Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 5, 2018 2018 WIN8C03075 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS

FROM:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 1.25 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)

TO:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 0.9798 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
June 5, 2018 2018 WIN8C03090 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development – Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao - Agusan Sect) – K1160 + 784 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 325 - K1163 + 501


Project ID No. P00200694MN
Scope of Work: Road Widening
Physical Target: 5.306 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)

TO:

Daang Maharlika (Surigao - Agusan Sect) – K1162 + 084.72 - K1162 + 180, K1162 + 400 - K1163 + 080, K1163 + 080 - K1163 + 136.09, K1163 + 165.91 - K1163 + 200, K1163 + 200 - K1163 + 270, K1163 + 270 - K1163 + 303.09, K1163 + 332.91 - K1163 + 365, K1163 + 365 - K1163 + 497.8


Project ID No. P00200694MN
Scope of Work: Road Widening and Upgrading / Raising of Grade
Physical Target: 4.04272 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)
June 5, 2018 2018 WIN8C03092 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
LOCAL PROGRAM - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.000 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)

TO:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.0502 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)
June 4, 2018 2018 WIN8G02186 WIN8G02186 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0422+000; Physical Target:17.924 Lane Km; Allocation = Php 100,000,000

To: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0442+000; Physical Target:10.992 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02100 WIN8G02100 April 5, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation of Drainage Canal, Brgy. Poblacion, Bangued, Abra; Physical Target:128.3 meters; Allocation = Php 1,500,000

To: Rehabilitation of Drainage Canal, Brgy. Patucannay, Bangued, Abra; Physical Target:128.30 meters; Allocation = Php1,500,000
June 4, 2018 2018 WIN8G02203 WIN8G02203 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Sur Road with Selective Reblocking and Asphalt Overlay, K0387+(-957) - K0408+190; Physical Target:10.074 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Secondary Road, Abra-Ilocos Sur Road K0400+000-K0408+000; Physical Target:16.144 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02204 WIN8G02204 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Kalinga Norte Road with Selective Reblocking and Asphalt Overlay, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:16.438 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Tertiary Road, Abra-Kalinga Norte Road, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:14.68 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02138 WIN8G02138 April 23, 2018 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:ROW : 5,000 Square meters, CW1 : 1.40 Lane Km, CW2 : 6,800 Square meters, CW3 : 477 Square meters; Allocation = Php 100,000,000

To: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:CW1 : 2.40 Lane Km, CW2 : 8,800 Square meters, CW3 : 443.61 Square meters; Allocation = Php100,000,000
June 4, 2018 FY 2018 WIN8G02288 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Program – Local – Buildings and Other Structures – Multipurpose / Facilities – Construction / Improvement of Multi-Purpose Building, Atlag, Malolos City, Bulacan
June 4, 2018 FY 2018 WIN8G02295 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems Construction / Rehabilitation / Improvement of Dike / Seawall at Tibaguin, Hagonoy, Bulacan
June 4, 2018 FY 2018 GAA WIN8C03095 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.514 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Road
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.718 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00
June 1, 2018 FY - 2018 WIN8C02816 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Seaports

FROM:
Little Caramay - TDC - Pagdanan leading to proposed
port, San Vicente, Palawan

CW1: 4.832 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

TO:
Little Caramay - TDC - Pagdanan leading to Proposed
Port, San Vicente, Palawan

CW1: 2.42 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

June 1, 2018 GAA FY 2018 WIN8F05552 UACS No. 300103200108000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200108000
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Addition Hills, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M

As Modified
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
June 1, 2018 GAA FY 2018 WIN8F05536 UACS No. 320101100499000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. Don Galo, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=900 lineal meter
Unit Cost (P’000): P54.44/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00

