Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 24, 2018 FY 2018 WIN8G02120 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Network Development Program – Construction of By-Pass and Diversion Roads – Licab – Victoria Rd, Nueva Ecija
April 24, 2018 2018 310103100085000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0014+(-177) - K0014+008
April 24, 2018 FY 2018 WIN8G02115 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance - Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Road, K0135+000 – K0135+545, K0138+000 – K0138+350, K0141+000 – K0141+529, K0142+179 – K0142+315
April 24, 2018 2018 310212100053000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0023 + 200 - K0023 + 305, K0023 + 836 - K0024 + 032, S00002ST Chainage 099 - Chainage 116
April 24, 2018 2018 310109100049000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 067 - K0004 + 112, K0005 + 160 - K0005 + 194
April 24, 2018 FY 2018 WIN8G02131 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project – Local Roads – Reconstruction / Rehabilitation / Upgrading of Landig – Villaflores Road, Cuyapo, Nueva Ecija
April 24, 2018 FY 2018 GAA WIN8C02372 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.160 lane km (Road Widening)
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.3955 lane km
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00
April 24, 2018 FY 2018 WIN8G02119 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation – Preventive Maintenance – Secondary Roads – San Jose City – Rizal Rd via Pinili – Porais – Villa Joson (Palarilla) Rd, K0160+-141.10 – K0160+000, K0160+100 – K0161+000, K0161+000 – K0161+104, K0161+309 – K0161+506.70, K0161+905 – K0163+522, K0163+531.70 – K0165+128.70, K0163+515 – K0166+480, K0172+091.70 – K0172+275, K0172+510 – K0172+716, K0173+508 – K0173+813, K0176+606 – K0176+841
April 24, 2018 FY 2018 GAA WIN8C02333 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1732+220 - K1734+106, K1734+326 - K1736+055
Physical Target:
CW1: 7.826 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1731+360 - K1732+194, K1732+260 - K1734+106,
K1734+326 - K1735+950
Physical Target:
CW1: 8.63522 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00
April 24, 2018 FY 2018 WIN8G02116 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction of Slope Protection along Balantacan Creek, Sta, Cruz to Balantacan, Lubao, Pampanga
April 24, 2018 2018 310106100098000 GAA FY 2018 January 1, 2018 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads

Tertiary Roads - Mayan-Mauyen Port Rd - K0008 + 498.20 - K0008 + 533.50
April 24, 2018 FY 2018 WIN8G02127 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Rehabilitation/Improvement of Dike with Slope Protection along Porac River, Hacienda Dolores, Porac, Pampanga
April 24, 2018 FY - 2018 WIN8F05227 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Jct. Puerto Princesa South Road leading to Mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.60 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php

TO:
Jct. Puerto Princesa South Road leading to mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.786 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
April 24, 2018 FY - 2018 WIN8F05228 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 1.96 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php

TO:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan

CW1: 4.36 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
April 24, 2018 FY - 2018 WIN8F05232 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Malambunga Flood Control Structure,
Bataraza, Palawan

CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Malambunga Flood Control Structure,
Rizal, Palawan

CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
April 24, 2018 FY 2018 GAA WIN8C02366 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.720 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.200 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00
April 24, 2018 FY 2018 GAA WIN8C02373 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1736+055 - K1737+033, K1764+184 - K1766+825,
K1767+872 - K1769+000
Physical Target:
CW1: 9.942 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1735+950 - K1737+040, K1737+600 - K1741+987
Physical Target:
CW1: 10.93884 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00
April 24, 2018 2018 WIN8F05409 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Preventive Maintenance – Secondary Roads, Tagbilaran East Rd (Tagbilaran-Jagna) – K0250 + 492.50 – K0251 + 000
April 24, 2018 FY 2018 WIN8G02132 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction of Flood Mitigation Structure – Improvement of dike with slope protection along Porac River, Calantas, Floridablanca, Pampanga
April 24, 2018 2018 WIN8C02299 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road – Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd – K0034+200 – K0035+000, K0039+493 – K0041+679
April 24, 2018 FY 2018 GAA WIN8C02274 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 lane km (Construction of Concrete Road)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,820,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 6.94112 lane km (Construction of Concrete Road)
CW2: 715.5 sq.m. (Construction of Concrete Bridge)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 116,698,287.13 (Construction of Concrete Road)
CW2: P 68,581,712.87 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
April 24, 2018 2018 WIN8C02302 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) – K0013 + 931 – K0015 + 423.30
April 24, 2018 FY 2018 WIN8G02126 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems of Upper Dalan Bapor, Sasmuan, Pampanga
April 24, 2018 FY 2018 WIN8G02118 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office Concreting of Road, Brgy. Gumi, Lubao, Pampanga
April 24, 2018 2018 WIN8C02297 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0005 + 500 – K0007 + 137
April 24, 2018 2018 WIN8C02298 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0007 + 137 – K0008 + 000, (S00065BH) K0009 + 000 – K0010 + 000
April 24, 2018 2018 WIN8C02304 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Tagbilaran City-Corella-Sikatuna-Loboc Rd – K0011 + 017 – K0012 + 000, K0019 + 645 – K0019 + 900
April 24, 2018 2018 WIN8C02303 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Looc (Binlod) – Bil-isan-Crossing Tangnan leading to Veraneante Resort, Momo Beach and House, and Ayacca Condo-residences Resort, Brgy Looc, Panglao, Bohol
April 24, 2018 2018 WIN8C02306 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – La Paz (Cortes)-Cabaguan-Lourdes-Anislag (Corella) Road in Support of the Agribusiness Industry, Cortes, Bohol
April 24, 2018 2018 WIN8C02305 R.A. 10964 December 19, 2017 Region VII Bohol 1st District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – Maribojoc-Pagnitoan-Candavid-Basak (Loon) Provincial Road in support of the Agribusiness Industry, Maribojoc, Bohol
April 24, 2018 FY 2018 GAA WIN8C02489 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.032 lane km (Construction of Gravel Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Gravel Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.11106 lane km (Construction of Concrete Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Concrete Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00
April 24, 2018 2018 WIN8F05411 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Construction of Bypass/Diversion Road ,Carcar Diversion Road incl. ROW, Cebu
April 24, 2018 2018 WIN8F05379 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to declared Tourism Destination Barangay Simala-Lindogon Leading to Simala Parish Church, Simala, Sibonga, Cebu
April 24, 2018 2018 WIN8F05416 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Revetments (Gabions) along Suba River at Suba Bridge (K0050+640), Sibonga,Cebu
April 24, 2018 2018 WIN8F05415 R.A. 10964 December 19, 2017 Region VII Cebu 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Suba River Control Structure (Gabions) Suba, Sibonga,Cebu
April 24, 2018 2018 WIN8C02149 R.A. 10964 December 19, 2017 Region VII Cebu 3rd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Revetment (Rubble Concrete) at Guinabasan River along Toledo-Tabuelan-San Remigio Rd, Brgy. Sta. Lucia, Asturias, Cebu
April 24, 2018 2018 WIN8C02148 R.A. 10964 December 19, 2017 Region VII Cebu 3rd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Weir Dam at Sapangdaku Bridge along Toledo-Tabuelan-Sn Remegio Rd., Brgy. Dumlog-Brgy. Daanlungsod, Toledo City, Cebu
April 24, 2018 2018 WIN8C02397 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads, Tertiary Roads, Sogod-Tabuelan Rd - K0123 + 089 - K0123 + 716, K0120+133 - K00120+598, K0119+(-927) - K0019+(-841)
April 24, 2018 2018 WIN8C02301 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Off-Carriageway Improvement, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0043 + 000 - K0044 + 560, K0046 + 918 - K0047 + 668, K0055 + 725 - K0056 + 840, K0070 + 725 - K0071 + 615, K0073 + 687 - K0073 + 771, K0073 + 822 - K0073 + 847
April 24, 2018 2018 WIN8C02300 R.A. 10964 December 19, 2017 Region VII Cebu 5th District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Construction/Upgrading/Rehabilitation of Drainage along National Roads, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0037 + 301 - K0038+877, K0039+800 - K0040+178, K0040+700 - K0041+000
April 24, 2018 2018 WIN8C02144 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction (Completion) of Multi-Purpose Building (Barangay Hall), Brgy. Tilhaong, Consolacion, Cebu
April 24, 2018 2018 WIN8C02147 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program Local Roads and Bridges, Local Roads, Rehabilitation/Upgrading of S.E. Llenes Road with Drainage Facilities, Brgy. Pakna-an & Brgy. Labogon, Mandaue City, Cebu
April 24, 2018 2018 WIN8C02145 R.A. 10964 December 19, 2017 Region VII Cebu 6th District Engineering Office
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction of Multi-purpose Building, Brgy. Poblacion, Cordova, Cebu
April 24, 2018 2018 WIN8F05260 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation /Reconstruction of Roads with Slips, Slope Collapse and Landslide-Tertiary Roads- Guihulngan-Baloc-Isabela Rd. K0120+800 - K0120+850, K0121+000 - K0121+119, K0129+938 - K0130+010
April 24, 2018 2018 WIN8F05237 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME -1: Ensure Safe and Reliable National Road System- Network Development Program - Paving of Unpaved Road-Tertiary Roads-Guihulngan-Baloc-Isabela Roads. K0130+940 - K0130+960, K0150+000 - K0150+260
April 24, 2018 2018 WIN8F05238 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
LOCAL PROGRAM: Local Infrastructure Program- Local Roads and Bridges- Local Roads-Construction of Local Roads, Barangay Manogtong, Ayungon, Negros Oriental
April 24, 2018 2018 WIN8F05412 R.A. 10964 December 19, 2017 Region VII Negros Oriental 1st District Engineering Office
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control along Tampocon River (Upstream) at Brgy. Tampocon, Ayungon, Negros Oriental
April 24, 2018 2018 WIN8C02390 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Metro Dumaguete Diversion Road (Section 1), Negros Oriental
April 24, 2018 2018 WIN8C02401 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Bais-Kabankalan Rd incl. ROW - K0085 + 848 - K0086 + 420, K0086 + 500 - K0086 + 756.50, K0086 + 640 - K0086 + 757
April 24, 2018 2018 WIN8C02558 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction /Upgrading of Damaged Paved Roads

