July 17, 2018 |
FY 2018 |
WIN8G02339 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300106200017000
Project ID: P00257546LZ
LOCAL PROGRAM – Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Mitigation along Taysan River, Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 802.00 lm
Unit Cost: CW1 – Php 60.16T/lm.
Estimated Cost: Php 50.0 M
(As Modified)
|
July 17, 2018 |
FY 2018 |
WIN8G02348 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300106200008000
Project ID: P00257537LZ
LOCAL PROGRAM – Flood Control and Drainage - Flood Control Structures/ Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Flood Control Structures along Matanag River (Upstream) - Sta. 0+460 - Sta. 0+910 (B/S), Legazpi City
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 900 lm
Unit Cost: CW1 – Php 107.22T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 17, 2018 |
FY 2018 |
WIN8G02332 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 320102100424000
Project ID: P00221296LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction/Improvement of Quirangay River Course (Poblacion Section), Sta. 0+000 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Sta. 0+025 - Sta. 0+125.30, Sta. 0+005 - Sta. 0+063, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 341.60 lm
Unit Cost: CW1 – Php 71.721T/lm.
Estimated Cost: Php 25.00 M
(As Modified)
|
July 16, 2018 |
FY - 2018 |
WIN8F05662 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
and other ancillary works,
K0111+300 - K0113+800,
Narra
CW1: 9.812 lane km
Allocation: 150,000,000 Php
TO:
Widening of Puerto Princesa Road
from to (2) to six (6) lanes including drainage
and other ancillary works,
K0110+440 - K0110+740,
K0111+300 - K0111+439,
K0111+455 - K0111+677,
K0111+693 - K0113+714,
K0111+736 - K0113+770,
Narra
CW1: 10.892 lane km
Allocation: 150,000,000 Php
|
July 16, 2018 |
FY - 2018 |
WIN8F05663 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+100 - K0234+300,
Bataraza
CW1: 9.248 lane km
Allocation: 135,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0232+171 - K0234+460,
Bataraza
CW1: 9.604 lane km
Allocation: 135,000,000 Php |
July 16, 2018 |
FY - 2018 |
Win8F05654 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K228+900,
CW1: 9.784 lane km
Allocation: 150,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including
drainage and other ancillary works,
K0226+400 - K0226+5378,
K0226+562 - K0228+954,
Bataraza
CW1: 10.00 lane km
Allocation: 150,000,000 Php
|
July 16, 2018 |
FY 2018 |
WIN8G02338 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 300106200114000
Project ID: P00257615LZ
Local Infrastructure Program – Flood Control and Drainage - Flood control Structures / facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Seawall along the coast of Barangay Poblacion East to Brgy. Poblacion West, Milagros, Masbate
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 358.75 lm
Unit Cost: CW1 – Php 55.19 T/lm
Estimated Cost: Php 20.0 M
(As Modified)
|
July 16, 2018 |
FY 2018 |
WIN8G02502 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300201100014000
Project ID: P00230380LZ
Convergence and Special Support Program –
Construction/Improvement of Access Roads leading to Airports – Jct. DM (Tabon-tabon)-Mariawa-Homapon-Maslog-Lamba-Puro Road leading to Bicol International Airport, Albay
Physical Target: CW1 – Road Widening/ 5.998 lane-km
CW2 - Construction of Drainage Structure along Road/ 4,340 lm.
CW3 - Construction of Road Slope Protection Structure/ 6,687.65 sq.m
Unit Cost: CW1 – Php 16.85 M/lane-km
CW2 – Php 11,042.74/lm.
CW3 – Php 2,248.12/sq.m.
Estimated Cost: Php 170.0 M
(As Modified)
|
July 16, 2018 |
FY 2018 |
WIN8G02503 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
|
July 16, 2018 |
FY 2018 |
WIN8G02503 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100075000
Project ID: P00201069LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Road (Camarines Sur Section), Camarines Sur
Physical Target: CW1 – Reconstruction of Concrete Road/ 4.8524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 4,217.62 sq.m.
Right-of-Way Acquisition (ROW)/ 72,786 sq.m.
Unit Cost: CW1 – Php 30.10 M/lane-km
CW2 – Php 8,813.40/sq.m.
ROW Acquisition – Php 134.23/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
|
July 13, 2018 |
2018 |
WIN8F05501 |
GAA FY 2018 |
January 29, 2018 |
Region VIII |
Leyte 3rd District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
FROM:
Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 445
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
10,004.00 sq.m.
EAO P 3.50 M
Total Allocation: P 100.00 M
AS MODIFIED:
Tabango-Catmon-La Fortuna-Manlawaan-Gimarco Rd - K1036 + 800 - K1038 + 000
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 25.483 M
Shoulder Paving / Construction-
7,959.50 sq.m.
CW2-Construction of Slope Protection P 71.017 M
Structure-4,605.00 sq.m.
