April 24, 2018 |
FY 2018 |
WIN8G02120 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program – Construction of By-Pass and Diversion Roads – Licab – Victoria Rd, Nueva Ecija |
April 24, 2018 |
2018 |
310103100085000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0014+(-177) - K0014+008 |
April 24, 2018 |
FY 2018 |
WIN8G02115 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance - Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Road, K0135+000 – K0135+545, K0138+000 – K0138+350, K0141+000 – K0141+529, K0142+179 – K0142+315 |
April 24, 2018 |
2018 |
310212100053000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0023 + 200 - K0023 + 305, K0023 + 836 - K0024 + 032, S00002ST Chainage 099 - Chainage 116 |
April 24, 2018 |
2018 |
310109100049000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Basco-Mahatao-Ivana-Uyugan-Imnajbu Rd - K0004 + 067 - K0004 + 112, K0005 + 160 - K0005 + 194 |
April 24, 2018 |
FY 2018 |
WIN8G02131 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Program – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project – Local Roads – Reconstruction / Rehabilitation / Upgrading of Landig – Villaflores Road, Cuyapo, Nueva Ecija |
April 24, 2018 |
FY 2018 GAA |
WIN8C02372 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.160 lane km (Road Widening)
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1456+1002 - K1457+604, K1460+804 - K1461+640
Physical Target:
CW1: 3.3955 lane km
ROW: 5,061.523 sq.m.
Allocation:
TOTAL: P 127,630,000.00
CW1: P 74,405,360.00 (Road Widening)
ROW: P 48,757,590.00
EAO: P 4,467,050.00 |
April 24, 2018 |
FY 2018 |
WIN8G02119 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation – Preventive Maintenance – Secondary Roads – San Jose City – Rizal Rd via Pinili – Porais – Villa Joson (Palarilla) Rd, K0160+-141.10 – K0160+000, K0160+100 – K0161+000, K0161+000 – K0161+104, K0161+309 – K0161+506.70, K0161+905 – K0163+522, K0163+531.70 – K0165+128.70, K0163+515 – K0166+480, K0172+091.70 – K0172+275, K0172+510 – K0172+716, K0173+508 – K0173+813, K0176+606 – K0176+841 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02333 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1732+220 - K1734+106, K1734+326 - K1736+055
Physical Target:
CW1: 7.826 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1731+360 - K1732+194, K1732+260 - K1734+106,
K1734+326 - K1735+950
Physical Target:
CW1: 8.63522 lane km (Road Widening)
ROW:34,972.800 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 143,947,120.00 (Road Widening)
ROW: P 802,880.00
EAO: P 5,250,000.00 |
April 24, 2018 |
FY 2018 |
WIN8G02116 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Construction of Slope Protection along Balantacan Creek, Sta, Cruz to Balantacan, Lubao, Pampanga |
April 24, 2018 |
2018 |
310106100098000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
Tertiary Roads - Mayan-Mauyen Port Rd - K0008 + 498.20 - K0008 + 533.50 |
April 24, 2018 |
FY 2018 |
WIN8G02127 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Rehabilitation/Improvement of Dike with Slope Protection along Porac River, Hacienda Dolores, Porac, Pampanga |
April 24, 2018 |
FY - 2018 |
WIN8F05227 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Jct. Puerto Princesa South Road leading to Mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan
CW1: 1.60 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
TO:
Jct. Puerto Princesa South Road leading to mainit Falls,
Brgy. Mainit, Brooke's Point, Palawan
CW1: 1.786 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php |
April 24, 2018 |
FY - 2018 |
WIN8F05228 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan
CW1: 1.96 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
TO:
Pangobilian Road leading to Mainit Seven Falls,
Brgy. Mainit, Brooke's Point, Palawan
CW1: 4.36 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php |
April 24, 2018 |
FY - 2018 |
WIN8F05232 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Malambunga Flood Control Structure,
Bataraza, Palawan
CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Malambunga Flood Control Structure,
Rizal, Palawan
CW1: 440 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
April 24, 2018 |
FY 2018 GAA |
WIN8C02366 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.720 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Licanan-Bunawan-Mahayag-Indangan-Cabantian-Jct Davao City Diversion Road (Buhangin-Lapanday Road), Package 9, incl. ROW, Davao City
Physical Target:
CW1: 10.200 Lane Km (Road Widening)
ROW: 4,984.501 sq. m.
