Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Quezon City 1st Engineering District Office | SUPPLEMENTAL BULLETIN NO. 83 - POSTPONEMENT FOR CONTRACT ID NO. 24OF0179 | May 20, 2024 | May 27, 2024 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2024-67 - Amendment of Bill of Quantities and Project Description. |
May 20, 2024 | May 27, 2024 | ||
Sorsogon District Engineering Office |
Supplemental Bulletin No. 31-2024_23FK0143-Revised Bill of Quantity, Plans and ABC |
May 20, 2024 | May 27, 2024 | ||
Regional Office III |
Supplemental Bulletin No. 1 for: Contract ID No. : 24C00369 Name of Contract : Asset Preservation Program – Preventive Maintenance - Primary Roads, Daang Maharlika (LZ). |
May 20, 2024 | May 27, 2024 | ||
Regional Office XIII | 24N00162 (AMENDMENTIN THE PROCUREMENT SCHEDULE) | May 20, 2024 | May 28, 2024 | ||
Cagayan 3rd District Engineering Office | Change in Contract Duration | May 20, 2024 | May 27, 2024 | ||
Cagayan 3rd District Engineering Office | Change in Contract Duration | May 20, 2024 | May 27, 2024 | ||
Bukidnon 2nd District Engineering Office |
Supplemental Bulletin No 2 Revised Scope of Work, Major Categories of Work, Bill of Quantities, Specification/s and Equipment Requirement |
May 20, 2024 | May 27, 2024 | ||
Surigao del Sur 1st District Engineering Office |
Supplemental Bulletin for Contract ID No. 24NH0097 - Construction of North Eastern Mindanao University (NEMSU) Medical School, Tandag City, Surigao del Sur |
May 20, 2024 | May 27, 2024 | ||
Cavite 3rd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 24-05 23DQ0154 24DQ0076 CORRECTION IN THE BILL OF QUANTITIES |
May 20, 2024 | May 27, 2024 | ||
Quirino District Engineering Office |
24BK0108 - Construction of 1-storey 3-Classroom School Building in Pulang-Lupa Elementary School, Barangay Disimungal, Nagtipunan, Quirino |
May 20, 2024 | May 27, 2024 | ||
Quirino District Engineering Office |
24BK0101 - Bridge Program - Replacement of Permanent Weak Bridges - Bumabato Br. (B04453LZ) Phase II along Dumabato-Balligui Rd, Maddela, Quirino |
May 20, 2024 | May 27, 2024 | ||
Bukidnon 2nd District Engineering Office | Notice to postponement due to some adjustments and/or revision of plan | May 20, 2024 | May 27, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 43-AJ Series of 2023 for Contract ID No. 23CG0289 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 43-AJ Series of 2023 for Contract ID No. 23CG0290 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 43-AJ Series of 2023 for Contract ID No. 23CG0292 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 43-AJ Series of 2023 for Contract ID No. 23CG0294 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 51-U Series of 2023 for Contract ID No. 24CG0030 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-K Series of 2024 for Contract ID No. 24CG0093 |
May 20, 2024 | May 28, 2024 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 14-I Series of 2024 24CG0106 |
May 20, 2024 | May 28, 2024 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0078 | May 20, 2024 | May 27, 2024 | ||
Tarlac 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 24 - 24CK0141 - Construction of Multi-Purpose Building, Barangay San Roque, La Paz, Tarlac |
May 20, 2024 | May 29, 2024 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0076 | May 20, 2024 | May 27, 2024 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0074 | May 20, 2024 | May 27, 2024 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0077 | May 20, 2024 | May 27, 2024 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0075 | May 20, 2024 | May 27, 2024 | ||
Bohol 1st District Engineering Office |
Supplemental Bulletin No. 2 for 24HA0128 - Concreting of Brgy. Canlaas FMR, Brgy. Canlaas, Antequera, Bohol |
May 20, 2024 | May 27, 2024 | ||
NCR - Regional Office |
Addendum No. 1 for Contract ID No. 24O00044 (Re-ads) - Additional Manpower Requirement |
May 20, 2024 | May 28, 2024 | ||
Zambales 1st District Engineering Office |
SUPPLEMENTAL BID BULLETIN NO. 35 POSTPONEMENT OF OPENING OF BIDS RE-24CL0173- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG |
May 18, 2024 | May 25, 2024 | ||
Camiguin District Engineering Office |
Supplemental Bid Bulletin No. 48 for Contract ID No. 24KE0072 Construction of Road, Barangay Cabuan, Municipality of Guinsiliban, Province of Camiguin (Changes in Bill of Quantities, Plans, Approved Budget for the Contract (ABC), Contract Duration and Dropping and Opening of Bids) |
May 18, 2024 | May 30, 2024 | ||
Camiguin District Engineering Office |
Supplemental Bid Bulletin No. 47 for Contract ID No. 24KE0035 Construction (Completion) of New Municipal Hall and Grounds, Barangay Poblacion, Municipality of Sagay, Province of Camiguin (Changes in Bill of Quantities, Plans, Approved Budget for the Contract (ABC), Contract Duration and Dropping and Opening of Bids) |
May 18, 2024 | May 30, 2024 | ||
Camiguin District Engineering Office |
Supplemental Bid Bulletin No. 46 for Contract ID No. 24KE0054 Construction of River Control along Magting Box Culvert, Mambajao, Camiguin (Changes in Bill of Quantities, Plans, Approved Budget for the Contract (ABC) and Dropping and Opening of Bids) |
May 18, 2024 | May 30, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 01 (Correction in the Bill of Quantities (BOQ) - 24L00322 Construction of DPWH Davao del Norte Sub Office (Admin, Finance & QAS), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Minimum Equipment Requirement) - 24L00322 Construction of DPWH Davao del Norte Sub Office (Admin, Finance & QAS), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Contract Duration) - 24L00322 Construction of DPWH Davao del Norte Sub Office (Admin, Finance & QAS), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Contract Duration) - 24L00321 Construction of DPWH Davao del Norte Sub Office (Employees Quarters and DE residence), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Minimum Equipment Requirement) - 24L00321 Construction of DPWH Davao del Norte Sub Office (Employees Quarters and DE residence), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 01 (Correction in the Bill of Quantities (BOQ) - 24L00321 Construction of DPWH Davao del Norte Sub Office (Employees Quarters and DE residence), Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Approved Budget for the Contract) - 24L00320 Construction of DPWH Davao del Norte Sub DEO Building, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 01 (Correction in the Bill of Quantities (BOQ) - 24L00320 Construction of DPWH Davao del Norte Sub DEO Building, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Contract Duration) - 24L00320 Construction of DPWH Davao del Norte Sub DEO Building, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Bill of Quantities (BOQ)) - 24L00302 Construction of 1 Storey 4-Classroom School Building in New Casay Integrated School, Barangay New Casay, B.E. Dujali, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Approved Budget for the Contract) - 24L00302 Construction of 1 Storey 4-Classroom School Building in New Casay Integrated School, Barangay New Casay, B.E. Dujali, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Bill of Quantities (BOQ)) - 24L00267 Construction of Multi-Purpose Building, Carmen, Davao del Norte (Phase 2) |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Minimum Equipment Requirement) - 24L00267 Construction of Multi-Purpose Building, Carmen, Davao del Norte (Phase 2) |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Bill of Quantities (BOQ) - 24L00245 Construction of Bank Protection Structure along Lasana River protecting Panabo City Coastal Road, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Minimum Equipment Requirement) - 24L00245 Construction of Bank Protection Structure along Lasana River protecting Panabo City Coastal Road, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 04 (Correction in the Contract Duration) - 24L00244 Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Minimum Equipment Requirement) - 24L00244 Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Bill of Quantities (BOQ) - 24L00244 Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Minimum