May 15, 2018 |
FY 2018 |
WIN8G01991 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads – Sn Fernando North Rd – K0001+950 – K0002+070, K0006+338 – K0006+520, K0006+985 – K0007+101, K0007+104 – K0007+141, K0008+389 – K0008+565, K0008+860 – K0009+200, K0009+315 – K0009+415, K0015+106 – K0015+414, K0015+516 – K0015+695, K0016+089 – K0016+348, K0016+454 – K0016+952, K0018+224 – K0018+506, K0021+022 – K0021+084, K0023+130 – K0023+268, K0024+146 – K0024+383, K0025+000 – K0025+708, K0021+250 – K0021+421, K0021+426 – K0021+947
Physical Target - CW1 - Construction of Drainage Structure along Road/ 5,061 lm.
Unit Cost: Php 13,306.17/lm.
Estimated Cost: Php 68.785M
(As Modified)
|
May 15, 2018 |
FY 2018 |
WIN8G01983 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads – Sn Pascual-Claveria Rd – K0007+000 – K0008+000, K0009+000 – K0010+314, K0013+232 – K0014+400, K0047+214 – K0048+000, K0048+238 – K0048+438, K0048+538 – K0048+601, K0048+862 – K0049+000, K0053+000 – K0053+200, K0053+474 – K0053+574, K0053+874 – K0054+000
Physical Target - CW1- Rehabilitation of Paved Road/ 9.3228 lane-km
Unit Cost: Php 17.57M/ lane-km
Estimated Cost: Php 169.73M
(As Modified)
|
May 15, 2018 |
FY 2018 GAA |
WIN8C02717 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Dagohoy-Sitio Paition Road leading to Pabahay sa Lumad, incl. Bridge, Brgy. Dagohoy, Talaingod, Davao del Norte
Physical Target:
CW1: 6.480 Lane Km (Construction of Concrete Road)
CW2: 381.600 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 57,900,000.00 (Construction of Concrete Road)
CW2: P 38,600,000.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Dagohoy-Sitio Paiton Road leading to Pabahay sa Lumad, Brgy. Dagohoy, Talaingod, Davao del Norte
Physical Target:
CW1: 7.810 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02736 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Roads leading to Tagum Energy Park, Brgy. Apokon to Hijo Resources to Lanikai Boutique Hotel and Banana Beach, Brgy. Madaum, Tagum City, Davao del Norte
Physical Target:
CW1: 6.668 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Roads leading to Tagum Energy Park, Brgy. Apokon to Hijo Resources to Lanikai Boutique Hotel and Banana Beach, Brgy. Madaum, Tagum City, Davao del Norte
Physical Target:
CW1: 7.367 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02748 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Panas, Carcor-Patrocenio to El Salvador to Nabunturan leading to Tinagong Busay Cave and View Deck and Balaan Bukid, Brgy. Carcor, New Corella, Davao del Norte
Physical Target:
CW1: 9.010 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Panas, Carcor-Patrocenio to El Salvador to Nabunturan leading to Tinagong Busay Cave and View Deck and Balaan Bukid, Brgy. Carcor, New Corella, Davao del Norte
Physical Target:
CW1: 3.560 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02751 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Purok 2 – Purok 9, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 0.220 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Rehabilitation of Concrete Road)
EAO: P 40,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Purok 2 – Purok 9, Brgy. Cabaywa, Asuncion, Davao del Norte
Physical Target:
CW1: 0.220 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Gravel Road)
EAO: P 40,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02718 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Purok 8 – Purok 5, Sto. Niño, - Purok Falcata, Brgy. Sawata, Davao del Norte
Physical Target:
CW1: 0.430 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Rehabilitation of Concrete Road)
EAO: P 100,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Purok 8 – Purok 5, Sto. Niño, - Purok Falcata, Brgy. Sawata, Davao del Norte
Physical Target:
CW1: 0.722 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02756 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Brgy. Sanangan, San Isidro – Brgy. Sta. Felomina, Asuncion, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 0.430 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Rehabilitation of Concrete Road)
EAO: P 100,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Rehabilitation of Road Brgy. Sanangan, San Isidro – Brgy. Sta. Felomina, Asuncion, Brgy. San Miguel, San Isidro, Davao del Norte
Physical Target:
CW1: 0.540 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Rehabilitation of Concrete Road)
EAO: P 100,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02728 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Park. 8, Upper La Filipia – Prk. San Isidro, Brgy. La Filipina, Tagum City, Davao del Norte
Physical Target:
CW1: 2.220 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Park. 8, Upper La Filipina – Prk. San Isidro, Brgy. La Filipina, Tagum City, Davao del Norte
Physical Target:
CW1: 1.580 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02779 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Brgy. Liboganon Road leading to Local Beach Resorts, Brgy. Liboganon, Tagum City, Davao del Norte
Physical Target:
CW1: 8.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Concrete Road)
EAO: P 2,100,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Brgy. Liboganon Road leading to Local Beach Resorts, Brgy. Liboganon, Tagum City, Davao del Norte
Physical Target:
CW1: 4.495 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Concrete Road)
EAO: P 2,100,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02729 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Tribal Village, Tibyun Cave, San Miguel Cave and Paradise Cave, New Corella, Davao del Norte
Physical Target:
CW1: 9.760 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Tribal Village, Tibyun Cave, San Miguel Cave and Paradise Cave, New Corella, Davao del Norte
Physical Target:
CW1: 6.920 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00 |
May 15, 2018 |
FY 2018 GAA |
WIN8C02982 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Matina Aplaya-Punta Dumalag Road Leading to Seagull Beach Resort-Pawikan Sanctuary and Felis Beach Resort, Brgy. Matina Aplaya, Davao City
Physical Targets:
CW1: 3.392 Lane km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 12,561,000.00
CW1: P 12,309,780.00 (Reconstruction from Paved to Concrete)
EAO: P 251,220.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Matina Aplaya-Punta Dumalag Road Leading to Seagull Beach Resort-Pawikan Sanctuary and Felis Beach Resort, Brgy. Matina Aplaya, Davao City
Physical Targets:
CW1: 0.202 Lane km (Construction of Concrete Road)
CW2: 3,037.32 sq.m. (Additional Lane Width)
Allocation:
TOTAL: P 12,561,000.00
CW1: P 1,656,470.00 (Construction of Concrete Road)
CW2: P 10,653,310.00 (Additional Lane Width)
EAO: P 251,220.00 |
May 13, 2018 |
FY 2018 |
WIN8C02663 |
300117201978000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201978000
Project ID: P00250079MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Lapakan Road, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.30 lane km.
