Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 17, 2018 FY 2018 WIN8G02339 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200017000
Project ID: P00257546LZ
LOCAL PROGRAM – Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Mitigation along Taysan River, Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 802.00 lm
Unit Cost: CW1 – Php 60.16T/lm.
Estimated Cost: Php 50.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02348 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 300106200008000
Project ID: P00257537LZ
LOCAL PROGRAM – Flood Control and Drainage - Flood Control Structures/ Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Control Structures along Matanag River (Upstream) - Sta. 0+460 - Sta. 0+910 (B/S), Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 900 lm
Unit Cost: CW1 – Php 107.22T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
July 17, 2018 FY 2018 WIN8G02332 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Albay 2nd Engineering Office
UACS No.: 320102100424000
Project ID: P00221296LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Improvement of Quirangay River Course (Poblacion Section), Sta. 0+000 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Sta. 0+025 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 341.60 lm
Unit Cost: CW1 – Php 71.721T/lm.
Estimated Cost: Php 25.00 M
(As Modified)
July 16, 2018 FY - 2018 WIN8F05662 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
and other ancillary works,
K0111+300 - K0113+800,
Narra

CW1: 9.812 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa Road
from to (2) to six (6) lanes including drainage
and other ancillary works,
K0110+440 - K0110+740,
K0111+300 - K0111+439,
K0111+455 - K0111+677,
K0111+693 - K0113+714,
K0111+736 - K0113+770,
Narra

CW1: 10.892 lane km
Allocation: 150,000,000 Php
July 16, 2018 FY - 2018 WIN8F05663 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+100 - K0234+300,
Bataraza

CW1: 9.248 lane km
Allocation: 135,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+171 - K0234+460,
Bataraza

CW1: 9.604 lane km
Allocation: 135,000,000 Php
July 16, 2018 FY - 2018 Win8F05654 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K228+900,

CW1: 9.784 lane km
Allocation: 150,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K0226+5378,
K0226+562 - K0228+954,
Bataraza

CW1: 10.00 lane km
Allocation: 150,000,000 Php

July 16, 2018 FY 2018 WIN8G02338 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 300106200114000
Project ID: P00257615LZ
Local Infrastructure Program – Flood Control and Drainage - Flood control Structures / facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Seawall along the coast of Barangay Poblacion East to Brgy. Poblacion West, Milagros, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 358.75 lm
Unit Cost: CW1 – Php 55.19 T/lm
Estimated Cost: Php 20.0 M
(As Modified)
July 16, 2018 FY 2018 WIN8G02502 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100014000
Project ID: P00230380LZ
Convergence and Special Support Program –
Construction/Improvement of Access Roads leading to Airports – Jct. DM (Tabon-tabon)-Mariawa-Homapon-Maslog-Lamba-Puro Road leading to Bicol International Airport, Albay
Physical Target: CW1 – Road Widening/ 5.998 lane-km
CW2 - Construction of Drainage Structure along Road/ 4,340 lm.
CW3 - Construction of Road Slope Protection Structure/ 6,687.65 sq.m
Unit Cost: CW1 – Php 16.85 M/lane-km
CW2 – Php 11,042.74/lm.
CW3 – Php 2,248.12/sq.m.
Estimated Cost: Php 170.0 M
(As Modified)

July 16, 2018 FY 2018 WIN8G02503 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 16, 2018 FY 2018 WIN8G02503 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 13, 2018 2018 WIN8F05501 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Tertiary Roads

FROM:

Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 445

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
10,004.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 000

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 25.483 M
Shoulder Paving / Construction-
7,959.50 sq.m.
CW2-Construction of Slope Protection P 71.017 M
Structure-4,605.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M
July 13, 2018 2018 WIN8F05635 GAA FY 2018 January 30, 2018 Region VIII Samar 2nd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridges

FROM:

Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)

Physical Target: Allocation:

CW1-Widening of Bridge- 539.00 Square Meter P 38.208210 M
EAO P 1.385790 M

Total Allocation: P 39.594 M

AS MODIFIED:

Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)

Physical Target: Allocation:

CW1-Widening of Bridge- 269.50 Square Meter P 38.208210 M
EAO P 1.385790 M

Total Allocation: P 39.594 M
July 13, 2018 2018 WIN8F05625 GAA FY 2018 January 27, 2018 Region VIII Samar 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road
System

Network Development - Construction of By-Pass and Diversion Roads

FROM:

Basey-Maydolong Road, Including ROW and Bridge, Samar

Physical Target: Allocation:

