May 23, 2018 |
FY 2018 GAA |
WIN8C03043 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 15.308 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Island Garden City of Samal (IGACOS) Circumferential Road (West Side), Package 2, Davao del Norte
Physical Target:
CW1: 213798 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 450,000,000.00
CW1: P 434,250,000.00 (Construction of Concrete Road)
EAO: P 15,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03049 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) – K1672 + 675 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1675 + 475 - K1679 + 048
Physical Target:
CW1: 3,900.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 6.860 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 87,815,000.00 (Construction of Road Slope Protection Structure)
CW2: P 52,957,270.00 (Asphalt Overlay)
EAO: P 5,105,730.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan) –
K1670 + 650 - K1670 + 860, K1670 + 740 - K1670 + 760, K1672 + 660 - K1672 + 705,
K1673 + 600 - K1673 + 700, K1673 + 860 - K1673 + 960, K1675 + 475 - K1677 + 000
Physical Target:
CW1: 3,000.00 sq. m. (Construction of Road Slope Protection Structure)
CW2: 3.04744 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 145,878,000.00
CW1: P 100,301,497.80 (Construction of Road Slope Protection Structure)
CW2: P 40,470,772.22 (Asphalt Overlay)
EAO: P 5,105,730.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03038 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Bayabas - Handurumog Road Nabunturan, Compostela Valley
Physical Target:
CW1: 1.498 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03033 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 13.428 Lane Km (Construction of Concrete Road)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 291,555,450.00 (Construction of Concrete Road)
ROW: P 9,524,550.00
EAO: P 10,920,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Bukidnon-Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon-Laak-Compostela Valley), Package 5, incl. ROW, Davao del Norte
Physical Target:
CW1: 8.49298 Lane Km (Construction of Concrete Road)
CW2: 821.2032 sq. m. (Construction of Concrete Bridge)
CW3: 381.60 sq. m. (Construction of Concrete Bridge)
ROW: 100,710.00 sq. m.
Allocation:
TOTAL: P 312,000,000.00
CW1: P 177,771,295.75 (Construction of Concrete Road)
CW2: P 80,450,661.34 (Construction of Concrete Bridge)
CW3: P 33,333,492.91 (Construction of Concrete Bridge)
ROW: P 9,524,550.00
EAO: P 10,920,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03048 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 8.560 Lane Km (Construction of Gravel Road)
CW2: 286.20 sq. m. (Construction of Concrete Bridge)
CW3: 286.20 sq. m. (Construction of Concrete Bridge)
CW4: 286.20 sq. m. (Construction of Concrete Bridge)
CW5: 286.20 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 103,225,000.00 (Construction of Gravel Road)
CW2: P 28,226,250.00 (Construction of Concrete Bridge)
CW3: P 28,226,250.00 (Construction of Concrete Bridge)
CW4: P 28,226,250.00 (Construction of Concrete Bridge)
CW5: P 28,226,250.00 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 4.714 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 65,535.60 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 140,000,544.17 (Construction of Gravel Road)
CW2: P 51,720,653.19 (Construction of Concrete Bridge)
CW3: P 43,234,302.64 (Construction of Concrete Bridge)
ROW: P 6,272,500.00
EAO: P 8,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03041 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.380 Lane Km (Construction of Asphalt Road)
CW2: 3,460.00 sq. m. (Construction of Road Slope Protection Structure)
CW3: 292.95 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 172,445,500.00 (Construction of Asphalt Road)
CW2: P 49,504,500.00 (Construction of Road Slope Protection Structure)
CW3: P 19,300,000.00 (Construction of Concrete Bridge)
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Apalaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 1, incl. Bridge, Davao City
Physical Target:
CW1: 2.636Lane Km (Construction of Concrete Road)
CW2: 1,376.86 sq. m. (Construction of Road Slope Protection Structure)
CW3: 243.22 sq. m. (Construction of Concrete Bridge)
CW4: 1.028 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 179,640,110.18 (Construction of Asphalt Road)
CW2: P 23,337,474.65 (Construction of Road Slope Protection Structure)
CW3: P 35,313,018.57 (Construction of Concrete Bridge)
CW4: P 2,959,396.60 (Construction of Gravel Road)
EAO: P 8,750,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03037 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,0000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Bongkilaton Road leading to Mandaya Village, Pansan Falls, Bongkilaton Cave and Tagbubunlas Falls, Brgy. Ngan, Compostela Valley
Physical Target:
CW1: 1.403 Lane Km (Construction of Concrete Road)
CW2: 348.000 Lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 14,787,930.00 (Construction of Concrete Road)
CW2: P 4,812,070.00 (Construction of Revetment)
EAO: P 400,000.00 |
May 23, 2018 |
FY 2018 GAA |
WIN8C03025 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 1,908.00 sq. m. (Construction of Concrete Bridge)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 48,250,000.00 (Construction of Concrete Road)
CW2: P 231,600,000.00 (Construction of Concrete Bridge)
ROW: P 9,650,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Road-Talandang-Sumimao-Pañalum-Tapak-Cabanglasan-Aglayan, Malaybalay, Package A, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 2.500 Lane Km (Construction of Concrete Road)
CW2: 381.60 sq. m. (Construction of Concrete Bridge)
CW3: 429.30 sq. m. (Construction of Concrete Bridge)
CW4: 10.34678 Lane Km (Construction of Gravel Road)
ROW: 11,627.907 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 56,183,759.92 (Construction of Concrete Road)
CW2: P 33,336,090.22 (Construction of Concrete Bridge)
CW3: P 39,477,236.29 (Construction of Concrete Bridge)
CW4: P 150,852,913.58 (Construction of Gravel Road)
ROW: P 9,650,000.00
EAO: P 10,500,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02165 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300203100319000
Project ID: P00230346LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Access Road from Virac to Bagamanoc leading to Paday Falls, Bagamanoc, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.94 lane-km
Unit Cost: CW1 – Php 16.68M /lane-km
Estimated Cost: Php 16.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01912 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300203100320000
Project ID: P00230399LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – San Andres-Pandan-Hiyop Access Road leading to Hiyop Highlands and Su-nog Sea Cave, San Andres, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 2.275 lane-km
Unit Cost: CW1 – Php 14.215M /lane-km
Estimated Cost: Php 33.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02167 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 300117201439000
Project ID: P00255760LZ
Local Program – Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road, Brgy. Rizal, Viga, Catanduanes
Physical Target - CW1 – Construction of Concrete Road/ 0.2814 lane-km
Unit Cost: CW1 – Php 10.55M /lane-km
Estimated Cost: Php 3.0M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03028 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagarano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 6.220 Lane Km (Construction of Concrete Road)
CW2: 773.00 sq. m. (Construction of Concrete Bridge)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 91,573,675.00 (Construction of Concrete Road)
CW2: P 78,165,000.00 (Construction of Concrete Bridge)
ROW: P 23,261,325.00
EAO: P 7,000,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Davao-Bukidnon Rd (Calinan Section)-Wangan-Subasta-Tagakpan-Tungkalan-Tagurano-Bayabas-Catigan-Baracatan-Sibulan Road, Davao City
Physical Target:
CW1: 3.774 Lane Km (Construction of Concrete Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
CW3: 200.34 sq. m. (Replacement of Bridge)
CW4: 0.591 Lane Km (Construction of Gravel Road)
ROW: 24,105.00 sq. m.
