April 27, 2017 CY 2017 WIN7E01293 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 1st District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road : Road Widening
Puerto Princesa North Road
K0241+000 - K0243+261
( Road Widening)
L = 4.544 lane km
Php 72,748,000.00
April 27, 2017 2017 WIN7G01366 SR2017-02-002986 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Road Dike along Daang Maharlika (Surigao-Agusan Section), K1183+880 - K1185+095

Allocation - Php 200.00 Million

Physical Target - 1,220.00 lm
April 27, 2017 CY 2017 WIN7E01136 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary road
Puerto Princesa North Road
K0107+000 - K0107+600,
K0107+700 - K0108+679,
K0112+884 - K0114+195
( Road Widening )
L= 5.798 lane km
Php 109,468,000.00
April 27, 2017 2017 WIN7G01357 SR2017-02-003034 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - Declared Tourism Destinations

Circumferential Road leading to Lake Mainit, Jabonga, Agusan del Norte, Sta. 1183+8000 - Sta. 1187+000

Allocation - Php 150.00 Million

Physical Target - 6.40 lane km
April 27, 2017 2017 WIN7G01368 SR2017-02-002423 February 2, 2017 Region XIII Regional Office XIII
Modified:
Network Development - Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, Daang Maharlika (Surigao-Agusan Sect), K1207+281 - K1208+259, K1208+297.10 - K1210+285

Allocation - Php 130.585 Million

Physical Target - 5.96 lane km
April 27, 2017 CY 2017 WIN7E01127 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Road
Leading to Airports
New Ibajay - Manini - Sandoval Access Road
leading to Taytay Airport, Palawan
Sta 0+ 020 - Sta 0+300,
Sta 18+029.70 - Sta 19+529.78,
Sta 15+384.90 - Sta 18+029.70
L = 8085 lane km
Php 150,000,000.00
( Construction of Concrete Road )
April 27, 2017 CY 2017 WIN7E01223 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis ) - Secondary:
Road Upgrading Gravel to Paved
Palawan Circumferential Road
K0228+656 - K0232+764,
K0233+025 - K0233+090
L = 8.618 lane km
Php 150,000,000.00



April 27, 2017 2017 WIN7G01355 165003014400094 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Rehab/Recon of National Roads with Slips, Slope Collapse and Landslide - Primary Road

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Daang Maharlika (Agusan-Davao Sect), K1274+762.63 - K1274+840.30

Allocation - Php 9.900 Million

Physical Target - 388.35 sq.m.
April 27, 2017 2017 WIN7G01353 165003015800470 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road

Road Upgrading (unpaved to paved) along NRJ Bayugan-Calaitan-Tandag Road, K1289+896 - K1289+995

Allocation - Php 5.00 Million

Physical Target - 0.198 lane km
April 27, 2017 2017 WIN7G01354 165003014900172 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Construction//Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Road

Construction/Upgrading/Rehabilitation of Drainage along NRJ Bayugan - Calaitan - Tandag Road, K1273+000 - K1273+080

Allocation : ₱ 7.697 Million

Physical Target : 80.000 lm
April 27, 2017 2017 WIN7G01326 165003014200319 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah - Talacogon Road, K1311+-703 - K1311+-521

Allocation : ₱ 6.104 Million

Physical Target : 0.364 lane km
April 27, 2017 2017 WIN7G01370 165003016800153 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Off-Carriageway Improvement including drainage - Secondary Road

Off-Carriageway Improvement including drainage along NJR Bahbah - Talacogon Road, K1294+500 - K1294+868 (RS), K1294+692 - K1294+731 (LS), K1294+809 - K1294+845 (LS), K1294+993 - K1295+633 (BS)

Allocation : ₱ 9.500 Million

Physical Target : 4,392.50 sq. m.
April 27, 2017 2017 WIN7G01369 165003015800468 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road

Road Upgrading (unpaved to paved) along Butuan City - Talacogon - Loreto - Veruela - Sta. Josefa Road, K1326+527 - K1326+774

Allocation : ₱ 7.000 Million

Physical Target : 0.494 lane km
April 27, 2017 2017 WIN7G01360 165003015200214 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary Road

Improvement/Widening of National Road along Bayugan-Esperanza Road, K1270+-874 - K1270+-347

Allocation : ₱ 7.576 Million

Physical Target : 1.054 lane km
April 27, 2017 2017 WIN7G01359 165003014200318 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Road - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah-Talacogon Road, K1304+600 - K1304+680.30, K1304+800 - K1304+835, K1305+000 - K1305+092, K1309+680 - K1309+780

