Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Bulacan 1st District Engineering Office |
New schedule of Bid Submission & bid opening on January 29, 2024 at 10 A.M. for Contract ID 24CC0095 |
January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00190 | January 22, 2024 | January 29, 2024 | ||
Bulacan 1st District Engineering Office |
New schedule of Bid Submission & bid opening on January 29, 2024 at 10 A.M. for Contract ID 24CC0092 |
January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00189 | January 22, 2024 | January 29, 2024 | ||
Bulacan 1st District Engineering Office |
New schedule of Bid Submission & bid opening on January 29, 2024 at 10 A.M. for Contract ID 24CC0091 |
January 22, 2024 | January 29, 2024 | ||
Bulacan 1st District Engineering Office |
New schedule of Bid Submission & bid opening on January 29, 2024 at 10 A.M. for Contract ID 24CC0090 |
January 22, 2024 | January 29, 2024 | ||
Tarlac District Engineering Office |
24CJ0193 Concreting of Barangay Road (Luna - Bularit Road Phase II), Gerona, Tarlac SUPPLEMENTAL BULLETIN NO. 4 Notice of Postponement |
January 22, 2024 | February 2, 2024 | ||
Tarlac District Engineering Office |
24CJ0192 Concreting of Barangay Road (Luna - Bularit Road Phase I), Gerona, Tarlac SUPPLEMENTAL BULLETIN NO. 4 Notice of Postponement |
January 22, 2024 | February 2, 2024 | ||
Tarlac District Engineering Office |
24CJ0191 Construction of Barangay Road at Brgy. Tolega Sur, Moncada, Tarlac SUPPLEMENTAL BULLETIN NO. 4 Notice of Postponement |
January 22, 2024 | February 2, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00188 | January 22, 2024 | January 29, 2024 | ||
Tarlac District Engineering Office |
23CJ0372 Construction of Tarlac City Southwest Diversion Road (Segment 8), Tarlac SUPPLEMENTAL BULLETIN NO. 7 Notice of Postponement and Amendment of Bills of Quantity (BOQ) for the scheduled Procurement Activity |
January 22, 2024 | January 30, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00187 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00186 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Revised Plans (2 of 2) - 24F00098 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Revised Plans (1 of 2) - 24F00098 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS and BOQ) - 24F00098 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS, BOQ and Plans) - 24F00072 | January 22, 2024 | January 29, 2024 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS, BOQ and Plans) - 24F00059 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | Supplemental/Bid Bulletin No. 2 Amendments of Bidding Documents with Revised BOQ | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0030: SBB#02, BOQ & PLANS 4-5 | January 22, 2024 | January 29, 2024 | ||
Zambales 1st District Engineering Office |
SUPPLEMENTAL BID BULLETIN NO.17 AMENDMENT ON APPROVED BUDGET 24CL0080 - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TAKAR RIVER, BARANGAY LIPAY DINGIN, PANIBUTAN, PHASE 1, IBA, ZAMBALES |
January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0030: PLANS 1-3 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0029: SBB#02 BOQ & PLANS 5 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0029: PLANS 3-4 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office |
Supplemental/ Bid Bulletin No. 1 Revised Schedule for Submission/Dropping and Opening of Bids |
January 22, 2024 | February 23, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0029: 1-2 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0028: PLANS 1-2 | January 22, 2024 | January 29, 2024 | ||
Cagayan de Oro City 1st District Engineering Office |
Supplemental/Bid Bulletin No. 1 Revised Schedule for Submission/Dropping and Opening of Bids |
January 22, 2024 | February 23, 2024 | ||
Cagayan de Oro City 1st District Engineering Office | 24KH0028: SBB#02 PLANS 3 & BOQ | January 22, 2024 | January 29, 2024 | ||
Iloilo City District Engineering Office | Construction of Iloilo City Access Road Section 1 (Bike Lane), Iloilo City | January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office |
Construction of Road along Iznart St. and JM Basa St. with Drainage System, iloilo City |
January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office |
Construction of Flood Mitigation Structures in Iloilo City - Drainage System 1, Iloilo City |
January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office |
Construction of Flood Mitigation Structure along Dungon Creek, Dungon B, Iloilo City |
January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office |
Construction of Flood Mitigation Structure - Iloilo City Flood Control Project Section 9 |
January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office | Construction of Flood Mitigation Structure (Section 1), Iloilo City, Iloilo | January 22, 2024 | January 30, 2024 | ||