ROW Acquisition-80,000 square meters P 4.825 M
CW1-Construction of Gravel Road- P 24.125 M
8.00 Lane Km
CW2-Construction of Concrete Bridge- P 9.650 M
334.00 square meter
CW3-Construction of Concrete Road- P 9.650 M
4.00 Lane Km
EAO P 1.750 M

Total Allocation: P 50.00 M

AS MODIFIED:

Basey-Maydolong Road, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- - P 49.00 M
5.050 Lane Km
EAO P 1.00 M

Total Allocation: P 50.00 M
July 12, 2018 2018 WIN8G02500 SR2018-02-003215 February 1, 2018 Region III Regional Office III
Local Program - Local Roads and Bridges
LocaL Roads

Construction/Improvement/Upgrading of Lubao-Guagua-Minlain-Sto. Tomas Road, Pampanga

Allotment: PHP 1 BILLION

CW-1: Construction of Gravel Road / 55.000ln-km
CW-2: Construction of Drainage Structure along Road / 380 lm
ROW: ROW Acquisition / 466,666.67 sq.m.
July 12, 2018 2018 WIN8G02507 SR2018-02-003447 February 1, 2018 Region III Regional Office III
Local Program - Local Roads and Bridges
Local Bridges

Construction of Ciudad de Victoria Interchange Overpass Bridge, Bocaue, Bulacan

Allotment: PHP 300 MILLION

CW-1: Construction of Concrete Road / 6.399ln-km
CW-2: Construction of Concrete Bridge / 1,526.40sq.m.
ROW: ROW Acquisition / 51,152sq.m.
July 12, 2018 2018 WIN8F05215 GAA FY 2018 January 1, 2018 Region VIII Eastern Samar District Engineering Office
Local Projects

Local Roads and Bridges-Local Roads-Local Infrastructure Program

FROM:

Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Borongan, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 9.900 M
0.967 Lane Km
EAO P 0.100 M

Total Allocation: P 10.00 M

AS MODIFIED:

Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Taft, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 9.900 M
1.620 Lane Km
EAO P 0.100 M

Total Allocation: P 10.00 M
July 12, 2018 2018 WIN8F05502 GAA FY 2018 March 20, 2018 Region VIII Biliran District Engineering Office
Local Program

Local- National Roads and Bridges- Local Roads- Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 96.500 M
7.00 Lane Km
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 96.500 M
5.80 Lane Km
EAO P 3.500 M

Total Allocation: P 100.00 M
July 12, 2018 2018 WIN8F05542 GAA FY 2018 January 1, 2018 Region VIII Biliran District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

FROM:

Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630, K1031+1000 - K1032+500

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 48.6864 M
along Road-3,794.0 Lineal meters
EAO P 0.9936 M

Total Allocation: P 49.680 M

AS MODIFIED:

Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 46.9412 M
along Road-3,794.0 Lineal meters
ROW-ROW Acquisition- P 1.000 M
EAO P 0.9936 M
EXCESS P 0.7452 M

Total Allocation: P 49.680 M
July 12, 2018 2018 WIN8F05541 GAA FY 2018 January 1, 2018 Region VIII Biliran District Engineering Office
Convergence and Special Support Program

Convergence and Special Support-Construction/Improvement of Access Roads leading to Declared Tourism Destination

FROM:

Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran

Physical Target: Allocation:

CW1-Reconstruction from Paved to Concrete- P 4.90 M
0.4 Lane Km
EAO P 0.10 M

Total Allocation: P 5.00 M

AS MODIFIED:

Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran

Physical Target: Allocation:

CW1-Reconstruction from Paved to Concrete- P 2.86966 M
0.28 Lane Km
CW2- Construction of Slope Protection P 1.95534 M
Structure- 190 Square meters
EAO P 0.10 M
EXCESS P 0.075 M

Total Allocation: P 5.00 M
July 12, 2018 2018 WIN8F05073 GAA FY 2018 January 1, 2018 Region VIII Leyte 5th District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Off Carriageway Improvement - Secondary Roads

FROM:

Bato-Bontoc Rd - K1116+700 - K1117+851, K1118+030 - K1120+335

Physical Target: Allocation:

CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M

Total Allocation: P 43.484 M


AS MODIFIED:

Bato - Bontoc Rd - K1110 + 848 - K1111 + 000, K1111 + 000 - K1111 + 211, K1111 + 211 - K1111 + 441, K1111 + 441 - K1111 + 484, K1111 + 484 - K1111 + 726, K1111 + 726 - K1111 + 872, K1111 + 872 - K1112 + 000, K1112 + 000 - K1112 + 022, K1112 + 022 - K1112 + 130, K1112 + 130 - K1112 + 227, K1112 + 588 - K1112 + 615, K1112 + 615 - K1112 + 770, K1118 + 030 - K1120 + 335