Allocation:
TOTAL: P 262,000,000.00
CW1: P 229,554,200.00 (Road Widening)
ROW: P 23,275,800.00
EAO: P 9,170,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02373 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1736+055 - K1737+033, K1764+184 - K1766+825,
K1767+872 - K1769+000
Physical Target:
CW1: 9.942 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way incl. ROW –
K1735+950 - K1737+040, K1737+600 - K1741+987
Physical Target:
CW1: 10.93884 lane km (Road Widening)
ROW:45,561.60 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,820,000.00 (Road Widening)
ROW: P 1,930,000.00
EAO: P 5,250,000.00 |
April 24, 2018 |
2018 |
WIN8F05409 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Preventive Maintenance – Secondary Roads, Tagbilaran East Rd (Tagbilaran-Jagna) – K0250 + 492.50 – K0251 + 000 |
April 24, 2018 |
FY 2018 |
WIN8G02132 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Construction of Flood Mitigation Structure – Improvement of dike with slope protection along Porac River, Calantas, Floridablanca, Pampanga |
April 24, 2018 |
2018 |
WIN8C02299 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road – Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd – K0034+200 – K0035+000, K0039+493 – K0041+679 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02274 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 9.600 lane km (Construction of Concrete Road)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 185,820,000.00 (Construction of Concrete Road)
ROW: P 7,720,000.00
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/ New Roads
Montevista-DNAS Road (DNAS-Laak), Package 2, incl. ROW, Compostela Valley
Physical Target:
CW1: 6.94112 lane km (Construction of Concrete Road)
CW2: 715.5 sq.m. (Construction of Concrete Bridge)
ROW: 81,632.653 sq.m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 116,698,287.13 (Construction of Concrete Road)
CW2: P 68,581,712.87 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 7,000,000.00 |
April 24, 2018 |
2018 |
WIN8C02302 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Jct (TNR) Maribojoc-Antequera-Catagbacan (Loon) – K0013 + 931 – K0015 + 423.30 |
April 24, 2018 |
FY 2018 |
WIN8G02126 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems of Upper Dalan Bapor, Sasmuan, Pampanga |
April 24, 2018 |
FY 2018 |
WIN8G02118 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Concreting of Road, Brgy. Gumi, Lubao, Pampanga |
April 24, 2018 |
2018 |
WIN8C02297 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0005 + 500 – K0007 + 137 |
April 24, 2018 |
2018 |
WIN8C02298 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Panglao Island Circumferential Rd – (S00064BH) K0007 + 137 – K0008 + 000, (S00065BH) K0009 + 000 – K0010 + 000 |
April 24, 2018 |
2018 |
WIN8C02304 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development – Off-Carriageway Improvement – Tertiary Roads, Tagbilaran City-Corella-Sikatuna-Loboc Rd – K0011 + 017 – K0012 + 000, K0019 + 645 – K0019 + 900 |
April 24, 2018 |
2018 |
WIN8C02303 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Looc (Binlod) – Bil-isan-Crossing Tangnan leading to Veraneante Resort, Momo Beach and House, and Ayacca Condo-residences Resort, Brgy Looc, Panglao, Bohol |
April 24, 2018 |
2018 |
WIN8C02306 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – La Paz (Cortes)-Cabaguan-Lourdes-Anislag (Corella) Road in Support of the Agribusiness Industry, Cortes, Bohol |
April 24, 2018 |
2018 |
WIN8C02305 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Bohol 1st District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM, Construction/Improvement of Access Roads leading to Trades Industries and Economic Zones – Maribojoc-Pagnitoan-Candavid-Basak (Loon) Provincial Road in support of the Agribusiness Industry, Maribojoc, Bohol |
April 24, 2018 |
FY 2018 GAA |
WIN8C02489 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.032 lane km (Construction of Gravel Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Gravel Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.11106 lane km (Construction of Concrete Road)
ROW: 147,959.184 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Concrete Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00 |
