Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-PLAN SET 12 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 -FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 11 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-PLAN SET 10 | February 29, 2024 | March 7, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND OTHER IMPROVEMENTS, BRGY. MOLINO 4, ZAPOTE RIVER, BACOOR, CAVITE |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 2, CARMONA CITY, CAVITE |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF ROAD CONNECTING CARMONA-SILANG DIVERSION ROAD AND SLEX EXIT, PHASE 1, CARMONA CITY, CAVITE |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSOKBUSOKAN RIVER, BARANGAY SAN VICENTE, SAN NARCISO, QUEZON, PACKAGE 2 |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE K) |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A | CONSTRUCTION OF LUKUTANG MALAKI BRIDGE 2, MONTALBAN, RIZAL | February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads SAN JUAN BYPASS (ROSARIO-SAN JUAN-LAIYA TOURISM BYPASS ROAD) CANDELARIA-SAN JUAN, SAN JUAN, BATANGAS |
February 29, 2024 | March 21, 2024 | ||
Regional Office IV-A |
Convergence and Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Coastal Roads/Causeway for environmental protection/conservation BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 1 |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND OTHER IMPROVEMENTS, BRGY. SAN NICOLAS 3, ZAPOTE RIVER, BACOOR, CAVITE (PHASE 2) |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF MULTI-PURPOSE BUILDING (SECTOR 4 CUBA POLICE ASSISTANCE BASE) CALAMBA CITY, LAGUNA |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
CONSTURCTION OF MULTI-PURPOSE BUILDING (MAKILING SECTOR 3 POLICE, ASSISTANCE BASE) CALAMBA CITY, LAGUNA |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITE |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
Road Widening – Tertiary Roads BACOOR-DASMARIÑAS NATIONAL RD - K0023 + 830 - K0024 + 080, K0024 + 093 - K0024 + 450 |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads TAGKAWAYAN-LABO DIVERSION ROAD, (TAGKAWAYAN SECTION), QUEZON |
February 29, 2024 | March 20, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I) |
February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A |
INSTALLATION OF ROAD SAFETY DEVICES ALONG DAANG MAHARLIKA (LZ) - K0170+800 - K0171+000 (L/S), K0171+000 - K0171+100 (L/S), K0172+630 - K0173+000 (L/S), K0173+000 - K0173+153 (L/S), K0173+1020 - K0173+1080 (L/S) |
February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A | Construction of By-Pass and Diversion Roads TAYABAS BY-PASS ROAD, QUEZON | February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A |
INSTALLATION OF ROAD SAFETY DEVICES ALONG DAANG MAHARLIKA (LZ) - K0173+1120 - K0174+480 (L/S), K0174+650 - K0174+690 (L/S), K0175+500 - K0175+860 (L/S) |
February 29, 2024 | March 19, 2024 | ||
Cebu 6th District Engineering Office | 24HN0112 SUPPLEMENTAL BULLETIN 02 | February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A | RETROFITTING OF BRIDGE (PHASE III), BOLBOK FLYOVER, BATANGAS CITY, BATANGAS | February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A | CONSTRUCTION OF LUKUTANG MALAKI BRIDGE 1, MONTALBAN, RIZAL | February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A |
Convergence and Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (SIPAG), Coastal Roads / Causeway for environmental protection/conservation BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 2 |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A |
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads DAANG MAHARLIKA (LZ) - K0223 + 858 - K0225 + 000, K0225 + 100 - K0225 + 292, K0225 + 500 K0225 + 560, K0225 + 635 - K0225 + 665, K0225 + 697 - K0225 + 716, K0225 + 739 - K0225 + 762, K0225 + 920 - K0226 + 000, K0226 + 000 - K0227 + 000, K0227 + 068 - K0227 + 130, K0227 + 441 K0227 + 611, K0228 + 000 - K0228 + 500, K0228 + 820 - K0229 + 000, K0229 + 250 - K0230 + 000, K0230 + 307 - K0230 + 407, K0230 + 905 - K0231 + 000, K0231 + 000 - K0231 + 202, K0231 + 830 - K0232 + 000 |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A |
CONSTRUCTION OF ROAD DIKE ALONG RIO GRANDE RIVER, BARANGAY SANTIAGO, GEN. TRIAS, CAVITE (PHASE II) |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A |
Preventive Maintenance - Primary Roads DAANG MAHARLIKA (LZ) - K0082 + 595 - K0082 + 974 |
February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads GENERAL NAKAR - DINGALAN ROAD (GEN. NAKAR SIDE), PACKAGE G, QUEZON |