Iloilo City District Engineering Office | Rehabilitation of Revetment, Jaro Floodway (Left Bank), Iloilo City | January 22, 2024 | January 30, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0074_BID BULLETIN NO.1 - Cancellation (Modification of Station Limits) | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0074_BID BULLETIN NO.1 - Cancellation (Modification of Station Limits) | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office |
24KL0064_BID BULLETIN NO.1 - Cancellation (Increase the Approved Budget for the Contract (ABC)) |
January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0046_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0048_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0047_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0049_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0050_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0051_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0052_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 24KL0053_BID BULLETIN NO.1 | January 22, 2024 | January 29, 2024 | ||
Batanes District Engineering Office | SUPPLEMENTAL BULLETIN NO. 24-014: AMENDMENT IS MADE IN THE BOQ FOR 24BA0054 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 4 for Contract ID No. 24J00070 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 2 for Contract ID No. 24J00122 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 2 for Contract ID No. 24J00069 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 3 for Contract ID No. 24J00068 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00051 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00131 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00131 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00006 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00128 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00052 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00128 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00120 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00045 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00120 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00120 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 5 for Contract ID No. 24J00048 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00027 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00075 | January 22, 2024 | January 29, 2024 | ||
Regional Office IX | Supplemental Bulletin No. 1 for Contract ID No. 24J00075 | January 22, 2024 | January 29, 2024 | ||
Batanes District Engineering Office | SUPPLEMENTAL BULLETIN NO. 24- 013: AMENDMENT IS MADE IN THE BOQ (24BA0051) | January 22, 2024 | January 29, 2024 | ||
Quezon City 2nd Engineering District Office |
Bid Bulletin No. 2024-011: Postponement of submission and opening of bids for Contract I.D. Nos. 24OG0030: Construction of Perimeter Security Wall, Camp General Emilio Aguinaldo, Quezon City, Phase III, 24OG0034: Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Epifanio Delos Santos Ave. (EDSA) – K0016 + 679 – K0017 + 525, Quezon City and 24OG0040: Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Epifanio Delos Santos Ave (EDSA) – K0019 + 264 – K0019 + 314, Quezon City |
January 22, 2024 | January 29, 2024 | ||
Masbate 1st District Engineering Office | SUPPLEMENTAL BULLETIN No. 5 - 24FM0013 | January 22, 2024 | January 30, 2024 | ||
Batanes District Engineering Office | SUPPLEMENTAL BULLETIN NO. 24- 012: AMENDMENT IS MADE IN THE BOQ (24BA0047) | January 22, 2024 | January 29, 2024 | ||
Quezon City 2nd Engineering District Office |
Bid Bulletin No. 2024-011: Postponement of submission and opening of bids for Contract I.D. Nos. 24OG0030: Construction of Perimeter Security Wall, Camp General Emilio Aguinaldo, Quezon City, Phase III, 24OG0034: Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Epifanio Delos Santos Ave. (EDSA) – K0016 + 679 – K0017 + 525, Quezon City and 24OG0040: Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Epifanio Delos Santos Ave (EDSA) – K0019 + 264 – K0019 + 314, Quezon City |
January 22, 2024 | January 29, 2024 | ||
Masbate 1st District Engineering Office | SUPPLEMENTAL BULLETIN No. 5 - 24FM0012. | January 22, 2024 | January 30, 2024 | ||
Quezon City 2nd Engineering District Office |
Bid Bulletin No. 2024-011: Postponement of submission and opening of bids for Contract I.D. Nos. 24OG0030: Construction of Perimeter Security Wall, Camp General Emilio Aguinaldo, Quezon City, Phase III, 24OG0034: Installation/Application of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Zebra Pedestrian Crossing along Epifanio Delos Santos Ave. (EDSA) – K0016 + 679 – K0017 + 525, Quezon City and 24OG0040: Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Epifanio Delos Santos Ave (EDSA) – K0019 + 264 – K0019 + 314, Quezon City |
January 22, 2024 | January 29, 2024 | ||
Cebu 7th District Engineering Office | 24HO0069 BID BULLETIN NO. S24-C7-006.pdf | January 22, 2024 | January 29, 2024 | ||