As Modified
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. San Dionisio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=323 lineal meter
Unit Cost (P’000): P151.702/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
June 1, 2018 GAA FY 2018 WIN8F05551 UACS No. 320101100497000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymar Village, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=480 lineal meter
Unit Cost (P’000): P40.83/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymanville Village, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=440 lineal meter
Unit Cost (P’000): P44.54/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
June 1, 2018 GAA FY 2018 WIN8F05538 UACS No. 300116200365000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.158 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P9,309.55/ lane km
Allocation: P 20.090 M
Total: P 20.50 M

As Modified
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.420 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P14,147.89/ lane km
Estimated Cost: P 20.090 M
Total: P 20.5 M
June 1, 2018 GAA FY 2018 WIN8F05537 UACS No. 300116200373000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.200 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P11,581.82/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.620 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P15,728.40/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05546 UACS No. 300116200320000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.500 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P16,986.67/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.014 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P25,128.21/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05547 UACS No. 310105100020000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-510 – K0012+920
Physical Target: CW1-Rehabilitation of Paved Road L = 7.15 lane km
Unit Cost (P’000): P13,489.75/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-505 – K0013+483
Physical Target: CW1-Rehabilitation of Paved Road L = 9.03 lane km
Unit Cost (P’000): P10,681.25/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
June 1, 2018 FY - 2018 WIN8C02829 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Cnvergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
New Ibajay - Mabini - Sandoval Access Road leading to Taytay Airport

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000,000 Php

TO:
New Ibahay - Mabini - Sandoval Access Road leading to Taytay Airport , Taytay, Palawan

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000.000 Php
June 1, 2018 GAA FY 2018 WIN8F05545 UACS No. 310112100011000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
UACS No. 310112100011000
Project ID: P00200705LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-174
Physical Target: CW1-Upgrading of Drainage along Road L = 1,132 lineal meter
Unit Cost (P’000): P 9.22 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-290
Physical Target: CW1-Upgrading of Drainage along Road L = 800 lineal meter
Unit Cost (P’000): P 13.06 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
June 1, 2018 FY - 2018 WIN8C02825 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa North Rd
K0173+439 - K0173+611

CW1: 0.344 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php

TO;
Puerto Princesa North Rd
K0173+420 - K0173+580

CW1: 0.32 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
June 1, 2018 GAA FY 2018 WIN8F05540 UACS No. 310106100072000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
roject ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-001 – K0010+367
Physical Target: CW1-Rehabilitation of Paved Road L = .736 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00

As Modified
UACS No. 310106100072000
Project ID: P00200531LZ
WIN8F05540
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road – Tertiary Roads
C. Benitez St. – K0010+-856 – K0010+-371
Physical Target: CW1-Rehabilitation of Paved Road L = .970 lane km
Unit Cost (P’000): P 13,301.90 / lane km
Allocation (‘000): P 9,790.20
EAO (‘000) P 199.80
Total (‘000): P 9,990.00
June 1, 2018 GAA FY 2018 WIN8F05535 UACS No. 310112100012000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 170, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,506 lineal meter
Unit Cost (P’000): P 14.97 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00

As Modified
UACS No. 310112100012000
Project ID: P00200707LZ
WIN8F05535
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Camp Crame Rd Network – (S05562LZ) Chainage 0 – Chainage 131, (S05563LZ) Chainage 0 – Chainage 127, (S05564LZ) Chainage 0 – Chainage 393, (S05566LZ) Chainage 0 – Chainage 325
Physical Target: CW1-Upgrading of Drainage Structure along Road L = 1,125 lineal meter
Unit Cost (P’000): P 20.04 / lineal meter
Allocation (‘000): P 22,540.00
EAO (‘000) P 460.00
Total (‘000): P 23,000.00
June 1, 2018 GAA FY 2018 WIN8F05548 UACS No. 320101100392000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+798.8) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 439.0 lm
EAO P 0.5 M
Unit Cost: P 55,808.65/ lm
Allocation: P 24.5 M
Total: P 25 M