Unit Cost: P 6,600,000.00/lane km.
EAO: P 20,000.00
Allocation: 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02723 |
300117201976000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201976000
Project ID: P00250077MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Cacao, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.16 lane km.
Unit Cost: P 12,375,000.00/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02786 |
300117201977000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201977000
Project ID: P00250078MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Culianan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.26 lane km.
Unit Cost: P 7,615,384.62/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02703 |
300117201980000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201980000
Project ID: P00250081MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Lumbangan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.18 lane km.
Unit Cost: P 8,250,000.00/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02664 |
300117201974000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201974000
Project ID: P00250063MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Zambowood, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.12 lane km.
Unit Cost: P 12,375,000.00
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02705 |
300109200212000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200212000
Project ID: P00251840MN
Local Program:
Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Rehabilitation of Drainage Facilities, Brgy. Baliwasan, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage Structure: 260.72 ln.m.
Unit Cost: P 11,391.53/lane km.
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C2684 |
300117201962000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201962000
Project ID: P00251830MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road Including Drainage Facilities Tumaga - Aurora, Tumaga, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.26 lane km.
Unit Cost: P 8,878,571.43/lane km.
EAO: P 113,000.00
Allocation: P 11,300,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02785 |
310305100429000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310305100429000
Project ID: P00201115MN
OO1: Ensure Safe and Reliable National Road System - Bridge
Widening of Permanent Bridges
San Ignacio Br. (B00555MN) along Governor Camins Rd
Physical Target:
CW-1 - Widening of Bridge: 151.11 sq.m.
Unit Cost: P 110,118.46/sq.m.
CW-2 - ROW: 900.00 sq.m.
Unit Cost: P 1,111.11/sq.m.
EAO: P 360,000.00
Allocation: P 18,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02760 |
300117201963000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201963000
Project ID: P00251829MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road Leading to San Roque National High School(Including Drainage Facilities), San Roque, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.28 lane km.
Unit Cost: P 11,601,562.50/lane km.
EAO: P 150,000.00
Allocation: P 15,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02687 |
310305100441000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310305100441000
Project ID: P00201136MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Calapan (B00489MN) along Lanao - Pagadian - Zamboanga City Rd
Physical Target:
CW-1 - Widening of Bridge: 399.20 square meters
Unit Cost: P 67,443.64/square meter
ROW Acquisition: 1,395.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.558 M
Allocation: P 27.90 M |
May 13, 2018 |
FY 2018 |
WIN8C02755 |
310305100440000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310305100440000
Project ID: P00201135MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Batu Br. (B00488MN) along Lanao-Pagadian-Zamboanga City Rd
Physical Target:
CW-1 - Widening of Bridge: 506.18 square meters
Unit Cost: P 69,642.12/square meter
ROW Acquisition: 1,826.50 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.7306 M
Allocation: P 36.53 M |
May 13, 2018 |
FY 2018 |
WIN8C02675 |
310305100442000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310305100442000
Project ID: P00201137MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Dipala Br. (B00491MN) along Lanao-Pagadian-Zamboanga City Rd
Physical Target:
CW-1 - Widening of Bridge: 399.20 square meters
Unit Cost: P 67,226.08/square meter
ROW Acquisition: 1,390.50 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.5562 M
Allocation: P 27.81 M |
May 13, 2018 |
FY 2018 |
WIN8C02678 |
310305100443000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310305100443000
Project ID: P00201138MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Lumbayao Br. (B00492MN) along Lanao-Pagadian-Zamboanga City Rd
Physical Target:
CW-1 - Widening of Bridge: 371.52 square meters
Unit Cost: P 67,273.63/square meter
ROW Acquisition: 1,295.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.518 M
Allocation: P 25.90 M |
May 13, 2018 |
FY 2018 |
WIN8C02873 |
300117201985000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201985000
Project ID: P 00250085MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Quiniput, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.22 lane km.
