April 18, 2018 |
FY - 2018 |
WIN8F05320 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridge
FROM:
Bono - Bono Br. ( B00125PW ) along
Puerto Princesa South Rd
CW1: 352.694 sq.m ( Widening of Bridge )
Allocation: 36,970,000 Php
TO:
Boo - Bono Br. ( B00125PW ) along
Puerto Princesa South Rd
CW1: 298.72 sq.m ( Widening of Bridge )
Allocation: 36,970,000 Php |
April 18, 2018 |
FY - 2018 |
WIN8F05288 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Secondary Roads
FROM:
Aramaywan - Berong - Pto Princesa Rd
K0202+521 - K0205+825
CW1: 6.608 lane km ( Paving of Unpaved Road )
Allocation: 98,128,800 Php
TO:
Aramaywan - Berong - Pto Princesa Rd
K0202+521 - K0205+825
CW1: 6.68 lane km ( Paving of Unpaved Road )
Allocation: 98,128,800 Php |
April 18, 2018 |
GAA FY 2018 |
WIN8F05364 |
UACS No. 310104100007000 |
January 1, 2018 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310104100007000
Project ID: P00200379LZ
WIN8F05364
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
C-5 Road – K0020 + -374 – K0020 + -195, K0019 + -118 – K0019 + 103, K0018 + 613 – K0018 + 120, K0017 + -393 – K0017+ -262
Physical Target: CW1-Reconstruction from Paved to Concrete 4.096 lane km
Unit Cost (P’000): P28,531.34/ lane km
Allocation: P 116.864 M
EAO P 4.239 M
Total: P 121.103 M
As Modified
UACS No. 310104100007000
Project ID: P00200379LZ
WIN8F05364
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
C-5 Road – K0020 + -374 – K0020 + -195, K0019 + -118 – K0019 + 103, K0018 + 613 – K0018 + 120, K0017 + -393 – K0017+ -262, K0018 + 080 – K0019 + 060, K0019 + 280 – K0019 + 570
Physical Target: CW1-Reconstruction from Paved to Concrete 6.882 lane km
Unit Cost (P’000): P16,981.17/ lane km
Allocation: P 116.864 M
EAO P 4.239 M
Total: P 121.103 M
|
April 18, 2018 |
FY 2018 |
WIN8G02074 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Improvement / Rehabilitation of Flood Control Structures along Pentor - Balsik River (Torres Section), Sta. 3+735 to Sta. 3+943 and Sta. 3+998 to Sta. 4+078.20, Dinalupihan, Bataan |
April 18, 2018 |
FY 2018 |
WIN8G02075 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Network Development Program – Road Widening – Primary Roads – Jose Abad Santos Avenue (JASA), K0105 + 874 – K0106 + 335, K0109 + 640 – K0109 + 831.60, K0112 + 412.25 – K0112 + 658, K0113 + 268 – K0113 + 460, K0113 + 995 – K0114 + 471, K0114 + 714.50 – K0114 + 854.85, K0115 + 022.50 – K0115 + 207, K0115 + 316.60 – K0115 + 620 |
April 18, 2018 |
2018 |
WIN8F05122 |
R.A. 10964 |
December 19, 2017 |
Region VII |
Regional Office VII |
Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads Tertiary Roads Guihulngan-Baloc-Isabela Rd, K0124 + 987.7 - K0125 + 589, K0126 + 433 - K0126 + 640, K0128 + 000- K0129 + 000 |
April 18, 2018 |
FY - 2018 |
WIN8F05321 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Paratungon Road leading to Sir Brooke's and Tanaki
Beach Resorts, Pangobilian, Brooke's Point, Palawan
CW1: 2.34 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
TO:
Paratungon Road leading to Sir Brooke's and Tanaki
Beach Resorts, Pangobilian, Brooke's Point, Palawan
CW1: 3.14 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php |
April 18, 2018 |
FY - 2018 |
WIN8F05269 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa South Road
K0166+333 - K0166+363,
K0135+072.50 - K0135+230,
K0185+694.40 - K0186+000,
K0188+276 - K0189+897
CW1: 4.246 lane km (Reconstruction from paved to Concrete)
Allocation: 62,323,000
TO:
Puerto Princesa South Road
K0166+333 - K0166+363,
K0135+072.50 - K0135+230,
K0185+694.40 - K0186+100,
K0188+276 - K0189+897,
K0154+390 - K0154+540
CW1: 4.570 lane km (Reconstruction from Paved to Concrete)
Allocation: 62,323,000 Php |
April 18, 2018 |
FY - 2018 |
WIN8F05299 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Local Program
Local Infrastructure Program - Buildings and Other Structures
- School Buildings
FROM:
Construction of Teresa Elementary School,
Brgy. Poblacion, Narra, Palawan
CW1: Construction of 1-storey Classroom : 1 - Classroom
Allocation: 1,000,000 Php
TO:
Construction of Teresa Elementary School,
Brgy. Teresa, Narra, Palawan
CW1: Construction of 1-storey Classroom: 1 - Classroom
Allocation: 1,000,000 Php |
April 18, 2018 |
FY - 2018 |
WIN8F05291 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
Mainit Falls Road leading to Sabsaban Falls,
Brgy. Aribungos, Brooke's Point, Palawan
CW1: 2.0 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php
TO;
Mainit Falls Road leading to Sabsaban Falls,
Brgy. Aribungos, Brooke's Point, Palawan
CW1: 3.6 lane km ( Construction of Concrete Road )
Allocation: 35,000,000 Php |
April 18, 2018 |
FY - 2018 |
WIN8F05280 |
FY _ 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 2nd District Engineering Office |
Local Program
Local Infrastructure - Local Roads and Bridges - Roads
FROM:
Construction of DPWH Access Road,