As Modified
UACS No. 320101100392000
Project ID: P00221852LZ-CW1
WIN8F05548
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Upgrading/Improvement/Construction of Riverwall (Sta. 0+359.8 – Sta. 0+542.20) along San Rafael Village (Phase II), Navotas City
Physical Target: CW1 – Construction of Flood Mitigation Structure: 182.4 lm
EAO P 0.5 M
Excess: P 0.019 M
Unit Cost: P 134,216.01/ lm
Allocation: P 24.481 M
Total: P 25 M
June 1, 2018 GAA FY 2018 WIN8F05539 UACS No. 320101100384000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+204) at B. Cruz, Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 204 lm
EAO P 0.3 M
Unit Cost: P 72,058.82/ lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100384000
Project ID: P00221627LZ
WIN8F05539
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+545.70) at B. Cruz St., Brgy. Tangos, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 545.70 lm
EAO P 0.3 M
Unit Cost: P 26,937.88/ lm
Estimated Cost: P 14.7 M
Total: P 15 M
June 1, 2018 GAA FY 2018 WIN8F05550 UACS No. 320101100385000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+180) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Unit Cost: P 66,650 / lm
Allocation: P 14.7 M
Total: P 15 M

As Modified
UACS No. 320101100385000
Project ID: P00221628LZ
WIN8F05550
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Raising and Improvement of Drainage Canal (Sta. 0+000 – Sta. 0+220.55) at Takino St., Brgy. Bangkulasi, Navotas City
Physical Target: CW1 – Upgrading of Drainage Structure: 220.55 lm
EAO P 0.3 M
Excess: P2.972 M
Unit Cost: P 53,180 / lm
Estimated Cost: P 11.728 M
Total: P 15 M
June 1, 2018 FY - 2018 WIn8C02828 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 4 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php

TO:
Rehabilitation/Improvement of Dumaran - Araceli Road,
Dumaran, Palawan

CW1: 3.62 lane km ( Rehabilitation of Concrete Road )
Allocation: 50,000,000 Php
June 1, 2018 FY - 2018 WIN8C02827 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Road Widening - Puerto Princesa North Road
incl. ROW
K0267+532 - K0267+2532

CW1: 4 lane km ( Road Widening )
ROW - ROW acquisition - 20,000 sq.m.
Allocation: 978,994,000 Php

TO:
Road Widening - Puerto Princesa North Road
including ROW
K0267+960 - K0267+2512

CW1: 3.104 lane km ( Road Widening )
ROW - ROW Acquisition - 20,000 sq.m.
Allocation: 97,994,000 Php
June 1, 2018 FY 2018 WIN8G02278 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Road Dike leading to Bancal Pugad, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02280 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Natividad, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02281 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Paving of Sta. Rita Road, Lubao, , Pampanga
June 1, 2018 FY 2018 WIN8G02282 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Dila-Dila, Zone 4, Santa Rita, Pampanga
June 1, 2018 FY 2018 WIN8G02284 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Barangay Road, Barangay San Jose Mitla – Mitla Proper, Sta. 0+118 – Sta. 0+597.40, Sta. 1+722.40 – Sta. 2+636, Sta. 3+105 – Sta. 3+642.40, Sta. 3+853.90 – Sta. 4+920, Porac, Pampanga
June 1, 2018 FY 2018 WIN8G02285 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Sta. Teresa 1, Lubao, Pampanga
June 1, 2018 GAA FY 2018 WIN8F05558 UACS No. 310102100052000 January 1, 2018 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+359.5, K0004+515.0 – K0004+682.80, K0004+987.7 – K0005+009.5, K0005+021.6 – K0005+158.0, K0006+056 – K0006+224.5, K0006+510.4 – K0006+-347.5, K0006+-377.2 – K0006+-175.90, K0006+-164.6 – K0006+056.10, K0006+070.2 – K0006+311.4
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=4.4364 lane km
Unit Cost (P’000): P6,922,558.83/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00