FROM:
Daang Maharlika (Agusan-Davao Sect) - K1312 + 578 - K1312 + 715 , K1324 + 875 - K1325 + 001 , K1350 + 463 - K1350 + 485, K1375 + 000 - K1375 + 100 , K1376 + 088 - K1376 + 328, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 554, K1349 + 654 - K1349 + 667, K1349 + 709 - K1349 + 767, K1350 + 685 - K1350 + 700, K1352 + 454 - K1352 + 485, K1355 + 372 - K1355 + 389, K1355 + 538 - K1355 + 561, K1355 + 584 - K1355 + 602

Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 1.147 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)

TO:
Daang Maharlika (Agusan-Davao Sect) -K1312 + 578 - K1312 + 715, K1324+875 - K1325+001, K1325+238 - K1325+808, K1338+991.5 – K1339+005, K1338+996 – K1339+000.5, K1339+231 – K1339+244.5, K1339+253 – K1339+262, K1339+290 – K1339+299, K1339+331 – K1339+371.5, K1339+568 – K1339+581.5, K1342+085 – K1342+112, K1344+000 – K1344+100, K1345+508 – K1346+000, K1349 + 269 - K1349 + 366, K1349 + 450 - K1349 + 469, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 545, K1349 + 604 - K1349 + 613, K1349 + 617 - K1349 + 622, K1349 + 644 - K1349 + 658, K1349 + 671 -K1349 + 680, K1349+686 – K1349+691, K1349+728 – K1349+737, K1349 + 700 - K1349 + 710, K1349 + 732 - K1349 + 743, K1349 + 755 - K1349 + 759, K1349 + 764 - K1349 + 768, K1350 + 291 - K1350 + 300, K1350 + 463 - K1350 + 485, K1350 + 605 - K1350 + 614, K1350 + 671 - K1350 + 703, K1351 + 019 - K1351 + 039, K1352 + 167 - K1352 + 180, K1352 + 454 - K1352 + 485, K1352 + 491 - K1352 + 505, K1355 + 438 - K1355 + 452, K1355 + 494 - K1355 + 516, K1355 + 520 - K1355 + 534, K1355 + 538 - K1355 + 561, K1355+538+K1355+557, K1355 + 584 - K1355 + 602, K1375 + 000 - K1375 + 100, K1376 + 088 - K1376 + 328, K1376 + 802 - K1376 + 832

Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 3.252 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)
April 24, 2018 2018 WIN8C02400 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Road (Dumaguete-Jct Bais-Kabankalan) incl. ROW-K0045+600-K0046+148
April 24, 2018 2018 WIN8C02399 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) incl. ROW - K0026 + 700 - K0027 + 555
April 24, 2018 FY 2018 GAA WIN8C02556 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-New Bataan Diversion Road, Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.025 lane km (Construction of Concrete Road)
ROW: 96,938.776 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 232,082,500.00 (Construction of Concrete Road)
ROW: P 9,167,500.00
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-New Bataan Diversion Road, Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 17.79502 lane km (Construction of Concrete Road)
ROW: 96,938.776 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 232,082,500.00 (Construction of Concrete Road)
ROW: P 9,167,500.00
EAO: P 8,750,000.00
April 24, 2018 2018 WIN8C02296 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Bais Bypass Road, incl. ROW, Negros Oriental
April 24, 2018 2018 WIN8c02295 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of Banica River Control, Dumaguete City, Negros Oriental
April 24, 2018 2018 WIN8C02307 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of River Control, Amlan, Negros Oriental
April 24, 2018 2018 WIN8C02277 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of Ocoy River Control, Candau-ay, Dumaguete City, Negros Oriental
April 24, 2018 2018 WIN8C02398 R.A. 10964 December 19, 2017 Region VII Negros Oriental 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tanjay River Control, Poblacion II, Tanjay City, Negros Oriental
April 24, 2018 FY 2018 GAA WIN8C02591 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Panacan Avenue Road leading to Sasa Wharf-F. Bangoy International Airport, Brgy. Panacan, Davao City
Physical Target:
CW1: 0.400 lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 7,800,000.00
CW1: P 7,644,000.00 (Reconstruction from Paved to Concrete)
EAO: P 156,000.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Panacan Avenue Road leading to Sasa Wharf-F. Bangoy International Airport, Brgy. Panacan, Davao City
Physical Target:
CW1: 0.988 lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 7,800,000.00
CW1: P 7,644,000.00 (Reconstruction from Paved to Concrete)
EAO: P 156,000.00
April 24, 2018 FY 2018 GAA WIN8C02573 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River, Kadayawan Section, Brgy. Talomo, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River, Kadayawan Section, Brgy. Talomo, Davao City
Physical Target:
CW1: 650 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
April 24, 2018 FY 2018 GAA WIN8C02602 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+288 - Sta. 38+788), Right Bank, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+288 - Sta. 38+533, Sta. 38+548 - Sta. 38+999), Right Bank, Davao City
Physical Target:
CW1: 696 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
April 24, 2018 FY 2018 GAA WIN8C02571 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Panacan River, Davao City
Physical Target:
CW1: 250 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structures)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Panacan River, Davao City
Physical Target:
CW1: 502 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structures)
EAO: P 600,000.00
April 24, 2018 FY 2018 GAA WIN8C02582 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Talomo River, Talomo, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 65,000,000.00
CW1: P 62,725,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,275,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Talomo River, Talomo, Davao City
Physical Target:
CW1: 867 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 65,000,000.00
CW1: P 62,725,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,275,000.00
April 24, 2018 FY 2018 GAA WIN8C02575 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of GAbions and Mattresses along Matina RIver (SM Village Section), Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structures)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River (SM Village Section), Davao City
Physical Target:
CW1: 605 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structures)
EAO: P 1,000,000.00
April 24, 2018 FY 2018 GAA WIN8C02576 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Crossing Mahayag Road leading to Safari Land Crocodile Park, Barangay Mahayag, Davao City
Physical Target:
CW1: 2.602 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,820,000.00 (Construction of Concrete Road)
CW1: P 20,403,600.00
EAO: P 416,400.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Crossing Mahayag Road leading to Safari Land Crocodile Park, Barangay Mahayag, Davao City
Physical Target:
CW1: 2.430 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,820,000.00
CW1: P 20,403,600.00 (Construction of Concrete Road)
EAO: P 416,400.00
April 24, 2018 FY 2018 GAA WIN8C02609 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures Drainage and Systems
Installation of Gabions and Mattresses along Lasang River, Mabuhay-Pañalum-Paquibato Section, Davao City
Physical Target:
CW1: 400 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures Drainage and Systems
Installation of Gabions and Mattresses along Lasang River, Mabuhay-Pañalum-Paquibato Section, Davao City
Physical Target:
CW1: 539 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
April 24, 2018 FY 2018 GAA WIN8C02572 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 4.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 2.020 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
April 24, 2018 FY 2018 GAA WIN8C02608 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Tigatto-Waan Section, Davao City
Physical Target:
CW1: 450 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Tigatto-Waan Section, Davao City
Physical Target:
CW1: 583 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
April 23, 2018 2018 WIN8G01900 WIN8G01900 March 16, 2018 Cordillera Administrative Region Baguio City District Engineering Office
From: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay East Flyover (B02191LZ) along Magsaysay Ave. (Trinidad Rd); Physical Target:1 No. of Bridge; Allocation = Php 70,000,000