February 29, 2024 | March 19, 2024 | ||
Regional Office IV-A |
Construction of Flyovers / Interchanges / Underpasses / Long Span Bridges BALAGTAS FLYOVER, BATANGAS CITY |
February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE N, BATANGAS |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A |
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads DAANG MAHARLIKA (LZ) - K0236 + 000 - K0236 + 183, K0236 + 332 - K0236 + 872, K0236 + 1025 - K0237 + 259, K0237 + 570 - K0237 + 685, K0238 + 240 - K0238 + 623, K0238 + 840 - K0238 + 930, K0239 + 150 - K0239 + 383, K0239 + 647 - K0239 + 718, K0240 + 000 - K0240 + 240, K0240 + 650 - K0240 + 806, K0241 + 000 - K0241 + 690, K0242 + 385 - K0242 + 433, K0242 + 500 - K0242 + 913, K0243 + 088 - K0243 + 133, K0243 + 200 - K0243 + 900, K0244 + 216 - K0244 + 476, K0244 + 614 - K0244 + 721, K0245 + 090 - K0245 + 127, K0245 + 269 - K0245 + 345, K0245 + 620 - K0245 + 844, K0245 + 940 - K0246 + 000, K0246 + 327 - K0246 + 460 |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A |
REHABILITATION OF LAIYA-MALABRIGO ROAD, BRGY. HUGOM, SAN JUAN, BATANGAS (PHASE 4) |
February 29, 2024 | March 14, 2024 | ||
Regional Office IV-A | CONSTRUCTION OF CARMONA - BIÑAN EXTENSION ROAD, CAVITE | February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A |
Preventive Maintenance - Primary Roads MANILA SOUTH RD - K0036 + 150 - K0036 + 789, K0036 + 845 - K0037 + 623, K0037 + 634 - K0037 + 739, K0038 + 000 - K0038 + 437, K0038 + 735 - K0040 + 962, K0040 + 968 - K0041 + 516 |
February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A |
Construction of Flyovers / Interchanges / Underpasses / Long Span Bridges AGUINALDO HIGHWAY, GOVERNOR'S DRIVE INTERCHANGE, CAVITE, PACKAGE B, CAVITE |
February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads MAUBAN-TIGNOAN ROAD (MAUBAN SIDE), QUEZON |
February 29, 2024 | March 12, 2024 | ||
Regional Office IV-A |
Construction of Flyovers/ Interchanges/ Underpasses/ Long Span Bridges AGUINALDO HIGHWAY - GOVERNOR'S DRIVE INTERCHANGE, CAVITE |
February 29, 2024 | March 12, 2024 | ||
Eastern Samar District Engineering Office | 24IB0026 (Re-advertised) - Amendment of Procurement Schedule | February 29, 2024 | March 7, 2024 | ||
Misamis Occidental 2nd District Engineering Office |
Bid Bulletin No. 24-02-11 - Modification of Calendar Days (CD) for Contract ID Nos. 24KJ0072, 24KJ0073, 24KJ0074, 24KJ0075, 24KJ0076 and 24KJ0077 |
February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 9 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 9 | February 29, 2024 | March 7, 2024 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads CARMONA - BIÑAN DIVERSION ROAD, BIÑAN SECTION, LAGUNA |
February 29, 2024 | March 13, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 8 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 6 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 7 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 5 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 3 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 4 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 2 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044-REVISED PLAN SET 1 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 14 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 13 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 12 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 11 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 10 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 9 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 8 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 7 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-010 FOR CONTRACT ID NO. 24FF0044 | February 29, 2024 | March 7, 2024 | ||
Regional Office XII | 24M00093-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Regional Office XII | 24M00093-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Camarines Sur 3rd District Engineering Office | ID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 6 | February 29, 2024 | March 7, 2024 | ||
Davao Oriental 1st District Engineering Office |
24LF0134 - SUPPLEMENTAL BULLETIN NO. 2 - AMENDMENTS OF MAJOR CATEGORY OF WORK AND SIMILAR CATEGORY OF WORKS IN BID DATA SHEET |
February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | ID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 5 | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041-REVISED PLAN SET 4 | February 29, 2024 | March 7, 2024 | ||