Central, Narra, Palawan
CW1: 1.60 lane km ( Construction of Gravel Road )
Allocation: 5,000,000 Php
TO:
Construction of DPWH Access Road,
Central, Narra, Palawan
CW1: 0.2886 lane km ( Construction of Concrete Road )
Allocation: 5,000,000 Php
|
April 17, 2018 |
FY - 2018 |
WIN8F05095 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Bridge Program - Construction of New Permanent Bridges
FROM:
Sigman Br. along Mindoro West Coastal Rd
CW1: 170.10 sq.m. ( Construction of Concrete Bridge )
Allocation : 22,000,000 Php
TO:
Sigman Br. along Mindoro West Coastal Rd
CW1: 236.25 sq.m ( Construction of Concrete Bridge )
Allocation : 22,000,000 Php |
April 17, 2018 |
FY - 2018 |
WIN8F05084 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Tertiary Roads
FROM:
Jct. Lubang - Binakas - Barac Rd
K0006+727 - K0008+972
CW1: 4,840 sq.m. ( Off-Carriageway Improvement )
Allocation : 35,514,000 Php
TO:
Jct. lubang - Binakas - Barac Rd
K0006+727 - K0008+717
CW1: 8,100 sq.m ( Off-Carriageway Improvement )
Allocation : 35,514,000 Php |
April 17, 2018 |
FY 2018 |
WIN8G01972 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads - Baler - Casiguran Rd (Dinadiawan - Casiguran Sect), K0298 + 893 - K0298 + 992.50 |
April 17, 2018 |
Fy - 2018 |
WIN8F05106 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Alag River Flood Control Structures
( Phase - 3 ), Sablayan, Occidental Mindoro
CW1: 763 l.m ( Construction of Flood Mitigation Structure )
Allocation : 100,000,000 Php
TO:
Construction of Alag River Flood Control Structures
( Phase - 3 ), Sablayan, Occidental Mindoro
CW1: 565.60 l.m ( Construction of Flood Mitigation Structure )
Allocation : 100,000,000 Php |
April 17, 2018 |
2018 |
300117200663000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Road (Catwalk), Bambang Central School, Bambang, Nueva Vizcaya |
April 17, 2018 |
FY 2018 |
WIN8G02056 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Manggitahan, Dilasag, Aurora |
April 17, 2018 |
2018 |
310107100026000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0286+150 - K0286 + 200, K0295+050 - K0295+200, K0295+930 - K0295+980, K0298+030 - K0298+145 |
April 17, 2018 |
FY 2018 |
WIN8G02055 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Baler - Cemento via Dicaloyungan, K0235 + 440 - K0235 + 536.56, K0236 + 010 - K0236 + 055, K0237 + 000 - K0237 + 050, K0237 + 200 - K0237 + 340, K0239 + 970 - K0240 + 056 |
April 17, 2018 |
FY 2018 |
WIN8G02055 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Baler - Cemento via Dicaloyungan, K0235 + 440 - K0235 + 536.56, K0236 + 010 - K0236 + 055, K0237 + 000 - K0237 + 050, K0237 + 200 - K0237 + 340, K0239 + 970 - K0240 + 056 |
April 17, 2018 |
FY 2018 |
WIN8G01998 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Zarah to Suklayin Road, San Luis and Baler, Aurora |
April 17, 2018 |
FY 2018 |
WIN8G01998 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Zarah to Suklayin Road, San Luis and Baler, Aurora |
April 17, 2018 |
2018 |
320101101032000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO2: Protect Lives and Properties against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
- Construction of Spillway and Drainage Canal, Brgy. Balete, Diadi, Nueva Vizcaya |
April 17, 2018 |
FY 2018 |
WIN8G02050 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of So. Bugallan Road, Brgy. Dimabuno, Dipaculao, Aurora |
April 17, 2018 |
FY 2018 |
WIN8G02050 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of So. Bugallan Road, Brgy. Dimabuno, Dipaculao, Aurora |
April 17, 2018 |
2018 |
300117200661000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road, District IV, Bayombong, Nueva Vizcaya |
April 17, 2018 |
FY - 2018 |
WIN8C02175 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Bulalacao - San Jose - Jct. Mapaya Road, incl Bridge,
Mindoro Occidental
CW1: 5.800 lane km ( Construction Of Concrete Road )
Allocation: 100,000,000 Php
TO:
Bulalacao - San Jose - Jct. Mapaya Road,
Mindoro Occidental
CW1: 3.146 lane km ( Construction of Concrete Road )
Allocation: 100,000,000 Php |
April 17, 2018 |
FY 2018 |
WIN8G02032 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads - Dinadiawan - Madella Rd, K0297 + 750 - K0297 + 803.40, K0297 + 750 - K0297 + 815.90, K0297 + 833.50 - K0297 + 882.40, K0297 + 923 - K0297 + 941, K0298 + 331.60 - K0298 + 488, K0298 + 336.20 - K0298 + 394.50, K0298 + 407 - K0298 + 446, K0298 + 455 - K0298 + 488 |
April 17, 2018 |
FY 2018 |
WIN8G02029 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads - Nueva Ecija - Aurora Rd, K0208 + 665 - K0211 + 757, K0216 + 327 - K0217 + 757, K0218 + 000 - K0219 + 010, K0224 + 000 - K0226 + 000 |
April 17, 2018 |
FY 2018 |
WIN8G01987 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Debucao - San Leonardo - Sta. Lucia Road, Ma. Aurora, Aurora |
April 17, 2018 |
FY - 2018 |
