Drainage Pipe to Be Installed Along Elliptical Road on September 20-25
Reinforced concrete pipes with 36 inches diameter will be installed at night time on September 20, 2016 across the five (5) inner lanes of Elliptical Road in line with the drainage improvement works of the Department of Public Works and Highways (DPWH) at this major road in Quezon City.