September 2, 2021 |
FY2021 |
WIN1E02562 |
310108100566000 |
April 13, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal - Dakak - Dapitan Coastal Loop Rd - K1852+210 - K1852+250, K1852+530 - K1852+580, K1822+500 - K1823+200, K1827+400 - K1827+881
CW1: Construction of Slope Protection Structure
Physical Target: 6,521.0 Sq. M.
Unit Cost: Php 16,101.08665/sq. m.
ROW Acquisition: 939.9415 Sq. M. (Php 281,982.46)
EAO: Php 3,674,831.51
Total Allocation: Php 108,952,000.00 |
September 2, 2021 |
FY2021 |
WIN1E02440 |
310205100731000 |
April 19, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads
Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga del Norte
CW1: Construction of Concrete Road
Physical Target: 3.596 Lane Km.
Unit Cost: Php 27,869,938.92/lane km.
EAO: Php 139,699.63
Total Allocation: Php 104,000,000.00 |
September 2, 2021 |
FY2021 |
WIN1E02471 |
310205100733000 |
April 19, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads
Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Norte
CW1: Construction of Concrete Road
Physical Target: 1.26 Lane Km.
Unit Cost: Php 66,296,896.37/lane km.
EAO: Php 3,035,025.00
Excess: Php 145,885.57
Total Allocation: Php 86,715,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01143 |
300116203731000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Timbangan to Pantao Road, Barangay Timbangan, Indanan, Sulu.
CW1: Construction of Concrete Road
Physical Target: 4.40 Lane Km.
Unit Cost: Php 14,255,013.70/lane km.
EAO: Php 2,195,272.11
Excess: Php 82,667.62
Total Allocation: Php 65,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02274 |
310204101155000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Road
Zamboanga City Diversion Road, Zamboanga City
CW1: Road Widening
Physical Target (Road): 6.06 Lane Km.
Unit Cost (Road): Php 12,438,392.49/lane km.
CW2: Construction of Concrete Bridge
Physical Target (Bridge): 352.026 Sq. M.
Unit Cost (Bridge): Php 65,830.5527/sq.m.
EAO: Php 3,449,275.36
Total Allocation: Php 102,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01144 |
300116203730000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects - Construction of Jolo-Buansa Road, Barangay Buansa, Indanan, Sulu
CW1: Construction of Concrete Road
Physical Target: 10.20 Lane Km.
Unit Cost: Php 13,234,242.44/lane km.
EAO: Php 4,900,000.00
Excess: Php 110,727.08
Total Allocation: Php 140,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01139 |
310105100506000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Indanan-Parang-Silangkan Rd - K0012+0000 - K0013+690
CW1: Rehabilitation of Paved Road
Physical Target: 3.38 Lane Km.
Unit Cost: Php 17,122,798.65/lane km.
EAO: Php 2,025,627.08
Excess: Php 99,313.47
Total Allocation: Php 60,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01145 |
310105100508000 |
April 17, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Taglibi-Tiptipon Rd - K0008+000 - K0008+507
CW1: Rehabilitation of Paved Road
Physical Target: 1.014 Lane Km.
Unit Cost: Php 23,709,243.18/lane km.
EAO: Php 841,441.04
Excess: Php 17,386.38
Total Allocation: Php 24,900,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01138 |
310202100726000 |
April 17, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road
Camp Andres-Sucuban Rd - Sta. 6+480 - Sta. 8+180
CW1: Road Widening
Physical Target: 3.40 Lane Km.
Unit Cost: Php 21,164,164.33/lane km.
ROW Acquisition: 1,744.352467 Sq. M. (Php 523,305.74)
EAO: Php 2,518,535.55
Total Allocation: Php 75,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01142 |
310202100727000 |
April 17, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Road
Karungdong-Kulay-Kulay Rd - Sta. 6+480 - Sta. 8+045
CW1: Road Widening
Physical Target: 3.13 Lane Km.
Unit Cost: Php 18,241,795.49/lane km.
