Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 16, 2018 FY 2018 WIN8C02966 320101100237000 May 9, 2018 Region IX Regional Office IX
UACS No. 320101100237000
Project ID: P00221448MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Extension of Flood Control Structure along Siocon River (Upstream), Siocon, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 443.50 lm
Unit Cost: P 228,259.62/lm
ROW: 306.20 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,675,000.00
Allocation: P 105,000,000.00
May 16, 2018 FY 2018 WIN8C02970 310201100185000 May 9, 2018 Region IX Regional Office IX
UACS No. 310201100185000
Project ID: P00200596MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City - Zamboanga City Rd
K1936+374.00 - K1936+765.00,
K1936+765.00 - K1936+980.00,
K1937+020.00 - K1937+160.00,
K1937+160.00 - K1937+180.00,
K1937+180.00 - K1937+360.00,
K1937+360.00 - K1937+400.00,
K1937+460.00 - K1937+511.00
Physical Target:
CW-1 - Road Widening-Primary Road:
1.572 lane km.
Unit Cost: P 34,431,377.72/lane km.
CW-2 - ROW: 462,912.91 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 7,000,000.00
Allocation: P 200,000,000.00
May 16, 2018 FY 2018 WIN8C02943 300117201991000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201991000
Project ID: P00251835MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Road Concreting, Brgy. Recodo, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.41 lane km.
Unit Cost: P 7,243,902.44/lane km.
EAO: P 30,000.00
Allocation: P 3,000,000.00
May 16, 2018 FY 2018 WIN8G02192 SR2018-01-001268 January 29, 2018 Region III Regional Office III
Network Development Program
Road Widening - Tertiary Roads

Baliwag - Candaba - Sta Ana Rd
K0058+ (-555) - K0059+452, K0062+054 - K0062+681, K0063+963 - K0064+160, K0064+980 - K0065+321, K0066+162 - K0067+428
May 16, 2018 FY 2018 WIN8C02936 300117201967000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201967000
Project ID: P00250058MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Brgy. Limaong, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.33 lane km.
Unit Cost: P 4,500,000.00
EAO: P 15,000.00
Allocation: P 1,500,000.00
May 16, 2018 FY 2018 WIN8C02896 UACS No. 320102100507000 May 7, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320102100507000
Project ID: P00220489MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Boulevard) along Sibuguey River, Imelda, Zamboanga Sibugay (Sta. 00+000 - Sta. 00+360, Sta. 00+000 - Sta. 00+064)

Physical Target:
CW-1- Construction of Flood Mitigation Structure: 424 Lineal Meters
Unit Cost: P 62,336.38/ Lineal Meters
Physical Target:
ROW: 162 sq.m.
Unit Cost: P 3,206.01/Sq. m.
EAO: P 550,000.00
Allocation: P 27,500,000.00
May 16, 2018 FY 2018 WIN8C02932 300117201979000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201979000
Project ID: P00250080MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Lumayang, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.19 lane km.
Unit Cost: P 7,815,789.47/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00
May 16, 2018 FY 2018 WIN8C02931 300117201964000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201964000
Project ID: P00250075MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Arena Blanco, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.44 lane km.
Unit Cost: P 4,500,000.00
EAO: P 20,000.00
Allocation: P 2,000,000.00
May 16, 2018 FY 2018 WIN8C02930 300117201982000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201982000
Project ID: P00250082MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Mampang, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.42 lane km.
Unit Cost: P 4,714,285.71/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00
May 16, 2018 FY 2018 WIN8C02928 300117201990000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201990000
Project ID:P00251837MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Road Concreting, Brgy. Limpapa, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.35 lane km.
Unit Cost: P 11,314,285.71/lane km.
EAO: P 40,000.00
Allocation: P 4,000,000.00
May 16, 2018 FY 2018 WIN8C02870 300117201966000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201966000
Project ID: P00250057MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Brgy. Lamisahan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.28 lane km.
Unit Cost: P 7,071,428.57/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00
May 16, 2018 FY 2018 WIN8C02869 300116201149000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300116201149000
Project ID: P00258443MN

Local Program:

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Concreting of Cabatangan Road, Cabatangan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.68 lane km.
Unit Cost: P 7,638,235.29/lane km.
EAO: P 106,000.00
Allocation: P 5,300,000.00
May 16, 2018 FY 2018 WIN8C02866 300117201983000 May 7, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117201983000
Project ID: P00250083MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Muti, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road:
0.43 lane km.
Unit Cost: P 4,604,651.16/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00
May 16, 2018 FY 2018 GAA WIN8C02714 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads –Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement of Road Junction Highway Apokon, Prk. Durian, Tagum City, Davao del Norte
Physical Target:
CW1: 1.770 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00

TO: Local Program – Local Roads and Bridges – Local Roads –Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement of Road Junction Highway Apokon, Prk. Durian, Tagum City, Davao del Norte
Physical Target:
CW1: 1.227 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
May 16, 2018 FY 2018 GAA WIN8C02712 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Roads, Panabo City, Davao del Norte
Physical Target:
CW1: 0.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Roads, Panabo City, Davao del Norte
Physical Target:
CW1: 0.116 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00
May 16, 2018 FY - 2018 WIN8F05438 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure safe and Reliable National Road System

Network Development - Construction of Missing Links/
New Roads

FROM:
Odiongan East - West Road, incl. ROW Romblon

CW1: 2.450 Lane Km ( Construction of Missing Links/
New Roads )
CW2: 12,250 sq.m. ( ROW Acquisition )
Total Allocation: 53,900,000 Php

TO:
Odiongan East - West Road, incl. ROW< Romblon

CW1: 1.29 Lane Km ( Construction of Missing Links/
New Roads )
CW2: 12,250 sq.m. ( ROW Acquisition )
Total Allocation: 53,900,000 Php
May 16, 2018 FY - 2018 WIN8F05440 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
002 - Protect Lives and Properties Against major Floods

Flood Management Program -
- Construction/Maintenance of Flood Mitigation Structure
and Drainage System

FROM:
Construction of Agnipa Flood Control Structure along
Romblon-Cogon-Sablayan Circumferential Road,
Agnipa, Romblon

CW1: 767.00 lin.m. ( Construction of Flood Mitigation
Structure )
Allocation: 48,250,000 Php

TO:
Construction of Agnipa Flood Control Structure along
Romblon-Cogon-Sablayan Circumferential Road,
Agnipa, Romblon

