Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 1, 2018 GAA FY 2018 WIN8F05540 UACS No. 310106100072000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
roject ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-001 – K0010+367
Physical Target: CW1-Rehabilitation of Paved Road L = .736 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00

As Modified
UACS No. 310106100072000
Project ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-856 – K0010+-371
Physical Target: CW1-Rehabilitation of Paved Road L = .970 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
June 1, 2018 GAA FY 2018 WIN8F05535 UACS No. 310112100012000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 170, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,506 lineal meter
Unit Cost (P’000): P 14.97 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00

As Modified
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 393, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,125 lineal meter
Unit Cost (P’000): P 20.04 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
June 1, 2018 GAA FY 2018 WIN8F05548 UACS No. 320101100392000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+798.8) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 439.0 lm
EAO P 0.5 M
Unit Cost: P 55,808.65/ lm
Allocation: P 24.5 M
Total: P 25 M

As Modified
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+542.20) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 182.4 lm
EAO P 0.5 M
Excess: P 0.019 M
Unit Cost: P 134,216.01/ lm
Allocation: P 24.481 M
Total: P 25 M
June 1, 2018 GAA FY 2018 WIN8F05539 UACS No. 320101100384000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+204) at B. Cruz, Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 204 lm
EAO P 0.3 M
Unit Cost: P 72,058.82/ lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+545.70) at B. Cruz St., Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 545.70 lm
EAO P 0.3 M
Unit Cost: P 26,937.88/ lm
Estimated Cost: P 14.7 M
Total: P 15 M
June 1, 2018 GAA FY 2018 WIN8F05550 UACS No. 320101100385000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+180) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Unit Cost: P 66,650 / lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+220.55) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Excess: P2.972 M
Unit Cost: P 53,180 / lm
Estimated Cost: P 11.728 M
Total: P 15 M
June 1, 2018 FY - 2018 WIn8C02828 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 4 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php

TO:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 3.62 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
June 1, 2018 FY - 2018 WIN8C02827 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Road Widening - Puerto Princesa North Road
incl. ROW
K0267+532 - K0267+2532

CW1: 4 lane km ( Road Widening )
ROW - ROW acquisition - 20,000 sq.m.
Allocation: 978,994,000 Php

TO:
Road Widening - Puerto Princesa North Road
including ROW
K0267+960 - K0267+2512

CW1: 3.104 lane km ( Road Widening )
ROW - ROW Acquisition - 20,000 sq.m.
Allocation: 97,994,000 Php
June 1, 2018 FY 2018 WIN8G02278 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road Dike leading to Bancal Pugad, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02280 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Natividad, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02281 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Paving of Sta. Rita Road, Lubao, , Pampanga
June 1, 2018 FY 2018 WIN8G02282 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Dila-Dila, Zone 4, Santa Rita, Pampanga
June 1, 2018 FY 2018 WIN8G02284 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Barangay Road, Barangay San Jose Mitla – Mitla Proper, Sta. 0+118 – Sta. 0+597.40, Sta. 1+722.40 – Sta. 2+636, Sta. 3+105 – Sta. 3+642.40, Sta. 3+853.90 – Sta. 4+920, Porac, Pampanga
June 1, 2018 FY 2018 WIN8G02285 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sta. Teresa 1, Lubao, Pampanga
June 1, 2018 GAA FY 2018 WIN8F05558 UACS No. 310102100052000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+359.5, K0004+515.0 – K0004+682.80, K0004+987.7 – K0005+009.5, K0005+021.6 – K0005+158.0, K0006+056 – K0006+224.5, K0006+510.4 – K0006+-347.5, K0006+-377.2 – K0006+-175.90, K0006+-164.6 – K0006+056.10, K0006+070.2 – K0006+311.4
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=4.4364 lane km
Unit Cost (P’000): P6,922,558.83/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00

As Modified
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+275
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=1.30 lane km
Unit Cost (P’000): P23,624,030.77/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
June 1, 2018 GAA FY 2018 WIN8F05555 UACS No. 300116200313000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.450 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P12,000/lane km
Allocation: P 29.400 M
Total: P 30.0 M