EAO P 3.50 M
Total Allocation: P 100.00 M |
July 13, 2018 |
2018 |
WIN8F05635 |
GAA FY 2018 |
January 30, 2018 |
Region VIII |
Samar 2nd District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
FROM:
Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
Physical Target: Allocation:
CW1-Widening of Bridge- 539.00 Square Meter P 38.208210 M
EAO P 1.385790 M
Total Allocation: P 39.594 M
AS MODIFIED:
Silaga Br. (B00397SM) along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br)
Physical Target: Allocation:
CW1-Widening of Bridge- 269.50 Square Meter P 38.208210 M
EAO P 1.385790 M
Total Allocation: P 39.594 M |
July 13, 2018 |
2018 |
WIN8F05625 |
GAA FY 2018 |
January 27, 2018 |
Region VIII |
Samar 2nd District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road
System
Network Development - Construction of By-Pass and Diversion Roads
FROM:
Basey-Maydolong Road, Including ROW and Bridge, Samar
Physical Target: Allocation:
ROW Acquisition-80,000 square meters P 4.825 M
CW1-Construction of Gravel Road- P 24.125 M
8.00 Lane Km
CW2-Construction of Concrete Bridge- P 9.650 M
334.00 square meter
CW3-Construction of Concrete Road- P 9.650 M
4.00 Lane Km
EAO P 1.750 M
Total Allocation: P 50.00 M
AS MODIFIED:
Basey-Maydolong Road, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road- - P 49.00 M
5.050 Lane Km
EAO P 1.00 M
Total Allocation: P 50.00 M |
July 12, 2018 |
2018 |
WIN8G02500 |
SR2018-02-003215 |
February 1, 2018 |
Region III |
Regional Office III |
Local Program - Local Roads and Bridges
LocaL Roads
Construction/Improvement/Upgrading of Lubao-Guagua-Minlain-Sto. Tomas Road, Pampanga
Allotment: PHP 1 BILLION
CW-1: Construction of Gravel Road / 55.000ln-km
CW-2: Construction of Drainage Structure along Road / 380 lm
ROW: ROW Acquisition / 466,666.67 sq.m. |
July 12, 2018 |
2018 |
WIN8G02507 |
SR2018-02-003447 |
February 1, 2018 |
Region III |
Regional Office III |
Local Program - Local Roads and Bridges
Local Bridges
Construction of Ciudad de Victoria Interchange Overpass Bridge, Bocaue, Bulacan
Allotment: PHP 300 MILLION
CW-1: Construction of Concrete Road / 6.399ln-km
CW-2: Construction of Concrete Bridge / 1,526.40sq.m.
ROW: ROW Acquisition / 51,152sq.m. |
July 12, 2018 |
2018 |
WIN8F05215 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Eastern Samar District Engineering Office |
Local Projects
Local Roads and Bridges-Local Roads-Local Infrastructure Program
FROM:
Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Borongan, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 9.900 M
0.967 Lane Km
EAO P 0.100 M
Total Allocation: P 10.00 M
AS MODIFIED:
Construction/Repair/Rehabilitation of Road, Barangay Nato to Barangay Bongdo, Taft, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 9.900 M
1.620 Lane Km
EAO P 0.100 M
Total Allocation: P 10.00 M
|
July 12, 2018 |
2018 |
WIN8F05502 |
GAA FY 2018 |
March 20, 2018 |
Region VIII |
Biliran District Engineering Office |
Local Program
Local- National Roads and Bridges- Local Roads- Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
FROM:
Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 96.500 M
7.00 Lane Km
EAO P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Road Opening and Concreting of Access Road going to Germohenes Waterfalls, Biliran
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 96.500 M
5.80 Lane Km
EAO P 3.500 M
Total Allocation: P 100.00 M
|
July 12, 2018 |
2018 |
WIN8F05542 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Biliran District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
FROM:
Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630, K1031+1000 - K1032+500
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 48.6864 M
along Road-3,794.0 Lineal meters
EAO P 0.9936 M
Total Allocation: P 49.680 M
AS MODIFIED:
Naval-Caibiran Cross Country Rd - K1027+361 - K1027+660, K1027+788 - K1027+890, K1028 + 770 - K1029 + 740, K1030 + 150 - K1030 + 750, K1030 + 311 - K1030 + 920, K1030+930 - K1031+630
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 46.9412 M
along Road-3,794.0 Lineal meters
ROW-ROW Acquisition- P 1.000 M
EAO P 0.9936 M
EXCESS P 0.7452 M
Total Allocation: P 49.680 M |
July 12, 2018 |
2018 |
WIN8F05541 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Biliran District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support-Construction/Improvement of Access Roads leading to Declared Tourism Destination
FROM:
Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran
Physical Target: Allocation:
CW1-Reconstruction from Paved to Concrete- P 4.90 M
0.4 Lane Km
EAO P 0.10 M
Total Allocation: P 5.00 M
AS MODIFIED:
Access Road leading to Tomalistis Falls, Brgy. Asug, Caibiran, Biliran
Physical Target: Allocation:
CW1-Reconstruction from Paved to Concrete- P 2.86966 M
0.28 Lane Km
CW2- Construction of Slope Protection P 1.95534 M
Structure- 190 Square meters
EAO P 0.10 M
EXCESS P 0.075 M
Total Allocation: P 5.00 M
|
July 12, 2018 |
2018 |
WIN8F05073 |
GAA FY 2018 |
January 1, 2018 |
Region VIII |
Leyte 5th District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Off Carriageway Improvement - Secondary Roads
FROM:
Bato-Bontoc Rd - K1116+700 - K1117+851, K1118+030 - K1120+335
Physical Target: Allocation:
CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M
Total Allocation: P 43.484 M
AS MODIFIED:
Bato - Bontoc Rd - K1110 + 848 - K1111 + 000, K1111 + 000 - K1111 + 211, K1111 + 211 - K1111 + 441, K1111 + 441 - K1111 + 484, K1111 + 484 - K1111 + 726, K1111 + 726 - K1111 + 872, K1111 + 872 - K1112 + 000, K1112 + 000 - K1112 + 022, K1112 + 022 - K1112 + 130, K1112 + 130 - K1112 + 227, K1112 + 588 - K1112 + 615, K1112 + 615 - K1112 + 770, K1118 + 030 - K1120 + 335
Physical Target: Allocation:
CW1 - Off Carriageway Improvement: P 42.614320 M
Shoulder Paving/ Construction-
13,876.00 Square meter
EAO P 0.869680 M
Total Allocation: P 43.484 M |
July 12, 2018 |
2018 |
WIN8F05503 |
GAA FY 2018 |
January 29, 2018 |
Region VIII |
Leyte 3rd District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
FROM:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 947 - K1014 + 639
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,665.00 sq.m.