Physical Target: Allocation:

CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M

Total Allocation: P 43.484 M
July 12, 2018 2018 WIN8F05503 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

FROM:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 947 - K1014 + 639

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,665.00 sq.m.
EAO- P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 952 - K1013 + 700

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 39.574 M
Shoulder Paving / Construction-
10,821.40 sq.m.
CW2-Construction of Slope Protection P 56.926 M
Structure-4,275.65 sq.m.
EAO- P 3.50 M

Total Allocation: P 100.00 M
July 12, 2018 2018 WIN8F05592 GAA FY 2018 January 31, 2018 Region VIII Leyte 3rd District Engineering Office
Local Program

Local-National Roads and Bridges-Local Roads-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 168.875 M
6.0 Lane Km
EAO P 6.125 M

Total Allocation: P 175.00 M

AS MODIFIED:

Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road- P 61.438 M
6.566 Lane Km
CW2-Construction of Concrete Bridge- P 105.687 M
1,004.41 sq.m
ROW-ROW Acquisition-20,000 sq.m P 1.750 M
EAO P 6.125 M

Total Allocation: P 175.00 M
July 12, 2018 2018 WIN8F05543 GAA FY 2018 January 29, 2018 Region VIII Leyte 3rd District Engineering Office
Organizational Outcome1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

FROM:

Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 771, K0984 + 833 - K0986 + 596

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,671.00 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M

AS MODIFIED:

Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 766, K0984 + 838 - K0985 + 505

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: P 30.544 M
Shoulder Paving / Construction-
9,869.80 sq.m.
CW2-Construction of Slope Protection P 65.956 M
Structure-5,790.60 sq.m.
EAO P 3.50 M

Total Allocation: P 100.00 M
July 11, 2018 FY - 2018 WIN8F05648 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2)to six (6) lanes including
drainage structures and other ancillary works,
K0200+100 - K0202+300,
Bataraza

CW1: 8.024 lane km ( Road Widening )
Allocation: 135,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0200+100 - K0201+147,
K0201+173 - K0202+200,
K0202+275 - K0202+435,
Bataraza

CW1: 8.576 lane km ( Road Widening )
Allocation: 135,000,000 Php
July 11, 2018 FY - 2018 WIN8F05652 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+290 - K0177+600,
Brooke's Point

CW1: 9.176 lane km ( Road Widening )
Allocation: 140,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+627 - K0176+185,
K0176+194 - K0177+880,
Brooke's Point

CW1: 9.024 lane km ( Road Widening )
Allocation: 140,000,000 Php
July 11, 2018 2018 WIN8F05112 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0879 + 680 - K0880 + 370, K0881 + 000 - K0881 + 880, K0882 + 100 - K0883 + 000, K0883 + 600 - K0885 + 177, K0885 + 209 - K0885 + 521

Physical Target: Allocation

CW1-Road Widening-10.434 Lane Km P 63.764 M
CW2- ROW Acquisition-53,665.00 Sq.m P 32.736 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0881 + 000 - K0881 + 880, K0883 + 600 - K0884 + 862

Physical Target: Allocation

CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 WIN8F05113 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 500

Physical Target: Allocation:

CW1-Road Widening-7.679 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation: P 200.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 448

Physical Target: Allocation:

CW1-Road Widening-7.5754 Lane Km P 183.00 M
ROW Acquisition- 5,000.00 Sq.m P 10.00 M
EAO P 7.00 M

Total Allocation: P 200.00 M
July 11, 2018 2018 WIN8F05114 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0786 + 432 - K0787 + 000, K0789 + 000 - K0790 + 000, K0834 + 000 - K0835 + 000, K0841 + 300 - K0841 + 400, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 814

Physical Target: Allocation:

CW1-Road Widening-10.786 Lane Km P 69.108 M
CW2-ROW Acquisition-55,449.00 Sq.m P 27.392 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0834 + 000 - K0835 + 000, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 081

Physical Target: Allocation:

CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 OUT8$85139 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0680 + 790 - K0680 + 800, K0684 + 840 - K0685 + 020, K0687 + 550 - K0687 + 975, K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 900

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,215 Sq.m
EAO P 2.800 M

Total Allocation: P 80.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - , K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 920

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,534.95 Sq.m
EAO P 2.800 M

Total Allocation: P 80.00 M
July 11, 2018 2018 WIN8F05085 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0885 + 553 - K0886 + 036, K0886 + 058 - K0886 + 210, K0887 + 200 - K0887 + 550, K0887 + 800 - K0888 + 950, K0889 + 480 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0894 + 000, K0894 + 100 - K0894 + 300