CW1: 1,284.00 lin.m. ( Construction of Flood Mitigation
Structure )
Allocation: 48,250,000 Php
May 16, 2018 FY 2018 GAA WIN8C02731 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management- Construction/Rehabilitation of Flood Mitigation Structures along Major River Basins and Principal Rivers
Construction of Concrete Revetment on Steel Sheet Piles along Tagum-Libuganon River, Downstream/ Upstream Miranda Bridge II incl. ROW, Tagum City, Davao del Norte
Physical Target:
CW1: 813.00 Lineal Meters (Construction of Flood Mitigation Structures)
Allocation:
TOTAL: P 100,000,000.000
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structures)
EAO: P 3,500,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management- Construction/Rehabilitation of Flood Mitigation Structures along Major River Basins and Principal Rivers
Construction of Concrete Revetment on Steel Sheet Piles along Tagum-Libuganon River, Downstream/ Upstream Miranda Bridge II incl. ROW, Tagum City, Davao del Norte
Physical Target:
CW1: 617.00 Lineal Meters (Construction of Flood Mitigation Structures)
ROW: 13,460.00 sq. m.
Allocation:
TOTAL: P 100,000,000.000
CW1: P 94,000,000.00 (Construction of Flood Mitigation Structures)
ROW: P 2,500,000.00
EAO: P 3,500,000.00
May 16, 2018 FY 2018 WIN8C02937 320102100515000 May 7, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 320102100515000
Project ID: P00220561MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure, (Revetment Wall) along Sibuguey River, Brgy. Bulawan, Payao, Zamboanga Sibugay (Sta. 01+144.50 - Sta. 01+265 & Sta. 00+560 - Sta. 00+666)
Physical Target:
CW-1 - Construction of Revetment: 226.50 Lineal meters
Unit Cost: P 110,145.08/Lineal meters
EAO: P 509,140
Allocation: P 25,457,000
May 16, 2018 FY 2018 WIN8C03001 300116200019000 May 10, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 300116200019000
Project ID: P00257781MN
Local Program
Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Maganay - La Dicha Road, Maganay, Buug, Zamboanga Sibugay, Sta. 00+000 to Sta. 01+720
Physical Target:
CW-1 - Construction of Concrete Road: 3.44 Lane km
Unit Cost: P 5,358,652.03/Lane km
CW-2 - Construction of Drainage Structure: 199 lm
Unit Cost: P 4,352.95/ lm
EAO: P 700,000
Allocation: P 20,000,000
May 16, 2018 FY 2018 WIN8C02851 310103100211000 May 7, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 310103100211000
Project ID: P00201577MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Diplahan Jct-Malangas Port Rd - K1740+(-322) - K1740+731, K1743+167 - K1743+279.50
Physical Target:
CW-1 - Preventive Maintenance of Road: Asphalt Overlay: 2.331 Lane km
Unit Cost: P 11,091,976.13/ lane km
CW-2 - Preventive Maintenance of Road: Concret Reblocking: 0.12 Lane km
Unit Cost: P13,205,030.42/Lane km
EAO: P 560,000
Allocation: P 28,000,000
May 16, 2018 FY 2018 WIN8C02858 310101100023000 May 7, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 310101100023000
Project ID: P00200001MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd - K1729+541 - K1731+325,K1731+350 - K1732+000, K1732+989 - L1733+276, K1743+906 - K1744+200, K1744+724.50 - K1746+000
Physical Target:
CW-1 - Preventive Maintenance of Road: Asphalt Overlay 7.941 Lane km
Unit Cost: P 11,275,141,62/Lane km
CW-2 - Preventive Maintenance of Road:Concrete Reblocking 0.588 Lane km
Unit Cost: P 11,843,708.13/lane km
EAO: P 3,500,000
Allocation: P 100,000,000
May 16, 2018 FY 2018 GAA WIN8C02724 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Off-Carriageway Improvement – Primary Roads
Daang Maharlika (MN) –
K1450+117 – K1453+240, K1462+460 – K1462+760
Physical Target:
CW1: 6,892.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 73,842,000.00
CW1: P 71,257,530.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,584,470.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Off-Carriageway Improvement – Primary Roads
Daang Maharlika (MN) –
K1451+360 – K1453+240, K1462+460 – K1462+760
Physical Target:
CW1: 23,200.71 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 73,842,000.00
CW1: P 71,257,530.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,584,470.00
May 16, 2018 FY 2018 GAA WIN8C02732 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1455+(-551) – K1456+138
Physical Target:
CW1: 4,914.00 lineal meters (Construction of Drainage Structure along Road)
ROW: 3,526.00 sq. m.
Allocation:
TOTAL: P 75,900,000.00
CW1: P 71,046,195.00 (Construction of Drainage Structure along Road)
ROW: P 2,197,305.00
EAO: P 2,656,500.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads
Tagum City Diversion Rd incl. ROW –
K1455+(-605) – K1456+840
Physical Target:
CW1: 5,078.14 lineal meters (Construction of Drainage Structure along Road)
ROW: 3,526.00 sq. m.
Allocation:
TOTAL: P 75,900,000.00
CW1: P 70,966,500.00 (Construction of Drainage Structure along Road)
ROW: P 2,277,000.00
EAO: P 2,656,500.00
May 16, 2018 FY 2018 WIN8C02871 310109100125000 May 7, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No: 310109100125000
Project ID: P00200262MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct. Imelda-Alicia Rd - K1750+870 - K1750+975, K1751+340 - K1751+405, K1751+430 - K1751+513, K1753+160 - K1753+246, K1753+700 - K1753+835, K1753+840 - K1753+903, K1753+910 - K1754+012, K1756+240 - K1756+395
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 6,453.83 Square meters
Unit Cost: P 7,592.39/Square meters
EAO: P 1,000,000
Allocation: P 50,000,000
May 16, 2018 FY 2018 WIN8C02787 320101102191000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 320101102191000
Project ID: P00220738MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Kabasalan River, Kabasalan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 234.00 lineal meters
Unit Cost: P 87,948.72/lineal meter
EAO: P 0.42 M
Allocation: P 21 M
May 16, 2018 FY 2018 WIN8C02754 320101102197000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 320101102197000
Project ID: P00222749MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Sto. Niño Flood Control Structure along Tungawan River, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 73.0 lineal meters
Unit Cost: P 26,849.32/lineal meter
EAO: P 0.04 M
Allocation: P 2.0 M
May 16, 2018 FY 2018 GAA WIN8C02719 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Preventive Maintenance – Secondary Roads
Tagum-Panabo Circum Rd –
K1457+(-913) – K1458+000, K 1460+127 – K1460+939
Physical Target:
CW1: 11.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 73,645,000.00
CW1: P 71,076,110.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,577,890.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Preventive Maintenance – Secondary Roads
Tagum-Panabo Circum Rd –
K1457+(-913) – K1457+750, K 1460+127 – K1460+939
Physical Target:
CW1: 9.900 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 73,645,000.00
CW1: P 71,076,110.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,577,890.00
May 16, 2018 2018 310204100292000 GAA FY 2018 January 1, 2018 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