EAO- P 3.50 M
Total Allocation: P 100.00 M
AS MODIFIED:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1011 + 952 - K1013 + 700
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 39.574 M
Shoulder Paving / Construction-
10,821.40 sq.m.
CW2-Construction of Slope Protection P 56.926 M
Structure-4,275.65 sq.m.
EAO- P 3.50 M
Total Allocation: P 100.00 M |
July 12, 2018 |
2018 |
WIN8F05592 |
GAA FY 2018 |
January 31, 2018 |
Region VIII |
Leyte 3rd District Engineering Office |
Local Program
Local-National Roads and Bridges-Local Roads-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 168.875 M
6.0 Lane Km
EAO P 6.125 M
Total Allocation: P 175.00 M
AS MODIFIED:
Construction of Calubian-Jubay-Daja Road including Bridges, Calubian and San Isidro, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road- P 61.438 M
6.566 Lane Km
CW2-Construction of Concrete Bridge- P 105.687 M
1,004.41 sq.m
ROW-ROW Acquisition-20,000 sq.m P 1.750 M
EAO P 6.125 M
Total Allocation: P 175.00 M |
July 12, 2018 |
2018 |
WIN8F05543 |
GAA FY 2018 |
January 29, 2018 |
Region VIII |
Leyte 3rd District Engineering Office |
Organizational Outcome1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
FROM:
Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 771, K0984 + 833 - K0986 + 596
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 96.50 M
Shoulder Paving / Construction-
16,671.00 sq.m.
EAO P 3.50 M
Total Allocation: P 100.00 M
AS MODIFIED:
Sambulawan Jct-Calaguise-Calubian Rd - K0984 + (-300) - K0984 + 766, K0984 + 838 - K0985 + 505
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 30.544 M
Shoulder Paving / Construction-
9,869.80 sq.m.
CW2-Construction of Slope Protection P 65.956 M
Structure-5,790.60 sq.m.
EAO P 3.50 M
Total Allocation: P 100.00 M |
July 11, 2018 |
FY - 2018 |
WIN8F05648 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa Road
from two (2)to six (6) lanes including
drainage structures and other ancillary works,
K0200+100 - K0202+300,
Bataraza
CW1: 8.024 lane km ( Road Widening )
Allocation: 135,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0200+100 - K0201+147,
K0201+173 - K0202+200,
K0202+275 - K0202+435,
Bataraza
CW1: 8.576 lane km ( Road Widening )
Allocation: 135,000,000 Php |
July 11, 2018 |
FY - 2018 |
WIN8F05652 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+290 - K0177+600,
Brooke's Point
CW1: 9.176 lane km ( Road Widening )
Allocation: 140,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0175+627 - K0176+185,
K0176+194 - K0177+880,
Brooke's Point
CW1: 9.024 lane km ( Road Widening )
Allocation: 140,000,000 Php
|
July 11, 2018 |
2018 |
WIN8F05112 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0879 + 680 - K0880 + 370, K0881 + 000 - K0881 + 880, K0882 + 100 - K0883 + 000, K0883 + 600 - K0885 + 177, K0885 + 209 - K0885 + 521
Physical Target: Allocation
CW1-Road Widening-10.434 Lane Km P 63.764 M
CW2- ROW Acquisition-53,665.00 Sq.m P 32.736 M
EAO P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0870 + 000 - K0870 + 250, K0870 + 850 - K0871 + 445, K0881 + 000 - K0881 + 880, K0883 + 600 - K0884 + 862
Physical Target: Allocation
CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M
Total Allocation: P 100.00 M
|
July 11, 2018 |
2018 |
WIN8F05113 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 500
Physical Target: Allocation:
CW1-Road Widening-7.679 Lane Km P 193.00 M
EAO P 7.00 M
Total Allocation: P 200.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0935 + 585.30 - K0936 + 000, K0935 + -634 - K0935 + 540, K0943 + 277 - K0944 + 225, K0945 + 222 - K0946 + 448
Physical Target: Allocation:
CW1-Road Widening-7.5754 Lane Km P 183.00 M
ROW Acquisition- 5,000.00 Sq.m P 10.00 M
EAO P 7.00 M
Total Allocation: P 200.00 M
|
July 11, 2018 |
2018 |
WIN8F05114 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0786 + 432 - K0787 + 000, K0789 + 000 - K0790 + 000, K0834 + 000 - K0835 + 000, K0841 + 300 - K0841 + 400, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 814
Physical Target: Allocation:
CW1-Road Widening-10.786 Lane Km P 69.108 M
CW2-ROW Acquisition-55,449.00 Sq.m P 27.392 M
EAO P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0834 + 000 - K0835 + 000, K0842 + 860 - K0844 + 000, K0845 + 000 - K0845 + 440, K0845 + 670 - K0846 + 081
Physical Target: Allocation:
CW1-Road Widening-6.00 Lane Km P 96.500 M
EAO P 3.500 M
Total Allocation: P 100.00 M
|
July 11, 2018 |
2018 |
OUT8$85139 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0680 + 790 - K0680 + 800, K0684 + 840 - K0685 + 020, K0687 + 550 - K0687 + 975, K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 900
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,215 Sq.m
EAO P 2.800 M
Total Allocation: P 80.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - , K0688 + 250 - K0688 + 350, K0691 + 800 - K0691 + 920
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure-3,534.95 Sq.m
EAO P 2.800 M
Total Allocation: P 80.00 M |
July 11, 2018 |
2018 |
WIN8F05085 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) incl. ROW - K0885 + 553 - K0886 + 036, K0886 + 058 - K0886 + 210, K0887 + 200 - K0887 + 550, K0887 + 800 - K0888 + 950, K0889 + 480 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0894 + 000, K0894 + 100 - K0894 + 300
Physical Target: Allocation:
CW1-Road Widening-10.250 Lane Km P 66.900 M
CW2- ROW Acquisition-5,103.00 Sq.m P 29.600 M
EAO P 3.500 M
Total Allocation: P 100.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0888 + 000 - K0888 + 200, K0889 + 480 - K0890 + 000, K0890 + 000 - K0890 + 460, K0890 + 600 - K0890 + 710, K0891 + 410 - K0891 + 800, K0892 + 000 - K0892 + 470, K0893 + 190 - K0893 + 230, K0893 + 230 - K0894 + 000, K0894 + 100 - K0894 + 300
Physical Target: Allocation:
CW1-Road Widening-6.350 Lane Km P 96.500 M
EAO P 3.500 M
Total Allocation: P 100.00 M |
July 11, 2018 |
2018 |
WIN8F05088 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0679 + -056 - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 901.60 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000, K0690 + 000 - K0690 + 565
Physical Target: Allocation:
CW1-Road Widening-12.562 Lane Km P 193.00 M
EAO P 7.00 M
Total Allocation P 200.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0690 + 000 - K0690 + 565, K0679 + (-056) - K0680 + 133, K0680 + 163.60 - K0680 + 572, K0680 + 596 - K0680 + 879, K0680 + 909 - K0682 + 330, K0682 + 345 - K0684 + 389, K0684 + 423 - K0685 + 000,
Physical Target: Allocation:
CW1-Road Widening-12.5468 Lane Km P 193.00 M
EAO P 7.00 M
Total Allocation P 200.00 M |
July 11, 2018 |
2018 |
WIN8F05087 |
GAA FY 2018 |
January 26, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0811 + 000
Physical Target: Allocation:
CW1-Asphalt Overlay-12.426 Lane Km P 59.151605 M
EAO P 2.145395 M
Total Allocation: P 61.297 M
AS MODIFIED:
Arteche-Jipapad-Las Navas-Rawis Rd - K0805 + -237 - K0806 + 748, K0806 + 778 - K0810 + 293
Physical Target: Allocation:
CW1-Asphalt Overlay-11.00 Lane Km P 59.151605 M
EAO P 2.145395 M
Total Allocation: P 61.297 M |
July 11, 2018 |
FY 2018 |
WIN8G02477 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 300117201356000
Project ID: P00254194LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Patong-Cagbibi Road, Brgy. Patong, Pamplona, Camarines Sur
Physical Target - CW1 - Construction of Concrete Road / 0.252 lane-km
Unit Cost: Php 7.86M / lane km
Estimated Cost: Php 2.00M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02472 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 300117201357000
Project ID: P00255759LZ
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Reconstruction of Tambo-Calawat Road, Brgy. Calawat, Pamplona, Camarines Sur
Physical Target - CW1 – reconstruction of Concrete Road / 0.24 lane km
Unit Cost: CW1 - Php 8.25 M/lane km
Estimated Cost: Php 2.00 M
(As Modified)
|
July 11, 2018 |
2018 |
WIN8F05587 |
GAA FY 2018 |
May 10, 2018 |
Region VIII |
Regional Office VIII |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure- P 48.250 M
870.00 Lineal Meters
EAO P 1.750 M
Total Allocation: P 50.00 M
AS MODIFIED:
Construction of Flood Control along Poblacion Kananga-Kanawagan River flood control and Protection Work, Kananga, Leyte
Physical Target: Allocation:
CW1-Construction of Revetment- P 48.250 M
350.00 Lineal Meters
EAO P 1.750 M
Total Allocation: P 50.00 M |
July 11, 2018 |
FY 2018 |
WIN8G02486 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101718000
Project ID: P00223409LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Bocon Seawall/Causeway, Caramoran, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 88 lm
Unit Cost: CW1 – Php 556,818.18/lm.
Estimated Cost: Php 50.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02491 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101700000
Project ID: P00220236LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+000 - Sta. 0+091, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 91 lm
Unit Cost: CW1 – Php 323.077 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02492 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101701000
Project ID: P00220237LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Breakwater Rock Causeway, Brgy. Rawis, Sta. 0+091 - Sta. 0+167, Virac, Catanduanes
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 76 lm
Unit Cost: CW1 – Php 386.842 T/lm.
Estimated Cost: Php 30.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02476 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100144000
Project ID: P00230392LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Pasacao-Balatan Tourism Coastal Highway leading to Pasacao Port to White San Beaches, Brgy. Odicon, Pasacao, Camarines Sur
Physical Target: CW1 – Construction of Gravel Road/ 8.5288 lane-km
CW2 - Construction of Drainage Structure along Road/ 6,272 lm.
CW3 - Construction of Road Slope Protection Structure/ 8,556.23 sq.m.
Unit Cost: CW1 Php 10.046 M/lane km
CW2 - Php 5,505.08/lm
CW3 - Php 2,868.55/sq.m.
Estimated Cost: Php 150.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02483 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100075000
Project ID: P00230404LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Sta. Cruz-Pandan-Upland Central Economic Zone in Busac-Oma oma-Paulba Road connecting to Ligao-Pioduran Road, incl. bridge in support to Agribusiness (Food Resource Based Processing) Ligao City, Albay
Physical Target: CW1 – Reconstruction from Paved to Concrete/ 3.68 lane-km
CW2 – Construction of Gravel Road/1.029 lane-km
CW3 – Construction of Concrete Bridge/122.11 sq.m.
