June 1, 2018 |
GAA FY 2018 |
WIN8F05540 |
UACS No. 310106100072000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
roject ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-001 – K0010+367
Physical Target: CW1-Rehabilitation of Paved Road L = .736 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
As Modified
UACS No. 310106100072000
Project ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-856 – K0010+-371
Physical Target: CW1-Rehabilitation of Paved Road L = .970 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05535 |
UACS No. 310112100012000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 170, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,506 lineal meter
Unit Cost (P’000): P 14.97 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
As Modified
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 393, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,125 lineal meter
Unit Cost (P’000): P 20.04 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05548 |
UACS No. 320101100392000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+798.8) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 439.0 lm
EAO P 0.5 M
Unit Cost: P 55,808.65/ lm
Allocation: P 24.5 M
Total: P 25 M
As Modified
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+542.20) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 182.4 lm
EAO P 0.5 M
Excess: P 0.019 M
Unit Cost: P 134,216.01/ lm
Allocation: P 24.481 M
Total: P 25 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05539 |
UACS No. 320101100384000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+204) at B. Cruz, Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 204 lm
EAO P 0.3 M
Unit Cost: P 72,058.82/ lm
Allocation: P 14.7 M
Total: P 15 M
As Modified
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+545.70) at B. Cruz St., Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 545.70 lm
EAO P 0.3 M
Unit Cost: P 26,937.88/ lm
Estimated Cost: P 14.7 M
Total: P 15 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05550 |
UACS No. 320101100385000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+180) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Unit Cost: P 66,650 / lm
Allocation: P 14.7 M
Total: P 15 M
As Modified
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+220.55) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Excess: P2.972 M
Unit Cost: P 53,180 / lm
Estimated Cost: P 11.728 M
Total: P 15 M
|
June 1, 2018 |
FY - 2018 |
WIn8C02828 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan
CW1: 4 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
TO:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan
CW1: 3.62 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
|
June 1, 2018 |
FY - 2018 |
WIN8C02827 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Road Widening - Puerto Princesa North Road
incl. ROW
K0267+532 - K0267+2532
CW1: 4 lane km ( Road Widening )
ROW - ROW acquisition - 20,000 sq.m.
Allocation: 978,994,000 Php
TO:
Road Widening - Puerto Princesa North Road
including ROW
K0267+960 - K0267+2512
CW1: 3.104 lane km ( Road Widening )
ROW - ROW Acquisition - 20,000 sq.m.
Allocation: 97,994,000 Php
|
June 1, 2018 |
FY 2018 |
WIN8G02278 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road Dike leading to Bancal Pugad, Lubao, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02280 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Natividad, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02281 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Paving of Sta. Rita Road, Lubao, , Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02282 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Dila-Dila, Zone 4, Santa Rita, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02284 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Barangay Road, Barangay San Jose Mitla – Mitla Proper, Sta. 0+118 – Sta. 0+597.40, Sta. 1+722.40 – Sta. 2+636, Sta. 3+105 – Sta. 3+642.40, Sta. 3+853.90 – Sta. 4+920, Porac, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02285 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sta. Teresa 1, Lubao, Pampanga |
June 1, 2018 |
GAA FY 2018 |
WIN8F05558 |
UACS No. 310102100052000 |
January 1, 2018 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+359.5, K0004+515.0 – K0004+682.80, K0004+987.7 – K0005+009.5, K0005+021.6 – K0005+158.0, K0006+056 – K0006+224.5, K0006+510.4 – K0006+-347.5, K0006+-377.2 – K0006+-175.90, K0006+-164.6 – K0006+056.10, K0006+070.2 – K0006+311.4
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=4.4364 lane km
Unit Cost (P’000): P6,922,558.83/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
As Modified
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+275
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=1.30 lane km
Unit Cost (P’000): P23,624,030.77/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05555 |
UACS No. 300116200313000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.450 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P12,000/lane km
Allocation: P 29.400 M
Total: P 30.0 M
As Modified
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.170 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P25,128.21/lane km
Allocation: P 29.400 M
Total: P 30.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05557 |
UACS No. 300118200032000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 73.20 sq.m.