Physical Target: Allocation:

CW1-Road Widening-10.250 Lane Km P 66.900 M
CW2- ROW Acquisition-5,103.00 Sq.m P 29.600 M
EAO P 3.500 M

Total Allocation: P 100.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0888 + 000 - K0888 + 200, K0889 + 480 - K0890 + 000, K0890 + 000 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0893 + 230, K0893 + 230 - K0894 + 000, K0894 + 100 - K0894 + 300

Physical Target: Allocation:

CW1-Road Widening-6.350 Lane Km P 96.500 M
EAO P 3.500 M

Total Allocation: P 100.00 M
July 11, 2018 2018 WIN8F05088 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0679 + -056 - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 901.60 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000, K0690 + 000 - K0690 + 565

Physical Target: Allocation:

CW1-Road Widening-12.562 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation P 200.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0690 + 000 - K0690 + 565, K0679 + (-056) - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 909 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000,

Physical Target: Allocation:

CW1-Road Widening-12.5468 Lane Km P 193.00 M
EAO P 7.00 M

Total Allocation P 200.00 M
July 11, 2018 2018 WIN8F05087 GAA FY 2018 January 26, 2018 Region VIII Regional Office VIII
Organizational Outcome 1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0811 + 000

Physical Target: Allocation:

CW1-Asphalt Overlay-12.426 Lane Km P 59.151605 M
EAO P 2.145395 M

Total Allocation: P 61.297 M


AS MODIFIED:

Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0810 + 293

Physical Target: Allocation:

CW1-Asphalt Overlay-11.00 Lane Km P 59.151605 M
EAO P 2.145395 M

Total Allocation: P 61.297 M
July 11, 2018 FY 2018 WIN8G02477 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 300117201356000
Project ID: P00254194LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Patong-Cagbibi Road, Brgy. Patong, Pamplona, Camarines Sur
Physical Target - CW1 - Construction of Concrete Road / 0.252 lane-km
Unit Cost: Php 7.86M / lane km
Estimated Cost: Php 2.00M
(As Modified)
July 11, 2018 FY 2018 WIN8G02472 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 300117201357000
Project ID: P00255759LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Reconstruction of Tambo-Calawat Road, Brgy. Calawat, Pamplona, Camarines Sur
Physical Target - CW1 – reconstruction of Concrete Road / 0.24 lane km
Unit Cost: CW1 - Php 8.25 M/lane km
Estimated Cost: Php 2.00 M
(As Modified)
July 11, 2018 2018 WIN8F05587 GAA FY 2018 May 10, 2018 Region VIII Regional Office VIII
Organizational Outcome 2: Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation Structure- P 48.250 M
870.00 Lineal Meters
EAO P 1.750 M

Total Allocation: P 50.00 M

AS MODIFIED:

Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Revetment- P 48.250 M
350.00 Lineal Meters
EAO P 1.750 M

