August 7, 2019 |
FY 2019 GAA |
WIN9G02621 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1383+764-K1384+710, K1386+000-K1386+641, K1387+944-K1390+000,
K1394+744-K1395+178, K1395+307-K1395+498, K1394+744-K1395+178,
K1395+307-K1395+498
Physical Target:
CW1: 8.516 Lane Km (Reconstruction to Concrete Pavement)
CW2: 2.460 Lane Km (Road Widening)
Allocation:
TOTAL: P 118,914,000.00
CW1: P 81,620,660.00 (Reconstruction to Concrete Pavement)
CW2: P 33,131,350.00 (Road Widening)
EAO: P 4,161,990.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1383+764-K1384+710, K1386+000-K1386+641, K1387+944-K1390+000,
K1394+744-K1395+178, K1395+307-K1395+498
Physical Target:
CW1: 8.516 Lane Km (Reconstruction to Concrete Pavement)
CW2: 2.460 Lane Km (Road Widening)
Allocation:
TOTAL: P 118,914,000.00
CW1: P 81,620,660.00 (Reconstruction to Concrete Pavement)
CW2: P 33,131,350.00 (Road Widening)
EAO: P 4,161,990.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02620 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1494+000 - K1496+000, K1500+000 - K1502+000
Physical Target:
CW1: 7.567 Lane Km (Road Widening)
ROW: 50,323.689 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 93,778,700.00 (Road Widening)
ROW: P 2,820,000.00 (ROW Acquisition)
EAO: P 3,401,300.00
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Primary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1494+000 - K1496+000, K1500+000 - K1503+136
Physical Target:
CW1: 6.272 Lane Km (Road Widening)
ROW: 50,323.689 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 93,778,700.00 (Road Widening)
ROW: P 2,820,000.00 (ROW Acquisition)
EAO: P 3,401,300.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02568 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Rd, Compostela and New Bataan -
K1440+128 - K1441+000
Physical Target:
CW1: 1.666 Lane Km (Road Widening)
ROW: 12,495.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 31,990,000.00
CW1: P 25,115,350.00 (Road Widening)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 874,650.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program
Road Widening - Tertiary Roads
Montevista-Compostela-New Bataan-Maragusan-Mati Bdry Rd, Compostela and New Bataan -
K1440+220 - K1441+000
Physical Target:
CW1: 1.522 Lane Km (Road Widening)
CW2: 4,405.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 12,495.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 31,990,000.00
CW1: P 17,503,580.00 (Road Widening)
CW2: P 6,611,770.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 874,650.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02573 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building Sitio Awa, Brgy. Catalunan, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building Sitio Awa, Brgy. Catalunan Grande, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G05605 |
FY 2018 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Pañalum, Brgy. Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,400,000.00
CW1: P 5,346,000.00 (Construction of Multi-Purpose Building)
EAO: P 54,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Pañalum ES, Brgy. Pañalum, Davao City
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,400,000.00
CW1: P 5,346,000.00 (Construction of Multi-Purpose Building)
EAO: P 54,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02586 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Bayanihan Irrigators Asst., Admin Bldg.), Sinayawan, Hagonoy, Davao del Norte
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Construction of Multi-Purpose Building)
EAO: P 15,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multi-Purpose Building (Bayanihan Irrigators Asst., Admin Bldg.), Sinayawan, Hagonoy, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 1,500,000.00
CW1: P 1,485,000.00 (Construction of Multi-Purpose Building)
EAO: P 15,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02585 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multipurpose Building (Barangay Hall), Sinarangan, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction of Multipurpose Building (Barangay Hall), Sinaragan, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
August 7, 2019 |
FY 2019 GAA |
WIN9G02604 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao del Sur District Engineering Office |
FROM: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction (Completion) of Multi-Purpose Buidling, Brgy. Poblacion, Matan-ao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
Construction (Completion) of Multi-Purpose Building, Brgy. Poblacion, Matanao, Davao del Sur
Physical Target:
CW1: 1 Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
August 6, 2019 |
2019 |
WIN9C03424 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 320101103568000
Project ID: P00322870LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Daet River Control, (Mantagbac Section) Brgy.. Mantagbac, Daet, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Daet River Control, (Mantagbac Section) Brgy. IV, Daet, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m. |
August 6, 2019 |
2019 |
WIN9C03425 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203878000
Project ID: P00347151LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Guisican Road, Brgy. Guisican, Labo, camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.266 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Guisican Road, Brgy. Guisican, Labo, camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.226 Lane KM
|
August 6, 2019 |
2019 |
WIN9C03417 |
2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203892000
Project ID: P00347167LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Barangay Road , Brgy . San Isidro, San Lorenzo Ruiz Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.752 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Barangay Road , Brgy . San Isidro, San Lorenzo Ruiz Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.758 Lane KM
|
August 6, 2019 |
2019 |