Unit Cost: P 9,000,000.00/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02861 |
300116201151000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116201151000
Project ID: P00258445MN
Local Program:
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of San Roque Road, San Roque, Zamboannga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.53 lane km.
Unit Cost: P 5,547,169.81/lane km.
EAO: P 60,000.00
Allocation: P 3,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02864 |
300117201969000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201969000
Project ID: P00250060MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Taguiti, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.32 lane km.
Unit Cost: P 4,640,625.00/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02874 |
300117201987000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201987000
Project ID: P 00250087MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Tigbalabag, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.18 lane km.
Unit Cost: P 8,250,000.00/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02887 |
300117201972000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201972000
Project ID: P00250062MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Tumitus, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.31 lane km.
Unit Cost: 4,790,322.58/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02865 |
300117201986000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201986000
Project ID: P00250086MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sibulao, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.28 lane km.
Unit Cost: P 5,303,571.43/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02890 |
300117201984000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201984000
Project ID: P00250084MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Panubigan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.26 lane km.
Unit Cost: P 5,711,538.46/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02962 |
300117201988000 |
May 8, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201988000
Project ID: P00251838MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting including drainage facilities, Brgy. Baluno, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.54 lane km.
Unit Cost: P 9,166,666.67/lane km.
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02942 |
300107200218000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300107200218000
Project ID: P00251831MN
Local Program:
Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Drainage Facilities at Southcom Village, Upper Calarian, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage Structure: 399.36 l.m.
Unit Cost: P 8,676.382/l.m.
EAO: P 35,000.00
Allocation: P 3,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02889 |
300109200209000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200209000
Project ID: P00250072MN
Local Program:
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Talon-Talon, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage System: 226.00 l.m.
Unit Cost: P 8,761.06/l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02888 |
300109200211000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200211000
Project ID: P00250074MN
Local Program:
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Tugbungan, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage Structure: 220.00 l.m.
Unit Cost: P 9,000.00/l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02883 |
300109200210000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200210000
Project ID: P00250073MN
Local Program:
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Tetuan, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage System: 310.00 l.m.
Unit Cost: P 9,580.65/l.m.
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02882 |
320101102150000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320101102150000
Project ID: P00221868MN
OO2: Protect Lives and Properties Against Major Floods-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Sibulao River at Sibulao Section, (Including Right of Way Acquisition), Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 915.00 l.m.
Unit Cost: P 52,732.24/l.m.
ROW: 740.00 sq.m.
Unit Cost: P 1,013.51/sq.m.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02929 |
310103100210000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310103100210000
Project ID: P00200063MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Old Rd. (Ayala - Talisayan) - K1958+136 - K1958+436
Physical Target:
CW-1 - Preventive Maintenance: 0.60 lane km.
Unit Cost: P 7,350,000.00
EAO: P 90,000.00
Allocation: P 4,500,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02872 |
310201100186000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310201100186000
Project ID: P00200595MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Road including ROW - K1935+559 - K1935+965
Physical Target:
CW-1 - Road Widening: 1.62 lane km.
Unit Cost: P 22,557,027.97/lane km.
ROW: 5,440.40 sq.m.
Unit Cost: P 11,020.91/sq.m.
EAO: P 3,500,000.00
Allocation: P 100,000,000.00 |
May 13, 2018 |
FY 2018 |
WIN8C02868 |
300109200213000 |
May 7, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200213000
Project ID: P00251839MN
Local Program:
Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Rehabilitation of Drainage Facilities, Brgy. Camino Nuevo, Zamboanga City
Physical Target:
CW-1 - Construction of Drainage Structure: 144.60 lm.
Unit Cost: P 13,692.95/ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G01879 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 310110100027000
Project ID: P00200661LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0454+674 - K0455+013
Physical Target - Construction of Drainage Structure along Road: 718.00 lm.
Unit Cost: Php24.212T/lm
Estimated Cost: Php17.739M
(As Modified) |
May 12, 2018 |
FY 2018 |
WIN8G01908 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 310207100025000
Project ID: P00202630LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Road - Daang Maharlika (LZ) - K0449+719, K0437++187, K0440+241
Physical Target - CW1 - Off-Carriageway Improvement - : Flaring of Intersections: 3.0 Number of Intersections
Unit Cost: Php 8.970M/Intersection
Estimated Cost: Php27.460M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G02009 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 310109100086000
Project ID: P00200934LZ
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Land Slide - Tertiary Roads - Hanawan-Consocep Rd - K0471+485 - K0471+532, K0471+600 - K0471+743
Physical Target - Construction of Road Slope Protection Structure/ 190.00sq.m.
Unit Cost: Php5,776.84/sq.m.
Estimated Cost: Php1.120M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G02003 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310205100009000
Project ID: p00201152LZ
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/New Roads - Bacon-Manito Road incl. Bridge, Sorsogon
Physical Target - CW1 - Construction of Concrete Road/ 5.77 lane-km
CW2 - Construction of Concret Bridge/ 601.97 sq.m.
Unit Cost: CW1: Php19.338M/lane-km
CW2: Php55.10T/sq.m.