April 24, 2018 |
2018 |
WIN8F05411 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Construction of Bypass/Diversion Road ,Carcar Diversion Road incl. ROW, Cebu |
April 24, 2018 |
2018 |
WIN8F05379 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Convergence and Special Support Program, Construction/Improvement of Access Road-leading to declared Tourism Destination Barangay Simala-Lindogon Leading to Simala Parish Church, Simala, Sibonga, Cebu |
April 24, 2018 |
2018 |
WIN8F05416 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Revetments (Gabions) along Suba River at Suba Bridge (K0050+640), Sibonga,Cebu |
April 24, 2018 |
2018 |
WIN8F05415 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Flood Management Program -Construction /Maintenance of Flood Control Mitigation Structure and Drainage System-Construction of Suba River Control Structure (Gabions) Suba, Sibonga,Cebu |
April 24, 2018 |
2018 |
WIN8C02149 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Revetment (Rubble Concrete) at Guinabasan River along Toledo-Tabuelan-San Remigio Rd, Brgy. Sta. Lucia, Asturias, Cebu |
April 24, 2018 |
2018 |
WIN8C02148 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Weir Dam at Sapangdaku Bridge along Toledo-Tabuelan-Sn Remegio Rd., Brgy. Dumlog-Brgy. Daanlungsod, Toledo City, Cebu |
April 24, 2018 |
2018 |
WIN8C02397 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 5th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads, Tertiary Roads, Sogod-Tabuelan Rd - K0123 + 089 - K0123 + 716, K0120+133 - K00120+598, K0119+(-927) - K0019+(-841) |
April 24, 2018 |
2018 |
WIN8C02301 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 5th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Off-Carriageway Improvement, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0043 + 000 - K0044 + 560, K0046 + 918 - K0047 + 668, K0055 + 725 - K0056 + 840, K0070 + 725 - K0071 + 615, K0073 + 687 - K0073 + 771, K0073 + 822 - K0073 + 847 |
April 24, 2018 |
2018 |
WIN8C02300 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 5th District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Construction/Upgrading/Rehabilitation of Drainage along National Roads, Secondary Roads, Cebu North Hagnaya Wharf Rd - K0037 + 301 - K0038+877, K0039+800 - K0040+178, K0040+700 - K0041+000 |
April 24, 2018 |
2018 |
WIN8C02144 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 6th District Engineering Office |
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction (Completion) of Multi-Purpose Building (Barangay Hall), Brgy. Tilhaong, Consolacion, Cebu |
April 24, 2018 |
2018 |
WIN8C02147 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 6th District Engineering Office |
LOCAL PROGRAM, Local Infrastructure Program Local Roads and Bridges, Local Roads, Rehabilitation/Upgrading of S.E. Llenes Road with Drainage Facilities, Brgy. Pakna-an & Brgy. Labogon, Mandaue City, Cebu |
April 24, 2018 |
2018 |
WIN8C02145 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Cebu 6th District Engineering Office |
LOCAL PROGRAM, Local Infrastructure Program, Buildings and Other Structures, Multipurpose/Facilities, Construction of Multi-purpose Building, Brgy. Poblacion, Cordova, Cebu |
April 24, 2018 |
2018 |
WIN8F05260 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation /Reconstruction of Roads with Slips, Slope Collapse and Landslide-Tertiary Roads- Guihulngan-Baloc-Isabela Rd. K0120+800 - K0120+850, K0121+000 - K0121+119, K0129+938 - K0130+010 |
April 24, 2018 |
2018 |
WIN8F05237 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 1st District Engineering Office |
ORGANIZATIONAL OUTCOME -1: Ensure Safe and Reliable National Road System- Network Development Program - Paving of Unpaved Road-Tertiary Roads-Guihulngan-Baloc-Isabela Roads. K0130+940 - K0130+960, K0150+000 - K0150+260 |
April 24, 2018 |
2018 |
WIN8F05238 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 1st District Engineering Office |
LOCAL PROGRAM: Local Infrastructure Program- Local Roads and Bridges- Local Roads-Construction of Local Roads, Barangay Manogtong, Ayungon, Negros Oriental |
April 24, 2018 |
2018 |