Regional Office XII | 24M00191-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Regional Office XII | 24M00134-Supplemental Bulletin No. 01 | February 29, 2024 | March 7, 2024 | ||
Regional Office XII | 24M00131-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO. 2024-02-008 FOR CONTRACT ID NO. 24FF0041- REVISED PLAN SET 2 | February 29, 2024 | March 7, 2024 | ||
Regional Office XII | 24M00095-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Regional Office XII | 24M00014-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Regional Office XII | 24M00092-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Regional Office XII | 24M00051-Supplemental Bulletin No. 01 | February 29, 2024 | March 14, 2024 | ||
Bataan 1st District Engineering Office |
24CA0037 - Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structure along Pulo-Kabalutan River, Orani, Bataan Supplemental Bid Bulletin No. 2024-07-017 |
February 29, 2024 | March 7, 2024 | ||
Nueva Ecija 2nd District Engineering Office |
DPWH-INFR-27 Supplemental Bulletin No. 24-02-08 Revised Approved Budget for the Contract, Bill of Quantities and Plans for Contract ID No. 24CF0067 - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities – Rehabilitation of Road with drainage at Barangay Bayanihan, Gapan City, Nueva Ecija |
February 29, 2024 | March 7, 2024 | ||
Bohol 1st District Engineering Office |
Supplemental Bulletin No. 1 for 23HA0163 - Construction of Solar Lights and Road Safety Devices within the Tubigon, Tubigon, bohol |
February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO. 2024-02-008 FOR CONTRACT ID.24FF0041-REVISED PLAN (SET 1) | February 29, 2024 | March 7, 2024 | ||
Camarines Sur 3rd District Engineering Office | BID BULLETIN NO 2024-02-008 FOR CONTRACT ID NO. 24FF0041 | February 29, 2024 | March 7, 2024 | ||
Cebu 2nd District Engineering Office | 24HE0182 Supplemental Bulletin No. 1 | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 24LB0105 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 24LB0101 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 24LB0094 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Albay 2nd Engineering Office |
SUPPLEMENTAL BID BULLETIN for Contract ID no. 24FB0073 - OO2 - Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Riverbank Protection Works and Drainage System along Brgy. Pandan - Brgy. Bongalon River, Daraga, Alabay |
February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 24LB0092 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 24LB0089 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 23LB0170 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 23LB0170 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Albay 2nd Engineering Office |
SUPPLEMENTAL BID BULLETIN no. S24-0016 for Contract ID no. 24FB0031 - BIP: Construction of Road, Mabinit - Bonga, Legazpi City |
February 29, 2024 | March 7, 2024 | ||
Cavite 2nd District Engineering Office | Bid Bulletin No. 010-2024, 24DG0095 | February 29, 2024 | March 7, 2024 | ||
Davao City District Engineering Office | 23LB0169 BID BULLETIN | February 29, 2024 | March 7, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & Bid Opening on March 6, 2024 at 10AM for Contract ID 24CC0297 |
February 29, 2024 | March 7, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & Bid Opening on March 6, 2024 at 10AM for Contract ID 24CC0297 |
February 29, 2024 | March 7, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & Bid Opening on March 6, 2024 at 10 AM for Contract ID 24CC0296 |
February 29, 2024 | March 7, 2024 | ||
Regional Office X | SUPPLEMENTAL BULLETIN NO.1 - Revision of Contract Name for 24K00126 | February 29, 2024 | March 11, 2024 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.2 - Postponement of Dropping and Opening of Bids for 24K00113 |
February 29, 2024 | March 7, 2024 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 24K00110 |
February 29, 2024 | March 7, 2024 | ||
Pangasinan 3rd District Engineering Office | 24AI0152 - CONCRETING OF BRGY. SAN ISIDRO FMR, SAN ISIDRO, ROSALES, PANGASINAN | February 29, 2024 | March 7, 2024 | ||
Ilocos Norte 2nd District Engineering Office | 24AB0057: SUPPLEMENTAL BULLETIN NO. 1, SERIES 2024 | February 29, 2024 | March 7, 2024 | ||
Pangasinan 3rd District Engineering Office |
24AI0153 - CONCRETING OF BRGY. CAROSUCAN NORTE-BRGY. CAROSUCAN SUR FMR, BRGY CAROSUCAN NORTE AND BRGY. CAROSUCAN SUR, ASINGAN, PANGASINAN |
February 29, 2024 | March 7, 2024 |