Estimated Cost: Php 150.0M
(As Modified) |
May 12, 2018 |
FY 2018 |
WIN8G02019 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100012000
Project ID: P00230358LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zone – Balud National Road connecting Barangay Danao in support of Agribusiness, Balud, Masbate
Physical Target - Construction of Concrete Road/ 12.96128 lane-km
Unit Cost: Php14.146M/lane-km
Estimated Cost: Php190.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G02064 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
OO1: Ensure Safe and Reliable National Road System – Bridge Program – Widening of Permanent Bridges - Baraca Br. 2 (B04478LZ) along Daang Maharlika (LZ)
Physical Target - CW1 - Widening of Bridge/547.10sq.m.
Unit Cost: Php 97.012T/sq.m.
Estimated Cost: Php 55.00M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G01999 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100060000
Project ID: P00230362LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Bulan-Matnog-Sta. Magdalena-Bulusan Road (Bulan Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 - Construction of Concrete Road/3.76 lane-km
CW2 - Construction of Drainage Structure along Road/2,142.62 lm.
Unit Cost: CW1 - Php 22.81M/lane-km
CW2 - Php 14.01T/lm
Estimated Cost: Php 120.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02562 |
UACS No. 320102100505000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100505000
Project ID: P00220410MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control along Imelda-Bayog-Kumalarang - Lapuyan - Margostubig Road, Part of Sibuguey River, Brgy. Paradise, Diplahan, Zamboanga Sibugay (Sta. 00+689.50 - Sta. 00+738.70)
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 49.20 lineal meters
Unit Cost: P 125,507.72/lineal meters
EAO: P 126,020.00
Allocation: P 6,301,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02001 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
UACS No.: 310105100014000
Project ID: P00202639LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads - Catanduanes Cir Rd - K0052+416 - K0052+949, K0053+000 - K0053+350, K0054+000 - K0055+125, K0055+470 - K0056+089, K0108+421 - K0109+000, K0114+000 - K0114+151, K0118+000 - K0118+665, K0129+806 - K0130+011, K0182+400 - K0183+001, K0186+500 - K0187+000
Physical Target - CW1 - Rehabilitation of Paved Road/ 10.62 lane-km
Unit Cost: Php13.95M/lane-km
Estimated Cost: Php153.46M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G02024 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310202100035000
Project ID: P00201384LZ
OO1: Ensure Safe and Reliable National Road System – Road Widening – Secondary Roads - Catanduanes Cir Rd - K0195+854 - K0196+842, K0197+000 - K0198+000
Physical Target - CW1 - Road Widening/ 3.9982 lane-km
Unit Cost: Php 14.689M/lane-km
Estimated Cost: Php 60.859M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G01869 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100296000
Project ID: P00223246LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structures along Downstream Fabrica Bridge both side Sta. 4+190 to Sta. 4+585.55, Bulan, Sorsogon
Physical Target - CW1-Construction of Flood Mitigation Structure/ 573.03lm
Unit Cost: Php168.40T/lm.
Estimated Cost: Php100.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02551 |
UACS No. 320102100510000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100510000
Project ID: P00220495MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Balugo, Zamboanga Sibugay (Sta. 00+920 - Sta. 01+150)
Physical Target:
CW-1- Construction of Revetment: 230 lineal meters
Unit Cost: P 115,043.48/lineal meters
EAO: P 540,000.00
Allocation: P 27,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02130 |
FY 2018 GAA R.A. 10964 |
December 29, 2018 |
Region V |
Regional Office V |
UACS No.: 320101100297000
Project ID: P00223247LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structures along Downstream of Magsaysay Bridge, Sta. 9+480 to Sta. 9+950.30, Bulan, Sorsogon
Physical Target - CW1-Construction of Flood Mitigation Structure/854.92 lm.
Unit Cost: Php 112.876T/lm
Estimated Cost: Php 100.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02512 |
UACS No. 300204100203000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300204100203000
Project ID: P00230011MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Jct. Lanao - Pagadian - Zamboanga City Road to Brgy. La Dicha Road in Support of Rubber Processing, Malangas, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 0.425 Lane km
Unit Cost: P 11,529,411.76/Lane km
EAO: P 100,000.00
Allocation: P 5,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02511 |
UACS No. 310203100128000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100128000
Project ID: P00200781MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Jct. Imelda - Alicia Rd
K1752+200 - K1753+047
Physical Target:
CW-1- Road Widening : 1.694 Lane Km
Unit Cost: P 15,398,801.65/Lane km
Physical Target:
ROW: 1,260.67 Sq.m
Unit Cost: P 3,445.33/Sq.m.