Allocation:
TOTAL: P 200,000,000.00
CW1: P 99,782,383.82 (Construction of Concrete Road)
CW2: P 44,040,342.13 (Construction of Concrete Bridge)
CW3: P 23,079,631.49 (Replacement of Bridge)
CW4: P 2,836,317.56 (Construction of Gravel Road)
ROW: P 23,261,325.00
EAO: P 7,000,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G01913 |
FY 2018 GAA R.A. 10964 |
December 29, 2016 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101708000
Project ID: P00220672LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Drainage Structure along Sibanhan River, Sta. 0+000 - Sta.0+952, Virac, Catanduanes
Physical Target - CW - Construction of Drainage Structure/ 952.0 lm.
Unit Cost: CW1 - Php 30,882.35/lm
Estimated Cost: Php 30.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02173 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 320101101720000
Project ID: P00223411LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of River Protection, Brgy. San Nicolas, Panganiban, Catanduanes
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 452 lm
Unit Cost: Php 43,363/lm
Estimated Cost: Php 20.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01871 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310111100045000
Project ID: P00202645LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads –Secondary Roads – Catanduanes Cir Rd - K0121+000 - K0122+000, K0122+000 - K0122+540
Physical Target - CW1 - Construction of Drainage Structure along Road/ 1,545.59 lm.
Unit Cost: CW1 – Php 11,316.11/lm.
Estimated Cost: Php 17.847M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03026 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 9.596 Lane Km (Construction of Gravel Road)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 138,916,575.00 (Construction of Gravel Road)
ROW: P 5,833,425.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Carmen-Tagum City Coastal Road, incl. ROW, Carmen, Tagum City, Davao del Norte
Physical Target:
CW1: 5.184 Lane Km (Construction of Gravel Road)
CW2: 861.27 sq. m. (Construction of Concrete Bridge)
ROW: 71,970.00 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 37,115,676.61 (Construction of Gravel Road)
CW2: P 101,800,898.39 (Construction of Concrete Bridge)
ROW: P 5,833,425.00
EAO: P 5,250,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G02049 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310111100046000
Project ID: P00202644LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Secondary Roads – Catanduanes Cir Rd – K0201+000 – K0201+811
Physical Target - CW1 - Construction of Drainage Structure along Road/ 115.58 lm.
Unit Cost: CW1 – Php 63,159.89/lm.
Estimated Cost: Php 7.449M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01911 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310209100069000
Project ID: P00202648LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Tertiary Roads - Jct Bato-Baras Rd incl. ROW - K0008+-003 - K0008+579, K0012+000 - K0012+940
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 6,566.00 sq.m.
Right-of-Way Acquisition (ROW)/ 3,492 sq.m.
Unit Cost: CW1 – Php 7,401.49/sq.m.
ROW Acquisition – Php 103.84/sq.m.
Estimated Cost: Php 49.960M
(As Modified)
|
May 23, 2018 |
FY 2018 GAA |
WIN8C03032 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Roads - Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Kao-Cabacungan-Dauis Road Phase 1, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.187 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 23, 2018 |
FY 2018 |
WIN8G01872 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310212100060000
Project ID: P00202650LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Paving of Unpaved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0056+031.50 - K0056+146.50, K0056+502.62 - K0056+530.92, K0064+155 - K0064+582.50
Physical Target - CW1 - Paving of unpaved Roads/1.1416 lane-km
Unit Cost: CW1 - Php 13.091M/ lane-km
Estimated Cost: Php 15.25 M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G01870 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310109100088000
Project ID: P00200936LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0031+700 - K0032+052, K0081+440 - K0081+590
Physical Target - CW1 - Construction of Road Slope Protection Structure/ 4,057.09 sq.m.
Unit Cost: Php 4,831.05/sq.m.