WIN8F05412 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods-Flood Management Program-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Flood Control along Tampocon River (Upstream) at Brgy. Tampocon, Ayungon, Negros Oriental |
April 24, 2018 |
2018 |
WIN8C02390 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Metro Dumaguete Diversion Road (Section 1), Negros Oriental |
April 24, 2018 |
2018 |
WIN8C02401 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Bais-Kabankalan Rd incl. ROW - K0085 + 848 - K0086 + 420, K0086 + 500 - K0086 + 756.50, K0086 + 640 - K0086 + 757 |
April 24, 2018 |
2018 |
WIN8C02558 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction /Upgrading of Damaged Paved Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1312 + 578 - K1312 + 715 , K1324 + 875 - K1325 + 001 , K1350 + 463 - K1350 + 485, K1375 + 000 - K1375 + 100 , K1376 + 088 - K1376 + 328, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 554, K1349 + 654 - K1349 + 667, K1349 + 709 - K1349 + 767, K1350 + 685 - K1350 + 700, K1352 + 454 - K1352 + 485, K1355 + 372 - K1355 + 389, K1355 + 538 - K1355 + 561, K1355 + 584 - K1355 + 602
Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 1.147 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)
TO:
Daang Maharlika (Agusan-Davao Sect) -K1312 + 578 - K1312 + 715, K1324+875 - K1325+001, K1325+238 - K1325+808, K1338+991.5 – K1339+005, K1338+996 – K1339+000.5, K1339+231 – K1339+244.5, K1339+253 – K1339+262, K1339+290 – K1339+299, K1339+331 – K1339+371.5, K1339+568 – K1339+581.5, K1342+085 – K1342+112, K1344+000 – K1344+100, K1345+508 – K1346+000, K1349 + 269 - K1349 + 366, K1349 + 450 - K1349 + 469, K1349 + 491 - K1349 + 509, K1349 + 518 - K1349 + 545, K1349 + 604 - K1349 + 613, K1349 + 617 - K1349 + 622, K1349 + 644 - K1349 + 658, K1349 + 671 -K1349 + 680, K1349+686 – K1349+691, K1349+728 – K1349+737, K1349 + 700 - K1349 + 710, K1349 + 732 - K1349 + 743, K1349 + 755 - K1349 + 759, K1349 + 764 - K1349 + 768, K1350 + 291 - K1350 + 300, K1350 + 463 - K1350 + 485, K1350 + 605 - K1350 + 614, K1350 + 671 - K1350 + 703, K1351 + 019 - K1351 + 039, K1352 + 167 - K1352 + 180, K1352 + 454 - K1352 + 485, K1352 + 491 - K1352 + 505, K1355 + 438 - K1355 + 452, K1355 + 494 - K1355 + 516, K1355 + 520 - K1355 + 534, K1355 + 538 - K1355 + 561, K1355+538+K1355+557, K1355 + 584 - K1355 + 602, K1375 + 000 - K1375 + 100, K1376 + 088 - K1376 + 328, K1376 + 802 - K1376 + 832
Project ID No. P00200113MN
Scope of Work: Reconstruction from Paved to Concrete
Physical Target: 3.252 Lane Km
Allocation: Php 36,063,000.00 (Total)
Php 35,341,740.00 (Road)
Php 721,260.00 (EAO)
|
April 24, 2018 |
2018 |
WIN8C02400 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Road (Dumaguete-Jct Bais-Kabankalan) incl. ROW-K0045+600-K0046+148 |
April 24, 2018 |
2018 |
WIN8C02399 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening - Primary Roads, Dumaguete North Rd (Dumaguete-Jct Bais-Kabankalan) incl. ROW - K0026 + 700 - K0027 + 555 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02556 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-New Bataan Diversion Road, Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.025 lane km (Construction of Concrete Road)
ROW: 96,938.776 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 232,082,500.00 (Construction of Concrete Road)
ROW: P 9,167,500.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Nabunturan-New Bataan Diversion Road, Package A, incl. ROW, Compostela Valley
Physical Target:
CW1: 17.79502 lane km (Construction of Concrete Road)
ROW: 96,938.776 sq.m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 232,082,500.00 (Construction of Concrete Road)
ROW: P 9,167,500.00
EAO: P 8,750,000.00 |
April 24, 2018 |
2018 |
WIN8C02296 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Bais Bypass Road, incl. ROW, Negros Oriental |
April 24, 2018 |
2018 |
WIN8c02295 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of Banica River Control, Dumaguete City, Negros Oriental |
April 24, 2018 |
2018 |
WIN8C02307 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of River Control, Amlan, Negros Oriental |
April 24, 2018 |
2018 |