Unit Cost: CW1 – Php 13.28 M/lane-km
CW2 – Php 13.93 M/lane-km
CW3 – Php 35,671.61 T/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02495 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200121000
Project ID: P00257842LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Ariman - Panganiban Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.7332 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,887.99 sq.m.
Unit Cost: CW1 – Php 41.66 M/lane-km
CW2 – Php 34,932.92/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02494 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200144000
Project ID: P00257865LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Paghuliran – Poropandan Coastal Road and Shore Protection, Matnog, Sorsogon
Physical Target:CW1 – Construction of Concrete Road/ 0.6168 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,588.26 sq.m.
Unit Cost: CW1 – Php 48.16 M/lane-km
CW2 – Php 42,054.20/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02496 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200146000
Project ID: P00257867LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Poropandan – Culasi Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6067 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,562.25 sq.m.
Unit Cost: CW1 – Php 49.44 M/lane-km
CW2 – Php 42,571.29/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02474 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100070000
Project ID: P00201255LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0376+006 – K0377+540
Physical Target: CW1 - Road Widening/ 3.078 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,654 lm.
Unit Cost: CW1 – Php 20.10 M/lane-km
CW1 – Php 12.00 T/lm.
Estimated Cost: Php 97.122 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02468 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310102100040000
Project ID: P00202708LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance – Secondary Roads –
Repair/Rehabilitation (Asphalt Overlay) Masbate-Uson-Placer Road (Buenavista-Cawayan Section), Masbate
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 9.054 lane-km
Unit Cost: CW1 – Php 10.66 M/lane-km
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02475 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100074000
Project ID: P00201068LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Roads – Camarines Sur/Albay Diversion Road (Albay Section), incl. ROW, Albay
Physical Target: CW1 – Construction of Gravel Road/ 3.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 1,890 lm.
CW3 - Construction of Road Slope Protection Structure/ 2,146.75 sq.m.
Right-of-Way Acquisition (ROW)/ 31,600 sq.m.
Unit Cost: CW1 – Php 22.55 M/lane-km
CW2 – Php 7,236.94/lm.
CW3 – Php 4,554.35/sq.m.
ROW Acquisition – Php 56.96/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02482 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100101000
Project ID: P00201072LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Construction of By-Pass and Diversion Road – Daraga Urban Traffic Eco Route (DUTERTE), Project, Albay incl. ROW and Dike
Physical Target: CW1 – Construction of Gravel Road/ 2.912lane-km
CW2 – Construction of Dike/ 518.60 lm
Right-of-Way Acquisition (ROW)/ 21,840 sq.m.
Unit Cost: CW1 – Php 13.19 M/lane-km
CW2 – Php 167,847.01/lm.
ROW Acquisition – Php 3,092.95/sq.m.
Estimated Cost: Php 200.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02467 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310104100009000
Project ID: P00200412LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) - K0396+441.10 - K0396+840
Physical Target: CW1 – Construction of Concrete Road/ 1.5956 lane-km
CW2 - Construction of Drainage Structure along Road/ 797.80 lm.
CW3 - Construction of Road Slope Protection Structure/ 1,790.20 sq.m.
Unit Cost: CW1 – Php 39.43 M/lane-km
CW2 – Php 8,280.20/lm.
CW3 – Php 4,287.60/sq.m.
Estimated Cost: Php 80.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02471 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100076000
Project ID: P00201260LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0600+ -008 – K0602+683, K0605+000 – K0605+167
Physical Target: CW1 - Road Widening/ 5.727 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,873 lm.
Unit Cost: CW1 – Php 8.67 M/lane-km
CW2 – Php 12.09T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02478 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100082000
Project ID: P00201259LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) – K0530+360 – K0534+630
Physical Target: CW1 - Road Widening/ 8.91084 lane-km
Right-of-Way Acquisition (ROW)/ 22,277.10 sq.m.
Unit Cost: CW1 – Php 17.31 M/lane-km
CW2 – Php 849.68/sq.m.
Estimated Cost: Php 179.41 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02473 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02473 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310201100195000
Project ID: P00201263LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Primary Roads – Rolando A Andaya Highway – K0288+513.10 – K0290+720
Physical Target: CW1 – Construction of Concrete Road/ 4.415 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,689.93sq.m.
CW3 - Construction of Drainage Structure along Road/ 2,445lm
Unit Cost: CW1 – Php 18.16M/lane-km
CW2 – Php 3,586.47/sq.m.
