April 9, 2024 |
FY 2022 |
WIN2B00971 |
310102100847000 |
April 9, 2022 |
Region IX |
Regional Office IX |
UACS No. 310102100847000
Project ID: P00601294MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Seit-Tayungan-Camp Andres Rd - K0034 + 450 - K0042 + 580
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 12.637 Lane Km
Unit Cost: ₱ 11,445,077.01/ Lane Km
EAO: ₱ 5,250,000.000
EXCESS: ₱ 118,561.84
Allocation: ₱ 150,000,000.00 |
April 9, 2024 |
FY 2022 |
WIN2B00971 |
310102100847000 |
April 9, 2022 |
Region IX |
Regional Office IX |
UACS No. 310102100847000
Project ID: P00601294MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Seit-Tayungan-Camp Andres Rd - K0034 + 450 - K0042 + 580
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 12.637 Lane Km
Unit Cost: ₱ 11,445,077.01/ Lane Km
EAO: ₱ 5,250,000.000
EXCESS: ₱ 118,561.84
Allocation: ₱ 150,000,000.00 |
April 9, 2024 |
FY 2022 |
WIN2B00972 |
310102100848000 |
April 9, 2022 |
Region IX |
Regional Office IX |
UACS No. 310102100848000
Project ID: P00601295MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Seit-Tayungan-Camp Andres Rd - K0042 + 589.84- K0046 + 388.4
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 5.777 Lane Km
Unit Cost: ₱ 12,021,143.08 / Lane Km
EAO: ₱ 2,520,000.00
EXCESS: ₱ 33,856.42
Allocation: ₱ 72,000,000.00 |
April 9, 2024 |
FY 2022 |
WIN2B00919 |
300217100045000 |
April 9, 2022 |
Region IX |
Regional Office IX |
UACS No. 300217100045000
Project ID: P00633887MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads - and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Rehabilitation of Road, Parang-Maimbung Road (Sta. 0000 +000 - Sta. 002+660), Parang and Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road: 5.32 lane km
Unit Cost: ₱ 18,139,097.74/ Lane Km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
March 30, 2024 |
2023 |
WIN3F07661 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310101101027000
Project ID: P00705810VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Iloilo-Capiz Rd (New Route) - K0004 + (-663) - K0004 + (-160)
CW1- Preventive Maintenance: Asphalt Overlay: 1.320 lane km – 8,596.56
EAO – 175.44
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Iloilo-Capiz Rd (New Route) - K0004 + (-663) - K0004 + (-414)
CW1- Preventive Maintenance: Asphalt Overlay: 0.8117 lane km – 8,596.56
EAO – 175.44
|
March 30, 2024 |
2023 |
WIN3F07679 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310101101028000
Project ID: P00705811VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - K0002 + (-916) - K0002 + 311
CW1- Preventive Maintenance: Asphalt Overlay: 4.501 lane km – 29,292.20
EAO – 597.80
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - K0004 + (-951) - K0004 + (-221)
CW1- Preventive Maintenance: Asphalt Overlay: 3.065 lane km – 29,292.20
EAO – 597.80
|
March 30, 2024 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310102101364000
Project ID: P00705814VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd - K0003 + (-537) - K0003 + 377, K0001 + 000 - K0001 + 764
CW1- Preventive Maintenance: Asphalt Overlay: 3.356 lane km – 26,158.16
EAO – 533.84
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd - K0003 + (-537) - K0003 + (-130), K0001 + 000 - K0001 + 600
CW1- Preventive Maintenance: Asphalt Overlay: 2.828 lane km – 26,158.16
EAO – 533.84
|
March 30, 2024 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310102101365000
Project ID: P00705815VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
La Paz Deep Sea Water Port Rd - K0003 + (-328) - K0003 + 446
CW1- Preventive Maintenance: Asphalt Overlay: 1.766 lane km – 13,061.44
EAO – 266.56
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
La Paz Deep Sea Water Port Rd - K0004 + 078 - K0004 + 451
CW1- Preventive Maintenance: Asphalt Overlay: 1.492 lane km – 13,061.44
EAO – 266.56
|
March 30, 2024 |
2023 |
WIN3F07663 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103101286000
Project ID: P00705816VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Iznart-Ledesma-Molo Rd - K0001 + (-469) - K0002 + 115
CW1- Preventive Maintenance: Asphalt Overlay: 2.299 lane km – 17,765.44
EAO – 362.56
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Iznart-Ledesma-Molo Rd - K0001 + (-469) - K0002 + 338
CW1- Preventive Maintenance: Asphalt Overlay: 1.614 lane km – 17,765.44
EAO – 362.56
|
March 30, 2024 |
2023 |
WIN3F07660 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103101287000
Project ID: P00705817VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Delgado St - K0001 + 391 - K0001 + 508
CW1- Preventive Maintenance: Asphalt Overlay: 0.351 lane km – 2,632.28
EAO – 53.72
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Delgado St - K0001 + 391 - K0001 + 459
CW1- Preventive Maintenance: Asphalt Overlay: 0.272 lane km – 2,632.28
EAO – 53.72
|
March 30, 2024 |
2023 |
WIN3F07662 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103101288000
Project ID: P00705818VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Molo-Mandurriao Rd - K0004 + (-529) - K0004 + 002
CW1- Preventive Maintenance: Asphalt Overlay: 2.033 lane km – 11,948.16
EAO – 243.84
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Molo-Mandurriao Rd - K0004 + (-529) - K0004 + (-153)
CW1- Preventive Maintenance: Asphalt Overlay: 1.504 lane km – 11,948.16
EAO – 243.84
|
March 30, 2024 |
2023 |
WIN3F07698 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103101289000
Project ID: P00705819VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Mandurriao-Jaro Rd - K0006 + (-102) - K0007 + 082
CW1- Preventive Maintenance: Asphalt Overlay: 2.368 lane km – 14,389.34
EAO – 293.66
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Mandurriao-Jaro Rd - K0006 + (-102) - K0006 + 388
CW1- Preventive Maintenance: Asphalt Overlay: 0.980 lane km – 14,389.34
EAO – 293.66
|
March 30, 2024 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310101101029000
Project ID: P00705822VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0051 + 498 - K0052 + 000, K0052 + 131 - K0052 + 246
CW1- Preventive Maintenance: Asphalt Overlay: 2.506 lane km – 22,381.24
EAO – 456.76
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0082 + 893 - K0083 + 000, K0090 + 474 - K0091 + 000
CW1- Preventive Maintenance: Concrete Reblocking: 1.3 lane km – 22,381.24
EAO – 456.76
|
March 29, 2024 |
2023 |
WIN3F07375 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100271000