WIN8C02173 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Access Roads leading to Cabra Island, Cabra Lighthouse and White Sand Beach, Lubang, Occidental Mindoro
CW1: 5.070 lane km ( Construction of Concrete Road )
Allocation: 50,700,000 Php
TO:
Access Roads leading to Cabra Island, Cabra Lighthouse
and White Sand Beach, Lubang, Occidental Mindoro |
April 17, 2018 |
FY 2018 |
WIN8G01985 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslides – Tertiary Roads - A. Castaneda - Ma. Aurora - San Luis Road, K0197+860 – K0197+940, K0199+140 – K0199+240, K0199+305 – K0199+360, K0199+780 – K0199+810, K0200+240 – K0200+320, K0200+332 – K0200+360, K0200+860 – K0200+940, K0202+095 – K0202+120, K0202+660 – K0202+740, K0202+800 – K0202+940, K0204+260 – K0204+300, K0206+740 - K0206+775, K0206+785 – K0206+965, K0208+000 – K0208+060, K0208+170 – K0208+400, K0208+633 – K0208+680, K0208+720 – K0208+800, K0208+966 – K0209+260, K0209+400 – K0209+640, K0209+830 – K0209+960, K0213+505 – K0213+547, K0214+960 – K0215+000 |
April 17, 2018 |
FY - 2018 |
WIN8C02180 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM:
Jct MWCR ( Labangan ) - Murtha - Jct. Iriron Rd
K0234+( - 931 ) - K0236+088
CW1: 6.000 lane km ( Road Widening )
Allocation: 90,000,000 Php
TO:
Jct MWCR ( Labangan ) - Murtha - Jct Iriron Rd
K0234+( - 931 ) - K0235+000,
K0242+911 - K0244+000
CW1: 6.000 lane km ( Road Widening )
Allocation: 90,000,000 Php |
April 17, 2018 |
FY 2018 |
WIN8G01986 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads - Nueva Ecija - Aurora Road, K0182+000 – K0183+486, K0183+505 – K0183+815, K0183+839 – K0188+998, K0189+220 – K0191+376, K0191+386 – K0193+000, K0193+000 – K0194+051, K0194+141 – K0196+109, K0196+376 – K0196+980 |
April 17, 2018 |
FY 2018 |
WIN8G01989 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Bianoan, Casiguran, Aurora |
April 17, 2018 |
FY 2018 |
WIN8G01979 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads, Concreting of Road, Brgy. Lawang, Dilasag, Aurora |
April 17, 2018 |
FY 2018 |
WIN8G01977 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Asphalt Overlay – Secondary Roads - Dingalan - Gabaldon Road, K0180 + 000 – K0181 + 468
|
April 17, 2018 |
FY 2018 |
WIN8G01976 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads, Concreting of Culat – Cozo - San Ildefonso Road, Casiguran, Aurora |
April 17, 2018 |
FY 2018 |
WIN8G01981 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads, Baler - Cemento via Dicaloyunan, K0233 + 000 – K0234 + 323, K0235 + 000 – K0236 + 481, K0237 + 000 – K0237 + 927, K0237 + 958.10 – K0238 + 395, K0238 + 486 – K0238 + 520 |
April 17, 2018 |
FY 2018 |
WIN8G01980 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Asphalt Overlay - Secondary Roads - Dingalan - Gabaldon Road, K0175+870 – K0177+892 |
April 17, 2018 |
2018 |
300203100238000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Roads Leading Declared Tourism Destinations - Access Road leading to Abuan River- Base Eco- Tourism, Sindon Bayabo, Ilagan City, Isabela |
April 17, 2018 |
2018 |
310103100088000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Asset Preservation Program – Preventive Maintenance - Tertiary Roads - Calamagui – Ilagan Rd. K0399+479 – K0399+600, K0399+600 – K0399+637.14, K0399+637.14 – K0399+781, K0400+573 – K0402+000 |
April 17, 2018 |
FY - 2018 |
WIN8C02179 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM:
Jct MWCR ( Labangan ) - Murtha - Jct Iriron rd
K0236+088 - K0238+113
CW1: 4.000 lane km ( Road Widening )
Allocation: 60,000,000 Php
TO:
Jct. MWCR ( Labangan ) - Murtha - Jct Iriron Rd
K0240+893 - K0242+911
CW1: 4.000 ( Road Widening )
Allocation: 60,000,000 Php |
April 17, 2018 |
FY - 2018 |
WIN8C02174 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads
Mindoro West Coastal Rd
K0335+500 - K0337+200,
K0348+250 - K0349+000,
K0396+000 - K0397+635
CW1: 4,956.00 l.m ( Construction of Drainage Structure along Road)
Allocation: 52,162,000 Php
TO:
Mindoro West Coastal Rd
K0335+500 - K0337+200,
K0348+250 - K0349+000,
K0396+000 - K0397+635
CW1: 4,222.00 l.m ( Construction of Drainage Structure along Road )
Allocation: 52,162,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05140 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
FROM:
Construction of Mompong River Flood Control Structures,
So. Pandaitan Section, Sablayan, Occidental Mindoro
CW1: 1,173 l.m ( Construction of Flood Mitigation Structure )
Allocation: 100,000,000 Php
TO:
Construction of Mompong River Flood Control Structures,
So. Pandaitan Section, Sablayan, Occidental Mindoro
CW1: 630 l.m ( Construction of Flood Mitigation Structure)
Allocation: 100,000,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05139 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structures,
Patrick River ( Victoria Section ), Sablayan,
Occidental Mindoro
CW1: 995 l.m ( Construction of Flood Mitigation Structure )