To: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay East Flyover (B02191LZ) along Magsaysay Ave. (Trinidad Rd); Physical Target:1 No. of Bridge; Allocation = Php39,275,000
April 23, 2018 2018 WIN8G01878 WIN8G01878 March 16, 2018 Cordillera Administrative Region Baguio City District Engineering Office
From: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- BGH Flyover (B00568LZ) along Baguio Gen. Hospital Flyover; Physical Target:1 No. of Bridge; Allocation = Php 80,000,000

To: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- BGH Flyover (B00568LZ) along Baguio Gen. Hospital Flyover; Physical Target:1 No. of Bridge; Allocation = Php35,545,000
April 21, 2018 2018 320102100096000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0546+777.10 - K0547+138.30, Gattaran Section, Cagayan
April 21, 2018 2018 320102100098000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin - K0547+501.90 - K0547+891.90, Gattaran Section, Cagayan
April 21, 2018 2018 320102100099000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0547+891.90 - K0548+270.30, Gattaran Section, Cagayan
April 21, 2018 2018 320102100097000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin - K0547+138.30 - K0547+501.90, Gattaran Section, Cagayan
April 21, 2018 2018 320102100101000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0548+604.30 - K0548+986.70, Gattaran Section, Cagayan
April 21, 2018 2018 320102100100000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0548+270.30 - K0548+604.30, Gattaran Section, Cagayan
April 21, 2018 2018 320101100096000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control System, Sta. 0+000 - Sta. 0+348 (Downstream), L. Adviento - Casicallan Sur Section, Gattaran, Cagayan
April 21, 2018 2018 310109100051000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0547+000 - K0547+110.80
April 21, 2018 2018 310208100066000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement -Secondary Roads

Cagayan Valley Road (Magapit-Jct Aparri Airport Sect) K0558+658- K0559+000, K0560+151 - K0560+845.50
April 21, 2018 2018 310202100025000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program- Road Widening -Secondary Roads

Cagayan Valley Rd. (Magapit -Jct. Aparri Airport Section) - K0567+000- K0570+255.80, K0570+255.80- K0570+295.80, K0570+295.80-K0571+000, K0574+794 - K0575+286.40, K0575+286.40 - K0575+290.40, K0575+290.40 - K0575+401.40
April 21, 2018 2018 310108100084000 GAA FY2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Magapit-Mission Rd - K0560+340-K0560+520, K0560+599-K0560+729, K0560+835-K0560+9736, K0561+180 - K0561+357
April 21, 2018 2018 310109100059000 GAA FY2018 January 1, 2018 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Bambang-Kasibu-Solano Road - K0262+801 - K0262+823, K0262+845 – K0262+856, K0262+911 – K0262+927, K0263+015 – K0263+038, K0263+058 – K0263+069, K0263+107 - K0263+128, K0263+344 – K0263+390, K0263+551 – K0263+616, K0263+630 – K0263+657, K0269+870 – K0269+905, K0275+569 – K0257+646, K0275+799 – K0275+863, K0275+873 – K0276+006, K0276+174 – K0276+226, K0282+758 – K0282+806; K0282+868 – K0282+891, K0283+800 – K0283+828, K0283+845 – K0283+867, K0283+880 – K0283+902, K0284+640 – K0284+669, K0285+526 – K0285+576, K0287+621 – K0287+643, K0287+839 – K0287+911, K0288+354 – K0288+381, K0288+851 – K0288+868, K0288+874 – K0288+895
April 21, 2018 2018 310109100061000 GAA FY2018 January 1, 2018 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Nueva Vizcaya - Pangasinan Road K0217+733 – K0217+783, K0218+238 – K0218+434, K0218+298 – K0218+323, K0218+354 – K0218+366.80, K0218+580 – K0218+601, K0218+623 – K0218+670,
K0219+129 – K0219+157, K0219+168 – K0219+191, K0219+561 – K0219+690, K0219+790 – K0219+994, K0219+957 – K0219+990, K0220+033 – K0220+046, K0220+144 – K0220+175.40, K0220+561 – K0220+617.20, K0226+303 – K0226+330, K0226+303 – K0226+331.30, K0227+100 – K0227+274
April 21, 2018 2018 310109100060000 GAA FY2018 January 1, 2018 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Nat'l Road-Bitnong-Belance- N. Vizcaya Bdry. Road -
K0260+530 - K0260+556, K0261+412 - K0261+443, K0262+197.8 - K0262+223, K0262+601.5 - K0262+617, K0263+541 - K0263+571, K0263+811 - K0263+830, K0263+953.5 - K0264+010, K0264+200 - K0264+229, K0264+361 - K0264+387, K0269+020 - K0269+055, K0270+027 - K0270+082, K0271+065 - K0271+106, K0271+144 - K0271+188, K0271+219 - K0271+323, K0272+134 - K0272+156, K0272+213 - K0272+254
April 21, 2018 2018 300203100247000 GAA FY2018 January 1, 2018 Region III Quirino District Engineering Office
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Access Road leading to Siitan Nature Park, Nagtipunan, Quirino
April 21, 2018 2018 300203100248000 GAA FY2018 January 1, 2018 Region II Quirino District Engineering Office
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Access Road to Diamond Caves, Nagtipunan, Quirino
April 21, 2018 2018 300203100246000 GAA FY2018 January 1, 2018 Region II Quirino District Engineering Office
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Access Road leading to Pensal Falls Aglipay, Quirino
April 21, 2018 2018 WIN8C02515 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
Organizational Outcome 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System

