Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 10, 2017 FY 2017 WIN7E01123 FY 2017 APPROVED MODIFICATION March 21, 2017 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21883 [Road Upgrading Gravel to Paved]
Physical Target = 5.142 ln-km

To:MFO 1 - National Road Network Services - Road Upgrading (unpaved to paved) - Tertiary - Road Upgrading Gravel to Paved - Mt Province - Isabela Road - Chainage 19243 - Chainage 19495, Chainage 19564 - Chainage 21780 [Road Upgrading Gravel to Paved]
Physical Target = 4.936 ln-km
May 10, 2017 2017 WIN7E01545 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Barangay Road, Bakod Bayan, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road)
May 10, 2017 2017 WIN7E01453 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement / Repair of Road, Bantog St., Brgy. Camatsile, Gabaldon, Nueva Ecija
(Construction of Concrete Road)
May 10, 2017 2017 WIN7E01057 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction of Local Road, Phase I, Milaor, Camarines Sur (Construction of Concrete)
Physical Target: -
Unit Cost: -
Allocation: P6.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Construction/Rehabilitation/Improvement of Local Roads, Brgy. Dalipay, Brgy. Mayaopayawan and Brgy. Lipot, Milaor, Camarines Sur (Construction of Concrete Road/ Rehabilitation of Concrete Road)
Physical Target: Const. of Concrete Road: 0.804 lane.km
Rehab. of Concrete Road: 0.296 lane.km
Unit Cost: Const. of Concrete Road: P4,975T/ lane.km
Rehab. of Concrete Road: P6,757T/lane.km
Estimated Cost: P6.0M

May 10, 2017 2017 WIN7E01055 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.26+400-Sta.26+681, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 281 ln.m
Unit Cost: P169.32T/ln.m
Allocation: P47.580M

As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Barangay Del Carmen - Del Rosario, Sta.27+013 - Sta.27+445, Minalabac, Camarines Sur (Construction of Flood Mitigation Structure)
Physical Target: 432 ln.m
Unit Cost: P110.14T/ln.m
Estimated Cost: P47.580M
May 10, 2017 2017 WIN7E01054 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 1st District Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.27+000 - Sta.27+294, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 294 ln.m
Unit Cost: P156.50T/ln.m
Allocation: P46.010M

As MODIFIED:
MFO-2 Flood Management Services: Construction /
Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Dike (along the cut-off Channel) along Bicol River Basin, Sta.25+282 - Sta.25+698, Barangay San Juan - San Lorenzo, Minalabac, Camarines Sur
(Construction of Flood Mitigation Structure)
Physical Target: 416 ln.m
Unit Cost: P110.60T/ln.m
Estimated Cost: P46.010M
May 10, 2017 2017 WIN7E01352 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln.km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Concreting of Barangay Road, Brgy. Pinagdapian, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.556 ln.km
Unit Cost (P'000): P3,597.12/ln-km
Allocation (P'000): P2,000.00


May 10, 2017 2017 WIN7E01355 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01355 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.3 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Widening of Barangay Road, Barangay Salvacion, Del Gallego, Camarines Sur [Road Widening]
Physical Target: 0.384 ln-km
Unit Cost (P'000): P3,906.25/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01086 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.480ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Binahian going to Brgy. Caima, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.444 ln-km
Unit Cost (P'000): P4,504.5045/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01087 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Brgy. Buenasuerter Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.339 ln-km
Unit Cost (P'000): P4,424.7788/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01348 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads — Concreting of Barangay Road, Barangay Cabugao, Ragay, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.528 ln-km
Unit Cost (P'000): P3,787.88/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01345 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Comadogcadog, Del Gallego, Camarines Sur
[Construction of Concrete Road]
Physical Target: 0.162 ln-km
Unit Cost (P'000): P9,259.26/ln-km
Estimated Cost (P'000): P1,500.00

May 10, 2017 2017 WIN7E01353 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.4 ln-km
Unit Cost (P'000): P3,750.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mabini, Del Gallego, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.376 ln-km
Unit Cost (P'000): P3,989.36/ln-km
Estimated Cost (P'000): P1,500.00

May 10, 2017 2017 WIN7E01078 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Mantila, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 GAA FY 2017 WIN7G01446 GAA FY R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving / Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-Glan)
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1609+081 - K1610+020, K1601+100 - K1602+000,
K1602+000 - K1602+564, K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1610+020 - K1610+081

TO: National Road Network Services:
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) -Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Paving of Shoulders (Caputian-Basiawan Section), Davao Occidental
K1598+853 - K1599+000, K1599+000 - K1600+000, K1600+936 - K1601+100, K1601+100 - K1602+000, K1602+000 - K1602+564
K1604+972 - K1605+566, K1606+415 - K1608+050, K1608+476 - K1609+081, K1609+081 - K1610+020, K1610+020 - K1610+081

ALLOCATION: Php 169.255 Million
May 10, 2017 GAA FY 2017 WIN7G01449 GAA FY R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: National Road Network Services:
Asset Preservation of National Roads-Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Reconstruction from Asphalt to Concrete/Off-Carriageway Improvement: Shoulder Paving/Construction and Construction of Road Slope Protection Structure - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1618+355 - K1619+000, K1619+957 - K1620+300, K1620+300 - K1623+000, K1616+816 - K1617+000,
K1617+520 - K1617+804, K1619+199 - K1619+583, K1616+265 - K1616+405

TO: National Road Network Services:
Asset Preservation of National Roads -Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Slope Protection and Paving of Shoulders (Buhangin-Lacaron Section), Davao Occidental
K1616+265 - K1616+405, K1616+816 - K1617+000, K1617+520 - K1617+804, K1618+355 - K1619+000,
K1619+199 - K1619+583, K1619+957 - K1620+300, K1620+300 - K1623+000

