September 8, 2020 |
2020 |
WIN0C03985 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct. Pinagpanaan - Rizal - Pantabangan Rd. K0127+568.90 - K0127+644.40, K0132+399.80 - K0132+457 |
September 8, 2020 |
2020 |
WIN0C03999 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Roads and Bridges - Local Roads
Concreting of Talugtug - Umingan Road, Talugtug, Nueva Ecija |
September 8, 2020 |
FY 2020 |
WIN0G03084 |
300116202251000 |
July 14, 2020 |
Region IX |
Regional Office IX |
UACS No. 300116202251000
Project ID: P00443440MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay including Thermoplastic Markings along Zamboanga City-Labuan Road, San Ramon Penal Colony and RT Lim, Blvd, Zamboanga City
Physical Target:
CW-1 - Preventive Maintenance of Road: Asphalt Overlay: 10.611 lane km.
Unit Cost: P 16,373,649.72/lane km.
EAO: P 6,080,927.90
Excess: P 178,274.92
Allocation: P 180,000,000.00 |
September 7, 2020 |
FY 2020 GAA |
WIN0G03083 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1384+550 - K1384+650, K1385+600 - K1385+650,
K1398+300 - K1398+360, K1401+500 - K1401+550,
K1404+700 - K1404+800
Physical Target:
CW1: 2,800.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 28,000,000.00
CW1: P 27,440,000.00 (Construction of Road Slope Protection Structure)
EAO: P 560,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1384+710 - K1384+867, K1385+600 - K1385+638,
K1398+315 - K1398+423, K1404+720 - K1404+800
Physical Target:
CW1: 1,217.40 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 28,000,000.00
CW1: P 27,440,000.00 (Construction of Road Slope Protection Structure)
EAO: P 560,000.00 |
September 7, 2020 |
2020 |
WIN0G03086 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 300111200161000
Project ID: P00444719MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide along Surigao-Agusan West Coastal Road - K1134+735 - K1134+905, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Roads Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P53,075,000
EAO: P1,925,000
TOTAL: P55,000,000
TO:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide along Surigao-Agusan West Coastal Road - K1134+735 - K1134+798, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: 2,842.05 sq.m.
Unit Cost: P18,674.90/sq.m
Allocation: P53,075,000
EAO: P1,925,000
TOTAL: P55,000,000 |
September 7, 2020 |
2020 |
WIN0G03081 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 300111200162000
Project ID: P00444720MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation of Roads with Slips/Slope Collapse and Landslide along Daang Maharlika (Surigao-Agusan Sect) K1239+700 - K1240+000, Butuan City
Type of Work: CW1 - Rehabilitation / Major Repair of Roads Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P53,075,000
EAO: P1,925,000
TOTAL: P55,000,000
TO:
Rehabilitation of Roads with Slips/Slope Collapse and Landslide along Daang Maharlika (Surigao-Agusan Sect) K1239+380 - K1239+435, Butuan City
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: 2,842.00 sq.m.
Unit Cost: P18,675.23/sq.m
Allocation: P53,075,000
EAO: P1,925,000
TOTAL: P55,000,000 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03062 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Davao City Div Rd -
K1513+460 - K1513+520, K1513+722 - K1513+771,
K1513+879 - K1514+020, K1514+581 - K1514+646
Physical Target:
CW1: 0.499 lane km (Road Widening)
CW2: 280 sq. m. (Construction of Road Slope Protection Structure)
ROW: 2,395.68 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 24,193,000.00
CW1: P 6,923,700.00 (Road Widening)
CW2: P 5,982,900.00 (Construction of Road Slope Protection Structure)
ROW: P 11,023,000.00 (ROW Acquisition)
EAO: P 263,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Davao City Div Rd -
K1513+722 - K1513+771, K1513+879 - K1514+020, K1514+581 - K1514+646
Physical Target:
CW1: 0.431 lane km (Road Widening)
CW2: 304 sq. m. (Construction of Road Slope Protection Structure)
ROW: 2,395.68 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 24,193,000.00
CW1: P 6,923,700.00 (Road Widening)
CW2: P 5,982,900.00 (Construction of Road Slope Protection Structure)
ROW: P 11,023,000.00 (ROW Acquisition)
EAO: P 263,400.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03075 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Panibasan-Elizalde, Maco, Compostela Valley
Physical Target:
CW1: 2.204 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Panibasan-Elizalde, Maco, Compostela Valley
Physical Target:
CW1: 4.521 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03068 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road (Opening) Tagugpo, Pantukan, Compostela Valley
Physical Target:
CW1: 0.760 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road (Opening) Tagugpo, Pantukan, Compostela Valley
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03074 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Bridges - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Ma-a Bridge II, Davao City
Physical Target:
CW1: 1,777.50 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Bridge)
EAO: P 6,300,000.00
TO: Local Program - Local Roads and Bridges - Local Bridges - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Ma-a Bridge II, Davao City
Physical Target:
CW1: 1,527.50 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Bridge)
EAO: P 6,300,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03071 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road, Poblacion (Public Cemetery), Mawab, Compostela Valley
Physical Target:
CW1: 0.678 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,000,000.00
CW1: P 3,920,000.00 (Construction of Concrete Road)
EAO: P 80,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concreting Road, Poblacion (Public Cemetery), Mawab, Compostela Valley
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,000,000.00
CW1: P 3,920,000.00 (Construction of Concrete Road)