Estimated Cost: Php 20.0M
(As Modified)
|
May 23, 2018 |
FY 2018 |
WIN8G02051 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310106100148000
Project ID: P00202641LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Baras-Gigmoto-Viga Rd - K0027+185 - K0027+499, K0027+522 - K0027+651, K0040+900 - K0041+000, K0041+243 - K0041+473, K0083+550 - K0083+600
Physical Target - CW1 -Rehabilitation of Paved Road/ 1.44 lane-km
Unit Cost: Php 9.403 M/lane-km
Estimated Cost: Php 13.855M
(As Modified)
|
May 22, 2018 |
FY 2018 |
WIN8C02997 |
300203100521000 |
May 10, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100521000
Project ID: P00230026MN
CSSP: Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destination
NRJ leading to Philippine Eagle Sanctuary, Brgy. Dakayakan, Midsalip, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 1.60 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 13.781M/lane km
EAO: P 0.45M
Allocation: 22.5M |
May 22, 2018 |
FY 2018 |
WIN8C02862 |
300204100202000 |
May 7, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No: 300204100202000
Project ID: P00230034MN
CSSP: Convergence and Special Support Program -
Construction/Improvement of Acces Roads leading to Trades, Industries and Economic Zones
NRJ to Brgy. Upper Timonan - Marangan - Kahayagan - Palili - Timbaboy in Support of Abaca Handicraft Processing, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.286 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,573,930/lane km
EAO: P 0.40M
Allocation: P 20.0M |
May 22, 2018 |
FY 2018 |
WIN8C02683 |
310101100111000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No: 310101100111000
Project ID: P00200007MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1786+786.00 - K1786+804.00, K1786+813.00 - K1786+826.50, K1786+890.50 - K1786+908.50, K1786+926.50 - K1786+967.00, K1787+004.50 - K1787+036.00, K1787+049.50 - K1787+103.50, K1787+113.50 - K1787+190.00, K1787+204.50 - K1787+213.50, K1787+218.00 - K1787+245.00, K1808+004.50 - K1808+067.50, K1808+085.50 - K1808+209.00, K1808+209.00 - K1808+227.00, K1808+227.00 - K1808+243.00, K1808+254.00 - K1808+263.00, K1808+288.00 - K1808+360.00, K1808+364.50 - K1808+387.00, K1808+400.50 - K1808+495.00, K1808+513.00 - K1808+576.00, K1808+667.50 - K1808+676.50, K1808+700.00 - K1808+704.50, K1808+726.00 - K1808+789.00, K1808+818.00 - K1808+863.00, K1808+874.50 - K1808+897.00, K1808+951.00 - K1808+973.50, K1810+460.00 - K1811+000.00, K1812+332.00 - K1812+458.00, K1812+471.50 - K1812+489.50, K1812+489.50 - K1812+507.50, K1812+507.50 - K1812+611.00, K1812+611.00 - K1812+665.00, K1812+692.00 - K1812+867.50, K1812+881.00 - K1812+890.00, K1812+894.50 - K1812+912.50, K1812+930.50 - K1813+000.00
Physical Target:
CW-1 - Concrete Reblocking: 3.3185 lane km
Unit Cost: CW-1 - Concrete Reblocking: P 9,261,642.31/lane km
EAO: P 0.62724M
Allocation: P 31.362M |
May 22, 2018 |
FY 2018 |
WIN8C02721 |
300117201989000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201989000
Project ID: P00251836MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Brgy. Cawit, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 0.34 lane km
Unit Cost: CW-1 - Construction of Concrete Road: P 8,735,294.12 lane km
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02935 |
300109200208000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300109200208000
Project ID: P00250071MN
Local Program:
Local - Flood Control and Drainage -
Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Sta. Catalina, Zamboanga City
Physical Target:
CW-1: Construction of Drainage System: 156.00 l.m.
Unit Cost: CW-1: Construction of Drainage System: P 9,519.23/l.m.
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02674 |
300107200217000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300107200217000
Project ID: P00251832MN
Local Program:
Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of Drainage Facilities at San Roque, Zamboanga City
Physical Target:
CW-1: Construction of Drainage Structure: 164.00 lm
Unit Cost: CW-1: Construction of Drainage Structure: P 18,109.76/lm
EAO: P 30,000.00
Allocation: P 3,000,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02702 |
300202100069000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300202100069000
Project ID: P00230005MN
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
Acces Road leading to Panubigan Wharf, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 1.40 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 17,220,000.00/lane km
EAO: P 492,000.00
Allocation: P 24,600,000.00 |
May 22, 2018 |
FY 2018 |
WIN8C02704 |
300117201975000 |
May 3, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No: 300117201975000
Project ID: P00250076MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Cabaluay, Zamboanga City
Physical Target:
CW-1: Construction of Concrete Road: 0.21 lane km
Unit Cost: CW-1: Construction of Concrete Road: P 7,071.43/lane km
EAO: P 15,000.00
Allocation: P 1,500,000.00 |
May 21, 2018 |
FY - 2018 |
WIN8F05458 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0111+200 - K0112+284
CW1: 4.36 lane km ( Road Widening )
Allocation: 89,462,000 Php
TO:
Puerto Princesa North Rd
K0111+200 - K0112+878
CW1: 6.74 lane km ( Road Widening )
Allocation: 89,462,000 Php
|
May 21, 2018 |
FY - 2018 |
WIN8F05457 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Road
FROM:
El Nido -Jct. New Ibahay Rd
K0273+583 - K0276+168,
K0276+337 - K0277+000
CW1: 7,440 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php
TO:
El Nido - Jct New Ibahay Rd
K0273+235.3 - K0276+168,
K0276+337.0 - K0277+000
CW1: 15,776030 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 66,960,000 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05461 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Palawan
CW1: 260 lm ( Construction of Flood Control Mitigation
Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at Tapiken Bridge,
CBNR, Busuanga, Palawan
CW1: 227 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
|
May 21, 2018 |
FY - 2018 |
WIN8F05459 |
FY _ 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Endure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd.
K0220 + 000 - K02220 + 000
CW1: 4.008 lane km ( Road Widening )
Allocation: 75,818,000 Php
TO:
Puerto Princesa North Rd
K0219 + 015 - K0222 + 000
CW1: 6 lane km ( Road Widening )
Allocation: 75,818,00 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05462 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan
CW1: 20 lane km ( Construction of Concrete Road )
Allocation : 60,000,000 Php
TO:
Mampio Road from Seaport to Cagayancillo Poblacion,
Brgy. Mampio, Cagayancillo, Palawan
CW1: 4.84 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php |
May 21, 2018 |
FY - 2018 |
WIN8F05463 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Palawan
CW1: 715 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php
TO:
Construction of Flood Control Structure at Caramay Bridge,
PPNR, Roxas, Palawan
CW1: 530 lm ( Construction of Flood Mitigation Structure )
Allocation: 20,000,000 Php |
May 21, 2018 |
FY 2018 GAA |
WIN8C02989 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao City
Physical Target:
CW1: 19.430 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Samal Bridge leading to San Remigio, Samal Island, Davao del Norte
Physical Target:
CW1: 17.388 Lane Km (Construction of Concrete Road)
ROW: 97,150.00
Allocation:
TOTAL: P 300,000,000.00
CW1: P 281,249,250.00 (Construction of Concrete Road)
ROW: P 8,250,750.00
EAO: P 10,500,000.00 |
May 21, 2018 |
FY - 2018 |
WIN8F05464 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
002 - Protect Lives and Properties against Major Floods
Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
FROM: Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Palawan
CW1: 261 lm ( Construction of Flood Mitigation Structure )
Allocation: 10,000,000 Php
TO:
Construction of Flood Control Structure at Dipuyai Bridge, Coron - Busuanga Road, Coron, Palawan
CW1: 209.50 lm ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
|
May 21, 2018 |
FY 2018 GAA |
WIN8C03003 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 8.760 Lane Km (Construction of Concrete Road)
CW2: 2.654 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 231,327,870.00 (Construction of Concrete Road)
CW2: P 53,783,310.00 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Fatima-Malabog Road to Mabuhay-Pañalum-Paquibato Road, Package B, incl. ROW, Davao City
Physical Target:
CW1: 6.754 Lane Km (Construction of Concrete Road)
CW2: 2.213 Lane Km (Reconstruction from Paved to Concrete)
ROW: 9,096.00 sq. m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 147,061,491.59 (Construction of Concrete Road)
CW2: P 41,549,688.41 (Reconstruction from Paved to Concrete)
ROW: P 4,388,820.00
EAO: P 7,000,000.00
EXC: P 100,000,000.00 (Excess) |
May 21, 2018 |
FY 2018 GAA |
WIN8C03000 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 10.320 Lane Km (Construction of Gravel Road)
CW2: 763.20 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 124,485,000.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Package A, incl. ROW and Bridge, Davao del Norte
Physical Target:
CW1: 12.212 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
ROW: 78,163.20 sq. m.
