June 22, 2021 |
2021 |
WIN1F06309 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 796
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 3.406 Lane Km
EAO P 0.390420 M
Total P 19.521 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0912 + 562 – K0912 + 673 , K0913 + 000 – K0913 + 925
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 19.13058 M
Asphalt Overlay: 2.726 Lane Km
EAO P 0.390420 M
Total P 19.521 M
|
June 22, 2021 |
FY 2021 |
WIN1C03762 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310209100317000
PROJECT ID: P00505315LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0596+497 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0604+724
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 3,887.77 sq.m.
Allocation: ₱20,000,000.00
AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0596+618 – K0597+000, K0597+194 – K0597+460, K0604+421 – K0605+000
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 6,374.44 sq.m.
Allocation: ₱20,000,000.00 |
June 22, 2021 |
FY 2021 |
WIN1B01141 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS: 310209100277000
Project ID: P00505316LZ
AS PER GAA:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0608+810
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
Allocation: ₱70,000,000.00
AS MODIFIED:
Bacon-Sawanga-Prieto Diaz Rd – K0605+395 – K0609+106
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 13,660 sq.m.
CW2 – Construction of Drainage Structure along Road - 373 Lineal Meters
Allocation: ₱70,000,000.00 |
June 22, 2021 |
FY 2021 |
WIN1C03888 |
FY 2021 GAA RA 11518 |
December 28, 2020 |
Region V |
Sorsogon District Engineering Office |
UACS No.: 310209100320000
Project ID: P00505318LZ
AS PER GAA:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads- Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,152 sq.m.
Allocation: ₱5,902,000.00
AS MODIFIED:
OO1: Network Development - Off-carriageway Improvement - Tertiary Roads-Jct Putiao-Pilar-Donsol Rd - K0566 + 640 - K0567 + 098, K0567 + 125 - K0567 + 210
Physical Target:
CW1 – Off-Carriageway Improvement: Shoulder Paving / Construction - 1,144 sq.m.
CW2 – Construction of Road Slope Protection Structure - 1,168.05 sq.m.
Allocation: ₱5,902,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02301 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package C), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) (Package G), Davao del Norte
Physical Target:
CW1: 3.502 Lane Km (Road Widening)
ROW: 26,265.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 198,000,000.00
CW1: P 170,033,000.00 (Road Widening)
ROW: P 21,037,000.00 (ROW Acquisition)
EAO: P 6,930,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02298 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 0.598 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Improvement of Road, Doña Luisa Phase 1, Barangay Matina Crossing 74-A, Davao City
Physical Target:
CW1: 1.270 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,980,000.00
CW1: P 5,860,400.00 (Construction of Concrete Road)
EAO: P 119,600.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02312 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 2.082 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Jacinto St., Davao City
Physical Target:
CW1: 1.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,050,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02318 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.682 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Calamansi St., Juna, Davao City
Physical Target:
CW1: 1.552 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,045,000.00
CW1: P 20,308,425.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 736,575.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02299 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1510+000 - K1510+856, K1510+876.50 - K1518+006
Physical Target:
CW1: 0.350 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1510+008.27 - K1512+149.48
Physical Target:
CW1: 0.210 Lane Km (Preventive Maintenance of Road: Concrete Reblocking)
Allocation:
TOTAL: P 1,583,000.00
CW1: P 1,551,340.00 (Preventive Maintenance of Road: Concrete Reblocking)
EAO: P 31,660.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02321 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 228.500 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Manga Section, Barangay Tres de Mayo, Digos City
Physical Target:
CW1: 300.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 400,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02323 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 420.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Aplaya Section, Barangay Aplaya, Digos City
Physical Target:
CW1: 450.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 1,750,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02297 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 1,806.638 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction/Upgrading/Rehabilitation of Drainage Outfall - Jct. Digos-Makar, Balutakay Section, Hagonoy, Davao del Sur
Physical Target:
CW1: 950.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Flood Mitigation Structure)
EAO: P 700,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02316 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+499
Physical Target:
CW1: 364.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1509+135 - K1509+665
Physical Target:
CW1: 530.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure along Road)
EAO: P 600,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02319 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.350 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 6-A, Davao City
Physical Target:
CW1: 0.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Construction of Concrete Road)
EAO: P 35,000.00
|
June 21, 2021 |
FY 2021 GAA |
WIN1E02310 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 3.241 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Concrete Road)