ALLOCATION: Php 132.605 Million
May 10, 2017 2017 WIN7E01343 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Port Junction Norte to Barangay Lohong, Ragay, Camarines Sur
[Construction of Concrete Road]
Physical target: 0.324 ln-km
Unit Cost (P'000): P6,172.84/ln-km
Estimated Cost (P'000): P2,000.00

May 10, 2017 2017 WIN7E01351 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.4 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Barangay Samay, Ragay, Camarines Sur [Construction of Concrete Road]
Physical target: 0.456 ln-km
Unit Cost (P'000): P4,385.96/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01090 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.40 ln-km
Unit Cost (P'000): P3,750/ln-km
Allocation (P'000): P1,500

As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. San Rafael Sur, Lupi, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.6667/ln-km
Estimated Cost (P'000): P1,500


May 10, 2017 2017 WIN7E01084 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Allocation (P'000): P2,000

As MODIFIED:
Locally-Funded Projects — Roads and Bridges Local Roads — Concreting of Barangay Road, Brgy. South Centro, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.501 ln-km
Unit Cost (P'000): P3,992.02/ln-km
Estimated Cost (P'000): P2,000
May 10, 2017 2017 WIN7E01349 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Preventive Maintenance of
Road: Concrete Reblocking]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P2,000.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Reblocking of Barangay Road, Brgy. Sta. Cruz, Cabusao, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.525ln-km
Unit Cost (P'000): P3,809.52/ln-km
Estimated Cost (P'000): P2,000.00
May 10, 2017 2017 WIN7E01085 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.48 ln-km
Unit Cost (P'000): P3,125/ln-km
Allocation (P'000): P1,500

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Concreting of Barangay Road, Brgy. Tible, Sipocot, Camarines Sur [Construction of Concrete Road]
Physical Target: 0.36 ln-km
Unit Cost (P'000): P4,166.667/ln-km
Estimated Cost (P'000): P1,500

May 10, 2017 2017 WIN7E01356 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.20 ln-km
Unit Cost (P'000): P4,166.67/ln-km
Allocation (P'000): P5,000.00

As MODIFIED:
Locally-Funded Projects - Roads and Bridges - Local Roads - Reblocking of Barangay Road, Brgy. Poblacion Ilaod going to Brgy. Apad, Ragay, Camarines Sur [Preventive Maintenance of Road: Concrete Reblocking]
Physical Target: 1.287 ln-km
Unit Cost (P'000): P3,885.00/ln-km
Estimated Cost (P'000): P5,000.00
May 10, 2017 2017 WIN7E01527 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Flood Control Structures, Angat River, Rueda Section, Plaridel, Bulacan
(Construction of Flood Mitigation Structure)
May 10, 2017 2017 WIN7E01350 FY 2017 GAA RA 10924 December 28, 2016 Region V Camarines Sur 5th District Engineering Office
As per GAA:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.30 ln-km
Unit Cost (P'000): P5,000.00/ln-km
Allocation (P'000): P1,500.00

As MODIFIED:
Locally-Funded Projects — Roads and Bridges — Local Roads — Repair/Rehabilitation of Barangay Road, Barangay Sta. Rita Il, Del Gallego, Camarines Sur
[Rehabilitation of Concrete Road]
Physical Target: 0.366 ln-km
Unit Cost (P'000): P4,098.36/ln-km
Estimated Cost (P'000): P1,500.00
May 10, 2017 2017 WIN7E01212 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
As per GAA:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure (Downstream, Right
Side) and Groundsill (Downstream), Macawayan Section, Irosin, Sorsogon [Construction of Food Mitigation Structure]
Physical Target: 300.0lm
Unit Cost (P'000): P150.0/lm
Allocation (P'000): P45,000.00

As MODIFIED:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems - Construction of Flood Mitigation Structure -
Construction of Flood Control Structure along Cadac-an River, Barangay Macawayan, Irosin, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 435.0lm
Unit Cost (P'000): P103.45/lm
Estimated Cost (P'000): P45,000.00
May 10, 2017 2017 WIN7E01210 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon 2nd District Engineering Office
MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures —
Construction of Flood Control Structures along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon [Construction of Flood Mitigation Structures]
Physical Target: 250 sq.m.
Unit Cost (P'000): P200.0/sq.m.
Allocation (P'000): P50,000.00