Allocation:
TOTAL: P 250,000,000.00
CW1: P 194,396,985.49 (Construction of Gravel Road)
CW2: P 39,133,014.51 (Construction of Concrete Bridge)
ROW: P 7,720,000.00
EAO: P 8,750,000.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02991 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 781 - K1502 + 811, K1503 + 100 - K1503 + 140,
K1503 + 950 - K1503 + 998, K1504 + 260 - K1504 + 300,
K1504 + 409 - K1504 + 436, K1504 + 800 - K1504 + 846
Physical Target:
CW1: 9,840.00 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Tertiary Road
Fatima-Malabog Rd – K1502 + 840 - K1502 + 886.3, K1503 + 797 - K1503 + 842.5,
K1504 + 132 - K1504 + 192, K1504 + 292 - K1504 + 310,
K1504 + 492 - K1504 + 579, K1504 + 595 - K1504 + 625,
K1504 + 723 - K1504 + 776
Physical Target:
CW1: 5,610.38 sq. m. (Construction of Slope Protection)
Allocation:
TOTAL: P 233,430,000.00
CW1: P 225,259,950.00
EAO: P 8,170,050.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C03002 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 8.474 Lane Km (Construction of Gravel Road)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 155,395,880.00 (Construction of Gravel Road)
ROW: P 1,930,000.00
EAO: P 5,706,120.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Missing Links/New Roads
Demoloc-Little Baguio-Alabel Road, incl. ROW, Davao Occidental
Physical Target:
CW1: 4.39112 Lane Km (Construction of Gravel Road)
CW2: 333.90 sq. m. (Construction of Concrete Bridge)
ROW: 42,370.00 sq. m.
Allocation:
TOTAL: P 163,032,000.00
CW1: P 127,739,390.00 (Construction of Gravel Road)
CW2: P 27,656,490.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 5,706,120.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C03004 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 15.000 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Improvement/Concreting of Jct. Calinan-Baguio-Cadalian Road (Baguio Proper-Wines-Magpet Bdry.), Davao City
Physical Target:
CW1: 3.150 Lane Km (Construction of Concrete Road)
CW2: 666.00 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 21,582,910.00 (Construction of Concrete Road)
CW2: P 74,917,090.00 (Construction of Concrete Bridge)
EAO: P 3,500,000.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02994 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 2.898 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
EAO: P 724,520.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.940 Lane Km (Construction of Concrete Road)
CW2: 0.940 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 36,226,000.00
CW1: P 35,501,480.00 (Construction of Concrete Road)
CW2: P 18,859,070.00 (Construction of Gravel Road)
EAO: P 724,520.00 |
May 21, 2018 |
FY 2018 GAA |
WIN8C02987 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 2.220 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road, Brgy. Malinawon, Tagum City
Physical Target:
CW1: 1.502 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 18, 2018 |
FY - 2018 |
WIN8F05460 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Mindoro West Coastal Rd
K0409+000 - K0414+000
CW1: 9.99 lane km ( Road Widening )
Allocation: 150,000,000 Php
TO:
Mindoro West Coastal Rd
K0409+000 - K0410+056,
K0410+095 - K0413+676,
K0413+695 - K0414+000
CW1: 9.874 LANE KM ( Road Widening )
Allocation: 150,000,000 Php
|
May 18, 2018 |
FY - 2018 |
WIN8F05455 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/
New Roads
FROM:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan
CW1: 33 lane km
Allocation: 150,000,000 Php
TO:
Palawan Circumferential Road ( Latud - Canipaan Section )
Package B, Palawan
CW1: 16.6376 lane km ( Construction of Gravel Road )
CW2: 493.568 sq.m. ( Construction of Steel Bridge )
Allocation: 150,000,000 Php |
May 18, 2018 |
FY - 2018 |
WIN8F05453 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Regional Office IV-B |
001 - Ensure Safe and Reliable National Road System
Network Development -Road Widening - Secondary Roads
FROM:
Calapan South Road
K0072+026 - K0072+178,
K0072+191 - K0072+443,
K0072+822 - K0075+252,
K0075+283 - K0076+849,
K0077+348 - K0078+269,
K0078+466 - K0079+745
CW1: 13.220 lane km ( Road Widening )
Allocation: 160,000,000 Php
TO:
Calapan South Road
K0074+640 - K0075+239,
K0075+275 - K0079+714,
K0079+820 - K0080+609,
K0080+613 - K0082+639,
K0082+651 - K0083+114,
K0083+140 - K0083+511,
K0083+532 - K0084+064
CW1: 18.322 lane km ( Road Widening )
Allocation: 160,000,000 Php |
May 18, 2018 |
FY - 2018 |
WIN8F05456 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
01 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Roads
FROM:
Tablas Circumferential Rd
K0006+454-0K0007+000,
K0008+158 - K0009+000,
K0013+000-k0013+693,
K0015+000 - K0016+098,
K0016+528 - K0016912,
K0024+708 - K0025+597,
K0030+000 - K0030+934,
K0031+854 - K0032+570,
K0038+500 - K0038+700,
K0041+000 - k0042+000
CW1: 21,696 square meters
( Off-Carriageway Improvement :Shoulder Paving/
Construction )
Allocation; 69,878,000 Php
TO:
Tablas Circumferential Rd.