EAO: P 648,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Banban, Brgy. Lumiad to Brgy. Malabog, Paquibato District, Davao City
Physical Target:
CW1: 1.088 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 32,400,000.00
CW1: P 31,752,000.00 (Construction of Gravel Road)
EAO: P 648,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02317 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 3.124 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along V. Mapa St. (Jct. Daang Maharlika Rd-Jct. Lopez Jaena St.), Davao City
Physical Target:
CW1: 2.984 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,780,000.00
CW1: P 54,792,700.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,987,300.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02303 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1452+000 - K1452+752
Physical Target:
CW1: 4.512 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1451+017 - K1451+994
Physical Target:
CW1: 5.862 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
June 21, 2021 |
FY 2021 GAA |
WIN1E02306 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+000
Physical Target:
CW1: 1.998 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1450+681 - K1451+017
Physical Target:
CW1: 2.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00 |
June 18, 2021 |
FY 2021 GAA |
WIN1F06172 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300201100072000
Project ID : P00531946LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Airports
FROM:
Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas to Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.606 Lane Km
Allocation : Php 10.00 Million
TO:
Access Road leading to Francisco B. Reyes Airport
( Brgy. San Nicolas - Brgy. Decalacho ),
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.720 Lsnr zKm
Allocation : Php 10.00 Million
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06185 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300201100073000
Project ID : P00531985LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Airports
FROM:
New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport, Busuanga, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.667 Lane Km
Allocation : Php 10.00 Million
TO:
New Quezon - Cheey - San Jose - Decalacho Road
leading to Busuanga Airport
Physical Target - CW1 - Construction of Concrete Road :
0.592 Lane Km
Allocation : Php 10.00 Million
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06117 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100516000
Project ID : P00516170LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0014 + 300 - K0014 + 550
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 million
TO :
Puerto Princesa North Road
K0014 + 300 - K0014 + 409
Physical Target - CW1 - Construction of Road Slope Protection :
4,430.81 square meter
Allocation : Php 100.00 Million |
June 18, 2021 |
FY 2021 GAA |
WIN1F06116 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100517000
Project ID : P00516171LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0014 + 700 - K0014 + 900
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million
TO :
Puerto Princesa North Road
K0014 + 740 - K0014 + 900,
K0016 + 620 - K0016 + 670
Physical Target - CW1 - Construction of Road Slope Protection :
4,431.85 square meter
Allocation : Php 100.00 Million |
June 18, 2021 |
2021 |
WIN1C03952 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1375.16 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Baguyos Flood Control at Barangay Colalo, Mankayan, Benguet ;
Physical Target: CW1 : 1537.47 Lineal meters;
Allocation= Php 100,000,000
|
June 18, 2021 |
2021 |
WIN1C03953 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control along Lagawe River, Sta 0+020-Sta 0+860;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000
To: Construction of Flood Control along Lagawe River, Sta 0+000-Sta 0+680;
Physical Target: CW1 : 680 Lineal meters;
Allocation= Php 63,804,000
|
June 18, 2021 |
2021 |
WIN1C03961 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Kapangan Flood Control Sta. 8+246 - 8+386 (R.S.), Sta. 8+294 - 8+394 (L.S.),Kapangan, Benguet;
Physical Target: CW1: : 280 Lineal meters;
Allocation= Php 11,887,000
To: Construction of Kapangan Flood Control Sta. 8+241 - Sta. 8+374 (R.S.), Sta. 8+243 - 8+374 (L.S.),Kapangan, Benguet;
Physical Target: CW1: 280 Lineal meters;
Allocation= Php 11,887,000
|
June 18, 2021 |
2021 |
WIN1C03954 |
SR2021-02-001253 |
February 3, 2021 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 056+000 – Sta. 057+570, La Trinidad, Benguet;
Physical Target: CW1: 1,072.38 Lineal meters;
Allocation= Php 84,019,000
To: Construction of Flood Mitigation Structure within Naguillian River Basin: along Naguillian River Section 2 (Bolo Creek), Sta. 055+820 – Sta. 056+780, La Trinidad, Benguet;
Physical Target: CW1: 918 Lineal meters;
Allocation= Php 84,019,000
|
June 18, 2021 |
FY 2021 GAA |
WIN1F06115 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100582000
Project ID : P00516137LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Calapan South Road
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 +117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 13.127 Lane Km
Allocation : Php 106.813.00 Million
TO:
Calapan South Road
K0001 + 850 - K0002 + 698,
K0022 + 438 + K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay : 13.884 Lane Km
Allocation : Php 106.813.00 Million
|
June 18, 2021 |
2021 |
WIN1C03920 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) K0123+000 - K0124+317 |
June 18, 2021 |
2021 |
WIN1F06287 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0805 + 071
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 4.313 Lane Km
EAO P 0.48346 M
Total P 24.173 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0802 + 956.40 - K0804 + 540
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.68954 M
Asphalt Overlay: 3.227 Lane Km
EAO P 0.48346 M
Total P 24.173 M