As Modified
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.170 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P25,128.21/lane km
Allocation: P 29.400 M
Total: P 30.0 M
June 1, 2018 GAA FY 2018 WIN8F05557 UACS No. 300118200032000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 73.20 sq.m.
EAO (‘000) – P 200.00
Unit Cost (P’000): P133.88/sq.m.
Allocation (‘000): P 9,800.00
Total: P 10,000.00 M

As Modified
UACS No. 300116200313000
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 66.00 sq.m.
CW2-Rehabilitation of Concrete Road 0.338 lane km
EAO (‘000) – P 100.00
Unit Cost (P’000): P111.56/sq.m.
P7,506.92/ lane km
Allocation (‘000): P 7,363.00
P 2,537.00
Total: P 10,000.00 M
June 1, 2018 FY 2018 WIN02286 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of Drainage System (Line Canal) Brgy. Pulung Masle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02287 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Ascomo, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02289 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Pulungmasle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02290 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation / Improvement of Dike with Slope Protection along Porac River, Sta. Rita, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02296 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehabilitation of Access Road leading to SCTEX and Economic Zone, San Jose, Floridablanca, Pampanga
May 31, 2018 FY - 2018 WIn8C02807 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Flood

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage System

FROM:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Palawan

CW1: 650 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Taytay, Palawan

CW1: 520 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
May 31, 2018 FY - 2018 WIN8C02811 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads
Local Infrastructure Program

FROM:
Construction of Roads in barangay 3, Roxas, Palawan

CW1: 0.528 lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php

TO:
Construction of Roads in Barangay 3, Roxas, Palawan

CW1: 0.590 Lane Km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
May 31, 2018 FY - 2018 WIN8C02826 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+181.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 6,303 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php

TO:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+180.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 9,732 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
May 31, 2018 FY - 2018 WIN8C02815 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,412 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 12,14,,000 Php

TO:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,424.10 sq m ( Construction of Road Slope
Protection Structure )
Allocation; 12,141,000 Php

May 31, 2018 FY 2018 WIN8G02279 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui – Camiling - Wawa Rd - K0156 + 380 - K0157 + 210.20, K0162 + 699 - K0162 + 929, K0168 + 710 - K0169 + 629.50
May 31, 2018 FY 2018 WIN8G02283 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Barangay Balibago Bypass, Barangay Balibago, Tarlac City
May 31, 2018 FY 2018 WIN8G02291 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations - Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac
May 31, 2018 FY 2018 WIN8G02292 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Manila North Rd - K0153 + 260 - K0153 + 963, K0155 + 507 - K0158 + 487.20
May 29, 2018 FY - 2018 WIN8C02813 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
Brgy. Port Barton - Brgy. Kemdeng - Begy.Poblacion
leading to San Vicente Airport, Palawan

CW1: 5.90 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 php

TO:
Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion
leading to San Vicente Airport, Palawan

CW1: 3.24 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 Php
May 29, 2018 FY - 2018 WIN8C02814 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Fllod
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Balolo Bridge, CBNR< Palawan

CW1: 260 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

TO:
Construction of Flood Control Structure at
Balolo Bridge, CBNR, Coron, Palawan

CW1: 258 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WINC02817 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Batacalan bridge, CBNR, Palawan

CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Batacalan Bridge, CBNR, Coron, Palawan

CW1: 250 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

May 29, 2018 FY - 2018 WIN8C02810 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Palawan


CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Busuanga, Palawan

CW1: 245.70 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WIN8C02808 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Palawan

CW1: 350 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Busuanga, Palawan

CW1: 240 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02265 SR2018-01-002524 January 1, 2018 Region III Regional Office III
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Bridgy. Dinadiawan, Dipaculao, Aurora

CW-1 (Construction of Concrete Road) - 6.00 lane km
CW-2 (Construction of Road Slope Protection Structure) - 1,635 sq.m.