WIN9C03427 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203897000
Project ID: P00347170LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Road, Brgy. Mang - ogob, San Vicente, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.55 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Construction of Road, Brgy. Man - ogob, San Vicente, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.55 Lane KM |
August 6, 2019 |
2019 |
WIN9C03412 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300103201279000
Project ID: P00348592LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose /Facilities - Construction / Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi Purpose Building, Barangay 11, Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 Number of Building
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose /Facilities - Construction / Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi Purpose Building, Barangay II, Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 Number of Building
|
August 6, 2019 |
2019 |
WIN9C03420 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208880000
Project ID: P0000350701LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction (Completion) of Barangay Multi-Purpose Building, Brgy. Mactan, Capalonga, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction (Completion) of Barangay Multi-Purpose Building, Brgy. Mactang, Capalonga, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03404 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208904000
Project ID: P00350709LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi -Purpose Building in Tagontong Elementary School, Brgy. Taqontonq. Mercedes, Camarines Norte
Allocation: Php 5,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi -Purpose Building in Tagontong Elementary School, Brgy. Del Rosario. Mercedes, Camarines Norte
Allocation: Php 5,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03438 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208925000
Project ID: P00350714LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction oF Multi Purpose Building Camambungan National High School Annex, Camambunqan, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction oF Multi Purpose Building Camarines Norte National High School Annex, Camambungan, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03416 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208934000
Project ID: P00350719LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, Manqcruz Elementary School, Barangay Manqcruz, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, Mancruz Elementary School, Barangay Mancruz, Daet, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03423 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208940000
Project ID: P00350722LZ
FROM:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, T.F. Obusan Elementary School , Barangay Mamnuntay, Basud, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program - Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building, T.F. Obusan Elementary School , Barangay Manmuntay, Basud, Camarines Norte
Allocation: Php 3,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg. |
August 6, 2019 |
2019 |
WIN9C03402 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208943000
Project ID: P00350723LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction/Repair/ Rehabilitation of Camarines Norte, State College Cooperative Building, Phase 1, Albaño Campus Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction/Repair/ Rehabilitation of Camarines Norte, State College Cooperative Building, Phase 1, Abaño Campus Daet, Camarines Norte
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03428 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300104208948000
Project ID: P00350728LZ
FROM:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building in Zantua-Abondo
Elementary School, Brgy. San Francisco, Talisay, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
TO:
Local Program -Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program - Construction of Multi-Purpose Building in Zantua-Abordo
Elementary School, Brgy. San Francisco, Talisay, Camarines Norte
Allocation: Php 2,000,000
Physical Target: CW1 - Construction of Multi Purpose Building - 1 No. of Bldg.
|
August 6, 2019 |
2019 |
WIN9C03413 |
FY 2019 GAA |
April 28, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 300117203910000
Project ID: P00354940LZ
FROM:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Pulongguitguit- Guit Road, Brgy, Pulongguitguit, Sta. Elena, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 1.70 Lane KM
TO:
Local Program - Local Program - Local Roads - Local Infrastructure Program - Concreting of Pulongguit- Guit Road, Brgy, Pulongguit, Sta. Elena, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 1.70 Lane KM |
August 5, 2019 |
FY - 2019 |
WIN9F05774 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 300104208710000
Project ID: P00350602LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM:
Construction of Mlti-Purpose Building ( Covered Court ),
Barangay Odiongan, Roxas, Oriental Mindoro
CW1 - Construction of Other Building - 1 Number of Buildings
Unit Cost - Php 2,871/Number of Building
Allocation - Php 2.90 Million
TO:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Odiong, Roxas, Oriental Mindoro
CW1 - Construction of Other Building - 1 Number of Buildings
Unit Cost - Php 2,871.00/Number of Building
Allocation - Php 2.90 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05794 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200048000
Project ID: P00353634 LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide
Marinduque Circumferential Road
K0078+300 - K0078+420,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure/
3,840.00 sq.m.
Unit Cost - Php 25.781/sq.m.
Allocation - Php 100.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide
Marinduque Circumferential Road
K0052+690 - K0052+940,
K0052+980 - K0053+100,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure/