MFO 2 — Flood Management Services — Construction/
Maintenance of Flood Mitigation Structures and Drainage
Systems — Construction of Flood Mitigation Structures -
Reconstruction of Flood Control Structure along Cadac-an River, Barangay Carriedo, Irosin, Sorsogon(Upstream, Right Side) Sta. 1+578.70 - Sta. 1+932.70 [Reconstruction of Flood
Mitigation Structures]
Physical Target: 354 sq.m.
Unit Cost (P'000): P141.24/sq.m.
Estimated Cost (P'000): P50,000.00
May 10, 2017 FY 2017 WIN7C01568 SR2017-02-002147 February 1, 2017 Region VIII Regional Office VIII
As per GAA:
MFO 3 - Maintenance and Construction Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Construction of Gravel Road - Junction Abuyog-Silago Road, Cadac-an-Malaguicay-Boundary Silago Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte
As Modified:
MFO 3 - Construction and Maintenance Services of Other Infrastructures
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Junction Abuyog-Silago Road- Cadac-an-Malaguicay Road Section (Malaguicay Falls), including bridge, Abuyog, Leyte 5th LD
May 9, 2017 CY 2017 WIN7E01465 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
Secondary Road
Sibuyan Circumferential Road
K0051+317 -K0052+091,
K0052+353 - K0052+557,
K0061+466 - K0062+730,
K0062+809 - K0064+937,
K0065+261 - K0066+028,
K0066+167 - K0067+078,
K0068+155 - K0068+919
L = 13.742 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved )
May 9, 2017 CY 2017 WIN7E01489 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Tablas Circumferential Road
K0033+900 - K0034+743.60
7,200 sq m
Php 117,442,000.00
(Construction of Road Slope Protection Structure)
May 9, 2017 2017 WIN7E01036 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Barangay
Health Center, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Allocation: P3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Covered Court, Brgy. Del Rosario, Canaman, Camarines Sur (Construction of Other Building)
Physical target: 1 Bldg.
Unit Cost: P3.0M/Bldg.
Estimated Cost: P3.0M
May 9, 2017 2017 WIN7E01035 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building with Tanod Outpost and Basketball Court, Pangpang, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Allocation: P3.0M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures: Multipurpose / Facilities: Construction of Multipurpose Building of Multipurpose Building (Covered Court), Brgy.Mangayawan, Canaman, Camarines Sur (Construction of Multipurpose Building)
Physical target: 1 Bldg.
Unit Cost: -
Estimated Cost: P3.0M
May 9, 2017 2017 WIN7E01030 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+694 - K0445+283
(Road Widening)
Physical Target: 3.180 Lane km
Unit Cost: P14,858.17/Lane Km
Allocation: Php 47.249M

As MODIFIED:
MFO 1 : NATIONAL ROAD NETWORK SERVICES;
Network Development, Improvement/Widening of
National Roads - Tertiary, Naga City Bdry-Calabanga-Balongay Rd - (S03506LZ) K0443+686 - K0444+880(Road Widening/Construction of Drainage Structure along the Road)
Physical Target: Widening: 2.388 Lane km
Const. of drainage with sidewalk: 1.456ln.m.
Unit Cost: Widening: P9,014.60/Lane Km
Const. of drainage with sidewalk: P17,666.30/Ln.m.
Estimated Cost: PhP 47.249M

May 9, 2017 CY 2017 WIN7E01483 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of Missing Gaps connecting
National Roads, including ROW
Victoria-Sablayan Road
Sta. 052+234.35 - Sta. 059+107
L = 12.545 lane km
Php 150,000,000.00
( Construction of Concrete Road )
May 9, 2017 2017 WIN7E01031 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 2nd District Engineering Office
As per GAA:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+500-K0440+951, K0443+000-K0443+219 (Road Widening)
Physical Target: 3.770 Lane km.
Unit Cost: P13,129.97T/lane km.
Allocation: P49.500M

As MODIFIED:
MFO-1 National Road Network Services: Network Development: Improvement / Widening of National Roads: Tertiary Roads: Naga - Carolina - Panicuason Rd (S03567LZ) K0439+469-K0440+549 (Road Widening/Construction of Drainage/Structure along Road/Reconstruction: Raising od Grade)
Physical Target: 2.160 lane km.
1.943 lm.
1,447.20 lane km.
Unit Cost: P5,820.35T/lane km.
P15,440.66T/lm.
P1,447.20T/lm.
Estimated Cost: P49.500M
May 9, 2017 CY 2017 WIN7E01490 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading ( Unpaved to Paved )
- Secondary Road
Culandanum - Panalingaan Cross Country Road
Chainage 11980 - Chainage 12229,
Chainage 12251 - Chainage 14785,
Chainage 16169 - Chainage 16210
L = 5.648 lane km
Php 113,000,000.00
( Road Upgrading Gravel to Paved )
May 9, 2017 CY 2017 WIN7E01470 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access Roads
leading to Declared Tourism destinations
Bacungan - Simpucan - Bagumbayan -
Napsan Road
Sta. 33+818 - Sta. 39+820
L = 12.534 lane km
Php 200,000,000.00
( Construction of Concrete Road )
May 9, 2017 CY 2017 WIN7E01466 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructures
- Construction/Improvement of Access
Roads leading to Airports
Bantulan (Pamantolon) -
Sandoval Airport Access Road
Sta. 007+219.6 - Sta. 013+118
L = 11.742 lane km
Php 150,000,000.00
( Construction of Concrete Road )
May 9, 2017 2017 WIN7E01253 SR2017-01-000213 January 27, 2017 Region V Regional Office V
As per GAA:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302 + 646 - K0306 + 137, K0315 + 000 - K0315 + 749 (S03784LZ)
(Road Widening)
Physical Target: 8.534 Lane km
Unit Cost: P15,819.07/Lane km
Allocation: PhP 135.0M

As MODIFIED:
MFO 1: National Road Network Services - Network
Development - Improvement /Widening of National Roads - Primary Roads along N1 Road Widening - Daang Maharlika (LZ) - K0302+646 - K0305+440, K0315+000 - K0315+749 (S03784LZ)
(Road Widening/Construction of Drainage Structure along Road)
Physical Target:
Road Widening: 7.13 Lane km
Const.of Drainage Structure along Road: 3,635.20 Lm
Unit Cost:
Road Widening: P15,353.845T/Lane km
Const.of Drainage Structure along Road: P7.022T/Lm
Estimated: PhP 135.0M
May 9, 2017 2017 WIN7E01252 SR2017-01-000529 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate (Construction of Concrete Road)
Physical Target: 6.67 Lane km
Unit Cost: P14,992.50/Lane km
Allocation: Php 100.0M

