April 8, 2017 |
2017 |
WIN7G00970 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads of Zamboanga City - Labuan - Limpapa Road, Zamboanga City 1st LD (S01185MN)
Sect. 1: K1966+780 - K1967+588,
Sect. 2: K1967+633 - K1969+027,
Sect. 3: K1969+170 - K1970+180
Allocation:
Php 79.270 Million (Total)
Php 77,985.193.11 (Road Widening)
Php 1,284,806.89 (Road Acquisition)
Physical Target:
6.424 lane km (Road Widening)
1,284.81 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,139,662.69/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7C01507 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Dapitan River, Tutua - Polo Section along Dipolog - Oroquieta Road, Dapitan City, Zamboanga del Norte 1st LD
Left Side:
Beg. of Proj.: K0+000.00
End of Proj.: K0+642.00
Allocation:
Php 100.000 Million (Total)
Php 99,759,879.05 (Const. of Flood Control Structure)
Php 240,120.95 (ROW Acquisition)
Physical Target:
642.00 ln.m. (Const. of Flood Control Structure)
240.12 sq.m. (ROW Acquisition)
Unit Cost:
Php 155,389.22/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7C01508 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) Siocon - Sirawai - Sibuco - Limpapa Rd, Zamboanga del Norte 2nd DEO (S01165MN)
Chainage 3680 - Chainage 4280,
(K2114+680.00 - K2115+280.00)
Chainage 7880 - Chainage 8130
(K2118+880.00 - K2119+130.00)
Allocation:
Php 84.000 Million (Road Concreting)
Php 1,528,199.65 (ROW Acquisition)
Physical Target:
1.70 lane km (Road Concreting)
5,093 sq.m. (ROW Acquisition)
Unit Cost:
Php 48,512,823.74/lane km (Road Concreting)
Php 300.06/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G01140 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Revetment along Mapangi River Basin, Kapalaran - Salug River, Tambulig, Zamboanga del Sur
Sta. 0+000.00 - Sta. 0+950.00
Allocation:
Php 100.000 Million (Total)
Php 99,733,444.65 (Const. of Flood Control Structure)
Php 266,555.35 (ROW Acquisition)
Physical Target:
950.00 ln.m. (Const. of Flood Control Structure)
888.51 sq.m. (ROW Acquisition)
Unit Cost:
Php 104,982.57/ln.m. (Const. of Flood Control Structure)
Php 300.00/sq.m. (ROW Acquisition) |
April 7, 2017 |
FY 2017 |
WIN7E01206 |
UACS No. 165003014200189 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
Per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Secondary: Reconstruction from Concrete to Concrete: C-2 Road (S02319LZ) Chainage 537 – Chainage 1344.20 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200189
Physical Target / Cost
Per GAA / Original
Physical Target: 1.614 lane.km
Unit Cost: P18,587.36M/lane.km
Allocation: P30M
WIN7E01206
As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete including Drainage: C-2 Road (S02319LZ) Chainage 960.0 – Chainage 1344.0 Manila City (Reconstruction from Concrete to Concrete including Drainage)
UACS No. 165003014200189
As Modified
Per GAA / Original
Physical Target: 1.53 lane.km
Unit Cost: P19,607.84M/lane.km
Estimated Cost: P30M
WIN7E01206
|
April 6, 2017 |
2017 |
WIN7G00954 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Road Upgrading (Gravel to Paved) including ROW of Ipil Circumferential Road: Veterans - Tiayon - Don Andres Section, Zamboanga Sibugay 2nd LD,
K10+496.20 - K10+760.00,
K11+020.00 - K11+140.00,
K11+160.00 - K12+900.00
Allocation:
Php 91.200 Million (Total)
Php 82,549,172.60 (Road Concreting)
Php 8,650,827.40 (ROW Acquisition)
Physical Target:
4.248 lane km (Road Concreting)
28,836 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,432,479.43/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00960 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (unpaved to paved) of Rizal - Dakak - Dapitan Coastal Loop Road, Zamboanga del Norte 3rd DEO, (S01038MN)
K1844+200 - K1844+828,
K1844+903 - K1845+419,
K1845+518 - K1846+107,
K1846+390 - K1846+570,
K1846+630 - K1846+812,
K1847+043 - K1848+245,
K1848+286 - K1848+966,
K1849+069 - K1849+540
Allocation:
Php 125.850 Million (Total)
Php 123,850,000.00 (Road Concreting)
Php 2.000 Million (ROW Acquisition)
Physical Target:
8.898 lane km (Road Concreting)
2,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,918,858.16/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00930 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Construction of Bypasses/Diversion Roads including ROW, Construction of Airport - Turno - Sinaman By-Pass Road, Zamboanga del Norte 1st DEO,
Sta. 8+089.00 - Sta. 9+613.80
Allocation:
Php 100.000 Million (Total)
Php 95,132,569.69 (Gravel Road)
Php 4,867,430.31 (ROW Acquisition)
Physical Target:
3.0496 lane km (Gravel Road)
4,867 sq.m. (ROW Acquisition)
Unit Cost:
Php 31,195,084.50/lane km (Gravel Road)
Php 1,000.09/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00952 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO, (S01169MN)
Chainage 14610 - Chainage 16160,
Chainage 22024 - Chainage 23508.16
Allocation:
Php 100.000 M (Total)
Php 98.000 M (Road Concreting)
Php 2.000 M (ROW Acquisition)
Physical Target:
6.068 lane km (Road Concreting)
6,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,150,296.64/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00949 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage of National Roads at Ipil - Liloy - Sindangan Road, Zamboanga Sibugay 2nd DEO, (S01139MN)
K1998+120 - K1999+905.51
Allocation:
Php 52.298 Million (Total)
Php 48,865,245.02 (Road Widening)
Php 3,432,754.98 (ROW Acquisition)
Physical Target:
3.57102 lane km (Road Widening)
11,442 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,683,834.04/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00964 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage Dipolog - Sindangan - Liloy Road, Zamboanga del Norte 1st DEO, (S01057MN)
K1848+877.00 - K1852+971.70,
K1852+979.82 - K1853+220.53
Allocation:
Php 130.414 Million (Total)
Php 128,458,518.15 (Widening of Road)
Php 1,955,481.85 (ROW Acquisition)
Physical Target:
8.67 lane km (Widening of Road)
6,518 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,816,438.08/lane km (Widening of Road)