FROM:
Construction of Bayugan River Bank Protection including River Training along NRJ Bayugan-Esperanza Road Phase II, Bayugan City, Agusan Del Sur, K 0+120 – K 0+330
Scope of Work: Construction of Flood
Mitigation Structure
Physical Target: 185.000 lineal meters
Amount:
Php 20,000,000.00 (Total)
Php 19,600,000.00 (Flood Control)
Php 400,000.00 (EAO)

TO:
Construction of Bayugan River Bank Protection including River Training along NRJ Bayugan-Esperanza Road Phase II, Bayugan City, Agusan Del Sur, Sta. 0+000 – Sta. 0+210.00
Scope of Work: Construction of Flood
Mitigation Structure
Physical Target: 210.000 lineal meters
Amount:
Php 20,000,000.00 (Total)
Php 19,600,000.00 (Flood Control)
Php 400,000.00 (EAO)
April 21, 2018 2018 WIN8C02488 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
Organizational Outcome 1 - Network Development - Construction of By-Pass and Diversion Roads

FROM:
Daang Maharlika (Alternate Route) NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat, (Sibagat Section), incl. ROW, Agusan del Sur
Scope of Work:
Construction of Gravel Road
ROW Acquisition
Physical Target:
1.800 lane km
60,000.00 square meters
Amount:
Php 20,000,000.00 (Total)
Php 15,190,000.00 (Gravel Road)
Php 4,410,000.00 (ROW Acquisition)
Php 400,000.00 (EAO)

TO:
Daang Maharlika (Alternate Route) NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat, (Sibagat Section), incl. ROW, Agusan del Sur
Scope of Work:
Construction of Gravel Road
Construction of Concrete Road
ROW Acquisition
Physical Target:
1.20 lane km
0.7224 lane km
57,672.00 square meters
Amount:
Php 20,000,000.00 (Total)
Php 7,736,429.15 (Gravel Road)
Php 7,249,234.90 (Gravel Road)
Php 4,614,335.95 (ROW Acquisition)
Php 400,000.00 (EAO)
April 19, 2018 FY - 2018 WINF05293 FY - 2018 GAA DPWH Infra program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
001 - Ensure Safe and Reliable National Road System

Bridge- Widening of Permanent Bridge

FROM:
Panacan Br. ( B00031PW ) along
Puerto Princesa South Rd

CW1: 270.459 sq.m. ( Widening of Bridge )
Allocation: 28,350,000 Php

TO:
Panacan Br. ( B00031PW ) along
Puerto Princesa South Rd

CW1: 226.80 sq.m ( Widening of Bridge )
Allocation: 28,350,000 Php

April 19, 2018 FY - 2018 WIN8F05289 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- School Buildings

FROM:
Construction of One (1) Classroom Building
So. Cabuluan, Brgy. Aramaywan, Narra, Palawan