As MODIFIED:
MFO 3: Construction and Maintenance Services of
Other Infrastructures - Construction/Improvement of Access Roads leading to Airports, Seaports. and
Declared Tourism Destinations - to seaports,
Construction of Concrete Road - Jct. Morning, Cataingan- Esperanza Port Road, Masbate K0109+000 - K0112+701.56 (Construction of Concrete Road)
Physical Target: 7.40312 Lane km
Unit Cost: P13,508.04/Lane km
Estimated Cost: Php 100.0M

May 8, 2017 2017 WIN7E01336 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
AS PER GAA:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+661,
K0535+700 - K0535+927, K0541+300 - K0541+524, K0542+691.40 - K0542+1013.9
( Reconstruction from Concrete to Concrete)
Physical Target; 2.475 Lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000): P49,500

AS MODIFIED:
MFO 1 — National Road Network Services - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway
Development Management-4 (HDM-4)
— Secondary : Reconstruction from Concrete to Concrete – Presentacion - Maligaya Rd — K0534+100- K0534+300, K0534+400 -K0534+561,
K0535+700 - K0535+927, K0541+300 - K0541+514, K0542+691.40 - K0542+1013.9
( Rehabilitation of Concrete Road)
Physical Target; 2.249 Lane-km
Unit Cost (P'000): P22,009.78/lane-km
Estimated Cost (P'000): P49,500

May 8, 2017 CY 2017 WIN7E01497 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (Unpaved to Paved)
- Secondary Road
Sibuyan Circumferential Road
K0082+297 - K0084+943,
K0085+092 - K0087+042
L = 9.158 lane km
Php 100,000,000.00
( Road Upgrading Gravel to Paved )
May 8, 2017 2017 WIN7E01346 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
AS PER GAA:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 000
( Off-Carriageway Improvement: Shoulder Paving/
Construction)
Physical target: 8,496 sq.m.
Unit Cost (P'000): P5.720T/sq.m.
Allocation Cost (P'000): P48,597

AS MODIFIED:
MFO — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Tertiary : Off-Carriageway Improvement: Shoulder Paving / Construction - Jct Binalay (Tinambac)-Tamban Rd - K0513 + 850 - K0514 + 979, K0514 + 1007 - K0516 + 015 ( Shoulder Paving/Construction)
Physical target: 6,648.14 sq.m.
Unit Cost (P'000): P7.310T/sq.m.
Estimated Cost (P'000): P48,597


May 8, 2017 CY 2017 WIN7E01462 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading (unpaved to paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0068+919 - K0070+194,
K0070+448 - K0071+283,
K0071+434 - K0071+490,
K0076+138 - K0078+633,
K0078+983 - K0079+249,
K0079+577 - K0081+060,
K0081+776 - K0082+297
L = 13.958 lane km
Php 150,000,000.00
( Road Upgrading Gravel to Paved )
May 8, 2017 2017 WIN7E01347 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0567 + 1000
(Construction of Road Slope Protection Structure)
Physical Target: 1,400 sq.m.
Unit Cost (P'000): P6,789/sq.m.
Allocation Cost (P'000): P9,504

As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction of National Roads with Slips, Slope
Collapse, and Landslide — Secondary : Construction of Road Slope Protection Structure - Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd K0567 + 900 - K0568 + 137.30
(Construction of Road Slope Protection Structure)
Physical Target: 1,173.90 sq.m.
Unit Cost (P'000): P8.096T/sq.m.
Estimated Cost (P'000): P9,504

May 8, 2017 2017 WIN7E01358 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Abo (Zone 7), Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally — Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, PobIacion-Barangay Abo (Zone 7), Tigaon, Camarines Sur
Sta. 0+000 - sta. 0+100.00, Sta. 0+208.70 - Sta. 0+258.70 (Construction of Concrete Road)
Physical Target: 0.30 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,500



May 8, 2017 CY 2017 WIN7E01463 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Regional Office IV-B
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Road Upgrading ( unpaved to paved ) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis )
- Secondary Road
Sibuyan Circumferential Road
K0044+032 - K0044+599,
K0044+731 - K0045+478,
K0045+610 - K0047+517,
K0047+718 - K0047+727,
K0047+859 - K0048+085,
K0048+217 - K0049+565,
K0049+743 - K0049+861,
K0049+993 - K0050+471,
K0050+471 - K0050+598
L = 12.482 lane km
Php 150,000,000.00
( Road Upgrading to Paved )
May 8, 2017 2017 WIN7E01340 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Allocation Cost (P'000): P2,000

As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Repair/ Improvement of Multi-Purpose Building (Covered Court), Brgy. Gaao, Tigaon, Camarines Sur (Rehabilitation/Major Repair Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P2,000
Estimated Cost (P'000): P2,000

May 8, 2017 2017 WIN7E012B7 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures (Rip Rap), Brgy. Tagas, San Jose, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/ Facilities :
Construction of Flood Control Structures, Brgy. Tagas, San Jose, Camarines Sur (Construction of Drainage Structure)
Physical Target: 13.50 lm
Unit Cost (P'000): P74.074T/lm
Estimated Cost (P'000): P1,000

May 8, 2017 2017 WIN7E01308 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0535 + 000, K0536 + 793 - K0536+ 1014,
K0545 + 812 - K0546 + 079, K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503
( Road Upgrading Grave/ to Paved)
Physical Target: 4.138 lane-km
Unit Cost (P'000): P20,382/lane-km
Allocation Cost (P'000): P84,342