|
June 18, 2021 |
2021 |
WIN1E02291 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100722000
PROJECTS ID: P00501567MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1170 + 000, K1174 + 701 - K1175 + 133
Type of Work / Physical Target: CW1 - Road Widening: 2.880 lane km
Unit Cost: P17,423,611.11lane km
Allocation: P50,180,000.00
EAO: P1,820,000.00
TOTAL: P52,000,000.00
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 000 - K1169 + 793, K1174 + 701 - K1175 + 133
Type of Work / Physical Target: CW1 - Road Widening: 2.456 lane km
Unit Cost: P20,431,596.09 lane km
Allocation: P50,180,000.00
EAO: P1,820,000.00
TOTAL: P52,000,000.00 |
June 18, 2021 |
2021 |
WIN1E02296 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310201100719000
PROJECTS ID: P00501568MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1268 + 000 - K1268 + 749, K1277 + 000 - K1277 + 795
Type of Work / Physical Target: CW1 - Road Widening: 3.088 lane km
Unit Cost: P15,855,000.00 lane km
Allocation: P48,960,240.00
EAO: P1,775,760.00
TOTAL: P50,736,000.00
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1267 + 938 - K1268 + 742, K1277 + 000 - K1277 + 387
Type of Work / Physical Target: CW1 - Road Widening: 2.396 lane km
Unit Cost: P20,434,156.93 lane km
Allocation: P48,960,240.00
EAO: P1,775,760.00
TOTAL: P50,736,000.00 |
June 17, 2021 |
FY 2021 GAA |
WIN1F06149 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100584000
Project ID : P00516139LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM ;
Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0025 + 468,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.472 Lane Km
Allocation : Php 114.992 Million
TO :
Calapan North Road
K0019 + 511 - K0020 + 000,
K0022 + 554 - K0023 + 422,
K0023 + 465 - K0025 + 385,
K0026 + 325 - K0026 + 1065,
K0027 + 311 - K0028 + 002
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 9.224 Lane Km
Allocation : Php 114.992 Million |
June 17, 2021 |
FY 2021 GAA |
WIN1F06148 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100585000
Project ID : P00516140LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive maintenance - Secondary Roads
FROM:
Calapan South Road
K0027 + 548 - K0031 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.108 Lane Km
Allocation : Php 85.008 Million
TO:
Calapan South Road
K0027 + 547 - K0031 + 087
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 7.284 Lane Km
Allocation : Php 85.008 Million |
June 17, 2021 |
FY 2021 GAA |
WIN1F06187 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100515000
Project ID : P00516169LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads
FROM :
PPSR - Jct - Napsan - Apurawan Road
K0037 + 520 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
10,000.00 square meter
Allocation : Php 100.00 Million
TO :
PPSR Jct - Napsan - Apurawan Road
K0037 + 420 - K0037 + 620,
K0037 + 660 - K0037 + 720
Physical Target - CW1 - Construction of Road Slope Protection :
4,435.60 square meter
Allocation : Php 100.00 Million
|
June 17, 2021 |
FY 2021 GAA |
WIN1F06145 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100518000
Project ID : P00516172LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse and
Landslide - Secondary Roads
FROM:
Puerto Princesa North Road
K0016 + 610 - K0017 + 000,
K0017 + 660 - K0017 + 780
Physical Target - CW1 - Construction of Road Slope Protection :
0.00 square meter
Allocation : Php 100.00 Million
TO:
Puerto Princesa North Road
K0016 + 782 - K0016 + 980
Physical Target - CW1 - Construction of Road Slope Protection :
4,427.10 square meter
Allocation : Php 100.00 Million
|
June 17, 2021 |
FY 2021 GAA |
WIN1F06155 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 320102104115000
Project ID : P00526331LZ
002: Protect Lives and Properties
Flood Management - Construction/Rehabilitation of Flood
Mitigation Facilities along Major River
Basins and Principal Rivers
FROM:
Construction of Flood Control Structure along Pula River at Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Pinamalayan, Oriental Mindoro
Sta. 0 + 000 - Sta. 2 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure: 623.60 Linear Meters (lm)
Allocation : Php 100.00 Million
TO :
Construction of Flood Control Structure along Pula River at
Barangay Sto. Nino - Pagalagala - Sta. Maria and Pambisan Malaki, Oriental Mindoro
Sta. 0 + 376.40 - Sta. 1 + 000
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 623.60 Lineal Meters (lm)
Allocation : Php 100.00 Million
|
June 17, 2021 |
2021 |
WIN1F06271 |
SR2021-02-002371 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program
Construction of Two Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City
CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00
Total: 200,000.00
TO:
LOCAL PROGRAM
Local - Buildings and Other Structures Multipurpose / Facilities - National Building Program
Construction of Three Storey DPWH Regional Office VI Building, Fort San Pedro, Iloilo City
CW1- Construction of Multi Purpose Building: 1 Number of Building
193,000.00 / Number of Building - 193,000.00
EAO - 7,000.00
Total: 200,000.00 |
June 17, 2021 |
2021 |
310204101016000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1 : Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Aurora Bypass Road, Isabela |
June 16, 2021 |
FY 2021 GAA |
WIN1F06097 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. 310108100524000
Project ID : P00505931LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 300,
K0038 + 900 - K0039 + 498,
K0047 + 500 - K0047 + 865,
K0065 + 260 - K0066 + 047
Physical Target - CW1 - Construction of Road Slope Protection :
8,277.65 square meter
Allocation : Php 80.00 Million
TO:
Sibuyan Circumferential Road
K0037 + 000 - K0037 + 058,
K0065 + 320 - K0065 + 520
Physical Target - CW1 - Construction of Road Slope Protection :
3,506.70 square meter
Allocation : Php 80.00 Million
|
June 16, 2021 |
FY 2021 GAA |
WIN1F06083 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100526000