Cebu 7th District Engineering Office | 24HO0067 BID BULLETIN NO. S24-C7-006.pdf | January 22, 2024 | January 29, 2024 | ||
Masbate 1st District Engineering Office | SUPPLEMENTAL BULLETIN No. 3 - 24FM0016 | January 22, 2024 | January 30, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 5 - CORRECTION FOR CONTRACT ID NO. 24CD0080 - Construction of Flood Control Structure along Sta. Maria River and its Tributaries, Sta. 14+152 – Sta. 14+452 (San Jose Patag – Pulong Buhangin Section), Sta. Maria, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 5 - CORRECTION FOR CONTRACT ID NO. 24CD0079 - Construction of Dike along Santo Cristo River, Barangay Santo Cristo, San Jose del Monte City, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 5 - CORRECTION FOR CONTRACT ID NO. 24CD0078 - Construction of Dike along Santo Cristo River, Barangay Kaypian, San Jose del Monte City, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 5 - CORRECTION FOR CONTRACT ID NO. 24CD0077 - Construction of Dike along Santo Cristo River, Barangay Dulong Bayan, San Jose del Monte City, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 19 - CORRECTION FOR CONTRACT ID NO. 24CD0016 - Construction of Flood Control Structure along Angat River, Barangay Pinagtulayan, Norzagaray, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Albay 3rd Engineering Office |
24FO0032-ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Albay West Coast Rd - K0508+408 - K0508+490-(Bid Bulletin No. 024-2024- Postponement of Submission of Bids) |
January 22, 2024 | January 29, 2024 | ||
Agusan del Norte District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 1 for 24NA0020 : Construction of Baleguian CIS Slope Protection Works, Jabonga, Agusan del Norte |
January 22, 2024 | January 29, 2024 | ||
Camarines Sur 2nd District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2024-002 for 24FE0012 | January 22, 2024 | February 5, 2024 | ||
Surigao del Norte 2nd District Engineering Office |
23NG0134 – REPAIR OF CLASSROOMS, VICENTE C. CABILAO MEMORIAL ELEMENTARY SCHOOL/SURIGAO CITY, SURIGAO DEL NORTE |
January 22, 2024 | January 29, 2024 | ||
Surigao del Norte 2nd District Engineering Office |
23NG0134 – REPAIR OF CLASSROOMS, VICENTE C. CABILAO MEMORIAL ELEMENTARY SCHOOL/SURIGAO CITY, SURIGAO DEL NORTE |
January 22, 2024 | January 29, 2024 | ||
Apayao 2nd District Engineering Office |
BID BULLETIN FOR CONTRACT ID NO. 24PC0032: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS- ASPHALT OVERLAY ALONG KABUGAO-PUDTOL-LUNA-CAGAYAN BOUNDARY ROAD, LUNA, APAYAO |
January 22, 2024 | January 29, 2024 | ||
Surigao del Norte 2nd District Engineering Office |
23NG0134 – REPAIR OF CLASSROOMS, VICENTE C. CABILAO MEMORIAL ELEMENTARY SCHOOL/SURIGAO CITY, SURIGAO DEL NORTE |
January 22, 2024 | January 29, 2024 | ||
Misamis Occidental 2nd District Engineering Office |
Bid Bulletin No. 24-01-01 for Contract ID Nos. 24KJ0001, 24KJ0002, 24KJ0003, 24KJ0004 and 24KJ0006 |
January 22, 2024 | January 29, 2024 | ||
Zamboanga del Sur 2nd District Engineering Office |
24JG0031 - Bid Bulletin #07, s.2024 & Revised BOQ (Amendments on the Items in the BOQ) |
January 22, 2024 | January 29, 2024 | ||
Benguet 1st District Engineering Office | 24PE0018 - Supplemental Bulletin No. 2024-001 | January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 4 - CORRECTION FOR CONTRACT ID NO. 24CD0084 - Installation of Solar Streetlights along Gen. Alejo Santos Highway K0060+560 – K0063+000 |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NO. 24CD0085 - Installation of Road Lighting along Santa Maria – Norzagaray Road K0035+200 – K0038+500, Santa Maria, Bulacan |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NO. 24CD0083 - Asset Preservation Program - Preventive Maintenance – Tertiary Road Bocaue – Sn Jose Rd – K0033+000 – K0034+000 |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NO. 24CD0082 - Asset Preservation Program - Preventive Maintenance – Tertiary Road Bocaue – Sn Jose Rd – K0030+000 – K0032+000 |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NO. 24CD0081 - Asset Preservation Program - Preventive Maintenance – Tertiary Road Bocaue – Sn Jose Rd – K0037+000 – K0037+825 |
January 22, 2024 | January 29, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NO. 24CD0076 - Asset Preservation Program - Preventive Maintenance – Tertiary Road Meycauayan-Camalig-Bahay Pari Rd- K0025+766.50 – k0026+889 |
January 22, 2024 | January 29, 2024 | ||
Bohol 3rd District Engineering Office | 24HB0077 Supplemental Bid Bulletin No. 002 - 33 | January 22, 2024 | January 29, 2024 | ||
Bohol 1st District Engineering Office |
Supplemental Bulletin No. 2 for 24HA0059 - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads – Balilihan – Hanopol – Batuan Rd – K0025+859 – K0025+895, K0025+941 – K0025+971, K0029+840 – K0029+887, K0038+087 – K0038+135, K0039+058 – K0039+068, K0039+096 – K0039+116 |
January 22, 2024 | February 2, 2024 |