CW1: Construction of Classroom: 1 Classroom
Allocation: 1,000,000 Php

TO:
Construction of one (1) Classroom Building
Cabuluan Elementary School, So. Cabuluan,
Brgy. Calategas, Narra, Palawan

CW1: Construction of Clsssroom : 1 Classroom
Allocation : 1,000,000 Php
April 19, 2018 FY - 2018 WIN8F05300 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure - National Roads and Bridges -
Local Roads

FROM:
Construction of Road, Brgy. Antipuluan, Narra, Palawan

CW1: 1.20 lane km ( Construction of Gravel Road )
Allocation; 2,000,000 Php

TO:
Construction of Road, Brgy. Antipuluan, Narra, Palawan

CW1: 2.04 lane Km ( Construction of Gravel road )
Allocation: 2,000,000 Php


April 19, 2018 FY - 2018 WIN8F05301 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Balabac Circumferential Road, Balabac, Palawan

CW1: 3.6 lane km ( Construction of Concrete Road )
Allocation: 69,300,000 Php

TO:
Balabac Circumferential Road, Balabac, Palawan

CW1: 6.0 lane km ( Construction of Concrete Road )
Allocation: 69,300,000 Php

April 19, 2018 FY - 2018 WIN8F05308 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
001 - Ensure Safe and Reliable National Road System

Bridge - Replacement of Permanent Weak Bridges

FROM:
Sumbiling Br. ( B00301PW ) along Palawan Circum. Rd

CW1: 216.558 sq.m. ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php

TO:
Sumbiling Br. (B00301PW) along Palawan

CW1: 333.90 sq.m. ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php
April 19, 2018 2018 WIN8F05413 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1:Ensure Safe and Reliable National Road System, Asset Preservation Program Preventive Maintenance - Secondary Roads, Cebu North Hagnaya Wharf Rd - K0034 + (-066) - K0034 + 000, K0036 + 568 - K0037 + 000, K0040 + 542 - K0040 + 700, K0042 + 814 - K0043 + 000, K0045 + 695 - K0046 + 172, K0047 + 899 - K0048 + 730, K0049 + 200 - K0050 + 000, K0051 + 602 - K0051 + 808, K0051 + 844 - K0052 + 000, K0057 + 000 - K0057 + 478, K0058 + 620 - K0059 + 000, K0061 + 500 - K0062 + 000, K0062 + 000 - K0062 + 700, K0062 + 900 - K0063 + 307, K0063 + 610 - K0064 + 000, K0068 + 000 - K0068 + 696, K0068 + 696 - K0069 +149, K0075 + 000 - K0075 + 500, K0075 + 600 - K0075 + 830
April 19, 2018 2018 WIN8F05417 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development, Road Widening, Primary Roads, Dumaguete North Rd (Jct Bais - Kabankalan) - K0051 + 790.60 - K0056 + 899, K0057 + (-073) - K0058 + 182.5
April 19, 2018 2018 WIN8F05418 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads with Slips, Slope Collapses and Landslide, Tertiary Road, Luyang-Poo-Lazi Rd - K0012 + 450 - K0012 + 960, K0013 + 040 - K0013 + 200, K0015 + 073 - K0015 + 190, K0015 + 300 - K0015 + 370, K0022 + 700 - K0022 + 805, K0023 + 460 - K0023 + 710
April 19, 2018 2018 WIN8F05410 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Roads system, Network Development Program, Road Widening-Secondary Roads-Construction of Missing Links/New Roads - Dalaguete-Mantalongon-Badian Road, Brgy. Ablayan to Brgy. Dobdob Section, Cebu
April 19, 2018 2018 310106100105000 GAA FY 2018 January 1, 2018 Region II Isabela 2nd District Engineering Office
OO1; Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Naguilian-San Mariano Road (S00789LZ) - K0399+000-K0400+000, K0400+000-K0401+000, K0401+000-K0402+000, K0402+000-K0402+470
April 18, 2018 FY - 2018 WIN8F05298 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures - School Buildings

FROM:
Construction of Poblacion 3 Elementary School,
Poblacion 3, Balabac, Palawan

CW1: Construction of 1-storey Classroom : 1- Classroom
Allocation : 1,100,000 Php

TO:
Construction of Building,
Balabac Central School, Balabac, Palawan

CW1: Construction of 1-storey Classroom : 1 - Classroom
Allocation : 1,100,000 Php

Pages