CW3 – Php 12,198.99/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
July 11, 2018 |
FY 2018 |
WIN8G02481 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310101100328000
Project ID: P00223278LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems –
Rehabilitation/Improvement of Busay Flood Control Dike, Busay, Sta. 7+267.00 - Sta. 7+462.73, Sta. 7+532 - Sta. 7+863.90, Sta. 7+991.67 - Sta. 8+321.80, Sta. 7+360 - Sta. 7+637, Daraga, Albay
Physical Target: CW1 – Construction of Dike/ 1,134.76 lm
Unit Cost: CW1 – Php 85.040 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
July 10, 2018 |
FY - 2018 |
WINF05653 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0142+300,
Espanola
CW1: 10.072 lane km ( Road Widening )
Allocation: 150,000,000 Php
TO:
Widening of Puerto Proncesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0139+800 - K0141+891,
Espanola
CW1: 8.424 lane km ( Road Widening )
Allocation: 150,000,000 Php
|
July 10, 2018 |
FY - 2018 |
WIN8F05651 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
Local Program
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Widening of Puerto Princesa South Road
from two (2) to six (6) lanes including drainage
structures and other ancillary works,
K0105+100 - K0107+400,
Narra
CW1: 9.004 lane km ( Road Widening )
Allocation: 140,000,000 Php
TO:
Widening of Puerto Princesa South Road
from two (2) to six (6 lanes including drainage
structures and other ancillary works,
K0104+388 - K0105+742,
K0105+771 - K0106+922,
Narra
CW1: 10.064 lane km ( Road Widening )
Allocation: 140,000,000 Php |
July 9, 2018 |
FY 2018 |
WIN8G02508 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Primary Roads – San Jose – Lupao Rd, K0160+000 – K0160+778, K0172+299.40 – K0172+565, K0172+592.20 – K0173+716.40 |
July 9, 2018 |
FY - 2018 |
WIN8F05649 |
FY - 2018 GAA DPWH Infra |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation -
Rehabilitation/Reconstruction/Upgrading of Damaged
Paved Roads - Secondary Roads
FROM:
Calapan South Rd
( K0169+040 - K0169+121,
K0171+000 - K0171+845,
K0172+092 - K0172+700 )
CW1: 3.068 lane km ( Reconstruction from Paved
to Concrete )
Allocation: 40,000,000 Php
TO:
Calapan South Rd
( K0169+040 - K0169+123.50,
K0177+176 - K0178+000.00,
K0178+544 - K0179+000.00 )
CW1: 2.789 lane km ( Reconstruction from Paved
to Concrete )
Allocation : 40,000,000 Php
|
July 9, 2018 |
FY - 2018 |
WIN8F05689 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Victoria Sablayan ( Mindoro Cross-Island Road ),
Package 2, Occidental Mindoro
CW1: 4.282 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php
TO:
Victoria - Sablayan ( Mindoro Cross Island Road ),
Occidental Mindodo
CW1: 3.816 lane km ( Construction of Concrete Road )
Allocation : 150,000,000 Php |
July 6, 2018 |
FY 2018 |
WIN8C03325 |
310206100006000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310206100006000
Project ID: P00200469MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/ Long Span Bridges
Governor Camin/MCLL Highway and Veterans Avenue Flyover incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of flyover: 7,659.925 sq.m
Unit Cost: CW-1 - Construction of flyover: P 31,266.62/sq.m
Physical Target:
ROW: 51,813.47 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,500,000.00
Allocation: P 300,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03329 |
310206100007000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310206100007000
Project ID: P00200470MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Jct. T. Taupan Street (Suterville/Gavilan) Flyover, incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of Flyover: 8,225.00 sq.m
Unit Cost: CW-1 - Construction of Flyover: P 29,161.09/sq.m
Physical Target:
ROW: 41,450.78 sq.m
Unit Cost: P 965.00/sq.m
EAO: P 10,150,000.00
Allocation: P 290,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03326 |
310107100018000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310107100018000
Project ID: P00200186MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation/Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Pagadian City - Zamboanga City Road
K1869+K950.00 - K1870+055.00,
K1870+240.00 - K1870+330.00,
K1870+520.00 - K1870+590.00,
K1870+680.00 - K1870+874.00,
K1894+220.00 - K1894+400.00,
K1911+910.00 - K1911+981.00
Physical Target:
CW-1 - Construction of Road Slope Protection: 11,091.47 sq.m
Unit Cost: CW-1 - Construction of Road Slope Protection: P 17,355.25/sq.m
Physical Target:
ROW: 1,682.48 sq.m
Unit Cost: P 300/sq.m
EAO: P 7,000,000.00
Allocation: P 200,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03317 |
310204100044000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100044000
Project ID: P00200294MN
OO1: Ensure Safe and Reliable National Road System
Network Development
Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Curuan - Lubigan Section) Incl. Bridge, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 83,178,164.06/lane km
Physical Target:
ROW: 6,716.46 sq.m
Unit Cost: P 300/sq.m
EAO: P 4,900,000.00
Allocation: P 140,000,000.00 |
July 6, 2018 |
FY 2018 |
WIN8C03328 |
310211100026000 |
June 29, 2018 |
Region IX |
Regional Office IX |
UACS No. 310211100026000
Project ID: P00200845MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Road (Limpapa - Sibuco Section) - (S01166MN)
Chainage 4000 - Chainage 5411.66
Chainage 5441.53 - Chainage 9029.87
Physical Target:
CW-1 - Paving of Unpaved Road: 10.00 lane km
Unit Cost: CW-1 - Paving of Unpaved Road: P 24,049,209.30
Physical Target:
ROW: 2,526.36 sq.m
Unit Cost: P 300/sq.m
EAO: P 8,750,000.00
Allocation: P 250,000,000.00 |
July 5, 2018 |
GAA FY 2018 |
WIN8F05684 |
UACS No. 300116200391000 |
January 1, 2018 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=0.40 lane km
Unit Cost (P’000): P49,000.00/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
As Modified
UACS No. 300116200391000
Project ID: P00240687LZ
WIN8F05684
Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
National Roads and Bridges
National Roads and Bridges – Local Roads
Rehabilitation of Road with Drainage Improvement at Zone 58 and 59, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=3.2586 lane km
Unit Cost (P’000): P6,014.85/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05685 |
UACS No. 310204100096000 |
January 1, 2018 |
National Capital Region |
NCR - Regional Office |
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 0 lane km
Unit Cost (P’000): P 0/ lane km
Allocation: P 121.590 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
As Modified
UACS No. 310204100096000
Project ID: P00202375LZ
WIN8F05685
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Construction of By-Pass Road (Marikina River Bank to J.P. Rizal St.), Marikina City
Physical Target: CW1-Construction of Concrete Road L= 2.576 lane km
Unit Cost (P’000): P 16,393.09/ lane km
ROW Acquisition A=7883.28 SQ,M. = P10.07/sq.m.