Allocation: 100,000,000 Php
TO:
Construction of Flood Control Structure,
Patrick River ( Victoria River ), Sablayan,
Occidental Mindoro
CW1: 636 l.m ( Construction of Flood Control Structure )
Allocation: 100,000,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05110 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Anahawin River Flood Control Structures,
Phase I, Calintaan, Occidental Miindoro
CW1: 395 l.m ( Construction of Flood Mitigation Structure
Allocation: 50,000,000
TO:
Construction of Anahawin River Flood Control Structures,
Phase 1, Calintaan, Occidental Mindoro
CW1: 276 l.m ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05134 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Amaling River,
River Flood Control Structures,
Rizal, Occidental Mindoro
CW1: 1,380 l.m (Construction of Flood Mitigation Structure)
Allocation: 100,000,000 Php
TO:
Construction of Amaling River,
River Flood Control Structures,
Rizal, Occidental Mindoro
CW!: 640 l.m ( Construction of Flood Mitigation Structure )
Allocation: 100,000,000 Php |
April 16, 2018 |
FY 2018 |
WIN8C02521 |
UACS No. 310201100211000 |
April 10, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100211000
Project ID: P00200597MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads -
Sindangan-Liloy Road
K1958+474.00 - K1960+994.00,
K1961+132.00 - K1962+180.00
Physical Target:
CW-1- Widening - Primary Road: 7.14 lane km.
Unit Cost: P 13,992,834.68/lane km
Physical Target:
ROW: 4,720.53 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,675,000.00
Allocation: P 105,000,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02555 |
UACS No. 310204100146000 |
April 10, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100146000
Project ID: P00200299MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Road
Jct. National Highway Siocon - Jct. National Highway R.T. Lim (Pob. Siocon - Brgy. Tagaytay Section), Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 18.25 lane km
Unit Cost: P 15,499,104.07/lane km
Physical Target:
CW-2- ROW: 6,054.51 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 10,325,000.00
Allocation: P 295,000,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02526 |
UACS No. 310211100025000 |
April 10, 2018 |
Region IX |
Regional Office IX |
UACS No. 310211100025000
Project ID: P00200844MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Secondary Road
Zamboanga West Coastal Road (Limpapa-Sibuco Section) - (S01150MN)
Chainage 940.00 - Chainage 1183.00
Chainage 1683.00 - Chainage 2260.00
Chainage 200.00 - Chainage 4000.00
Physical Target:
CW-1- Paving of Unpaved Roads: 9.24 lane km
Unit Cost: P 26,008,183.21
Physical Target:
CW-2- ROW: 3,114.62 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 8,750,000.00
Allocation: P 250,000,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02518 |
UACS No. 310106100207000 |
April 5, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100207000
Project ID: P00200132MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog - Polanco - Piñan - Jct. Oroquieta Rd
K1817+257 - K1818+343
K1819+000 - K1819+494
Physicat Target:
CW-1- Reconstruction from Paved to Concrete: 3.160 lane km
Unit Cost: P 9,599,968.35/lane km
EAO: P 619,100.00
Allocation: P 30,955,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02496 |
UACS No. 300117202006000 |
April 10, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117202006000
Project ID: P00255819MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Asphalt Overlay along Jct. Polo to Dapitan Park Road, Dapitan City
K1826+000 - K1826+915
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 3.660 lane km'
Unit Cost: P 5,409.84/lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
April 16, 2018 |
2018 |
WIN8C02336 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-carriageway Improvement
FROM:
Daang Maharlika (Agusan-Davao Sect) – K1306+805 – K1307+471, K1309+112 – K1310+482, K1308+496 – K1309+112
Project ID No. P00200809MN
Scope of Work: Shoulder Paving / Construction
Physical Target: 12,620 sq.m.
Allocation: Php 57,474,000.00 (Total)
Php 55,462,410.00 (Road)
Php 2,011,590.00 (EAO)
TO:
Daang Maharlika (Agusan-Davao Sect) – K1306+550 – K1307+471, K1308+496 – K1308+619, K1308+619 - K1309+112, K1309+112 - K1309+183, K1309+311 - K1310+482
Project ID No. P00200809MN
Scope of Work: Shoulder Paving / Construction
Physical Target: 12,927.5 sq.m.
Allocation: Php 57,474,000.00 (Total)
Php 55,462,410.00 (Road)
Php 2,011,590.00 (EAO) |
April 16, 2018 |
FY 2018 |
WIN8C02472 |
UACS No. 320101102185000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 320101102185000
Project ID: P00221199MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Usugan Flood Control, Brgy. Tungawan, Tambulig, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 517.00 l.m.
Unit Cost: P 86,384.06/l.m.