K0006+454.00 - K0007+000.00,
K0008+000.00 - K0008+984.09,
K0013+000.00 - K0013+580.00,
K0013+612.75 - K0013+672.75,
K0015+000.00 - K0016+086.15,
K0016+522.11 - K0016+920.00,
K0024+833.03 - K0025+594.27,
K0029+990.52 - K0030+686.70,
K0030+700.00 - K0030+940.00,
K0031+853.58 - K0032+572.25,
K0038+500.00 - K0038+700.00,
K0041+000.00 - K0041+958.02
CW1: 22,481.12 square meters
( Off-Carriageway Improvement: Shoulder Paving/
Construction )
Allocation: 69,878,000 Php |
May 18, 2018 |
2018 |
WIN8C02984 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Anibongan-Pangi Road, Maco, Compostela Valley
Physical Target:
CW1: 1.549 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
May 18, 2018 |
2018 |
WIN8C02979 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 320 Lineal Meters (Construction of Revetment)
CW2: 17,697 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 28,933,909.00 (Construction of Revetment)
CW2: P 4,778,091.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00
TO: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling/Construction of Revetment with Sheet Pile of Kingking River, Cebulida L/S, Pantukan, Compostela Valley
Physical Target:
CW1: 718.17 Lineal Meters (Construction of Revetment)
CW2: 15,055 Cubic Meters (Channelization)
ROW: 356 Square Meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1: P 29,736,949.00 (Construction of Revetment)
CW2: P 3,975,050.00 (Channelization)
ROW: P 588,000.00
EAO: P 700,000.00 |
May 18, 2018 |
2018 |
WIN8C02971 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 250 - K1456 + 830
Physical Target:
CW1 - 1.160 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00
TO: 001 Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1456 + 140 - K1456 + 934
Physical Target:
CW1 - 1.589 Lane Km (Reconstruction from Paved to Concrete)
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 34,300,000.00 (Reconstruction from Paved to Concrete)
EAO - P 700,000.00
|
May 18, 2018 |
2018 |
WIN8C02980 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Aguinaldo, Laak, Compostela Valley
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Concrete Road)
EAO: P 60,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Aguinaldo, Laak, Compostela Valley
Physical Target:
CW1: 0.340 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Concrete Road)
EAO: P 60,000.00 |
May 18, 2018 |
2018 |
WIN8C02973 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling and Construction of Revetment along Kalamokan Creek, Barangay Poblacion, New Bataan, Compostela Valley
Physical Target:
CW1: 750 Lineal Meters (Construction of Revetment)
CW2: 53,000 Cubic Meters (Channelization)
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 20,555,726.00
CW2: P 28,444,274.00
EAO: P 1,000,000.00
TO: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling and Construction of Revetment along Kalamokan Creek, Barangay Poblacion, New Bataan, Compostela Valley
Physical Target:
CW1: 2,276 Lineal Meters (Construction of Revetment)
CW2: 66,007 Cubic Meters (Channelization)
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 37,161,352.00
CW2: P 11,838.648.00
EAO: P 1,000,000.00 |
May 18, 2018 |
2018 |
WIN8C02981 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Anislagan Road, Maco, Compostela Valley
Physical Target:
CW1 - 0.600 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 6,000,000.00
CW1 - P 5,880,000.00 (Construction of Concrete Road)
EAO - P 120,000.00
TO : Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of Anislagan Road, Maco, Compostela Valley
Physical Target:
CW1 - 0.666 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 6,000,000.00
CW1 - P 5,880,000.00
EAO - P 120,000.00
|
May 18, 2018 |
2018 |
WIN8C02972 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Circumferential Road, Magading, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Circumferential Road, Magading, Nabunturan, Compostela Valley
Physical Target:
CW1: 0.716 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
May 18, 2018 |
2018 |
WIN8C02993 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Tan-awan Road, Malinawon, Mawab, Compostela Valley
Physical Target:
CW1 - 0.650 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 6,500,000.00
CW1 - P 6,370,000.00 (Construction of Concrete Road)
EAO - P 130,000.00
TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Tan-awan Road, Malinawon, Mawab, Compostela Valley
Physical Target:
CW1 - 0.842 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 6,500,000.00
CW1 - P 6,370,000.00 (Construction of Concrete Road)
EAO - P 130,000.00
|
May 18, 2018 |
2018 |
WIN8C02999 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Langtud to National Highway, Laak, Compostela Valley
Physical Target:
CW1: 1.200 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Construction of Concrete Road)
EAO: P 420,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Langtud to National Highway, Laak, Compostela Valley
Physical Target:
CW1: 1.324 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Construction of Concrete Road)
EAO: P 420,000.00 |
May 18, 2018 |
2018 |
WIN8C02978 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: 002: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Brgy. Napnapan, Pantukan, Compostela Valley
Physical Target:
CW1 - 1,050 Lineal meters (Construction of Revetment)
CW2 - 3,500 cubic meters (Channelization)
ROW - 2,343 square meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 31,734,487.00 (Construction of Revetment)
CW2 - P 2,163,713.00 (Channelization)
ROW - P 401,800.00
EAO - P 700,000.00
TO: 002: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Brgy. Napnapan, Pantukan, Compostela Valley
Physical Target:
CW1 - 687.28 Lineal meters (Construction of Revetment)
CW2 - 1,463 cubic meters (Channelization)
ROW - 2,343 square meters
ALLOCATION:
TOTAL: P 35,000,000.00
CW1 - P 32,540,500.00 (Construction of Revetment)
CW2 - P 1,357,700.00 (Channelization)
ROW - P 401,800.00
EAO - P 700,000.00 |
May 18, 2018 |
2018 |
WIN8C02992 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling and Construction of Revetment along Manat River, Barangay Banagbanag, Montevista, Compostela Valley
Physical Target:
CW1: 337 Lineal Meters (Construction of Revetment)
CW2: 4,267 Cubic Meters (Channelization)
ROW: 1,714 Square Meters
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 44,733,834.00 (Construction of Revetment)