Allocation : ₱ 7.896 Million

Physical Target : 0.6146 lane km
April 27, 2017 2017 WIN7G01358 165003014300422 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modfied:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary Road

Rehabilitation/Reconstruction/Upgrading of National Roads including drainage along Bayugan-Esperanza Road

Allocation : ₱ 6.359 Million

Physical Target : 0.620 lane km
April 27, 2017 2017 WIN7G01329 165003015800466 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road

Road Upgrading (unpaved to paved) along Butuan City-Pianing-Tandag Road, K1252+184 - K1252+242, K1252+756 - K1252+938

Allocation : ₱ 9.000 Million

Physical Target : 0.480 lane km
April 27, 2017 2017 WIN7G01329 165003015800466 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road

Road Upgrading (unpaved to paved) along Butuan City-Pianing-Tandag Road, K1252+184 - K1252+242, K1252+756 - K1252+938

Allocation : ₱ 9.000 Million

Physical Target : 0.480 lane km
April 27, 2017 2017 WIN7G01334 165003015800469 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Road

Road Upgrading (unpaved to paved) along NRJ Bahbah-Talacogon By-Pass Road (S00465MN), Chainage 864 - Chainage 1115

Allocation : ₱ 5.800 Million

Physical Target : 0.502 lane km
April 27, 2017 2017 WIN7G01340 165003014200317 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary Road

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Road along NRJ Bahbah-Talacogon Road, K1298+191 - K1298+249.70, K1299+811 - K1299+865, K1299+965.0 - K1299+1086, K1301+088 - K1301+128.24

Allocation : ₱ 6.500 Million

Physical Target : 0.54688 lane km
April 27, 2017 2017 WIN7G01412 292003020403473 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Hamogaway Flood Control Phase II (Downstream) along Daang Maharlika (Agusan-Davao Section), K0000+000 - K0000+056, Bayugan, Agusan del Sur

Allocation : ₱ 5.000 Million

Physical Target : 56.00 lm.
April 27, 2017 2017 WIN7G01413 103004010313911 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
LIP-Buildings and Other Structures - Multipurpose/Facilities

Rehabilitation of Multi-Purpose Building, Poblacion, San Luis, Agusan del Sur

Allocation : ₱ 2.875 Million

Physical Target : 1.000 number of building
April 27, 2017 2017 WIN7G01426 292003020403474 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rechanneling of Afga River (Downstream) Phase I, Sibagat, Agusan del Sur, K0+000 - K0+130

Allocation : ₱ 5.120 Million

Physical Target : 130.000 lm
April 27, 2017 2017 WIN7G01431 165003015100340 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - Secondary Road

Improvement/Widening of National Roads along NRJ Awa - Lianga Road, Prosperidad, Agusan del Sur, K1291+-796 - K1291+-440

Allocation : ₱ 9.397 Million

Physical Target : 0.712 lane km
April 27, 2017 2017 WIN7G01425 292003020403475 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rechanneling of Afga River (Upstream) Phase I, Sibagat, Agusan del Sur, K0+130 - K0+330

Allocation : ₱ 5.120 Million

Physical Target : 200.000 lm
April 27, 2017 2017 WIN7G01430 292003020403476 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Crossing Luna Flood Control (K0+000 - K0+019.60), Esperanza, Agusan del Sur

Allocation : ₱ 5.000 Million

Physical Target : 19.600 lm
April 27, 2017 2017 WIN7G01428 165003014600268 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Road

Construction of Road Slope Protection Structure along NRJ Bayugan - Calaitan - Tandag Road (K1277+019.43 - K1277+066.60)

Allocation : ₱ 9.915 Million

Physical Target : 518.870 sq. m.
April 27, 2017 2017 WIN7G01427 165003016900138 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Off-Carriageway Improvement including drainage - Tertiary Road

Off-Carriageway Improvement including drainage along NRJ Bayugan - Esperanza Road, K1277+-640 - K1277+-210

Allocation : ₱ 3.141 Million

Physical Target : 1,841.750 sq. m.
April 27, 2017 2017 WIN7G01429 165003014600267 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Road

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Agusan - Malaybalay Road, K1289+140 - K1289+169

Allocation : ₱ 6.111 Million

Physical Target : 319.000 sq. m.
April 26, 2017 2017 WIN7E01098 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of National Roads - Tertiary, Hanawan-Consocep Rd (S03503LZ),
K0470+-594 - K0471+700 (Road Widening)
Physical Target: 4.698 Lane km.
Unit Cost (P'000): Road Widening: P6,696.8923/Lane km
Allocation (P'000): Php 31,462