Tuguegarao West Diversion Road - (Jct Carig-Linao-Atulayan-Bagay-Buntun), incl. ROW, Cagayan
May 16, 2018 FY 2018 WIN8C02720 320101102196000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 320101102196000
Project ID: P00220663MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Libertad Flood Control Structure along Tungawan River, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 164 lineal meters
Unit Cost: P 58,841.46/lineal meter
ROW Acquisition: 500 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.2 M
Allocation: P 10 M
May 16, 2018 2018 310204100293000 GAA FY 2018 January 1, 2018 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

Tuguegarao-Solana Diversion Road, incl. ROW, Cagayan
May 16, 2018 FY 2018 WIN8C02867 300203100522000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 300203100522000
Project ID: P00230027MN
CSSP: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Simata Adventure Park, Brgy. Simata, Molave, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.37 lane km
Unit Cost: P 10.338M/lane km
EAO: 0.50M
Allocation: 25.0M
May 16, 2018 2018 310205100089000 GAA FY 2018 January 1, 2018 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/New Roads

Jct Victoria-Maddela-Alicia-Kasibu, Nueva Vizcaya Road, Quirino
May 16, 2018 FY 2018 WIN8C02715 310109100126000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310109100126000
Project ID: P00200263MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Crossing Sta. Clara - Sandayong Rd -
K1806+360.00 - K1806+440.00,
K1806+655.00 - K1806+680.00,
K1809+520.00 - K1809+555.00,
K1809+580.00 - K1809+635.00,
K1810+045.00 - K1810+080.00,
K1810+150.00 - K1810+220.00,
K1810+220.00 - K1810+280.00,
K1810+280.00 - K1810+320.00
Physical Target:
CW-1 - Construction of Road Slope Protection Structure: 11,070 square meters
Unit Cost: P 3,748.42/square meter
ROW Acquisition: 2,150 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.86 M
Allocation: P 43 M
May 16, 2018 2018 300203100222000 GAA FY 2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Poblacion Sta. Ana - Marede - Sta. Clara - Patunungan - Sinago Road leading to Boacag Falls & Sinago Coves, incl. Bridge, Dungeg, Sta. Ana, Cagayan
May 16, 2018 2018 310106100101000 GAA FY 2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos Point Rd - K0566+(-399)-K0566+006.50, K0566+060.70-K0566+092.60, K0566+119.70-K0566+142.40, K0566+160.60-K0566+197.50, K0K0566+206.50-K0566+422, K0566+215.70-K0566+246.50, K0566+260-K0566+659.65, K0566+431-K0566+659.65, K0566+682.40-K0566+745.60, K0566+682.40-K0566+727.60, K0566+786.40-K0567+000, K0567+004.50-K0567+343, K0567+373.60-K0567+396.30, K0567+437.70-K0567+605, K0567+673.40-K0567+695.90, K0567+786.70-K0567+804.80, K0567+886.20-K0567+945.30, K0567+958.90-K0568+017.80, K0568+167.10-K0568+221.50, K0568+262.40-K0568+298.70, K0568+321.20-K0568+389.70, K0568+461.80-K568+506.60, K0568+561-K0568+602, K0568+905.40-K0568+928.20, K0569+105.40-K0569+128.20, K0569+200.10-K0569+214.40, K0569+349.40-K0569+367.40, K0569+603.40-K0569+630.30, K0569+786.10-K0569+817.80, K0569+854-K0569+881.20, K0570+000-K0570+190
May 16, 2018 FY 2018 WIN8C02859 300204100198000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 300204100198000
Project ID: P00230030MN
CSSP: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ to Brgy. Bobongan to Brgy. Poblacion in support of Engineered Bamboo, Ramon Magsaysay, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.20 lane km
Unit Cost: P 8.909M/lane km
EAO: P 19.60M
Allocation: 20.0M
May 16, 2018 FY 2018 WIN8C02710 300117202016000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300117202016000
Project ID: P00251465MN

Local Program:

Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Barangay Road, Brgy. Labe, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 0.174 lane km.
Unit Cost: P 5,747,126.44/lane km.
Allocation: P 1 M
May 16, 2018 2018 310204100005000 GAA FY 2018 January 1, 2018 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program- Construction of By-Pass and Diversion Roads

Alcala Bypass Road, incl. ROW and Slope Protection, Cagayan
May 16, 2018 FY 2018 GAA WIN8C02713 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment on Steel Sheet Piles and Construction of Earth Dike along Saug River incl. ROW, Canatan Section, Asuncion, Davao del Norte
Physical Target:
CW1: 2,400.00 lineal meters (Construction of Dike)
Allocation:
TOTAL: P 64,000,000.00
CW1: P 61,760,000.00 (Construction of Dike)
EAO: P 2,240,000.00

TO: OO2: Protect Lives and Properties Against Major Floods – Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment on Steel Sheet Piles and Construction of Earth Dike along Saug River incl. ROW, Canatan Section, Asuncion, Davao del Norte
Physical Target:
CW1: 2,298.00 lineal meters (Construction of Dike)
CW2: 137.00 lineal meters (Construction of Revetment)
ROW: 25,720.00 sq. m.
Allocation:
TOTAL: P 64,000,000.00
CW1: P 34,891,896.54 (Construction of Dike)
CW2: P 23,988,103.46 (Construction of Revetment)
ROW: P 2,880,000.00
EAO: P 2,240,000.00
May 16, 2018 FY 2018 WIN8C02941 UACS No. 320102100504000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 320102100504000
Project ID: P00220932MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Rehabilitataion of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment with Steel Sheet Piles along Mapangi River, Zamboanga del Sur
Physical Target:
CW-1- Construction of Revetment: 480.00 l.m.
Unit Cost: P 102,083.33/l.m.
EAO: P 1.00M
Allocation: P 50.00M
May 16, 2018 2018 WIN8C02891 FY 2018 GAA RA 10964 January 1, 2017 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Roads, Samal, Davao del Norte
Physical Target:
CW1: 0.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Concrete Road)

TO: Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program
Construction of Roads, Samal, Davao del Norte
Physical Target:
CW1: 0.140 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Concrete Road)
May 16, 2018 GAA FY 2018 WIN8F05492 UACS No. 320101100115000 January 1, 2018 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 320101100115000
Project ID: P00222765LZ
WIN8F05492
Organizational Outcome 002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation s Structures and Drainage System
Construction of Marikina River Drainage Outfall, Brgy. J. Dela Peña, Marikina City
Physical Target: CW1-Construction of Drainage Structure L=990 lineal meter
Unit Cost (P’000): P97.60/ lineal meter
Allocation: P 96,625,450.00
EAO P 3,504,550.00
Total: P 100,130,000.00