Php 300.01/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00962 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads, Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
Sect. 1: K1970+180.00 - K1971+130.00,
Sect. 2: K1971+433.00 - K1972+065.92
Allocation:
Php 58.121 Million (Total)
Php 44,940,148.92 (Road Widening)
Php 13,180,851.08 (ROW Acquisition)
Physical Target:
3.16548 lane km (Road Widening)
13,180 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,196,946.09/lane km (Road Widening)
Php 1,000.06/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00963 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Unpaved to Paved) of Siocon - Sirawai - Sibuco - Limpapa Road, Zamboanga del Norte 2nd DEO, (S01165MN)
Chainage 9380 - Chainage 9995
(K2120+380.00 - K2120+995.00)
Allocation:
Php 98.400 M (Total)
Php 98,004,621.72 (Road Concreting)
Php 395,378.28 (ROW Acquisition)
Physical Target:
1.23 lane km (Road Concreting)
1,317 sq.m. (ROW Acquisition)
Unit Cost:
Php 79,678,554.24/lane km (Road Concreting)
Php 300.21/sq.m. (ROW Acquisition) |
April 5, 2017 |
FY 2017 |
WIN7E01142 |
UACS No.165003014300245 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary/ Reconstruction from Concrete to Concrete – H. Lopez Blvd – K0006+379 – K0007+020 (Reconstruction from concrete to concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
Original: 0.19 ln-km
Unit Cost (P’000): P105,263.16/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS-HDM-4 – Tertiary – H. Lopez Blvd – K0006+383.50 – K0006+611.25 (Reconstruction from Concrete to Concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
New: 0.227/km; 0.911ln-km (4-lanes)
Unit Cost (P’000): P21,953.89/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142
|
April 5, 2017 |
FY 2017 |
WIN7E01139 |
UACS No. 292003020401923 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall including pumping station at North Estero de Maypajo, Tondo (Construction of Flood Mitigation Structure)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 111 lm
Unit Cost (P’000): P360.36/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139
New
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall at North Estero de Maypajo, Tondo (Construction of Revetment)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 110.6 lm
Unit Cost (P’000): P361.664/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139
|
April 5, 2017 |
FY 2017 |
WIN7E01137 |
UACS No. 165003014200188 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading – Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 301.90 (Reconstruction from Concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
Original: 1.812 ln-km
Unit Cost (P’000): P4,415.01/ln-km
Allocation: (P’000): P8,000.0
Reference No.: WIN7E01137
New
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on PMS/HDM-4- Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 255 (Reconstruction from concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
New: 1.53 ln-km
Unit Cost (P’000): P5,228.76/ln-km
Estimated Cost (P’000): P8,000.0
Reference No.: WIN7E01137
|
April 5, 2017 |
FY 2017 |
WIN7E01180 |
UACS No. 16004050306740 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage, Pulang Lupa 1, Las Piñas City (Improvement)
UACS No. 165004050306740
Physical Target/Cost (P’000):
Original: 1.0 km
Unit Cost (P’000): P 10M/km
Allocation (P’000): P10M
Ref. No. WIN7E01180
As Modified
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage at (Mapayapa), Pulang Lupa 1, Las Piñas City (Improvement/Upgrading of Drainage Structure along Road)
UACS No. 165004050306740
Physical Target/Cost (P’000):
As modified .553 lane.km
Unit Cost (P’000): P 18,083.18M/lane.km
Allocation (P’000): P10M
Ref. No. WIN7E01180
|
April 5, 2017 |
2017 |
WIN7G00902 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Eastern Bobongan - Sominot - Midsalip - Dumingag Rd., Zamboanga del Sur 1st DEO, (S01325MN),
K1677+410.00 - K1679+740.00,
K1672+780.00 - K1674+230.00,
Allocation:
Php 150.000 M (Total)
Php 149,390,948.50 (Road Concreting)
Php 609,051.49 (ROW Acquisition)
Physical Target:
7.56 lane km. (Road Concreting)
2,030.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,760,707.47/lane km. (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00951 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - along N1: Road Widening including Drainage of National Roads along N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1770+539.00 - K1773+295.87,
K1773+323.83 - K1775+094.29
Allocation:
Php 136.168 Million (Total)
Php 131,167,999.90 (Road Widening)
Php 5,000,000.00 (ROW Acquisition)
Physical Target:
9.054 lane km. (Road Widening)
16,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,487,298.42/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00928 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO (S01059MN),
Chainage 15799 - Chainage 16899
(Sta. 1944+640 - Sta. 1945+740)
Allocation:
Php 120.00 Million (Total)
Php 119,532,198.60 (Road)
Php 467,801.37 (ROW Acquisition)
Physical Target:
2.20 lane km. (Road)
1,559.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 54,332,817.55/lane km. (Road)
Php 300.00 sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00929 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN),
K1936+955.60 - K1937+779.11,
K1937+819.49 - K1938+030.02,
K1938+970.07 - K1941+015.65,
K1941+995.51 - K1943+485.54
Allocation:
Php 119.081 Million (Total)
Php 118,265,737.80 (Road Concreting)
Php 815,262.20 (ROW Acquisition)
Physical Target:
9.06 lane km. (Road Concreting)
2,717.54 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,053,613.44/lane km. (Road Conreting)
Php 300/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00965 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads, including ROW:
Road Upgrading (Gravel to Paved) of Jct. Nat'l Highway Siocon - Jct. Nat'l Highway R.T. Lim, Poblacion Siocon - Brgy. Tagaytay Section, Zamboanga del Norte 2nd DEO,