EAO: P 80,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03056 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Quezon Blvd (MN) -
K1510+401 - K1501+791 (R/S)
Physical Target:
CW1: 0.588 lane km (Road Widening)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,720,000.00 (Road Widening)
EAO: P 280,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Quezon Blvd (MN) -
K1509+860 - K1509+933, K1510+290 - K1510+410
Physical Target:
CW1: 1.200 lane km (Road Widening)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,720,000.00 (Road Widening)
EAO: P 280,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03073 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Concepcion Mawab to Calabcab Limbo Macao Road, Compostela Valley
Physical Target:
CW1: 1.940 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Concepcion Mawab to Calabcab Limbo Maco Road, Compostela Valley
Physical Target:
CW1: 1.720 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03057 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Mawab River, Brgy. Poblacion, Mawab, Compostela Valley
Physical Target:
CW1: 316.246 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 54,000,000.00
CW1: P 52,110,000.00 (Construction of Revetment)
EAO: P 1,890,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Mawab River, Brgy. Poblacion, Mawab, Compostela Valley
Physical Target:
CW1: 455.070 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 54,000,000.00
CW1: P 52,110,000.00 (Construction of Revetment)
EAO: P 1,890,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03072 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Concepcion Mawab, Compostela Valley
Physical Target:
CW1: 1.640 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Concepcion Mawab, Compostela Valley
Physical Target:
CW1: 1.890 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03065 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road, Waterfall to Kauswagan, Panabo City, Davao del Norte
Physical Target:
CW1: 1.940 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,640,000.00
CW1: P 14,493,600.00 (Construction of Concrete Road)
EAO: P 146,400.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road, Waterfall to Kauswagan, Panabo City, Davao del Norte
Physical Target:
CW1: 1.532 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,640,000.00
CW1: P 14,493,600.00 (Construction of Concrete Road)
EAO: P 146,400.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03015 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) -
K1459+484 - K1460+497
Physical Target:
CW1: 1,728.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) -
K1459+750 - K1460+590
Physical Target:
CW1: 1,610.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03064 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Maduao, Upper Licanan Road, Panabo City, Davao del Norte
Physical Target:
CW1: 2.660 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Maduao, Upper Licanan Road, Panabo City, Davao del Norte
Physical Target:
CW1: 2.414 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03076 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1457+(-393) - K1458+340
Physical Target:
CW1: 3,133.00 lineal meters (Construction of Drainage Structure along Road)
ROW: 14,967.80 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 48,221,000.00
CW1: P 41,650,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,721,000.00 (ROW Acquisition)
EAO: P 850,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tagum-Panabo Circum Rd -
K1457+040 - K1458+340, K1462+668.62 - K1462+880
Physical Target:
CW1: 3,257.98 lineal meters (Construction of Drainage Structure along Road)
ROW: 15,564.89 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 48,221,000.00
CW1: P 41,650,000.00 (Construction of Drainage Structure along Road)
ROW: P 5,721,000.00 (ROW Acquisition)
EAO: P 850,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G03049 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Brgy. Canocotan, Tagum City, Davao del Norte
Physical Target:
CW1: 3.490 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Brgy. Canocotan, Tagum City, Davao del Norte
Physical Target:
CW1: 1.998 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G02843 |
FY 2020 GAA RA 11465 |
January 1, 2019 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1381+950 - K1382+050, K1391+866 - K1392+030,
K1396+166 - K1396+290, K1396+504 - K1396+993
Physical Target:
CW1: 13,068.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 174,240,000.00
CW1: P 168,141,600.00 (Construction of Road Slope Protection Structure)
EAO: P 6,098,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1381+950 - K1382+090, K1391+890 - K1391+970,
K1391+970 - K1392+030, K1396+170 - K1396+310,
K1396+370 - K1396+390, K1396+390 - K1396+410,
K1396+550 - K1396+704
Physical Target:
CW1: 11,283.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 174,240,000.00
CW1: P 168,141,600.00 (Construction of Road Slope Protection Structure)
EAO: P 6,098,400.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G02844 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1399+500 - K1399+600, K1400+150 - K1400+225
Physical Target:
CW1: 5,160.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,760,000.00
CW1: P 66,353,400.00 (Construction of Road Slope Protection Structure)
EAO: P 2,406,600.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1399+500 - K1399+570, K1399+570 - K1399+630,
K1399+630 - K1399+510, K1400+150 - K1400+190,
K1400+190 - K1400+210, K1400+210 - K1400+255
Physical Target:
CW1: 4,185.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,760,000.00
CW1: P 66,353,400.00 (Construction of Road Slope Protection Structure)
EAO: P 2,406,600.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G02850 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Davao City Div Rd -
K1511+420 - K1511+800
Physical Target:
CW1: 3,900.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 122,045,000.00