EAO: P 911,440.00
Allocation: P 45,572,000.00 |
April 16, 2018 |
Fy - 2018 |
WIN8F05147 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Busuanga River Flood Control Structures
( Adela Section ), Rizal, Occidental Mindoro
CW1: 446 l.m ( Construction of Flood Mitigation Structure )
Allocation: 56,550,000 Php
TO:
Construction of Busuanga River Flood Control Structures
( Adela Section ), Rizal, Occidental Mindoro
CW1: 318 l.m ( Construction of Flood Mitigation Structure )
Allocation; 56,550,000 Php |
April 16, 2018 |
FY - 2018 |
WIN8F05124 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Anahawin River Flood Control Structures,
Phase 2, Calintaan, Occidental Mindoro
CW1: 205 l.m ( Construction of Flood Mitigation Structure )
Allocation: 26,170,000 Php
TO:
Construction of Anahawin River Flood Control Structure,
Phase 2, Calintaan, Occidental Mindoro
CW1: 144 l.m (Construction of Flood Mitigation Structure )
Allocation: 26,170,000 Php
|
April 16, 2018 |
FY - 2018 |
WIN8F05107 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Junction MWCR (Labangan) - Murtha - Jct Iriron Road,
incl Bridge, Mindoro Occidental
CW1: 4.286 lane km ( Construction of Concrete Road )
CW2: 476 sq.m ( Construction of Bridge )
Allocation: 100,000,000 Php
TO:
Junction MWCR (Labangan) - Murtha - Jct. Iriron Road,
incl. Bridge, Mindoro Occidental
CW1: 4.774 lane km ( Constructin of Concrete Road )
CW2: 476 sq.m ( Construction of Bridge )
Allocation: 100,000,000 Php
|
April 16, 2018 |
FY - 2018 |
WIN8F05083 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction and Improvement of Drainage System of
Mamburao, Occidental Mindoro
CW1: 3,375 l.m (Construction of Flood Mitigation Structure)
Allocation: 25,000,000Php
TO:
Construction and Improvement of Drainage System of
Mamburao, Occidental Mindoro
CW1: 3,042 l.m (Construction of Flood Mitigation Structure)
Allocation: 25,000,000 Php
3,042 l.m |
April 16, 2018 |
Fy - 2018 |
WIN8F05141 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Occidental District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Mindoro West Coastal Rd.
K0235+000 - K0235+594,
K0237+050 - K0237+984,
K0237+1000 - K0238+065,
K0239+700 - K0239+750,
K0340+300 - K0340+469,
K0404+816 - K0405+477,
K0407+400 - K0408+543
CW1: 9.444 lane km ( Rehabilitation of Paved Road )
Allocation: 99,800,000
TO:
Mindoro West Coastal Rd.
K0235+000 - K0235+594,
K0237+050 - K0237+984,
K0237+1000 - K0238+065,
K0239+700 - K0239+750,
K0340+300 - K0340+469,
K0404+816 - K0405+377,
K0407+400 - K0408+543,
K0395+434+K0396+653
CW1: 9.444 lane km ( Rehabilitation of Paved Road )
Allocation: 99,800,000 Php |
April 16, 2018 |
FY 2018 |
WIN8C02478 |
UACS No. 300203100518000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100518000
Project ID: P00230022MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Bugwak Spring, Brgy. Lower Dimalinao, Molave, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.66 lane km
Unit Cost: P 9,210,000.00
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
April 16, 2018 |
FY 2018 |
WIN8C02475 |
UACS No. 320101102178000 |
April 2, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 320101102178000
Project ID: P00222663MN
OO2: Protect Lives and Properties Against Major Floods
Management Programs
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Lower Landing Bridge (Downstream) along Mahayag-Dumingag Road, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 204.00 l.m.
Unit Cost: P 120,098.04/l.m.
EAO: P 500,000.00
Allocation: P 25,000,000.00 |
April 16, 2018 |
2018 |
WIN8C02479 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
FROM:
Lanuza Bypass Road (SDCR Alternate Route), incl. ROW, Surigao del Sur
Project ID No. P00200448MN
Physical Target: 3.76 Lane Km (Construction of Concrete Road)
11,971.834 Square meters (ROW Acquisition)
Allocation - Php 100,000,000.00 (Total)
- Php 88,297,500 (Road)
- Php 8,202,500 (ROW Acquisition)
- Php 3,500,000 (EAO)
TO:
Lanuza Bypass Road (SDCR Alternate Route) with bridge, incl. ROW, Surigao del Sur
Project ID No. P00200448MN
Physical Target:
0.146 Lane Km (Construction of Concrete Road)
429.30 Square meters (Construction of Concrete Bridge)
3.00 Lane Km (Construction of Gravel Road)
11,971.834 Square meters (ROW Acquisition)
Allocation - Php 100,000,000.00 (Total)
- Php 12,594,914 (Concrete Road)
- Php 29,651,687 (Bridge)
- Php 46,050,899 (Gravel Road)
- Php 8,202,500 (ROW Acquisition)
- Php 3,500,000 (EAO)
|
April 16, 2018 |
2018 |
WIN8C02485 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
LOCAL PROGRAM
Various Infrastructure including Local Projects - Local Roads and Bridges - Local Roads
FROM:
Completion of Quezon-San Isidro Road with Bridge, Barangay Quezon, Tandag City, Surigao del Sur
Project ID No. P00240326MN
Physical Target: 3.480 Lane Km (Construction of Concrete Road)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000 (Road)
- Php 1,000,000 (EAO)
TO:
Completion of Quezon-San Isidro Road, Barangay Quezon, Tandag City, Surigao del Sur
Project ID No. P00240326MN
Physical Target: 4.20 Lane Km (Construction of Concrete Road)
Allocation - Php 50,000,000.00 (Total)
- Php 49,000,000 (Road)
- Php 1,000,000 (EAO)
|
April 16, 2018 |
GAA FY 2018 |
WIN8F05313 |
UACS No. 300104200139000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104200139000
Project ID: P00252116LZ
WIN8F05313
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi-Purpose Facilities
Construction of Multipurpose Building, Paso de Blas ES, Brgy. Karuhatan, Valenzuela City
Physical Target: CW1-Construction of Multi-Purpose Building 1 Building
EAO – P 0.050 M
Unit Cost (P’000): P4,950/Building
Allocation: P 4.950 M
Total: P 5.0 M
As Modified
As per GAA/Original
UACS No. 300104200139000
Project ID: P00252116LZ
WIN8F05313
Local Infrastructure Program – Building and Other Structures
Building and Other Structures – Multi-Purpose Facilities
Construction of Multipurpose Building, Paso de Blas ES, Brgy. Paso De Blas, Valenzuela City
Physical Target: CW1-Construction of Multi-Purpose Building 1 Building
EAO – P 0.050 M
Unit Cost (P’000): P4,950/Building
Allocation: P 4.950 M
Total: P 5.0 M
|
April 16, 2018 |
GAA FY 2018 |
WIN8F05302 |
UACS No. 300107200005000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300107200005000
Project ID: P00257647LZ
WIN8F05302
Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures and Facilities
Construction of a Flood Control Wall along the left bank of ShelterVille Creek,
Barangay 171, Caloocan City, Metro Manila
Physical Target: CW1-Construction of Flood Mitigation Structure 1,444 l.m.