As Modified
UACS No. 320101100115000
Project ID: P00222765LZ
WIN8F05492
Organizational Outcome 002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation s Structures and Drainage System
Construction of Marikina River Drainage Outfall, Brgy. J. Dela Peña, Marikina City
Physical Target: CW1-Construction of Drainage Structure L=480 lineal meter
Unit Cost (P’000): P201.30/ lineal meter
Allocation: P 96,625,450.00
EAO P 3,504,550.00
Total: P 100,130,000.00
May 16, 2018 GAA FY 2018 WIN8F05485 UACS No. 320101100374000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
UACS No. 320101100374000
Project ID: P00221396LZ
WIN8F05485
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems
Construction/Sealing of South Pinagkabalian River from Brgy. Muzon to Brgy. Dampalit, (Sta. 1+443 to Sta. 1+483), Malabon City
Physical Target: CW1 – Construction of Revetment: 40.0 lm
EAO P 0.24 M
Unit Cost: P 294,000.00/ lm
Allocation: P 11.76 M
Total: P 12 M

As Modified
UACS No. 320101100374000
Project ID: P00221396LZ
WIN8F05485
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and
Drainage Systems
Construction/Sealing of South Pinagkabalian River from Brgy. Muzon to Brgy. Dampalit, (Sta. 1+443 to Sta. 1+483) and (Sta. 0+253 to Sta. 0+267), Malabon City
Physical Target: CW1 – Construction of Revetment: 54.0 lm
EAO P 0.24 M
Unit Cost: P 211,772.22/ lm
Estimated Cost: P 11.43 M
Excess: P 0.327 M
Total: P 12 M
May 16, 2018 GAA FY 2018 WIN8G02239 UACS No. 300104200277000 January 1, 2018 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300104200277000
Project ID: P00249596LZ
WIN8G02239
Local Program
Local – Local Buildings and Other Structures – Multipurpose/ Facilities – Local Infrastructure Program
Repair/ Rehab of Multipurpose Building, Inner Wheel, Payatas A, Brgy. Payatas, Quezon City
Physical Target: CW1-Rehabilitation/ Major of Multi-Purpose Building – 1.0
Unit Cost (P’000): P1,980.00/ Bldg.
Allocation: P 1,980,000.00 M
EAO P 20,000.00
Total: P 2,000,000.00 M

As Modified
UACS No. 300104200277000
Project ID: P00249596LZ
WIN8G02239
Local Program
Local – Local Buildings and Other Structures – Multipurpose/ Facilities – Local Infrastructure Program
Repair/ Rehab of Multipurpose Building, Inner Wheel, Brgy. Holy Spirit, Quezon City
Physical Target: CW1-Rehabilitation/ Major of Multi-Purpose Building – 1.0
Unit Cost (P’000): P1,980.00/ Bldg.
Allocation: P 1,980,000.00 M
EAO P 20,000.00
Total: P 2,000,000.00 M
May 16, 2018 GAA FY 2018 WIN8F05483 UACS No. 300103200085000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200085000
Project ID: P00240455LZ
WIN8F05483
Local Program
Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Multi – Purpose Building at Barangay.Sta. Tañong, Marikina City
Physical Target: CW1-Construction of Multi-Purpose Building – 1 Building
Unit Cost (P’000): P17,640.00/bldg..
Allocation: P 17,640.00 M
EAO P 360.00 M
Total: P 18,000.00 M

As Modified
UACS No. 300103200085000
Project ID: P00240455LZ
WIN8F05483
Local Program
Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Multi – Purpose Building at Barangay Tañong, Marikina City
Physical Target: CW1-Construction of Multi-Purpose Building – 1 Building
Unit Cost (P’000): P17,640.00/bldg..
Allocation: P 17,640.00 M
EAO P 360.00 M
Total: P 18,000.00 M
May 16, 2018 GAA FY 2018 WIN8F05486 UACS No. 320101100094000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100094000
Project ID: P00222865LZ
WIN8F05486
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures including Bridge and Approach at Don Galo River, Parañaque City
Physical Target: CW1 Construction of Drainage Structure along Road L=316 lineal meter
Unit Cost (P’000): P198,496.83/ l.m.
Allocation: P 62,725,000.00
EAO P 2,275,000.00
Total: P 65,000,000.00

As Modified
UACS No. 320101100094000
Project ID: P00222865LZ
WIN8F05486
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures including Bridge and Approach at Don Galo, Parañaque City
Physical Target: CW1 Construction of Drainage Structure along Road L=440 lineal meter
Unit Cost (P’000): P198,496.83/ l.m.
Allocation: P 62,725,000.00
EAO P 2,275,000.00
Total: P 65,000,000.00
May 16, 2018 GAA FY 2018 WIN8F05488 UACS No. 300116200369000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200369000
Project ID: P00240550LZ
WIN8F05488
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Road with Drainage System along Purificacion Street, Brgy. 183, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.836 Lane Km
EAO – P 0.300 M
Unit Cost (P’000): P17,583.73/ lane km
Allocation: P 14.70 M
Total: P 15 M

As Modified
UACS No. 300116200369000
Project ID: P00240550LZ
WIN8F05488
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Road with Drainage System along Purificacion Street, Brgy. 183, Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road 0.698 Lane Km
EAO – P 0.300 M
Unit Cost (P’000): P21,060.17/ lane km
Allocation: P 14.70 M
Total: P 15 M
May 16, 2018 GAA FY 2018 WIN8F05487 UACS No. 300116200317000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200317000
Project ID: P00240614LZ
WIN8F05487
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system-Balubaran Road, Brgy. Malinta (from MacArthur HW Balubaran to Zapra St., Brgy. Maysan to T. Santiago St.), Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.060 Lane Km
EAO – P 0.420 M
Unit Cost (P’000): P19,415.09/ lane km
Allocation: P 20.580 M
Total: P 21.00 M