As MODIFIED:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of National Roads - Tertiary, Hanawan-Consocep Rd (S03503LZ),
K0470+-594 - K0470+230 (Road Widening/Construction of Drainage Structure along Road)
Physical Target: Road Widening: 1.648 Lane km.
Const. of Drainage Structure along Road: 1,648 Lm
Unit Cost (P'000): Road Widening: P10,080.97/Lane km
Const. of Drainage Structure along Road: P9.01/Lm
Est. Cost (P'000): Php 31,462
April 26, 2017 2017 WIN7E01029 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO-I National Road: Network Services: Network Development: Improvement / Widening of National Roads:Tertiary Roads: Naga City Bdry — Calabanga — Balongay Rd (S03506LZ) K0446+675-K0447+588, K0448+200-K0448+556 (Road Widening)
Physical Target: 2.538 Lane km.
Unit Cost (P'000): P14,856.58/Lane km
Allocation (P'000): Php 37,706

As MODIFIED:
MFO-I National Road: Network Services: Network Development: Improvement / Widening of National Roads:Tertiary Roads: Naga City Bdry — Calabanga — Balongay Rd (S03506LZ) K0446+740-K0447+669, K0448+200-K0448+280 (Road Widening)
Physical Target: 2.018 Lane km.
Unit Cost (P'000): P18,684.83/Lane km
Est. Cost (P'000): Php 37,706
April 26, 2017 2017 WIN7E01033 FY 2017 GAA RA 10924 December 29, 2017 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Evacuation Center/Covered Court, Brgy. Sta. Cruz Quipayo, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Allocation: Php 3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Multipurpose Building (Covered Court), Brgy. Sta. Cruz Quipayo, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Estimated Cost: Php 3.0M
April 26, 2017 2017 WIN7E01034 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 4th District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program:
Buildings and Other Structures: Multi-Purpose / Facilities:
Construction of Multi-Purpose Hall (Covered Court), Brgy. La Purisima, Quipayo, Calabanga, Camarines Sur(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P2M/Bldg.
Allocation: Php 2M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program:
Buildings and Other Structures: Multi-Purpose / Facilities:
Construction of Multi-Purpose Building (Covered Court), Brgy. La Purisima, Quipayo, Calabanga, Camarines Sur(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P2M/Bldg.
Estimated Cost: Php 2M
April 26, 2017 2017 WIN7E01038 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Covered Court, Brgy. San Isidro, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: -
Unit Cost: -
Allocation: Php 3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program,
Buildings and Other Structures, Multipurpose Facilities, Construction of Multipurpose Building (Evacuation Center), Brgy. San Isidro, Calabanga, Camarines Sur (Construction of Other Building)
Physical Target: 1 Building
Unit Cost: P3.0M/Building
Est. Cost: Php 3.0M

April 26, 2017 2017 WIN7E01382 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Asset Preservation of National roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 - Tertiary - Rehabilitation of Concrete Road - A. Castaneda - Ma. Aurora - San Luis Road, K0224+(-663) - K0224+(-613.5), K0225+132 - K0225+223, K0225+543.50 - K0225+858 (S01523LZ)
April 26, 2017 2017 WIN7E01381 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Asset Preservation of National Roads - Rehab/Reconst/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 - Secondary - Nueva Ecija - Aurora Road, K0180+229 - K0180+319, K0181+289 - K0181+311, K0181+366 - K0181+466, K0181+796 - K0181+915, K0182+474 - K0182+492, K0183+127 - K0183+177, K0183+505 - K0183+595, K0189+239 - K0189+360, K0189+543 - K0189+593. K0190+467 - K0190+539, K0197+160 - K0197+400, K0198+215 - K0198+354, K0198+522 - K0198+717, K0200+000 - K0200+054, K0200+600 - K0200+900, K0201+055 - K0201+000, K0201+610 - K0201+624, K0201+645 - K0201+700, K0203+368 - K0203+400, K0203+584 - K0203+657, K0203+775 - K0203+890, K0204+490 - K0204+750, K0205+100 - K0205+250, K0205+550 - K0205+700, K0206+-167 - K0206+-038, K0206+000 - K0206+171, K0206+200 - K0206+530, K0206+671 - K0206+930, K0207+100 - K0207+218, K0208+030 - K0208+100, K0208+190 - K0208+235, K0208+840 - K0208+885, K0214+212 - K0214+909 (S01516LZ)
April 26, 2017 2017 WIN7E01065 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction — M.R. Espinosa Airport Rd (S00024MT) Chainage 060-Chainage 287 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 1,362 Sq.m.
Unit Cost (P'000): P7.19/sq.m.
Allocation (P'000): P9,786