EAO – P 1.00 M
Unit Cost (P’000): P68.56/ l.m.
Allocation: P 99.00 M
Total: P 100.00 M
As Modified
UACS No. 300107200005000
Project ID: P00257647LZ
WIN8F05302
Local Infrastructure Program
Flood Control and Drainage – Flood Control Structures and Facilities
Construction of a Flood Control Wall along the bank of ShelterVille Creek,
Barangay 171, Caloocan City, Metro Manila
Physical Target: CW1-Construction of Flood Mitigation Structure 1,444 l.m.
EAO – P 1.00 M
Unit Cost (P’000): P68.56/ l.m.
Allocation: P 99.00 M
Total: P 100.00 M
|
April 16, 2018 |
FY 2018 |
WIN8G02090 |
SR2018-01-000940 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program
Road Widening - Primary Roads
Jose Abad Santos Ave (JASA)
K0076 + (-010) - K0076 + 319, K0076 + 571.03 - K0077 + 174, K0077 + 421.40 - K0078 + 291.30, K0078 + 680 - K0079 + 630.40, K0079+789.70 - K0081+000 |
April 16, 2018 |
FY 2018 |
WIN8G02053 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads - Nueva Ecija - Aurora Rd, K0217 + 757 - K0218 + 000, K0219 + 010 - K0220 + 000, K0220 + 640 - K0224 + 000, K0226 + 000 - K0229 + 000, K0229 + 928 - K0230 + 698 |
April 16, 2018 |
FY 2018 |
WIN8G02052 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dilaguidi, Dilasag, Aurora |
April 16, 2018 |
FY 2018 |
WIN8G01944 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads - Baler - Casiguran Rd (Baler - Dinadiawan), K0251 + 000 - K0252 + 213, K0252 + 309 - K0253 + 945, K0253 + 959 - K0254 + 160, K0254 + 173.55 - K0256 + 693, K0257 + 414 - K0262 + 970, K0262 + 995 - K0264 + 508, K0264 + 669 - K0264 + 802.57, K0264 + 812.18 - K0265 + 831.18 |
April 14, 2018 |
FY 2018 |
WIN8C02500 |
UACS No. 320101102155000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102155000
Project ID: P00221249MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction/Extension of Flood Control at Saaz River (Including Right of Way Aquisition), San Ramon, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 618.50 ln.m
Unit Cost: P 31,371.82/ln.m
Physical Target:
ROW: 194.0 sq.m.
Unit Cost: P 1,013.04/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02495 |
UACS No. 320101102149000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102149000
Project ID: P00222071MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along San Roque River, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 696.70 ln.m
Unit Cost: P 20,294.76/ln.m
Physical Target:
ROW: 553 sq.m.
Unit Cost: P 1,013.82/sq.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02503 |
UACS No. 320101102145000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102145000
Project ID: P00220449MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control at Sinunuc River (Including Right of Way Aquisition), Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 599.24 ln.m
Unit Cost: P 23,815.99/ln.m
Physical Target:
ROW: 423 sq.m.
Unit Cost: P 1,013.00/sq.m.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02499 |
UACS No. 320101102152000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102152000
Project ID: P00220544MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Talisayan, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 440.00 ln.m
Unit Cost: P 43,640.72/ln.m
Physical Target:
ROW: 393 sq.m.
Unit Cost: P 1,012.93/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
April 14, 2018 |
FY 2018 |
WIN8C02498 |
UACS No. 320101102153000 |
April 10, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102153000
Project ID: P00222072MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure at Tinuba River, Sinubong, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 466.22 ln.m
Unit Cost: P 21,020.12/ln.m
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
April 13, 2018 |
FY - 2018 |
WIN8F05130 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
Mindoro Oriental/Occidental East Coastal Rd
K0188+928 - K0189+681,
K0189+781 - K0190+428,
K0190+733 - K0191+381,
K0191+613 - K0193+000,
K0193+596 - K0193+840
CW1: 10,509.00 sq.m.