EAO (‘000) – P 200.00
Unit Cost (P’000): P133.88/sq.m.
Allocation (‘000): P 9,800.00
Total: P 10,000.00 M
As Modified
UACS No. 300116200313000
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 66.00 sq.m.
CW2-Rehabilitation of Concrete Road 0.338 lane km
EAO (‘000) – P 100.00
Unit Cost (P’000): P111.56/sq.m.
P7,506.92/ lane km
Allocation (‘000): P 7,363.00
P 2,537.00
Total: P 10,000.00 M
|
June 1, 2018 |
FY 2018 |
WIN02286 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of Drainage System (Line Canal) Brgy. Pulung Masle, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02287 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Ascomo, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02289 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Pulungmasle, Guagua, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02290 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation / Improvement of Dike with Slope Protection along Porac River, Sta. Rita, Lubao, Pampanga |
June 1, 2018 |
FY 2018 |
WIN8G02296 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehabilitation of Access Road leading to SCTEX and Economic Zone, San Jose, Floridablanca, Pampanga |
May 31, 2018 |
FY - 2018 |
WIn8C02807 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Flood
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage System
FROM:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Palawan
CW1: 650 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Taytay, Palawan
CW1: 520 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
May 31, 2018 |
FY - 2018 |
WIN8C02811 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Construction of Roads in barangay 3, Roxas, Palawan
CW1: 0.528 lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
TO:
Construction of Roads in Barangay 3, Roxas, Palawan
CW1: 0.590 Lane Km ( Construction of Concrete Road )
Allocation: 3,000,000 Php |
May 31, 2018 |
FY - 2018 |
WIN8C02826 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Tertiary Road
FROM:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+181.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30
CW1: 6,303 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
TO:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+180.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30
CW1: 9,732 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
|
May 31, 2018 |
FY - 2018 |
WIN8C02815 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Tertiary Road
FROM:
Coron - Busuanga Rd
K0058+537 - K0058+738
CW1: 2,412 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 12,14,,000 Php
TO:
Coron - Busuanga Rd
K0058+537 - K0058+738
CW1: 2,424.10 sq m ( Construction of Road Slope
Protection Structure )
Allocation; 12,141,000 Php
|
May 31, 2018 |
FY 2018 |
WIN8G02279 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui – Camiling - Wawa Rd - K0156 + 380 - K0157 + 210.20, K0162 + 699 - K0162 + 929, K0168 + 710 - K0169 + 629.50 |
May 31, 2018 |
FY 2018 |
WIN8G02283 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Barangay Balibago Bypass, Barangay Balibago, Tarlac City |
May 31, 2018 |
FY 2018 |
WIN8G02291 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations - Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac |
May 31, 2018 |
FY 2018 |
WIN8G02292 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Manila North Rd - K0153 + 260 - K0153 + 963, K0155 + 507 - K0158 + 487.20 |
May 29, 2018 |
FY - 2018 |
WIN8C02813 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to Airports
FROM:
Brgy. Port Barton - Brgy. Kemdeng - Begy.Poblacion
leading to San Vicente Airport, Palawan
CW1: 5.90 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 php
TO:
Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion
leading to San Vicente Airport, Palawan
CW1: 3.24 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 Php
|
May 29, 2018 |
FY - 2018 |
WIN8C02814 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Fllod
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Balolo Bridge, CBNR< Palawan
CW1: 260 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php
TO:
Construction of Flood Control Structure at
Balolo Bridge, CBNR, Coron, Palawan
CW1: 258 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY - 2018 |
WINC02817 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Batacalan bridge, CBNR, Palawan
CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Batacalan Bridge, CBNR, Coron, Palawan
CW1: 250 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php
|
May 29, 2018 |
FY - 2018 |
WIN8C02810 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Palawan
CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Busuanga, Palawan
CW1: 245.70 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY - 2018 |
WIN8C02808 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Palawan
CW1: 350 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Busuanga, Palawan
CW1: 240 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02265 |
SR2018-01-002524 |
January 1, 2018 |
Region III |
Regional Office III |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Bridgy. Dinadiawan, Dipaculao, Aurora
CW-1 (Construction of Concrete Road) - 6.00 lane km
CW-2 (Construction of Road Slope Protection Structure) - 1,635 sq.m.