Project ID : P00505932LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0062 + 500 - K0062 + 874
Physical Target - CW1 - Construction of Road Slope Protection :
8,139.125 square meter
Allocation : Php 149.00 Million
TO:
Tablas CIrcumferential Road
K0032+ 752.50 - K0033 + 193.00
Physical Target - CW1 - Construction of Road Slope Protection :
6,793.00 square meter
Allocation : Php 149.00 Million |
June 16, 2021 |
2021 |
WIN1F06242 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 189 - K0724 + 312, K0724 + 460 -K0724 + 660, K0724 + 743 - K0724 + 843, K0726 + 929 - K0727 + 106
Physical Target: Allocation:
CW1-Road Widening: 1.17 Lane Km P 22.54 M
EAO P 0.46 M
Total P 23.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 186 - K0724 + 316, K0726 + 929 - K0727 + 106, K0734 + 168.6 - K0734 + 398
Physical Target: Allocation:
CW1-Road Widening: 0.39 Lane Km P 6.818 M
CW2-Construction of Road Slope Protection P 6.736 M
Structure : 833.20 Square Meters
CW3-Road Safety: Street Lighting: P 5.164 M
0.509 Kilometers
ROW-ROW Acquisition: 2,151.72 Square Meters P 3.900 M
EAO P 0.382 M
Total P 23.00 M
|
June 16, 2021 |
2021 |
WIN1F06257 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction of Multi-Purpose Building (Daycare Center), Mancol, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings
EAO P 0.02 M
Total P 2.00 M
AS MODIFIED:
Construction of Multi-Purpose Building, Mancol, San Jorge, Samar
Physical Target: Allocation:
CW1-Construction of Multi-Purpose P 1.98 M
Building: 1 Number of Buildings
EAO P 0.02 M
Total P 2.00 M
|
June 16, 2021 |
FY 2021 GAA |
Win1F06178 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100525000
Project ID : P{00505933LZ
001: Ensure safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0062 + 119 - K0062 + 500
Physical Target - CW1 - Construction of Road Slope Protection ;
12,639.36 square meter
Allocation : Php 232.00 Million
TO:
Tablas Circumferential Road
K0044 + 518 - K0044 + 791
Physical Target - CW1 - Construction of Road Slope Protection :
9,888.07 square meter
Allocation : Php 232.00 Million |
June 16, 2021 |
2021 |
WIN1F06253 |
GAA FY 2021 |
April 16, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction (Completion) of Multi-purpose Building (Barangay Health Station), Dapdap, Talalora, Samar
Physical Target: Allocation:
CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M
Total P 1.500 M
AS MODIFIED:
Construction of Multi-purpose Building (Barangay Health Station), Dapdap, Tarangnan, Samar
Physical Target: Allocation:
CW1-Construction of Multipurpose Building: P 1.485 M
1.00 Number of Building
EAO P 0.015 M
Total P 1.500 M |
June 16, 2021 |
2021 |
WIN1F06288 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br) K0745+652 – K0746+000
Physical Target: Allocation:
CW1-Road Widening: 0.86 Lane Km P 14.70 M
EAO P 0.30 M
Total P 15.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0745+652 – K0746+000
Physical Target: Allocation:
CW1-Road Widening: 0.469Lane Km P 8.23 M
CW2-Off-Carriageway Improvement: P 4.51 M
Shoulder Paving:2,296.80 Square Meters
ROW-ROW Acquisition: 3,867.95 Square Meters P 2.00 M
EAO P 0.26 M
Total P 15.00 M
|
June 16, 2021 |
2021 |
WIN1F06275 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1031 + 400 - K1032 + 769
Physical Target: Allocation:
CW1-Road Widening: 2.806 Lane Km P 29.400 M
EAO P 0.600 M
Total P 30.00 M
AS MODIFIED:
Biliran Circumferential Rd - K1031 + 252 - K1032 + 328
Physical Target: Allocation:
CW1-Road Widening: 2.220 Lane Km P 29.400 M
EAO P 0.600 M
Total P 30.00 M
|
June 16, 2021 |
FY 2021 GAA |
WIN1F06146 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310102100583000
Project ID : P00516138LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Calapan South Road
K0005 + 415 - K005 + 876,
K0009 + 572 - K0010 + 521,
K0012 + 733 - K0015 + 162
Physical Target - CW1 - Preventive Maintenance Of Road :
Asphalt Overlay : 7.676 Lane Km
Allocation : Php 93.187 Million
TO;
Calapan South Road
K0005 + 415 - K0005 + 861,
K0009 + 571 - K0010 + 803,
K0012 + 799 - K0015 + 211
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 8.178 Lane Km
Allocation : Php 93.187 Million |
June 16, 2021 |
2021 |
WIN1F06267 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd - K0958 + 254 - K0958 + 413, K0958 + 534.35 - K0958 + 685
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.95702 M
Asphalt Overlay: 1.239 Lane Km
EAO P 0.14198 M
Total P 7.099 M
AS MODIFIED:
Palo-Carigara-Ormoc Rd - K0958 + 123.67 - K0958 + 413, K0958 + 534.35 - K0958 + 827.40
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.95702 M
Asphalt Overlay: 1.16476 Lane Km
EAO P 0.14198 M
Total P 7.099 M
|
June 16, 2021 |
2021 |
WIN1F06266 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
AS PER GAA/ORIGINAL:
Jaro-Dagami-Burauen-La Paz Rd - K0944 + 292 - K0944 + 747
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,275.00 Square Meters
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
Jaro-Dagami-Burauen-La Paz Rd - K0944 + 290 - K0944 + 881
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,364.00 Square Meters
EAO P 0.20 M
Total P 10.00 M
|
June 16, 2021 |
2021 |
WIN1F06268 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement-Primary Roads
AS PER GAA/ORIGINAL:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+063 – K1013+960
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 8.790600 M
Paving/ Construction: 2,242.500 Square Meters
EAO P 0.179400 M
Total P 8.970 M
AS MODIFIED:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+710 – K1014+249
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 8.790600 M
Paving/ Construction: 2,251.15 Square Meters
EAO P 0.179400 M
Total P 8.970 M
|
June 16, 2021 |
2021 |
WIN1F06260 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement-Primary Roads
AS PER GAA/ORIGINAL:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1013+968 – K1015+355
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 13.690600 M
Paving/ Construction: 3,492.500 Square Meters
EAO P 0.279400 M
Total P 13.970 M