CW2: P 3,972,166.00 (Channelization)
ROW: P 294,000.00
EAO: P 1,000,000.00
TO: OO2 Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rechanneling and Construction of Revetment along Manat River, Barangay Banagbanag, Montevista, Compostela Valley
Physical Target:
CW1: 674.40 Lineal Meters (Construction of Revetment)
CW2: 4,267 Cubic Meters (Channelization)
ROW: 1,714 Square Meters
ALLOCATION:
TOTAL: P 50,000,000.00
CW1: P 46,382,278.00 (Construction of Revetment)
CW2: P 2,323,721.00 (Channelization)
ROW: P 294,000.00
EAO: P 1,000,000.00 |
May 18, 2018 |
2018 |
WIN8C02985 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road at Brgy. Dumlan to Brgy. Libaylibay Section Maco, Compostela Valley
Physical Target:
CW1: 1.500 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road at Brgy. Dumlan to Brgy. Libaylibay Section Maco, Compostela Valley
Physical Target:
CW1: 2.282 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
May 18, 2018 |
2018 |
WIN8C02986 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: 002: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Manat River, Olaycon Section, Monkayo, Compostela Valley
Physical Target:
CW1 - 360 Lineal meters (Construction of Revetment)
CW2 - 55,000 cubic meters (Channelization)
ROW - 1,286 square meters
ALLOCATION:
TOTAL: P 85,000,000.00
CW1 - P 57,214,850.00 (Construction of Revetment)
CW2 - P 24,520,650.00 (Channelization)
ROW - P 289,500.00
EAO - P 2,975,000.00
TO: 002: Protect Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Manat River, Olaycon Section, Monkayo, Compostela Valley
Physical Target:
CW1 - 373.6 Lineal meters (Construction of Revetment)
CW2 - 61,208 cubic meters (Channelization)
ROW - 1,286 square meters
ALLOCATION:
TOTAL: P 85,000,000.00
CW1 - P 71,107,054.00 (Construction of Revetment)
CW2 - P 10,628,446.00 (Channelization)
ROW - P 289,500.00
EAO - P 2,975,000.00 |
May 18, 2018 |
2018 |
WIN8C03005 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Magsaysay Road leading to Aqualime Mountain Resort, Brgy. Magsaysay, Nabunturan, Compostela Valley
Physical Target:
CW1 – 2.525 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 30,000,000.00
CW1 - P 29,400,000.00 (Construction of Concrete Road)
EAO - P 600,000.00
TO: Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Declared Tourism Destinations
Magsaysay Road leading to Aqualime Mountain Resort, Brgy. Magsaysay, Nabunturan, Compostela Valley
Physical Target:
CW1 – 2.273 Lane Km (Construction of Concrete Road)
ALLOCATION:
TOTAL: P 30,000,000.00
CW1 - P 29,400,000.00 (Construction of Concrete Road)
EAO - P 600,000.00 |
May 17, 2018 |
FY - 2018 |
WIN8F05436 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Tablas Circumferential Rd
K0084+315 - K0084+560
CW1:0.490 Lane Km ( Reconstruction from Paved
to Concrete )
Allocation: 6,600,000 Php
TO:
Tablas Circumferential Rd
K0077+220 - K0077+420
CW1: 0.40 Lane Km ( Reconstruction from Paved
to Concrete )
Allocation: 6,600,000 Php |
May 17, 2018 |
FY - 2018 |
WIN8F05432 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement
- Secondary Roads
FROM:
Tablas Circumferential Rd
K0050+000 - K0052+485,
K0054+000 - K0055+125,
K0083+000 - K0083+398,
K0083+541 - K0084+315,
K0084+560 - K0087+000,
K0091+048 - K0091+670,
K0096+000 - K0097+233,
K0102+894 - K0103+052
CW1: 27,747 square meters
( Off-Carriageway Improvement: Shoulder Paving/
Construction )
Allocation: 89,377,000 Php
TO:
Tablas Circumferential Rd.
K0050+000 - K0052+477,
K0054+000 - K0055+134,
K0083+000 - K0083+990,
K0084+560 - K0086+792,
K0091+048 - K0091+670,
K0096+000 - K0097+254,
K0102+894 - K0103+.45.70
CW1: 28,123.26 square meters
( Off-Carriageway Improvement: Shoulder Paving/
Construction )
Allocation: 89,377,000 Php |
May 17, 2018 |
FY - 2018 |
WIN8F05442 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
FROM:
Access Road leading to Fishing Industry
Taytay, Palawan
CW1: 4 lane km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Fishing Induatry
Taytay, Palawan
CW1: 3.556 Lane Km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
|
May 17, 2018 |
FY - 2018 |
WIN8F05435 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Trades, Industries and Economic Zones
FROM:
Access Road leading to Mussel Production and
Fishing Industry, Taytay, Palawan
CW1: 4 lane Km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Mussel Production and
Fishing Industry, Taytay, Palawan
CW1: 3.4136 Lane Km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 17, 2018 |
FY 2018 |
WIN8C02688 |
320101102199000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102199000
Project ID: P00221451MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Flood Control Project Phase I in Metro Brgys. of Ipil, (Don Andres - Bangkerohan, Lower Taway, ), Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 784.84 lineal meters
Unit Cost: P 36,185.72/lineal meter
ROW Acquisition: 3,333.33 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.6 M
Allocation: P 30 M |
May 17, 2018 |
FY - 2018 |
WIN8F05433 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Trades, Industries and Economic Zones
FROM:
Access Road leading to Seaweed Plantations in
Brgy. Sta. Teresita, Dumaran, Palawan
CW1: 4 lane Km ( Construction of Concrete Road )
Allocation: 50,000,000 Php
TO:
Access Road leading to Seaweed Plantation in
Brgy. Sta. teresita, Dumaran, Palawan
CW1: 3.054 Lane Km ( Construction of Concrete Road )
Allocation: 50,000,000 Php |
May 17, 2018 |
FY 2018 |
WIN8C02686 |
300116201168000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201168000
Project ID: P00240256MN
Local Program:
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Construction/Concreting of Labasan - Camaga Road, Siay, Zamboanga Sibugay (Phase II)
Sta. 3+111.00 - Sta. 3+745.12,
Sta. 4+045.84 - Sta. 5+378.00
Physical Target:
CW-1 - Construction of Concrete Road:
3.93256 lane km.
Unit Cost: P 7,476,046.14/lane km.
EAO: P 0.600 M
Allocation: P 30 M |
May 17, 2018 |
FY 2018 |
WIN8C02685 |
300117202015000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300117202015000
Project ID: P00251466MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Barangay Road, Brgy. Don Andres, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road:
0.19 lane km.
Unit Cost: P 5,263,157.89/lane km.
Allocation: P 1 M |
May 17, 2018 |
FY - 2018 |
WIN8F05431 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads -
Secondary Roads
FROM:
El Nido - Jct New ibahay Rd.