Allotment: PHP 137.50M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02264 |
SR2018-01-001414 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program\
Construction of Missing Links/New Roads
Capas-Botolan Road, incl. Slope Protection, Tarlac
CW-1 (Construction of Concrete Road including Drainage Structure) - 13.8704 lane km
CW-2 (Construction of Road Slope Protection Structure) - 9,698.90 sq.m.
Allotment: PHP 300M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02271 |
SR2018-01-001282 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Road Widening - Tertiary Roads
NCR/Bulacan Bdry - Bigte - Ipo Dam Rd
K0033 + 384 - K0033 + 814.50,
K0034 + 238.70 - K0035 + 587,
K0035 + 683 - K0037 + 664
CW-1 (Road Widening) - 4.840 lane km
ROW (ROW Acquisition) - 5,246.00 sq.m.
Allotment: PHP 137.143M
Excess: PHP 38.761M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02266 |
SR2018-01-000921 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads
Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508
CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.
ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M |
May 29, 2018 |
FY 2018 GAA (RA 10964) |
WIN8G02266 |
SR2018-01-000921 |
January 1, 2018 |
Region III |
Regional Office III |
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads
Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508
CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.
ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M |
May 28, 2018 |
FY - 2018 |
WIN8C02812 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to Trades, Industries, and Economic Zones
FROM:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan
CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan
CW1: 2.4026 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 28, 2018 |
FY - 2018 |
WIN8C02824 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Trades, Industries, and Economic Zones
FROM:
Access Road leading to Seaweed Plantations in
Brgy. Danleg, Dumaran, Palawan
CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Seaweed Plantations in
Danleg, Dumaran, Palawan
CW1: 2.894 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 28, 2018 |
FY - 2018 |
WIN8C02809 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Bebeladan El Nido, Palawan
CW1: 1.6 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
TO:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Taytay & San Vicente, Palawan
CW1: 1.215 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php |
May 28, 2018 |
FY 2018 |
WIN8G02241 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jct. Layac – Balanga – Mariveles Port Road, K0102+(-100) – K0104+529, K0106+000 – K0107+393, K0107+500 – K0107+980, Hermosa and Orani, Bataan |
May 28, 2018 |
FY 2018 GAA |
WIN8C03050 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 26.667 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 15.28874 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03057 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 8.682 Lane Km (Construction of Concrete Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 171,770,000.00 (Construction of Concrete Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 3,860,000.00
EAO: P 10,325,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 9.58216 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 280,815,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 10,325,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03051 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.036 Lane Km (Construction of Gravel Road)
CW2: 10.268 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 82,777,700.00 (Construction of Gravel Road)
CW2: P 211,774,075.00 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 4.42462 Lane Km (Reconstruction to Concrete Pavement)
CW2: 17.14992 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 35,480,818.69 (Construction of Gravel Road)
CW2: P 259,070,956.31 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03056 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.910 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.836 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00 |
May 28, 2018 |
FY 2018 GAA |
WIN8C03040 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+280.50
Physical Target:
CW1: 7,463.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+750
Physical Target:
CW1: 4,822.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00 |
May 25, 2018 |
FY 2018 |