AS MODIFIED:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Ormoc-Baybay-Southern Leyte Bdry. Rd – K1014+249 – K1015+100
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 13.690600 M
Paving/ Construction: 3,621.5 Square Meters
EAO P 0.279400 M
Total P 13.970 M
|
June 16, 2021 |
2021 |
WIN1F06289 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement-Primary Roads
AS PER GAA/ORIGINAL:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Palo-Carigara-Ormoc Rd – K0993+186 – K0994+030
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 8.36920 M
Paving/ Construction: 2,135 Square Meters
EAO P 0.17080 M
Total P 8.540 M
AS MODIFIED:
Off-Carriageway Improvement: Shoulder Paving/ Construction – Palo-Carigara-Ormoc Road, K0993+186 – K0994+070; K0995+859 – K0996+062
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 8.36920 M
Paving/ Construction: 2,135.80 Square Meters
EAO P 0.17080 M
Total P 8.540 M
|
June 16, 2021 |
2021 |
WIN1F06269 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Road
AS PER GAA/ORIGINAL:
Reconstruction to Concrete Pavement – Palompon-Isabel-Merida-Ormoc Rd – K1089+000 – K1089+424
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 18.892440 M
0.848 Lane Km
EAO P 0.385560 M
Total P 19.278 M
AS MODIFIED:
Reconstruction to Concrete Pavement – Palompon-Isabel-Merida-Ormoc Rd – K088+050 – K1088+068 (B); K1088+202 – K1088+220 (B); K1088+329 – K1088+409 (R); K1088+655 – K1088+673 (B); K1089+000 – K1089+027 (B); K1089+027 – K1089+045 (L); K1089+045 – K1089+392 (B); K1089+392 – K1089+410 (R);
K1089+410 (R); K1089+451 – K1089+528 – K1089+528 (R); K1089+528 – K1089+569 (B); K1090+000 – K1090+013 (B); K1090+013 – K1090+186 (R); 1090+239 - K1090+248 (B);
K1090+362 – K1090+380 (B); K1090+380 - K1090+403 (R); K1090+420 – K1090+438 (L); K1090+488 - K1090+515 (R); K1090+583 – K1090+673 (B); K1090+696 - K1090+714 (B); K1090+733 – K1090+760 (R); K1090+841 - K1090+913 (B); K1090+945 – K1090+981 (R); K1091+130 - K1091+189 (B); K1091+277 – K1091+417 (B); K1091+586 - K1091+604 (R); K1091+687 – K1091+705 (R); K1092+019 - K1092+037 (L); K1092+059 – K1092+331 (R); K1092+426 - K1092+449 (L); K1092+476 – K1092+527 (R)
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 18.892440 M
2.842 Lane Km
EAO P 0.385560 M
Total P 19.278 M
|
June 16, 2021 |
2021 |
WIN1F06290 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
AS PER GAA/ORIGINAL:
Preventive Maintenance of Road: Asphalt Overlay Ormoc-Baybay-So. Leyte Bdry. Road, K1023+000 – K1023+421
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.684 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Preventive Maintenance of Road: Asphalt Overlay Ormoc-Baybay-So. Leyte Bdry. Road, K1023+000 – K1023+842
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.684 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
June 16, 2021 |
2021 |
WIN1F06282 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads
AS PER GAA/ORIGINAL:
Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Rd – K1009+700 – K1010+516
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 14.700 M
along Road: 1,704.00 Lineal Meters
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Road, K1009+544- K1010+069
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 14.700 M
along Road: 944.00 Lineal Meters
EAO P 0.300 M
Total P 15.00 M
|
June 16, 2021 |
2021 |
WIN1F06279 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0768 + 561 - K0768 + 674
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 10.8192 M
Structure: 904.00 Square Meters
EAO P 0.2208 M
Total P 11.0400 M
AS MODIFIED:
Bugko-Nenita-Mirador-Cagpanit-an-De Maria-Sn Jose Rd - K0768 + 610 - K0768 + 728.50
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 10.8192 M
Structure: 569.895 Square Meters
EAO P 0.2208 M
Total P 11.0400 M
|
June 16, 2021 |
2021 |
WIN1F06277 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction (Completion) of Multi-Purpose Building (Barangay Health Station), Calag-itan, Limasawa, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 1.485 M
1 Number of Building
EAO P 0.015 M
Total P 1.50 M
AS MODIFIED:
Construction (Completion) of Multi-Purpose Building (Barangay Health Station), Calag-itan, Hinunangan, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 1.485 M
1 Number of Building
EAO P 0.015 M
Total P 1.50 M
|
June 16, 2021 |
2021 |
WIN1F06226 |
GAA FY 2021 |
April 13, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Flood Mitigation Structure and Riverbank Protection, Sangyan AFP PNP Housing, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 34.300 M
1,415 Lineal Meters
EAO P 0.700 M
Total P 35.00 M
AS MODIFIED:
Construction of Flood Mitigation Structure and Riverbank Protection, Sangyaw AFP PNP Housing, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 34.650 M
1,415 Lineal Meters
EAO P 0.350 M
Total P 35.00 M
|
June 16, 2021 |
FY 2021 GAA |
WIN1E02294 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1565+000 - K1567+000
Physical Target:
CW1: 4.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1564+533 - K1566+033
Physical Target:
CW1: 3.000 Lane Km (Road Widening)
ROW: 22,500.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 41,784,500.00 (Road Widening)
ROW: P 6,465,500.00 (ROW Acquisition)
EAO: P 1,750,000.00 |
June 16, 2021 |
FY 2021 GAA |
WIN1E02286 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Centennial Section, Barangay Zone 1, Digos City
Physical Target:
CW1: 482.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,100,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Rehabilitation of Concrete Revetment along Digos River, Purok Centennial Section, Barangay Zone 1, Digos City
Physical Target:
CW1: 683.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,100,000.00 |
June 16, 2021 |
2021 |
WIN1F06228 |
GAA FY 2021 |
April 13, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Flood Control Mitigation Structure and Riverbank Protection, Knightsbridge Residence, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 44.100 M