EAO: P 4,343,430.00
Allocation: P 31,050,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02519 |
UACS No. 320102100506000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100506000
Project ID: P00220413MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control along Lanao-Pagadian - Zamboanga City Road, Part of Sibuguey River, (Sta. 00+142.20 - Sta. 00+408.50), (Upstream), Brgy. Balugo, Imelda, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 266.30 Lineal Meters
Unit Cost: P 110,401.80/ Lineal Meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02523 |
UACS No. 320102100508000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100508000
Project ID: P00221209MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Sta. 00+(-002) - Sta. 00+250.20, Downstream, Brgy. Pilar, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Revetment: 252.20 Lineal Meters
Unit Cost: P 116,574.15/ Lineal Meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02520 |
UACS No. 320102100509000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100509000
Project ID: P00221208MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Sta. 00+(-002) - Sta. 00+251.60, Upstream, Brgy. Pilar, Diplahan, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Revetment: 253.60 Lineal Meters
Unit Cost: P 115,930.60/ Lineal Meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02552 |
UACS No. 320102100512000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100512000
Project ID: P00221869MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Pilar, Diplahan, Sta. 00+250.20 - Sta. 00+513.10 (Downstream), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Revetment: 262.90 Lineal Meters
Unit Cost: P 111,829.59/ Lineal Meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02726 |
30010420416000 |
May 3, 2018 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 30010420416000
Project ID: P00257139MN
Buildings and Other Structures - Multipurpose Facilities - Local Infrastructure Program
Livelihood Center/Multi-purpose Building in Paglaum, Dumalinao, Zamboanga del Sur
Physical Target: Construction of Multi-Purpose Building: 1.00 No. of Bldg.
Unit Cost: P 2,475/bldg.
EAO: P 25,000
Allocation: P 2,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02667 |
310204100313000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100313000
Project ID: P00200311MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section), Package 3, incl. ROW, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 5.31 lane km.
Unit Cost:
P 26,448,256.37/lane km.
CW-2 - ROW: 134,990.86 sq.m.
Unit Cost:
P 300/sq.m.
EAO: P 6,562,500.00
Allocation: P 187,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02759 |
320102100028000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 320102100028000
Project ID: P00220451MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management -
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control at Tumaga River Basin, Tetuan - Tugbungan Section, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 1,050 ln.m.
Unit Cost:
P 141,533.33/ln.m.
EAO: P 5,390,000.00
Allocation: P 154,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02536 |
UACS No. 320102100513000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100513000
Project ID: P00220496MN
OO2: Protect Lives and Properties
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Pilar, Diplahan, Zamboanga Sibugay (Sta. 00+251.60 - Sta. 00+516.50)
Physical Target:
CW-1- Construction of Revetment: 264.90 Lineal Meters
Unit Cost: P 110,985.28/ Lineal meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02722 |
320101100111000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 320101100111000
Project ID: P00220749MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Labason River Control, Antonino-Imelda, Labason, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 718.00 lm.
Unit Cost: P 201,482.21/lm.
CW-2 - ROW: 607.58 sq.m.
Unit Cost: P 300/sq
EAO: P 5,253,500.00
Allocation: P 150,100,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02527 |
UACS No. 320102100514000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320102100514000
Project ID: P00221210MN
OO2: Protect Lives and Properties
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Sibuguey River, Bulawan, Payao, Zamboanga Sibugay
(Sta. 00+856.40 - Sta. 01+144.50)
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 288.10 Lineal Meters
Unit Cost: P 102,047.90/ Lineal meters
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02547 |
UACS No. 300202100073000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300202100073000
Project ID: P00230015MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Seaports
National Road Jct. leading to Payao Wharf, Payao, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 2.570 Lane km
Unit Cost: P 17,617,120.62/Lane km
EAO: P 924,000.00
Allocation: P 46,200,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02680 |
310201100145000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100145000
Project ID: P00200588MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd -
K1724+110.00 - K1724+310.90,
K1724+560.00 - K1726+480.00,
K1728+885.97 - K1729+367.02,
K1734+918.00 - K1736+403.50,
K1737+500.00 - K1738+454.08
Physical Target:
CW-1 - Road Widening: 9.97 lane km.
Unit Cost: P 16,925,147.80/lane km.
CW-2 - ROW: 437.59 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 6,125,000.00
Allocation: P 175,000,000.00
|
May 12, 2018 |
FY 2018 |
WIN8C02508 |
UACS No. 310203100024000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 310203100024000
Project ID: P00200775MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Diplahan Jct. - Malangas Port Rd
K1747+922 - K1749+165
Physical Target:
CW-1- Road Widening: 2.486 Lane km
Unit Cost: P 16,093,845.13/Lane km'
Physical Target:
ROW: 5,040.23 Sq. m.
Unit Cost: P 3,348.55/Sq.m.
EAO: P 2,063,250.00
Allocation: P 58,950,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02676 |
310212100037000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 310212100037000
Project ID: P00200865MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Sindangan-Bayog-Lakewood Rd - (S01061MN) -
Sta. 1946+460.00 - Sta. 1947+170.33,
Chainage 0000.00 - Chainage 2640.00
Physical Target:
CW-1 - Paving of Unpaved Roads: 6.70 lane km.
Unit Cost: P 25,090,976.09/lane km.
CW-2 - ROW: 782.37 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 6,105,750.00
Allocation: P 174,450,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02679 |
310204100305000 |
May 3, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100305000
Project ID: P00200305MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Vitali-Sibulao-Bypass Road Project (Alternate Road of N1), Package 4, Zamboanga City
Physical Target:
CW-1 - Road Widening: 3.90 lane km.
Unit Cost: P 15,496,663.79/lane km.