Project ID: P00705599VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0009 + (-860) - K0011 + 981
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 9,278.40 sq. m. – 27,915.30
EAO – 569.70
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0031 + 441 - K0031 + 902
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 1,383.00 sq. m. – 13,235.470
CW2- Construction of Drainage along Road: 922 lineal meters – 11,822.794
CW3- Construction of Slope Protection Structure: 1,106.40 sq. m. – 2,857.036EAO – 569.70
|
March 29, 2024 |
2023 |
WIN3F07375 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100271000
Project ID: P00705599VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0009 + (-860) - K0011 + 981
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 9,278.40 sq. m. – 27,915.30
EAO – 569.70
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0031 + 441 - K0031 + 902
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 1,383.00 sq. m. – 13,235.470
CW2- Construction of Drainage along Road: 922 lineal meters – 11,822.794
CW3- Construction of Slope Protection Structure: 1,106.40 sq. m. – 2,857.036EAO – 569.70
|
March 29, 2024 |
2023 |
WIN3F07395 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100272000
Project ID: P00705600VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0011 + (-1008) - K0009 + 777
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 9,134.00 sq. m. – 18,261.32
EAO – 372.68
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod North Rd - K0031 + 146 - K0031 + 441
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 885.00 sq. m. – 18,261.32
EAO – 372.68
|
March 29, 2024 |
2023 |
WIN3F06956 |
SR2023-03-005816 |
March 2, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310103101091000
Project ID: P00706765VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0071 + (-736) - K0079 + 000
CW1- Preventive Maintenance: Asphalt Overlay: 17.186 lane km – 94,570.00
EAO – 3,430.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0071 + (-793) – K071 + (-769), K0071 + (-728) – K0076 + 522
CW1- Preventive Maintenance: Asphalt Overlay: 12.274 lane km – 94,570.00
EAO – 3,430.00
|
March 29, 2024 |
2023 |
WIN3F06942 |
SR2023-03-005819 |
March 2, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310103101092000
Project ID: P00706766VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0080 + 000 - K0089 + 000
CW1- Preventive Maintenance: Asphalt Overlay: 17.872 lane km – 94,570.00
EAO – 3,430.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Natl Rd-Dumarao-Sn Rafael (Iloilo) Rd - K0080 + 000 - K0086 + 220
CW1- Preventive Maintenance: Asphalt Overlay: 12.284 lane km – 94,570.00
EAO – 3,430.00
|
March 29, 2024 |
2023 |
|
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100970000
Project ID: P00705861VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0088 + 241 - K0089 + 000
CW1- Rehabilitation of Paved Road: 3.06 lane km – 49,000.00
EAO – 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0088 + 297 - K0089 + 000, K0102+170 – K0102+324
CW1- Reconstruction to Concrete Pavement: 2.914 lane km – 49,000.00
EAO – 1,000.00
|
March 29, 2024 |
2023 |
WIN3F06999 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100971000
Project ID: P00705862VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Natl Rd-Jamindan-Linambasan-Camp V Peralta Rd - K0112 + 190 - K0113 + 714
CW1- Rehabilitation of Paved Road: 3.06 lane km – 49,000.00
EAO – 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Natl Rd-Jamindan-Linambasan-Camp V Peralta Rd - K0112 + 190 - K0113 + 086
CW1- Rehabilitation of Paved Road: 1.804 lane km – 26,500.00
CW2- Construction of Road Slope Protection Structure: 3,003.86 sq. m. – 26,500.00
EAO – 1,000.00
|
March 29, 2024 |
2023 |
WIN3F06941 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310201101172000
Project ID: P00705279VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0079 + 008 - K0079 + 373, K0088 + 391 - K0088 + 531, K0089 + 207 - K0089 + 338, K0089 + 536 - K0089 + 658, K0089 + 676 - K0089 + 712, K0089 + 886 - K0089 + 918, K0090 + 455 - K0090 + 515, K0091 + 720 - K0091 + 773, K0092 + 487 - K0092 + 535
CW1- Road Widening: 1.539 lane km – 49,000.00
EAO – 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0079 + 008 - K0079 + 373
CW1- Road Widening: 0.73 lane km – 18,000.00
CW2- Construction of Road Slope Protection Structure: 2,447.75 sq. m. – 15,000.00
ROW- ROW Acquisition: 1,911.78 sq. m. – 16,000.00
EAO – 1,000.00 |
March 29, 2024 |
2023 |
WIN3F06940 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310202101445000
Project ID: P00705281VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + 000 - K0102 + 390
CW1- Road Widening: 2.78 lane km – 39,200.00
EAO – 800.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0101 + (-239) - K0101 + 460
CW1- Road Widening: 1.398 lane km – 32,700.00
ROW- ROW Acquisition: 1,188.88 sq. m. – 6,500.00
EAO – 800.00
|
March 29, 2024 |
2023 |
|
SR2023-03-005827 |
March 2, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310201101074000
Project ID: P00706813VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Dao By Pass Road, K0084 + 404 – K0084 + 513
CW1- Road Widening: 0.218 lane km – 96,500.00
EAO – 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Dao By Pass Road, K0084 + 404 – K0085 + 804
CW1- Road Widening: 2.404 lane km – 55,000.00
ROW- ROW Acquisition: 7,596.94 sq. m. – 41,500.00
EAO – 3,500.00
|
March 29, 2024 |
2023 |
WIN3F06973 |
SR2023-03-005828 |
March 2, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310201101075000
Project ID: P00706814VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo – Capiz (Old Route), K0082 + 000 – K0084 + 568
CW1- Road Widening: 5.048 lane km – 96,500.00
EAO – 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo – Capiz (Old Route), K0083 + 000 – K0084 + 490
CW1- Road Widening: 3.0 lane km – 70,200.00
CW2- Construction of Road Slope Protection Structure: 4,829.83 sq. m. – 18,000.00
ROW- ROW Acquisition: 1,834.44 sq. m. – 8,300.00
EAO – 3,500.00
|
March 29, 2024 |
2023 |
WIN3F06913 |
SARO-ROVI-23-0022796 |
August 29, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No. 310109101336000
Project ID: P00706809VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Construction of Road Slope Protection Structure-Jct Bancal-Leon-Antique Bdry Rd, K0045 + 877 - K0045 + 977
CW1- Construction of Road Slope Protection Structure: 5,555.556 sq. m. – 98,000.00