ROW Acquisition: 1,012.971 Sq. M. (Php 304,791.41)
EAO: Php 1,998,388.70
Total Allocation: Php 59,400,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02244 |
300117210043000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Tandu-Bato-Kan Allayon Road, Luuk, Sulu
CW1: Construction of Concrete Road
Physical Target: 1.76 Lane Km.
Unit Cost: Php 14,045,301.35
EAO: Php 250,000.00
Excess: Php 30,269.62
Total Allocation: Php 25,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02242 |
300117210043000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Suligpang-Garid Road, Luuk, Sulu
CW1: Construction of Concrete Road
Physical Target: 1.90 Lane Km.
Unit Cost: Php 13,000,013.88/lane km.
EAO: Php 250,000.00
Excess: Php 49,973.63
Total Allocation: Php 25,000,000.00 |
August 31, 2021 |
2021 |
WIN1E02809 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203510000
Project ID: P00550690MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Bunawan - Varuela Road (Phase 4), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15 / Lane Km
TO:
Construction of Bunawan - Veruela Road (Phase 4), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 2.54 Lane Km
CW2- 16,205.2 Square meters
Allocation:
TOTAL: P 130,000,000
CW1: P 105,170,193.55
CW2: P 20,279,806.45
EAO: P 4,550,000
Unit Cost:
CW1: P 41,405,588.01 / Lane Km
CW2: P 1,251.44 /Square meters
|
August 31, 2021 |
2021 |
WIN1E02808 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203511000
Project ID: P00550691MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Bunawan - Varuela Road (Phase 5), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15 / Lane Km
TO:
Construction of Bunawan - Veruela Road (Phase 5), Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 2.633 Lane Km
CW2- 11,716.85 Square meters
Allocation:
TOTAL: P 130,000,000
CW1: P 108,192,373.11
CW2: P 17,257,626.89
EAO: P 4,550,000
Unit Cost:
CW1: P 41,090,912.69 / Lane Km
CW2: P 1,472.89 /Square meters
|
August 31, 2021 |
FY2021 |
WIN1E02240 |
300116203722000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure - including Local Projects
Construction/Re-blocking of Romandier Camp Andres-Tandu Bato National Road, Km 26+000.00 - Km 27+000.00, Km 44+000.00 - Km 45+510.00, 2nd District, Sulu
CW1: Preventive Maintenance of Road (Concrete Reblocking)
Physical Target: 5.020 Lane Km.
Unit Cost: Php 19,192,180.64/lane km.
EAO: Php 3,500,000.00
Excess: Php 155,253.17
Total Allocation: Php 100,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02239 |
300112200190000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - National Roads and Bridges - National Bridge - Local Infrastructure Program - Reblocking of Camp Andres Lahing-Lahing Road, Luuk, Sulu
Km 04+000 - Km 07+080
CW1: Preventive Maintenance of Road (Concrete Reblocking)
Physical Target: 6.16 Lane Km.
Unit Cost: Php 11,235,827.97/lane km.
EAO: Php 700,000.00
Excess: Php 87,299.73
Total Allocation: Php 70,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02238 |
300111200355000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Widening of Jolo-Taglibi-Tiptipo National Road, Panamao, Sulu
CW1: Road Widening
Physical Target: 5.920 Lane Km.
Unit Cost: Php 16,227,552.91/lane km.
ROW Acquisition: 1,901.792 Sq. M. (Php 570,537.83)
EAO: Php 3,362,348.96
Total Allocation: Php 100,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01150 |
300116204458000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction/ Concreting of Kan-Imbas Road Camp Andres, Luuk, Sulu
CW1: Construction of Concrete Road
Physical Target: 1.160 Lane Km.
Unit Cost: Php 16,773,738.42/lane km.
EAO: Php 500,000.00
Excess: Php 42,463.43
Total Allocation: Php 20,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01149 |
310105100507000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jolo-Taglibi-Tiptipon Road, K0002+000 - K0003+035
CW1: Rehabilitation of Paved Road
Physical Target: 2.070 Lane Km.
Unit Cost: Php 16,325,626.26/lane km.