As Modified
UACS No. 300116200317000
Project ID: P00240614LZ
WIN8F05487
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system-Balubaran Road, Brgy. Malinta (from MacArthur HW Balubaran to Zapra St., Brgy. Maysan to T. Santiago St.), Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.434 Lane Km
EAO – P 0.420 M
Unit Cost (P’000): P14,351.46/ lane km
Allocation: P 20.580 M
Total: P 21.00 M
May 16, 2018 FY 2018 GAA WIN8C02902 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Surigao-Davao Coastal Rd incl. ROW – K1823+512 – K1825+702
Physical Target:
CW1: 3,063.00 lineal meters (Construction of Drainage Structure along Road)
ROW: 6,128.00 sq. m.
Allocation:
TOTAL: P 78,065,000.00
CW1: P 71,819,725.00 (Construction of Drainage Structure along Road)
ROW: P 3,390,045.00
EAO: P 2,732,275.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Surigao-Davao Coastal Rd incl. ROW – K1823+512 – K1825+406
Physical Target:
CW1: 2,379.42 lineal meters (Construction of Drainage Structure along Road)
ROW: 6,128.00 sq. m.
Allocation:
TOTAL: P 78,065,000.00
CW1: P 71,819,725.00 (Construction of Drainage Structure along Road)
ROW: P 3,513,000.00
EAO: P 2,732,275.00
May 16, 2018 FY 2018 GAA WIN8C02886 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Sitio Pandulian, Mabantao-Florida-Suaon Road leading to Kapalong Woodland Resort, Davao del Norte
Physical Target:
CW1: 9.010 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Sitio Pandulian, Mabantao-Florida-Suaon Road leading to Kapalong Woodland Resort, Davao del Norte
Physical Target:
CW1: 9.468 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
May 16, 2018 GAA FY 2018 WIN8F05493 UACS No. 300116200367000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200367000
Project ID: P00240626LZ
WIN8F05493
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in San Simon, Brgy. Dalandanan, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.142 Lane Km
EAO – P 0.130 M
Unit Cost (P’000): P5,557.93/ lane km
Allocation: P 6.370 M
Total: P 6.50 M

As Modified
As per GAA/Original
UACS No. 300116200367000
Project ID: P00240626LZ
WIN8F05493
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in San Simon, Brgy. Dalandanan, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 0.562 Lane Km
EAO – P 0.130 M
Unit Cost (P’000): P5,557.93/ lane km
Allocation: P 6.370 M
Total: P 6.50 M
May 16, 2018 FY 2018 WIN8C02939 320101102168000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 320101102168000
Project ID: P00220994MN
OO2: Protect lives and Properties Against Major Floods
Flood Management Program Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Sto. Niño Tukuran, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 202.00 l.m
Unit Cost: P 121,287.13/l.m.
EAO: P 0.5M
Allocation: P 25.0M
May 16, 2018 GAA FY 2018 WIN8F05508 UACS No. 310111100016000 January 1, 2018 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310111100016000
Project ID: P00202757LZ
WIN8F05508
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Quirino Avenue – K0013+316 – K0013+583
Physical Target: CW1-Construction of Drainage Structure along Road = 532.00 lineal meters
EAO – P 1,000,000.00
Unit Cost (P’000): P92,105.26/ linear meter
Allocation: P 49,000,000.00
Total: P 50,000,000.00

As Modified
As per GAA/Original
UACS No. 310111100016000
Project ID: P00202757LZ
WIN8F05508
Organizational Outcome 001: Ensure and Safe and Reliable National Road System
Asset Preservation – Construction/Upgrading/Rehabilitation of Drainage along National Road –
Secondary Roads
Quirino Avenue – K0013+316 – K0013+583
Physical Target: CW1-Construction of Drainage Structure along Road = 1,142.09 lineal meters
EAO – P 1,000,000.00
Unit Cost (P’000): P42,903.80/ linear meter
Allocation: P 49,000,000.00
Total: P 50,000,000.00
May 16, 2018 FY 2018 WIN8C02706 320102100516000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 320102100516000
Project ID: P00222747MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management -
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Flood Control Structure along Sibuguey River (Phase VII), Siay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 680 lineal meters
Unit Cost: P 63,860.29/lineal meter
ROW Acquisition: 2,250 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.9 M
Allocation: P 45 M
May 16, 2018 GAA FY 2018 WIN8F05506 UACS No. 320101100613000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101100613000
Project ID: P00223289LZ
WIN8F05506
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) Estero de Binondo, Sta. 0+323.96 to Sta. 0+400.00, Sta. 0+420.00 to Sta. 0+484.81, Manila City
Physical Target: CW1 Construction of Revetment L=80.80 lm
Unit Cost (P’000): P363,861.39/ lm
Allocation: P 29,400,000.00 M
EAO P 600,000 M
Total: P 30,000,000.00

As Modified
UACS No. 320101100613000
Project ID: P00223289LZ
WIN8F05506
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) Estero de Binondo, Sta. 0+323.96 to Sta. 0+403.16, Manila City
Physical Target: CW1 Construction of Revetment L=79.20 lm
Unit Cost (P’000): P371,212.12/ lm
Allocation: P 29,400,000.00 M
EAO P 600,000 M
Total: P 30,000,000.00
May 16, 2018 FY 2018 WIN8C02940 320101102173000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 320101102173000
Project ID: P00220991MN
OO2: Protect lives and Properties Against Major Floods
Flood Management Program Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dipolog Flood Control, Tiparak, Tambulig, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 335 l.m.
Unit Cost: P 87,761.19/l.m.
EAO: P 0.60M
Allocation: P 30.0M
May 16, 2018 GAA FY 2018 WIN8F05506 UACS No. 320101100613000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101100613000
Project ID: P00223289LZ
WIN8F05506
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) Estero de Binondo, Sta. 0+323.96 to Sta. 0+400.00, Sta. 0+420.00 to Sta. 0+484.81, Manila City
Physical Target: CW1 Construction of Revetment L=80.80 lm
Unit Cost (P’000): P363,861.39/ lm
Allocation: P 29,400,000.00 M
EAO P 600,000 M
Total: P 30,000,000.00

As Modified
UACS No. 320101100613000
Project ID: P00223289LZ
WIN8F05506
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) Estero de Binondo, Sta. 0+323.96 to Sta. 0+403.16, Manila City
Physical Target: CW1 Construction of Revetment L=79.20 lm
Unit Cost (P’000): P371,212.12/ lm
Allocation: P 29,400,000.00 M
EAO P 600,000 M
Total: P 30,000,000.00
May 16, 2018 FY 2018 WIN8C02690 300116201167000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201167000
Project ID: P00240255MN

Local Program:

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Poblacion Titay Dalangin-Dalangin Muslim-Achasol-San Antonio Tugop-Banco-Boundary Kalawit (Phase III), Zamboanga Sibugay Sta. 5+372.00 - Sta. 6+557.00
Physical Target:
CW-1 - Construction of Concrete Road:
2.370 lane km.
Unit Cost: P 12,405.063/lane km.
EAO: P 0.600 M
Allocation: P 30 M
May 16, 2018 GAA FY 2018 WIN8F05504 UACS No. 310102100053000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100053000
Project ID: P00200070LZ
WIN8F05504
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
Legarda Flyover – (S02369LZ) Chainage 0 – Chainage 98, Chainage 303 – Chainage 417
Physical Target: CW1 Preventive Maintenance Asphalt Overlay L=0.42 lane km
Unit Cost (P’000): P6,723.63/ lane km
Allocation: P 2,850,820.00 M
EAO P 58,180.00 M
Total: P 2,909,000.00