As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved Tinambac-Siruma Rd - K0521 + 1002 - K0521 + 1020, K0524 + 851.50 - K0524 +872.60, K0526 + 282.40 - K0526 + 598.10, K0526 + 643.25 - K0526 + 734.55, K0534 + 959 - K0534 + 1008.00, K0536 + 793 - K0536+ 1014,
K0546 + 949.43 - K0547 + 502.30, K0549 + 939.40 - K0550 + 503 ( Road Upgrading Grave/ to Paved)
Physical Target: 3.638 lane-km
Unit Cost (P'000): P23,184/lane-km
Estimated Cost (P'000): P84,342
May 8, 2017 2017 WIN7E01290 FY 2017 RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 581 - K0504 + 792 ( Road Upgrading Grave/ to Paved)
Physical Target: 2.450 lane-km
Unit Cost (P'000): P20,000/lane-km
Allocation Cost (P'000):P49,000


As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Tertiary : Road Upgrading Gravel to Paved - Tigaon-Goa-Sn Jose-Lagonoy-GuijaIo via Sn Vicente Rd - K0503 + 560 - K0504 + 360 (Road Upgrading Grave/ to Paved)
Physical Target: 1.628 lane-km
Unit Cost (P'000): P30,098/lane-km
Estimated Cost (P'000):P49,000
May 8, 2017 2017 WIN7E01286 FY 2017 GAA RA 10924 November 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 256
( Road Upgrading Grave/ to Paved)
Physical target: 0.728 lane-km
Unit Cost (P'000): P54,176/lane km
Allocation Cost (P'000): P39,440

As MODIFIED:
MFO 1 — National Road Network Services - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) — Secondary : Road Upgrading Gravel to Paved - Lagonoy-Presentacion Rd - K0498 + 870 - K0499 + 018, K0499 + 081 - K0499 + 360
( Road Upgrading Grave/ to Paved)
Physical target: 0.934 lane-km
Unit Cost (P'000): P42,227/lane km
Estimated Cost (P'000): P39,440
May 8, 2017 2017 WIN7E01279 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0508+621 - K0509+000, K0513+895 - K0514+097, K0518+009 - K0518+109, K0524+858 - K0525+015, K0526+300 - 0526+902 (Rehabilitation of Concrete Road)
Physical Target: 3,028 lane-km
Unit Cost (P'000): P16.182T/lane-km
Allocation Cost (P'000): P49,000

As MODIFIED:
MFO 1 — National Road Network Service - Asset Preservation of National Roads - Rehabilitation/
Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) — Secondary : Reconstruction from Concrete to Concrete - Lagonoy- Presentacion Rd - K0509+700-K0509+772, K0510+845-K0511+000, K0513+891-K0514+093.47,K0515+300-K0515+526,K0518+005-K0518+105, K0521+841-K0521+1023, K0524+286-K0524+387, K0524+858-K0525+015, K0526+563-K0526+660
(Rehabilitation of Concrete Road)
Physical Target: 2,989 lane-km
Unit Cost (P'000): P16.393T/lane-km
Estimated Cost (P'000): P49,000
May 8, 2017 2017 WIN7E01282 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 256 - K0500 + 888 (Shoulder Paving/Construction)
Physical Target: 13,260 sq.m.
Unit Cost (P'000): P3.763T/sq.m.
Allocation Cost (P'000): 49,900


As MODIFIED:
MFO 1 — National Road Network Services - Network
Development - Off-Carriageway Improvement including drainage — Secondary : Off-Carriageway Improvement: Shoulder Paving / Construction - Lagonoy-Presentacion Rd - K0498 + -817 - K0498 + 870, K0499 + 360 - K0501 + 032 (Shoulder Paving/Construction)
Physical Target: 8,796.24sq.m.
Unit Cost (P'000): P5.673T/sq.m.
Estimated Cost (P'000): 49,900
May 8, 2017 2017 WIN7E01341 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities : Construction of Flood Control Structures, Brgy. Vinagre, Tigaon, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally-Funded Projects - Flood Control and Drainage - Flood Control Structures/Facilities .
Construction of Flood Control Structure Poblacion, Brgy. Vinagre, Tigaon, Camarines Sur - Sta. 0+000.00 - Sta. 0+115.00 (Construction of Drainage
Structure along Road)
Physical Target: 115.0 lm.
Unit Cost (P'000): P13.043T/lm
Estimated Cost (P'000): P1,500

May 8, 2017 2017 WIN7E01339 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally —Funded Projects - Roads and Bridges - Local Roads . Construction of Local Road, Brgy.
Catalotoan, Sagñay, Garchitorena, Camarines Sur
Physical target: 0.20 lane-km
Unit Cost (P'000): P5,000/lane-km
Estimated Cost (P'000): P1,000
May 8, 2017 2017 WIN7E01338 FY 2017 GAA RA 10924 December 28, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
Physical Target: -
Unit Cost (P'000): -
Allocation Cost (P'000): P1,000

As MODIFIED:
Locally - Funded Projects - Roads and Bridges - Local Roads : Construction of Local Road, Brgy.
Antipolo, Tinambac, Garchitorena, Camarines Sur
(Construction of Concrete Road)
Physical Target: 0.20 lane km.
Unit Cost (P'000): P5,000/ lane-km
Estimated Cost (P'000): P1,000