Sect. 1: Sta. 0+000.00 - Sta. 3+279.38,
Sect. 2: Sta. 4+683.45 - Sta. 6+640.00
Allocation:
Php 150.000 Million (Total)
Php 147,954,500.40 (Road Concreting)
Php 2,045,499.60 (ROW Acquisition)
Physical Target:
10.472 lane km. (Road Concreting)
6,818 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,128,581.02/lane km. (Road Concreting)
Php 300.01 sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00938 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Liloy – Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2029+550.00 – K2030+253.74,
K2030+386.83 – K2031+957.31,
K2032+367.31 – K2033+520.00,
Allocation:
Php 150.000 Million (Total)
Php 149,727,250.24 (Road Concreting)
Php 272,749.76 (ROW Acquisition)
Physical Target:
6.854 lane km (Road Concreting)
909.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,845,236.39/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
|
April 5, 2017 |
2017 |
WIN7G00906 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Labason River Control, Poblacion, Labason, Zamboanga del Norte 3rd LD,
Right Side - K0+000.00 - K0+441.32, K0+752.84 - K0+884.40,
Left Side - K0+540.00 - K0+878.28
Allocation:
Php 100.00 Million (Total)
Php 97,823,648.49 (Flood Mitigation Structure)
Php 2,176,351.51 (ROW Acquisition)
Physical Target:
911.16 lm (Flood Mitigation Structure)
7,254.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 107,361.66/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
|
April 5, 2017 |
2017 |
WIN7G00905 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River Control along Kipit River, Brgy. Kipit, Labason, Zamboanga del Norte 3rd LD,
Upstream-Left Side - K0+270.00 - K0+785.00,
Downstream-Right Side - K0+000.00 - K0+400.00
Allocation:
Php 95.00 Million (Total)
Php 94,810,985.74 (Flood Mitigation Structure)
Php 189,014.26 (ROW Acquisition)
Physical Target:
915.00 lm (Flood Mitigation Structure)
630.05 sq.m. (ROW Acquisition)
Unit Cost:
Php 103,618.56/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00948 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte, 2nd DEO, (S01153MN)
K1975+860 - K1978+860,
Allocation:
Php 89.711 Million (Total)
Php 87,994,572.86 (Road Widening)
Php 1,716,427.14 (ROW Acquisition)
Physical Target:
6.00 lane km. (Road Widening)
5,721.42 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,665,762.14/lane km. (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00904 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Secondary Road -
Improvements/Widening of National Roads of Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
K1957+427.00 - K1957+674.80,
K1957+750.00 - K1957+980.00,
K1964+400.00 - K1966+780.00
Allocation:
Php 71.73 Million (Total)
Php 69,395,311.78 (Road Widening)
Php 2,334,688.22 (ROW Acquisition)
Physical Target:
5.7156 lane kms. (Road Widening)
2,334.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,141,387.04/lane km. (Road Widening)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00945 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Primary Roads:
Road Widening including Drainage of National Roads - N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1775+158.78 - K1776+923.25,
K1776+950.55 - K1777+366.00
Allocation:
Php 63.832 Million (Total)
Php 58,911,369.76 (Road Widening)
Php 4,920,630.24 (ROW Acquisition)
Physical Target:
4.36 lane km. (Road Widening)
16,402 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,511,782.06/ lane km. (Road Widening)
Php 300/sq.m. (ROW Acquisition) |
April 5, 2017 |
GAA FY 2017 |
WIN7G01195 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Davao-Cotabato Old Road including RROW -
K1526+(-)432 - K1526+301
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage and RROW at Davao-Cotabato Old Road, Toril District, Davao City
K1526+(-)432 - K1526+301
ALLOCATION: Php 33.00 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01196 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Construction of Road Slope Protection Structure - Davao-Bukidnon Rd -
K1641+782 - K1641+792,
K1645+115 - K1645+135,
K1664+150 - K1664+190,
K1655+830 - K1655+850
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Rehab./Reconstruction of National Roads with Slips, Slope Collapses and Landslide along Davao-Bukidnon Road -
K1641+890 - K1641+990(L/S),
K1645+090 - K1645+160(R/S),
K1645+120 - K1645+170(L/S),
K1655+890 - K1655+930(R/S),
K1664+130 - K1664+218(L/S)
ALLOCATION: Php 42.652 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01197 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Bayabas-Eden Rd -
K1528+393 - K1530+295
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Bayabas-Eden Road, Toril District, Davao City
K1528+393 - K1530+280.715
ALLOCATION: Php 30.786 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01198 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Bayabas-Eden Rd,
K1526+(-)368 - K1526+198
TO: MFO1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage at Bayabas-Eden Road, Toril District, Davao City
K1526+(-)320 - K1526+035
ALLOCATION: Php 15.00 Million |
April 4, 2017 |
FY 2017 |
WIN7E01120 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+970 - K0352+035, K0351+950 - K0352+055 [Construction of Slope Protection Structure] ; Physical Target = 2,565 sq.m.
To : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+950 - K0352+363 [Construction of Slope Protection Structure] ; Physical Target = 4,706 sq.m. |
April 4, 2017 |
FY 2017 |
WIN7E01121 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 500 lm
To : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 406 lm |
April 3, 2017 |
FY 2017 |
WIN7E01145 |
UACS No. 103004010310027 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As Per GAA
Locally-Funded Projects: Buildings and Other Structures: Multipurpose/Facilities: Construction of Multipurpose Building, (Police and Fire Station), and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost (P’000):
Original: 1 bldg
Allocation (P’000): P4.000 M
Unit Cost (P’000): P 4,000/bldg..