EAO – 2,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Construction of Road Slope Protection Structure-Jct Bancal-Leon-Antique Bdry Rd, K0044 + 500 - K0044 + 545 (Phase II)
CW1- Construction of Road Slope Protection Structure: 4,250.07 sq. m. – 98,000.00
EAO – 2,000.00
|
March 29, 2024 |
2023 |
|
SARO-ROVI-23-0017362 |
May 24, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No. 300221103725000
Project ID: P00733437VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road Jct Bancal, Leon-Antique Rd, K0041+700 - K0041+820 - R/S
CW1- Construction of Concrete Road: 0.210 lane km – 9,900.00
EAO – 100.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road Jct Bancal, Leon-Antique Rd, K0022+600 - K0022+769 - B/S
CW1- Construction of Concrete Road: 0.337 lane km – 9,900.00
EAO – 100.00
|
March 29, 2024 |
2023 |
|
SARO-ROVI-23-0017358 |
May 24, 2023 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No. 310102101355000
Project ID: P00706763VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
New Lucena-Sta. Barbara Rd, K0020 + 240 - K0024 + 960
CW1- Preventive Maintenance: Asphalt Overlay: 9.44 lane km – 122,500.00
EAO – 2,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
New Lucena-Sta. Barbara Rd, K0016 + (-458) – K0022 + 828, K0023 + 603 – K0024 + 952
CW1- Preventive Maintenance: Asphalt Overlay: 17.27 lane km – 122,500.00
EAO – 2,500.00
|
March 29, 2024 |
2023 |
WIN3F07446 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310207100273000
Project ID: P00705601VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0014 + (-437) - K0025 + 429, K0025 + 597 - K0025 + 659, K0026 + 000 - K0035 + 286
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 51,124.80 sq. m. – 29,059.94
EAO – 593.06
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0014 + (-437) - K0025 + 429, K0025 + 597 - K0025 + 659, K0026 + 000 - K0035 + 286
CW1- Off-Carriageway Improvement: Construction of Sidewalk: 11,504.00 sq. m. – 29,059.94
EAO – 593.06
|
March 29, 2024 |
2023 |
WIN3F07624 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Regional Office VI |
UACS No. 310204102084000
Project ID: P00705463VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Kalibo Circumferential Road (Makato-Lezo Section), Aklan
CW1- Construction of Concrete Road: 4.00 lane km – 106,150.00
ROW – ROW Acquisition: 20,000 sq. m. – 9,650.00
EAO – 4,200.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Kalibo Circumferential Road (Makato-Lezo Section), Aklan
CW1- Construction of Concrete Road: 3.612 lane km – 105,599.09
CW2- Road Safety: Street Lighting: 120 No. of Units – 10,200.91
EAO – 4,200.00 |
March 29, 2024 |
2023 |
WIN3F07489 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310204101770000
Project ID: P00705283VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Sigma Bypass Road, Capiz
CW1- Construction of Concrete Road: 0.082 lane km – 11,760.00
CW2- Construction of Concrete Road: 1.040 lane km – 25,180.00
CW3- Road Widening: 0.082 lane km – 11,760.00
EAO – 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Sigma Bypass Road, Capiz
CW1- Road Widening: 0.774 lane km – 30,000.00
CW2- Construction of Drainage along Road: 2,990 lineal meters – 17,500.00
ROW – ROW Acquisition: 200 sq. m. – 1,500.00
EAO – 1,000.00 |
March 29, 2024 |
2023 |
WIN3F07310 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310107100544000
Project ID: P00706045VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Iloilo-Capiz Rd (New Route) - K0066 + 000 - K0067 + 000
CW1- Construction of Road Slope Protection Structure: 5,056.00 sq. m. – 49,000.00
EAO – 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Iloilo-Capiz Rd (New Route) - K0066 + 000 - K0067 + 000
CW1- Construction of Road Slope Protection Structure: 5,056.00 sq. m. – 28,910.00
CW2- Off-Carriageway Improvement: Paving of Shoulders: 3,033.00 sq. m. – 20,090.00
EAO – 1,000.00
|
March 29, 2024 |
2023 |
WIN3F07313 |
WIN3F07313 |
January 1, 2023 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310105100814000
Project ID: P00705859VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0326 + 522 - K0327 + 402
CW1- Rehabilitation of Paved Road: 3.542 lane km – 55,869.64
EAO – 2,026.36
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0326 + 522 - K0327 + 402
CW1- Reconstruction to Concrete Pavement: 1.776 lane km – 39,072.14
CW2- Construction of Drainage Structure along Road: 2,503.11 lineal meters – 16,797.50
EAO – 2,026.36
|
March 29, 2024 |
2023 |
|
SARO-BMB-A-23-0013254 |
February 20, 2023 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 320101110106000
Project ID: P00721930VS
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction/Improvement of Guimbal Shoreline/Seawall Protection including Access Road, Guimbal, Iloilo
CW1- Construction of Flood Mitigation Structure: 140.00 lineal meters – 19,600.00
EAO – 400.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction/Improvement of Guimbal Shoreline/Seawall Protection, Guimbal, Iloilo
CW1- Construction of Flood Mitigation Structure: 230.00 lineal meters – 19,600.00
EAO – 400.00
|
March 29, 2024 |
2023 |
|
SARO-BMB-A-23-0014255 |
March 13, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300225101336000
Project ID: P00733731VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Drainage System San Juan, Iloilo City, Iloilo
CW1- Construction of Drainage Structure: 260.00 lineal meters – 4,950.00
EAO – 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Drainage System San Juan, Iloilo City, Iloilo
CW1- Construction of Drainage Structure: 246.00 lineal meters – 4,950.00
EAO – 50.00
|
March 29, 2024 |
2023 |
WIN3F07394 |
SARO-BMB-A-23-0014255 |
March 13, 2023 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300221103809000
Project ID: P00733512VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road in Buntatala, Iloilo City, Iloilo
CW1- Construction of Concrete Road: 0.781 lane km – 4,950.00
EAO – 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road in Buntatala, Iloilo City, Iloilo
CW1- Construction of Concrete Road: 0.643 lane km – 4,950.00
EAO – 50.00 |
March 26, 2024 |
2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00713235LZ
UACS NO.: 310109101328000
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Lubi-Binoog Rd - K0060 + 022 - K0060 + 054, K0063 + 533 - K0063 + 599
CW1- Construction of Road Slope Protection Structure - 1,006.66 sq.m.