315 Lineal Meters
EAO P 0.900 M
Total P 45.00 M
AS MODIFIED:
Construction of Flood Control Mitigation Structure and Riverbank Protection, Knightsridge Bridge Residence, Tacloban City, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 44.550 M
315 Lineal Meters
EAO P 0.450 M
Total P 45.00 M
|
June 16, 2021 |
FY 2021 GAA |
WIN1E02288 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1563+000 - K1563+400
Physical Target:
CW1: 0.800 Lane Km (Road Widening)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Road Widening)
EAO: P 480,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1563+198 - K1563+400
Physical Target:
CW1: 0.404 Lane Km (Road Widening)
CW2: 0.202 km (Road Safety: Street Lighting)
ROW: 3,471.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 10,323,330.00 (Road Widening)
CW2: P 2,182,670.00 (Road Safety: Street Lighting)
ROW: P 11,014,000.00 (ROW Acquisition)
EAO: P 480,000.00 |
June 16, 2021 |
2021 |
WIN1F06273 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St – (S00003LT) Chainage 393 – Chainage 641
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 11.050480 M
0.496 Lane Km
EAO P 0.225520 M
Total P 11.276 M
AS MODIFIED:
Avenida Veteranos St - (S00003LT) Chainage 121 - Chainage 641
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 11.050480 M
0.768 Lane Km
EAO P 0.225520 M
Total P 11.276 M
|
June 15, 2021 |
2021 |
WIN1F06235 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Biliran District Engineering Office |
Local Program
Local -Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Rehabilitation of Barangay Road, Barangay Lucsoon, Naval, Biliran
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road : P 1.98 M
0.188 Lane Km
EAO P 0.20 M
Total P 2.00 M
AS MODIFIED:
Rehabilitation of Barangay Road, Barangay Lucsoon, Naval, Biliran
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road : P 1.98 M
0.328 Lane Km
EAO P 0.20 M
Total P 2.00 M
|
June 15, 2021 |
2021 |
WIN1F06234 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Jaro-Dagami-Burauen-Lapaz Rd - K0981 + 700 - K0982 + 723
Physical Target: Allocation:
CW1-Road Widening: 2.16 Lane Km P 29.40 M
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Jaro-Dagami-Burauen-Lapaz Rd - K0980 + 649 - K0981 + 327, K0981 + 373 - K0981 + 706
Physical Target: Allocation:
CW1-Road Widening: 2.16 Lane Km P 29.40 M
EAO P 0.60 M
Total P 30.00 M
|
June 15, 2021 |
2021 |
WIN1C03932 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0300+636;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000
To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Baguio - Bontoc Road K0284+969 - K0294+969;
Physical Target: CW1 : 20.00 Lane Km;
Allocation= Php 125,000,000
|
June 15, 2021 |
2021 |
WIN1C03906 |
GAA 2021 |
June 4, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction of Ap-Apid Multi-Purpose Building (1st Phase), Ap-Apid, Tinoc, Ifugao;
Physical Target: CW1: 1 Number of Buildings;
Allocation= Php 3,000,000
To: Construction of Ap-Apid Multi-Purpose Building (2nd Phase), Ap-Apid, Tinoc, Ifugao;
Physical Target: CW1: 1 Number of Buildings;
Allocation= Php 3,000,000
|
June 15, 2021 |
2021 |
WIN1F06241 |
SR2021-02-002205 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package D, E, F, Negros Occidental
CW1- Road Widening: 9.536 lane km
20,866.51 / lane km - 198,983.00
EAO - 7,217.00
Total: 206,200.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package D, E, F, Negros Occidental
CW1- Road Widening: 6.170 lane km
32,250.08 /lane km - 198,983.00
EAO - 7,217.00
Total: 206,200.00
|
June 15, 2021 |
2021 |
WIN1F06250 |
SR2021-02-002197 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0092 + 565 - K0095 + 886
CW1- Road Widening: 6.654 lane km
16,887.50 /lane km - 112,369.425
EAO - 4,075.575
Total: 116,445.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0092 + 364 - K0095 + 886
CW1- Road Widening: 7.056 lane km
15,515.08 / lane km - 109,474.425
ROW Acquisition: 35,280 square meters
0.082 / square meter - 2,895.00
EAO - 4,075.575
Total: 116,445.00
|
June 15, 2021 |
2021 |
WIN1F06225 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Off-Carriageway Improvement-Primary Roads
AS PER GAA/ORIGINAL:
Off-Carriageway Improvement Shoulder Paving/Construction – Palo-Carigara-Ormoc Rd – K0994+345 – K0995+344
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving/ Construction: 2,500.22
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
Off-Carriageway Improvement Shoulder Paving/Construction – Palo-Carigara-Ormoc Road, K0994+345 – K0995+344; K0995+344 – K0995+859
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving/ Construction: 2,500.50
EAO P 0.20 M
Total P 10.00 M
|
June 15, 2021 |
2021 |
WIN1F06219 |
SR-2021-02-002360 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Sitio Bago - ATA Village, Brgy. Puey, Sagay City, Negros Occidental
CW1- Construction of Concrete Road: 8.40 lane km
12,062.50 /lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Access Road leading to Sitio Bago - ATA Village, Brgy. Puey, Sagay City, Negros Occidental
CW1- Construction of Concrete Road: 4.88 lane km
20,763.32 /lane km - 101,325.00
EAO - 3,675.00
Total: 105,000.00
|
June 15, 2021 |
2021 |
WIN1F06236 |
SR2021-02-002184 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Kabankalan-Bais Rd - K0109 + 034 - K0111 + 763
CW1- Road Widening: 5.376 lane km
17,950.15 /lane km - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Primary Roads
Kabankalan-Bais Rd - K0109 + 034 - K0111 + 421
CW1- Road Widening: 4.692 lane km
18,771.43 / lane km - 88,075.55
ROW Acquisition: 23,460 square meters
0.359 / square meter - 8,424.45
EAO - 3,500.00
Total: 100,000.00
|
June 15, 2021 |
2021 |
WIN1F06214 |
SR2021-02-002214 |
February 4, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Segment 3, Negros
Occidental
CW1- Construction of Concrete Road: 10.00 lane km
16,887.50 /lane km - 168,875.00
ROW Acquisition: 14,285.71 sq.m
2.70/ sq.m - 38,600.00
EAO - 7,525.00