Equipment Requirement) 24L00239 Construction of Road including Bridge, Barangay San Isidro, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 (Correction in the Bill of Quantities (BOQ) - 24L00239 Construction of Road including Bridge, Barangay San Isidro, Carmen, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 05 - 24L00226 Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak - Samal - Kaputian Road, K1501+825 - K1504+140, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 04 (Correction in the Contract Name) - 24L00226 Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak - Samal - Kaputian Road, K1501+825 - K1504+140, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 (Correction in the Bill of Quantities (BOQ) - 24L00226 Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak - Samal - Kaputian Road, K1501+825 - K1504+14-, Davao del Norte |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 03 - (Correction in the Contract Name) 24L00225 Babak - Samal - Kaputian Road K1518+935 - K1521+493 |
May 18, 2024 | May 25, 2024 | ||
Regional Office XI |
Supplemental Bulletin No. 02 - (Correction in the Bill of Quantities (BOQ) 24L00225 Babak - Samal - Kaputian Road K1518+935 - K1521+493 |
May 18, 2024 | May 25, 2024 | ||
Quezon City 1st Engineering District Office |
SUPPLEMENTAL BULLETIN NO. 82 - Correction in the Bill of Quantities (BOQ) for Contract ID No. 24OF0180 |
May 18, 2024 | May 25, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | new plan -5 | May 18, 2024 | May 25, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | new plan -4 | May 18, 2024 | May 25, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | new plan -3 | May 18, 2024 | May 25, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | new plan -2 | May 18, 2024 | May 25, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | new plan -1 | May 18, 2024 | May 25, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 37 (Revisions in the ABC and BOQ) For 24PA0145 : Concreting of Sitio Paliwon to Sitio Nini, Brgy. Bazar FMR, Brgy. Bazar, Sallapadan, Abra |
May 17, 2024 | May 24, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 36 (Revisions in the Major Category of Works, Similar Category of Works) For 24PA0142 : CONSTRUCTION OF SIDONGAN-TAGAYON ROAD, LA PAZ SECTION, La Paz, Abra |
May 17, 2024 | May 24, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 36 (Revisions in the Major Category of Works, Similar Category of Works) For 24PA0142 : CONSTRUCTION OF SIDONGAN-TAGAYON ROAD, LA PAZ SECTION, La Paz, Abra |
May 17, 2024 | May 24, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 35 (Revisions in the ABC and BOQ) For 24PA0122 : Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities, Construction of Road Approaches of Otip Bridge along Abra-Cervantes Road, Mayabo-Poblacion, Tubo, Abra |
May 17, 2024 | May 24, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 34 (Revisions in the ABC and BOQ) For 24PA0117 : Concreting of Sitio Talinaoen, Brgy. Bulbulala FMR, Brgy. Bulbulala, Licuan-Baay, Abra |
May 17, 2024 | May 24, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No. 33 (Revisions in the BOQ) For 24PA0128 : Concreting of Brgy Tabiog FMR, Brgy. Tabiog, Bucay, Abra |
May 17, 2024 | May 24, 2024 | ||
Regional Office III |
Supplemental Bulletin No. 1 Basic Infrastructure Program - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Flood Mitigation Structure along Madlum River FSRR, Brgy. Tartaro, San Miguel, Bulacan (Phase 2), Contract ID No. 24C00524 Additional Minimum Major Equipment Requirements, Revision in the Bill of Quantities & Plan |
May 17, 2024 | May 24, 2024 | ||
Regional Office III |
Supplemental Bulletin No. 1 Basic Infrastructure Program - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Flood Mitigation Structure along Madlum River FSRR, Brgy. Tartaro, San Miguel, Bulacan (Phase 3), Contract ID No. 24C00522 Additional Minimum Major Equipment Requirements & Revision in the Bill of Quantities |
May 17, 2024 | May 24, 2024 | ||
Regional Office III |