WIN8G02261 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dila-Dila, Zone 6, Santa Rita, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02257 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation / Improvement / Upgrading of Lubao – Floridablanca road, San Pablo 2nd, Lubao, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02258 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program – Road Widening – Secondary Roads - Angeles – Porac – Floridablanca – Dinalupihan Road – K0108+1260 – K0110+300, K0110+380 – K0111+937.38, K0108+1260 – K0110+300, K0110+434 – K0111+937. |
May 25, 2018 |
FY 2018 |
WIN8G02259 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Sitio Tabun, San Basilio, Santa Rita, Pampanga |
May 25, 2018 |
f |
WIN8G02263 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02260 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program – Local Roads – Concreting of road, Sitio Kulitang, Barangay San Francisco, Lubao, Pampanga |
May 25, 2018 |
FY 2018 |
WIN8G02243 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment Along Labangan Channel at Iba O’ Este, Calumpit, Bulacan
|
May 25, 2018 |
FY 2018 |
WIN8G02242 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program – Buildings and Other Structures - Multipurpose / Facilities - Rehabilitation of Multi-Purpose Building, North 6, Santol, Balagtas, Bulacan |
May 25, 2018 |
FY 2018 |
WIN8G02244 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges - Local Roads - – Road Improvement of Local Road, Malibong Matanda, Pandi, Bulacan |
May 25, 2018 |
FY 2018 |
WIN8G02273 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02273 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02245 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – San Jose – Lupao Rd, K0164+885 – K0165+000, K0166+000 – K0166+604, K0169+343 – K0169+782, K0169+822.60 – K0170+000, K0173+716.40 – K0175+394, K0175+422 – K0175+945, K0175+945 – K0176+869 |
May 25, 2018 |
FY 2018 |
WIN8G02272 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02270 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Ditabuyan Falls, Brgy. Cadaclan, Pantabangan, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02275 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures / Facilities – Rechanneling / Desilting of Talavera River (San Carlos Aliaga Section), San Carlos, Aliaga, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02256 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Rd, K0159+630 – K0159+740, K0160+099 – K0160+302.50, K0160+1087.40 – K0161+149, K0161+436 – K0161+523, K0162+310 – K0162+430, K0162+472 -K0162+683, K0163+000 – K0163+152, K0163+205 – K0163+387, K0163+478 – K0163+650, K0163+679 – K0163+780, K0163+792 – K0163+901.50, K0164+138 – K0164+293 |
May 25, 2018 |
FY 2018 |
WIN8G02276 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Program – Construction / Repair/Rehabilitation / Improvement of Various Infrastructure including Local Project - Local Roads – Construction of Gen. Luna, Carranglan – Conversion, Pantabangan Road, Nueva Ecija |
May 25, 2018 |
FY 2018 |
WIN8G02253 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 3rd District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection Works along Quitangil Creek, Brgy. San Ildefonso, Sitio Balibago – Sitio Balas, Magalang, Pampanga
|
May 25, 2018 |
FY 2018 |
WIN8G02255 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Angeles – Porac – Floridablanca – Dinalupihan Road, K0113+(-225) – K0115+810, K0117+800 – K0118+1215, Dinalupihan, Bataan |
May 24, 2018 |
FY 2018 |
WIN8C02701 |
300117201981000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201981000
Project ID: P00251825MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Malagutay, Zamboanga City
Physical Target: CW-1: Construction of Concrete Road: 0.62 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 6,274,396.74/lane km
Physical Target: CW-2: Construction of Drainage Structure: 310 Ln.m
Unit Cost: CW-2: Construction of Drainage Structure: P 3,418.95/Ln.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
|
May 24, 2018 |
FY 2018 GAA |
WIN8C03036 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00
TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 4.516 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03058 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
May 24, 2018 |
FY 2018 |
WIN8C02566 |
320101102146000 |
April 16, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 320101102146000
Project ID: P00222069MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Ayala Section (both side) Zamboanga City
Physical Target:
CW-1: Construction of Flood Mitigation Structure: 640.00 ln.m.