CW1: P 117,773,425.00 (Construction of Road Slope Protection Structure)
EAO: P 4,271,575.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Davao City Div Rd -
K1510+230 - K1510+324
Physical Target:
CW1: 3,574.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 122,045,000.00
CW1: P 117,773,425.00 (Construction of Road Slope Protection Structure)
EAO: P 4,271,575.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G02883 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Installation of Rockfall Netting along Davao City Div Rd -
K1511+035 - K1511+300 (L/S), K1511+420 - K1511+800 (L/S)
Physical Target:
CW1: 3,269.420 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Installation of Rockfall Netting along Davao City Div Rd -
K1511+420 - K1511+524
Physical Target:
CW1: 3,461.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00 |
September 4, 2020 |
FY 2020 GAA |
WIN0G02961 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Local Infrastructure Program
Preventive Maintenance of Road: Asphalt Overlay - Specific Location along Digos-Makar Road (S00184MN) -
K1581+860 - K1584+066
Physical Target:
CW1: 5.080 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: Local Program - National Roads and Bridges - National Roads - Local Infrastructure Program
Preventive Maintenance of Road: Asphalt Overlay - Specific Location along Digos-Makar Road (S00202MN) -
K1580+897 - K1581+953, K1583+882 - K1584+066
Physical Target:
CW1: 5.080 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03024 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road Cabidianan to Antiquera, Nabunturan, Compostela Valley
Physical Target:
CW1: 4.144 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road Cabidianan to Antiquera, Nabunturan, Compostela Valley
Physical Target:
CW1: 4.082 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03030 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of a Concrete Road, Brgy. Tagnocon, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of a Concrete Road, Brgy. Tagnocon, Nabunturan, Compostela Valley
Physical Target:
CW1: 2.040 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03031 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Nabunturan-Maragusan Rd -
K1464+900 - K1464+950
Physical Target:
CW1: 500.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Nabunturan-Maragusan Rd -
K1464+614 - K1464+640, K1464+740 - K1464+830
Physical Target:
CW1: 959.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03038 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1385+110 - K1386+000, K1386+669 - K1387+000, K1390+000 - K1390+244,
K1390+297 - K1390+944, K1391+239 - K1391+429, K1391+514 - K1392+000
Physical Target:
CW1: 5.430 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 48,553,000.00
CW1: P 47,581,940.00 (Reconstruction to Concrete Pavement)
EAO: P 971,060.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) -
K1385+188 - K1386+000, K1386+673 - K1387+120, K1389+980 - K1390+240,
K1390+301 - K1390+940, K1391+329 - K1391+429, K1391+514 - K1392+020
Physical Target:
CW1: 5.578 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 48,553,000.00
CW1: P 47,581,940.00 (Reconstruction to Concrete Pavement)
EAO: P 971,060.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03026 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Constructions/ Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects
Opening/Rehabilitation Boringot, Pantukan, Compostela Valley
Physical Target:
CW1: 2.588 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Gravel Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Constructions/ Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects
Opening/Rehabilitation Boringot, Pantukan, Compostela Valley
Physical Target:
CW1: 2.120 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Gravel Road)
EAO: P 400,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03048 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Amorcruz, Laak, Compostela Valley
Physical Target:
CW1: 1.414 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Amorcruz, Laak, Compostela Valley
Physical Target:
CW1: 0.801 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03035 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao City Div Rd -
K1513+726 - K1514+819
Physical Target:
CW1: 2.200 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao City Div Rd -
K1513+726 - K1514+103
Physical Target:
CW1: 1.620 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03032 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road from Purok I to Tibulao, Brgy. Paradise Embac, Davao City
Physical Target:
CW1: 0.119 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road from Purok I to Tibulao, Brgy. Paradise Embac, Davao City
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03043 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Gem Village, Maa, Davao City
Physical Target:
CW1: 2.240 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Gem Village, Maa, Davao City
Physical Target:
CW1: 4.310 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03046 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) -
K1519+922 - K1519+987, K1519+1150 - K1520+059, K1520+250 - K1520+315,
K1520+560 - K1520+625, K1520+701 - K1520+766, K1520+909 - K1521+015,
K1521+042 - K1521+052, K1521+169 - K1521+215, K1521+218 - K1521+283,
K1521+295 - K1521+360, K1521+477 - K1521+542, K1523+589 - K1523+940
Physical Target:
CW1: 1,081.980 sq. m. (Off-Carriageway Improvement: Shoulder Paving/ Construction)
CW2: 10.000 Laybys (Off-Carriageway Improvement: Construction of Laybys)
Allocation:
TOTAL: P 9,351,000.00
CW1: P 1,421,000.00 (Off-Carriageway Improvement: Shoulder Paving/ Construction)
CW2: P 7,742,980.00 (Off-Carriageway Improvement: Construction of Laybys)
EAO: P 187,020.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) -