Ref. No. WIN7E01145
As Modified
Locally-Funded Projects: Buildings/Other Structures: Multipurpose/Facilities: Completion of Multi-Purpose Building (Police and Fire Station) and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost:
New: 1 bldg
Estimated Cost (P’000): P4.000 M
Unit Cost (P’000): P4,000/bldg.
Ref. No. WIN7E01145
|
April 3, 2017 |
FY 2017 |
WIN7E01143 |
UACS No. 103004010310029 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
Per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-purpose Building, Pulanglupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
Original: 1 bldg
Unit Cost (P’000): P4,000.0
Allocation (P’000): P4,000.0
Ref. No. WIN7E01143
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Doña Julita, Pulang Lupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01143
|
April 3, 2017 |
FY 2017 |
WIN7E01134 |
UACS No. 103004010310031 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01134
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at BF Phase 3, West Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01134
|
April 3, 2017 |
FY 2017 |
WIN7E01135 |
UACS No. 103004010310033 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01135
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Moonwalk Phase 2, Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0/Bldg.
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01135
|
April 3, 2017 |
FY 2017 |
WIN7E01138 |
UACS No. 103004010309894 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
Original: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Phase I), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
New: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
|
April 3, 2017 |
2017 |
165003014100119 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES, Asset Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) , SANTIAGO-TUGUEGARAO RD - K0 424+142 – K0424+670, K0425+000 - K0 425+721, K0 430+000 – K0 431+000, K0 431+298.4 - K0 431+ 348.4, K0 431+360 –K0431+400, K0 431+430 - K0 431+506, K0 431+520 - K0 431+ 542.50, K0 431+620 – K0 432+000, K0 432+240- K0 432+316, K0 432+379 – K0 432+430, K0 433+193.5- K0 433+260 |
April 3, 2017 |
2017 |
165003014700074 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Construction of Drainage Structure along Road-Daang Maharlika (LZ)- K0427+327-K0428+005 (R/S); K0427+327-K0427+617 (L/S) |
April 3, 2017 |
2017 |
165003015100256 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
MFO1: National Road Network Services, Network Development, Improvement/Widening of National Roads-Secondary, Road Widening and Reconstruction of Existing PCCP (thk. = 0.15m), Cabagan-Sta. Maria Road, K0452+282-K0452+400 |
April 3, 2017 |
2017 |
103004010310715 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Completion of Multi-Purpose Building, Calinaoan Centro, Sto. Tomas, Isabela |
March 31, 2017 |
2017 |
103004010310800 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Nueva Vizcaya District Engineering Office |
Locally Funded Project:
Local Infrastructure Program:
Buildings and Other Structures: Multipurpose/Facilities:
Construction of MultiPurpose Bldg., Ambaguio Central School, Ambaguio, Nueva Vizcaya |
March 31, 2017 |
2017 |
WIN7E01102 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation of National Roads
Construction/Upgrading/Rehabilitation of Drainage along National Roads
Secondary Roads
Rehabilitation/Major Repair of Drainage Structure along Road - Olongapo - Bugallon Rd
K0181+563 - K0182+160
Cabangan, Zamabales
(Rehabilitation/Major Repair of Drainage Structure along Road) |
March 31, 2017 |
2017 |
WIN7E01047 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Flood Control and Drainage
Drainage/Protection Works
Construction of Slope Protection/Flood Control at Sto. Niño River Dike,
Sta. 0+469 to Sta. 0+721
Cabangan, Zambales
(Construction of Slope Protection) |
March 31, 2017 |
2017 |
WIN7E01104 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Roads and Bridges - Local Roads
Concreting of Namanaan Road located at San Narciso, Zambales
(Construction of Concrete Road) |
March 31, 2017 |
2017 |
165003015200106 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary – (Tuao-Rizal Section) K0530+(-1771)-K0531+499 |
March 31, 2017 |
2017 |
165003015800420 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
MFO-1 National Road Network Services- Network Development - Road Upgrading (unpaved to paved) - Tertiary Road Upgrading Gravel to Paved- Ayaga-Sta. Marcela-Flora- Lasam Rd. K0670 +(-806) – K0670+311,K0670+314-K0671 + 047, Chainage 1292-Chainage 2368, Chainage 2388- Chainage 3472 |
March 31, 2017 |
2017 |
165003030800329 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination - Our Lady of Piat Diversion Road including Bridge and Approaches, Piat, Cagayan |
March 31, 2017 |
2017 |
103004010310681 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures, Multipurpose Facilities, Construction/Completion of Multi-Purpose Building, Bilibigao, Claveria, Cagayan |
March 31, 2017 |
GAA FY 2017 |
WIN7G00977 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services: Network Development -
Off-Carriageway Improvement including drainage - Tertiary
Demoloc-Little Baguio-Alabel Road, Malita, Davao Occidental Lone District -
K1639+200 - K1639+621,
K1639+621 - K1642+442
TO: MFO 1 - National Road Network Services: Network Development -
Off-Carriageway Improvement including drainage -Tertiary
Demoloc Little Baguio-Alabel Road, Malita, Davao Occidental Lone District -
K1639+200 - K1639+621,
K1639+621 - K1642+280, (S00203MN)
ALLOCATION: Php 46.827 Million |
March 31, 2017 |
GAA FY 2017 |