May 8, 2017 CY 2017 WIN7E01500 GAA CY 2017 RA 10924 December 29, 2016 Region IV-A Regional Office IV-A
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National Roads
with Slips, Slope Collapse, and Landslide
- Secondary Road
Sibuyan Circumferential Road
K0003+615.71 - K0004+000
7,200 sq m.
Php 117,442,000.00
(Construction of Road Slope
Protection Structure )
May 8, 2017 2017 WIN7C01519 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Network Development -
Improvement/Widening of National Roads - Other Primary -
Dipolog - Sindangan - Liloy Rd
(S01057MN) -
K1847+544 - K1847+690,
K1847+(-576) - K1847+(-282.40),
K1848+060 - K1848+800
Allocation:
Php 35.367 Million
Physical Target: 2.3592 lane km
Unit Cost: Php 14,991,098.68/lane km
May 8, 2017 2017 WIN7C01511 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads - Dipolog - Sindangan - Liloy Rd (S01057MN)
K1917+913.60 - K1917+1400
Allocation: Php 7.200 Million
Physical Target: 952.80 lm.
Unit Cost: Php 7,556.68/lm
May 8, 2017 2017 WIN7C01509 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Dohinob River Roxas, Zamboanga del Norte, 2nd LD
Allocation: Php 45.000 Million
Physical Target: 647 lineal meters
Unit Cost: Php 69,551.78/lm
May 8, 2017 2017 WIN7C01512 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Roads and Bridges - Local Roads -
Road Concreting of Brgy. Road, Brgy. Poblacion, Siayan, Zamboanga del Norte, 2nd LD
Allocation: Php 4.000 Million
Physical Target: 0.880 lane km.
Unit Cost: Php 4,545,454.54/lane km
May 8, 2017 2017 WIN7C01521 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure at Mandih, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 30.000 Million
Physical Target: 379 lineal meters (lm)
Unit Cost: Php 79,155.67/lm
May 8, 2017 2017 WIN7C01520 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Piao River, Sindangan, Zamboanga del Norte, 2nd LD
Allocation: Php 20.000 Million
Physical Target: 212 lineal meters (lm)
Unit Cost: Php 94,339.62/lm
May 8, 2017 2017 WIN7C01514 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Network Development -
Improvement/Widening of National Roads,
Tertiary - Road Widening - Dipolog - Polanco - Piñan Jct. Oroquieta Rd including RROW,
K1833+860 - K1834+363 (S01054MN)
Allocation:
Php 22.657 MIllion (Total)
Php 18.1256 MIllion (Road Widening)
Php 4.5314 MIllion (ROW Acquisition)
Physical Target:
1.000 lane km (Road Widening)
886.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 18,125,600/lane km (Road Widening)
Php 5,114.45/sq.m. (ROW Acquisition)
May 8, 2017 2017 WIN7C01515 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4) - Primary Roads - Dipolog - Punta - Dansullan - S. Osmeña - Zamboanga del Norte/Sur Bdry Rd (S01056MN)
K1850+577.98 - K1850+699.54
Allocation: Php 2.004 Million
Physical Target: 0.24312 lane km
Unit Cost: Php 8,242,843.04/lane km
May 8, 2017 2017 WIN7C01510 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Asset Preservation of National Roads -
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslides - Secondary Roads -
Sindangan - Siayan - Dumingag - Mahayag (S01060MN) (Sindangan - Siayan Section)
K1929+920 - K1929+990, R/S
K1937+140 - K1937+660, L/S
K1939+9355 - K1939+9500, L/S
K1939+060 - K1939+090
Allocation: Php 17.269 Million
Physical Target: 5,849.09 sq.m.
Unit Cost: Php 2,952.42/sq.m.
May 8, 2017 2017 WIN7E01071 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M

As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
May 8, 2017 2017 WIN7E01071 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M

As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
May 8, 2017 2017 WIN7E01071 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 73.20 sq.m.
Unit Cost: P109.59T/Sq.m.
Allocation: Php 8.0M

As per GAA:
MFO 1- National Road Network Services: Construction and Maintenance of Bridges along National Roads, Construction of New Permanent Bridges, Matungao Br. along Masbate-Cataingan-PIacer Rd (Phase II) (Construction of Concrete
Bridge)
Physical Target: 2,010 sq.m.
Unit Cost: P3.98T/Sq.m.
Estimated Cost: Php 8.0M
May 8, 2017 2017 WIN7E01342 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
MFO-1 National Road Network Services: Construction and Maintenance of Bridges along National Roads — Construction of New Permanent Bridges: Construction of Concrete Bridge — Pinamangcaan Br. along Jct Tawad - Balud Rd (Construction of Concrete Bridge)
Physical target: 457.5 sq.m.
Unit Cost: P109.590T/sq.m.
Allocation: P49.900M

As MODIFIED:
MFO-1 National Road Network Services: Construction and Maintenance of Bridges along National Roads — Construction of New Permanent Bridges: Construction of Concrete Bridge — Pinamangcaan Br. along Jct Tawad - Balud Rd (Construction of Concrete Bridge)
Physical target: 486.54 sq.m.
Unit Cost: P102.560T/sq.m.
Estimated Cost: P49.900M



May 8, 2017 2017 WIN7E01310 FY 2017 GAA RA 10924 December 29, 2016 Region V Masbate 1st District Engineering Office
As per GAA:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures Multipurpose / Facilities: Construction of DPWH Masbate 1st DEO Supply, Procurement and
General Services Building, Masbate City, Masbate
(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P10M/Bldg.
Allocation: P10M

As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures Multipurpose / Facilities: Construction of DPWH Masbate 1st DEO Building (Annex), Masbate City, Masbate
(Construction of Other Building)
Physical Target: 1 Bldg.
Unit Cost: P10M/Bldg.
Estimated Cost: P10M
May 8, 2017 2017 WIN7C01513 FY 2017 (R.A 10924) March 27, 2017 Region IX Zamboanga del Norte 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Dipolog River Flood Control Development Project, Barangay Turno, Dipolog City, Zamboanga del Norte, 2nd LD
Allocation: Php 45.000 Million
Physical Target: 261 lineal meters (lm)
Unit Cost: Php 172,413.79/lm
May 8, 2017 GAA FY 2017 WIN7E01312 RA 10924 January 27, 2017 Region III Zambales 1st District Engineering Office
Flood Control and Drainage:
Drainage/Protection Works