Unit Cost: CW-1: Construction of Flood Mitigation Structure: P 28,762.72/ln.m
ROW Acquisition: 1,117 sq.m
Unit Cost: P 1,067.02/sq.m.
EAO: P 400,000
Allocation: P 20,000,000 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03055 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.973 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03059 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1424+996.10 - K1434+482.90
Physical Target:
CW1: 10.600 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1425+002 - K1429+923
Physical target:
CW1: 9.800 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03031 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 1,272 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 28,651,915.00 (Construction of Revetment)
CW-2: P 5,158,085.00 (Channelization)
ROW: P 490,000.00
EAO: P 700,000.00
TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 989.9 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 29,562,243.00 (Construction of Revetment)
CW-2: P 4,247,758.00 (Channelization)
ROW: P 490,000.00
EAO: 700,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03034 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00
TO:Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 2.180 Lane Km (Construction of Concrete Road)
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03044 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1 - 500 Lineal meters (Construction of Revetment)
ROW - 2,857 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1 - P 33,810,000.00 (Construction of Revetment)
ROW - P 490,000.00
EAO - P 700,000.00
TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1: 1,092.3 Lineal meters (Construction of Revetment)
ROW: 2,857 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1: P 33,810,000.00 (Construction of Revetment)
ROW: P 490,000.00
EAO: P 700,000.00 |
May 24, 2018 |
FY 2018 GAA |
WIN8C03042 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,703 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 41,254,043.00 (Construction of Revetment)
CW-2: P 7,255,957.00 (Channelization)
ROW: P 490,000.00
EAO: P 1,000,000.00
TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,692.50 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 45,498,370.00 (Construction of Revetment)
CW-2: P 3,011,630.00 (Channelization
ROW: P 490,000.00
EAO: P 1,000,000.00 |
May 23, 2018 |
FY - 2018 |
WIN8F05494 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522
CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php
TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340
CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php
|
May 23, 2018 |
FY - 2018 |
WIN8F05489 |
FY - 2018 GAA DPWH Infra program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
CSR Jct - Minas Rd
K0039+544 - K0039+649,
K0037+531 - K0038+204
CW1: 1.034 Lane Km ( Preventive Maintenance of Road:
Asphalt overlay )
Allocation: 6,259,000 Php
TO:
CSR Jct - Minas Rd
K0037+531 - K0038+202
CW1: 0.820 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,259,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02191 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100001000
Project ID: P00230349LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports - Access Road Leading to Bahao Port, Camarines Sur
Physical Target - CW1- Construction of Concrete Road/ 7.00 lane-km
Unit Cost: Php 20.68M/lane-km
Estimated Cost: Php 150.00M
(As Modified)
|
May 23, 2018 |
FY - 2018 |
WIN8F05499 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
CSR Jct - Pola Rd
K0065+914 - K0066+983
CW1: 2.088 Lane Km ( Preventive maintenance of Road:
Asphalt Overlay )
Allocation:12,645,000 Php
TO:
CSR Jct - Pola Rd
K0065+914 - K0066+748
CW1: 1.618 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 12,645,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02164 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100015000
Project ID: P00230360LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy. 4-Brgy.5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target - CW1 – Construction of Concrete Road/ 0.774 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,001.50 sq.m.
Unit Cost: CW1 – Php 25.444M /lane-km
CW2 – Php 23.910T/sq.m.
Estimated Cost: Php 70.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02161 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100061000
Project ID: P00230363LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Bulan-Matnog-Sta. Magdalena-Bulusan Road (Matnog Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.54 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,880.39 lm.
Unit Cost: CW1 – Php 17.373M /lane-km
CW2 – Php 12.82T/lm.
Estimated Cost: Php 120.0M
(As Modified)
|
May 23, 2018 |
FY - 2018 |
WIN8F05495 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro
CW1: - ( Construction of Flood Mitigation Structure
Allocation: 150,000,000 Php
TO:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro
CW1: 1,740 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 150,000,000 Php
|
May 23, 2018 |
FY 2018 |
WIN8G02170 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100111000
Project ID: P00230388LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 508.10 lm.