Total Allocation: P 50.00 M
July 11, 2018 FY 2018 WIN8G02486 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101718000
Project ID: P00223409LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Bocon Seawall/Causeway, Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 88 lm
Unit Cost: CW1 – Php 556,818.18/lm.
Estimated Cost: Php 50.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02491 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101700000
Project ID: P00220236LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+000 - Sta. 0+091, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 91 lm
Unit Cost: CW1 – Php 323.077 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02492 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Catanduanes District Engineering Office
UACS No.: 320101101701000
Project ID: P00220237LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+091 - Sta. 0+167, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 76 lm
Unit Cost: CW1 – Php 386.842 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02476 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100144000
Project ID: P00230392LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White San Beaches, Brgy. Odicon, Pasacao, Camarines Sur
Physical Target: CW1 – Construction of Gravel Road/ 8.5288 lane-km
CW2 - Construction of Drainage Structure along Road/ 6,272 lm.
CW3 - Construction of Road Slope Protection Structure/ 8,556.23 sq.m.
Unit Cost: CW1 Php 10.046 M/lane km
CW2 - Php 5,505.08/lm
CW3 - Php 2,868.55/sq.m.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02483 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Regional Office V
UACS No.: 300204100075000
Project ID: P00230404LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Sta. Cruz-Pandan-Upland Central Economic Zone in Busac-Oma oma-Paulba Road connecting to Ligao-Pioduran Road, incl. bridge in support to Agribusiness (Food Resource Based Processing) Ligao City, Albay
Physical Target: CW1 – Reconstruction from Paved to Concrete/ 3.68 lane-km
CW2 – Construction of Gravel Road/1.029 lane-km
CW3 – Construction of Concrete Bridge/122.11 sq.m.
Unit Cost: CW1 – Php 13.28 M/lane-km
CW2 – Php 13.93 M/lane-km
CW3 – Php 35,671.61 T/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02495 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200121000
Project ID: P00257842LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Ariman - Panganiban Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.7332 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,887.99 sq.m.
Unit Cost: CW1 – Php 41.66 M/lane-km
CW2 – Php 34,932.92/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02494 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200144000
Project ID: P00257865LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Paghuliran – Poropandan Coastal Road and Shore Protection, Matnog, Sorsogon
Physical Target:CW1 – Construction of Concrete Road/ 0.6168 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,588.26 sq.m.
Unit Cost: CW1 – Php 48.16 M/lane-km
CW2 – Php 42,054.20/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02496 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200146000
Project ID: P00257867LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Poropandan – Culasi Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6067 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,562.25 sq.m.
Unit Cost: CW1 – Php 49.44 M/lane-km
CW2 – Php 42,571.29/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02474 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100070000
Project ID: P00201255LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0376+006 – K0377+540
Physical Target: CW1 - Road Widening/ 3.078 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,654 lm.
Unit Cost: CW1 – Php 20.10 M/lane-km
CW1 – Php 12.00 T/lm.
Estimated Cost: Php 97.122 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02468 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310102100040000
Project ID: P00202708LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance – Secondary Roads –
Repair/Rehabilitation (Asphalt Overlay) Masbate-Uson-Placer Road (Buenavista-Cawayan Section), Masbate
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 9.054 lane-km
Unit Cost: CW1 – Php 10.66 M/lane-km
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02475 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100074000
Project ID: P00201068LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads – Camarines Sur/Albay Diversion Road (Albay Section), incl. ROW, Albay
Physical Target: CW1 – Construction of Gravel Road/ 3.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 1,890 lm.
CW3 - Construction of Road Slope Protection Structure/ 2,146.75 sq.m.
Right-of-Way Acquisition (ROW)/ 31,600 sq.m.
Unit Cost: CW1 – Php 22.55 M/lane-km
CW2 – Php 7,236.94/lm.
CW3 – Php 4,554.35/sq.m.
ROW Acquisition – Php 56.96/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02482 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100101000
Project ID: P00201072LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Road – Daraga Urban Traffic Eco Route (DUTERTE), Project, Albay incl. ROW and Dike
Physical Target: CW1 – Construction of Gravel Road/ 2.912lane-km
CW2 – Construction of Dike/ 518.60 lm
Right-of-Way Acquisition (ROW)/ 21,840 sq.m.
Unit Cost: CW1 – Php 13.19 M/lane-km
CW2 – Php 167,847.01/lm.
ROW Acquisition – Php 3,092.95/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02467 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310104100009000
Project ID: P00200412LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) - K0396+441.10 - K0396+840
Physical Target: CW1 – Construction of Concrete Road/ 1.5956 lane-km
CW2 - Construction of Drainage Structure along Road/ 797.80 lm.
CW3 - Construction of Road Slope Protection Structure/ 1,790.20 sq.m.
Unit Cost: CW1 – Php 39.43 M/lane-km
CW2 – Php 8,280.20/lm.
CW3 – Php 4,287.60/sq.m.
Estimated Cost: Php 80.0 M
(As Modified)

July 11, 2018 FY 2018 WIN8G02471 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100076000
Project ID: P00201260LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0600+ -008 – K0602+683, K0605+000 – K0605+167
Physical Target: CW1 - Road Widening/ 5.727 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,873 lm.
Unit Cost: CW1 – Php 8.67 M/lane-km
CW2 – Php 12.09T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02478 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100082000
Project ID: P00201259LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0530+360 – K0534+630
Physical Target: CW1 - Road Widening/ 8.91084 lane-km
Right-of-Way Acquisition (ROW)/ 22,277.10 sq.m.
Unit Cost: CW1 – Php 17.31 M/lane-km
CW2 – Php 849.68/sq.m.
Estimated Cost: Php 179.41 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02473 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02473 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
July 11, 2018 FY 2018 WIN8G02481 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310101100328000
Project ID: P00223278LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems –
Rehabilitation/Improvement of Busay Flood Control Dike, Busay, Sta. 7+267.00 - Sta. 7+462.73, Sta. 7+532 - Sta. 7+863.90, Sta. 7+991.67 - Sta. 8+321.80, Sta. 7+360 - Sta. 7+637, Daraga, Albay
Physical Target: CW1 – Construction of Dike/ 1,134.76 lm
Unit Cost: CW1 – Php 85.040 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
July 10, 2018 FY - 2018 WINF05653 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0142+300,
Espanola