As Modified
As per GAA/Original
UACS No. 310102100052000
Project ID: P00202390LZ
WIN8F05558
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos Ave – K0004+-375 – K0004+275
Physical Target: CW1 Preventive Maintenance of Road: Asphalt Overlay L=1.30 lane km
Unit Cost (P’000): P23,624,030.77/ lane km
Allocation: P 30,711,240.00
EAO P 626,760.00
Total: P 31,338,000.00
June 1, 2018 GAA FY 2018 WIN8F05555 UACS No. 300116200313000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.450 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P12,000/lane km
Allocation: P 29.400 M
Total: P 30.0 M

As Modified
UACS No. 300116200313000
Project ID: P00247879LZ
WIN8F05555
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Construction/ Rehabilitation/ Improvement of Road and Drainage System along Durian Road, Brgy. 178, (Connecting to Deparo-Camarin Road), Caloocan City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.170 Lane Km
EAO (‘000) – P 0.600 M
Unit Cost (P’000): P25,128.21/lane km
Allocation: P 29.400 M
Total: P 30.0 M
June 1, 2018 GAA FY 2018 WIN8F05557 UACS No. 300118200032000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 73.20 sq.m.
EAO (‘000) – P 200.00
Unit Cost (P’000): P133.88/sq.m.
Allocation (‘000): P 9,800.00
Total: P 10,000.00 M

As Modified
UACS No. 300116200313000
UACS No. 300118200032000
Project ID: P00240561LZ
WIN8F05557
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads with Bridge Replacement, Brgy. 171, Caloocan City
Physical Target: CW1-Replacement of Bridge = 66.00 sq.m.
CW2-Rehabilitation of Concrete Road 0.338 lane km
EAO (‘000) – P 100.00
Unit Cost (P’000): P111.56/sq.m.
P7,506.92/ lane km
Allocation (‘000): P 7,363.00
P 2,537.00
Total: P 10,000.00 M
June 1, 2018 FY 2018 WIN02286 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Control and Drainage – Drainage / Protection Works – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of Drainage System (Line Canal) Brgy. Pulung Masle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02287 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Ascomo, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02289 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Concreting of Road, Brgy. Pulungmasle, Guagua, Pampanga
June 1, 2018 FY 2018 WIN8G02290 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation / Improvement of Dike with Slope Protection along Porac River, Sta. Rita, Lubao, Pampanga
June 1, 2018 FY 2018 WIN8G02296 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Repair / Rehabilitation of Access Road leading to SCTEX and Economic Zone, San Jose, Floridablanca, Pampanga
May 31, 2018 FY - 2018 WIn8C02807 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Flood

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage System

FROM:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Palawan

CW1: 650 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php

TO:
Construction of Flood Control Structure at
Tubuan Bridge, PPNR, Taytay, Palawan

CW1: 520 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
May 31, 2018 FY - 2018 WIN8C02811 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Local Roads and Bridges - Local Roads
Local Infrastructure Program

FROM:
Construction of Roads in barangay 3, Roxas, Palawan

CW1: 0.528 lane km ( Construction of Concrete Road )
Allocation: 3,000,000 Php

TO:
Construction of Roads in Barangay 3, Roxas, Palawan

CW1: 0.590 Lane Km ( Construction of Concrete Road )
Allocation: 3,000,000 Php
May 31, 2018 FY - 2018 WIN8C02826 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+181.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 6,303 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php

TO:
Coron - Busuanga Rd
K0028+624 - K0029+515.60,
K0033+200 - K0033+308.00,
K0043+889 - K0044+180.00,
K0048+505 - K0049+000.00,
K0072+167 - K0072+446.30

CW1: 9,732 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 50,291,000 Php
May 31, 2018 FY - 2018 WIN8C02815 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse and Landslide -
Tertiary Road

FROM:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,412 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 12,14,,000 Php