EAO: Php 1,182,791.62
Excess: Php 23,162.02
Total Allocation: Php 35,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01151 |
300116203723000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Concreting of Kan-Bah-Kan Bulak Road, Luuk, Sulu
CW1: Construction of Concrete Road
Physical Target: 5.020 Lane Km.
Unit Cost: Php 17,969,967.08/lane km.
EAO: Php 2,800,000.00
Excess: Php 48,456.79
Total Allocation: Php 80,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01152 |
300117210035000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Salimbangun, Barangay Pandan Niog, Pangutaran, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.930 Lane Km.
Unit Cost: Php 10,645,161.29
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1B01153 |
300117210012000 |
April 17, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Barangay Bangas Likud, Hadji Panglima Tahil, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.834 Lane Km.
Unit Cost: Php 11,870,503.60/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
August 31, 2021 |
FY2021 |
WIN1E02272 |
310201100680000 |
April 12, 2021 |
Region IX |
Regional Office IX |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Punta-Dansullan-S Osmeña Rd, Zamboanga del Norte/Sur Bdry Rd - K1882+220 - K1885+560
CW1: Road Widening
Physical Target: 6.72 Lane Km.
Unit Cost: Php 15,417,758.34/lane km.
ROW Acquisition: 9,221.357 Sq. M. (Php 2,766,407.20)
EAO: Php 3,626,256.76
Total Allocation: Php 110,000,000.00 |
August 27, 2021 |
FY 2021 |
WIN1C04227 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320101106861000
Project ID: P00526227LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Mitigation and Drainage Systems – Rehabilitation/Improvement of Flood Control Structures along Laniton Bridge in Barangay Laniton, Basud, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 522 Lineal Meters
Allocation: Php 43,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Mitigation and Drainage Systems – Rehabilitation/Improvement of Flood Control Structures along Laniton Bridge in Barangay Laniton, Basud, Camarines Norte
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 380 Lineal Meters
Allocation: Php 43,000,000.00
|
August 27, 2021 |
FY 2021 GAA |
WIN1E02721 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - K1377+(-201) - K1377+(-198),
K1377+655 - K1377+665, K1377+683 - K1378+000
Physical Target:
CW1: 3.654 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,876,000.00
CW1: P 21,438,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 437,520.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - K1392+287 - K1392+872
Physical Target:
CW1: 3.510 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 21,876,000.00
CW1: P 21,438,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 437,520.00 |
August 27, 2021 |
FY 2021 |
WIN1C04016 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320101106855000
Project ID: P00526221LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Barangay Taba-Taba to Barangay Mangcamagong, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Barangay Taba-Taba to Barangay Mangcamagong, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04205 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320101106856000
Project ID: P00526222LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Phase I, Barangay Cayucyucan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 190 Lineal Meters
Allocation: Php 43,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Phase I, Barangay Cayucyucan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 210 Lineal Meters
Allocation: Php 43,000,000.00
|
August 27, 2021 |
2021 |
WIN1E02766 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300204101157000
Project ID: P00537703MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
FROM:
Road connecting Brgys. Mat-i and E.G. Montilla, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.843 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 4,694,610.78/Lane Km
TO:
Road Connecting Brgys. Mat-i and E.G. Montilla, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.843 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 4,694,610.78/Lane Km
|
August 27, 2021 |
FY 2021 |
WIN1C04304 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320102104344000
Project ID: P00526488LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Flood Control Project along Daet River (Brgy. 1 Section), Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 75.819 Lineal Meters
Allocation: Php 17,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Flood Control Project along Daet River (Brgy. 1 Section), Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 73.00 Lineal Meters
Allocation: Php 17,000,000.00
|
August 27, 2021 |
2021 |
WIN1E02737 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310109100733000
Project ID: P00509865MN
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 428
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.000 Square meters
Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000
Unit Cost:
CW1: P -
TO:
Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134+300 - K1134+590, K1134+700 – K1134+860
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2,946.50 Square meters
Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000
Unit Cost:
CW1: P 14,966.91/ Square meters
|
August 27, 2021 |
2021 |
WIN1E02725 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300211100240000
Project ID: P00533131MN
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Asphalt Overlay along Surigao - San Juan Coastal Road, K1116+059.00 - K119+816, Brgy. Sabang, Surigao
