SUMMARY OF EXISTING NATIONAL BRIDGES (LENGTH AND NUMBER) by TYPE
PER REGION AND DISTRICT ENGINEERING OFFICE
                               
Table 2
                               
RBIA Generated Report as of October 16, 2024     Unit of Measure: Linear Meter (lm)
Region District Engineering Office Permanent Bridges Temporary Bridges Grand Total
Concrete Steel Total Bailey Timber Total
Number Length Number Length Number Length Number Length Number Length Number Length Number Length
XII Cotabato 1st DEO 18              653.30 3             86.30 21              739.60 0            -   0          -   0            -   21             739.60
Cotabato 2nd DEO 50           1,633.60 13           448.50 63           2,082.10 2       53.05 0          -   2       53.05 65           2,135.15
Cotabato 3rd DEO 32           1,165.44 3           259.25 35           1,424.69 0            -   0          -   0            -   35           1,424.69
Sarangani DEO 51           2,672.63 7           267.30 58           2,939.93 0            -   0          -   0            -   58           2,939.93
South Cotabato 1st DEO 28           1,823.50 0                  -   28           1,823.50 0            -   0          -   0            -   28           1,823.50
South Cotabato 2nd DEO 24              680.40 0                  -   24              680.40 0            -   0          -   0            -   24             680.40
Sultan Kudarat 1st DEO 17           1,335.63 0                  -   17           1,335.63 0            -   0          -   0            -   17           1,335.63
Sultan Kudarat 2nd DEO 62           1,746.48 16           405.56 78           2,152.04 0            -   0          -   0            -   78           2,152.04
Sub-Total 282         11,710.98 42        1,466.91 324        13,177.89 2       53.05 0           -   2       53.05 326        13,230.94
 

Back Home Next

HOME / BARMM / CAR / NCR / NIR / Region I / Region II / Region III / Region IV-A / Region IV-B / Region V / Region VI / Region VII / Region VIII / Region IX / Region X / Region XI / Region XII / Region XIII

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.