Allotment: PHP 137.50M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02264 SR2018-01-001414 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program\
Construction of Missing Links/New Roads

Capas-Botolan Road, incl. Slope Protection, Tarlac

CW-1 (Construction of Concrete Road including Drainage Structure) - 13.8704 lane km
CW-2 (Construction of Road Slope Protection Structure) - 9,698.90 sq.m.


Allotment: PHP 300M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02271 SR2018-01-001282 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Road Widening - Tertiary Roads

NCR/Bulacan Bdry - Bigte - Ipo Dam Rd
K0033 + 384 - K0033 + 814.50,
K0034 + 238.70 - K0035 + 587,
K0035 + 683 - K0037 + 664


CW-1 (Road Widening) - 4.840 lane km
ROW (ROW Acquisition) - 5,246.00 sq.m.

Allotment: PHP 137.143M
Excess: PHP 38.761M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 28, 2018 FY - 2018 WIN8C02812 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Trades, Industries, and Economic Zones

FROM:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 2.4026 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02824 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Trades, Industries, and Economic Zones

FROM:
Access Road leading to Seaweed Plantations in
Brgy. Danleg, Dumaran, Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Seaweed Plantations in
Danleg, Dumaran, Palawan

CW1: 2.894 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02809 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Bebeladan El Nido, Palawan

CW1: 1.6 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php

TO:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Taytay & San Vicente, Palawan

CW1: 1.215 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
May 28, 2018 FY 2018 WIN8G02241 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jct. Layac – Balanga – Mariveles Port Road, K0102+(-100) – K0104+529, K0106+000 – K0107+393, K0107+500 – K0107+980, Hermosa and Orani, Bataan
May 28, 2018 FY 2018 GAA WIN8C03050 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 26.667 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 15.28874 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
May 28, 2018 FY 2018 GAA WIN8C03057 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 8.682 Lane Km (Construction of Concrete Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 171,770,000.00 (Construction of Concrete Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 3,860,000.00
EAO: P 10,325,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 9.58216 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 280,815,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 10,325,000.00
May 28, 2018 FY 2018 GAA WIN8C03051 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.036 Lane Km (Construction of Gravel Road)
CW2: 10.268 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 82,777,700.00 (Construction of Gravel Road)
CW2: P 211,774,075.00 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 4.42462 Lane Km (Reconstruction to Concrete Pavement)
CW2: 17.14992 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 35,480,818.69 (Construction of Gravel Road)
CW2: P 259,070,956.31 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00
May 28, 2018 FY 2018 GAA WIN8C03056 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.910 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.836 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00
May 28, 2018 FY 2018 GAA WIN8C03040 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+280.50
Physical Target:
CW1: 7,463.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+750
Physical Target:
CW1: 4,822.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00
May 25, 2018 FY 2018 WIN8G02261 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dila-Dila, Zone 6, Santa Rita, Pampanga
May 25, 2018 FY 2018 WIN8G02257 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation / Improvement / Upgrading of Lubao – Floridablanca road, San Pablo 2nd, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02258 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Network Development Program – Road Widening – Secondary Roads - Angeles – Porac – Floridablanca – Dinalupihan Road – K0108+1260 – K0110+300, K0110+380 – K0111+937.38, K0108+1260 – K0110+300, K0110+434 – K0111+937.
May 25, 2018 FY 2018 WIN8G02259 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Sitio Tabun, San Basilio, Santa Rita, Pampanga
May 25, 2018 f WIN8G02263 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga
May 25, 2018 FY 2018 WIN8G02260 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program – Local Roads – Concreting of road, Sitio Kulitang, Barangay San Francisco, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02243 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment Along Labangan Channel at Iba O’ Este, Calumpit, Bulacan