As MODIFIED:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction — M.R. Espinosa Airport Rd (S00024MT) Chainage 060-Chainage 287 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 1,332 Sq.m.
Unit Cost (P'000): P7.35/sq.m.
Est. Cost (P'000): P9,786
April 26, 2017 2017 WIN7E01384 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Network Development - Road Upgrading (unpaved to paved) - Secondary - Baler - Casiguran Road (Dinadiawan - Casiguran Section), K0307+802.61 - K0307+410.17, K0308+669 - K0308+709.33, K0319+425.62 - K0319+798.09 (S04736LZ)
April 26, 2017 2017 WIN7E01076 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction —Jct
Milagros — Baleno — Lagta Rd (S00016MT) K0046+287-K0047+517 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 7,416 sq.m.
Unit Cost: P6.41T/sq.m.
Allocation: P47.560M

As MODIFIED:
MFO-1 National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-carriageway Improvement : Shoulder Paving / Construction —Jct
Milagros — Baleno — Lagta Rd (S00016MT) K0046+287-K0047+517 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 7,380.90 sq.m.
Unit Cost: P6.44T/sq.m.
Est. Cost: P47.560M
April 26, 2017 2017 WIN7E01072 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO-I National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-Carriageway Improvement : Shoulder Paving/Construction - Jct Crossing - Mandaon Rd (S00037MT) K0046+818 - K0047+283, K0047+300 - K0048+349 (Off-carriageway Improvement/ Shoulder Paving / Construction)
Physical Target: 9,000 Sq.m.
Unit Cost: P5.28/sq.m.
Allocation: Php 47.560M

As MODIFIED:
MFO-I National Road Network Services: Network
Development — Off-Carriageway Improvement including Drainage: Secondary Roads: Off-Carriageway Improvement : Shoulder Paving/Construction - Jct Crossing - Mandaon Rd (S00037MT) K0046+818 - K0047+283, K0047+300 - K0048+349 (Off-carriageway Improvement/ Shoulder Paving / Construction)
Physical Target: 8,760 Sq.m.
Unit Cost: P5.43/sq.m.
Est. Cost: Php 47.560M
April 26, 2017 2017 165003014300286 GAA FY 2017 January 1, 2017 Region II Quirino District Engineering Office
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Tertiary Roads: Jct Abbag-Guingin Bdry Rd - K0381+(-256) - K0381+(-174), K0381+(-174) - K0381+000
April 26, 2017 FY 2017 WIN7E01369 FY 2017 APPROVED MODIFICATION April 12, 2017 Cordillera Administrative Region Benguet 1st District Engineering Office
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Chogong-Danas Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 85 Lm

To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Chogong-Danas Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 150 Lm
April 26, 2017 FY 2017 WIN7E01367 FY 2017 APPROVED MODIFICATION April 12, 2017 Cordillera Administrative Region Benguet 1st District Engineering Office
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Kabayan Barrio Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)

To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Kabayan Barrio Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 445 Lm

April 26, 2017 FY 2017 WIN7E01368 FY 2017 APPROVED MODIFICATION April 12, 2017 Cordillera Administrative Region Benguet 1st District Engineering Office
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Poblacion Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)