K1519+920 - K1519+1100, K1520+048 - K1520+183, K1520+204 - K1520+339,
K1520+850 - K1520+950, K1520+871 - K1521+952, K1521+042 - K1521+088,
K1523+561 - K1523+731, K1523+765 - K1523+847, K1523+867 - K1523+917
Physical Target:
CW1: 1,030.75 sq. m. (Off-Carriageway Improvement: Shoulder Paving/ Construction)
CW2: 660 Laybys (Off-Carriageway Improvement: Construction of Median/ Center Island)
Allocation:
TOTAL: P 9,351,000.00
CW1: P 1,421,000.00 (Off-Carriageway Improvement: Shoulder Paving/ Construction)
CW2: P 7,742,980.00 (Off-Carriageway Improvement: Construction of Median/ Center Island)
EAO: P 187,020.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03037 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Daang Maharlika F. Torres St. -
K1509+(-494) - K1509+000
Physical Target:
CW1: 0.988 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 9,188,000.00
CW1: P 9,004,240.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 183,760.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay Jct. Daang Maharlika F. Torres St. -
K1509+(-494) - K1509+000, K1509+656 - K1509+814
Physical Target:
CW1: 1.248 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 9,188,000.00
CW1: P 9,004,240.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 183,760.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03029 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1511+670 - K1513+156, K1513+592 - K1513+1014
Physical Target:
CW1: 3.764 lane km (Road Widening)
Allocation:
TOTAL: P 63,600,000.00
CW1: P 61,374,000.00 (Road Widening)
EAO: P 2,226,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd -
K1512+663 - K1513+156, K1513+592 - K1513+1014
Physical Target:
CW1: 1.810 lane km (Road Widening)
CW2: 2,328 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 63,600,000.00
CW1: P 30,776,745.00 (Road Widening)
CW2: P 30,597,255.00 (Construction of Road Slope Protection Structure)
EAO: P 2,226,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03036 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road Network, Davao del Norte State College (Datu Jose Libayao Talaingod Gampus), Talaingod, Davao del Norte (IP Ata Manobo Tribe Higher Education School)
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,000,000.00
CW1: P 8,820,000.00 (Construction of Concrete Road)
EAO: P 180,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road Network, Davao del Norte State College (Datu Jose Libayao Talaingod Campus), Talaingod, Davao del Norte (IP Ata Manobo Tribe Higher Education School)
Physical Target:
CW1: 0.702 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,000,000.00
CW1: P 8,820,000.00 (Construction of Concrete Road)
EAO: P 180,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03052 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Nueva Fuerza Road leading to FIA Park and Recreation, Tagum City, Davao del Norte
Physical Target:
CW1: 6.176 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,5000,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Nueva Fuerza Road leading to FIA Park and Recreation, Tagum City, Davao del Norte
Physical Target:
CW1: 4.238 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,5000,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03042 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road, Jct. Davao Cot-Tubison Road, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 12.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 84,150,000.00 (Construction of Concrete Road)
EAO: P 850,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road, Jct. Davao Cot-Tubison Road, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 11.640 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 85,000,000.00
CW1: P 84,150,000.00 (Construction of Concrete Road)
EAO: P 850,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03045 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Road
K1564+395 - K1564+635
Physical Target:
CW1: 0.554 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 120,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Road
K1564+372 - K1564+635
Physical Target:
CW1: 0.646 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 120,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G0302 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao-Cotabato Rd (Davao City - Jct. Digos Sect) -
K1513+465 - K1514+190 (R/S), K1516+329 - K1518+519,
K1518+1556 - K1520+015, K1521+042 - K1524+394,
K1524+394 - K1524+471
Physical Target:
CW1: 5.805 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along Davao-Cotabato Rd (Davao City - Jct. Digos Sect) -
K1513+643 - K1514+190 (R/S), K1517+229 - K1518+224,
K1518+697 - K1520+151
Physical Target:
CW1: 5.675 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 4,900,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03063 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, F. Bangoy Central Elementary School, Brgy. Sasa, Davao City
Physical Target:
CW1: 230.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, F. Bangoy Central Elementary School, Brgy. Sasa, Davao City
Physical Target:
CW1: 280.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03058 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Matina Aplaya, Davao City
Physical Target:
CW1: 0.890 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Matina Aplaya, Davao City
Physical Target:
CW1: 1.792 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03054 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevino Shopping Center-Madrazo Fruit Stands-Central Bank-F. Torres St., Davao City
Physical Target:
CW1: 2.042 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 27,993,000.00
CW1: P 27,433,140.00 (Rehabilitation of Paved Road)
EAO: P 559,860.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement along Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank-F. Torres St., Davao City
Physical Target:
CW1: 2.364 lane km (Rehabilitation of Paved Road)
Allocation:
TOTAL: P 27,993,000.00
CW1: P 27,433,140.00 (Rehabilitation of Paved Road)
EAO: P 559,860.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03050 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, Lampa Lapidan Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 330.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, Lampa Lapidan Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 273.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03061 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1522+968 - K1524+319
Physical Target:
CW1: 2.268 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1522+968 - K1523+535
Physical Target:
CW1: 2.268 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03055 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1520+(-521) - K1521+067
Physical Target:
CW1: 2.200 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay - Davao-Cotabato Old Rd -
K1520+(-521) - K1520+029
Physical Target:
CW1: 2.200 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
September 3, 2020 |
FY 2020 GAA |
WIN0G03070 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, T. Awad Echevarria Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 520.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System, T. Awad Echevarria Elementary School, Brgy. Mandug, Davao City
Physical Target:
CW1: 262.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
September 1, 2020 |
2020 |
WIN0C03976 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Bulacan 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, St. Bernadette Children's Hospital, Brgy. Muzon, San Jose Del Monte City, Bulacan |
August 27, 2020 |
FY 2020 GAA |
WIN0F06244 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202927000
Project ID: P00446988LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitaton/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section
K0013+170 - K0013+300
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 2,240.00 sq.m
Allocation - Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0013+140 - K0013+210
Palawan
Physical target: CW1 - Construction of Road Slope
Protection Structure: 1,719.05 sq.m
Allocation: Php 40.00 Million
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06246 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202930000
Project ID: P00446993LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Reconstruction/Rehabilitation of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+510 - K0014+790
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,523.00 sq.m
Allocation: Php 45.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+840.00 - K0014+921.40
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,945.75 sq.m
Allocation: Php 45.00 Million
|
August 27, 2020 |
CY 2020 |
WIN0F06252 |
UACS No. 300102200371000 |
March 12, 2020 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
UACS No. 300102200371000
Project ID.: P00445753LZ
Local Infrastructure Program
School Buildings
Completion/Rehabilitation of School Building and Other Improvements, Golden Acres Elementary School,
Talon 3, Las Piñas City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building
Unit Cost (P’000) = P 14,850.00/Building
Allocation = P 14,850,000.00
EAO = P 150,000.00
Total (P’000) = P 15,000,000.00
As Modified
Local Infrastructure Program
School Buildings
Completion/Rehabilitation of School Building and Other Improvements, Golden Acres Elementary School,
Talon 1, Las Piñas City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building
Unit Cost (P’000) = P 14,850.00/Building
Allocation = P 14,850,000.00
EAO = P 150,000.00
Total (P’000) = P 15,000,000.00
WIN0F06252
|
August 27, 2020 |
CY 2020 |
WIN0F06256 |
UACS No. 300102200370000 |
February 19, 2020 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300102200370000
Project ID.: P0041233lz
Local Program
Local – Buildings and Other Structures – School Buildings – Local Infrastructure Program
Rehabilitation of School Building, ALS, Brgy. Tunasan, Muntinlupa City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building = 1 No. of Building
Unit Cost (P’000) = P 1,980 / building
Allocation = P 1,980.00
EAO = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program – Building and other Structures
Local – Buildings and Other Structures – School Buildings – Local Infrastructure Program
Rehabilitation of School Building, ALS, Brgy. Bayanan, Muntinlupa City
Physical Target: CW1 = Rehabilitation/Major Repair of School Building – 1 No. of Building
Unit Cost (P’000) = P 1,980/building
Allocation = P 1,980.00
EAO = P 20.00
Total (P’000) = P 2,000.00
WIN0F06256
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06232 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205397000
Project ID: P00447725LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0099+470 - K0099+525
K0099+717 - K0099+770
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,936.00 sq.m
Allocation: 68.885 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0099+480 - K0099+570
K0099+730 - K0099+830.30
Physical Target: CW1- Construction of Road Slope
Protection Structure: 3,145.77 sq.m.
Allocation: Php 68.885 Million
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06233 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202938000
Project ID: P00447007LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+950 - K0017+020,
K0017+700 - K0017+750
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,240.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0017+100.00 - K0017+161.80
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.73 sq.m
Allocation: Php 40.00 Million
|
August 27, 2020 |
FY 2020 |
WIN0G03005 |
310108100447000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310108100447000
Projects ID: P00400095MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1827+194 - K1827+325.20
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 3,345.80 sq.m.