WIN7G00979 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Rd including RROW -
K1658+700 - K1660+347,
K1660+742 - K1662+000
TO: FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Road including RROW (Demoloc Section), Davao Occidental Lone District -
K1658+700 - K1660+347,
K1660+742 - K1661+372, (S00203MN)
ALLOCATION: Php 99.770 Million |
March 31, 2017 |
GAA FY 2017 |
WIN7G00980 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Gravel Road - Demoloc-Little Baguio-Alabel Road including ROW, Davao Occidental
TO: MFO 1- National Road Network Services:
Network Development - Construction of Missing Gaps connecting National Roads, including RROW -
Demoloc-Little Baguio-Alabel Road including RROW, Malita, Davao Occidental Lone District
ALLOCATION: Php 49.90 Miliion |
March 31, 2017 |
GAA FY 2017 |
WIN7G00981 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: MFO 1- National Road Network Services: Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Paved) of Demoloc-Little Baguio-Alabel Road including RROW,
K1663+000 - K1665+184
TO: MFO 1- National Road Network Services: Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Demoloc-Little Baguio-Alabel Road including RROW (Demoloc Section), Davao Occidental Lone District -
K1661+372 - K1662+000,
K1663+000 - K1664+320 (S00203MN)
ALLOCATION: Php 87.360 Million |
March 30, 2017 |
2017 |
165003015400138 |
SR2017-02-002711 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Newtwork Development: Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, San Miguel Proper (Surigao del Sur)-Calaitan (Bayugan), Package 2, Surigao del Sur |
March 30, 2017 |
2017 |
165003030800298 |
SR2017-02-003040 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations : Construction/Improvement of Access Roads leading to Declared Tourism Destinations, NRJ-Cumawas-Tinuy-an Falls Road, Borboanan, Bislig City, Surigao del Sur |
March 30, 2017 |
2017 |
165003015400103 |
SR2017-02-002610 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Bdry. Bukidnon/Agusan Del Norte, Agusan Del Norte 1st LD, Package 2 |
March 30, 2017 |
2017 |
165003015400104 |
SR2017-02-002613 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Bdry. Bukidnon/Agusan Del Norte, Agusan Del Norte 1st LD, Package 3 |
March 30, 2017 |
2017 |
165003017100102 |
SR2017-02-002963 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Construction and Maintenance of Bridges along National Roads: Widening of Permanent Bridges to more than 2 lanes, including ROW - Taguibo Br. (B00820MN) along Daang Maharlika (Surigao-Agusan Sect.) (Phase II) |
March 30, 2017 |
2017 |
165003015400114 |
SR2017-02-002616 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Network Development: Construction of Missing Gaps connecting National Roads, including ROW - Butuan City-Pianing-Tandag Rd (Tandag Section), Surigao del Sur |
March 30, 2017 |
2017 |
WIN7E01041 |
GAA 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung Rive, Brgy. Sta. Cruz Section, Left Bank, Sta. 3+530 to Sta. 3+786.80, Concepcion, Tarlac (Rehabilitation/Major Repair of Flood Control Structure) |
March 30, 2017 |
2017 |
WIN7E01070 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River, D/S of Santiago Bridge, R/S Sta. (-4) +589.20 - Sta. (-)5+000 (Construction of Dike) |
March 30, 2017 |
2017 |
WIN7E01021 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River, Upstream of San Nicolas Section, R/S, Concepcion, Tarlac
Sta. (-)2+200 - Sta. (-)2+694.40
(Construction of Dike) |
March 30, 2017 |
2017 |
WIN7E01095 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Parua River, Barangay San Vicente Section,
Sta. 8+865 to Sta. 9+165 and Sta. 9+186 to Sta. 9+370.80
(Rehabilitation/Major Repair of Flood Control Structure) |
March 30, 2017 |
2017 |
WIN7E01063 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Lucung River (Left Bank)
Sta. 0+765 to Sta. 0+935.61
(Rehabilitation/Major Repair of Flood Control Structure) |
March 30, 2017 |
2017 |
WIN7E01022 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Restoration of Eroded Embankment of Existing Dike along Maet Creek, Right Bank (San Isidro Section), La Paz, Tarlac
Sta. 0+000 - Sta. 0+27
(Construction of Flood Mitigation Structure) |
March 30, 2017 |
2017 |
WIN7E01014 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Protective dike along Bangut River, Left Bank, U/S of Bangut Bridge, Sta. (-)1+152 - Sta. (-)1+766.40
(Construction of Dike) |
March 30, 2017 |
2017 |
WIN7E01064 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation/Improvement of Existing Dike along Marimla River, Left Bank,
Sta. 0+258 - Sta. 0+630, Sta. 0+033 - Sta. 0+089.80,
Sta. 0+033 - Sta. 0+129
Bamban, Tarlac
(Rehabilitation/Major Repair of Flood Control Structure) |
March 30, 2017 |
2017 |
WIN7E01023 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along Manila North Road, K0102+799 - K0102+803; K0108+906 - K0110+000; K0111+000 - K0111+291
(Construction of Drainage Structure along Road) |
March 30, 2017 |
2017 |
WIN7E01103 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Roads and Bridges - Locals Roads
Concreting of road at Brangay Cut-cut I, Capas, Tarlac
(Construction of Concrete Road) |
March 28, 2017 |
FY 2017 |
WIN7E01060 |
UACS PAP 165003014300241 |
December 22, 2016 |
National Capital Region |
North Manila District Engineering Office |
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management – 4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Alfonso St., Chainage 489.0 – Chainage 696.0 (Reconstruction from concrete to concrete)
UACS No. 165003014300241
Physical Target/Cost:
Original: 0.414 lane km
Allocation (P’000): P7,000
Unit Cost (P’000): P16,908/lane km
Ref. No. WIN7E01060