To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Poblacion Flood Control, Kabayan, Benguet (Construction of Flood Mitigation Structure)
Physical Target = 310 Lm
April 26, 2017 2017 WIN7E01383 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Asset Preservation of National Roads - Rehab/Reconst. of National Roads with Slips, Slope Collapse and Landslide - Secondary - Nueva Ecija - Aurora Road, K0181+210 - K0181+286, K0181+380 - K0181+448, K0182+509 - K0182+521, K0182+530 - K0182+732, K0182+732 - K0182+753, K0182+944 - K0182+962, K0183+250 - K0183+400, K0183+530 - K0183+730. K0184+037 - K0184+187, K0185+012 - K0185+042, K0185+204 - K0185+240, K0185+393 - K0185+417, K0185+492 - K0185+543, K0185+702 - K0185+717, K0185+000 - K0186+000, K0186+705 - K0186+759, K0186+700 - K0186+900, K0186+914 - K0186+962, K0187+240 - K0187+306, K0187+362 - K0187+395, K0187+691 - K0187+736, K0187+880 - K0187+910, K0188+420 - K0188+477, K0188+570 - K0188+651, K0188+670 - K0188+730, K0188+815 - K0188+842, K0188+855 - K0188+918, K0188+1018 - K0188+1033, K0190+000 - K0190+150, K0191+-100 - K0191+100, K0199+300 - K0199+400, K0201+100 - K0202+000, K0202+700 - K0202+950 (S01516LZ)
April 26, 2017 2017 WIN7E01380 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Covered Court at Tabang Elementary School, Plaridel, Bulacan
April 26, 2017 2017 WIN7E01386 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Barangay Balite, Malolos, Bulacan
April 26, 2017 2017 WIN7E01387 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Banga 2nd High School, Plaridel, Bulacan
April 26, 2017 2017 WIN7E01408 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court), Tampok, Hagonoy, Bulacan
April 26, 2017 2017 WIN7E01403 FY 2017 GAA January 2, 2017 Region III Bulacan 1st District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Angat River, Banga 2nd Section, Plaridel, Bulacan
April 26, 2017 2017 WIN7E01405 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Asset Preservation of National Roads - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary - Old Cagayan Valley Rd (S04493LZ), K0050+390 - K0050+989
April 26, 2017 2017 WIN7E01385 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) - Tertiary - Gen Alejo Santos Highway, K0054+800 - K0055+000, K0055+000 - K0056+000, K0056+000 - K0056+443
April 25, 2017 CY 2017 WIN7E01412 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-purpose Facilities
Construction of Multi-Purpose Building,
Bagy. Ambil, Looc, Occidental Mindoro
1 bldg.
Php 1.00M
April 25, 2017 CY 2017 WIN7E01414 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and other Structures
- Multi-Purpose Facilities
- Construction of Multi-Purpose Building
Brgy. Mulawin, Sta. Cruz, Occidental Mindoro
1 Bldg.
Php 1.00 M
April 25, 2017 CY 2017 WIN7E01419 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projwcts
Local Infrastructure Project (LIP)
- Buildings and other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Pawican, San Jose, Occidental Mindoro
1 Bldg.
Php 1.00 M
April 25, 2017 CY 2017 WIN7E01411 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Maligaya, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 M
April 25, 2017 CY 2017 WIn7E01409 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Bulacan, Looc, Occidental Mindoro
1 Bldg.
Php 1.00 M
April 25, 2017 CY 2017 WIN7E01410 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally- Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Balikyas, Looc, Occidental Mindoro
1 Bldg.
Php 1.00 M
April 25, 2017 CY 2017 WIN7E01417 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
Local Infrastructure Project (LIP)
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Mamburao, Occidental Mindoro
1 Bldg.
Php 10.00 M
April 25, 2017 CY 2017 WIN7E01292 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of Missing Gaps connecting National
Roads, including ROW
Mindoro Island Circumferential Road,
Abra de Ilog - Puerto Galera
(Sta. 2+465 - Sta. 4+421.70)
L = 3.9134 lane-km
Php 150,000,000.00
April 25, 2017 CY 2017 WIN7E01281 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
Secondary Road
Tablas Circumferential Road
K0110+503 - K0111+000,
K0112+000 - K0113+000,
K0113+500 - K0115+000,
K0107+020 - K0107+952,
K0107+966 - K0108+500,
K0116+234 - K0118+000
( Road Widening )
L = 12.442 lane km
Php 150,000,000.00
April 25, 2017 CY 2017 WIN7E01295 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 2nd District Engineering Office
as MODIFID:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( Unpaved to Paved )
- Secondary Road
Culandanum - Panalingaan Cross-Country Road
Chainage 16442 - Chainage 18683
( Construction of Concrete Road )
L = 4.482 lane km
Php 87,000,000.00
April 25, 2017 2017 WIN7G01325 FY 2017 (R.A. 10924) April 7, 2017 Region IX Isabela City District Engineering Office
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K13+800.00 - K15+152.50
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km.
April 25, 2017 CY 2017 WIN7E01256 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services of Other
Infrastructures
- Construction/Improvement of Access Roads leading
to Declared Tourist Destinations
Coron Town Proper to Borac RORO Port
Km 5+577 - Km 10+366
L = 9.578 lane km
Php 200,000,000.00
April 25, 2017 CY 2017 WIN7E01284 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance of Other infrastructures
- Construction/improvement of Access Roads leading to
Seaports
- Little Caramay - TDC - Pandanan leading to
Proposed Port, San Vicente, Palawan
Sta. 14+000 - Sta. 17+750
L = 7.50 lane km
Php 200,00,000.00
April 25, 2017 2017 WIN7G01328 FY 2017 (R.A. 10924) April 7, 2017 Region IX Isabela City District Engineering Office
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K9+000.00 - K10+280.00
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km.
April 25, 2017 CY 2017 WIN7E01280 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services of Other
Structures
- Construction/Improvement of Access Roads leading
to Airports
- Brgy. Port Barton - Brgy. Kemdeng -
Brgy. Poblacion Access Road leading to
San Vicente Airport
( Sta. 10+100 - Sta. 12+821 )
L = 5.442 lane km
Php 131,000,000.00
April 25, 2017 CY 2017 WIN7E01283 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 1st District Engineering Office
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Roads
leading to Declared Tourism Destinations
Guadalupe - San Nicolas - Decabobo leading
to Borac RORO Port
( Sta. 16+820 - Sta. 18+044,
Sta. 24+918.40 - Sta. 25+528.58 )
L = 3.668 lane km
Php 92,308,000.00