CW1: 10.072 lane km ( Road Widening )
Allocation: 150,000,000 Php

TO:
Widening of Puerto Proncesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0141+891,
Espanola

CW1: 8.424 lane km ( Road Widening )
Allocation: 150,000,000 Php
July 10, 2018 FY - 2018 WIN8F05651 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
Local Program

Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0105+100 - K0107+400,
Narra

CW1: 9.004 lane km ( Road Widening )
Allocation: 140,000,000 Php

TO:
Widening of Puerto Princesa South Road
from two (2) to six (6 lanes including drainage
structures and other ancillary works,
K0104+388 - K0105+742,
K0105+771 - K0106+922,
Narra

CW1: 10.064 lane km ( Road Widening )
Allocation: 140,000,000 Php
July 9, 2018 FY 2018 WIN8G02508 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40
July 9, 2018 FY - 2018 WIN8F05649 FY - 2018 GAA DPWH Infra December 19, 2017 Region IV-B Southern Mindoro Engineering District Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged
Paved Roads - Secondary Roads

FROM:
Calapan South Rd
( K0169+040 - K0169+121,
K0171+000 - K0171+845,
K0172+092 - K0172+700 )

CW1: 3.068 lane km ( Reconstruction from Paved
to Concrete )
Allocation: 40,000,000 Php

TO:
Calapan South Rd
( K0169+040 - K0169+123.50,
K0177+176 - K0178+000.00,
K0178+544 - K0179+000.00 )

CW1: 2.789 lane km ( Reconstruction from Paved
to Concrete )
Allocation : 40,000,000 Php
July 9, 2018 FY - 2018 WIN8F05689 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
001 - Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/
New Roads

FROM:
Victoria Sablayan ( Mindoro Cross-Island Road ),
Package 2, Occidental Mindoro

CW1: 4.282 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php

TO:
Victoria - Sablayan ( Mindoro Cross Island Road ),
Occidental Mindodo

CW1: 3.816 lane km ( Construction of Concrete Road )
Allocation : 150,000,000 Php
July 6, 2018 FY 2018 WIN8C03325 310206100006000 June 29, 2018 Region IX Regional Office IX
UACS No. 310206100006000
Project ID: P00200469MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/ Long Span Bridges
Governor Camin/MCLL Highway and Veterans Avenue Flyover incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of flyover: 7,659.925 sq.m
Unit Cost: CW-1 - Construction of flyover: P 31,266.62/sq.m
Physical Target:
ROW: 51,813.47 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,500,000.00
Allocation: P 300,000,000.00
July 6, 2018 FY 2018 WIN8C03329 310206100007000 June 29, 2018 Region IX Regional Office IX
UACS No. 310206100007000
Project ID: P00200470MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Jct. T. Taupan Street (Suterville/Gavilan) Flyover, incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of Flyover: 8,225.00 sq.m
Unit Cost: CW-1 - Construction of Flyover: P 29,161.09/sq.m
Physical Target:
ROW: 41,450.78 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,150,000.00
Allocation: P 290,000,000.00
July 6, 2018 FY 2018 WIN8C03326 310107100018000 June 29, 2018 Region IX Regional Office IX
UACS No. 310107100018000
Project ID: P00200186MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Pagadian City - Zamboanga City Road
K1869+K950.00 - K1870+055.00,
K1870+240.00 - K1870+330.00,
K1870+520.00 - K1870+590.00,
K1870+680.00 - K1870+874.00,
K1894+220.00 - K1894+400.00,
K1911+910.00 - K1911+981.00
Physical Target:
CW-1 - Construction of Road Slope Protection: 11,091.47 sq.m
Unit Cost: CW-1 - Construction of Road Slope Protection: P 17,355.25/sq.m
Physical Target:
ROW: 1,682.48 sq.m
Unit Cost: P 300/sq.m
EAO: P 7,000,000.00
Allocation: P 200,000,000.00
July 6, 2018 FY 2018 WIN8C03317 310204100044000 June 29, 2018 Region IX Regional Office IX
UACS No. 310204100044000
Project ID: P00200294MN