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 2.359 Lane Km
Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000
Unit Cost:
CW1: P 16,362,865.62/Lane Km
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Asphalt Overlay along Surigao - San Juan Coastal Road, K1116+059.00 – K1117+000, K1117+171 - K1117+582.37, Brgy. Sabang, Surigao
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 2.727 Lane Km
Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000
Unit Cost:
CW1: P 14,154,748.81/Lane Km
|
August 27, 2021 |
2021 |
WIN1E02757 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300116204631000
Project ID: P00550981MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation/Concreting of Road, from Barangay Pili to Barangay Karihatag, Malimono, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.812 Lane Km
Allocation:
TOTAL: P 33,000,000
CW1: P 32,340,000
EAO: P 660,000
Unit Cost:
CW1: P 17,847,682.12/Lane Km
TO:
Rehabilitation/Concreting of Road, from Barangay Pili to Barangay Karihatag, Malimono, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.423 Lane Km
CW2- 483.29 Square meters
Allocation:
TOTAL: P 33,000,000
CW1: P 29,026,530
CW2: P 3,313,470
EAO: P 660,000
Unit Cost:
CW1: P 2,398,123.68/Lane Km
CW2: P 6,856.07/Square meters
|
August 27, 2021 |
FY 2021 |
WIN1C04084 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320102104345000
Project ID: P00526489LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Mabulao River Control Structure, Barangay Calasgasan – Magang Section, Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 290 Lineal Meters
Allocation: Php 43,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Mabulao River Control Structure, Barangay Calasgasan – Magang Section, Daet, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 239 Lineal Meters
Allocation: Php 43,000,000.00
|
August 27, 2021 |
FY 2021 GAA |
WIN1F06521 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100728000
Project ID : P00506139LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Mindoro Island Circumferential Road (Puerto Galera - Abra De Ilog)
Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.546 Lane Km
- CW2 - Construction of Concrete Bridge :
1,436.724 Square Meters
Allocation : Php 110.00 Million
TO :
Mindoro Island Circumferential Road (Puerto Galera - Abra De Ilog)
Occidental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
0.934 Lane Km
Allocation : Php 110.00 Million |
August 27, 2021 |
FY 2021 |
WIN1C04303 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300107200973000
Project ID: P00561592LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction of Flood Control Structure (River Bank Stabilization), Brgy. Bakiad, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,267.664 Lineal Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Construction of Flood Control Structure (River Bank Stabilization), Brgy. Bakiad, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 388.0 Lineal Meters
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04280 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300107200982000
Project ID: P00561598LZ
AS PER GAA:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Improvement of River Bank in Brgy. Dalas, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,267.664 Lineal Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program – Flood Control and Drainage – Flood Control Structures/Facilities – Local Infrastructure Program – Improvement of River Bank in Brgy. Dalas, Labo, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 399.0 Lineal Meters
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04203 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300116203521000
Project ID: P00561929LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Divresion Road, Brgy. Exciban, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 7.98 Lane Km
Allocation: Php 93,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Divresion Road, Brgy. Exciban, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.25278 Lane Km
CW2 - Construction of Road Slope Protection Structure – 3,622.04 Square meters
Allocation: Php 93,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04131 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300116203522000
Project ID: P00561930LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Bypass Road, Brgy. Anahaw, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 7.98 Lane Km
Allocation: Php 93,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of Bypass Road, Brgy. Anahaw, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.816 Lane Km
CW2 - Construction of Road Slope Protection Structure – 4,818.40 Square meters
Allocation: Php 93,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04113 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300116203727000
Project ID: P00561995LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road with Seawall (Cong. Eming Panotes Boulevard) Barangay Mambungalon, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road with Seawall (Cong. Eming Panotes Boulevard) Barangay Mambungalon, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.89 Lane Km
CW2 - Construction of Road Slope Protection Structure – 2,202.75 Square meters
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04085 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300116203733000