Unit Cost: CW1 – Php 16.648M /lane-km
CW2 – Php 91.600T/lm.
Estimated Cost: Php 120.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02189 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100113000
Project ID: P00230390LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Naga City (del Rosario)–Cararayan–Langon–San Isidro-Carolina Road leading to Mt. Isarog Natural Park and Est Highland Tourism Zone, Brgy. Del Rosario, Naga City, Camarines Sur
Physical Target - CW1 – Road Widening/ 6.72 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,699.74 sq.m.
Unit Cost: CW1 – Php 12.910M /lane-km
CW2 – Php 10.05T/sq.m.
Estimated Cost: Php 149.25M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03035 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1456 + 060 - K1458 + 400
Physical Target:
CW1: 4.680 Lane Km (Road Widening)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 158,067,000.00 (Road Widening)
ROW: P 5,183,015.00
EAO: P 5,920,985.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1450 + 567 - K1450 + 810
K1453 + 061 - K1453 + 312, K1456 + 315 - K1457 + 581
Physical Target:
CW1: 1.277 Lane Km (Road Widening)
CW2: 0.486 Lane Km (Paving of Unpaved Roads)
CW3: 1.749 Lane Km (Reconstruction to Concrete Pavement)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 87,250,982.32 (Road Widening)
CW2: P 34,675,665.96 (Paving of Unpaved Roads)
CW3: P 36,140,351.72 (Reconstruction to Concrete Pavement)
ROW: P 5,183,015.00
EAO: P 5,920,985.00 |
May 23, 2018 |
FY 2018 |
WIN8G02162 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02162 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03029 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.953 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03006 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 3,960.00 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02163 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100027000
Project ID: P00201065LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Barcelona-Casiguran Diversion Road (Barcelona Section), Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ lane-km
Unit Cost: Php 16.50M/lane-km
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02166 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100156000
Project ID: P00201074LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road (Bulan Section), incl. ROW, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.60 lane-km
Right-of-Way Acquisition (ROW)/46,000 sq.m.
Unit Cost: CW1 – Php 15.98M /lane-km
ROW Acquisition – Php 500.00/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02169 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100210000
Project ID: P00201078LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Nabua bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 4.57 lane-km
Unit Cost: CW1 – Php 17.53M /lane-km
Estimated Cost: Php 83.00M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02168 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS: 310101100046000
Project ID: P00202693LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0585+431 - K0588+170, K0588+370 - K0590+181, K0593+922 - K0594+836
Physical Target - CW1 – Preventive Maintenance of Road: Asphalt Overlay/ 21.514 lane-km
Unit Cost: Php 13.456 M/lane-km
Estimated Cost: Php 300.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02160 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100026000
Project ID: P00222430LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Polangui, Albay for critical sections of barangays Kinale, Balangibang and Matacon, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 713.35 lm
Unit Cost: CW1 – Php 101.46T/lm.
Estimated Cost: Php 75.0M
(As Modified)
|
May 23, 2018 |
2018 |
310106100012000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System: Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Cagayan-Apayao Road - K0494+000 - K0495+000, K0495+000 - K0496+190, K0497+849 - K0498+777, K0519+121 - K0522+101, K0522+112 - K0523+351, K0523+367 - K0524+000 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03008 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 0 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03013 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 7.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Road)
EAO: P 6,300,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 2.696 Lane Km (Construction of Concrete Road)
CW2: 6.586 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 39,700,642.33 (Construction of Concrete Road)
CW2: P 133,999,357.67 (Construction of Gravel Road)
EAO: P 6,300,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03047 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 15.335 Lane Km (Construction of Gravel Road)
CW2: 18.890 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 221,959,650.00 (Construction of Gravel Road)
CW2: P 164,040,350.00 (Construction of Concrete Road)
EAO: P 14,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 13.74836 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00 |