CW-2 - ROW: 75,176.70 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,010,000.00
Allocation: P 86,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8C02550 |
UACS No. 300203100124000 |
April 10, 2018 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300203100124000
Project ID: P00230021MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
NRJ Leading to Baluran Falls, Brgy. Lower Baluran, Imelda, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 3.600 Lane km
Unit Cost: P 16,217,361.11/ Lane km
EAO: P 2,117,500.00
Allocation: P 60,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02022 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100081000
Project ID: P00230376LZ
Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Esperanza - Placer leading to Pasiagon Beach Front, Balay na Bato and Esperanza Seaport, Masbate
Physical Target - CW1- Construction of Concrete Road/ 7.5567 lane-km
CW2- Construction of Drainage Structure along Road/ 4,114.68 lm.
Unit Cost: CW1- Php 14.129M/lane-km
CW2- Php 9.23T/lm
Estimated Cost: Php 150.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02734 |
310204100259000 |
May 3, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310204100259000
Project ID: P00200303MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Sominot - Dumingag Road, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 6.24 lane km.
Unit Cost: P 11,598,557.69/lane km.
EAO: P 2.625 M
Allocation: 75.0 M |
May 12, 2018 |
FY 2018 |
WIN8G02002 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100010000
Project ID: P00230379LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Imelda Boulevard, incl. Slope Protection, Catanduanes
Physical Target - CW1- Reconstruction from Paved to Concrete/ 1.288 lane-km
Unit Cost: Php 112.384M/lane-km
Estimated Cost: Php 150.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02662 |
300203100123000 |
May 3, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100123000
Project ID: P00230020MN
CSSP: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Balas River Cruise, Brgy. Balas, Aurora, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 6.20 lane km.
Unit Cost: P 9,027,419.35/lane km.
EAO: P 2.03M
Allocation: P 58.0 M |
May 12, 2018 |
FY 2018 GAA |
WINBC02765 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road (Section 1), Package B, incl. ROW, Compostela Valley
Physical Target:
CW1: 8.780 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 189,140,000.00
ROW: P 3,860,000.00
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road (Section 1), Package B, incl. ROW, Compostela Valley
Physical Target:
CW1: 6.5354 Lane Km (Construction of Concrete Road)
ROW: 40,816.327 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 189,140,000.00
ROW: P 3,860,000.00
EAO: P 7,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G01990 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310211100010000
Project ID: P00201639LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Paving of Unpaved Roads - Secondary - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0062+493 - K0062+854.86, K0066+880 - K0067+256, K0072+338 - K0072+624.67, K0072+788.60 - K0072+946.75, K0075+373 + K0076+520
Physical Target - CW1- Paving of Unpaved Roads/ 4.65 lane-km
Unit Cost: Php 35.211M/lane-km
Estimated Cost: Php 169.670M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02708 |
310204100219000 |
May 3, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310204100219000
Project ID: P00201349MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
NRJ Poblacion Tambulig-Tungawan-Pasingkalan Road
Physical Target:
CW-1 - Construction of Concrete Road: 2.82 lane km.
Unit Cost: P 17,356,310.00/lane km.
EAO: P 1.7752 M
Allocation: P 50.720 M |
May 12, 2018 |
FY 2018 |
WIN8G02060 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310209100015000
Project ID: P00201615LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads - Jct Donsol-Banuang Gurang Rd - K0571+(-475) - K0574+210, K0574+235 - K0577+700
Physical Target - CW1- Off-Carriageway Improvement; Shoulder Paving/Construction/ 15,989.58 sq.m.
CW2- Construction of Drainage Structure along Road/ 4,754.68 lm.
CW3- Construction of Slope Protection Structure/ 15,319.83 sq.m.
Unit Cost: CW1- Php 3,414.78/sq,m.
CW2- Php 6,409.97/lm
CW3- Php 2,399.99/sq.m.
Estimated Cost: Php 126.265M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8G02021 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310209100016000
Project ID: P00201616LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads - Jct Putiao-Pilar-Donsol Rd – K0561+(-1073) – K0564+006, K0564+042.50 – K0565+500
Physical Target - CW1- Off-Carriageway Improvement; Shoulder Paving/Construction/ 21,633.00 sq.m.
CW2- Construction of Drainage Structure along Road/ 5,491.00 lm.
CW3- Construction of Slope Protection Structure/ 10,120.39sq.m.
Unit Cost: CW1- Php 3,015.19/sq,m.
CW2- Php 8,456.76/lm
CW3- Php 3,269.28/sq.m.
Estimated Cost: Php 150.00M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02737 |
300117201960000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201960000
Project ID: P00251828MN
Local Program:
Local Roads and Bridges - Local Roads Local Infrastructure
Concreting of Road at Camp Arturo Enrile, Malagutay, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 1.55 lane km.
Unit Cost: P 6,387,096.77/lane km.
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02762 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Jct. Davao-Cotabato Road (Bangkal Section)-Catalunan Grande Road-Jct. Davao-Bukidnon Road (Mintal Section), incl. ROW and Bridge, Davao City
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
ROW: 2,917.181 sq. m.
Allocation:
TOTAL: P 117,498,000.00
CW1: P 94,085,570.00 (Construction of Substructure)
ROW: P 19,300,000.00
EAO: P 4,112,430.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Jct. Davao-Cotabato Road (Bangkal Section)-Catalunan Grande Road-Jct. Davao-Bukidnon Road (Mintal Section), incl. ROW and Bridge, Davao City
Physical Target:
CW1: 1 number of bridge (Construction of Substructure)
CW2: 1.384 Lane Km (Construction of Gravel Road)
ROW: 18,883.00 sq. m.