WIN8C02277 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Reconstruction/Rehabilitation of Ocoy River Control, Candau-ay, Dumaguete City, Negros Oriental |
April 24, 2018 |
2018 |
WIN8C02398 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Negros Oriental 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tanjay River Control, Poblacion II, Tanjay City, Negros Oriental |
April 24, 2018 |
FY 2018 GAA |
WIN8C02591 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Panacan Avenue Road leading to Sasa Wharf-F. Bangoy International Airport, Brgy. Panacan, Davao City
Physical Target:
CW1: 0.400 lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 7,800,000.00
CW1: P 7,644,000.00 (Reconstruction from Paved to Concrete)
EAO: P 156,000.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Panacan Avenue Road leading to Sasa Wharf-F. Bangoy International Airport, Brgy. Panacan, Davao City
Physical Target:
CW1: 0.988 lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 7,800,000.00
CW1: P 7,644,000.00 (Reconstruction from Paved to Concrete)
EAO: P 156,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02573 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River, Kadayawan Section, Brgy. Talomo, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River, Kadayawan Section, Brgy. Talomo, Davao City
Physical Target:
CW1: 650 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02602 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+288 - Sta. 38+788), Right Bank, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+288 - Sta. 38+533, Sta. 38+548 - Sta. 38+999), Right Bank, Davao City
Physical Target:
CW1: 696 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02571 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Panacan River, Davao City
Physical Target:
CW1: 250 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structures)
EAO: P 600,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Panacan River, Davao City
Physical Target:
CW1: 502 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structures)
EAO: P 600,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02582 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Talomo River, Talomo, Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 65,000,000.00
CW1: P 62,725,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,275,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Riverbank Protection & Installation of Gabions and Mattresses along Talomo River, Talomo, Davao City
Physical Target:
CW1: 867 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 65,000,000.00
CW1: P 62,725,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,275,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02575 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of GAbions and Mattresses along Matina RIver (SM Village Section), Davao City
Physical Target:
CW1: 500 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structures)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Installation of Gabions and Mattresses along Matina River (SM Village Section), Davao City
Physical Target:
CW1: 605 lineal meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structures)
EAO: P 1,000,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02576 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Crossing Mahayag Road leading to Safari Land Crocodile Park, Barangay Mahayag, Davao City
Physical Target:
CW1: 2.602 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,820,000.00 (Construction of Concrete Road)
CW1: P 20,403,600.00
EAO: P 416,400.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Crossing Mahayag Road leading to Safari Land Crocodile Park, Barangay Mahayag, Davao City
Physical Target:
CW1: 2.430 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,820,000.00
CW1: P 20,403,600.00 (Construction of Concrete Road)
EAO: P 416,400.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02609 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures Drainage and Systems
Installation of Gabions and Mattresses along Lasang River, Mabuhay-Pañalum-Paquibato Section, Davao City
Physical Target:
CW1: 400 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures Drainage and Systems