Construction of Slope Protection/Flood Control at Sto. Nino River Dike, Sta. 0+200 to Sta. 0+469 Cabangan, Zambales

(Construction of Slope Protection Structure)
May 5, 2017 FY 2017 WIN7E01450 UACS No. 292003020401855 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO 2 - Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayn River, Sta. 1+530 to Sta. 1+745, Valenzuela [CW1-Construction of Revetment]
UACS No. 292003020401855
Physical Target/Cost
Original: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P232.55814/lm
Allocation (‘000): P50,000.00
WIN7E01450

As Modified
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+725 to Sta. 1+870, Sta.1+915 to Sta. 1+985, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401855
New: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P224.53419/lm
Est. Cost (‘000): P48,274.00
WIN7E01450
May 5, 2017 FY 2017 WIN7E01451 UACS No. 292003020401854 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+135 to Sta. 1+530, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401854
Physical Target/Cost
Original: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P232.55814/lm
Allocation (‘000): P50,000.00
WIN7E01451

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+135 to Sta. 1+345, Sta. 1+527 to Sta.1+672, Sta. 1+685 to Sta.1+685 to Sta. 1+725, Valenzuela [CW1 – Construction of Revetment]
UACS No. 292003020401854
New: CW1 – 215.00 lm
Unit Cost (‘000): CW1-P221.79474/lm
Est. Cost (‘000): P47,685.00
WIN7E01451
May 5, 2017 FY 2017 WIN7E01440 UACS No. 292003020401545 January 2, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Slope Protection and Other Improvements including Removal of Informal Settlers along Talon Creek to Almirante Creek, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401545
Physical Target/Cost
Original: 3,200 m2
Unit Cost (P’000): P18.750T/m2
Allocation Cost (P’000): P60,000
WIN7E01440

As Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Flood Control and Other Improvements including Removal of Informal Settlers along Talon Creek to Almirante Creek, Las Piñas City (Construction of Slope of Flood Control Structure)
UACS No. 292003020401545
Physical Target/Cost
Modified: 920 lm
Unit Cost (P’000): P65.217T/lm
Allocation Cost (P’000): P60,000
WIN7E01440
May 5, 2017 2017 WIN7G01390 FY 2017 (R.A 10924) April 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building/Covered Court at Brgy. Baao, Dapitan City, Zamboanga del Norte
Allocation: Php 2.2 Million (Total)
Physical Target: 1 Project
Unit Cost: Php 2,200,000.00/project
May 5, 2017 2017 WIN7G01388 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Buildings and Other Structures -
Multipurpose/Facilities
Construction of Multipurpose Building/Covered Court at Brgy. Princesa Lamaya, Sergio Osmeña, Zamboanga del Norte
Allocation: Php 2.2 Milllion (Total)
Physical Target: 1 Project
Unit Cost: Php 2,200,000.00/project
May 5, 2017 2017 WIN7G01404 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Bridges
Construction of Pitusan Bridge (Local Bridge), including RROW, Dapitan City, Zamboanga del Norte
Sta. 1828+133.58 - Sta. 1828+194.42
Allocation:
Php 50.000 Million (Total)
Php 49.365 Million (Bridge)
Php 0.635 MIllion (ROW Acquisition)
Physical Target:
580.41 sq.m. (Bridge)
1,810 sq.m. (ROW Acquisition)
Unit Cost:
Php 85,051.95/sq.m. (Bridge)
Php 350.83/sq.m. (ROW Acquisition)
May 5, 2017 2017 WIN7G01397 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Layawan River, Poblacion Section, Polanco, Zamboanga del Norte - Construction of Revetment including RROW
Sta. 0+260 - Sta. 0+428
Allocation:
Php 20.00 Million (Total)
Php 19.80 Million (Flood Control)
Php 0.2 Million (ROW Acquisition)
Physical Target:
168.00 lm. (Flood Control)
1,680 sq.m. (ROW Acquisition)
Unit Cost:
Php 117,857.14/lm (Flood Control)
Php 119.05/sq.m. (ROW Acquisition)
May 5, 2017 2017 WIN7G01398 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Flood Control Structure (Poblacion Side) along Layawan River, Dapdap Section, Polanco, Zamboanga del Norte -
Construction of Revetment including RROW
Sta. 01+654.30 - Sta. 01+818.30
Allocation:
Php 20.000 Million (Total)
Php 19.800 MIllion (Flood Control)
Php 0.2 Million (ROW Acquisition)
Physical Target:
164 lm. (Flood Control)
1,640 sq.m. (ROW Acquisition)
Unit Cost:
Php 120,731.71/lm (Flood Control)
Php 121.95/sq.m. (ROW Acquisition)
May 5, 2017 FY 2017 WIN7E01544 UACS No. 165003014300246 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4-Tertiary: Reconstruction from Asphalt to Concrete – Juan Luna St K0005+303.40-K0005+537.90, K0006+025.50-K0006+276.20, K0006+452.80-K0006+760 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300246
Physical Target/Cost
Original: 1.584 lane-km
Unit Cost (P’000): P12,626/lane-km
Allocation Cost (P’000): P20,000
WIN7E01544

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) -Tertiary: Juan Luna St - K0005+395.90-K0005+537.90, K0005+960.00-K0006+277.80, K0006+452.80-K0006+760 (S02304LZ) (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300246
Physical Target/Cost
Modified: 3.068 lane-km
Unit Cost (P’000): P6,519/lane-km
Estimated Cost (P’000): P20,000
WIN7E01544
May 5, 2017 FY 2017 WIN7E01543 UACS No. 292003020401681 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structures – Construction of Slope Protection Structures and other Improvement along Dalig Creek including ROW along Perpetual to Tramo, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401681
Physical Target/Cost
Original: 800 m2
Unit Cost (P’000): P62.500T/m2
Allocation Cost (P’000): P50,000
WIN7E01543