Allocation:
TOTAL: P 117,498,000.00
CW1: P 32,982,727.33 (Construction of Substructure)
CW2: P 10,010,917.67 (Construction of Gravel Road)
ROW: P 70,391,925.00
EAO: P 4,112,430.00 |
May 12, 2018 |
FY 2018 |
WIN8G02035 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100157000
Project ID: P00201075LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Constructiong of By-Pass and Diversion Roads - Juban-Bulan Diversion Road (Juban section), incl. ROW, Sorsogon
Physical Target - CW1- Construction of Concrete Road/ 2.88 lane-km
CW2- Construction of Drainage Structure along Road/ 4,390.86 lm.
ROW Acquisition: 28,822. sq.m.
Unit Cost: CW1- Php 16.472M/lane-km.
CW2- Php 5,480/lm
ROW- Php 867.39/sq.m.
Estimated Cost: Php 100.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02761 |
300117201965000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201965000
Project ID: P00250056MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Bolong, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.37 lane km.
Unit Cost: P 5,351,351.35/lane km.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02129 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310209100018000
Project ID: P00201617LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads – Juban-Magallanes Rd – K0613+815 – K0616+647, K0616+660 – K0619+147, K0619+161 – K0623+546, K0623+562 – K0624+486
Physical Target - CW1- Off-Carriageway Improvement; Shoulder Paving/Construction/ 42,160.00 sq.m.
Unit Cost: Php 3.43T/sq.m.
Estimated Cost: Php 150.0M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02707 |
300117201968000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201968000
Project ID: P00250059MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Pasobolong, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.17 lane km.
Unit Cost: P 8,735,294.12/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G 01868 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300203100101000
Project ID: P00230386LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Ligao-Pioduran-Donsol Road Leading to Butanding Site, Albay
Physical Target - CW1- Reconstruction from Paved to Concrete/ 9.75 lane-km
Unit Cost: Php 9.897M/lane-km
Estimated Cost: Php 100.0M
(As Modified)
|
May 12, 2018 |
FY 2018 GAA |
WIN8C02782 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion Road-Buhangin-Tigatto Road (Buhangin Gallera Section), incl. ROW, Davao City
Physical Target:
CW1: 0.756 Lane Km (Construction of Concrete Road)
ROW: 6,562.00 sq. m.
Allocation:
TOTAL: P 60,540,000.00
CW1: P 20,427,120.00 (Construction of Concrete Road)
ROW: P 37,993,980.00
EAO: P 2,118,900.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion Road-Buhangin-Tigatto Road (Buhangin Gallera Section), incl. ROW, Davao City
Physical Target:
CW1: 0.808 Lane Km (Construction of Gravel Road)
ROW: 6,562.00 sq. m.
Allocation:
TOTAL: P 60,540,000.00
CW1: P 20,427,120.00 (Construction of Gravel Road)
ROW: P 37,993,980.00
EAO: P 2,118,900.00 |
May 12, 2018 |
FY 2018 |
WIN8C02666 |
300117201970000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201970000
Project ID: P00250088MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tolosa, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.18 lane km.
Unit Cost: P 8,250,000.00/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02026 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100088000
Project ID: P00201390LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Secondary Roads - Masbate-Cataingan-Placer Rd - K0024+350 - K0024+763, K0025+000 - K0025+201
Physical Target - CW1- Road Widening/ 1.228 lane-km
CW2- Construction of Slope Protection Structure/ 3,084sq.m.
Unit Cost: CW1- Php 10.94M/lane-km
CW2- Php 25.93T/sq.m.
Estimated Cost: Php 96.79M
(As Modified)
|
May 12, 2018 |
FY 2018 |
WIN8C02665 |
300117201973000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117201973000
Project ID: P00250089MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Victoria, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.19 lane km.
Unit Cost: P 7,815,789.47/lane km.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 12, 2018 |
FY 2018 |
WIN8G02004 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100089000
Project ID: P00201391LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Road Widening – Secondary Roads - Masbate-Cataingan-Placer Rd - K0075+872 - K0077+160, K0079+850 - K0081+182, K0083+390 - K0084+730, K0088+000 - K0088+834, K0089+000 - K0089+356
Physical Target - CW1-Road Widening/10.324 lane-km
Unit Cost: Php 15.42M/lane-km
Estimated Cost: Php 165.01m
(As Modified)
|
May 12, 2018 |
FY 2018 GAA |
WIN8C02733 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Upper Tibanban-Oregon-Magdug Road, incl. ROW and Bridge, Davao Oriental
Physical Target:
CW1: 4.570 Lane Km (Construction of Concrete Road)
CW2: 334.00 sq. m. (Construction of Concrete Bridge)
ROW: 22,842.105 sq. m.