Project ID: P00561998LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of By-pass Road with Seawall at Brgy. Parang – South Poblacion, Jose Panganiban, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of By-pass Road with Seawall at Brgy. Parang – South Poblacion, Jose Panganiban, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.87 Lane Km
CW2 - Construction of Road Slope Protection Structure – 2,175 Square meters
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04097 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300116204253000
Project ID: P00562514LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Seawall with Roads (cong. Elmer Panotes Blvd.), Leading to Cory Aquino Blvd., Lanot Section, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 2.476 Lane Km
Allocation: Php 25,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Seawall with Roads (cong. Elmer Panotes Blvd.), Leading to Cory Aquino Blvd., Lanot Section, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.24 Lane Km
CW2 - Construction of Road Slope Protection Structure – 564 Square meters
Allocation: Php 25,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04086 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300117207600000
Project ID: P00562560LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Lukbanan, Capalonga Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Lukbanan, Capalonga Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 3.406Lane Km
CW2 - Construction of Road Slope Protection Structure – 5,359.93 Square meters
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04087 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300117209236000
Project ID: P00564789LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Purok 3 to Purok 5, Barangay San Antonio to Barangay Bautista, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 1.592 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Opening/Concreting of Road, Purok 3 to Purok 5, Barangay San Antonio to Barangay Bautista, Labo, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 1.752 Lane Km
Allocation: Php 10,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04265 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310108100528000
Project ID: P00505991LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Masbate-Milagros Rd – K0004+743 – K0004+994
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,133.50 Square meters
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Masbate-Milagros Rd – K0004+743 – K0004+994, K0007+775 – K0007+890
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,259 Square meters
Allocation: Php 10,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04008 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310105100570000
Project ID: P00505784LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction Upgrading of Damaged Paved Roads - Secondary Roads – Masbate-Milagros Rd – K0011+483 – K0011+612
Physical Target: CW1- Reconstruction of Concrete Pavement – 0.258 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction Upgrading of Damaged Paved Roads - Secondary Roads – Masbate-Milagros Rd – K0011+483 – K0011+554
Physical Target: CW1- Reconstruction of Concrete Pavement – 0.142 Lane Km
Allocation: Php 5,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C03946 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 320101106882000
Project ID: P00526248LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Tinapian River Control, Masbate City
Physical Target: CW1- Construction of Flood Mitigation Structure – 676 Lineal Meters
Allocation: Php 50,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation and Drainage Systems – Construction of Tinapian River Control, Baleno, Masbate
Physical Target: CW1- Construction of Flood Mitigation Structure – 676 Lineal Meters
Allocation: Php 50,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C03754 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 300117209330000
Project ID: P00564883LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Masbate City, Masbate
Physical Target: CW1- Construction of Concrete Road – 0.162 Lane Km
Allocation: Php 3,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Road Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Milagros, Masbate
Physical Target: CW1- Construction of Concrete Road – 0.162 Lane Km
Allocation: Php 3,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04110 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 300117209327000
Project ID: P00564880LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road – Sitio Kabas-an, Barangay Paraiso, Milagros Masbate
Physical Target: CW1- Construction of Concrete Road – 0.37 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road – Sitio Luacan, Barangay Paraiso, Milagros Masbate
Physical Target: CW1- Construction of Concrete Road – 0.37 Lane Km
Allocation: Php 5,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04042 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310205100581000
Project ID: P00506283LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Malubi – Cabangcalan – Dayhagan – Mataba Road, Masbate
Physical Target: CW1- Construction of Concrete Road – 3.3 Lane km.
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Malubi – Cabangcalan – Dayhagan – Mataba Road, Masbate
Physical Target: CW1- Construction of Concrete Road – 2.32 Lane km.
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04013 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310205100583000
Project ID: P00506284LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Mandaon – Dayhagan Road, Masbate
Physical Target: CW1- Construction of Concrete Road – 3.2 Lane km.