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Lubi-Binoog Rd - K0060 + 022 - K0060 + 054, K0063 + 533 - K0063 + 599
CW1- Construction of Road Slope Protection Structure - 950.01 sq.m. |
March 26, 2024 |
2023 |
|
SARO BMB-A-23-0014322 |
March 13, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00741944LZ
UACS NO.: 300221103526000
FROM:
Convergence and Special Support Program (CSSP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Rehabilitation of Alcantara - Comod-om Provincial Road (with exemptions) Brgy. Madalag & Brgy. Comod-om, Alcantara, Romblon
CW1- Rehabilitation of Paved Road - 0.965 lane km
TO:
Convergence and Special Support Program (CSSP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Rehabilitation of Alcantara - Comod-om Provincial Road (with exemptions) Brgy. Madalag & Brgy. Comod-om, Alcantara, Romblon
CW1- Rehabilitation of Paved Road - 0.780 lane km
CW2 - Construction of Road Slope Protection Structure - 533.915 square meters
|
March 26, 2024 |
2023 |
|
SARO BMB-A-23-0014322 |
March 13, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00741944LZ
UACS NO.: 300221103526000
FROM:
Convergence and Special Support Program (CSSP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Rehabilitation of Alcantara - Comod-om Provincial Road (with exemptions) Brgy. Madalag & Brgy. Comod-om, Alcantara, Romblon
CW1- Rehabilitation of Paved Road - 0.965 lane km
TO:
Convergence and Special Support Program (CSSP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Rehabilitation of Alcantara - Comod-om Provincial Road (with exemptions) Brgy. Madalag & Brgy. Comod-om, Alcantara, Romblon
CW1- Rehabilitation of Paved Road - 0.780 lane km
CW2 - Construction of Road Slope Protection Structure - 533.915 square meters
|
March 26, 2024 |
2023 |
WIN3F07417 |
SARO BMB-A-23-0014322 |
March 15, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00739846LZ
UACS NO.: 300215102603000
FROM:
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from National Road/s Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Macalas-Sawang National Road, Cross Country Leading to Romblon Port, Phase 3, Romblon, Romblon
CW1- Construction of Concrete Road - 4.826 lane km
TO:
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from National Road/s Leading to Major/ Strategic Public Buildings/ Facilities - Construction of Macalas-Sawang National Road, Cross Country Leading to Romblon Port, Phase 3, Romblon, Romblon
CW1- Construction of Concrete Road - 3.0106 lane km |
March 26, 2024 |
2023 |
|
SARO BMB-A-23-0014322 |
March 13, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00741942LZ
UACS NO.: 300221103524000
FROM:
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of San Roque Interior Road, Brgy. San Roque, Alcantara, Romblon
CW1- Construction of Concrete Road - 2.413 lane km
TO:
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of San Roque Interior Road, Brgy. San Roque, Alcantara, Romblon
CW1- Construction of Concrete Road - 2.20684 lane km
|
March 26, 2024 |
2023 |
WIN3F06832 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Marinduque District Engineering Office |
Project ID: P00712598LZ
UACS NO.: 310102101323000
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Marinduque Circumferential Rd – K0103+810 – K0103+935, K0103+959 – K0104+510, K0118+1076 – K0119+000, K0118+205 – K0118+1076
CW1 – Preventive Maintenance of Road: Asphalt Overlay - 3.142 lane km
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Marinduque Circumferential Rd – K0103+810 – K0103-935, K0103+959 - K0104+510, K0104+855 – K0105+188
CW1 – Preventive Maintenance of Road: Asphalt Overlay - 2.11 lane km
|
March 26, 2024 |
2023 |
WIN3F07373 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 1st District Engineering Office |
Project ID: P00726768LZ
UACS NO.: 320102105838000
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Labangan Bridge I Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 692, Coron, Palawan
CW1 – Construction of Flood Mitigation Structure - 692 lineal meters
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Labangan Bridge I Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 229.02 (Downstream-BK. II), Coron, Palawan
CW1 – Construction of Flood Mitigation Structure - 229.02 lineal meters |
March 26, 2024 |
2023 |
WIN3F07561 |
SR2023-01-003676 |
January 1, 2023 |
Region IV-B |
Regional Office IV-B |
Project ID: P00711722LZ
UACS NO.: 310211100093000
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Secondary Roads - Quezon-Punta Baja Rd - K0168 + 282 - K0168 + 285, K0169 + 085.54 - K0169 + 131, K0169 + 175 - K0169 + 211, K0171 + 252 - K0171 + 460, K0174 + 422.60 - K0174 + 637, K0175 + 125.31 - K0175 + 177, K0181 + 1003 - K0181 + 1014, K0192 + 542 - K0193 + 033, K0197 + 580 - K0198 + 344
CW1 - Paving of Unpaved Roads - 3.8670 lane km
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Secondary Roads - Quezon-Punta Baja Rd - K0168 + 282 - K0168 + 285, K0169 + 085.54 - K0169 + 131, K0169 + 175 - K0169 + 211, K0171 + 252 - K0171 + 460, K0174 + 422.60 - K0174 + 637, K0175 + 125.31 - K0175 + 177, K0181 + 1003 - K0181 + 1014, K0192 + 542 - K0193 + 033, K0197 + 580 - K0198 + 344
CW1 - Paving of Unpaved Roads - 3.5334 lane km
CW2 - Road Safety: Street Lighting - 78 number of streetlights |
March 25, 2024 |
2023 |
WIN3F07236 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Project ID: P00726268LZ
UACS NO.: 320101109995000
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Colby River Flood Control Structure, Sta. 0+000 – Sta. 0+100 B/S Upstream, Sta. 0+000 – Sta. 0+100 B/S Downstream, Barangay Taburi, Rizal, Palawan
CW1 - 100 LM
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Colby River Flood Control Structure, Sta. 0+620 – Sta. 0+820 R/S Upstream, Barangay Taburi, Rizal, Palawan
CW1 - 200 LM
|
March 25, 2024 |
2023 |
WIN3F07437 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Project ID: P00726271LZ
UACS NO.: 320101109998000
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Malatgao Seaside Flood Control Structure, Sta. 0 + 000 - Sta. 0 + 300 L/S Downstream, Barangay Malatgao, Narra, Palawan
CW1 - 300 LM
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Malatgao Seaside Flood Control Structure, Sta. 0+000 – Sta. 0+135, Barangay Malatgao, Narra, Palawan
CW1 - 135 LM |
March 25, 2024 |
2023 |
WIN3F07187 |
RA 11936 |
January 1, 2023 |
Region IV-B |
Romblon District Engineering Office |
Project ID: P00713231LZ
UACS NO.: 310108101534000
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tablas Circumferential Rd - K0043 + 120 - K0043 + 130, K0043 + 250 - K0043 + 265, K0043 + 320 - K0043 + 335, K0043 + 400 - K0043 + 418