As Modified

MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structures – Construction of Flood Control Structures and other Improvement along Dalig Creek including ROW along Perpetual to Tramo, Las Piñas City (Construction of Slope Protection Structure)
UACS No. 292003020401681
Physical Target/Cost
Modified: 920 lm
Unit Cost (P’000): P54.348/lm
Allocation Cost (P’000): P50,000
WIN7E01543
May 5, 2017 2017 WIN7G01400 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (unpaved to paved) based on gravel road strategies traffic Benchmark for Upgrading to paved road standards (HDM-4) Project Analysis Tertiary
Road Upgrading Gravel to Paved - Polanco - Macleodes Rd including RROW -
K1830+463.4 - K1830+505,
K1843+660 - K1844+085,
K1847+535 - K1847+915
Allocation:
Php 43.393 Million (Total)
Php 42,959,070 (Road)
Php 433,930 (ROW Acquisition)
Physical Target:
1.694 lane km. (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,359,545.50/lane km (Road)
Php 33.05/sq.m. (ROW Acquisition)
May 5, 2017 2017 WIN7G01387 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control
(Revetment/Dike) Structure along Dipolog River, Conacon-Guinles Section, Polanco, Zamboanga del Norte - Construction of Revetment including ROW,
Sta. 0+244.20 - Sta. 0+594
Allocation:
Php 50.000 Million (Total)
Php 49.050 MIllion (Flood Control)
Php 0.950 (ROW Acquisition)
Physical Target:
349.80 lm. (Flood Control)
3,500 sq.m. (ROW Acquisition)
Unit Cost:
Php 140,222.98/lm. (Flood Control)
Php 271.43/sq.m. (ROW Acquisition)
May 5, 2017 2017 WIN7G01391 FY 2017 (R.A 10924) April 12, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of Flood Control Structure along Dipolog River, Guineles (Downstream Section), Polanco, Zamboanga del Norte -
Construction of Revetment including ROW,
Sta. 00+000 - Sta. 00+244.10
Allocation:
Php 30.000 Million (Total)
Php 29.700 Million (Flood Control)
Php 0.300 (ROW Acquisition)
Physical Target:
244.10 lm. (Flood Control)
2,440 sq.m. (ROW Acquisition)
Unit Cost:
Php 121,671.45/lm (Flood Control)
Php 122.95/sq.m. (ROW Acquisition)
May 4, 2017 CY 2017 WIN7E01375 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Palawan 1st District Engineering Office
as MODIFIED:
MF03 - Construction and maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Roads leading
to Airports
Construction of Concrete Bridge -
Jct. Itabiak - San Vicente Airport Access Road
(Bridge Replacement), San Vicente, Palawan
L = 177.44 sq.m
Php 19.00 Million
May 4, 2017 Cy 2017 WIN7E01459 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading of
Damaged Paved National Roads
- Secondary Road
Sibuyan Circumferential Road
K0031+733 - K0031+979
( S00008SY)
L = 0.4862 lane km
Php 4,710,000.00
( Reconstruction from Asphalt to Concrete )

May 4, 2017 CY 2017 WIN7E01457 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Improvement of Public Market
Brgy. Dapawan, Odiongan, Romblon
1 Bldg.
Php 1,000,000.00
( Construction of Multi-purpose Building )
May 4, 2017 CY 2017 WIN7E01456 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Romblon District Engineering Office
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
along National Roads
- Secondary Roads
Tablas Circumferential Road
K0003+348 - K0003+722.01,
K0003+851.50 - K0005+824,
K0081+968 - K0082+382
( S00013TL)

CW1 = 8,625.97 sq.m.
CW2 = 2,318.58 sq.m.
Php 24,500,000.00
CW1 = Php 14,228,000.00
CW2 = Php 10,272,000.00
( CW1 - Shoulder Paving/Construction )
( CW2 - Construction of Slope Protection
Structure )
May 4, 2017 2017 WIN7E01091 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Raising of Grade Maculcol Dike (Downstream), Sta. 1+650 to Sta. 2+160, San Narciso, Zambales
May 4, 2017 2017 WIN7E01528 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities - Construction/Completion of Multi-Purpose Building, Balatong B, Pullilan, Bulacan
May 3, 2017 CY 2017 WIN7E01430 GAA CY 2015 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program (LIP)
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Bonbon (Poblacion), Looc,
Occidental Mindoro
1 Bldg.
Php 1,000,000.00
( Construction Of Multi-Purpose Building)
May 3, 2017 CY 2017 WIN7E01432 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Talaotao, Looc,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building )
May 3, 2017 CY 2017 WIN7E01429 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-purpose Building
Brgy. Ilin Proper, San Jose,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-purpose Building )
May 3, 2017 CY 2017 WIN7E01428 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program ( LIP )
- Buildings and Other Structures
- Multi-Purpose Facilities
Construction of Multi-Purpose Building
Brgy. Tagbac, Lubang,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building )
May 3, 2017 CY 2017 WIN7E01433 GAA CY 2014 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Bagong Sikat ( Poblacion ), Lubang,
Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building )
May 3, 2017 Cy 2017 WIN7E01431 GAA CY 2017 RA 10924 December 29, 2016 Region IV-B Mindoro Occidental District Engineering Office
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Project ( LIP )
- Buildings and Other Structures
- Multipurpose Facilities
Construction of Multi-Purpose Building
Brgy. Maliig, Lubang, Occidental Mindoro
1 Bldg
Php 1,000,000.00
( Construction of Multi-Purpose Building )

Pages