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Road including drainage based on Pavement Management System/Highway Development and Management – 4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Alfonso Mendoza St. Chainage 508.90 – Chainage 688.60, Sta. Cruz, Manila, S02250LZ (Reconstruction: Concrete to Concrete including Raising of Grade)
UACS No. 165003014300241
Physical Target/Cost:
Modified: 0.53 lane km (179.7m – 3 lane km)
Allocation (P’000): P7,000
Unit Cost (P’000): P13,208/lane km
Ref. No. WIN7E01060
|
March 28, 2017 |
FY 2017 |
WIN7E01113 |
UACS PAP 165003014200193 |
December 22, 2016 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – R-10 – K0005+424.90 – K0005+978.70 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200193
Physical Target/Cost:
Original: 2.216 lane km
Allocation (P’000): P15,000
Unit Cost (P’000): P6,769/lane km
Ref. No. WIN7E01113
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – R-10 – K0005+424.90 – K0005+424.90 – K0005+641.90, S02379LZ, Tondo, Manila
(Reconstruction from concrete to concrete including drainage improvement)
UACS No. 165003014300241
Physical Target/Cost:
Modified: 1.32 lane km (217m – 6 lane)
Estimated Cost (P’000): P15,000
Unit Cost (P’000): P11,521/lane km
Ref. No. WIN7E01113
|
March 28, 2017 |
FY 2017 |
WIN7E01112 |
UACS PAP 165003014200190 |
December 22, 2016 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete – J Rizal Ave – K0003+-195 – K0003+259.1 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200190
Physical Target/Cost:
Original: 0.908 lane km
Allocation (P’000): P5,000
Unit Cost (P’000): P5,507/lane km
Ref. No. WIN7E01112
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Secondary: J Rizal Ave K0003+-168.80 – K0003+046.50, Sta. Cruz, Manila, S02407LZ (Reconstruction from Asphalt to Concrete, Repair/ Rehabilitation of Drainage Structures)
UACS No. 165003014200190
Physical Target/Cost:
Modified: 0.431 lane km
Estimated Cost (P’000): P5,000
Unit Cost (P’000): P11,601/lane km
Ref. No. WIN7E01112
|
March 28, 2017 |
FY 2017 |
WIN7E01114 |
UACS PAP 165003014300251 |
December 22, 2016 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary Road: Reconstruction from Concrete to Concrete – Sn Rafael St – Chainage 0 + Chainage 197 (Reconstruction from Concrete to Concrete
UACS No. 165003014300251
Physical Target/Cost:
Original: 0.394 lane km
Allocation (P’000): P5,000
Unit Cost (P’000): P12,690/lane km
Ref. No. WIN7E01114
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Sn Rafael St. – Chainage 125.00 – Chainage 234.00, Tondo, Manila, S02334LZ
UACS No. 165003014300251
Physical Target/Cost:
Modified: 0.237 lane km (109 m – 3 lane)
Estimated Cost (P’000): P5,000
Unit Cost (P’000): P15,291/lane km
Ref. No. WIN7E01114
|
March 28, 2017 |
FY 2017 |
WIN7E0111 |
UACS PAP 165003014300249 |
December 22, 2016 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway-4 – Tertiary Road: Reconstruction from Concrete to Concrete – Muelle dela Industria – K0003+595 – K0004+472, San Nicolas, Manila S02261LZ (Reconstruction from concrete to concrete)
UACS No. 165003014300249
Physical Target/Cost:
Original: 1.754 lane km
Allocation (P’000): P27,027
Unit Cost (P’000): P15,409/lane km
Ref. No. WIN7E01111
Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary Road: Muelle dela Industria – K0003+866.30 – K0004+470, San Nicolas, Manila, S02261LZ (Rehabilitation of Concrete Road, Repair/Rehabilitation of Drainage Structures)
UACS No. 165003014300249
Physical Target/Cost:
Modified: 1.21 lane km
Estimated Cost (P’000): P27,027
Unit Cost (P’000): P22,336/lane km
Ref. No. WIN7E01111
|
March 28, 2017 |
2017 |
165003016900024 |
GAA FY2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development – Off-Carriageway Improvement including Drainage – Jct. Gattaran-Cumao-Capissayan-Sta Margarita- Bolos Point Rd, Barangay Dummun – Palagao Norte, Gattaran, Cagayan K0544+(-903.65) - K0544+(-835.37), K0544+(-832.85)-K0544+(-493.40), K0544+(-488.90)-K0544+(-359.58), K0544+(-355.92)-K0544+(-297.88), K0544+(-194.22)-K0544+044.75, K0544+555.05-K0544+776.05, K0544+780.35-K0544+917, K0544+966 - K0544+970.35, K0545+511.45-K0545+621.32, K0545+616.75-K0545+904.10, K0545+906-K0546+381.90, K0546+376.60-K0546+581.30, K0544+051.70-K0544+109 R/S, K0544+161 - K0544+214.95 (R/S), K0544+218.18-K0544+218.45 R/S, K0544+281.05-K0544+551.25 R/S, K0544+975.45-K0545+316.35 R/S, K0546+604.55-K0547+185 R/S, K0547+343-K0547+904.95 R/S, K0544+051.60-K0544+212.35 L/S, K0544+273-K0544+551.60 L/S, K0544+970.35-K0545+306.55 L/S, K0545+501-K0545+505.77 L/S, K0546+596.20-K0547+197.40 L/S, K0547+348.50-K0547+852.30 L/S, K0547+852.30-K0548+213.30, K0548+291-K0549+288, K0549+338-K0550+321, K0550+408-K0550+996, K0551+038-K0551+431, K0551+486-K0552+295 |
March 28, 2017 |
2017 |
165003016900023 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development – Off-Carriageway Improvement including Drainage – Baybayog – Baggao – Dalin – Sta Margarita Rd, Barangay Centro – Assasi, Baggao, Cagayan K0524+000-K0524+730, K0524+745.60-K0525+031, K0525+401-K0527+964.50 (L/S), K0525+401-K0527+694.50 (R/S), K0527+865.10-K0527+965.50 (R/S), K0532+635-K0533+160 |
March 28, 2017 |
2017 |
165003013800087 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Primary Daang Maharlika (LZ) – K0348 + 456.30 - K0349 + 667, K0358 + 956.50 - K0359 + 005.50, K0360 + 806.60 - K0361 + 122, K0366 + 000 - K0366 + 211.50, K0373 + 180 - K0374 + 003.80, K0374 + 993.70 - K0375 + 054 |
March 28, 2017 |
2017 |
165003013800088 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Asset Preservetion of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) – Primary Santiago-Tuguegarao Rd - K0346 + 751 - K0348 + 421.80 |