Total: 215,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Segment 3, Negros
Occidental
CW1- Construction of Concrete Road: 8.45238 lane km
21,760.14 /lane km - 183,925.00
ROW Acquisition: 14,285.71 sq.m
1.65/ sq.m - 23,550.00
EAO - 7,525.00
Total: 215,000.00
|
June 14, 2021 |
FY 2021 GAA |
WIN1G02920 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1520+029 - K1522+678
Physical Target:
CW1: 17.644 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 211,400,000.00
CW1: P 204,001,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,399,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd - K1520+389 - K1522+680, K1526+(-)432 - K1526+398
Physical Target:
CW1: 12.460 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 211,400,000.00
CW1: P 204,001,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 7,399,000.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02918 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Slaughterhouse Bypass Road, Davao City
Physical Target:
CW1: 15.720 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 167,500,000.00
CW1: P 161,637,500.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,862,500.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Slaughterhouse Bypass Road, Davao City
Physical Target:
CW1: 10.320 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 167,500,000.00
CW1: P 108,562,500.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,937,500.00
EXC: P 55,000,000.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02917 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
K1516+280 - K1518+155, K1518+655 - K1519+606
Physical Target:
CW1: 13.621 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,300,000.00
CW1: P 157,488,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,712,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
K1522+764 - K1524+471
Physical Target:
CW1: 10.200 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,300,000.00
CW1: P 157,488,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,712,000.00 |
June 14, 2021 |
2021 |
WIN1C03835 |
GAA 2021 |
May 20, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road- K0388 + (-882) - K0388 + (-862), K0403 + 790 - K0403 + 805, K0405 + 700 - K0405 + 710, K0409 + 450 - K0409 + 465, K0409 + 550 - K0409 + 610, K0410 + 115 - K0410 + 130, K0411 + 210 - K0411 + 245, K0413 + 465 - K0413 + 487;
Physical Target: CW1: 2,967.754 Square meters;
Allocation= Php 29,260,000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road- K0409 + 438 - K0409 + 453, K0409 + 600 - K0409 + 660, K0411 + 195 - K0411 + 220, K0413 + 305 - K0413 + 320, K0414 + 520 - K0414 +570;
Physical Target: CW1: 1,596 Square meters;
Allocation= Php 29,260,000
|
June 14, 2021 |
2021 |
WIN1C03886 |
GAA 2021 |
June 1, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) - Nangalisan - Sn Pascual, Tuba, Benguet -La Union Bdry Road - K0258+(-351) - K0282+540;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 250,000,000
To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Asin (KM 8) - Nangalisan - Sn Pascual, Tuba, Benguet -La Union Bdry Road - K0258+(-351) - K0282+540;
Physical Target: CW1 : 46.272 Lane Km;
Allocation= Php 250,000,000
|
June 14, 2021 |
2021 |
WIN1C03860 |
GAA 2021 |
May 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Shilan-Beckel Rd - K0262 + 870 - K0263 + 000, K0263 + 345 - K0263 + 410;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 110,000,000
To: Shilan-Beckel Rd - K0262 + 870 - K0263 + 000, K0263 + 345 - K0263 + 410;
Physical Target: CW1 : 4,299 Square meters;
Allocation= Php 110,000,000
|
June 14, 2021 |
2021 |
WIN1C03878 |
GAA 2021 |
June 1, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance- Secondary Roads- Nueva Viscaya- Ifugao- Mt. Province Bdry. Road K0312+060-K0314+000, K0321+232-K0322+374, K0323+770-K0334+500;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000
To: Preventive Maintenance- Secondary Roads- Nueva Viscaya- Ifugao- Mt. Province Bdry. Road K0323+770 - K0324+015, K0324+738 - K0326+200;
Physical Target: CW1 : 3.414 Lane Km;
Allocation= Php 20,000,000
|
June 14, 2021 |
2021 |
WIN1C03855 |
GAA 2021 |
May 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet;
Physical Target: CW1 : 874 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Baney Flood Control at Barangay Baculongan Sur, Buguias, Benguet;
Physical Target: CW1 : 920 Lineal meters;
Allocation= Php 100,000,000
|
June 14, 2021 |
FY 2021 GAA |
WIN1G02922 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road with Line Canal, Barangay 21-C, Davao City
Physical Target:
CW1: 0.272 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Rehabilitation of Concrete Road)
EAO: P 20,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road with Line Canal, Barangay 21-C, Davao City
Physical Target:
CW1: 0.480 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Rehabilitation of Concrete Road)
EAO: P 20,000.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02919 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Dafra, Brgy. Colorado, Digos City
Physical Target:
CW1: 1.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Dafra, Brgy. Colorado, Digos City
Physical Target:
CW1: 1.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02926 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Demoloc-Little Baguio-Alabel Rd - K1650+027 - K1650+832, K1650+254 - K1650+832
Physical Target:
CW1: 3.922 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 15,639,000.00
CW1: P 15,326,220.00 (Reconstruction to Concrete Pavement)
EAO: P 312,780.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Demoloc-Little Baguio-Alabel Rd - K1650+027 - K1650+832
Physical Target:
CW1: 1.610 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 15,639,000.00
CW1: P 15,326,220.00 (Reconstruction to Concrete Pavement)
EAO: P 312,780.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02935 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
22677 |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1513+068 - K1514+000,