OO1: Ensure Safe and Reliable National Road System
Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Curuan - Lubigan Section) Incl. Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 83,178,164.06/lane km
Physical Target:
ROW: 6,716.46 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
July 6, 2018 FY 2018 WIN8C03328 310211100026000 June 29, 2018 Region IX Regional Office IX
UACS No. 310211100026000
Project ID: P00200845MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Road (Limpapa - Sibuco Section) - (S01166MN)
Chainage 4000 - Chainage 5411.66
Chainage 5441.53 - Chainage 9029.87
Physical Target:
CW-1 - Paving of Unpaved Road: 10.00 lane km
Unit Cost: CW-1 - Paving of Unpaved Road: P 24,049,209.30
Physical Target:
ROW: 2,526.36 sq.m
Unit Cost: P 300/sq.m
EAO: P 8,750,000.00
Allocation: P 250,000,000.00
July 5, 2018 GAA FY 2018 WIN8F05684 UACS No. 300116200391000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=0.40 lane km
Unit Cost (P’000): P49,000.00/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00

As Modified
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=3.2586 lane km
Unit Cost (P’000): P6,014.85/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
July 5, 2018 GAA FY 2018 WIN8F05685 UACS No. 310204100096000 January 1, 2018 National Capital Region NCR - Regional Office
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 0 lane km
Unit Cost (P’000): P 0/ lane km
Allocation: P 121.590 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M

As Modified
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 2.576 lane km
Unit Cost (P’000): P 16,393.09/ lane km
ROW Acquisition A=7883.28 SQ,M. = P10.07/sq.m.
Estimated Cost: P 42.236 M
P 79.354 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
July 5, 2018 GAA FY 2018 WIN8F05691 UACS No. 300116200243000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. Pascual Cities of Malabon and Navotas, Sta. 1+055
Physical Target: CW1 – Construction of Concrete Road: 4.22 Lane KM
EAO = P 1 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49 M
Total: P 50 M

As Modified
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. W. Pascual Ave., Malabon City (Phase I) Sta. 0+000 – Sta. 0+790
Physical Target: CW1 – Construction of Concrete Road: 2.644 Lane KM
EAO = P 0.5 M
Excess = P 0.038 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49.462 M
Total: P 50 M
July 5, 2018 GAA FY 2018 WIN8F05690 UACS No. 300108200027000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek (Bicutan Section), Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 200 lineal meters
Unit Cost (P’000): P 98.00/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek, Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 264 lineal meters
Unit Cost (P’000): P 74.24/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
July 5, 2018 FY 2018 WIN8G02485 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Pinsal Falls, Ecotourism Park, Nueva Ecija
July 5, 2018 FY 2018 WIN8G02498 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ), K0169+1216 – K0170+000, K0170+044 – K0170+070, K0170+231 – K0170+252, K0170+290 – K0170+415, K0171+150 – K0171+208, K0171+260 – K0171+440, K0171+955 – K0172+015, K0172+900 – K0172+992, K0173+390 – K0173+456, K0174+020 – K0174+140, K0177+375 – K0177+445, K0205+839.20 – K0205+890, K0205+890 – K0205+950
July 4, 2018 FY 2018 WIN8G02490 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement of Road and Bailey Bridge at Sitio Camachile, Nabuclod, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02443 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Road leading to Palacol (Summer Place), San Jose, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02456 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – road Widening - Primary Roads – Jose Abad Santos Ave (JASA), K0087+526 – K0087+972.30, K0087+980 – K0088+364.50, K0088+374.50 – K0088+580
July 4, 2018 FY 2018 WIN8G02454 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Nabuclod, Sitio Camachile, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02460 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting / Paving of Road, Sitio Santol and Purok 6 Road, San Jose, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02359 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Network Development Project - Off-Carriageway Improvement – Tertiary Roads – San Fernando – Lubao Rd, K0083+153 – K0083+526, K0083+538.20 – K0083+846, K0083+852.20 – K0084+160 – K0084+188.60 – K0084+703.90 – K0084+713.60 – K0084+875
July 4, 2018 FY 2018 WIN8G02458 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Benigno Aquino St., Sta. Cruz, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02459 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Lubao – Guagua – Minalin – Sto. Tomas Road, Pampanga
July 4, 2018 FY 2018 WIN8G02452 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Bridges – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of RCDG Bridge at Sta. Catalina, Sta. Catalina, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02442 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Dalan Betis, San Juan Nepomuceno, Guagua, Pampanga
July 4, 2018 FY 2018 WIN8G02441 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road and Canalization, Barangay Jalung, Porac, Pampanga
July 4, 2018 FY 2018 WIN8G02457 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road, Sto. Domingo – San Roque, Dau, Lubao, Pampanga