K0276+168 - K0276+268,
K0276+287 - K0276+337
CW1: 0.30 lane Km ( Paving of Unpaved Road )
Allocation: 5,100,000 Php
TO:
El Nido - New Ibahay Rd
K0276+168.00 - K0276+264.50,
K0276+291.00 - K0276+330.00
CW1: 0.2712 lane Km ( Paving of Unpaved Road )
Allocation: 5,100,000 Php |
May 17, 2018 |
FY 2018 |
WIN8C02682 |
320101102193000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102193000
Project ID: P00220661MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Brgy. Guintolan, Naga, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 510 lineal meters
Unit Cost: P 47,303.92/lineal meter
ROW Acquisition: 1,250 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.5 M
Allocation: P 30 M |
May 17, 2018 |
FY - 2018 |
WIN8F05434 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Mindoro Oriental District Engineering Office |
002 - Protect Lives and Properties against Major Floods
Flood Management - Construction/Rehabilitation of
Flood Mitigation Facilities along Major River Basins
and Principal Rivers
FROM:
Rehabilitation/Reconstruction of Alag Gabions,
Baco, Oriental Mindoro
CW1:36.40 l. m. ( Construction of Flood Control
Mitigation Structure )
Allocation: 4,530,000 Php
TO:
Rehabilitation/Reconstruction Of Alag Gabions,
Baco, Oriental Mindoro
CW1: 126.00 l. m. ( Construction of Flood
Mitigation Structure )
Allocation: 4,530,000 Php |
May 17, 2018 |
FY 2018 |
WIN8C02681 |
320101102188000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102188000
Project ID: P00220109MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Comprehensive Drainage System within Metro Ipil Area, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 985.66 lineal meters
Unit Cost: P 24,247.71/lineal meter
ROW Acquisition: 2,000.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.5 M
Allocation: P 25 M |
May 17, 2018 |
FY - 2018 |
WIN8F05454 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
- Buildings and Other Structures
FROM:
Concreting of Brgy. Libtangin MPB,
Gasan marinduque
CW1: 1 Bldg ( Construction of Multi Purpose Building )
Allocation; 4,000,000 Php
TO:
Construction / (Completion) of Brgy. Libtangin MPB,
Gasan, Marinduque
CW1: 1 Bldg ( Construction of Multi Purpose Building )
Allocation: 4,000,000 Php |
May 17, 2018 |
FY 2018 |
WIN8C02677 |
320101102189000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102189000
Project ID: P00220411MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control along Kabasalan River, FL Pena, Kabasalan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 380.00 lineal meters
Unit Cost: P 63,486.84/lineal meter
ROW Acquisition: 1,250.00 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 0.5 M
Allocation: P 25 M |
May 17, 2018 |
FY 2018 |
WIN8C02673 |
320101102194000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102194000
Project ID: P00220662MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Brgy. Poblacion, Naga, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 499.30 lineal meters
Unit Cost: P 48,317.64/lineal meter
ROW Acquisition: 1,250.00 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.5 M
Allocation: P 25 M |
May 17, 2018 |
FY 2018 |
WIN8C02672 |
320101102195000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102195000
Project ID: P00220664MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control, Brgy. Sta. Clara, Naga, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 656 lineal meters
Unit Cost: CW-1 - Construction of Flood Mitigation Structure: P 44,131.10/lineal meter
ROW Acquisition: 1,500 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.6 M
Allocation: P 30 M |
May 17, 2018 |
FY 2018 |
WIN8C02671 |
320101102192000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102192000
Project ID: P00221059MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Sanito River, Brgy. Sanito, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 161.50 lineal meters
Unit Cost: P 115,170.28/lineal meter
ROW Acquisition: 3,333.33 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 1.00 M
Allocation: P 20 M
|
May 17, 2018 |
FY 2018 |
WIN8C02670 |
300117202014000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300117202014000
Project ID: P00251472MN
Local Program:
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Barangay Road, Brgy. Concepcion, Kabasalan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road:
0.305 lane km.
Unit Cost: P 4,852,941.18/lane km.
EAO: P 0.015 M
Allocation: P 1.5 M |
May 17, 2018 |
FY 2018 |
WIN8C02669 |
320102100517000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320102100517000
Project ID: P00221747MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management -
Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Sibuguey River (Phase VI), Siay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 618 lineal meters
Unit Cost: CW-1 - Construction of Flood Mitigation Structure: P 62,459.55/lineal meter
ROW Acquisition: 2,000 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.8 M
Allocation: P 40 M |
May 17, 2018 |
FY 2018 |
WIN8C02668 |
320101102198000 |
May 3, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 320101102198000
Project ID: P00222748MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Upper Tungawan Flood Control Structure along Tungawan River, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 183.50 lineal meters
Unit Cost: CW-1 - Construction of Flood Mitigation Structure: P 36,811.99/lineal meter
ROW Acquisition: 350.00 square meters
Unit Cost: P 300.00/square meter
EAO: P 0.140 M
Allocation: P 7.0 M |
May 17, 2018 |
FY - 2018 |
WIN8F05441 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of 1,865 m. Dampulan - Mabilog road,
Barangay Dampulan, Torrijos, Marinduque
CW1: 1.640 Lane km ( Construction of Concrete Road )
Allocation: 9,325,000 Php
TO:
Concreting of 1.865 lane km Dampulan - Mabilog road,
Barangay Dampulan, Torrijos, Marinduque
CW1: 1.865 Lane Km ( Construction of Concrete Road )
Allocation: 9,325,000 Php |
May 17, 2018 |
FY 2018 |
WIN8G02183 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Secondary Roads – San Jose City – Rizal Rd via Pinili – Porais – Villa Joson (Palarilla) Rd, K0165+128.70 – K0165+515, K0167+000 – K0168+000, K0172+000 – K0172+067, K0172+737 – K0173+508, K0174+477 – K0174+912.70 |