Allocation:
TOTAL: P 108,517,000.00
CW1: P 71,822,055.00 (Construction of Concrete Road)
CW2: P 27,708,750.00 (Construction of Concrete Bridge)
ROW: P 4,188,100.00
EAO: P 3,798,095.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Upper Tibanban-Oregon-Magdug Road, incl. ROW and Bridge, Davao Oriental
Physical Target:
CW1: 1.694 Lane Km (Construction of Concrete Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 1.080 Lane Km (Construction of Gravel Road)
ROW: 22,842.105 sq. m.
Allocation:
TOTAL: P 108,517,000.00
CW1: P 53,384,068.99 (Construction of Concrete Road)
CW2: P 40,458,522.49 (Construction of Concrete Bridge)
CW3: P 6,688,213.52 (Construction of Gravel Road)
ROW: P 4,188,100.00
EAO: P 3,798,095.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02783 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Bridge Program
Replacement of Permanent Weak Bridges
Lipadas Br. (B00012MN) along Davao-Cotabao Rd (Davao City-Jct. Digos Sect)
Physical Target:
CW1: 669.60 sq. m. (Replacement of Bridge)
Allocation:
TOTAL: P 95,504,000.00
CW1: P 92,161,360.00 (Replacement of Bridge)
EAO: P 3,342,640.00
TO: OO1: Ensure Safe and Reliable National Road System – Bridge Program
Replacement of Permanent Weak Bridges
Lipadas Br. (B00012MN) along Davao-Cotabao Rd (Davao City-Jct. Digos Sect)
Physical Target:
CW1: 626.203 sq. m. (Replacement of Bridge)
Allocation:
TOTAL: P 95,504,000.00
CW1: P 92,161,360.00 (Replacement of Bridge)
EAO: P 3,342,640.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02691 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Bridge Program
Widening of Permanent Bridges
Kingking Br. (B00197MN) along Surigao-Davao Coastal Rd incl. ROW
Physical Target:
CW1: 1,886.70 sq. m. (Widening of Bridge)
ROW: 10,204.082 sq. m.
Allocation:
TOTAL: P 270,250,000.00
CW1: P 259,826,250.00 (Widening of Bridge)
ROW: P 965,000.00
EAO: P 9,458,750.00
TO: OO1: Ensure Safe and Reliable National Road System – Bridge Program
Widening of Permanent Bridges
Kingking Br. (B00197MN) along Surigao-Davao Coastal Rd incl. ROW
Physical Target:
CW1: 1,897.84 sq. m. (Widening of Bridge)
ROW: 10,204.082 sq. m.
Allocation:
TOTAL: P 270,250,000.00
CW1: P 259,826,250.00 (Widening of Bridge)
ROW: P 965,000.00
EAO: P 9,458,750.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02735 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road, Package C, incl. ROW, Davao Oriental
Physical Target:
CW1: 9.682 Lane Km (Construction of Concrete Road)
ROW: 22,727,273 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 191,552,500.00 (Construction of Concrete Road)
ROW: P 1,447,500.00
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Mawab-Maragusan-Caraga Road, Package C, incl. ROW, Davao Oriental
Physical Target:
CW1: 10.664 Lane Km (Construction of Concrete Road)
ROW: 22,727,273 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 191,552,500.00 (Construction of Concrete Road)
ROW: P 1,447,500.00
EAO: P 7,000,000.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02863 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package B, incl. ROW, Compostela Valley
Physical Target:
CW1: 19.032 Lane Km (Construction of Gravel Road)
ROW: 147,959.184 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Gravel Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Maragusan-Pantukan Road (Pantukan Section), Package B, incl. ROW, Compostela Valley
Physical Target:
CW1: 12.79372 Lane Km (Construction of Concrete Road)
ROW: 147,959.184 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 275,507,500.00 (Construction of Concrete Road)
ROW: P 13,992,500.00
EAO: P 10,500,000.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02772 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Nabunturan-Laak Road, Compostela Valley
Physical Target:
CW1: 2.034 Lane Km (Construction of Concrete Road)
CW2: 334 sq. m. (Construction of Concrete Bridge)
ROW: 15,255 sq. m.
Allocation:
TOTAL: P 60,000,000.00
CW1: P 29,442.150.00 (Construction of Concrete Road)
CW2: P 27,020,000.00 (Construction of Concrete Bridge)
ROW: P 1,437,850.00
EAO: P 2,100,000.00
TO: Local Program – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Nabunturan-Laak Road, Compostela Valley
Physical Target:
CW1: 1.75712 Lane Km (Construction of Gravel Road)
CW2: 333.90 sq. m. (Construction of Concrete Bridge)
ROW: 15,255 sq. m.
Allocation:
TOTAL: P 60,000,000.00
CW1: P 24,577,394.09 (Construction of Gravel Road)
CW2: P 31,884,755.91 (Construction of Concrete Bridge)
ROW: P 1,437,850.00
EAO: P 2,100,000.00 |
May 12, 2018 |
FY 2018 GAA |
WIN8C02880 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Preventive Maintenance – Secondary Roads
Davao City Div Rd – K1508+772 – K1512+221
Physical Target:
CW1: 20.472 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 200,639,000.00
CW1: P 193,616,635.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,022,365.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Preventive Maintenance – Secondary Roads
Davao City Div Rd – K1508+772 – K1511+936.987
Physical Target:
CW1: 18.738 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 200,639,000.00
CW1: P 193,616,635.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,022,365.00 |