TO:
Coron - Busuanga Rd
K0058+537 - K0058+738

CW1: 2,424.10 sq m ( Construction of Road Slope
Protection Structure )
Allocation; 12,141,000 Php

May 31, 2018 FY 2018 WIN8G02279 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Paniqui – Camiling - Wawa Rd - K0156 + 380 - K0157 + 210.20, K0162 + 699 - K0162 + 929, K0168 + 710 - K0169 + 629.50
May 31, 2018 FY 2018 WIN8G02283 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Barangay Balibago Bypass, Barangay Balibago, Tarlac City
May 31, 2018 FY 2018 WIN8G02291 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations - Access Road leading to Tarlac Ecotourism Park, San Jose, Tarlac
May 31, 2018 FY 2018 WIN8G02292 FY 2018 GAA January 4, 2018 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads – Primary Roads - Manila North Rd - K0153 + 260 - K0153 + 963, K0155 + 507 - K0158 + 487.20
May 29, 2018 FY - 2018 WIN8C02813 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
Brgy. Port Barton - Brgy. Kemdeng - Begy.Poblacion
leading to San Vicente Airport, Palawan

CW1: 5.90 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 php

TO:
Brgy. Port Barton - Brgy. Kemdeng - Brgy. Poblacion
leading to San Vicente Airport, Palawan

CW1: 3.24 lane km ( Construction of Gravel Road )
Allocation: 90,000,000 Php
May 29, 2018 FY - 2018 WIN8C02814 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Fllod
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Balolo Bridge, CBNR< Palawan

CW1: 260 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

TO:
Construction of Flood Control Structure at
Balolo Bridge, CBNR, Coron, Palawan

CW1: 258 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WINC02817 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Batacalan bridge, CBNR, Palawan

CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Batacalan Bridge, CBNR, Coron, Palawan

CW1: 250 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 php

May 29, 2018 FY - 2018 WIN8C02810 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Palawan


CW1: 280 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Lele Bridge, CBNR, Busuanga, Palawan

CW1: 245.70 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY - 2018 WIN8C02808 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of
Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Palawan

CW1: 350 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control Structure at
Malabnao Bridge, CBNR, Busuanga, Palawan

CW1: 240 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02265 SR2018-01-002524 January 1, 2018 Region III Regional Office III
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/Destinations, Bridgy. Dinadiawan, Dipaculao, Aurora

CW-1 (Construction of Concrete Road) - 6.00 lane km
CW-2 (Construction of Road Slope Protection Structure) - 1,635 sq.m.

Allotment: PHP 137.50M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02264 SR2018-01-001414 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program\
Construction of Missing Links/New Roads

Capas-Botolan Road, incl. Slope Protection, Tarlac

CW-1 (Construction of Concrete Road including Drainage Structure) - 13.8704 lane km
CW-2 (Construction of Road Slope Protection Structure) - 9,698.90 sq.m.


Allotment: PHP 300M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02271 SR2018-01-001282 January 1, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Network Development Program
Road Widening - Tertiary Roads

NCR/Bulacan Bdry - Bigte - Ipo Dam Rd
K0033 + 384 - K0033 + 814.50,
K0034 + 238.70 - K0035 + 587,
K0035 + 683 - K0037 + 664


CW-1 (Road Widening) - 4.840 lane km
ROW (ROW Acquisition) - 5,246.00 sq.m.

Allotment: PHP 137.143M
Excess: PHP 38.761M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 29, 2018 FY 2018 GAA (RA 10964) WIN8G02266 SR2018-01-000921 January 1, 2018 Region III Regional Office III
OO-1: Ensure safe and Reliable National Road System
Network Development Program
Road Widening - Primary Roads

Daang Maharlika (LZ) incl. ROW
K0040 + 506 - K0041 + 296, K0041 + 313 - K0042 + 000,
K0042 + 218 - K0042 + 680, K0043 + 006 - K0043 + 613,
K0045 + 635 - K0046 + 450, K0046 + 466 - K0047 + 508

CW-1 (Road Widening) - 8.8040 lane km
ROW (ROW Acquisition) - 10,000 sq.m.