4,587.00 sq.m.
Unit Cost - Php 21.583/sq.m.
Allocation - Php 100.00 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05780 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. 300116201315000
Project ID: P00345464 LZ
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM:
Construction of Lamoro - New Ibajay Provincial Road,
El nido, Palawan
CW1 - Construction of Concrete Road: 9.063 lane km
Unit Cost - Php 10,647.69/Lane km
Allocation - Php 100.00 Million
TO:
Construction of Lamoro - New Ibajay Provincial Road,
El Nido, Palawan
CW1 - Construction of Concrete Road: 7.24 Lane km
Unit Cost - Php 13,328.73/Lane km
Allocation - Php 100.00 Million |
August 5, 2019 |
FY - 2019 |
WIN9F05792 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310108100235000
Project ID: P00300364 LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslides -
Secondary Roads
FROM:
Romblon - Cogon - Sablayan Rd,
K0015+030 - K0015+080,
K0015+488 - K0015+508
CW1 - Construction of Road Slope Protection Structure:
3,075 square meters
Unit Cost - Php 3.82/square meters
Allocation - Php 12.00 Million
TO:
Romblon - Cogon - Sablayan Rd
K0015+030 - K0015+081,
K0015+488 - K0015+514
CW1 - Construction of Road Slope Protection Structure:
3,075 square meters
Unit Cost - Php 3.82/ square meters
Allocation - Php 12.00 Million
|
August 5, 2019 |
FY - 2019 |
WIN9F05796 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310105100259000
Project ID: P00301405 LZ
Organizational Outcome 1:
Ensure safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads
FROM:
Tablas Circumferential Road,
K0126+807 - K0127+542,
K0128+020 - K0128+278.30
CW1 - Reconstruction to Concrete Pavement: 1.985 lane km
Unit Cost - Php 18,217.63/ lane km
Allocation - Php 36.90 Million
TO:
Tablas Circumferential Road,
K0126+900 - K0127+540.00,
K0128+020 - K0128+277.34,
K0128+500 - K0128+943.00
CW1 - Reconstruction to Concrete Road: 2.68068 Lane km
Unit Cost - Php 13,489.86/Lane km
Allocation - Php 36.90 Million |
August 5, 2019 |
FY - 2019 |
WIN9F05795 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Romblon District Engineering Office |
UACS No. 310109100224000
Project ID: P00300373 LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslides -
Secondary Roads
FROM:
Parpagoha ( Marigondon ) - Binoog Rd.,
K0020+900 - K0021+080
CW1 - Construction of Road Slope Protection Structure :
702 square meters
Unit Cost - Php 69.80/ square meters
Allocation - Php 50.00 Million
TO:
Parpagoha ( Marigondon ) - Binoog Rd.,
K0020+900 - K0020+958.90
CW1 - Construction of Road Slope Protection Structure:
702 square meters
Unit Cost - Php 69.80/square meters
Allocation - Php 50.00 Million
|
August 5, 2019 |
2019 |
WIN9C03414 |
SR2019-07-005980 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+000 - KO456+400, Licuan-Baay, Abra;
Physical Target:
CW1 : 7,156 Square meters;
Allocation= Php 96,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0457+320 - K0457+794, Licuan-Baay, Abra;
Physical Target:
CW1 : 7,037 Square meters;
Allocation= Php 96,500,000
|
August 5, 2019 |
2019 |
WIN9C03433 |
SR2019-07-005983 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+050 - KO454+000, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,945.92 Square meters;
Allocation= Php 98,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0453+068 - K0453+117, K0453+475 - K0453+487, K0453+555 - K0453+600, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,945.92 Square meters;
Allocation= Php 98,500,000
|
August 5, 2019 |
2019 |
WIN9C03431 |
SR2019-07-005976 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO452+600 - KO454+250, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,943.68 Square meters;
Allocation= Php 98,500,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0455+775 - K0455+820, K0469+000 - K0469+050, K0469+350 - K0469+400, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,943.68 Square meters;
Allocation= Php 98,500,000
|
August 5, 2019 |
2019 |
WIN9C03415 |
SR2019-07-005989 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO454+390 - KO455+150, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,007.51 Square meters;
Allocation= Php 98,400,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0454+274 - K0454+396, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,021 Square meters;
Allocation= Php 98,400,000
|
August 5, 2019 |
2019 |
WIN9C03434 |
SR2019-07-005990 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO468+950 -KO469+620, Liccuan-Baay, Abra;
Physical Target:
CW1 : 5,971 Square meters;
Allocation= Php 98,400,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0454+396 - K0454+448, K0454+516 - K0454+645, Licuan-Baay, Abra;
Physical Target:
CW1 : 5,971 Square meters;
Allocation= Php 98,400,000
|
August 5, 2019 |
2019 |
WIN9C03441 |
SR2019-07-005987 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, KO453+800 - KO454+650, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,894 Square meters;
Allocation= Php 98,000,000
To: Rehabilitation/Improvement with Slip, Soil Collapse and Landslides along Abra-Kalinga Road, K0457+000 - K0457+320, Licuan-Baay, Abra;
Physical Target:
CW1 : 6,897 Square meters;
Allocation= Php 98,000,000
|
August 5, 2019 |
2019 |
WIN9C03432 |
SR2019-07-005825 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd -
K0233 + 685 - K0233 + 889, K0234 + 579 - K0234 + 758;
Physical Target:
CW1 : 8,704 Square meters;
Allocation= Php 150,000,000
To: Kennon Rd -
K0233 + 685 - K0233 + 889, K0234 + 000 - K0234+062, K0234+539 - K0234 + 595, K0234 + 682 - K0234 + 758;
Physical Target:
CW1 : 9,156.4 Square meters;
Allocation= Php 150,000,000
|
August 5, 2019 |
2019 |
WIN9C03439 |
SR2019-07-005948 |
July 4, 2019 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Lunas Br. (B04609LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd;
Physical Target:
CW1 : 240.03 Square meters;
Allocation= Php 138,300,000
To: Lunas Br. (B04609LZ) along Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd;