CW1 - 659.47 square meters
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tablas Circumferential Rd - K0043 + 120 - K0043 + 132.56, K0043 + 250 - K0043 + 284.37, K0043 + 320 - K0043 + 334, K0043 + 400 - K0043 + 418
CW1 - 408.65 square meters |
March 20, 2024 |
2023 |
WIN3F06831 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
PROJECT ID: P00712885LZ
UACS NO.: 310105100881000
FROM:
OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads -Secondary Roads - PPSR Jct (Abo-abo) – Quezon Rd – K0133+450 – K0134+833
Physical Target:
CW1- Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
2.864 Lane Km
TO:
OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads -Secondary Roads - PPSR Jct (Abo-abo) – Quezon Rd – K0133+450 – K0134+400
Physical Target:
CW1- Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
1.998 Lane Km
|
March 20, 2024 |
2023 |
WIN3F06830 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
PROJECT ID: P00713224LZ
UACS NO.: 310108101527000
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Culandanum-Panalingaan Cross Country Rd - (S00065PW) Chainage 5207 - Chainage 5248, Chainage 6941 - Chainage 7061, Chainage 8756 - Chainage 8782
CW1 - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - 882.980 square meters
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Culandanum-Panalingaan Cross Country Rd - (S00065PW) Chainage 6941 - Chainage 7061, Chainage 9060 - Chainage 9095, Chainage 9103 – Chainage 9135
CW1 - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - 828 square meters |
March 20, 2024 |
2023 |
WIN3F06829 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
PROJECT ID: P00712886LZ
UACS NO.: 310105100882000
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - PPSR Jct (Abo-abo)-Quezon Rd -K0144 + 343 - K0145 + 000
CW1 - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - 1.402 lane km
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - PPSR Jct (Abo-abo)-Quezon Rd -K0144 + 343 - K0144 + 903
CW1 - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - 1.120 Lane Km |
March 20, 2024 |
2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
PROJECT ID: P00713497LZ
UACS NO.: 310306100240000
FROM:
OO1: Ensure Safe and Reliable National Road System - Bridge - Construction of New Permanent Bridges - Construction of New Bridges - Comajos Br. Along Culandanum-Panalingaan Cross Country Road
CW1- Construction of New Bridges - 190.80 Square meters
TO:
OO1: Ensure Safe and Reliable National Road System - Bridge - Construction of New Permanent Bridges - Construction of New Bridges - Construction of New Bridges Comajos Br. Along Culandanum-Panalingaan Cross Country Road (Phase I)
CW1- Construction of New Bridges - 238.5 Square meters |
March 20, 2024 |
2023 |
WIN3F07271 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
PROJECT ID: P00713496LZ
UACS NO.: 310306100239000
FROM:
OO1: Ensure Safe and Reliable National Road System - Bridge - Construction of New Permanent Bridges -Construction of New Bridges Callagon Br. Along Aramaywan-Berong-Puerto Princesa Road
CW1 - Bridge - Construction of New Permanent Bridges - 286.200 Square meters
TO:
OO1: Ensure Safe and Reliable National Road System - Bridge - Construction of New Permanent Bridges - Construction of New Bridges Callagon Br. Along Aramaywan-Berong-Puerto Princesa Road (Phase I)
CW1 - Bridge - Construction of New Permanent Bridges - 286.200 Square meters
|
March 19, 2024 |
2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Mindoro Occidental District Engineering Office |
Project ID: P00742459LZ
UACS: 300225101250000
FROM:
Basic Infrastructure Program- Flood Mitigation Structures protecting Public Infrastructure/Facilities - Construction of Debris Flow Barrier along Mindoro West Coastal Road (S00095MR), Sto. Turawan, Brgy. San Francisco, Sablayan, Occidental Mindoro
CW1 - Flood Mitigation Structes Protecting Public Infrastructure/ Facilities
800 Lineal meter
TO:
Basic Infrastructure Program- Flood Mitigation Structures protecting Public Infrastructure/Facilities - Construction of Debris Flow Barrier along Mindoro West Coastal Road (S00095MR), Sitio Turawan, Brgy. San Francisco, Sablayan, Occidental Mindoro
CW1 - Flood Mitigation Structes Protecting Public Infrastructure/ Facilities
800 Lineal meter
|
March 5, 2024 |
FY 2023 |
WIN3E02643 |
320101109330000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 320101109330000
Project ID: P00721233MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control at Ilaya Bridge, Upstream Section, Dapitan City, Zamboanga del Norte Sta. 0+100 - Sta. 0+375.2
CW1 - Construction of Flood Mitigation Structure: 275.20 ln.m
Unit Cost: ₱ 245,457.85 /lane km
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02641 |
320101109329000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 320101109329000
Project ID: P00721232MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, Ilaya Bridge, Abutment A, Upstream Section, Dapitan City, Zamboanga del Norte Sta.0+100 - Sta.0+438.4
CW1 - Construction of Flood Mitigation Structure: 338.40 ln.m
Unit Cost: ₱ 199,615.84 /lane km
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00 |
March 5, 2024 |
2023 |
WIN3E02610 |
310203100740000 |
March 7, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100740000
Project ID: P00705479MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Tertiary Roads
Jct Imelda-Alicia Rd - K1750 + (-100) - K1751 + 024
CW1 - Road Widening/ 2.168 Lane Km
Unit Cost: ₱18,468,182.66/ Lane Km
EAO: ₱1,000,000.00
Allocation: ₱50,000,000.00
|
March 5, 2024 |
FY 2023 |
WIN3E02615 |
310105100966000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310105100966000
Project ID: P00707605MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Roads - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd - K1817 + 990.40 - K1818 + 058, K1818 + 585 - K1818 + 876.40
CW1 - Reconstruction to Concrete Pavement: 0.718 lane km
Unit Cost: ₱ 24,456,267.41 /lane km
CW2 - Construction of Drainage Structure along Road: 546.40 ln.m
Unit Cost: ₱ 9,353.55 /ln.m.
ROW Acquisition: 3,200.00 sq.m.
Unit Cost: ₱ 1,500.00 /sq.m.
EAO: ₱ 560,620.00
Allocation: ₱ 28,031,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02617 |
310203100736000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310203100736000
Project ID: P00705527MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Polanco-Macleodes Rd - K1844 + 000 - K1844 + 787.50
CW1 - Road Widening: 1.575 lane km
Unit Cost: ₱ 13,947,113.02 /lane km
CW2 - Construction of Drainage Structure along Road: 1,599.0 ln.m
Unit Cost: ₱ 4,336.02 /ln.m.
ROW Acquisition: 333.33 sq.m.
Unit Cost: ₱ 1,500.02 /sq.m.
EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00 |
March 5, 2024 |
FY 2023 |
|
310106100998000 |
March 13, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310106100998000
Project ID: P00706238MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1819 + 487 - K1819 + 921.10
CW1 - Reconstruction to Concrete Concrete: 0.8682 lane km
Unit Cost: ₱ 11,287,721.72 /lane km
EAO: ₱ 200,000.00
Allocation: ₱ 10,000,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02656 |
310104100586000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310104100586000
Project ID: P00706236MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Dipolog-Oroquieta National Rd - K1802 + 000 - K1802 + 185, K1806 + 516 - K1806 + 609, K1815+ 919 - K1815 + 987, K1828 + 967.50 - K1829 + 072.7
CW1 - Reconstruction to Concrete Concrete: 0.9724 lane km
Unit Cost: ₱ 13,361,975.52 /lane km
CW2 - Construction of Road Slope Protection Structure: 1,134 sq.m.
Unit Cost: ₱ 1,643.40 /sq.m.
EAO: ₱ 303,200.00
Allocation: ₱ 15,160,000.00 |
March 5, 2024 |
2023 |
WIN3F06909 |
310203100741000 |
March 7, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100741000
Project ID: P00705480MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Tertiary Roads
Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1751 + (-594.60) - K1751 + (-080.00)
CW1 - Road Widening / 1.029 lane km
Unit Cost: ₱ 17,030,962.10/ lane km
EAO: ₱ 400,000.00
Allocation: ₱ 20,000,000.00 |
March 5, 2024 |
FY 2023 |
|
310107100560000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310107100560000
Project ID: P00706579MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1861 + 600 - K1861+ 814.40
CW1 - Construction of Road Slope Protection Structure: 3,220.29 sq.m.
Unit Cost: ₱ 9,129.61 /sq.m.
EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02707 |
310108101628000 |
March 13, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310108101628000
Project ID: P00706365MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd - K1847 + 580 - K1847 + 880
CW1 - Construction of Road Slope Protection Structure: 3,284.9 sq.m.
Unit Cost: ₱ 4,414.14 /sq.m.
ROW Acquisition: 133.33 sq.m.
Unit Cost: ₱ 1,500.04 sq.m.
EAO: ₱ 300,000.00
Allocation: ₱ 15,000,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02861 |
310203100735000 |
April 19, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310203100735000
Project ID: P00705457MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Piñan-Mutia Rd - K1821+329 - K1821+646, K1828+800 - K1829+000
CW1 - Road Widening: 1.0348 lane km
Unit Cost: ₱ 15,073,452.84 /lane km
CW2 - Construction of Drainage Structure along Road: 1,078.8 ln.m
Unit Cost: ₱ 7,417.49 /ln.m.
ROW Acquisition: 600.0 sq.m.
Unit Cost: ₱ 1,500.0 /sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
March 5, 2024 |
2023 |
WIN3F06909 |
310103101340000 |
March 7, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310103101340000
Project ID: P00706084MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads
Diplahan Jct-Malangas Port Rd - K1740 + 731 - K1742 + 406
CW1 - Preventive Maintenance of Road: Asphalt Overlay / 3.390 Lane Km
Unit Cost: ₱ 11,563,421.83/ lane km
EAO: ₱ 800,000.00
Allocation: ₱ 40,000,000.00
|
March 5, 2024 |
FY 2023 |
|
310102101412000 |
April 19, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310102101412000
Project ID: P00706077MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Jct Polo-Dapitan Park Natl Rd - K1825 + (-294) - K1825 + 180, K1829 + 664 - K1830 + 021.90
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.6078 lane km
Unit Cost: ₱ 10,309,203.16 /lane km
EAO: ₱ 548,660.00
Allocation: ₱ 27,433,000.00 |
March 5, 2024 |
FY 2023 |
|
310103101335000 |
April 19, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101335000
Project ID: P00706078MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1826 + 620 - K1827 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.828 lane km
Unit Cost: ₱ 6,613,816.43 /lane km
EAO: ₱ 111,760.00
Allocation: ₱ 5,588,000.00 |
March 5, 2024 |
FY 2023 |
|
310101101074000 |
April 19, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310101101074000
Project ID: P00706076MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1857+(-1123) - K1857+(-677.10)
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.8918 lane km
Unit Cost: ₱ 9,107,692.31 /lane km
EAO: ₱ 165,760.00
Allocation: ₱ 8,288,000.00 |
March 5, 2024 |
2023 |
WIN3E02652 |
310103101341000 |
March 14, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310103101341000
Project ID: P00706085MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads
Preventive Maintenance of Road: Asphalt Overlay Jct Imelda-Alicia Rd - K1758 + 291 - K1759 + 000 & K1759 + 000 - K1760 + 097
CW1 - Preventive Maintenance of Road: Asphalt Overlay / 2.368 Lane Km
Unit Cost: ₱ 16,554,054.05/ lane km
EAO: ₱ 800,000.00
Allocation: ₱ 40,000,000.00 |
March 5, 2024 |
FY 2023 |
WIN3E02744 |
310108101627000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310108101627000
Project ID: P00706364MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd - K1842 + 120 - K1842 + 191, K1868 + 250 - K1868 + 310
CW1 - Construction of Road Slope Protection Structure: 1,553.65 sq.m.
Unit Cost: ₱ 9,204.13 /sq.m.
ROW Acquisition: 266.67 sq.m.
Unit Cost: ₱ 1,499.98 /sq.m.
EAO: ₱ 300,000.00
Allocation: ₱ 15,000,000.00 |
March 5, 2024 |
2023 |
WIN3E02609 |
310103101342000 |
March 7, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310103101342000
Project ID: P00706086MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads
Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1753 + 264.170 - K1754 + 994.170
CW1 - Preventive Maintenance of Road: Asphalt Overlay / 3.460 Lane Km
Unit Cost: ₱ 11,557,485.54/ Lane Km
EAO: ₱ 816,100.00
Allocation: ₱ 40,805,000.00 |
March 5, 2024 |
2023 |
|
310305102035000 |
March 15, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310305102035000
Project ID: P00706625MN
OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges
Bomba Br. (B00474MN) along Jct Imelda-Alicia Rd
CW1 - Widening of Bridge / 360.994 sq.m.
Unit Cost: ₱ 102,779.55/ sq.m.
EAO: ₱ 757,200.00
Allocation: ₱ 37,860,000.00 |
March 5, 2024 |
2023 |
WIN3E02988 |
310204102235000 |
May 22, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310204102235000
Project ID: P00707614MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Danlugan - La Dicha Diversion Road, Zamboanga Sibugay
CW1 - Construction of Concrete Road / 3.274 Lane Km
Unit Cost: ₱ 17,591,065.97 / Lane Km
CW2 - Road Safety: Street Lighting / 111 number of units
Unit Cost: ₱ 147,661.62 / number of units
ROW Acquisition - 13,440.94 sq.m.