As Modified
UACS No. 310102100053000
Project ID: P00200070LZ
WIN8F05504
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Road
Legarda Flyover – (S02369LZ) Chainage 44 – Chainage 302
Physical Target: CW1 Preventive Maintenance Asphalt Overlay L=0.516 lane km
Unit Cost (P’000): P5,524.84/ lane km
Allocation: P 2,850,820.00 M
EAO P 58,180.00 M
Total: P 2,909,000.00
May 16, 2018 GAA FY 2018 WIN8F05490 UACS No. 300116200393000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300116200393000
Project ID: P00240688LZ
WIN8F05490
Local Program
Local Roads and Bridges – Local Roads – Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
Rehabilitation of Road with Drainage Improvement at Zone 64, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=4.00 lane km
Unit Cost (P’000): P4,900,000/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00

As Modified
UACS No. 300116200393000
Project ID: P00240688LZ
WIN8F05490
Local Program
Local Roads and Bridges – Local Roads – Construction/ Repair/ Rehabilitation/ Improvements of Various Infrastructure including Local Projects
Rehabilitation of Road with Drainage Improvement at Zone 64, Manila City
Physical Target: CW1 Rehabilitation of Paved Road L=1.414 lane km
Unit Cost (P’000): P13,861,386.14/ lane km
Allocation: P 19,600,000.00
EAO P 400,000.00
Total: P 20,000,000.00
May 16, 2018 FY 2018 WIN8C02860 310211100034000 May 7, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No: 310211100034000
Project ID: P00201353MN
Network Development - Paving of Unpaved Roads - Secondary Roads
Sindangan - Siayan - Dumingag - Mahayag Road (Mahayag - Dumingag) K1690+250 - K1690+428.42
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.35684 lane km
Unit Cost: P 19.032M/lane km
EAO: P 0.1386M
Allocation: P 6.93M
May 16, 2018 FY 2018 WIN8C02689 320101102190000 May 3, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 320101102190000
Project ID: P00220473MN

OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control project from Veterans Village to Don Andres, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 595.84 lineal meters
Unit Cost: P 39,104.46/lineal meter
ROW Acquisition: 4,000.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.5 M
Allocation: P 25 M
May 16, 2018 FY 2018 WIN8G02178 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon District Engineering Office
OO1: Ensure Safe and Reliable National Road System –
Network Development Program - Construction of By-Pass and Diversion Roads - Castilla Bypass Road incl. ROW, Sorsogon
Physical Target - CW1- Construction of Concrete Road/ 6.08 lane-km.
ROW Acquisition/ 60,800 sq.m.
Unit Cost: CW1 - Php 14.23 M /lane-km
ROW - Php 164.47/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 16, 2018 FY 2018 WIN8G01922 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon District Engineering Office
UACS No.: 310208100029000
Project ID: P00201548LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Secondary Roads - Jct. Putiao-Pilar-Donsol Rd - K0544+(-980) - K0547+074
Physical Target - CW1-Off-carriageway Improvement: Shoulder Paving/Construction/ 12,150 sq.m.
CW2- Construction of Slope Protection Structure/ 13,831.64 sq.m.
Unit Cost: CW1 - Php 5,486.55/sq.m.
CW2 - Php 2,157.26/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
May 16, 2018 FY 2018 WIN8G02174 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon District Engineering Office
UACS No.: 310103100027000
Project ID: P00202724LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Preventive Maintenance -Tertiary Roads - Jct Donsol-Banuang-Gurang Rd - K0571+(-470) - K0571+138, K0572+170 - K0575+388
Physical Target - CW1- Preventive Maintenance of Road: Asphalt Overlay/6.776 lame-km
Unit Cost: Php 11.45M
Estimated Cost: Php 80.40M
(As Modified)


May 16, 2018 FY 2018 WIN8G01853 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon District Engineering Office
UACS No.: 31020110024500
Project ID: P00201267LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) -K0559+485 - K0559+573, K0544+786 - K0545+013, K0545+076 - K0545+267, K0564+203 - K0564+403, K0584+940 - K0585+125, K0585+157 - K0585+350, K0599+294 - K0599+751
Physical Target - CW1- Road Widening/0.09 lane-km
CW2- Off-Carriageway Improvement: Shoulder Paving/Construction/ 4,176.12 sq.m.
Unit Cost: Php113.067M/lane-km
Estimated Cost: Php 25.0M
(As Modified)
May 15, 2018 FY - 2018 WIN8F05344 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 2 km Malibago - Masilig road,
Barangay malibago, Torrijos, Marinduque

CW1: 1.759 Lanr km ( Construction of Concrete Road )
Allocation: 10,000,000 Php

TO:
Concreting of 2 lane km Malibago - Masilig road,
Barangay Malibago, Torrijos, Marinduque

CW1: 2.000 Lane km ( Construction of Concrete Road )
Allocation: 10,000,000 Php
May 15, 2018 FY - 2018 WIN8F05347 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
- Buildings and Other Structures - Multipurpose/Facilities

FROM:
Construction of barangay Health Station
( 2nd Floor of Brgy. Hall ), Barangay Masaguisi,
Santa Cruz, Marinduque

CW1: 1 Bldg. ( Construction of Multi Purpose Building )
Allocation: 2,000,000 Php

TO:
Construction of Barangay Health Stattion
( 1st Floor of Brgy. Hall ), Brgy. Masaguisi,
Santa Cruz, Marinduque

CW1: 1 Bldg ( Construction of Multi Purpose Building )
Allocation: 2,000,000 Php
May 15, 2018 FY - 2018 WIN8F05340 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
- Buildings and Other Structures - Multipurpose/Facilities

FROM:
Construction of Brgy. Mataas na Bayan Covered Court,
Mogpog, Marinduque

CW1: 1 Bldg. ( Construction of Multi Purpose Building )
Allocation: 4,000,000 Php

TO:
Construction(Completion) of Brgy. Mataas na Bayan
Covered Court, Mogpog, Marinduque

CW1: 1 Bldg ( Construction of Multi Purpose Building)
Allocation: 4,000,000
May 15, 2018 FY - 2018 WIN8F05353 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
-Buildings and Other Structures - Multipurpose/Facilities

FROM:
Construction of Multi-Purpose Building, Brgy. II,
Gasan, Marinduque

CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 2,000,000 Php

TO:
Construction/Rehabilitation of Multi-Purpose Building,
Brgy. II, Gasan, Marinduque