ALLOTMENT: PHP 164.037M
EXCESS: PHP 40.020M
May 28, 2018 FY - 2018 WIN8C02812 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to Trades, Industries, and Economic Zones

FROM:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Palawan Super Corn Development
Corporation in support of Agribusiness Industry, Cullion,
Palawan

CW1: 2.4026 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02824 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to
Trades, Industries, and Economic Zones

FROM:
Access Road leading to Seaweed Plantations in
Brgy. Danleg, Dumaran, Palawan

CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php

TO:
Access Road leading to Seaweed Plantations in
Danleg, Dumaran, Palawan

CW1: 2.894 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
May 28, 2018 FY - 2018 WIN8C02809 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Bebeladan El Nido, Palawan

CW1: 1.6 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php

TO:
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, Taytay & San Vicente, Palawan

CW1: 1.215 lane km ( Construction of Concrete Road )
Allocation: 20,000,000 Php
May 28, 2018 FY 2018 WIN8G02241 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jct. Layac – Balanga – Mariveles Port Road, K0102+(-100) – K0104+529, K0106+000 – K0107+393, K0107+500 – K0107+980, Hermosa and Orani, Bataan
May 28, 2018 FY 2018 GAA WIN8C03050 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 26.667 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00

TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Patel-Kapatagan Road Package 4, Davao del Norte
Physical Target:
CW1: 15.28874 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 400,000,000.00
CW1: P 386,000,000.00 (Construction of Gravel Road)
EAO: P 14,000,000.00
May 28, 2018 FY 2018 GAA WIN8C03057 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 8.682 Lane Km (Construction of Concrete Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 171,770,000.00 (Construction of Concrete Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 3,860,000.00
EAO: P 10,325,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Mawab-Maragusan-Caraga Road (Section 1), Package D, incl. Bridge and ROW, Compostela Valley
Physical Target:
CW1: 9.58216 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 295,000,000.00
CW1: P 280,815,000.00 (Construction of Concrete Road)
ROW: P 3,860,000.00
EAO: P 10,325,000.00
May 28, 2018 FY 2018 GAA WIN8C03051 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.036 Lane Km (Construction of Gravel Road)
CW2: 10.268 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 82,777,700.00 (Construction of Gravel Road)
CW2: P 211,774,075.00 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan), Package A, incl. ROW, Davao del Norte
Physical Target:
CW1: 4.42462 Lane Km (Reconstruction to Concrete Pavement)
CW2: 17.14992 Lane Km (Construction of Concrete Road)
ROW: 87,210.00 sq. m.
Allocation:
TOTAL: P 345,235,000.00
CW1: P 35,480,818.69 (Construction of Gravel Road)
CW2: P 259,070,956.31 (Construction of Concrete Road)
ROW: P 38,600,000.00
EAO: P 12,083,225.00
May 28, 2018 FY 2018 GAA WIN8C03056 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.910 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak Compostela Valley), Package 1, incl. ROW, Compostela Valley
Physical Target:
CW1: 15.836 Lane Km (Construction of Concrete Road)
ROW: 96,840.00 Lane Km
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800 (Construction of Concrete Road)
ROW: P 9,142,200.00
EAO: P 10,500,000.00
May 28, 2018 FY 2018 GAA WIN8C03040 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+280.50
Physical Target:
CW1: 7,463.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Daang Maharlika (MN) – K1457+128 – K1459+750
Physical Target:
CW1: 4,822.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 149,269,000.00
CW1: P 144,044,585.00 (Construction of Drainage Structure along Road)
EAO: P 5,224,415.00
May 25, 2018 FY 2018 WIN8G02261 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Brgy. Dila-Dila, Zone 6, Santa Rita, Pampanga
May 25, 2018 FY 2018 WIN8G02257 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Rehabilitation / Improvement / Upgrading of Lubao – Floridablanca road, San Pablo 2nd, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02258 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Network Development Program – Road Widening – Secondary Roads - Angeles – Porac – Floridablanca – Dinalupihan Road – K0108+1260 – K0110+300, K0110+380 – K0111+937.38, K0108+1260 – K0110+300, K0110+434 – K0111+937.
May 25, 2018 FY 2018 WIN8G02259 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Concreting of Road, Sitio Tabun, San Basilio, Santa Rita, Pampanga
May 25, 2018 f WIN8G02263 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga
May 25, 2018 FY 2018 WIN8G02260 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Infrastructure Program – Local Roads – Concreting of road, Sitio Kulitang, Barangay San Francisco, Lubao, Pampanga
May 25, 2018 FY 2018 WIN8G02243 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment Along Labangan Channel at Iba O’ Este, Calumpit, Bulacan