Estimated Cost: P 42.236 M
P 79.354 M
EAO (‘000): P 4.410 M
Total (‘000): P 126.00 M
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05691 |
UACS No. 300116200243000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. Pascual Cities of Malabon and Navotas, Sta. 1+055
Physical Target: CW1 – Construction of Concrete Road: 4.22 Lane KM
EAO = P 1 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49 M
Total: P 50 M
As Modified
UACS No. 300116200243000
Project ID: P00257942LZ – CW1
WIN8F05691
Local Program – Local Roads –
Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Projects
Construction of Access Road from Letre to Gov. W. Pascual Ave., Malabon City (Phase I) Sta. 0+000 – Sta. 0+790
Physical Target: CW1 – Construction of Concrete Road: 2.644 Lane KM
EAO = P 0.5 M
Excess = P 0.038 M
Unit Cost: P 11,611.37 / Lane KM
Allocation: P 49.462 M
Total: P 50 M
|
July 5, 2018 |
GAA FY 2018 |
WIN8F05690 |
UACS No. 300108200027000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek (Bicutan Section), Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 200 lineal meters
Unit Cost (P’000): P 98.00/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
As Modified
UACS No. 300108200027000
Project ID: P00257470LZ
WIN8F05690
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Flood Control and Drainage
Flood Control and Drainage – Drainage Protection Works
Improvement/Sheet Piling along Baloc-Baloc Creek, Brgy. Don Bosco, Parañaque City
Physical Target: CW1 Construction of Revetment 264 lineal meters
Unit Cost (P’000): P 74.24/ l.m.
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
|
July 5, 2018 |
FY 2018 |
WIN8G02485 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Pinsal Falls, Ecotourism Park, Nueva Ecija |
July 5, 2018 |
FY 2018 |
WIN8G02498 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ), K0169+1216 – K0170+000, K0170+044 – K0170+070, K0170+231 – K0170+252, K0170+290 – K0170+415, K0171+150 – K0171+208, K0171+260 – K0171+440, K0171+955 – K0172+015, K0172+900 – K0172+992, K0173+390 – K0173+456, K0174+020 – K0174+140, K0177+375 – K0177+445, K0205+839.20 – K0205+890, K0205+890 – K0205+950 |
July 4, 2018 |
FY 2018 |
WIN8G02490 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement of Road and Bailey Bridge at Sitio Camachile, Nabuclod, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02443 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Improvement / Concreting of Road leading to Palacol (Summer Place), San Jose, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02456 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – road Widening - Primary Roads – Jose Abad Santos Ave (JASA), K0087+526 – K0087+972.30, K0087+980 – K0088+364.50, K0088+374.50 – K0088+580 |
July 4, 2018 |
FY 2018 |
WIN8G02454 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Nabuclod, Sitio Camachile, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02460 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting / Paving of Road, Sitio Santol and Purok 6 Road, San Jose, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02359 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Project - Off-Carriageway Improvement – Tertiary Roads – San Fernando – Lubao Rd, K0083+153 – K0083+526, K0083+538.20 – K0083+846, K0083+852.20 – K0084+160 – K0084+188.60 – K0084+703.90 – K0084+713.60 – K0084+875 |
July 4, 2018 |
FY 2018 |
WIN8G02458 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Benigno Aquino St., Sta. Cruz, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02459 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Lubao – Guagua – Minalin – Sto. Tomas Road, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02452 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Bridges – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of RCDG Bridge at Sta. Catalina, Sta. Catalina, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02442 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Dalan Betis, San Juan Nepomuceno, Guagua, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02441 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road and Canalization, Barangay Jalung, Porac, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02457 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction / Concreting of Road, Sto. Domingo – San Roque, Dau, Lubao, Pampanga
|
July 4, 2018 |
FY 2018 |
WIN8G02444 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Angeles – Porac – By–Pass Road, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02446 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Bodega (Sitio Biglang Sibul), Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02436 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Mawacat, Floridablanca, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02433 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Manibaug, Porac, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02428 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road, Sitio Pigulut, Sta. Lucia, Lubao, Pampanga |
July 4, 2018 |
FY 2018 |
WIN8G02497 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Jose Abad Santos Ave (JASA), K0094+314 - K0094+674, K0095+692 - K0096+245 |
July 4, 2018 |
FY 2018 |
WIN8G02449 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Purok 6, Pulong Visaya, Brgy. Sta. Catalina, Lubao, Pampanga |
July 4, 2018 |
GAA FY 2018 |
WIN8F05655 |
UACS No. 300116200299000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Pedro Cruz, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 1.6 Lane km
Unit Cost (P’000): P3,062.50/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
As Modified
UACS No. 300116200299000
Project ID: P00257953LZ
WIN8F05655
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Rehabilitation/ Improvement of Roads including Drainage System, Regidor St., and T. Kalaw St., Brgy. Tibagan, San Juan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.217 Lane km
Unit Cost (P’000): P22,580.65/lane km.
Allocation (‘000): P 4,900.00
EAO (‘000) P 100.00 M
Total (‘000): P 5,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05660 |
UACS No. 300103200102000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Building, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000): P14,700/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05660
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Buildings and Other Structures – Multipurpose/ Facilities
Construction of Valeriano Fugoso High School Multi-Purpose Buildings, Brgy. Fortune, Marikina City
Physical Target: CW1- Construction of Multi-Purpose Building 2 Bldg.
Unit Cost (P’000): P7,350.00/bldg.