Physical Target: CW1 : 240.03 Square meters; Allocation= Php 138,300,000
|
August 5, 2019 |
2019 |
WIN9C03409 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Shilan - Beckel Rd - K0262+036 - K0262+063, K0262+110 - K0262+145, K0262+265 - K0262+350, K0262+501 - K0262+620;
Physical Target:
CW1 : 2,820 Square meters;
Allocation= Php 46,266,000
To: Shilan - Beckel Rd - K0262+036 - K0262+089, K0262+110 - K0262+145, K0262+202 - K0262+350, K0262+773 - K0262+890;
Physical Target:
CW1 : 3,127 Square meters;
Allocation= Php 46,266,000
|
August 5, 2019 |
2019 |
WIN9C03440 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Multi-Purpose Building (Gymnasium), Bunhian Central School, Barangay Bunhian, Aguinaldo, Ifugao;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
To: Construction of Multi-Purpose Building (Gymnasium), Aguinaldo Central School, Barangay Bunhian, Aguinaldo, Ifugao;
Physical Target:
CW1 : 1 Number of Buildings;
Allocation= Php 2,000,000
|
August 5, 2019 |
2019 |
WIN9C03442 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Manabo - Luba - Tubo Road leading to Kili Falls and Hotspring, Brgy. Kili, Tubo, Abra;
Physical Target:
CW1 : 1.5 Lane Km;
Allocation= Php 15,000,000
To: Manabo - Luba - Tubo Road leading to Kili Falls and Hotspring, Brgy. Kili, Tubo, Abra;
Physical Target:
CW1 : 0.482 Lane Km,
CW2: 841.34 Square Meters;
Allocation= Php 15,000,000
|
August 5, 2019 |
2019 |
WIN9C03408 |
GAA 2019 |
May 6, 2019 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bulbula Flood Control Project, La Paz, Abra, Sta. 44+280.8 - Sta. 44+702;
Physical Target:
CW1 : 398.40 Lineal Meter;
Allocation= Php 50,000,000
To: Construction of Bulbulala Flood Control Project, La Paz, Abra, Sta. 44+280.8 - Sta. 44+702;
Physical Target:
CW1 : 404.80 Lineal Meter;
Allocation= Php 50,000,000
|
August 2, 2019 |
FY - 2019 |
WIN9F05758 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 310202100406000
Project ID: P00303405LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Bongabong - Sagana - Roxas - San Aquilino Road,
K0103+433 - K0105+068,
K0105+199 - K0105+767,
K0110+734 - K0112+074
CW1 - Road Widening: 3.0860 lane km
Unit Cost - Php 7,939.08/lane km
Allocation - Php 25.00 Million
TO:
Bongabong - Sagana - Roxas - San Aquilino Road,
K0112+074 - K0113+077
CW1 - Road Widening: 2.0080 lane km
Unit Cost - Php 12,201.20/ Lane km
Allocation - Php 25.00 Million |
August 2, 2019 |
FY - 2019 |
WIN9F05757 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 310202100407000
Project ID: P00304502LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Calapan South Road,
K0100+378 - K0100+400,
K0102+050 - K0102+105,
K0102+187 - K0102+550,
K0103+000 - K0103+581,
K0104+224 - K0107+000
CW1 - Road Widening: 0.00 lane km
Unit Cost - Php 0/ Lane km
Allocation - Php 25.00 million
TO:
Calapan South Road,
K0105+000 - K0106+000
CW1 - Road Widening: 1.996 lane km
Unit Cost - Php 12,274.55/ Lane km
Allocation - Php 25.00 Million |
August 2, 2019 |
FY - 2019 |
WIN9F05773 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. 300104208704000
Project ID: P00350596LZ
Local Program
Buildings and Other Structures - Multipurpose/Facilities -
Local Infrastructure Building
FROM:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Binle, Bulalacao, Oriental Mindoro
CW1 - Construction of Other Building - 1
Number of Buildings
Unit Cost - Php 2,970.00/Number of Buidings
Allocation - Php 3.00 Million
TO:
Construction of Multi-Purpose Building ( Covered Court ),
Barangay Benli, Bulalacao, Oriental Mindoro
CW1 - Construction of Other Building - 1
Number of Buildings
Unit Cost - Php 2,970.00/ Number of Buildings
Allocation - Php 3.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05772 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 300104208658000
Project ID: P00342417LZ
Organizational Outcome: Local Program
Local - Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program
FROM:
Construction of Multi-purpose Building (Women's Center),
Brgy. Mabini, Puerto Princesa, Palawan
CW1 - Construction of Other Building
Unit Cost - Php 1,980.00/Building
Allocation - Php 2.00 Million
TO:
Construction of Multi-Purpose Building (Women's Center),
Brgy. Mabini, Aborlan, Palawan
CW1 - Construction of Other Building
Unit Cost - Php 1,980.00/Building
Allocation - Php 2.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05760 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS NO. 300117203791000
Project ID: P00354858LZ
Local Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Concreting of Abueg Road, Alfonso XIII, Quezon, Palawan
CW1 - Construction of Concrete Road: 0 lane km
Unit Cost - Php 0/lane km
Allocation - Php 2.00 Million
TO:
Concreting of Abueg Road, Alfonso XIII, Quezon, Palawan
CW1 - Construction of Concrete Road: 0.19 lane km
Unit Cost - Php 10,421.0526/lane km
Allocation - Php 2.00 Million |
August 1, 2019 |
FY - 2019 |
WIN9F05762 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200467000
Project ID: P00353442LZ
Local program
Local - Flood Control and Drainage -
Flood Control Structure/Facilities - Local Infrastructure Program
FROM:
Construction of Abo-Abo Flood Control, Barangay Abo-Abo,
Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Abo-Abo Flood Control, Barangay Abo-Abo,
Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure:
120 lineal meters
Unit Cost - Php 41.25/lineal meters
Allocation - Php 5.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05761 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200470000
Project ID: P00353445LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Danadio Flood Control, Barangay Danadio,
Brooke's Point, Palawan
CW1 - Construction of Flood Mitigation Structure - 0 lineal meter
Unit Cost - php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Danadio Flood Control, Barangay Danadio,
Brooke's Point, Palawan
CW1 - Construction of Flood Mitigation Structure:
220 lineal meters
Unit Cost - Php 22.50/lineal meters
Allocation - Php 5.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05768 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200472000