May 25, 2018 FY 2018 WIN8G02242 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Buildings and Other Structures - Multipurpose / Facilities - Rehabilitation of Multi-Purpose Building, North 6, Santol, Balagtas, Bulacan
May 25, 2018 FY 2018 WIN8G02244 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges - Local Roads - – Road Improvement of Local Road, Malibong Matanda, Pandi, Bulacan
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02245 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – San Jose – Lupao Rd, K0164+885 – K0165+000, K0166+000 – K0166+604, K0169+343 – K0169+782, K0169+822.60 – K0170+000, K0173+716.40 – K0175+394, K0175+422 – K0175+945, K0175+945 – K0176+869
May 25, 2018 FY 2018 WIN8G02272 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02270 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Ditabuyan Falls, Brgy. Cadaclan, Pantabangan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02275 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures / Facilities – Rechanneling / Desilting of Talavera River (San Carlos Aliaga Section), San Carlos, Aliaga, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02256 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Rd, K0159+630 – K0159+740, K0160+099 – K0160+302.50, K0160+1087.40 – K0161+149, K0161+436 – K0161+523, K0162+310 – K0162+430, K0162+472 -K0162+683, K0163+000 – K0163+152, K0163+205 – K0163+387, K0163+478 – K0163+650, K0163+679 – K0163+780, K0163+792 – K0163+901.50, K0164+138 – K0164+293
May 25, 2018 FY 2018 WIN8G02276 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Construction / Repair/Rehabilitation / Improvement of Various Infrastructure including Local Project - Local Roads – Construction of Gen. Luna, Carranglan – Conversion, Pantabangan Road, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02253 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection Works along Quitangil Creek, Brgy. San Ildefonso, Sitio Balibago – Sitio Balas, Magalang, Pampanga

May 25, 2018 FY 2018 WIN8G02255 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Angeles – Porac – Floridablanca – Dinalupihan Road, K0113+(-225) – K0115+810, K0117+800 – K0118+1215, Dinalupihan, Bataan
May 24, 2018 FY 2018 WIN8C02701 300117201981000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300117201981000
Project ID: P00251825MN

Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Malagutay, Zamboanga City
Physical Target: CW-1: Construction of Concrete Road: 0.62 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 6,274,396.74/lane km
Physical Target: CW-2: Construction of Drainage Structure: 310 Ln.m
Unit Cost: CW-2: Construction of Drainage Structure: P 3,418.95/Ln.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03036 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00

TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 4.516 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00
May 24, 2018 FY 2018 GAA WIN8C03058 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
May 24, 2018 FY 2018 WIN8C02566 320101102146000 April 16, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 320101102146000
Project ID: P00222069MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Ayala Section (both side) Zamboanga City
Physical Target:
CW-1: Construction of Flood Mitigation Structure: 640.00 ln.m.
Unit Cost: CW-1: Construction of Flood Mitigation Structure: P 28,762.72/ln.m
ROW Acquisition: 1,117 sq.m
Unit Cost: P 1,067.02/sq.m.
EAO: P 400,000
Allocation: P 20,000,000
May 24, 2018 FY 2018 GAA WIN8C03055 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.973 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
May 24, 2018 FY 2018 GAA WIN8C03059 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1424+996.10 - K1434+482.90
Physical Target:
CW1: 10.600 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1425+002 - K1429+923
Physical target:
CW1: 9.800 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03031 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 1,272 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 28,651,915.00 (Construction of Revetment)
CW-2: P 5,158,085.00 (Channelization)
ROW: P 490,000.00
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 989.9 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 29,562,243.00 (Construction of Revetment)
CW-2: P 4,247,758.00 (Channelization)
ROW: P 490,000.00
EAO: 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03034 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00

TO:Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 2.180 Lane Km (Construction of Concrete Road)
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00
May 24, 2018 FY 2018 GAA WIN8C03044 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1 - 500 Lineal meters (Construction of Revetment)
ROW - 2,857 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1 - P 33,810,000.00 (Construction of Revetment)
ROW - P 490,000.00
EAO - P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1: 1,092.3 Lineal meters (Construction of Revetment)
ROW: 2,857 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1: P 33,810,000.00 (Construction of Revetment)
ROW: P 490,000.00
EAO: P 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03042 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,703 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 41,254,043.00 (Construction of Revetment)
CW-2: P 7,255,957.00 (Channelization)
ROW: P 490,000.00
EAO: P 1,000,000.00

TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,692.50 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 45,498,370.00 (Construction of Revetment)
CW-2: P 3,011,630.00 (Channelization
ROW: P 490,000.00
EAO: P 1,000,000.00
May 23, 2018 FY - 2018 WIN8F05494 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522

CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340

CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

May 23, 2018 FY - 2018 WIN8F05489 FY - 2018 GAA DPWH Infra program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Minas Rd
K0039+544 - K0039+649,
K0037+531 - K0038+204

CW1: 1.034 Lane Km ( Preventive Maintenance of Road:
Asphalt overlay )
Allocation: 6,259,000 Php

TO:
CSR Jct - Minas Rd
K0037+531 - K0038+202

CW1: 0.820 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,259,000 Php


May 23, 2018 FY 2018 WIN8G02191 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300202100001000
Project ID: P00230349LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports - Access Road Leading to Bahao Port, Camarines Sur
Physical Target - CW1- Construction of Concrete Road/ 7.00 lane-km
Unit Cost: Php 20.68M/lane-km
Estimated Cost: Php 150.00M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05499 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Pola Rd
K0065+914 - K0066+983

CW1: 2.088 Lane Km ( Preventive maintenance of Road:
Asphalt Overlay )
Allocation:12,645,000 Php

TO:
CSR Jct - Pola Rd
K0065+914 - K0066+748

CW1: 1.618 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 12,645,000 Php
May 23, 2018 FY 2018 WIN8G02164 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100015000
Project ID: P00230360LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy. 4-Brgy.5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target - CW1 – Construction of Concrete Road/ 0.774 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,001.50 sq.m.
Unit Cost: CW1 – Php 25.444M /lane-km
CW2 – Php 23.910T/sq.m.
Estimated Cost: Php 70.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02161 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100061000
Project ID: P00230363LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Bulan-Matnog-Sta. Magdalena-Bulusan Road (Matnog Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.54 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,880.39 lm.
Unit Cost: CW1 – Php 17.373M /lane-km
CW2 – Php 12.82T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05495 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: - ( Construction of Flood Mitigation Structure
Allocation: 150,000,000 Php

TO:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: 1,740 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 150,000,000 Php

May 23, 2018 FY 2018 WIN8G02170 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100111000
Project ID: P00230388LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 508.10 lm.
Unit Cost: CW1 – Php 16.648M /lane-km
CW2 – Php 91.600T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02189 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100113000
Project ID: P00230390LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Naga City (del Rosario)–Cararayan–Langon–San Isidro-Carolina Road leading to Mt. Isarog Natural Park and Est Highland Tourism Zone, Brgy. Del Rosario, Naga City, Camarines Sur
Physical Target - CW1 – Road Widening/ 6.72 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,699.74 sq.m.
Unit Cost: CW1 – Php 12.910M /lane-km
CW2 – Php 10.05T/sq.m.
Estimated Cost: Php 149.25M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03035 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1456 + 060 - K1458 + 400
Physical Target:
CW1: 4.680 Lane Km (Road Widening)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 158,067,000.00 (Road Widening)
ROW: P 5,183,015.00
EAO: P 5,920,985.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1450 + 567 - K1450 + 810
K1453 + 061 - K1453 + 312, K1456 + 315 - K1457 + 581
Physical Target:
CW1: 1.277 Lane Km (Road Widening)
CW2: 0.486 Lane Km (Paving of Unpaved Roads)
CW3: 1.749 Lane Km (Reconstruction to Concrete Pavement)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 87,250,982.32 (Road Widening)
CW2: P 34,675,665.96 (Paving of Unpaved Roads)
CW3: P 36,140,351.72 (Reconstruction to Concrete Pavement)
ROW: P 5,183,015.00
EAO: P 5,920,985.00
May 23, 2018 FY 2018 WIN8G02162 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02162 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100149000
Project ID: P00230396LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Polangui-Albay West Coast Road leading to Beaches (Sitio Balinsasayaw Libon, Sitio Cabugaw Libon, Sitio Imaco Oas, Catburawan Ligao), Maonon, Ligao, Albay
Physical Target - CW1 – Construction of Concrete Road/ 4.524 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,058.69 sq.m.
Unit Cost: CW1 – Php 15.5238M /lane-km
CW2 – Php 2,900/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03029 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Antiquera - Nabunturan Road, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.953 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 23, 2018 FY 2018 GAA WIN8C03006 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 3,960.00 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 1, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 570,000,000.00
CW1: P 550,050,000.00 (Construction of Flyover)
EAO: P 19,950,000.00
May 23, 2018 FY 2018 WIN8G02163 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Regional Office V
UACS No.: 300204100027000
Project ID: P00201065LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Barcelona-Casiguran Diversion Road (Barcelona Section), Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ lane-km
Unit Cost: Php 16.50M/lane-km
Estimated Cost: Php 100.0M
(As Modified)