CW1: 1 Bldg. ( Construction of Multi Purpose Building )
Allocation: 2,000,000 Php
May 15, 2018 FY - 2018 WIN8F05386 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including local Projects
- Flood Control Structures/Facilities

FROM:
Construction of Brgy. Poctoy Flood Control,
Boac, Marinduque

CW1: 179.00 lin.m ( Construction of Revetment )
Allocation: 6,000,000 Php

TO:
Construction of Brgy. Poctoy Flood Control,
Boac, Marinduque

CW1: 110.00 lin.m ( Construction of Revetment )
Allocation: 6,000,000 Php
May 15, 2018 FY - 2018 WIN8F05371 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of Brgy. Danao - Mampaitan Road,
Mogpog, Marinduque

CW1: 1.055 Lane km ( Construction of Concrete Road )
Allocation: 6,000,000 Php

TO:
Concreting of Brgy. Danao - Mampaitan Road,
Mogpog, Marinduque

CW1: 1.404 Lane km ( Construction of Concrete Road )
Allocation: 6,000,000 Php
May 15, 2018 FY 2018 WIN8G02008 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Regional Office V
UACS No.: 310201100077000
Project ID: P00201261LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) - K0618+320 - K0619+522, K0619+742 - K0620+000, K0621+676 - K0621+987, K0622+680 - K0623+295, K0623+516 - K0624+320
Physical Target - CW1- Road Widening/ 6.382 lane-km
CW2- Construction of Drainage Structure along Road/
3,653 lm
Unit Cost: CW1 - Php 12.888M/lane-km
CW1 - Php 10,980/lm
Estimated Cost: Php 126.801M
(As Modified)

May 15, 2018 FY 2018 WIN8G02020 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310201100063000
Project ID: P00201252LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) – K0247+883 – K0250+193, K0250+719 – K0250+832, K0251+180 – K0251+800
Physical Target - CW1 – Road Widening/5.6804 lane-km
CW2 - Construction of Drainage Structure along Road/ 4,446.00 lm.
Unit Cost: CW1 – Php 16.589M/lane-km
CW2 – Php 11.36T/lm
Estimated Cost: Php 150.0M
(As Modified)
May 15, 2018 2018 310109100019000 GAA FY 2018 January 1, 2018 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Abbag-Guingin Bdry Rd - K0392 + 900 - K0393 + 255
May 15, 2018 FY 2018 WIN8G02006 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100067000
Project ID: P00201253LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) – K0335+971 – K0336+040, K0336+858 – K0337+245, K0337+255 – K0338+461, K0338+486 – K0339+092, K0339+186 – K0339+479, K0339+663 – K0339+803, K0339+817 – K0340+174, K0341+257 – K0341+445, K0342+600 – K0342+713, K0343+412 – K0343+416, K0343+493 – K0343+880, K0345+208 – K0345+500
Physical Target - CW1 – Road Widening/8.04250 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,765.00 lm.
CW3 – Construction of Slope Protection Structure/ 27,467.97 sq.m.
Unit Cost: CW1 – Php 7.998M/lane-km
CW2 – Php 10.71T/lm
CW3 - Php 1.46T/sq.m.
Estimated Cost: Php 150.0M
(As Modified)

May 15, 2018 FY 2018 WIN8G02000 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100069000
Project ID: P00201254LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) – K0371+-269 – K0371+160, K0371+167 – K0371+841, K0371+847.30 – K0373+660
Physical Target - CW1 – Road Widening/4.684 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,310.20 lm.
Unit Cost: PhpCW1 – Php 22.42M/lane-km
CW2 – Php 12.01T/lm
Estimated Cost: Php 150.0M
(As Modified)

May 15, 2018 2018 WIN8C02910 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao Oriental 2nd District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, incl. Slope Protection, Davao Oriental
Physical Target:
CW1: 8.000 Lane Km (Construction of Concrete Road)
CW2: 3,500.00 sq. m. (Construction of Slope Protection Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 46,320,000.00 (Construction of Concrete Road)
CW2: P 6,755,000.00 (Construction of Slope Protection Structure)
EAO: P 1,925,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 6.040 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Concrete Road)
EAO: P 1,925,000.00
May 15, 2018 FY 2018 GAA WIN8C02983 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program - Flood Control and Drainage
Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Construction of Drainage along Tulip Drive, Davao City
Physical Target:
CW1: 500 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Drainage Structure)
EAO: P 1,050,000.00

TO: Local Program- Flood Control and Drainage
Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Improvement/ Construction of Drainage along Tulip Drive, Davao City
Physical Target:
CW1: 1,272 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Drainage Structure)
EAO: P 1,050,000.00
May 15, 2018 FY 2018 GAA WIN8C02749 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Off-Carriageway Improvement- Secondary Roads
Tagum City Diversion Rd – K1459+605 – K1460+803.80
Physical Target:
CW1: 9,498.40 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 57,780,000.00
CW1: P 55,757,700.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 2,022,300.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Off-Carriageway Improvement- Secondary Roads
Tagum City Diversion Rd – K1459+600 – K1460+793
Physical Target:
CW1: 7,808.79 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 4,150.00 sq. m.
Allocation:
TOTAL: P 57,780,000.00
CW1: P 54,900,700.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 857,000.00
EAO: P 2,022,300.00
May 15, 2018 FY 2018 GAA WIN8C02975 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Coaco Road leading to Coaco Beach Resort, Brgy. Pampanga, Davao City
Physical Targets:
CW1: 0.240 Lane km (Construction of Concrete Road)
CW2: 0.600 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 5,110,000.00
CW1: P 2,116,800.00 (Construction of Concrete Road)
CW2: P 2,891,000.00 (Reconstruction from Paved to Concrete)
EAO: P 102,200.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Coaco Road leading to Coaco Beach Resort, Brgy. Pampanga, Davao City
Physical Targets:
CW1: 0.298 Lane km (Construction of Concrete Road)
CW2: 524 sq.m. (Additional Lane Width)
Allocation:
TOTAL: P 5,110,000.00
CW1: P 2,669,520.00 (Construction of Concrete Road)
CW2: P 2,338,280.00 (Additional Lane Width)
EAO: P 102,200.00
May 15, 2018 FY 2018 GAA WIN8C02977 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program - Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along Ecowest Drive, Davao City
Physical Targets:
CW1: 630 lineal meter (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Drainage Structure)
EAO: P 1,050,000.00