Installation of Gabions and Mattresses along Lasang River, Mabuhay-Pañalum-Paquibato Section, Davao City
Physical Target:
CW1: 539 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02572 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 4.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 2.020 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00 |
April 24, 2018 |
FY 2018 GAA |
WIN8C02608 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Tigatto-Waan Section, Davao City
Physical Target:
CW1: 450 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Installation of Gabions and Mattresses along Davao River, Tigatto-Waan Section, Davao City
Physical Target:
CW1: 583 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
April 23, 2018 |
2018 |
WIN8G01900 |
WIN8G01900 |
March 16, 2018 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay East Flyover (B02191LZ) along Magsaysay Ave. (Trinidad Rd); Physical Target:1 No. of Bridge; Allocation = Php 70,000,000
To: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- Magsaysay East Flyover (B02191LZ) along Magsaysay Ave. (Trinidad Rd); Physical Target:1 No. of Bridge; Allocation = Php39,275,000
|
April 23, 2018 |
2018 |
WIN8G01878 |
WIN8G01878 |
March 16, 2018 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- BGH Flyover (B00568LZ) along Baguio Gen. Hospital Flyover; Physical Target:1 No. of Bridge; Allocation = Php 80,000,000
To: Bridge Program-Retrofitting/ Strengthening of Permanent Bridges- BGH Flyover (B00568LZ) along Baguio Gen. Hospital Flyover; Physical Target:1 No. of Bridge; Allocation = Php35,545,000
|
April 21, 2018 |
2018 |
320102100096000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0546+777.10 - K0547+138.30, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320102100098000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin - K0547+501.90 - K0547+891.90, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320102100099000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0547+891.90 - K0548+270.30, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320102100097000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin - K0547+138.30 - K0547+501.90, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320102100101000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0548+604.30 - K0548+986.70, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320102100100000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvements of Flood Mitigation Structures and Drainage Systems, Improvements of Flood Control System, Cagayan River Basin, K0548+270.30 - K0548+604.30, Gattaran Section, Cagayan |
April 21, 2018 |
2018 |
320101100096000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control System, Sta. 0+000 - Sta. 0+348 (Downstream), L. Adviento - Casicallan Sur Section, Gattaran, Cagayan |
April 21, 2018 |
2018 |
310109100051000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0547+000 - K0547+110.80 |
April 21, 2018 |
2018 |
310208100066000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement -Secondary Roads
Cagayan Valley Road (Magapit-Jct Aparri Airport Sect) K0558+658- K0559+000, K0560+151 - K0560+845.50 |
April 21, 2018 |
2018 |
310202100025000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program- Road Widening -Secondary Roads
Cagayan Valley Rd. (Magapit -Jct. Aparri Airport Section) - K0567+000- K0570+255.80, K0570+255.80- K0570+295.80, K0570+295.80-K0571+000, K0574+794 - K0575+286.40, K0575+286.40 - K0575+290.40, K0575+290.40 - K0575+401.40 |
April 21, 2018 |
2018 |
310108100084000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Magapit-Mission Rd - K0560+340-K0560+520, K0560+599-K0560+729, K0560+835-K0560+9736, K0561+180 - K0561+357 |
April 21, 2018 |
2018 |
310109100059000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Bambang-Kasibu-Solano Road - K0262+801 - K0262+823, K0262+845 – K0262+856, K0262+911 – K0262+927, K0263+015 – K0263+038, K0263+058 – K0263+069, K0263+107 - K0263+128, K0263+344 – K0263+390, K0263+551 – K0263+616, K0263+630 – K0263+657, K0269+870 – K0269+905, K0275+569 – K0257+646, K0275+799 – K0275+863, K0275+873 – K0276+006, K0276+174 – K0276+226, K0282+758 – K0282+806; K0282+868 – K0282+891, K0283+800 – K0283+828, K0283+845 – K0283+867, K0283+880 – K0283+902, K0284+640 – K0284+669, K0285+526 – K0285+576, K0287+621 – K0287+643, K0287+839 – K0287+911, K0288+354 – K0288+381, K0288+851 – K0288+868, K0288+874 – K0288+895 |