Project ID: P00353446LZ
Local Program
Local - flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Lamikan River Flood Control, Sitio Tina Tagusao,
Barangay Tagusao, Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Lamikan River Flood Control, Sitio Tina Tagusao,
Barangay Tagusao, Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure -
80 lineal meters
Unit Cost - Php 61.8750/lineal meters
Allocation - Php 5.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05765 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200473000
Project ID: P00353447LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Panacan II Flood Control,
Barangay Panacan II, Narra, Plawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Panacan II Flood Control,
Barangay Panacan II, Narra, Palawan
CW1 - Construction of Flood Mitigation Structure:
118 lineal maters
Unit Cost - Php 41.9492/lineal meters
Allocation - Php 5.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05766 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No 300107200468000
Project ID: P00353443LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Bunog Flood Control, Barangay Bunog,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Bunog Flood Control, Barangay Bunog,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05763 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200469000
Project ID: P00353444LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Culasian Flood Control, Barangay Culasian,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - php 5.00 million
TO:
Construction of Culasian Flood Control, Barangay Culasian,
Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 million |
August 1, 2019 |
FY - 2019 |
WIN9F05764 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200474000
Project ID: P00353448LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities - Local Infrastructure Program
FROM:
Construction of Panitian Flood Contol, Barangay Panitian,
Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - php 5.00 million
TO:
Construction of Panitian Flood Control, Barangay Panitian
Quezon, Palawan
CW1 - Construction of Flood Mitigation Structure:
50.35 lineal meters
Unit Cost - Php 98.3118/lineal meters
Allocation - Php 5.00 Million |
August 1, 2019 |
FY - 2019 |
WIN9F05767 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300111200073000
Project ID: P00345370LZ
Local Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various infrastructure including Local Projects
FROM:
Rehabilitation/Improvement (Asphalt Overlay) along Quezon -
Punta Baja & PCR ( Rizal-Panalingan Section ),
K0196+976 - K0197+352,
K0201+377 - K0202+500,
K0204+770 - K0208+100,
Palawan
CW1 - Preventive maintenance of Road: Asphalt Overlay:
0 lane km
Unit Cost - Php 0/lane km
Allocation - Php 100.00 Million
TO:
Rehabilitation/Improvement (Asphalt Overlay) along Quezon -
Punta Baja & PCR ( Rizal - Panalingaan Section ),
K0196+976 - K0197+352,
K0201+377 - K0202+500,
K0204+770 - K0208+100,
Palawan
CW1 - Preventive maintenance of Road: Asphalt Overlay :
9.254 lane km
Unit Cost - Php 10,427.9231/lane km
Allocation - Php 100.00 Million
|
August 1, 2019 |
FY - 2019 |
WIN9F05779 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300203100050000
Project ID: P00330312LZ
Convergence and Special Support program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Balabac Circumferential Road, Balabac, Palawan
CW1 - Construction of Concrete Road: 3 lane km
Unit Cost - Php 16,333.333/lane km
Allocation - Php 50.00 Million
TO:
Balabac, Circumferential Road, Balabac, Palawan
CW1 - Construction of Concrete Road : 2.24 lane km
Unit Cost - Php 21,875.00/lane km
Allocation - Php 50.00 million |
July 31, 2019 |
FY - 2019 |
WIN9F05775 |
FY - 2019 GAA DPWH Infra Program |
May 1, 2019 |
Region IV-B |
Regional Office IV-B |
UACS No. 310203100155000
Project ID: P00303422LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM:
F.B. Reyes (Busuanga - Coron) Rd
K0015+550 - K0017+550
CW1 - Road Widening: 4 Lane Km
Allocation: Php 150.00Million
TO:
F.B.Reyes (Busuanga - Coron) Rd
K0014+951.50 - K0015+200.00,
K0015+300.00 - K0016+029.00,
K0017+843.00 - K0020+855.00
CW1 - Road Widening: 7.0015 Lane Km
Allocation: Php 150.00 Million
|
July 31, 2019 |
FY - 2019 |
WIN9F05778 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Regional Office IV-B |
UACS No. 310205100246000
Project ID: P00304063LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Network Development - Construction Of Missing Links/New Roads
FROM:
Odiongan East - West Road, Romblom
CW1 - Construction of Concrete Roads: 2.942 Lane Km
Unit Cost: Php 36,654.91/Lane Km
Allocation: Php 122.526 Million
TO:
Odiongan East - West Road, Romblon
CW1 - Construction of Concrete Roads: 1.460 Lane Km
Unit Cost: Php 73,862.16/Lane Km
Allocation; Php 122.526.00 million |
July 31, 2019 |
FY - 2019 |
WIN9F05776 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Regional Office IV-B |
UACS No. 310108100191000
Project ID: P00300365LZ
Organizational Outcome 1:
Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM:
Tablas Circumferential Road
K0034+488 - K0034+760
CW1 - Construction of Road Slope Protection Structure: 9,520 sq.m
Unit Cost - Php 15.712/sq.m.
Allocation - Php 150.00 Million
TO:
Tablas Circumferential Road
K0034+185 - K0034+568
CW1 - Construction of Road Slope Protection Structure: 6,762 sq.m
Unit Cost - Php 22.120/sq.m.
Allocation - Php 150.00 Million |
July 31, 2019 |
FY - 2019 |
WIN9F05775 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 310306100111000
Project ID: P00301379LZ
Organizational Outcome 001:
Ensure Safe and Reliable National Road System
Bridge - Construction of New Bridges
FROM:
Punang Br. along Puerto Princesa South Rd.
CW1 - Construction of Concrete Bridge - 301 sq.m.
Unit Cost - Php 101.3737/sq.m.
Allocation - Php 30.00 Million
TO:
Punang Br. along Puerto Princesa South Rd.
CW1 - Construction of Concrete Bridge - 304.50 sq.m.
Unit Cost - Php 96.5517/sq.m.