Unit Cost: P 7,323.00/sq.m
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03008 |
320101105350000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101105350000
Project ID: P00420457MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+398.09 - 2+666.25), Zamboanga del Norte
CW1 - Construction of Revetment: 268.16 lm
Unit Cost: P 182,726.73/lm
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02946 |
310112100226000 |
June 10, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310112100226000
Project ID: P00400400MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Piñan - Mutia Rd
K1822+572 - K1823+541
(S01035MN)
Chainage 000 - Chainage 548
CW1 - Construction of Drainage Structure along Road: 1,376.00 lm.
Unit Cost: P 10,480.16/lm
ROW:455.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 294,300.00
Allocation: P 15,170,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02967 |
300117207298000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117207298000
Project ID: P00444004MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Del Pilar Brgy. Road, Piñan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 1.0062 lane km
Unit Cost: P 7,315,000.00/Lane km
EAO: P 74,350.00
Allocation: P 7,435,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02854 |
310108100446000 |
March 16, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310108100446000
Projects ID: P00400094MN
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd
K1825+600 - K1825+831.90
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 4,555.57 sq.m.
Unit Cost: P 7,529.24/sq.m
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02976 |
300204100574000 |
June 3, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300204100574000
Project ID: P00431554MN
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Barangay San Juan-Dampalan - San Isidro Road Connecting National Road and Marapong in support of Rubber, Coconut and Abaca Industries, Sergio Osmeña, Zamboanga del Norte
CW1 - Construction of Concrete Road: 0.6184 lane km.
Unit Cost: P 15,847,000.00/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02970 |
310105100467000 |
June 11, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310105100467000
Project ID: P00400623MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Jct Pulauan Port Rd
K1827+(-320) - K1827+(-256),
K1828+215 - K1828+421.30
CW1 - Reconstruction from Pave to Concrete: 0.5406 lane km.
Unit Cost: P 8,016,200.00/lane km.
EAO: P 88,440.00
Allocation: P 4,422,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02988 |
310202100659000 |
June 18, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
'UACS No. 310202100659000
Project ID: P00400305MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1955+021 - K1955+081,
K1955+205 - K1955+216,
K1957+244 - K1957+540,
K1957+355 - K1957+540
CW1 - Road Widening:.0.572 lane km.
Unit Cost: P 14,620,468.80/lane km.
ROW: 50,000.00 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 331,700.00
Excess: P 7,890,391.84
Allocation: P 31,585,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G02944 |
310102100559000 |
June 11, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310102100559000
Project ID: P00400515MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1958+274 - K1958+362,
K1958+362 - K1958+456,
K1958+456 - 1959+246,
K1959+282 - K1959+853,
K1959+945 - K1960+776,
K1960+776 - K1961+000,
K1961+000 - K1961+290
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 9.326 lane km.
Unit Cost: P 5,254,128.244/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIN0F06234 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205398000
Project ID: P00447729LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0100+290 - K0100+430,
K0101+192 - K0101+309
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 5,075.00 sq.m
Allocation: Php 88.665 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0100+310.00 - K0100+440.00,
K0101+120.00 - K0101+202.90
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,052.81 sq.m
Allocation: Php 88.665 Million
|
August 27, 2020 |
FY 2020 |
WIN0G02943 |
310201100483000 |
June 5, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310201100483000
Project ID: P00400266MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd -
K1911+327.88 - K1911+767.25
K1911+789.27 - K1913+260
CW1 - Road Widening: 3.82026 lane km.
Unit Cost: P 15,661,237.72/lane km.
ROW: 1,800.00 sq. m.
Unit Cost: P 20,000/sq. m.
EAO: P 2,170,000.00
Allocation: P 98,000,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIN0F06237 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117205396000
Project ID: P00447723LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0098+150 - K0098+350,
K0099+445 - K0099+470
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,274.00 sq.m
Allocation: Php 74.750 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan K0098+160.00 - K0098+330.00
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,404.15 sq.m
Allocation Php 74.750 million |
August 27, 2020 |
FY 2020 |
WIN0G03002 |
300116202155000 |
June 18, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116202155000
Project ID: P00443224MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Parang Parang - Dita Road, Brgy. DIta, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 9.866 lane km.
Unit Cost: P 9,781,000.00/lane km.
EAO: P 3,500,000.00
Allocation: P 100,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03001 |
300113200028000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300113200028000
Project ID: P00443204MN
Local Program - National Roads and Bridges -National Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Buayan Br. (Parallel Br.) along Lanao - Pagadian - Zamboanga City Rd
Physical Target:
CW-1 - Construction of Parallel Bridge: 609.033 sq.m.
Unit Cost: P 33,791.27/sq.m.
EAO: P 420,000.00
Allocation: P 21,000,000.00 |
August 27, 2020 |
FY 2020 |
WINOG03013 |
320102101360000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101360000
Project ID: P00420642MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structures (revetment wall) along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+191.80, Brgy. STa. Barbara, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 191.80 lm.