April 25, 2017 2017 WIN7G01332 FY 2017 (R.A. 10924) April 7, 2017 Region IX Isabela City District Engineering Office
Roads and Bridges - National Roads - Rehabilitation of Concrete Road along Basilan Circumferential Road (BCR), Isabela - Maluso Road, Isabela City
K5+150.00 - K6+430.00
Allocation: Php 40.00 Million
Physical Target: 2.56 lane km.
Unit Cost: Php 15,625,000.00/lane km.
April 25, 2017 2017 WIN7G01295 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga del Norte 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities - Completion of Siocon Public Market, Poblacion, Siocon, Zamboanga del Norte
Allocation: Php 2.00 Million
Physical Target: 1.00 Project
Unit Cost: Php 2.00 M/Project
April 25, 2017 2017 WIN7G01324 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga del Norte 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Slope Protection along Liloy - Siocon Road, Gutalac, Zamboanga Del Norte
K2029+140 - K2029+240, K2029+390 - K2029+432, K2032+810 - K2032+850, K2033+405 - K2033+450, K2035+570 - K2035+605, K2035+700 - K2035+725, K2036+260 - K2036+315, K2036+450 - K2036+497, K2036+913 - K2036+967, K2037+170 - K2037+176, K2037+340 - K2037+379, K2037+379 - K2037+430, K2037+970 - K2037+1000, K2038+310 - K2038+341, K2038+660 - K2038+700, K2039+000 - K2039+030,
Allocation: Php 36,376 Million
Physical Target: 13,145 sq. m.
Unit Cost: Php 2,767.29/sq.m.
April 25, 2017 CY 2017 WIN7E01247 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 1st District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges along
National Roads
- Replacement of Bridges
( Temporary to Permanent )
- Replacement of Bridge
( Temporary to Permanent )
Petek - Petekan Br. ( B00049CR ) along
F.B. Reyes ( Busuanga - Coron ) Road
L = 225.14 sq.m.
Php 20,000,000.00
April 25, 2017 2017 WIN7E01231 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office Construction of Barangay Road, Kalikid Sur, Cabanatuan City, Nueva Ecija
April 25, 2017 2017 WIN7E01268 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Road, Brgy. North Poblacion, Gabaldon, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01228 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Barangay Road, Sto. Niño, Cabanatuan City, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01332 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Road, Brgy. Siclong, Laur, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01318 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Concreting of Road, Brgy. Canantong, Laur, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01335 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Drainage, Brgy. San Josef Sur, Cabanatuan City, Nueva Ecija

(Construction of Drainage Structure along Road)
April 25, 2017 2017 WIN7E01334 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Barangay Road, Bagong Sikat, Cabanatuan City, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01333 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Road, Brgy. Ariendo, Bongabon, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01330 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Road, Brgy. Sapang Buho, Palayan City, Nueva Ecija


(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01269 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Concreting of Road, Brgy. Sagana, Laur, Nueva Ecija

(Construction of Concrete Road)
April 25, 2017 2017 WIN7E01227 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction of Drainage, Brgy. Sumacab Norte, Cabanatuan City, Nueva Ecija