Allocation: 41,164,000 Php
TO:
Mindoro Oriental/Occidental East Coastal Road
K0188+928 - K0189+677.80
K0189+781 - K0190+419,
K0190+733 - K0191+354.90,
K0191+587 - K0193+000,
K0193+596 - K0193+840
CW1: 17,263.60 sq.m. ( Off-Carriageway Improvement:
Shoulder Paving/Construction )
Allocation: 41,164,000 Php
|
April 13, 2018 |
FY - 2018 |
WIN8F05129 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary roads
FROM:
Bongabong - Sagana - Roxas - Sn Aquilino Rd
K0103+ (-781) - K0103+433
CW1: 2.428 lane km ( Rehabilitation of Paved Road )
Allocation: 29,136,000 Php
TO:
Bongabong - Sagana - Roxas - Sn Aquilino Rd
K0103+(-781) - K103+(-050)
CW1: 1.462 lane km ( Rehabilitation of Paved Road )
Allocation: 29,136,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05123 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Maragooc Seawall,
Gloria, Oriental Mindoro
CW1: 1,603.50 lineal meters ( Construction of Revetment )
Allocation: 100,000,000 Php
TO:
Construction of Maragooc Seawall,
Gloria, Oriental Mindoro
CW1: 954.00 lineal meters ( Construction of Revetment )
Allocation: 100,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05127 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of San Miguel River Control,
Roxas, Oriental Mindoro
CW1: 760 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000
TO:
Construction of San Miguel River Control,
Roxas, Oriental Mindoro
CW1: 706 lineal meters ( Construction of Flood Mitigation Structure )
Allocation: 50,000,000 Php |
April 13, 2018 |
2018 |
320101101010000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods: Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Magat River Flood Control Project (Phase I), Estrella, San Mateo, Isabela
|
April 13, 2018 |
FY - 2018 |
WIN8F05146 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
002 - Protect lives and Properties Against Major Floods
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along major River Basins and Principal Rivers
FROM:
Construction of Panluan River Control,
Bongabong, Oriental Mindoro
CW1: 400.00 lineal meters ( Construction of Revetment )
Allocation; 30,000,000 Php
TO:
Construction of Panluan River Control,
Bongabong, Oriental Mindoro
CW1: 566.00 lineal meters ( Construction of Revetment)
Allocation: 30,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05146 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/
Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Gallego Road leading to Casabangan beach and Mangal Marine Protected Area ( MMPA ), incl Bridge,
Don Pedro, Mansalay, Oriental Mindoro
CW1: 1.400 lane km ( Construction of Concrete Road )
CW2: 782.280 sq.m. ( Construction of Concrete Bridge )
Allocation: 98,100,000 Php
TO:
Gallego Road leading to Casabangan Beach and Mangal Marine Protected Area ( MMPA ), incl. Bridge,
Don Pedro, Mansalay, Oriental Mindoro
CW1: 2.5679 lane km ( Construction of Concrete Road )
CW2: 772.740 sq.m. ( Construction of Concrete Bridge )
Allocation: 98,1000,000 Php
|
April 13, 2018 |
FY - 2018 |
WIN8F05126 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ leading to Buktot Beach, Brgy. Cabalwa,
Mansalay, Oriental Mindoro
CW1: 3.280 lane km ( Construction of Concrete Road )
Allocation: 37,720,000 Php
TO:
NRJ leading to Buktot Beach, Brgy. Cabalwa,
Mansalay, Oriental Mindoro
CW1:
2.880 lane km ( Construction of Concrete Road )
Allocation: 37,720,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8F05222 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
GAA 2018 Other Infrastructure ( CSSP )
Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Bacungan - Talaudyong Road, Palawan
CW1: 12.114 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php
TO:
Bacungan - Talaudyong Road, Palawan
CW1: 5.96 lane km ( Construction of Concrete Road )
Allocation: 200,000,000 Php |
April 13, 2018 |
FY - 2018 |
WIN8C02279 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Tertiary Roads
FROM:
Palawan Circum. Rd. ( Panalingaan - tagbita - Latud )
K0272+519 - K0276+000
CW1: 7.098 lane km ( Paving of Unpaved Road )
Allocation: 125,088,000 Php
TO:
Palawan Circum. Rd. ( Panalingaan - Tagbita - Latud )
K0272+519 - K0275+844
CW1: 6.76652 lane km ( Paving of Unpaved Road )
Allocation: 125,088,000 Php |
April 13, 2018 |
Fy - 2018 |
WIN8C02280 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Mindoro Island Circumferential Road
( Puerto Galera - Abra De Ilog ), Occidental Mindoro
CW1: 4.35 lane km ( Construction of Gravel Road )
Allocation: 150,000,000
TO:
Mindoro Island Circumferential Road
( Puerto Galera - Abra De Ilog ), Occidental Mindoro
CW1: 2.247 lane km ( Construction of Concrete Road )
Allocation: 150,000,000 Php |
April 13, 2018 |
FY 2018 |
WIN8G01984 |
SR2018-01-001378 |
January 29, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
San Ildefonso - San Rafael Bypass Road, incl. ROW, Bulacan |
April 13, 2018 |
FY 2018 |
WIN8G01978 |
SR2018-01-000575 |