Allocation - Php 30.00 Million
|
July 31, 2019 |
FY - 2019 |
WIN9F05754 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200476000
Project ID: O00353450LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Control Structures/Facilities -
Local infrastructure Program
FROM:
Construction of Salungsong Flood Control, Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Cost - Php 0/lineal meter
Allocation - Php 5.00 Million
TO:
Construction of Salungsong Flood Control, Rizal, Palawan
CW1 - Construction of Flood Mitigation Structure: 222 lineal meters
Unit Cost - Php 22.2973/lineal meters
Allocation - Php 5.00 Million |
July 31, 2019 |
FY - 2019 |
WIN9F05756 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. 300107200475000
Project ID: P00353449 LZ
Local Program
Local - Flood Control and Drainage -
Flood Control Structures/Facilities -
Local Infrastructure Program
FROM:
Construction of Panitian Flood Control, Barangay Panitian, Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 0 lineal meter
Unit Coat - Php 0/lineal meter
Allocation - 5.00 Million
TO:
Construction of Panitian Flood Control, Barangay Panitian, Sofronio Espanola, Palawan
CW1 - Construction of Flood Mitigation Structure: 120 lineal meters\
Unit Cost - Php 41.25/lineal meters
Allocation - Php 5.00 Million |
July 31, 2019 |
2019 |
WIN9F05759 |
UACS No. 310111100084000 |
May 5, 2019 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310111100084000
Project ID.: P00300001LZ
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
Zapote-Alabang Road (S03497LZ), K0021+-565 – K0022+386
Physical Target: CW1 = Upgrading of Drainage Structure along Road = 1,403 Lineal Meter
Unit Cost (P’000) = P12,024.73 /Lineal meter
Allocation = P 16,870,700.00
EAO = P 344,300.00
Total = P 17,215,000.00
As Modified
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
Zapote-Alabang Road (S03497LZ), K0021+335 – K0022+190
Physical Target: CW1 = Upgrading of Drainage Structure along Road = 1,078 Lineal Meter
Unit Cost (P’000) = P15,650.00 /Lineal meter
Allocation = P 16,870,700.00
EAO = P 344,300.00
Total = P 17,215,000.00
WIN9F05759
|
July 31, 2019 |
2019 |
WIN9F05769 |
UACS No. 310103100224000 |
May 5, 2019 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310103100224000
Project ID.: P00302554LZ
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Tertiary Road
International Receiver Road – K0019+330 = K0020+776
Physical Target: CW-Asphalt Overlay =8.456 Km
Unit Cost (P’000) = P6,145.83 /Lane km
EAO = P1,967,700.00
Total = P56,220,000.00
As Modified
001: Ensure Safe and Reliable National Road System
Assets Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Tertiary Road
International Receiver Road – K0019+(-)330 = K0019+982
Physical Target: CW-Asphalt Overlay = 5.22 Km
Unit Cost (P’000) = P10,393.16 /Lane km
EAO = P1,967,700.00
Total = P56,220,000.00
WIN9F05769
|
July 25, 2019 |
2019 |
320101103144000 |
GAA FY2019 |
May 2, 2019 |
Region II |
Isabela 2nd District Engineering Office |
OO2: Protect Lives and Properties - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mallig River Flood Control Project (Rang Ayan Section), Mallig, Isabela |
October 17, 2018 |
FY 2018 |
WIN8C03350 |
310107100015000 |
May 14, 2018 |
Region IX |
Regional Office IX |
UACS No. 310107100015000
Project ID: P002000185MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000 |
October 17, 2018 |
FY 2018 |
WIN8C03350 |
310107100015000 |
May 14, 2018 |
Region IX |
Regional Office IX |
UACS No. 310107100015000
Project ID: P002000185MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000 |
October 17, 2018 |
FY 2018 |
WIN8C03350 |
310107100015000 |
May 14, 2018 |
Region IX |
Regional Office IX |
UACS No. 310107100015000
Project ID: P002000185MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
Physical Target:
CW 1 - Const. of Road Slope Protection: 6,959.80 sq.m
Unit Cost: P 15,857.70/sq.m
ROW: 2,028.61 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,025,000.00
Allocation: P 115,000,000 |
August 23, 2018 |
FY 2018 |
REG8XL00910 |
UACS No. 310204100161000 |
May 10, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100161000
Project ID: P00200301MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Labangan-Pagadian City-Dumalinao ZDS Bypass Road, incl. ROW, Zamboanga del Sur
Physical Target:
CW1- Construction of Concrete Road: 12.80 lane km
Unit Cost: P 18,879,025.60/lane km
ROW: 159,494.91sq.m
Unit Cost: P 300/sq.m.
EAO: P 10,500,000.00
Allocation: P 300,000,000.00 |
August 4, 2018 |
2018 |
WIN8F05595 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development - Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges, Panglao-Tagbilaran City Offshore Connector, Bohol |
August 4, 2018 |
2018 |
WIN8F05559 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Organizational Outcome 1: Ensure safe and Reliable National Road System, Network Development-Road Widening of Primary Roads, N. Bacalso Ave. (Cebu South Road) incl. ROW - K0131+000 - K0131+776 |
August 4, 2018 |
2018 |
WIN8F05611 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Organizational Outcome 1: Ensure safe and Reliable National Road System, Network Development-Road Widening of Secondary Roads, Santander-Barili-Toledo Rd. - K0214+884 - K0216+100 |
August 4, 2018 |
2018 |
WIN8F05683 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 1st District Engineering Office |
LOCAL PROGRAM: Local Infrastructure Program- Local Roads and Bridges- Local Roads -Construction of Foot Bridge, Brgy. Solonggon-Mandapaton-Cangabo, La Libertad, Negros Oriental |
August 4, 2018 |
2018 |
WIN8F05575 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Jct. TCSR Abucay Norte - Can-agong leading to Lake Linaw, Sikatuna Tree Park & Tarsier Conservation Area, Brgy.Can-agong, Sikatuna, Bohol |