March 28, 2017 |
2017 |
165003014100123 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Primary - Santiago-Tuguegarao Rd - K0356 + 611 - K0357 + 000 |
March 28, 2017 |
2017 |
165003016600123 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Santiago-Tuguegarao Rd - K0342 + -039 - K0343 +884 |
March 28, 2017 |
2017 |
165003016600122 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Network Development – Improvement /Widening of National Roads – Cauayan - Cabatuan Rd – K0373 + 472 - K0375 + 549 |
March 27, 2017 |
FY 2017 |
WIN7E01115 |
PPA292003020402049 |
December 22, 2016 |
National Capital Region |
South Manila District Engineering Office |
Per GAA
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Improvement of MIA Road Outfall from Tambo Bridge to Nayong Pilipino Creek, Pasay City. (Construction of Flood Mitigation Structure)
UACS No.: 292003020402049
Physical Target/Cost:
Per GAA/Original
Physical Target: 588 lm
Unit Cost (P’000): P68.02T/lm
Allocation : P40.0 M
Ref. No. WIN7E01115
As Modified
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Improvement of MIA Road and Vicinity and Outfall from Tambo Bridge to Nayong Pilipino Creek, Pasay City. (Construction of Flood Mitigation Structure)
Physical Target/Cost:
As Modified
Physical Target: 588 lm
Unit Cost (P’000): P68.02T/lm
Estimated Cost : P40.0 M
Ref. No. WIN7E01115
|
March 27, 2017 |
2017 |
WIN7E01059 |
Approved FY 2017 Modification |
March 14, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Balili, Bontoc Ili, Sta. 039+493 - 039+906, 040+270 - 040+534, 040+646 - 040+720, 040+740, Bontoc, Mountain Province (Construction of Flood Mitigation Structure)
Physical Target = 953.00 lm
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Balili, Bontoc Ili, Sta. 039+800 - 039+906, 040+270 - 040+530, 040+646 - 040+726, 040+740', 040+740 - 040+850, Bontoc, Mountain Province (Construction of Flood Mitigation Structure)
Physical Target = 648.00 lm |
March 27, 2017 |
2017 |
WIN7E01052 |
Approved FY 2017 Modification |
March 13, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control along Chico River, Gonogon, Sta. 041+190 - 042+600, 041+520 - 041+620, 042+533 - 042+773, 045+203 - 045+583, Bontoc, Mt. Province (Construction of Flood Mitigation Structure) ; Physical Target = 941 ln.m
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control along Chico River, Gonogon, Sta. 041+190 - 041+500, 041+520 - 041+620, 042+533 - 042+773, 045+357 - 045+489, Bontoc, Mt. Province (Construction of Flood Mitigation Structure) ; Physical Target = 692 ln.m
|
March 27, 2017 |
2017 |
WIN7E01049 |
Approved FY 2017 Modification |
March 10, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Tay-ok Flood Control with Protection Wall, Poblacion, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 500 lm
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Tay-ok Drainagel with Protection Wall, Poblacion, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 200 lm
|
March 27, 2017 |
2017 |
WIN7E01050 |
Approved FY 2017 Modification |
March 13, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Taed, Sta. 030+060 - 032+378, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 297.00 lm
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control along Chico River, Taed, Sta. 030+183 - 030+409, Bontoc, Mountain Province (Construction of Flood Mitigation Structure) ; Physical Target = 225 lm
|
March 27, 2017 |
2017 |
WIN7E01053 |
Approved FY 2017 Modification |
March 13, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures, Multipurpose/ Facilities, Construction of Multi-Purpose Building, Abatan, Bauko, Mt Province (Construction of Multi-Purpose Building) ; Physical Target = 1 bldg
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures, Multipurpose/ Facilities, Construction (Completion) of Multi-Purpose Building, Abatan, Bauko, Mt Province (Construction of Multi-Purpose Building) ; Physical Target = 1 bldg
|
March 26, 2017 |
GAA FY 2017 |
WIN7G00978 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary
Widening (4 into 6 Lanes) of Davao-Bukidnon Road Including RROW, Davao City,
K1700+312 - K1701+000,
K1701+000 - K1701+450,
K1701+450 - K1701+970
TO: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary
Widening (4 into 6 Lanes) of Davao-Bukidnon Road Including RROW, Brgy. Catalunan Pequeño-Brgy. Talomo Section, Davao City 1st LD
K1700+312 - K1700+838,
K1700+981 - K1701+945, (S01409MN)
ALLOCATION: Php 137.665 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00983 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1- National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Slope Protection and RROW - Pres.Diosdado P. Macapagal Natl Hi-way -
K1725+860 - K1728+580
TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Other Primary -
Widening (2 into 4 lanes) of Pres. Diosdado P. Macapagal Natl Hi-way including Slope Protection and RROW, Brgy. Badas Section, Davao Oriental 2nd LD -
K1725+860 - K1727+572, (S01448MN)
ALLOCATION: Php 115.446 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00986 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of ByPasses/ Diversion Roads, including ROW -
Construction of Concrete Road - Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge, Road Slope Protection, Rehabilitation of Concrete Road and RROW, Davao City (Package 6)
TO: MFO 1 - National Road Network Services:
Network Development - Construction of ByPasses/ Diversion Roads, including ROW -
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Construction of Udiongan Bridge and RROW, Davao City (Package 6)