May 23, 2018 FY 2018 WIN8G02166 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100156000
Project ID: P00201074LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road (Bulan Section), incl. ROW, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.60 lane-km
Right-of-Way Acquisition (ROW)/46,000 sq.m.
Unit Cost: CW1 – Php 15.98M /lane-km
ROW Acquisition – Php 500.00/sq.m.
Estimated Cost: Php 100.0M
(As Modified)

May 23, 2018 FY 2018 WIN8G02169 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100210000
Project ID: P00201078LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Nabua bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 4.57 lane-km
Unit Cost: CW1 – Php 17.53M /lane-km
Estimated Cost: Php 83.00M
(As Modified)

May 23, 2018 FY 2018 WIN8G02168 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS: 310101100046000
Project ID: P00202693LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance - Primary Roads – Daang Maharlika (LZ) - K0585+431 - K0588+170, K0588+370 - K0590+181, K0593+922 - K0594+836
Physical Target - CW1 – Preventive Maintenance of Road: Asphalt Overlay/ 21.514 lane-km
Unit Cost: Php 13.456 M/lane-km
Estimated Cost: Php 300.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02160 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100026000
Project ID: P00222430LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Polangui, Albay for critical sections of barangays Kinale, Balangibang and Matacon, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 713.35 lm
Unit Cost: CW1 – Php 101.46T/lm.
Estimated Cost: Php 75.0M
(As Modified)
May 23, 2018 2018 310106100012000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System: Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Cagayan-Apayao Road - K0494+000 - K0495+000, K0495+000 - K0496+190, K0497+849 - K0498+777, K0519+121 - K0522+101, K0522+112 - K0523+351, K0523+367 - K0524+000
May 23, 2018 FY 2018 GAA WIN8C03008 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 0 sq. m. (Construction of Flyover)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Flyovers/Interchanges/Underpasses/Long Span Bridges
Tagum City Flyover along Agusan-Davao Road, Package 2, Davao del Norte
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
Allocation:
TOTAL: P 500,000,000.00
CW1: P 482,500,000.00 (Construction of Flyover)
EAO: P 17,500,000.00
May 23, 2018 FY 2018 GAA WIN8C03013 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 7.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Road)
EAO: P 6,300,000.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Guadalupe-Lower Tuganay Road Connecting Carmen Overland Transport Terminal in Support of Banana and Coconut Industries, Davao del Norte
Physical Target:
CW1: 2.696 Lane Km (Construction of Concrete Road)
CW2: 6.586 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 39,700,642.33 (Construction of Concrete Road)
CW2: P 133,999,357.67 (Construction of Gravel Road)
EAO: P 6,300,000.00
May 23, 2018 FY 2018 GAA WIN8C03047 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 15.335 Lane Km (Construction of Gravel Road)
CW2: 18.890 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 221,959,650.00 (Construction of Gravel Road)
CW2: P 164,040,350.00 (Construction of Concrete Road)
EAO: P 14,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 3, Davao del Norte
Physical Target:
CW1: 13.74836 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00