August 4, 2018 |
2018 |
WIN8F05584 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads - Road Concreting Brgy. Dipatlong (1 KM), Maribojoc, Bohol |
August 4, 2018 |
2018 |
WIN8F05577 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Water Management Facilities - Water Supply - Construction of Water Supply System Level III, Barangay Poblacion - Alegria - Candumayao - Baang - Liboron - Triple Union, Catigbian, Bohol |
August 4, 2018 |
2018 |
WIN8F05579 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Jct.(TNR) Cortes-Balilihan-Catigbian Macaas Rd. K0009+(-090) - K0009+020, K0017+250 - K0017+330, K0027+550 - K0027+600, K0044+506.580 - K0044+521.900, K0045+600 - K0045+847 |
August 4, 2018 |
2018 |
WIN8F05582 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting Brgy. Jandig (1KM), Maribojoc, Bohol |
August 4, 2018 |
2018 |
WIN8F05583 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Tagbilaran North Rd (Tagbilaran-Jetafe Sect) - K0006+060 -K0006+237 |
August 4, 2018 |
2018 |
WIN8F05580 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Jct. San Isidro - Binayran - Dampas Road, Sta. 00+000 - Sta. 00+315.37, Sta. 00+435 - Sta. 01+225, Tagbiliaran City |
August 4, 2018 |
2018 |
WIN8F05581 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Road Concreting, Tagbilaran City |
August 4, 2018 |
2018 |
WIN8F05576 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road Bicahan-Bantolinao, Antequera, Bohol |
August 4, 2018 |
2018 |
WIN8F05597 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Sal-ing River Control, Balilihan, Bohol |
August 4, 2018 |
2018 |
WIN8F05688 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
LOCAL PROGRAM - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Widening and Concreting of Hangos Road, Tagbilaran City (Road leading to new Provincial Capitol |
August 4, 2018 |
2018 |
WIN8F05687 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage Systems - Construction of Cantomimbo River Control, Balilihan, Bohol |
August 4, 2018 |
2018 |
WIN8F05686 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage Systems - Construction of Antequera River Control, Antequera, Bohol |
July 27, 2018 |
FY 2018 |
WIN8G02508 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40 |
July 26, 2018 |
FY 2018 |
WIN8G02509 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Anao - Ramos Rd - K0159 + (-504.40) - K0160 + 624.60, K0162 + 303 - K0163 + 206.50, K0163 + 206.50 - K0163 + 374 , K0164 + 942 - K0166+800 |
July 24, 2018 |
2018 |
WIN8C02894 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Daang Maharlika (LT) - K0901 + 1026 - K0902 + 929
Physical Target: Allocation:
CW1- Upgrading of Drainage Structure P 47.726 M
along Road -944 lineal meters
EAO P 0.974 M
Total Allocation: P 48.700 M
AS MODIFIED:
Daang Maharlika (LT) - K0901 + 1026 - K0902 + 933
Physical Target: Allocation:
CW1- Upgrading of Drainage Structure P 47.726 M
along Road -2,690 lineal meters
EAO P 0.974 M
Total Allocation: P 48.700 M |
July 24, 2018 |
2018 |
WIN8C02415 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Rizal Avenida Ext Rd - K0905 + -909 - K0905+-736, K0905+-485 - K0905+-440
Physical Target: Allocation:
CW1-Road Widening-0.436 Lane Km P 8.526 M
EAO- P 0.174 M
Total Allocation: P 8.700 M
AS MODIFIED:
Rizal Avenida Ext Rd - K0905 + -909 - K0905+-733, K0905+-733 - K0905+-705, K0905+-480-K0905+-471, K0905+-471-K0905+-440
Physical Target: Allocation:
CW1-Road Widening-0.451 Lane Km P 8.526 M
EAO- P 0.174 M
Total Allocation: P 8.700 M |
July 24, 2018 |
2018 |
WIN8F05225 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Rizal Avenida Ext Rd - K0905+-836 - K0905+-736
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 2.254 M
Structure-321 Sq.m
EAO- P 0.046 M
Total Allocation: P 2.300 M
AS MODIFIED:
Rizal Avenida Ext Rd - K0905+-805 - K0905+-705
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 2.254 M
Structure-321.31 Sq.m
EAO- P 0.046 M
Total Allocation: P 2.300 M |
July 24, 2018 |
2018 |
WIN8C02384 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local Infrastructure Program-National Roads and Bridges-National Roads
FROM:
Improvement/Widening of San Jose-Manlurip-McArthur Park Road, K0913+000-K0914+056, Tacloban City
Physical Target: Allocation:
CW1-Improvement/Widening of P 36.630 M
Road-2.093 Lane Km
EAO- P 0.370 M
Total Allocation: P 37.00 M
AS MODIFIED:
Improvement/Widening of San Jose-Manlurip-McArthur Park Road, K0913+000-K0914+756, Tacloban City
Physical Target: Allocation:
CW1-Improvement/Widening of P 36.630 M
Road-3.498 Lane Km
EAO- P 0.370 M
Total Allocation: P 37.00 M |
July 24, 2018 |
2018 |
WIN8C02893 |
GAA FY 2018 |
January 30, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome 2: Protect lives and Properties Against Major Floods
Flood Management Program: Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction/Rehabilitation of Flood Control Structure at Tanghas-Lirang Creek, Mahayahay creek, Baruguan River, Kawayan River and Suhi River, Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 93.875 M
Structure- 850 lineal meters
EAO- P 3.405 M
Total Allocation: P 97.280 M
AS MODIFIED:
Construction/Rehabilitation of Flood Control Structure at Tanghas-Lirang Creek, Mahayahay Creek, Baruguan River, Kawayan River and Suhi River, Tacloban City
Physical Target: Allocation:
CW1- Construction of Flood Mitigation P 93.875 M
Structure- 2,180 lineal meters
EAO- P 3.405 M
Total Allocation: P 97.280 M
|
July 24, 2018 |
2018 |
WIN8C02382 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Tigbao-Sta Fe-Sn Miguel Rd - K0912 + (-180) - K0912 + (-144), K0914 + 023 - K0914 + 080, K0914 + 056 - K0914 + 071, K0914 + 118 - K0914 + 163, K0914 + 153 - K0914 + 431, K0914 + 247 - K0914 + 431