May 17, 2018 |
FY 2018 |
WIN8G02188 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads – Bongabon – Rizal – Aurora Rd, K0152+560 – K0152+740, K0152+740 – K0153+197 |
May 16, 2018 |
FY - 2018 |
WIN8F05373 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of Brgy. Pili Road,
Mogpog, Marinduque
CW1: 1.055 Lane Km ( Construction of Concrete Road )
Allocation: 6,000,000 Php
TO:
Concreting of Brgy. Pili Road,
Mogpog, Martinduque
CW1: 1.404 lane Km ( Construction of Concrete Road )
Allocation: 6,000,000 Php |
May 16, 2018 |
FY - 2018 |
WIN8F05389 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
- Flood Control Structures/Facilities
FROM:
Construction of Brgy. Bamban Flood Control,
Boac, marinduque
CW1: 179.00 lin.m. ( Construction of Revetment )
Allocation: 6,000,000 Php
TO:
Construction of brgy. Bamban Flood Control,
Boac, Marinduque
CW1: 108.00 lin.m. ( Construction of Revetment )
Allocation: 6,000,000 Php |
May 16, 2018 |
FY - 2018 |
WIN8F05399 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
- Flood Control Structures/Facilities
FROM:
Construction of brgy. Duyay Flood Control,
Boac, Marinduque
CW1: 89.00 lin.m. ( Construction of Revetment )
Allocation: 3,000,000 Php
TO:
Construction of Brgy. Duyay Flood Control,
Boac, Marinduque
CW1: 54.00 lin.m. ( Construction of Revetment )
Allocation: 3,000,000 Php |
May 16, 2018 |
FY - 2018 |
WIN8F05400 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of Brgy. Maligaya,
Boac, Marinduque
CW1: 0.352 Lane Km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
TO:
Concreting of Brgy. Maligaya,
Boac, Marinduque
CW1: 0.495 Lane Km ( Construction of Concrete Road )
Allocation: 2,000,000 Php |
May 16, 2018 |
FY - 2018 |
WIN8F05375 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of 2 km. Bayanan to Sampalukan road,
Barangay Marlangga, Torrijos, Marinduque
CW1: 1.759 Lane Km ( Construction of Concrete Road )
Allocation: 10,000,000 Php
TO:
Concreting of 2 lane km Bayanan to Sampalukan road,
Barangay Marlanga, Torrijos, Marinduque
CW1: 2.00 Lane Km ( Construction of Concrete Road )
Allocation: 10,000,000 Php |
May 16, 2018 |
FY - 2018 |
WIN8F05414 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Concreting of 2.5 km Bangwayin-Pakaskasan road,
Barangay Bangwayin, Torrijos, Marinduque
CW1: 2.199 Lane Km ( Construction of Concrete Road )
Allocation; 12,500,000 Php
TO:
Concreting of 2.5 lane km Bangwayin-Pakaskasan road,
Barangay Bangwayin, Torrijos, Marinduque
CW1: 2.500 Lane Km ( Construction of Concrete Road )
Allocation: 12,500,000 Php |
May 16, 2018 |
FY 2018 |
WIN8C02995 |
310208100126000 |
April 5, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310208100126000
Project ID: P00200812MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Rizal-Dakak-Dapitan Coastal Loop Rd including RROW
K1860+254.00 - K1868+570.74
Physical Target:
CW-1 - Off-Carriageway Improvement: Shoulder Paving/Construction
11,883.89 sq.m.
Unit Cost: P 1,615.63/sq.m.
ROW: 267 sq.m.
Unit Cost: P 1,498.13/sq.m.
EAO: P 400,000
Allocation: P 20,000,000.00 |
May 16, 2018 |
FY 2018 |
WIN8C02967 |
300116200128000 |
May 9, 2018 |
Region IX |
Regional Office IX |
UACS No. 300116200128000
Project ID: P00257849MN
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Boulevard, Liloy, Zamboanga del Norte
Physical Target:
CW-1 - Paving of Unpaved Roads:
3.06 lane km.
Unit Cost: P 18,167,808.19/lane km
CW-2 - Embankment: 58,533.1917 cu.m.
Unit Cost: P 698.86/cu.m.
EAO: P 3,500,000.00
Allocation: P 100,000,000.00 |
May 16, 2018 |
FY 2018 |
WIN8C02968 |
300204100002000 |
May 9, 2018 |
Region IX |
Regional Office IX |
UACS No. 300204100002000
Project ID: P00230001MN
CSSP: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Access Road at Sitio Anuling, Pamucutan to Sta. Rita in support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City
Physical Target:
CW-1 - Const. of Concrete Road:
2.56 lane km.
Unit Cost: P 47,119,140.63/lane km.
EAO: P 4,375,000.00
Allocation: P 125,000,000.00 |
May 16, 2018 |
FY - 2018 |
WIN8F05443 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance
- Secondary Roads
FROM:
Tablas Circumferential Rd
K0098+100 - K0098+240
CW1: .280 Lane Km ( Preventive Maintenance of Road )
Allocation 1,247,000 Php
TO:
Tablas Circumferential Rd
K0098+100 - K0098+181.50
CW1: 0.163 Lane Km ( Preventive maintenance of Road )
Allocation: 1,247,000 Php |
May 16, 2018 |
FY 2018 |
WIN8C02969 |
310212100036000 |
May 9, 2018 |
Region IX |
Regional Office IX |
UACS No. 310212100036000
Project ID: P00200864MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Sindangan-Bayog-Lakewood Rd - (S01059MN) -
Sta. 1938+722.00 - Sta. 1938+810.00,
Sta. 1945+740.00 - Sta. 1946+460.00
Physical Target:
CW-1 - Paving of Unpaved Road:
1.62 lane km.
Unit Cost: P 93,775,921.98/lane km.
ROW: 8,276.69 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 5,600,000.00
Allocation: P 160,000,000.00 |
May 16, 2018 |
FY - 2018 |
WIN8F05437 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads
- Tertiary Roads
FROM:
Lubi - Binoog Rd
K0065+836 - K0068+319
CW1: 4.884 Lane Km ( Paving of Unpaved Roads )
Allocation: 100,000,000 Php
TO:
Lubi - Binoog Rd
K0065+836 - K0067+661.87
CW1: 3.42774 Lane Km ( Paving of Unpaved Road )
Allocation: 100,000,000 Php
|
May 16, 2018 |
FY 2018 |
WIN8C02965 |
320101100070000 |
May 9, 2018 |
Region IX |
Regional Office IX |
UACS No. 320101100070000
Project ID: P00220517MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Dipolog River Basin, Dipolog City, Zamboangna del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 479.04 lm.
Unit Cost: P 241,583.88/lm
ROW: 238.86 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
May 16, 2018 |
FY 2018 |
WIN8C02964 |
320101100236000 |
May 9, 2018 |
Region IX |
Regional Office IX |
UACS No. 320101100236000
Project ID: P00221447MN
OO2: Protect Lives and Properties Against Major Floods-Flood Management
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Extension of Flood Control Structure along Siocon River (Downstream), Siocon, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 569.50 lm
Unit Cost: P 184,950.83/lm
ROW: 203.48 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,822,455.00
Allocation: P 109,213,000.00 |