(Construction of Drainage Structure along Road)
April 24, 2017 CY 2017 WIN7EO1219 GAA Cy 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED :
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslides - Secondary Road
- Mindoro West Coastal Road
K0340+180-K0340+300
K0338+(-679)-K0338+(-576)
K0343+350-K0343+850
K0348+100-K0348+250
K0356+514-K0356+555
Php 49.50M
3,317 sq.m.
April 24, 2017 CY 2017 WIN7E01222 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Construction and Maintenance of Bridges along National Roads
- Widening of Permanent Bridges from 1 to 2 Lanes
- Madayang-dang Bridge (B00171MR) along Jct. MWCR
(Labangan)-Murtha-Jct. Iriron Road
Php 24.00M
196.77 sq.m.
April 24, 2017 CY 2017 WIN7E01220 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of Drainage along
National Roads - Secondary Road
- Mindoro Oriental/Occidental East Coastal Road
K0218+390-K0221+304
(S00094MR)
(Construction of Drainage Structure along Road)
Php 30.740 M
L = 5,740 lm
April 24, 2017 Cy 2017 WIN7E01217 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Construction/Maintenance of Flood Mitigation Structures and
Drainage System
- Construction of Amnay Flood Control (Ilvita Section),
Sablayan, Occidental Mindoro
Php 20.00M
L = 295 lm
April 24, 2017 cy 2017 WINE01218 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of Drainage along
National Roads - Tertiary Road
- Crossing MWCR (Pola) - Casague - Jct. Alacaak Rd
K0378+(-180) - K0378+191(R/S),
K0378+763 - K0379+887.44(B/S),
K0390+900 - K0391+440(B/S),
K0392+408 - K0392+540(L/S),
(S00163MR)
(Construction of Drainage Structure along Road)
Php 27,691,960.58
L = 3,831.88 lm
April 24, 2017 CY 2017 WIN7E01221 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Construction and Maintenance of Flood Mitigation Structures and Drainage Systems
- Construction of Busuanga Flood Control
( San Jose Section ) , San Jose, Occidental Mindoro
( Construction of Flood Mitigation Structure )
Php 30.00M
L = 388 lm
April 24, 2017 GAA FY 2017 WIN7G01439 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, including ROW
Construction/Rehabilitation of Concrete Road/Road Widening-Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including RROW, Davao City (Site B) (Package 4)

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, including RROW
Construction/Widening/Improvement of Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including RROW, Davao City (Site B) (Package 4)

ALLOCATION: Php 189.040 Million
April 24, 2017 2017 WIN7E01019 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
AS per GAA:
Locally-Funded Project: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road, Phase II, Pasacao, Camarines Sur (Construction of Concrete Road)
Physical target: 0.40Lane Km
Unit Cost (P'000): 10,000/Lane Km
Allocation (P'000): Php 4.0M

AS MODIFIED:
Locally-Funded Project: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road at Barangay Caranan, Pasacao, Camarines Sur (Construction of Concrete Road)
Physical target: 0.63 Lane Km
Unit Cost (P'000): P6,349.206/Lane Km
Estimated Cost (P'000): Php 4.0M
April 24, 2017 2017 WIN7E01083 GAA 2017 RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1-National Road Network Services-Asset Preservation of National Roads-Construction/Upgrading/Rehabilitation of Drainage along National Roads -Secondary-Construction of Drainage Structure along Road - Jct Milagros-Baleno-Lagta Road- K0025+550-K0025+636, K0090+860-K0092+109 (S000016MT) [Construction of Drainage Structure along Road]
Physical Target: 1,259 lm
Unit Cost ('000): P11.91/lm
Allocation ('000): Php 15,000

As MODIFIED:
MFO 1-National Road Network Services-Asset Preservation of National Roads-Construction/Upgrading/Rehabilitation of Drainage along National Roads -Secondary-Construction of Drainage Structure along Road - Jct Milagros-Baleno-Lagta Road- K0025+550-K0025+636, K0090+860-K0091+750(S000016MT) [Construction of Drainage Structure along Road]
Physical Target: 936 lm
Unit Cost(P'000): P16.03/lm
Est. Cost (P'000): Php 15,000
April 24, 2017 2017 WIN7E01080 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1-National Road Network Services - Asset Preservation of National Roads - rehabilitation/Reconstruction/Upgrading - Secondary - Reconstruction fro Concrete to Concrete - Jct Tawad-Balud Rd. - K0035+202-K0036+055, K0061+012-K0061+391 (S00023MT) [Construction of Concrete Road]
Physical Target: 2.514 Lane Km
Unit Cost (P'000): P15,400.16/Lane Km
Allocation (P'000): P38,716