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Mandaon – Dayhagan Road, Masbate
Physical Target: CW1- Construction of Concrete Road – 2.64 Lane km.
Allocation: Php 100,000,000.00
|
August 27, 2021 |
FY 2021 |
WIN1C04309 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202100836000
Project ID: P00505299LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Masbate-Cataingan-Placer Rd – K0009+803 – K0010+265
Physical Target: CW1- Road Widening – 0.922 Lane km.
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Masbate-Cataingan-Placer Rd – K0008+723 – K0008+859
Physical Target: CW1- Road Widening – 0.272 Lane km.
Allocation: Php 10,000,000.00
|
August 26, 2021 |
FY 2021 |
WIN1C04120 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 310107100255000
Project ID: P00505798LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ) – K0359+800 – K0359+850, K0360+100 – K0360+150, K0364+638 – K0364+748
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,000 Square meters
Allocation: Php 20,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Primary Roads – Daang Maharlika (LZ) – K0359+800 – K0360+024, K0360+100 – K0360+150, K0364+638 – K0364+748
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,176 Square meters
Allocation: Php 20,000,000.00
|
August 26, 2021 |
FY 2021 |
WIN1C04329 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300203101667000
Project ID: P00532255LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Daet – Vinzons leading to Mantigbi – Sula – Sabang – Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target: CW1- Construction of Concrete Bridge – 95.238 Square meters
Allocation: Php 10,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Daet – Vinzons leading to Mantigbi – Sula – Sabang – Aguit-it Beach, Quinamanukan Island, Vinzons, Camarines Norte
Physical Target: CW1- Construction of Revetment – 342.99 Square meters
CW2- Construction of Concrete Road – 0.0416 Lane km.
Allocation: Php 10,000,000.00
|
August 26, 2021 |
FY 2021 |
WIN1C04001 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300203101669000
Project ID: P00532256LZ
AS PER GAA:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Pinagtigasan to Mahabang Buhangin Road leading to White Sand Beaches Calaguas Island, Brgy. Pinagtigasan, Vinzons, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.302 Lane km.
Allocation: Php 10,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Pinagtigasan to Mahabang Buhangin Road leading to White Sand Beaches Calaguas Island, Brgy. Pinagtigasan, Vinzons, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.392 Lane km.
Allocation: Php 10,000,000.00
|
August 26, 2021 |
FY 2021 GAA |
WIN1F06461 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 3001162044221000
Project ID : P00562482LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road -
6.00 Lane Km
Allocation : Php 36.00 Million
TO :
Concreting of Road,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road -
5.0874 Lane Km
Allocation : Php 36.00 Million |
August 26, 2021 |
FY 2021 |
WIN1C04196 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 320102106857000
Project ID: P00526223LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Tambo Section, Barangay Taba-Taba, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 191.778 Lineal Meters
Allocation: Php 43,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Construction of Seawall with Road (Cong. Elmer E. Panotes Boulevard leading to Cory Aquino Boulevard) Tambo Section, Barangay Taba-Taba, Basud, Camarines Norte
Physical Target: CW1- Construction of Flood Mitigation Structure – 179 Lineal Meters
Allocation: Php 43,000,000.00
|
August 26, 2021 |
FY 2021 GAA |
WIN1F06524 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300103203539000
Project ID : P00557166LZ
LOCAL PROGRAM
Buildings and Other Structures - Multipurpose/Facilities -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction/Rehabilitation of Multi-Purpose Building
(Evacuation Center), Brgy. Poblacion and Brgy. Cabalwa,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building
1.00 No. of Building
Allocation : Php 6.00 Million
TO :
Construction/Rehabilitation of Multi-Purpose Building
(Evacuation Center), Brgy. Poblacion and Brgy. Cabalwa,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building