K1515+000 - K1515+219, K1515+254 - K1516+000, K1518+000 - K1518+443
Physical Target:
CW1: 7.497 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1513+068 - K1514+000,
K1515+000 - K1515+219, K1515+254 - K1516+000, K1518+000 - K1518+443
Physical Target:
CW1: 4.680 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
June 14, 2021 |
FY 2021 GAA |
WIN1G02936 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of junction Salingcomot-Batawan Road, Baganga, Davao Oriental
Physical Target:
CW1: 3.304 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Gravel Road)
EAO: P 1,050,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of junction Salingcomot-Batawan Road, Baganga, Davao Oriental
Physical Target:
CW1: 3.304 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
EAO: P 1,050,000.00 |
June 14, 2021 |
2021 |
310201100647000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Santiago - Tuguegarao Rd - K0353+337 - K0355+002.5 |
June 14, 2021 |
2021 |
310201100644000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0375+297.20 - K0376+613.72 |
June 11, 2021 |
FY 2021 GAA |
WIN1F06147 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310109100556000
Project ID : P00505814LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide - Tertiary Roads
FROM:
Parpagoha (Marigindon) - Binoog Road
K0026 + 500 - K0026 + 700
Physical Target: CW1 - Construction of Road Slope Protection:
7,721.913 square meter
Allocation : Php 139.00 Million
TO:
Parpagoha (Marigondon) - Binoog Road
K0026 + 500 - K0026 + 640,
K0026 + 661 - K0026 + 700,
K0026 + 720 - K0026 + 775
Physical Target : CW1 - Construction of Road Slope Protection:
6,158.03 square meter
Allocation : Php 139.00 Million
|
June 11, 2021 |
FY 2021 GAA |
WIN1F06182 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100527000
Project ID : P00505815LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads
FROM:
Tablas Circumferential Road
K0069 + 400 - K0069 + 470,
K0069 + 520 - K0069 + 840
Physical Target : CW1 - Construction of Road Slope Protection :
7,722.223 square meter
Allocation : Php 139.00 Million
TO:
Tablas Circumferential Road
K0069 + 400 - K0069 + 470,
K0069 + 520 - K0069 + 730
Physical Target : CW1 - Construction of Road Slope Protection :
6,559.00 square meter
Allocation : Php 139.00 Million
|
June 11, 2021 |
FY 2021 GAA |
WIN1F06093 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100521000
Project ID : P00505925LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads
FROM:
Romblon - C0hg0n - Sablayan Road
K0013 + 135 - K0013 + 285,
K0016 + 000 - K0016 + 150
Physical Target : CW1 - Construction of Road Slope Protection :
8,328.50 square meter
Allocation : Php 186.00 Million
TO:
Romblon - Cogon - Sablayan Road
K0013 + 135 - K0013 + 285,
K0016 + 000 - K0016 + 171
Physical Target : CW1 - Construction of Road Slope Protection :
8,328.50 square meter
Allocation : Php 186.00 Million
|
June 11, 2021 |
2021 |
WIN1C03894 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Aurora District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
A. Castaneda - Ma. Aurora - San Luis Road, K0196+924 - K0197+497 |
June 11, 2021 |
2021 |
WIN1C03902 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Roman Expressway, K0105+758 - K0106+121
|
June 11, 2021 |
FY2021 |
WIN1E02237 |
310204101141000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Airport-Turno-Sinaman Bypass Road, Zamboanga del Norte
Type of Work: Road Widening
Physical Target: 6.764 lane km.
Unit Cost: P 14,299,815.58/Lane Km.
ROW Acquisition: 6,302.3636 square meters
EAO: P 3,385,338.34
Total Allocation: P 102,000,000.00 |
June 11, 2021 |
FY2021 |
WIN1E02236 |
310305101246000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Piao Br. (B00454MN) along Dipolog-Sindangan-Liloy Rd
Type of Work: Widening of Bridge
Physical Target: 2,023.434 square meters
Unit Cost: P 71,448.83222/Square meter
ROW Acquisition: 593.3454333 square meters
EAO: P 5,250,000.00
Total Allocation: P 150,000,000.00 |
June 11, 2021 |
FY 2021 GAA |
WIN1F06079 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310108100523000
Project ID : P00505930LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse
and Landslide - Secondary Roads
FROM:
Sibuyan Circumferential Road
K0005 + 446 - K0006 + 072
Physical Target : CW1 - Construction of Road Slope Protection :
4,400.00 square meter
Allocation : Php 80.00 Million
TO:
Sibuyan Circumferential Road
K0003 + 900 - K0003 + 1075,
K0004 + 000 - K0004 + 120,
K0004 + 160 - K0004 + 224
Physical Target : CW1 - Construction of Road Slope Protection :
3,283.40 square meter
Allocation : Php 80.00 Million |
June 11, 2021 |
FY2021 |
WIN1E02253 |
320101106232000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO2: Protect Lives and Properties - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Ayala River, Tulungatung Section, Zamboanga City
Type of Work: Construction of Flood Mitigation Structure
Physical Target: 500.00 Lineal meters
Unit Cost: P 121.587..9425/Lineal meter
EAO: P 2,127,788.99
Total Allocation: P 62,931,000.00 |
June 11, 2021 |
FY2021 |
WIN1E02264 |
310202100719000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road - Basilan Circumferential Rd - K17+200.00 - K19+847.82
Type of Work: Road Widening
Physical Target: 5.296 Lane Km.
Unit Cost: P 20,046,768.81/Lane km.
ROW Acquisition: 32,107.708 square meters
EAO: P 4,200,000.00
Total Allocation: P 120,000,000.00 |
June 11, 2021 |
FY2021 |
WIN1E02251 |
310201100681000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Sindangan-Liloy Rd - K1903+736.00 - K1905+284.62, K1905+347.00 - K1906+700.00
Type of Work: Road Widening
Physical Target: 5.803 Lane Km.
Unit Cost: P 16,429,359.48/Lane Km.
ROW Acquisition: 11,078.473 square meters
EAO: P 3,336,885.06
Total Allocation: P 102,000,000.00 |
June 11, 2021 |
2021 |
WIN1C03944 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Bridge Program - Widening of Permanent Bridges
Cojuangco Br. (B01363LZ) along Paniqui - Camiling - Wawa Rd (Phase II) |