April 21, 2018 |
2018 |
310109100061000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Nueva Vizcaya - Pangasinan Road K0217+733 – K0217+783, K0218+238 – K0218+434, K0218+298 – K0218+323, K0218+354 – K0218+366.80, K0218+580 – K0218+601, K0218+623 – K0218+670,
K0219+129 – K0219+157, K0219+168 – K0219+191, K0219+561 – K0219+690, K0219+790 – K0219+994, K0219+957 – K0219+990, K0220+033 – K0220+046, K0220+144 – K0220+175.40, K0220+561 – K0220+617.20, K0226+303 – K0226+330, K0226+303 – K0226+331.30, K0227+100 – K0227+274
|
April 21, 2018 |
2018 |
310109100060000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Nat'l Road-Bitnong-Belance- N. Vizcaya Bdry. Road -
K0260+530 - K0260+556, K0261+412 - K0261+443, K0262+197.8 - K0262+223, K0262+601.5 - K0262+617, K0263+541 - K0263+571, K0263+811 - K0263+830, K0263+953.5 - K0264+010, K0264+200 - K0264+229, K0264+361 - K0264+387, K0269+020 - K0269+055, K0270+027 - K0270+082, K0271+065 - K0271+106, K0271+144 - K0271+188, K0271+219 - K0271+323, K0272+134 - K0272+156, K0272+213 - K0272+254
|
April 21, 2018 |
2018 |
300203100247000 |
GAA FY2018 |
January 1, 2018 |
Region III |
Quirino District Engineering Office |
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Siitan Nature Park, Nagtipunan, Quirino |
April 21, 2018 |
2018 |
300203100248000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Quirino District Engineering Office |
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Road to Diamond Caves, Nagtipunan, Quirino |
April 21, 2018 |
2018 |
300203100246000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Quirino District Engineering Office |
Convergence nad Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Pensal Falls Aglipay, Quirino |
April 21, 2018 |
2018 |
WIN8C02515 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Organizational Outcome 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System
FROM:
Construction of Bayugan River Bank Protection including River Training along NRJ Bayugan-Esperanza Road Phase II, Bayugan City, Agusan Del Sur, K 0+120 – K 0+330
Scope of Work: Construction of Flood
Mitigation Structure
Physical Target: 185.000 lineal meters
Amount:
Php 20,000,000.00 (Total)
Php 19,600,000.00 (Flood Control)
Php 400,000.00 (EAO)
TO:
Construction of Bayugan River Bank Protection including River Training along NRJ Bayugan-Esperanza Road Phase II, Bayugan City, Agusan Del Sur, Sta. 0+000 – Sta. 0+210.00
Scope of Work: Construction of Flood
Mitigation Structure
Physical Target: 210.000 lineal meters
Amount:
Php 20,000,000.00 (Total)
Php 19,600,000.00 (Flood Control)
Php 400,000.00 (EAO) |
April 21, 2018 |
2018 |
WIN8C02488 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Organizational Outcome 1 - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Daang Maharlika (Alternate Route) NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat, (Sibagat Section), incl. ROW, Agusan del Sur
Scope of Work:
Construction of Gravel Road
ROW Acquisition
Physical Target:
1.800 lane km
60,000.00 square meters
Amount:
Php 20,000,000.00 (Total)
Php 15,190,000.00 (Gravel Road)
Php 4,410,000.00 (ROW Acquisition)
Php 400,000.00 (EAO)
TO:
Daang Maharlika (Alternate Route) NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat, (Sibagat Section), incl. ROW, Agusan del Sur
Scope of Work:
Construction of Gravel Road
Construction of Concrete Road
ROW Acquisition
Physical Target:
1.20 lane km
0.7224 lane km
57,672.00 square meters
Amount:
Php 20,000,000.00 (Total)
Php 7,736,429.15 (Gravel Road)
Php 7,249,234.90 (Gravel Road)
Php 4,614,335.95 (ROW Acquisition)
Php 400,000.00 (EAO)
|
April 19, 2018 |
FY - 2018 |
WINF05293 |
FY - 2018 GAA DPWH Infra program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Bridge- Widening of Permanent Bridge
FROM:
Panacan Br. ( B00031PW ) along
Puerto Princesa South Rd
CW1: 270.459 sq.m. ( Widening of Bridge )
Allocation: 28,350,000 Php
TO:
Panacan Br. ( B00031PW ) along
Puerto Princesa South Rd
CW1: 226.80 sq.m ( Widening of Bridge )