ALLOCATION: Php 240.448 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00987 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Improvement/ Widening of National Roads - Secondary -
Widening (4-5 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1507+640 - K1507+850,
K1510+905 - K1510+937,
K1510+937 - K1511+200,
K1511+200 - K1511+780,
K1511+780 - K1511+950
TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Secondary -
Widening (4-5 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Ma-a-Brgy. Matina Crossing, Davao City 1st LD,
K1510+905 - K1510+937,
K1510+937 - K1511+200,
K1511+200 - K1511+780,
K1511+780 - K1511+950, (S00013MN)
ALLOCATION: Php 165.123 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00991 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Paved) of Montevista - DNAS Rd, Compostela Valley 1st LD
K1426+917 - K1428+090,
K1428+860 - K1430+286,
K1430+286 - K1431+753
TO: FROM: MFO 1 - National Road Network Services:
Network Development - Road Upgrading (unpaved to paved) - Tertiary
Road Upgrading (Gravel to Concrete) of Montevista-DNAS Road, Brgy. Camansi-Brgy.Prosperidad Section, Compostela Valley 1st LD
K1426+917 - K1428+090,
K1428+860 - K1430+286,
K1430+286 - K1431+140, (S00130MN)
ALLOCATION: Php 157.440 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00992 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development-Improvement/Widening of National Roads - Other Primary -
Road Widening - Davao-Bukidnon Road including Road Slope Protection and RROW, Davao City
K1621+708 - K1623+661
TO: MFO 1 - National Road Network Services:
Network Development-Improvement/Widening of National Roads- Other Primary -
Widening (2 into 4 lanes) of Davao-Bukidnon Road including RROW, Brgy. Buda Section, Davao City 3rd LD
K1621+708 - K1623+661, (S01406MN)
ALLOCATION: Php 112.973 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00993 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development-Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Gravel Road - Mawab-Maragusan-Caraga Road, Sitio Tagdalongdong-Brgy. Langawisan Section incl. Bridge and ROW, Compostela Valley
TO: MFO 1 - National Road Network Services
Network Development-Construction of Missing Gaps connecting National Roads, including ROW -
Construction/Opening/Concreting of Mawab-Maragusan- Caraga Road, Sitio Tagdalongdong-Brgy. Langawisan Section Including Construction of Tagdalongdong I and II Bridges and ROW, Compostela Valley
ALLOCATION: Php 300.000 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00994 |
GAA FY 2017 R.A. 10924 |
January 1, 2016 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Primary Roads N1
Road Widening - Davao-Cotabato Road (Davao City - Jct. Digos Section) including Rehabilitation of Damaged Pavement and RROW, Davao Del Sur,
K1554+273 - K1554+393,
K1554+393 - K1555+150,
K1555+150 - K1555+1044
TO: MFO 1 - National Road Network Services:
Network Development - Improvement/Widening of National Roads - Primary Roads N1
Widening (2-4 into 6 lanes) of Davao-Cotabato Road (Davao City - Jct. Digos Section) including Rehabilitation/Reconstruction of Damaged Pavement and RROW, Tagabuli-Bato & Sinawilan Sections, Davao Del Sur Lone District,
K1554+273 - K1554+393,
K1554+393 - K1555+150,
K1555+150 - K1555+1044,
K1558+650 - K1559+350,
(S00162MN)
ALLOCATION: Php 235.488 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00996 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (MN) Including RROW, Davao City
K1484+-979 - K1484+-844, K1489+857 - K1489+1082, K1489+1082 - K1490+086, K1490+273 - K1490+378, K1490+378 - K1491+153, K1491+153 - K1491+660, K1491+660 - K1492+136, K1492+136 - K1492+456,
K1492+660 - K1492+714, K1492+714 - K1492+980, K1492+980 - K1493+316, K1494+390 - K1494+404, K1497+792 - K1498+000, K1501+608 - K1501+621, K1501+638 - K1501+706, K1501+706 - K1501+020,
K1501+020 - K1501+130, K1503+431 - K1504+056
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Widening (4-5 into 6 Lanes) of Daang Maharlika (MN) Including RROW, Davao City 2nd LD
K1489+857 - K1489+1082, K1489+1082 - K1490+086, K1490+273 - K1490+378, K1490+378 - K1491+153, K1491+153 - K1491+660, K1491+660 - K1492+136, K1492+136 - K1492+456, K1492+660 - K1492+714,
K1492+714 - K1492+980, K1492+980 - K1493+316, K1497+792 - K1498+000, K1501+608 - K1501+621, K1501+638 - K1501+706, K1501+706 - K1502+020, K1502+020 - K1502+130, K1503+400 - K1504+056 (S00001MN)
ALLOCATION: Php 150.000 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00997 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Slaughter House Road Until F. Torres Bridge including Road Slope Protection, Road Widening and RROW, Davao City (Package 2)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Reconstruction/Concreting/Widening of Slaughter House Road Until F. Torres Bridge including RROW, Davao City 1st LD (Package 2)
ALLOCATION: Php 167.632 Million |
March 26, 2017 |
GAA FY 2017 |
WIN7G00998 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XII |
Regional Office XII |
MODIFICATION:
FROM: MFO 1- National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary -
Road Widening - Surigao Del Sur Boundary- Davao Oriental Coastal Road including Rehabilitation of Concrete Road, Improvement of Junction/Intersection and RROW, Davao Oriental 1st LD -
K1525+140 - K1526+440.94,
K1526+440.94 - K1527+440.94
To: MFO 1- National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary -
Widening (2 into 4 lanes) of Surigao Del Sur Boundary-Davao Oriental Coastal Road including Rehabilitation/Reconstruction of Damaged Pavement, Improvement of Junction/Intersection and RROW, Brgy. Boston Poblacion Section, Davao Oriental 1st LD,
K1525+140 - K1526+940, (S00140MN)
ALLOCATION: Php 160.000 Million |