January 26, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads
Daang Maharlika (LZ), K0193+500 - K0193+600 |
April 13, 2018 |
FY 2018 |
WIN8G02025 |
SR2018-01-001419 |
January 29, 2018 |
Region III |
Regional Office III |
OO-1: Ensure Safe and Reliable National Road System Network Development Program
Construction of Missing Links/New Roads
Capas - Botolan Road, Zambales |
April 13, 2018 |
FY 2018 |
WIN8G01988 |
SR2018-01-000969 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Secondary Roads - Angeles - Porac - Floridablanca - Dinalupihan Rd, K0091+000 - K0096+698 |
April 13, 2018 |
FY 2018 |
WIN8G01993 |
SR2018-01-000931 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW, K0064+369 - K0065+000, K0068+584 - K0068+777, K0068+801.60 - K0069+173, K0069+210.20 - K0069+300, K0073+000 - K0073+718, K0074+388 - K0074+909, K0074+924.60 - K0075+156, K0078+000 - K0079+080, K0079+113.80 - K0079+404, K0079+440.49 - K0080+245, K0081+000 - K0082+180 |
April 13, 2018 |
2018 |
310103100086000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Gattaran-Cumao-Capissayan-Sta Margarita-Bolos Point Rd - K0572+489.70-K0572+565.10, K0574+166-K0574+223.50, K0574+166-K0574+223, K0574+232-K0574+317, K0574+286.50-K0574+348.50, K0574+353-K0574+376, K0574+362.50-K0574+376, K0574+385-K0574+452.50, K0574+461.50-K0574+480, K0574+466-K0574+524.50, K0574+484.50-K0574+594.90, K0574+537.50-K0574+594.90, K0574+671.90-K0574+808.40, K0575+090.60-K0575+125.50, K0575+090.60-K0575+140.30, K0575+320.40-K0575+431.10, K0575+553.50-K0575+589.80, K0575+911.70-K0575+979.70, K0576+000-K0576+061.50 |
April 13, 2018 |
FY 2018 |
WIN8G01974 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Tarlac City - Sn Jose via Tibag - Burgos Rd, K0128+750.08 - K0129+202.00, K0130+230.00 - K0130.290.00, K0130+635.00 - K0130+683.50, K0131+402.30 - K0131+607.00, K0134+180.00 - K0134+350.00, K0134+850.00 - K0135+160.00, K0136+896.00 - K0136+976.00, K0139+266.00 - K0139+376.00, K0139+481.00 - K0139+626.00, K0141+519.00 - K0141+593.00, K0141+612.46 - K0141+662.00 |
April 13, 2018 |
FY 2018 |
WIN8G01967 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Paniqui - Ramos Rd, K0146+(-236) - K0148+345.80, K0148+994.90 - K0149+348.70, K0149+406.50 - K0149+640.00, K0150+270 - K0150+619, K0150+632 - K0151+546 |
April 13, 2018 |
2018 |
310105100084000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - K0571+(-705)-K0571+(-111), K0571+000-K0571+016, K0571+016-K0571+040, K0571+040-K0571+113, K0571+113-K0571+147, K0571+147-K0571+208, K0571+208-K0571+245, K0571+245-K0571+341.40, K0571+377.40-K0571+507.85, K0571+508.85-K0571+522.40, K0571+565.80-K0571+626.70, K0571+795.70-K0571+848.20, K0571+848.20 - K0571+880, K0571+880-K0571+940.70, K0571+908.30-K0571+962, K0573+045.70-K0573+059.90, K0573+088-K0573+129.25, K0573+157-K0573+189.10, K0573+285.75-K0573+322.65, K0573+304.25-K0573+318.10, K0573+350.20-K0573+396.80, K0573+779-K0573+850, K0574+639-K0574+673.10, K0574+697.65-K0575+011.40, K0575+022.20-K0575+072.25, K0575+72.25-K0575+104.70, K0575+251-K0575+368.20, K0575+368.20-K0575+404.90, K0576+237.40-K0576+293.30, K0576+496.15-K0576+511.40, K0576+503.40-K0576+540.15, K0576+584.10-K0576+610.55, K0576+679.05-K0576+798.75, K0576+706.35-K0576+724.50, K0576+900.65-K0576+932.45, K0576+983.25-K0576+996.85, K0577+032.40-K0577+155.10, K0577+177.70-K0577+217.70, K0577+264.75-K0577+309.80, K0577+273.70-K0577+295.15, K0577+350.30-K0577+368.30, K0577+386.25-K0577+399.80, K0577+386.25-K0577+399.80, K0577+437.30-K0577+468.90, K0577+497.25-K0577+546.40, K0577+727.60-K0577+741.30, K0579+993-K0580+026.40 |
April 13, 2018 |
FY 2018 |
WIN8G02036 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads - Tarlac - Sta. Rosa Rd, K0137+087 - K0137+711 |
April 13, 2018 |
2018 |
310102100078000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Cagayan 1st District Engineering Office |
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Magapit - Mission Rd K0558+273 - K0558+379, K0558+406 -K0558+525, K0558+525-K0559+000, K0559+060-K0559+444, K0559+750-K0559+803 |
April 13, 2018 |
FY 2018 |
WIN8G01969 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads - Tarlac City - San Jose via Tibag - Burgos Rd - K0131+069.40 - K0132+038.00, K0132+600 - K0134+000, K0136+728.60 - K0136+983.00, K0137+963 - K0138+500, K0139+000 - K0139+216, K0140+216 - K0141+593 & K0141+612.46 - K0142+131.00 |
April 13, 2018 |
FY 2018 |
WIN8G01973 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Tarlac District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Tarlac City - Sn Jose via Tibag - Burgos Rd, K0132+600.00 - K0134+000.00, K0136+482.60 - K0136+983.00, K0137+963.00 - K0138+500.00, K0139+000.00 - K0139+216.00, K0140+216.00 - K0141+593.00, K0141+612.46 - K0142+459.00 |
April 13, 2018 |
2018 |
320102100268000 |
GAA FY2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Sta. 0+000 – Sta. 0+170.40 Dalenat, Angadanan, Isabela |