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,891 Sq.m
EAO- P 1.00 M
Total Allocation: P 50.00 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0912 + (-180) - K0912 + (-080), K0914 + (-300) - K0914 + (- 080), K0914 + 023 - K0914 + 080, K0914 + 056 - K0914 + 071, K0914 + 118 - K0914 + 163, K0914 + 153 - K0914 + 431, K0914 + 247 - K0914 + 431
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,578.25 Sq.m
EAO- P 1.00 M
Total Allocation: P 50.00 M |
July 24, 2018 |
2018 |
WIN8C02830 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Tigbao-Sta Fe-Sn Miguel Rd - K0904 +194 - K0904 + 360, K0905 + (-215) - K0905 + (-131), K0905 + 450 - K0905 + 586, K0905 + 561 - K0905 + 586, K0908 + (-382) - K0908 + (-365), K0908 + (-484) - K0908 + (-370), K0908 + (-690) - K0908 + (-640)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,196 Sq.m
EAO- P 1.00 M
Total Allocation: P 50.00 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0904 +194 - K0904 + 360, K0905 + (-215) - K0905 + (-131), K0905 + 400 - K0905 + 586, K0905 + 561 - K0905 + 586, K0908 + (-549) - K0908 + (-476), K0908 + (-421) - K0908 + (-275), K0908 + (-382) - K0908 + (-365)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure-3,694 Sq.m
EAO- P 1.00 M
Total Allocation: P 50.00 M |
July 24, 2018 |
2018 |
WIN8C02878 |
GAA FY 2018 |
January 31, 2018 |
Region VIII |
Leyte 4th District Engineering Office |
OO2: Protect Lives and Properties
Flood Management-Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
FROM:
Improvement/Rehabilitation/Rechanneling of Pagsanga-an River including Dredging at Pagsanga-an River Mouth A, Brgy. San Juan, Ormoc City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure-600.00 Lineal Meter
EAO- P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Improvement/Rehabilitation/Rechanneling of Pagsanga-an River including Dredging at Pagsanga-an River Mouth A, Brgy. San Juan, Ormoc City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure-500.00 Lineal Meter
EAO- P 3.500 M
Total Allocation: P 100.00 M
|
July 24, 2018 |
2018 |
WIN8C02418 |
GAA FY 2018 |
March 20, 2018 |
Region VIII |
Leyte 4th District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Asphalt Overlay with Thermoplastic Pavement Markings along Palo-Carigara-Ormoc Road K0994+850 - K0999+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay-8.342 Lane Km
EAO- P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Asphalt Overlay with Thermoplastic Pavement Markings along Palo-Carigara-Ormoc Road K0996+335 - K0998+916
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay-10.556 Lane Km
EAO- P 3.500 M
Total Allocation: P 100.00 M |
July 23, 2018 |
2018 |
WIN8F05693 |
GAA FY 2018 |
January 27, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
FROM:
Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) incl. ROW, Package C, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 386.00 M
20.00 Lane Km
EAO P 14.00 M
Total Allocation: P 400.00 M
AS MODIFIED:
Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) incl. ROW, Package C, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 17.093 M
2.16 Lane Km
CW2-Construction of Gravel Road- P 113.059 M
6.504 Lane Km
CW3- Construction of Road Slope Protection P 240.848 M
Structure-5,400 Sq.m
ROW- ROW Acquisition-21,600 Sq.m P 15.00 M
EAO P 14.00 M
Total Allocation: P 400.00 M |
July 23, 2018 |
2018 |
WIN8F05694 |
GAA FY 2018 |
January 29, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
FROM:
Construction of Concrete Road-Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) Package C, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 193.00 M
10.00 Lane Km
EAO- P 7.00 M
Total Allocation: P 200.00 M
AS MODIFIED:
Construction of Concrete Road-Ormoc City Diversion Road (Brgy. San Juan-Lao-Naungan) Package C1, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 12.176 M
1.32 Lane Km
CW2-Construction of Gravel Road- P 35.695 M
1.98 Lane Km
CW3-Construction of Road Slope Protection P 145.129 M
Structure-3,300 Sq.m
EAO- P 7.00 M
Total Allocation: P 200.00 M |
July 23, 2018 |
2018 |
WIN8C02421 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
FROM:
Avenida Veteranos St - Chainage 197 - Chainage 535, Chainage 347 - Chainage 529
Physical Target: Allocation:
CW1-Construction of Drainage Structure- P 10.780 M
510 linear meters
EAO- P 0.220 M
Total Allocation: P 11.00 M
AS MODIFIED:
Avenida Veteranos St - Chainage 110 - Chainage 430
Physical Target: Allocation:
CW1-Construction of Drainage Structure- P 10.780 M
630 linear meters
EAO- P 0.220 M
Total Allocation: P 11.00 M |
July 23, 2018 |
2018 |
WIN8C02877 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Tacloban City District Engineering Office |
Local-Flood Control and Drainage-Drainage/Protection Works
Construction/Repair/Rehabilitation/Improvement of various Infrastructure Including Local Projects
FROM:
Construction of Drainage System, along Main Road of Brgy. 110 Utap, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure- P 9.90 M
850 lineal meters
EAO- P 0.10 M
Total Allocation: P 10.00 M
AS MODIFIED:
Construction of Drainage System, along Main Road of Brgy. 110 Utap, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure- P 9.90 M
600 lineal meters
EAO- P 0.10 M
Total Allocation: P 10.00 M |
July 20, 2018 |
FY 2018 |
WIN8G02514 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Sapang Uwak Road leading to Miyamit Falls, Porac Pampanga |
July 20, 2018 |
FY 2018 |
WIN8G02513 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Reconstruction (Completion) of Sta. Ursula Bridge, Betis, Guagua, Pampanga |