As MODIFIED:
MFO 1-National Road Network Services - Asset Preservation of National Roads - rehabilitation/Reconstruction/Upgrading - Secondary - Reconstruction fro Concrete to Concrete - Jct Tawad-Balud Rd. - K0035+202-K0036+000, K0061+012-K0061+199 (S00023MT) [Construction of Concrete Road]
Physical Target: 2.020 Lane Km
Unit Cost (P'000): P19,166.34/Lane Km
Est. Cost (P'000): P38,716
April 24, 2017 2017 WIN7E01061 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1- National Road Network Services: Network Development, Off - Carriageway Improvement including drainage, Secondary, Masbate-Cataingan-Placer Rd - K0003+967 - K0003+ 1316, K0004+593 - K0005+815 (S00005MT) (Shoulder Paving/Construction)
Physical Target: 7,710 Sq.m.
Unit Cost (P'000): P6.17/Sq.m.
Allocation (P'000): Php 47.560M


As MODIFIED:
MFO 1- National Road Network Services: Network Development, Off - Carriageway Improvement including drainage, Secondary, Masbate-Cataingan-Placer Rd - K0003+967 - K0003+ 1316, K0004+593 - K0005+815 (S00005MT) (Shoulder Paving/Construction)
Physical Target: 7,521 Sq.m.
Unit Cost (P'000): P6.32/Sq.m.
Est. Cost (P'000): Php 47.560M
April 24, 2017 2017 WIN7E01296 GAA 2017 RA 10924 January 1, 2017 Region III Regional Office III
Network Development - Road Upgrading (unpaved to paved) - Tertiary Rd - Bagac - Mariveles Road, K0177+500 - K0180+535.70, K0180+655.70 - K0182+126 (S01252LZ)
[Road Upgrading Gravel to Paved]
April 24, 2017 2017 WIN7E01074 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
AS per GAA:
MFO 1- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope
Collapse and Landslide —Secondary- Construction of Road Slope Protection Structure —Jct. Milagros-Baleno-Lagta Road — K0077+360 - K0077+453, K0079+895 - K0079+951, K0079+958 - 0080+082, K0089+439 -K0089+952
(S00016MT)
Physical Target: 2,320 Sq.m.
Unit Cost (P'000): P7.76/sq.m.
Allocation (P'000): Php 18,000


AS MODIFIED:
MFO 1- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope
Collapse and Landslide —Secondary- Construction of Road Slope Protection Structure —Jct. Milagros-Baleno-Lagta Road — K0077+360 - K0077+453, K0089+439 - K0089+952 (S00016MT)
Physical Target: 1,578.63 Sq.m.
Unit Cost (P'000): P11.40/sq.m.
Est. Cost (P'000): Php 18,000

April 24, 2017 2017 165003015400225 GAA FY 2017 January 1, 2017 Region II Batanes District Engineering Office
Network Development
Construction of Missing Gaps connecting National Roads, including ROW San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Road, BatanesLone District
Sta.00+00-Sta.00+601
April 24, 2017 2017 165003015800418 GAA FY 2017 January 1, 2017 Region II Batanes District Engineering Office
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis), Tertiary Roads: Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - (S00002ST) Chainage 0 - Chainage 099, K0007 + 427 - K0007 + 485, K0008 + 032 - K0008 + 171
April 24, 2017 2017 WIN7E01099 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO I- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide — Secondary- Construction of Road Slope Protection Structure — Masbate-Milagros Road — K0002+(-078) - K0002+315, K0003+423-K0004+1063, K0008+120 - K0008+319, K0008+373 - K0008+583, K0008+559 - K0008+573, K0008+635 - K0008+740, K0008+945 - K0009+069 (S00015MT)
Physical Target: 17,742 Sq.m.
Unit Cost (P'000): P2.25/sq.m.
Allocation (P'000): Php 40,000


As MODIFIED:
MFO I- National Road Network Services — Asset Preservation of National Roads — Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide — Secondary- Construction of Road Slope Protection Structure — Masbate-Milagros Road — K0002+(-078) - K0002+324, K0008+635- K0008+740 (S00015MT)
Physical Target: 3,587.45 Sq.m.
Unit Cost (P'000): P11.15/sq.m.
Est. Cost (P'000): Php 40,000



April 24, 2017 2017 165003030700086 GAA FY 2017 January 1, 2017 Region II Batanes District Engineering Office
Construction/ Improvement of Access Roads leading to Seaports
Access Road leading to Mauyen Port, Batanes
Sta.00+000-Sta.00+212