Unit Cost: P 111,509.49/lm
EAO: P 436,480.00
Allocation: P 21,824,000.00
|
August 27, 2020 |
FY 2020 GAA |
WIN0F06238 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. 300117205400000
Project Id: P00447735LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0104+810 - K0104+935,
K0105+243 - K0105+343
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 3,787 sq.m
Allocation : Php 74.750 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section
Palawan
K0104+780 - K0104+860,
K0105+180 - K0105+282
Physical Target: CW1 - Construction of Roads Slope
Protection Structure: 3,409.65 sqm.
Allocation: Php 74.750 million |
August 27, 2020 |
FY 2020 |
WIN0G03012 |
320102101364000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101364000
Project ID: P00420646MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Sibuguey River, Sta. 0+000 - Sta. 0+104.50, Brgy. Pilar, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major repair of Flood Control Structure: 104.50 lm.
Unit Cost: P 123,226.79/lm
EAO: P 262,800.00
Allocation: P 13,140,000.00 |
August 27, 2020 |
FY 2020 GAA |
WIn0F06236 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202939000
Project ID: P00447009LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0017+910 - K0017+970,
K0018+030 - K0018+120
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,240 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0018+307.90 - K0018+427.00
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.80 sq.m
Allocation Php 40.00 Million |
August 27, 2020 |
FY 2020 |
WIN0G03018 |
320101105353000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No.320101105353000
Project ID: P00420460MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood COntrol for prevention and mitigation along Sibuguey River, Brgy. Balugo - Brgy. Poblacion, Imelda, Zamboanga Sibugay, Sta. 0+000 - Sta. 0+178.80
CW1 - Construction of Flood Mitigation Structure: 178.80 lm
Unit Cost: P 219,239.37/lm
EAO: P 800,000.00
Allocation: P 40,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03021 |
320102101355000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101355000
Project ID: P00420637MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structure (revetment wall) along Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+192, Barangay Conception, Alicia, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 192 lm.
Unit Cost: P 86,770.83/lm
EAO: P 340,000.00
Allocation: P 17,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03019 |
320102101363000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101363000
Project ID: P00420645MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Sibuguey River (Upstream), Sta. 0+167 - Sta. 0+291.70, Barangay Paradise, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major Repair of Flood Control Structure: 124.70 lm.
Unit Cost: P 117,882.92/lm
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03014 |
320102101358000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101358000
Project ID: P00420640MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of flood control structures (revetment wall) along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road part of Sibuguey River (Upstream), Sta. 0+000 - Sta. 0+052.20, Brgy. Paradise, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Revetment: 52.20 lm.
Unit Cost: P 118,294.64/lm
EAO: P 126,020.00
Allocation: P 6,301,000.00 |
August 27, 2020 |
FY 2020 |
WIN0G03017 |
320102101357000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102101357000
Project ID: P00420639MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River (Upstream), Sta. 0+191.80 - Sta. 0+402.30, Brgy. Sta. Barbara, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Rehabilitation/ Major Repair of Flood Control Structure: 210.50 lm.
Unit Cost: P 116,389.55/lm
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
August 26, 2020 |
FY 2020 GAA |
WIN0F06248 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202932000
Project ID: P00446997LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+300 - K0015+350
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,558.00 sq.m.
Allocation: Php 30.00 Millionn
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K00156.50 - K0015+220
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,276.85 sq.m.
Allocation: Php 30.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06247 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202931000
Project ID: P00446995LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+880 - K0015+00,
K0015+100 - K0015+200
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,239.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+232 - K0015+291.90
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,730.13 sq.m.
Allocation: Php 40.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06240 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202936000
Project ID: P00447003LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section
K0016+500 - K0016+630 - K0016+650
Palawan
Physical Target - CW1: Construction of Road Slope
Protection Structure: 2,240.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+770 - K0016+830
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,724.80 sq.m.
Allocation : Php 40.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06241 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202929000
Project ID: P00446992LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+000 - K0014+120
K0014+200 - K0014+300
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,356.00 sq.m.
Allocation: Php 45.00 million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0014+118.90 - K0014+200
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,956.10 sq.m.
Allocation: Php 45.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06243 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202933000
Project ID: P00446999LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+550 - K0015+700
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 2,533.00 sq.m.
Allocation: Php 45.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+723.00 - K0015+770.00
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,953.59 sq.m.
Allocation: Ph 45.00 Million
|
August 26, 2020 |
FY 2020 GAA |
WIN0F06242 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202935000
Project ID: P00447001LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0016+380 - K0016+450
Palawan
Physical Target: CW1 - Construction of Road Slope
Protecton Structure: 1,672.00 sq.m.
Allocation: Php 30.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section
K0015+415.00 - K0015+456.80
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 1,286.03 sq.m.
Allocation: Php 30.00 Million |
August 26, 2020 |
FY 2020 |
WIN0G03006 |
310305100838000 |
June 22, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100838000
Project ID: P00401430MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Polo Parallel br. along Jct. Polo - Dapitan Park Natl Rd (Phase II)
CW1 - Construction of Parallel Bridge: 3,468.744 sq.m.