Unit Cost: ₱ 239.30 / sq.m.
EAO: ₱ 2,800,000.00
Allocation: ₱ 80,000,000.00 |
March 5, 2024 |
2023 |
|
310305102036000 |
May 22, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310305102036000
Project ID: P00707617MN
OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges
Lutiman Bridge along Jct. Imelda-Alicia Road
CW1 - Widening of Bridge / 360.994 sq.m.
Unit Cost: ₱ 108,589.06/ sq.m.
EAO: ₱ 800,000.00
Allocation: ₱ 40,000,000.00 |
March 5, 2024 |
2023 |
|
320101110241000 |
March 14, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320101110241000
Project ID: P00721364MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure (revetment wall) along Sibuguey River (upstream),
Sta. 0+000.00 - Sta. 0+303.50, Barangay Sampoli A, Diplahan, Zamboanga Sibugay (Package 2)
CW1 - Construction of Revetment / 303.500 Lineal meters
Unit Cost: ₱ 161,449.75 / Lineal meters
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
March 5, 2024 |
2023 |
WIN3E02881 |
320102105922000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102105922000
Project ID: PP00721659MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control along Sibuguey River, Barangay Villacastor, Buug, Zamboanga
Sibugay Package 3
CW1 - Construction of Flood Mitigation
Structure / 233.00 Lineal meters
Unit Cost: ₱ 210,300.43 / Lineal meters
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
March 5, 2024 |
2023 |
WIN3E02881 |
300203101873000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300203102503000
Project ID: P00731923MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
National Road Junction leading to Mali Little Baguio Eco Tourism Park, Imelda, Zamboanga
Sibugay
CW1 - Construction of Concrete Road / 0.990 Lane Km
Unit Cost: ₱ 9,898,989.90 / Lane Km
EAO: ₱ 200,000.00
Allocation: ₱ 10,000,000.00 |
March 5, 2024 |
2023 |
WIN3E02881 |
300203102509000 |
March 15, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300203102509000
Project ID: P00731927MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
NRJ Imelda-Alicia Rd to Lutiman-Guicam-Olutanga Provincial Rd leading to Moalboal Beach, Talusan, Zamboanga Sibugay
CW1 - Construction of Concrete Road / 2.297 Lane Km
Unit Cost: ₱ 15,529,821.51/ Lane Km
EAO: ₱ 728,000.00
Allocation: ₱ 36,400,000.00 |
March 5, 2024 |
2023 |
|
310101101080000 |
March 7, 2023 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310101101080000
Project ID: P00706083MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1738 + 000 - K1738 + 650
CW1 - Preventive Maintenance of Road: Asphalt Overlay / 2.60 Lane Km
Unit Cost: ₱ 13,192,307.69/ Lane Km
EAO: ₱ 700,000.00
Allocation: ₱ 35,000,000.00 |
March 4, 2024 |
FY 2023 |
|
310104100585000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310104100585000
Project ID: P00706231MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Pagadian City-Zamboanga City Rd - K1934 + 800 - K1935 + 175, K1935 + 205 - K1935+760
CW1 - Rehabilitation of Paved Road: 3.72 Lane Km
Unit Cost: ₱ 11,855,435.84/Lane Km
Excess: ₱ 40,898.66
EAO: ₱ 900,880.00
Allocation: ₱ 45,044,000.00 |
March 4, 2024 |
FY 2023 |
|
300219102094000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300219102094000
Project ID: P00734015MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure, Barangay Cawit, Zamboanga City
CW1 - Construction of Flood Mitigation Structure: 238.90 Lineal meters
Unit Cost: ₱ 123,064.04/Lineal meters
EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00 |
March 4, 2024 |
FY 2023 |
WIN3E03149 |
300225101409000 |
May 12, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300225101409000
Project ID: P00732471MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure, Villa Sta. Maria, Barangay Sta. Maria, Zamboanga City, Zamboanga del Sur
CW1 - Construction of Flood Mitigation Structure: 30.20 Lineal meters
Unit Cost: ₱ 360,596.03 Lineal meters
EAO: ₱ 110,000.00
Allocation: ₱ 11,000,000.00
|
March 4, 2024 |
FY 2023 |
|
310110100430000 |
May 12, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310110100430000
Project ID: P00707612MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Pagadian City-Zamboanga City Rd - K1908 + 820 - K1910 + 200, Malasugat Section
CW1 - Construction of Drainage Structure: 1,227.56 Lineal meters
Unit Cost: ₱ 21,967.66/Lineal meters
CW2 - Reconstruction to Concrete Pavement: 1.69 Lane km
Unit Cost: ₱ 13,037,504.57/Lane km
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
March 4, 2024 |
FY 2023 |
|
320101110214000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101110214000
Project ID: P00721356MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure at Maasin Creek, Zamboanga City
CW1 - Construction of Flood Mitigation Structure: 490 Lineal meters
Unit Cost: ₱ 80,000.00
EAO: ₱ 800,000.00
Allocation: ₱ 40,000,000.00
|
March 4, 2024 |
2023 |
WIN303207 |
SR2023-03-006988 |
March 15, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Installation of Road Safety Devices Along Abra-Kalinga Rd - K0425 + 500 - K0432 + 600;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"
"To:
Installation of Road Safety Devices Along Abra-Kalinga Rd - K0433 + 587 - K0440 + 990;
Type of Work:
CW1: Road Safety: Guardrails
CW2: Road Safety: Roadway Lighting;
Physical Target:
CW1: 734 meters
CW2: 134 units ;
Allocation: Php 100,000,000.000"
|
March 4, 2024 |
FY 2023 |
WIN3E02734 |
300225101416000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300225101416000
Project ID: P00732477MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Drainage System, Barangay Tugbungan, Zamboanga City, Zamboanga del Sur
CW1 - Construction of Drainage Structure: 1,185.85 Lineal meters
Unit Cost: ₱ 16,248.53/Lineal meters
Excess: ₱ 531,679.38
EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00 |
March 4, 2024 |
2023 |
WIN3E03206 |
SR2023-01-000980 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"
"To:
Construction of Flood Control Structure along Abra Major River Basin, Barangay San Jose Sur, Manabo, Abra;
Physical Target: 494 Lineal meters;
Allocation: Php 150,000,000.000"
|
March 4, 2024 |
FY 2023 |
WIN3E02740 |
300203102503000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300203102503000
Project ID: P00731946MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
NRJ Ayala-La Paz Road leading to La Paz Resort, Zamboanga City
CW1 - Construction of Road Slope Protection Structure: 1,060.67 Square meters
Unit Cost: ₱ 26,128.69/Square meters
CW2 - Construction of Concrete Road: 0.508 Lane km
Unit Cost: ₱ 41,901,743.74/ Lane km
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00
|
March 4, 2024 |
FY 2023 |
WIN3E02969 |
310201101090000 |
March 12, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310201101090000
Project ID: P00705501MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd - K1927 + 420 - K1927 + 990
CW1 - Road Widening: 1.14 Lane km
Unit Cost: ₱ 26,992,475.36/ Lane km
CW2 - Construction of Road Slope Protection Structure: 4,024.50 sq.m.
