Outline of the Project

Outline of the Project

 

Overall Goal

Conditions of roads and bridges administered by DPWH are improved.

Project Purpose

Road and bridge maintenance management works of DPWH are improved.

 

Outputs

Output-1:Capability of concerned engineers of all ROs/DEOs on road maintenance management is enhanced.

Output-2:Capability of concerned engineers of all ROs/DEOs on bridge maintenance management is enhanced.

Output-3:Capability of concerned engineers of ROs/DEOs in target Regions (II, III, VII, VIII, and XIII) on special bridge maintenance management is enhanced.

Output-4:Database system to be utilized for road and bridge maintenance management is developed.

 

Activities

Activity 1:Technical Improvement of Road Maintenance Management

   1.1: Assist conducting seminars/OJTs on road maintenance management by Sustainability Program for concerned engineers of all ROs/DEOs.

   1.2: Assist implementing pilot projects on road slope stability and relevant OJTs.

   1.3: Monitor and evaluate situations of road maintenance management by ROs/DEOs

   1.4: Review manuals on road maintenance management and construction supervision developed and/or revised by the Phase-II and make their necessary revisions.

Activity 2:Technical Improvement of Bridge Maintenance Management

2.1: Assist conducting seminars/OJTs on bridge maintenance management by Sustainability Program for concerned engineers of all ROs/DEOs.

2.2: Assist conducting seminars/OJTs on bridge engineering inspections by Sustainability Program for concerned engineers of all ROs/DEOs.

2.3: Assist implementing pilot projects on bridge repair and relevant OJTs.

2.4: Monitor and evaluate situations of bridge maintenance and engineering inspections by ROs/DEOs.

2.5: Review manuals on bridge maintenance management and construction supervision developed and/or revised by the Phase-II and make their necessary revisions.

Activity 3:Technical Improvement of Special Bridge Maintenance Management

   3.1: Develop special bridge maintenance and management manual.

   3.2: Conduct seminars/OJTs on special bridge maintenance management for concerned engineers of target ROs/DEOs.

   3.3: Assist conducting seminars/OJTs on special bridge inspections by Sustainability Program for concerned engineers of target ROs/DEOs (conduct OJT for RO-VIII).

   3.4: Assist implementing pilot projects on special bridge repair and relevant OJTs.

   3.5: Monitor and evaluate situations of special bridge inspections by ROs/DEOs.

   3.6: Review special bridge inspection manuals developed by the Phase-II and make their necessary revisions

Activity 4: Improvement of Database System for Road and Bridge Maintenance Management

   4.1: Review current filing situation of documents/data related to road and bridge maintenance management and identify issues to be improved.

   4.2: Prepare the basic plan (framework, necessary entry data, operation manner, selection of model RO, etc.) for developing the database system.

   4.3: Develop the database system based on the basic plan.

   4.4: Enter necessary data and make trial operations of the system at model RO.

   4.5: Improve the system in consideration of the results of trial operations at model RO.

   4.6: Prepare relevant manuals including operation manner.

   4.7: Conduct seminars on the database system and its relevant manuals.