TO: Local Program - Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along Ecowest Drive, Davao City
Physical Targets:
CW1: 1,210 lineal meter (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Drainage Structure)
EAO: P 1,050,000.00
May 15, 2018 FY 2018 GAA WIN8C02976 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mamay Road Extension leading to D’Leonor Inland Resort and Adventure Park, Brgy. Cabantian, Davao City
Physical Targets:
CW1: 0.900 Lane Km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 6,750,000.00
CW1: P 6,615,000.00 (Reconstruction from Paved to Concrete)
EAO: P 135,000.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mamay Road Extension leading to D’Leonor Inland Resort and Adventure Park, Brgy. Cabantian, Davao City
Physical Targets:
CW1: 0.880 Lane Km (Additional Lane Width)
Allocation:
TOTAL: P 6,750,000.00
CW1: P 6,615,000.00 (Additional Lane Width)
EAO: P 135,000.00
May 15, 2018 FY 2018 GAA WIN8C02738 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Preventive Maintenance – Secondary Roads
Tagum City Diversion Rd – K1455+000 – K1456+076, K1456+255 – K1456+635
Physical Target:
CW1: 6.120 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 48,960,000.00
CW1: P 47,980,800.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 979,200.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation
Preventive Maintenance – Secondary Roads
Tagum City Diversion Rd – K1456+(-1095) – K1456+076, K1456+255 – K1456+400
Physical Target:
CW1: 5.264 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 48,960,000.00
CW1: P 47,980,800.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 979,200.00
May 15, 2018 FY 2018 WIN8G02181 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. San Isidro, Santa Rita, Pampanga
May 15, 2018 FY 2018 WIN8G02196 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads - Sta. Ignacia - Guimba Road via Gerona Pura (Sta. Ignacia Section) incl. Slope Protection, Tarlac
May 15, 2018 FY 2018 WIN8G02201 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads - Romulo Highway to MNR via Fairlane Bypass/ Diversion Road, incl. Drainage, Tarlac

May 15, 2018 WIN8G02198 WIN8G02198 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads - Sta. Ignacia-Guimba Road via Gerona Pura (Gerona Section 2), Tarlac
May 15, 2018 FY 2018 WIN8G02200 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads - MNR to Tarlac - San Miguel via Macabulos Road, incl. Drainage, Tarlac

May 15, 2018 FY 2018 GAA WIN8C02716 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Norte District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Road Widening – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd incl. ROW –
K1488+382 – K1490+190, K1491+966 – K1492+418
Physical Target:
CW1: 4.520 Lane Km (Road Widening)
ROW: 3,299.60 sq. m.
Allocation:
TOTAL: P 90,740,000.00
CW1: P 77,293,605.00 (Road Widening)
ROW: P 10,270,495.00
EAO: P 3,175,900.00

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Road Widening – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd incl. ROW –
K1489+039.15 – K1490+155, K1491+966 – K1492+418
Physical Target:
CW1: 3.136 Lane Km (Road Widening)
CW2: 3,136.00 Lineal Meters (Construction of Drainage Structure along Road)
ROW: 3,299.60 sq. m.
Allocation:
TOTAL: P 90,740,000.00
CW1: P 29,152,510.00 (Road Widening)
CW2: P 47,768,560.00 (Construction of Drainage Structure along Road)
ROW: P 10,643,000.00
EAO: P 3,175,900.00
May 15, 2018 FY 2018 WIN8G02023 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100073000
Project ID: P00201256LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) – K0426+722 – K0428+361.50, K0428+383.47 – K0429+581, K0430+182.30 – K0431+150
Physical Target - CW1 – Road Widening/ 7.629 lane-km
Unit Cost: CW1 – Php 17.360M /lane-km
Estimated Cost: Php 137.244M
(As Modified)

May 15, 2018 FY 2018 WIN8G02195 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads - Paniqui-Camiling-Wawa Road to Sta. Ignacia-Guimba Road via Gerona and Pura incl. Bridge, Tarlac
May 15, 2018 FY 2018 WIN8G02005 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100074000
Project ID: P00201257LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads - Daang Maharlika (LZ) – K0437+258 - K0441+290
Physical Target - Road Widening/ 7.47 lane-km
Unit Cost: Php 16.148M /lane-km
Estimated Cost: Php 125.0M
(As Modified)
May 15, 2018 FY 2018 WIN8G02193 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Network Development Program – Road Widening – Tarlac – San Miguel via Macabulos Rd – K0122 + 400 – K0124 + 750
May 15, 2018 FY 2018 WIN8G02007 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100194000
Project ID: P00201262LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads – Rolando A Andaya Highway – K0283+183 – K0285+888, K0285+916 – K0286+760
Physical Target - CW1 – Road Widening/ 7.117 lane-km
Unit Cost: CW1 – Php 20.338M /lane-km
Estimated Cost: Php 150.0M
(As Modified)
May 15, 2018 FY 2018 WIN8G02007 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100194000
Project ID: P00201262LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads – Rolando A Andaya Highway – K0283+183 – K0285+888, K0285+916 – K0286+760
Physical Target - CW1 – Road Widening/ 7.117 lane-km
Unit Cost: CW1 – Php 20.338M /lane-km
Estimated Cost: Php 150.0M
(As Modified)
May 15, 2018 FY 2018 WIN8G02007 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100194000
Project ID: P00201262LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads – Rolando A Andaya Highway – K0283+183 – K0285+888, K0285+916 – K0286+760
Physical Target - CW1 – Road Widening/ 7.117 lane-km
Unit Cost: CW1 – Php 20.338M /lane-km
Estimated Cost: Php 150.0M
(As Modified)
May 15, 2018 FY 2018 WIN8G02028 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300201100196000
Project ID: P00201264LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Primary Roads – Rolando A Andaya Highway – K0294+477 – K0295+980
Physical Target - CW1 – Road Widening/ 3.018 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,312 lm.
Unit Cost: CW1 – Php 14.693M /lane-km
CW2 – Php 12.00T/lm
Estimated Cost: Php 74.701M
(As Modified)

May 15, 2018 FY 2018 WIN8G01991 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads – Sn Fernando North Rd – K0001+950 – K0002+070, K0006+338 – K0006+520, K0006+985 – K0007+101, K0007+104 – K0007+141, K0008+389 – K0008+565, K0008+860 – K0009+200, K0009+315 – K0009+415, K0015+106 – K0015+414, K0015+516 – K0015+695, K0016+089 – K0016+348, K0016+454 – K0016+952, K0018+224 – K0018+506, K0021+022 – K0021+084, K0023+130 – K0023+268, K0024+146 – K0024+383, K0025+000 – K0025+708, K0021+250 – K0021+421, K0021+426 – K0021+947
Physical Target - CW1 - Construction of Drainage Structure along Road/ 5,061 lm.
Unit Cost: Php 13,306.17/lm.
Estimated Cost: Php 68.785M
(As Modified)

Pages