Unit Cost: ₱ 2,683.246/sq.m.
ROW Acquisition: 2,453.89 sq.m.
Unit Cost: ₱ 3,500.00/sq.m.
EAO: ₱ 1,819,230.00
Allocation: ₱ 51,978,000.00 |
March 4, 2024 |
FY 2023 |
|
300221104189000 |
May 12, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300221104189000
Project ID: P00732216MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Barangay Buenavista, Zamboanga City, Zamboanga del Sur
CW1 - Construction of Concrete Road: 1.60 Lane Km
Unit Cost: ₱ 9,183,567.96/Lane Km
Excess: ₱ 156,291.27
EAO: ₱ 150,000.00
Allocation: ₱ 15,000,000.00 |
March 4, 2024 |
FY 2023 |
|
300204101215000 |
March 24, 2023 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300204101215000
Project ID: P00731947MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Access Road at Sitio Anuling, Pamucutan to Sta. Rita in Support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City
CW1 - Construction of Concrete Road: 1.39 Lane km
Unit Cost: ₱ 28,247,232.35/ Lane km
CW2 - Construction of Road Slope Protection Structure: 2,425.55 Square meters
Unit Cost: ₱ 14,748.04105/Square meters
Excess: ₱ 234,236.08
EAO: ₱ 2,730,000.00
Allocation: ₱ 78,000,000.00 |
March 4, 2024 |
FY 2023 |
|
310201101099000 |
March 14, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.310201101099000
Project ID: P00705543MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1792+488.66 - K1792+820, K1795+920 - K1797+410.92
CW1 - Road Widening: 2.96852 lane km
Unit Cost: ₱ 14,089,414.35 lane km
CW2 - Construction of Road Slope Protection Structure: 4,514.15 sq.m.
Unit Cost: ₱ 2,611.85 /sq.m.
ROW Acquisition: 5,000 sq.m.
Unit Cost: ₱ 300.00 /sqm.m
EAO: ₱ 1,998,990.00
Allocation: ₱ 57,114,000.00 |
March 4, 2024 |
FY 2023 |
|
310103101343000 |
March 14, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.310103101343000
Project ID: P00706087MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Crossing Sta. Clara-Sandayong Rd - K1795 + 978 - K1796 + 053
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.148 lane km
Unit Cost: ₱ 11,157,432.43 lane km
EAO: ₱ 33,700.00
Allocation: ₱ 1,685,000.00 |
March 4, 2024 |
FY 2023 |
|
310101101081000 |
March 13, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.310101101081000
Project ID: P00706088MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1825 + 826 - K1826 + 000, K1827 + 532 - K1829 + 799
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 4.87 lane km
Unit Cost: ₱ 5,693,457.91 lane km
EAO: ₱ 565,860.00
Allocation: ₱ 28,293,000.00 |
March 4, 2024 |
FY 2023 |
|
310107100561000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310107100561000
Project ID: P00706580MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1878 + 900- K1878+ 979.6, K1879+100 - K1879+180
CW1 - Construction of Road Slope Protection Structure: 2,409 sq.m.
Unit Cost: ₱ 10,166.29 /sq.m.
ROW Acquisition: 66.67 sq.m.
Unit Cost: ₱ 1,499.93 /sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
March 4, 2024 |
FY 2023 |
|
310203100734000 |
March 9, 2023 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310203100734000
Project ID: P00705456MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dipolog-Polanco-Piñan-Jct Oroquieta Rd - K1816 + 763 - K1817 + 726.4
CW1 - Road Widening: 1.9108 lane km
Unit Cost: ₱ 12,455,516.01 /lane km
ROW Acquisition: 466.67 sq.m.
Unit Cost: ₱ 1,499.99 /sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00 |
March 3, 2024 |
FY2023 |
|
300215103437000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.300215103437000
Project ID: P00733879MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Barangay Malubal, R.T Lim, Zamboanga Sibugay
CW1 - Construction of Concrete Road : 2.96 lane km
Unit Cost: ₱ 16,554,054.05 /lane km
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
March 3, 2024 |
FY2023 |
|
300215103436000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.300215103436000
Project ID: P00733878MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Construction of Road, Barangay Remedios, R.T Lim, Zamboanga Sibugay
CW1 - Construction of Concrete Road : 2.15 lane km
Unit Cost: ₱ 20,178,754.80 /lane km
CW2 - Construction of Road Slope Protection Structure: 1,433 sq.m.
Unit Cost: ₱ 3,918.33 /sq.m.
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00 |
March 3, 2024 |
FY2023 |
|
300215102762000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.300215102762000
Project ID: P00733822MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Construction of Local Road leading to Barangay Upper Pangi (Sitio Duguan - Sitio Lagman), Ipil, Zamboanga Sibugay
CW1 - Construction of Concrete Road : 5.06034 lane km
Unit Cost: ₱ 14,888,859.92 /lane km
CW2 - Construction of Road Slope Protection Structure: 2,936 sq.m.
Unit Cost: ₱ 3,918.38 /sq.m.
EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00 |
March 3, 2024 |
FY2023 |
|
300215102761000 |
May 8, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.300215102761000
Project ID: P00733821MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Construction of Concrete Road along Tungawan (Malungon) - Sirawai Road, Zamboanga Sibugay
CW1 - Construction of Concrete Road : 4.23 lane km
Unit Cost: ₱ 20,531,914.89 /lane km
EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00 |
March 3, 2024 |
FY2023 |
|
300215102760000 |
April 17, 2023 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.300215102760000
Project ID: P00733820MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Construction of Concrete Road along Titay (New Canaan) - Naga (Bulansing) Road with RCDG Bridge, Zamboanga Sibugay
CW1 - Construction of Concrete Road : 5.05786 lane km
Unit Cost: ₱ 15,402,370.44 /lane km
CW2 - Construction of Road Slope Protection Structure: 2,283 sq.m.
Unit Cost: ₱ 3,918.95 /sq.m.
EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00 |