May 25, 2018 FY 2018 WIN8G02242 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Buildings and Other Structures - Multipurpose / Facilities - Rehabilitation of Multi-Purpose Building, North 6, Santol, Balagtas, Bulacan
May 25, 2018 FY 2018 WIN8G02244 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges - Local Roads - – Road Improvement of Local Road, Malibong Matanda, Pandi, Bulacan
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02273 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Road construction, Sitio Talatalan, Barangay San Agustin, Carranglan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02245 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – San Jose – Lupao Rd, K0164+885 – K0165+000, K0166+000 – K0166+604, K0169+343 – K0169+782, K0169+822.60 – K0170+000, K0173+716.40 – K0175+394, K0175+422 – K0175+945, K0175+945 – K0176+869
May 25, 2018 FY 2018 WIN8G02272 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges – Local Roads – Construction of Roads, San Francisco, Sto. Domingo, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02270 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program – Construction / Improvement of Access Roads leading to Declared Tourism Destinations – Access Road Leading to Ditabuyan Falls, Brgy. Cadaclan, Pantabangan, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02275 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures / Facilities – Rechanneling / Desilting of Talavera River (San Carlos Aliaga Section), San Carlos, Aliaga, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02256 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads – Jct. Pinagpanaan – Rizal – Pantabangan Rd, K0159+630 – K0159+740, K0160+099 – K0160+302.50, K0160+1087.40 – K0161+149, K0161+436 – K0161+523, K0162+310 – K0162+430, K0162+472 -K0162+683, K0163+000 – K0163+152, K0163+205 – K0163+387, K0163+478 – K0163+650, K0163+679 – K0163+780, K0163+792 – K0163+901.50, K0164+138 – K0164+293
May 25, 2018 FY 2018 WIN8G02276 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Construction / Repair/Rehabilitation / Improvement of Various Infrastructure including Local Project - Local Roads – Construction of Gen. Luna, Carranglan – Conversion, Pantabangan Road, Nueva Ecija
May 25, 2018 FY 2018 WIN8G02253 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Reinforced Concrete Slope Protection Works along Quitangil Creek, Brgy. San Ildefonso, Sitio Balibago – Sitio Balas, Magalang, Pampanga

May 25, 2018 FY 2018 WIN8G02255 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Angeles – Porac – Floridablanca – Dinalupihan Road, K0113+(-225) – K0115+810, K0117+800 – K0118+1215, Dinalupihan, Bataan
May 24, 2018 FY 2018 WIN8C02701 300117201981000 May 3, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 300117201981000
Project ID: P00251825MN

Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Malagutay, Zamboanga City
Physical Target: CW-1: Construction of Concrete Road: 0.62 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 6,274,396.74/lane km
Physical Target: CW-2: Construction of Drainage Structure: 310 Ln.m
Unit Cost: CW-2: Construction of Drainage Structure: P 3,418.95/Ln.m
EAO: P 50,000.00
Allocation: P 5,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03036 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 2.000 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00

TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Mapawa Road leading to Miyaya Falls, Brgy. Mapawa, Maragusan, Compostela Valley
Physical Target:
CW1: 4.516 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Gravel Road)
EAO: P 800,000.00
May 24, 2018 FY 2018 GAA WIN8C03058 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Anitapan-Golden Valley, Mabini, Compostela Valley
Physical Target:
CW1: 1.600 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
May 24, 2018 FY 2018 WIN8C02566 320101102146000 April 16, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No: 320101102146000
Project ID: P00222069MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ayala River, Ayala Section (both side) Zamboanga City
Physical Target:
CW-1: Construction of Flood Mitigation Structure: 640.00 ln.m.
Unit Cost: CW-1: Construction of Flood Mitigation Structure: P 28,762.72/ln.m
ROW Acquisition: 1,117 sq.m
Unit Cost: P 1,067.02/sq.m.
EAO: P 400,000
Allocation: P 20,000,000
May 24, 2018 FY 2018 GAA WIN8C03055 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00

TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Brgy. Road, Langgam-Mapaang, Maco, Compostela Valley
Physical Target:
CW1: 0.973 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,840,000.00 (Construction of Concrete Road)
EAO: P 160,000.00
May 24, 2018 FY 2018 GAA WIN8C03059 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1424+996.10 - K1434+482.90
Physical Target:
CW1: 10.600 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Montevista-Compostela-Mati Bdry Rd - K1425+002 - K1429+923
Physical target:
CW1: 9.800 lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 24, 2018 FY 2018 GAA WIN8C03031 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 1,272 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 28,651,915.00 (Construction of Revetment)
CW-2: P 5,158,085.00 (Channelization)
ROW: P 490,000.00
EAO: P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River, Pindasan, Mabini, Compostela Valley
Physical Target:
CW-1: 989.9 Lineal meters (Construction of Revetment)
CW-2: 17,341 Cubic meters (Channelization)
ROW: 2,486 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1: P 29,562,243.00 (Construction of Revetment)
CW-2: P 4,247,758.00 (Channelization)
ROW: P 490,000.00
EAO: 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03034 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00

TO:Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road and Widening, Mawab, Compostela Valley
Physical Target:
CW1: 2.180 Lane Km (Construction of Concrete Road)
Total: P 15,000,000.00
CW1: P 14,475,000.00 (Construction of Concrete Road)
EAO: P 525,000.00
May 24, 2018 FY 2018 GAA WIN8C03044 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1 - 500 Lineal meters (Construction of Revetment)
ROW - 2,857 Square meters
Allocation:
TOTAL: P 35,000,000.00
CW-1 - P 33,810,000.00 (Construction of Revetment)
ROW - P 490,000.00
EAO - P 700,000.00

TO: OO2: Protect Lives and Properties - Flood Management -
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Puroks Natural Creeks, Laak Poblacion, Laak, Compostela Valley
Physical Target:
CW-1: 1,092.3 Lineal meters (Construction of Revetment)
ROW: 2,857 Square meters
ALLOCATION:
Total: P 35,000,000.00
CW-1: P 33,810,000.00 (Construction of Revetment)
ROW: P 490,000.00
EAO: P 700,000.00
May 24, 2018 FY 2018 GAA WIN8C03042 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,703 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 41,254,043.00 (Construction of Revetment)
CW-2: P 7,255,957.00 (Channelization)
ROW: P 490,000.00
EAO: P 1,000,000.00

TO: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Maoao Creek Maindrain leading to Agusan River, Brgy. Poblacion, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,692.50 Lineal meters (Construction of Revetment)
CW-2: 6,700 Cubic meters (Channelization)
ROW: 526 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW-1: P 45,498,370.00 (Construction of Revetment)
CW-2: P 3,011,630.00 (Channelization
ROW: P 490,000.00
EAO: P 1,000,000.00
May 23, 2018 FY - 2018 WIN8F05494 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522

CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340

CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php