Unit Cost: P 52,910.71/sq.m.
EAO: P 6,423,680.33
Allocation: P 190,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02929 |
310201100472000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100472000
Project ID: P00400312MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Sindangan-Liloy Rd
K1910+383 - K1911+886.94,
K1912+028.38 - K1912+102.96,
K1912+245 - K1913+420
CW1 - Road Widening: 5.507 lane km.
Unit Cost: P 16,416,972.33/lane km.
ROW: 26,838.14677 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,164,289.33
Allocation: P 101,624,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02920 |
310212100121000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310212100121000
Project ID: P00401552MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Road (S01184MN)
Sta. 9+960.00 - Sta. 11+917.34,
Sta. 1738+376.00 - Sta. 1738+951.28,
Sta. 1742+127.00 - Sta. 1743+678.44,
Sta. 1743+880.00 - Sta. 1744+241.86,
Sta. 1747+308.00 - Sta. 1747+560.00
CW1 - Paving of Unpaved Roads: 8.96 lane km.
Unit Cost: P 16,174,000.00/lane km.
EAO: P 5,072,463.77
Allocation: P 150,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02923 |
310212100122000 |
May 11, 2020 |
Region IX |
Regional Office IX |
UACS No. 310212100122000
Project ID: P00400478MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Zamboanga del Sur Coastal Rd - (S01168MN)
Chainage 197 - Chainage 400,
Chainage 7891.84 - Chainage 8540,
Chainage 12835 - Chainage 14280,
Chainage 16140 - Chainage 18845
CW1 - Paving of Unpaved Roads: 10.00232 lane km.
Unit Cost: P 14,315,149.38/lane km.
ROW: 6,012.768233 sq.m.
Unit Cost: 300/sq.m.
EAO: P 5,011,464.67
Allocation: P 150,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02891 |
320101104214000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104214000
Project ID: P00420372MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control along Kabasalan River (Phase II),
0+000.00 to 0+583.00, FL Pena, Kabasalan, Zamboanga Sibugay
CW1 - Construction of Flood Mitigation Structure: 583.00 lm
Unit Cost: P 168,316,723.30/lm
ROW : 1,456.158567 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,434,502.74
Allocation: P 102,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02888 |
320101104215000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104215000
Project ID: P00420373MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project at Dipolo River - Bridge Approach, Brgy Upper Timonan, Dumingag, Zamboanga del Sur
CW1 - Construction of Flood Mitigation Structure: 560.00 lm
Unit Cost: P 178,374.4784/lm
ROW : 5,380.507633 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,496,139.78
Allocation: P 105,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02881 |
310104100190000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310104100190000
Project ID: P00401407MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Pagadian City - Zamboanga City Rd
K1850+980 - K1854+360
CW1 - Reconstruction to Concrete Pavement: 10.12 lane km.
Unit Cost: P 9,697,686.14/lane km.
EAO: P 3,434,920.43
Excess: 424,495.83
Allocation: P 102,000,000.00 |
August 26, 2020 |
FY 2020 |
WIN0G02918 |
310201100477000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100477000
Project ID: P00400318MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1684+271 - K1684+620.09,
K1684+751.28 - K1689+165.03,
K1689+323.67 - K1690+490.97,
K1690+613.89 - K1690+900
CW1 - Road Widening:.12.432 lane km.
Unit Cost: P 13,928,019.48/lane km.
ROW: 69,288.33983 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 6,060,359.85
Allocation: P 200,000,000.00 |
August 26, 2020 |
2020 |
310209100199000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - Airport-Mauyen Port Rd - K0009 + 441 - K0010 + 537 |
August 26, 2020 |
2020 |
310112100172000 |
GAA FY 2020 |
February 12, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Basco-Contracosta Div Rd - (S00010BN) Chainage 120 - Chainage 564 |
August 26, 2020 |
2020 |
300103202116000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Multi-Purpose Building (Land Transportation Office (LTO) - Annex Building), Brgy. Kayvaluganan, Basco, Batanes |
August 26, 2020 |
2020 |
310209100201000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0005 + 040.40 - K0005 + 310.50 |
August 26, 2020 |
2020 |
310112100175000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K00005 + 480 - K0005 + 504.93, K0005 + 586 - K0005 + 720, K0005 + 820 - K0006 + 423 |
August 26, 2020 |
2020 |
300202100160000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Seaports - Access Road leading to Tachimus Port, Itbayat, Batanes |
August 26, 2020 |
2020 |
310109100359000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse, and Landslide - Tertiary Roads - Uyugan-Mahatao Interior Rd - K0029 + 046 - K0029 + 118, K0029 + 247 - K0029 + 255, K0032 + 300 - K0032 + 325, K0030 + (-290) - K0030 + (-223) |