Supplemental Bulletin No. 1 Basic Infrastructure Program - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Flood Mitigation Structure along Madlum River FSRR, Brgy. Tartaro, San Miguel, Bulacan (Phase 5), Contract ID No. 24C00513 Additional Minimum Major Equipment Requirements & Revision in the Bill of Quantities |
May 17, 2024 | May 24, 2024 | ||
Albay 1st Engineering Office |
24FA0040: Concreting of Brgy. Calbayog-Tinabakoan FMR, Brgy. Calbayog, Malilipot, Albay - Bid Bulletin No.3 |
May 17, 2024 | May 24, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | NEW PLAN -1 | May 17, 2024 | May 24, 2024 | ||
Quirino District Engineering Office |
24BK0097 - Network Development Program - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0363+500 - K0365+000, Maddela, Quirino |
May 17, 2024 | May 24, 2024 | ||
Quirino District Engineering Office |
24BK0097 - Network Development Program - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0363+500 - K0365+000, Maddela, Quirino |
May 17, 2024 | May 24, 2024 | ||
Catanduanes District Engineering Office | 24FH0063 - SUPPLEMENTAL BULLETIN NO. 9 WITH EDS | May 17, 2024 | May 30, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | NEW BOQ | May 17, 2024 | May 24, 2024 | ||
Catanduanes District Engineering Office | 23FH0112 - SUPPLEMENTAL BULLETIN NO. 9 WITH CORRECTED BDS | May 17, 2024 | May 30, 2024 | ||
Catanduanes District Engineering Office | 24FH0058 - SUPPLEMENTAL BULLETIN NO. 9 WITH CORRECTED BDS | May 17, 2024 | May 30, 2024 | ||
Catanduanes District Engineering Office | 24FH0051 - SUPPLEMENTAL BULLETIN NO. 9 WITH CORRECTED BDS | May 17, 2024 | May 30, 2024 | ||
Albay 2nd Engineering Office |
SUPPLEMENTAL BID BULLETIN for Contract ID no. 24FB0168 - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Package 2, Barangay Padang, Legazpi City |
May 17, 2024 | May 24, 2024 | ||
Catanduanes District Engineering Office | 24FH0050 - SUPPLEMENTAL BULLETIN NO. 9 WITH BOQ, PLANS AND CORRECTED BDS | May 17, 2024 | May 30, 2024 | ||
Benguet 1st District Engineering Office |
24PE0073 - Supplemental Bulletin No. 2024-030 for the Project "Construction of Road along Camp I-Tabaan Sur-Tabaan Norte-Taloy Sur to Marcos Highway, Phase 2, Tuba, Benguet" |
May 17, 2024 | May 24, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | SB BULLETIN 2024-037 | May 17, 2024 | May 24, 2024 | ||
Regional Office V | Supplemental Bulletin No. 2 (with Revised BOQ, Plans) - 24F00290 | May 17, 2024 | May 24, 2024 | ||
Agusan del Sur 2nd District Engineering Office | Supplemental Bulletin No. 02, Amendments in the Bill of Quantities | May 17, 2024 | May 24, 2024 | ||
Agusan del Sur 2nd District Engineering Office |
Supplemental Bulletin No. 02, Amendments in the list of minimum major equipment requirements and bill of quantities |
May 17, 2024 | May 24, 2024 | ||
Quezon City 1st Engineering District Office |
Supplemental Bulletin No. 81 Resumption of Procurement Activities For Contract ID No. 24of0161 with Bidding Documents |
May 17, 2024 | May 24, 2024 | ||
Quezon City 1st Engineering District Office |
Supplemental Bulletin No. 80 Resumption of Procurement Activities For Contract ID No. 24of0158 with Bidding Documents |
May 17, 2024 | May 24, 2024 | ||
Quezon City 1st Engineering District Office |
Supplemental Bulletin No. 79 Resumption of Procurement Activities and Correction in Approved Budget for the Contract (ABC) For Contract ID No. 24of0157 with Bidding Documents |
May 17, 2024 | May 24, 2024 | ||
Davao del Norte District Engineering Office | Bid Bulletin 24LC0090 | May 17, 2024 | May 24, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 - 24F00295 | May 17, 2024 | May 24, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 - 24F00295 | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | REVISED PLAN | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | NEW MER | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | NEW BOQ | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | REVISED PLAN | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | NEW MER | May 16, 2024 | May 23, 2024 | ||
Bukidnon 3rd District Engineering Office | NEW BOQ | May 16, 2024 | May 23, 2024 |