Allocation (‘000): P 14,700.00
EAO (‘000) P 300.00 M
Total (‘000): P 15,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05657 |
UACS No. 300116200262000 |
January 2, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.95 Lane km
Unit Cost (P’000): P51,578/lane km
Allocation (‘000): P 49,000.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
As Modified
UACS No. 300103200102000
Project ID: P0024047LZ
WIN8F05657
Local Program – Construction/ Repair/ Rehabilitation/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Roads
Construction of Laguna Lake Highway Access Road, Taguig City
Physical Target: CW1- Construction of Concrete Road L=0.732 Lane km
RWOW – ROW Acquisition 4,828.57 m2 = P7,000/sq.m
Unit Cost (P’000): P20,765/lane km
Allocation (‘000): P 15,200.00
EAO (‘000) P 1,000.00 M
Total (‘000): P 50,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05679 |
UACS No. 300107200004000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station, Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
As Modified
UACS No. 300103200102000
UACS No. 300107200004000
Project ID: P00257646LZ
WIN8F05679
Local Program – Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures/ Facilities
Construction of Pumping Station for the Catchment Area of Barangay San Perfecto, San Juan City
Physical Target: CW1- Construction of Flood Mitigation Structure, 1 Facility
Unit Cost (P’000): P74,250/facility
Allocation (‘000): P 74,250.00
EAO (‘000) P 750.00
Total (‘000): P 75,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05650 |
UACS No. 300104200117000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Sitio Fatima, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
As Modified
UACS No. 300104200117000
Project ID: P00253551LZ
WIN8F05650
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi Purpose/Facilties
Construction of Multi-Purpose Building at Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Multi-Purpose Building 1 Building
Unit Cost (P’000): P4,950.00/bldg.
Allocation (‘000) : P 4,950.00
EAO (‘000) P 50.00
Total (‘000): P 5,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05661 |
UACS No. 320101100558000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 48.60 lineal meters
EAO (‘000) – P 600.00
Unit Cost (P’000): P604.94/ l.m.
Allocation (000): P 29,400.00
Total (‘000): P 30,000.00
As Modified
UACS No. 320101100558000
Project ID: P00220648LZ
WIN8F05661
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along its Road Approaches along Brgy. 170, Caloocan City
Physical Target: CW1- Construction of Drainage Structure 128.60 lineal meters
CW2 – Construction of Concrete Road = 0.160 lane km
CW3 – Construction of Flood Mitigation Structures 604.00 Lineal Meters
Unit Cost (P’000): CW1 - P32.15/ l.m.
CW2 - P7,788.50/ l.m.
CW3 – P39,77/l.m.
EAO (‘000) – P 600.00
Allocation (000): CW1 = P 4,135.00
CW2 = P1,246.00
CW3 = P24,019.00
Total (‘000): P 30,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05678 |
UACS No. 300118200006000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Bridge 732 sq.m.
EAO (‘000) – P 3,500.00
Unit Cost (P’000): P131.00/sq.m.
Allocation (‘000): P 96,500.00
Total (‘000): P 100,000.00
As Modified
UACS No. 300118200006000
Project ID: P00240563LZ
WIN8F05678
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Local Roads and Bridges – Local Bridges
Construction of Bridge connecting Camarin to Bagong Silang, Caloocan City
Physical Target: CW1 - Construction of Bridge 439.20 sq.m.
CW2 – Rehabilitation of Concrete Road 2.33 Lane km
EAO (‘000) – P 3,500.00
Unit Cost (P’000): CW1 = P134.96/sq.m.
CW2 = P15,977,25/ Lane km
Allocation (‘000): CW1 = P 59,273.00
CW2 = P 37,227.00
Total (‘000): P 100,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05658 |
UACS No. 320101100561000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=450 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P21.78.00/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
As Modified
UACS No. 320101100561000
Project ID: P00220369LZ
WIN8F05658
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage System along Brgys. In 142 and 143, Caloocan City
Physical Target: CW1-Construction of Drainage Structure L=938 Lineal Meters
EAO (‘000) – P 200.00
Unit Cost (P’000): P10.45/l.m.
Allocation (‘000): P 9,800.00
Total (‘000): P 10,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05659 |
UACS No. 300104200130000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 177, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
As Modified
UACS No. 300104200130000
Project ID: P00256422LZ
WIN8F05659
Local Program
Local – Buildings and Other Structures – Multi-Purpose/ Facilities – Local Infrastructure Program
Construction of Multipurpose Building (Covered Court), Brgy. 176, Phase 1 Bagong Silang, Caloocan City
Physical Target: CW1-Construction of Multipurpose Building 1 Bldg.
EAO (‘000) – P 30.00
Unit Cost (P’000): P2,970.00/bldg.
Allocation (‘000): P 2,970.00
Total (‘000): P 3,000.00
|
July 4, 2018 |
GAA FY 2018 |
WIN8F05647 |
UACS No. 320101100367000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+686, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 686 lm
EAO = P 0.2 M
Unit Cost: P 14,285.71 / lm
Allocation: P 9.8 M
Total: P 10 M
As Modified
UACS No. 320101100367000
Project ID: P00220352LZ
WIN8F05647
Organizational Outcome 2: Protect Lives and Properties
Construction of Drainage Canal (Sta. 0+000 – Sta. 0+655, Right Side) along Babanse St., Brgy. NBBS, Navotas City
Physical Target: CW1 – Construction of Drainage Structure 655 lm
EAO = P 0.2 M
Unit Cost: P 14,961.83 / lm
Allocation: P 9.8 M
Total: P 10 M
|
July 4, 2018 |
FY 2018 |
WIN8G02461 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehab. of San Isidro – San Juan Road leading to Sta. Rita Eco Park, Pampanga |
July 3, 2018 |
FY 2018 GAA |
WIN8C03311 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 239 Sq.m. (Construction of Bridge)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Bridge)
EAO: P 500,000.00
TO: Local Program
Local Roads and Bridges - Local Bridges- Construction/ Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Saug Bridge, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 1 Number of Bridge (Construction of Substructure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Substructure)
EAO: P 500,000.00
|