Allocation: 28,350,000 Php
|
April 19, 2018 |
FY - 2018 |
WIN8F05289 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Local Program
Local Infrastructure Program - Buildings and Other Structures
- School Buildings
FROM:
Construction of One (1) Classroom Building
So. Cabuluan, Brgy. Aramaywan, Narra, Palawan
CW1: Construction of Classroom: 1 Classroom
Allocation: 1,000,000 Php
TO:
Construction of one (1) Classroom Building
Cabuluan Elementary School, So. Cabuluan,
Brgy. Calategas, Narra, Palawan
CW1: Construction of Clsssroom : 1 Classroom
Allocation : 1,000,000 Php |
April 19, 2018 |
FY - 2018 |
WIN8F05300 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Local Program
Local Infrastructure - National Roads and Bridges -
Local Roads
FROM:
Construction of Road, Brgy. Antipuluan, Narra, Palawan
CW1: 1.20 lane km ( Construction of Gravel Road )
Allocation; 2,000,000 Php
TO:
Construction of Road, Brgy. Antipuluan, Narra, Palawan
CW1: 2.04 lane Km ( Construction of Gravel road )
Allocation: 2,000,000 Php
|
April 19, 2018 |
FY - 2018 |
WIN8F05301 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Balabac Circumferential Road, Balabac, Palawan
CW1: 3.6 lane km ( Construction of Concrete Road )
Allocation: 69,300,000 Php
TO:
Balabac Circumferential Road, Balabac, Palawan
CW1: 6.0 lane km ( Construction of Concrete Road )
Allocation: 69,300,000 Php
|
April 19, 2018 |
FY - 2018 |
WIN8F05308 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Bridge - Replacement of Permanent Weak Bridges
FROM:
Sumbiling Br. ( B00301PW ) along Palawan Circum. Rd
CW1: 216.558 sq.m. ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php
TO:
Sumbiling Br. (B00301PW) along Palawan
CW1: 333.90 sq.m. ( Construction of Concrete Bridge )
Allocation: 43,750,000 Php |
April 19, 2018 |
2018 |
WIN8F05413 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1:Ensure Safe and Reliable National Road System, Asset Preservation Program Preventive Maintenance - Secondary Roads, Cebu North Hagnaya Wharf Rd - K0034 + (-066) - K0034 + 000, K0036 + 568 - K0037 + 000, K0040 + 542 - K0040 + 700, K0042 + 814 - K0043 + 000, K0045 + 695 - K0046 + 172, K0047 + 899 - K0048 + 730, K0049 + 200 - K0050 + 000, K0051 + 602 - K0051 + 808, K0051 + 844 - K0052 + 000, K0057 + 000 - K0057 + 478, K0058 + 620 - K0059 + 000, K0061 + 500 - K0062 + 000, K0062 + 000 - K0062 + 700, K0062 + 900 - K0063 + 307, K0063 + 610 - K0064 + 000, K0068 + 000 - K0068 + 696, K0068 + 696 - K0069 +149, K0075 + 000 - K0075 + 500, K0075 + 600 - K0075 + 830 |
April 19, 2018 |
2018 |
WIN8F05417 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development, Road Widening, Primary Roads, Dumaguete North Rd (Jct Bais - Kabankalan) - K0051 + 790.60 - K0056 + 899, K0057 + (-073) - K0058 + 182.5 |
April 19, 2018 |
2018 |
WIN8F05418 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction of Roads with Slips, Slope Collapses and Landslide, Tertiary Road, Luyang-Poo-Lazi Rd - K0012 + 450 - K0012 + 960, K0013 + 040 - K0013 + 200, K0015 + 073 - K0015 + 190, K0015 + 300 - K0015 + 370, K0022 + 700 - K0022 + 805, K0023 + 460 - K0023 + 710 |
April 19, 2018 |
2018 |
WIN8F05410 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Roads system, Network Development Program, Road Widening-Secondary Roads-Construction of Missing Links/New Roads - Dalaguete-Mantalongon-Badian Road, Brgy. Ablayan to Brgy. Dobdob Section, Cebu |
April 19, 2018 |
2018 |
310106100105000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 2nd District Engineering Office |
OO1; Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Naguilian-San Mariano Road (S00789LZ) - K0399+000-K0400+000, K0400+000-K0401+000, K0401+000-K0402+000, K0402+000-K0402+470 |
April 18, 2018 |
FY - 2018 |
WIN8F05298 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Local Program
Local Infrastructure Program - Buildings and Other Structures - School Buildings
FROM:
Construction of Poblacion 3 Elementary School,
Poblacion 3, Balabac, Palawan
CW1: Construction of 1-storey Classroom : 1- Classroom
Allocation : 1,100,000 Php
TO:
Construction of Building,
Balabac Central School, Balabac, Palawan
CW1: Construction of 1-storey Classroom : 1 - Classroom
Allocation : 1,100,000 Php
|