K0797 + 210, K0802 + 210 - K0802 + 300, K0803 + 010 - K0803 + 300, K0803 + 750 - K0803 + 800, K0804 + 310 - K0804 + 369

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 19.300 M
: 1.476 Lane Km

EAO P 0.700 M

Total P 20.00 M
May 26, 2025 2025 SR2025-03-009496 March 17, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0699 + 071 - K0700 + 000, K0675 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163.5

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 1.991 Lane Km

EAO P 1.225 M

Total P 35.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0697 + 535 - K0697 + 663, K0698 + 032 - K0698 + 163, K0699 + 071 - K0700 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 33.775 M
: 2.114 Lane Km

EAO P 1.225 M

Total P 35.00 M
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Guimaras District Engineering Office
UACS No. 310102102194000
Project ID: P00908638VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd (S00028GR) K0101 + 392 - K0102 + 494, K0103 + 376 - K0104 +348

CW1- Preventive Maintenance: Asphalt Overlay: 8.312 lane km – 96,017.50
EAO – 3,482.50


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads
Guimaras Circumferential Rd (S00028GR) K0098 + 732 - K0098 + 801, K0103 + 376 - K0104 +380, K0105 + 800 - K0106 + 800

CW1- Preventive Maintenance: Asphalt Overlay: 7.874 lane km – 96,017.50
EAO – 3,482.50
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310102102455000
Project ID: P00908657VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0118 + 100

CW1- Preventive Maintenance: Asphalt Overlay: 3.982 lane km – 35,770.00
EAO – 730.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Capiz Rd (New Route) - K0116 + (-173) - K0116 + 100, K0116 + 400 - K0117 + 080

CW1- Preventive Maintenance: Asphalt Overlay: 3.817 lane km – 35,770.00
EAO – 730.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Capiz 1st District Engineering Office
UACS No. 310103101857000
Project ID: P00908675VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0115 + 110 - K0118 + 000, K0118 + 402 - K0120 + 850

CW1- Preventive Maintenance: Asphalt Overlay: 14.164 lane km – 141,855.00
EAO – 5,145.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads
Roxas City Bdry-Panitan-Bailan Rd - K0112 + (-268) - K0113 + 434, K0116 + 606 - K0118 + 000, K0118 + 402 - K0118 + 920

CW1- Preventive Maintenance: Asphalt Overlay: 14.382 lane km – 141,855.00
EAO – 5,145.00
May 23, 2025 2025 SARO-BMB-A-25-0009037 March 27, 2025 Region VI Iloilo 1st District Engineering Office
UACS No. 300214102007000
Project ID: P00934901VS


FROM:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0038 + 000 - K0040 + 253

CW1- Road Safety: Roadway Lighting: 226 number of units – 29,400.00
EAO – 600.00


TO:

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Installation/Application of Road Safety Facilities (Solar Led Street Lights) along Guimbal-Igbaras-Tubungan-Leon Rd - K0035 + 500 - K0043 + 000

CW1- Road Safety: Roadway Lighting: 250 number of units – 29,400.00
EAO – 600.00
May 22, 2025 2025 SR2025-02-003246 February 3, 2025 Region VIII Regional Office VIII

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 881 - K0935 + 058, K0935 + 205 - K0935 + 404 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
1,116 Square meters

EAO P 0.371070 M

Total P 10.602 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0934 + 900 - K0936 + 000 (Off-Carriageway Improvement)

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 10.230930M
Construction of Sidewalk :
3,273 Square meters

EAO P 0.371070 M

Total P 10.602 M
May 22, 2025 2025 SR2025-02-001694 February 3, 2025 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

AS PER GAA/ORIGINAL:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0703 + 459 - K0703 + 853, K0705 + 122 - K0705 + 167, K0705 + 790 - K0705 + 811, K0706 + 000 - K0706 +500, K0707
+ 108 + K0707+ 267, K0707 + 830 - K0708 + 000, K0709 + 203 - K0709 + 240, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713 + 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.734 Lane Km

EAO P 2.940 M

Total P 84.00 M

AS MODIFIED:

Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 800, K0705 + 122 - K0705 + 167, K0706 + 000 - K0706 + 500, K0707 + 830 - K0708 + 000, K0710 + 630 - K0711 + 000, K0713 + 200 - K0713+ 554


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 81.060 M
: 4.166 Lane Km

EAO P 2.940 M

Total P 84.00 M

Pages