July 4, 2018 FY 2018 WIN8G02444 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Angeles – Porac – By–Pass Road, Pampanga
July 4, 2018 FY 2018 WIN8G02446 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Bodega (Sitio Biglang Sibul), Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02436 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Mawacat, Floridablanca, Pampanga
July 4, 2018 FY 2018 WIN8G02433 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Manibaug, Porac, Pampanga
July 4, 2018 FY 2018 WIN8G02428 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Sitio Pigulut, Sta. Lucia, Lubao, Pampanga
July 4, 2018 FY 2018 WIN8G02497 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Jose Abad Santos Ave (JASA), K0094+314 - K0094+674, K0095+692 - K0096+245
July 4, 2018 FY 2018 WIN8G02449 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Pulong Visaya, Brgy. Sta. Catalina, Lubao, Pampanga
July 4, 2018 GAA FY 2018 WIN8F05655 UACS No. 300116200299000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Pedro Cruz, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 1.6 Lane km
Unit Cost (P’000): P3,062.50/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00

As Modified
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Tibagan, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.217 Lane km
Unit Cost (P’000): P22,580.65/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
July 4, 2018 GAA FY 2018 WIN8F05660 UACS No. 300103200102000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Building, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000): P14,700/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00

As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Buildings, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 2 Bldg.
Unit Cost (P’000): P7,350.00/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
July 4, 2018 GAA FY 2018 WIN8F05657 UACS No. 300116200262000 January 2, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.95 Lane km
Unit Cost (P’000): P51,578/lane km
Allocation (‘000): P 49,000.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00

As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.732 Lane km
RWOW – ROW Acquisition 4,828.57 m2 = P7,000/sq.m
Unit Cost (P’000): P20,765/lane km
Allocation (‘000): P 15,200.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
July 4, 2018 GAA FY 2018 WIN8F05679 UACS No. 300107200004000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station, Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00

As Modified
UACS No. 300103200102000
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station for the Catchment Area of Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
July 4, 2018 GAA FY 2018 WIN8F05650 UACS No. 300104200117000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Sitio Fatima, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00

As Modified
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
July 4, 2018 GAA FY 2018 WIN8F05661 UACS No. 320101100558000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 48.60 lineal meters
EAO (‘000) – P 600.00
Unit Cost (P’000): P604.94/ l.m.
Allocation (000): P 29,400.00
Total (‘000): P 30,000.00

As Modified
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 128.60 lineal meters
CW2 – Construction of Concrete Road = 0.160 lane km
CW3 – Construction of Flood Mitigation Structures 604.00 Lineal Meters
Unit Cost (P’000): CW1 - P32.15/ l.m.
CW2 - P7,788.50/ l.m.
CW3 – P39,77/l.m.
EAO (‘000) – P 600.00
Allocation (000): CW1 = P 4,135.00
CW2 = P1,246.00
CW3 = P24,019.00
Total (‘000): P 30,000.00
July 4, 2018 GAA FY 2018 WIN8F05678 UACS No. 300118200006000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Bridge 732 sq.m.
EAO (‘000) – P 3,500.00
Unit Cost (P’000): P131.00/sq.m.
Allocation (‘000): P 96,500.00
Total (‘000): P 100,000.00

As Modified
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1 - Construction of Bridge 439.20 sq.m.
CW2 – Rehabilitation of Concrete Road 2.33 Lane km
EAO (‘000) – P 3,500.00
Unit Cost (P’000): CW1 = P134.96/sq.m.
CW2 = P15,977,25/ Lane km
Allocation (‘000): CW1 = P 59,273.00
CW2 = P 37,227.00
Total (‘000): P 100,000.00
July 4, 2018 GAA FY 2018 WIN8F05658 UACS No. 320101100561000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=450 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P21.78.00/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00

As Modified
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=938 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P10.45/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
July 4, 2018 GAA FY 2018 WIN8F05659 UACS No. 300104200130000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 177, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00

As Modified
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 176, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
July 4, 2018 GAA FY 2018 WIN8F05647 UACS No. 320101100367000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+686, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 686 lm
EAO = P 0.2 M
Unit Cost: P 14,285.71 / lm
Allocation: P 9.8 M
Total: P 10 M

As Modified
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+655, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 655 lm
EAO = P 0.2 M
Unit Cost: P 14,961.83 / lm
Allocation: P 9.8 M
Total: P 10 M
July 4, 2018 FY 2018 WIN8G02461 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehab. of San Isidro – San Juan Road leading to Sta. Rita Eco Park, Pampanga
July 3, 2018 FY 2018 GAA WIN8C03311 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte

Physical Target:
CW1: 239 Sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Bridge)
EAO: P 500,000.00

TO: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte

Physical Target:
CW1: 1 Number of Bridge (Construction of Substructure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Substructure)
EAO: P 500,000.00

Pages