2.00 No. of Building
Allocation : Php 6.00 Million
|
August 26, 2021 |
2021 |
WIN1F06710 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1099 + 704 - K1100 + 097
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.7077 M
Asphalt Overlay: 0.722 Lane Km
EAO P 0.1573 M
Total P 7.865 M
AS MODIFIED:
Biliran Circumferential Rd - K1099 + 704 - K1100 + 009
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.7077 M
Asphalt Overlay: 0.546 Lane Km
EAO P 0.1573 M
Total P 7.865 M
|
August 26, 2021 |
FY 2021 GAA |
WIN1F06483 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310102100693000
Project ID : P00505618LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road,
K0127 + 402 - K0127 + 560
Physical Target - Preventive Maintenance - 0.538 Lane Km
Allocation : Php 5.442 Million
TO :
Calapan South Road,
K0127 + 094 - K0127 + 218.50
Physical Target - Preventive Maintenance - 0.498 Lane Km
Allocation : Php 5.442 Million |
August 26, 2021 |
FY 2021 GAA |
WIn1F06458 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 310209100313000
Project ID : P00505126LZ
001 : Ensure Safe and Reliable National Road System
Off-Carriageway Improvement - Tertiary Roads
FROM :
Jct MWCR (Sn Isidro) - Penal Colony - Jct Yapang Road,
K0307 + 318 - K0307 + 535,
K0307 + 604 - K0310 + 049
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
10,458 square meters
Allocation : Php 28.76 Million
TO :
Jct. MWCR (Sn Isidro) - Penal Colony - Jct Yapang Road,
K0310 + 547 - K0312 + 149,
K0312 + 602 - K0313 + 690
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
13,125 square meters
Allocation : Php 28.76 Million
|
August 26, 2021 |
FY 2021 GAA |
Win1F06455 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 300116204148000
Project ID : P00562409LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Upgrading/Improvement of JNR to Lourdes P/R in
San Jose, Occidental Mindoro
Physical Target - CW1 - Rehabilitation of Concrete Road -
5.482 Lane Km
Allocation : Php 48.00 Million
TO :
Upgrading/Improvement of JNR to Lourdes P/R in
Magsaysay, Occidental Mindoro
Physical Target - CW1 - Rehabilitation of Concrete Road -
5.482 Lane Km
Allocation : Php 48.00 Million |
August 26, 2021 |
FY 2021 GAA |
WIN1E02789 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction (Completion) of Asico Bridge (Asico Village) Matina Pangi, Davao (Phase 2)
Physical Target:
CW1: 000.00 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Bridge)
EAO: P 800,000.00
TO: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction (Completion) of Asico Bridge (Asico Village) Matina Pangi, Davao (Phase 2)
Physical Target:
CW1: 1,940.60 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Construction of Bridge)
EAO: P 800,000.00 |
August 26, 2021 |
2021 |
WIN1F06709 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Naval-Caibiran Cross Country Rd - K1029 + 745 - K1029+ 883
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 5.90646 M
Asphalt Overlay: 0.552 Lane Km
EAO P 0.12054 M
Total P 6.027 M
AS MODIFIED:
Naval-Caibiran Cross Country Rd - K1029 + 745 - K1029+ 849
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 5.90646 M
Asphalt Overlay: 0.416 Lane Km
EAO P 0.12054 M
Total P 6.027 M
|
August 26, 2021 |
FY 2021 GAA |
WIN1E02789 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Barangay Maduao-Barangay Tagpore, Panabo City, Davao del Norte
Physical Target:
CW1: 7.090 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 55,970,000.00 (Construction of Concrete Road)
EAO: P 2,030,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Barangay Maduao-Barangay Tagpore, Panabo City, Davao del Norte
Physical Target:
CW1: 2.897 lane km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Replacement of Bridge)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 33,965,346.00 (Construction of Concrete Road)
CW2: P 22,004,654.00 (Replacement of Bridge)
EAO: P 2,030,000.00 |
August 26, 2021 |
FY 2021 GAA |
WIN1E02800 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1507+(-660) - K1507+(-068)
Physical Target:
CW1: 592.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,060,000.00
CW1: P 19,658,800.00 (Construction of Drainage Structure along Road)
EAO: P 401,200.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Dacudao Rd - K1507+(-419) - K1507+(-068)
Physical Target:
CW1: 351.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,060,000.00
CW1: P 19,658,800.00 (Construction of Drainage Structure along Road)
EAO: P 401,200.00 |
August 26, 2021 |
FY 2021 GAA |
WIN1E02802 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road from Purok 13 to Purok 9 Barangay Pasian, Monkayo, Davao de Oro
Physical Target:
CW1: 1.842 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 21,500,000.00
CW1: P 21,285,000.00 (Construction of Concrete Road)
EAO: P 215,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road from Purok 13 to Purok 9 Barangay Pasian, Monkayo, Davao de Oro
Physical Target:
CW1: 0.760 Lane km (Construction of Concrete Road)
CW2: 146.400 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 21,500,000.00
CW1: P 11,989,116.74 (Construction of Concrete Road)
CW2: P 9,295,883.26 (Construction of Concrete Bridge)
EAO: P 215,000.00 |
August 26, 2021 |
FY 2021 GAA |
WIN1F06459 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 300202100194000
Project ID : P00531942LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
FROM :
Access Road leading to Caminawit Port,
Rizal, Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.678 Lane Km
Allocation : Php 10.00 Million
TO :
Access Road leading to Caminawit Port,
San Jose, Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road -
0.300 Lane Km
Allocation : Php 10.00 Million |
August 26, 2021 |
FY 2021 GAA |
P00562395LZ |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 300116204134000
Project ID : P00562395LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Repair/Restoration of Road with Slips, Road Collapse,
and Landslide
Marinduque Circumferential Road,
K0022 + 080 - K0022 + 140,
Lamesa, Santa Cruz, Marinduque
Physical Target - CW1 - Rehabilitation/Major Repair of Road Slope
Protection Structure - 1,200 square meters
Allocation : Php 20.00 Million
TO :
Repair/Restoration of Road with Slips, Soil Collapse and
Landslide,
Marinduque Circumferential Road
K0022 + 137 - K0022 + 407,
Lamesa, Santa Cruz, Marinduque
Physical Target - CW1 - Rehabilitation/Major Repair of Road Slope
Protection Structure - 2,480 square meters
Allocation : Php 20.00 Million |
August 26, 2021 |
FY 2021 GAA |
WIN1F06548 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 320102104116000
Project ID : P00526332LZ
002 : Protect Lives and Properties Against major Floods
Construction/Maintenance of Flood Mitigation Structure
and Drainage Systems
FROM :
Construction of Calapan River Control along
Ibaba Section, Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
608.40 Lineal meters
Allocation : Php 70.00 Million
TO :
Construction of Calapan River Control along
Ibaba Section. Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
217.60 Lineal Meters
Allocation : Php 70.00 Million
|
August 26, 2021 |
2021 |
WIN1C04429 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239
Installation of Road Safety Devices and Lighting Facilities along Gov JJ Linao Road (S04821LZ), (S04822LZ) |
August 26, 2021 |
2021 |
WIN1C04413 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239
Improvement of Signages along Various Intersections of Roman Expressway
|
August 25, 2021 |
FY 2021 GAA |
WIN1F06488 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310108100638000
Project ID : P00505927LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslides -
Secondary Roads
FROM :
Calapan South Road,
K0114 + 600 - K0114 + 691
Physical Target - CW1 - Construction of Road Slope
Protection Structure : 910 sq. m.
Allocation : Php 15.30 Million
TO :
Calapan South Road,
K0114 + 527.80 - K0114 + 563,
K0114 + 600 - K0114 + 695.60
Physical Target - CW1 - Construction of Road Slope
Protection Structure : 1,046.40 sq.m.
Allocation : Php 15.30 Million
|
August 25, 2021 |
FY 2021 |
WIN1C04252 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 310109100662000
Project ID: P00505799LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Tertiary Roads
– Ariman-Casiguran Rd – K0607+400 – K0607+500
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,000.0 Square meters
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Tertiary Roads
– Ariman-Casiguran Rd – K0607+400 – K0607+492, K0607+535 – K0607+635, K0608+100 – K0608+225, K0608+310 – K0608+430
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,311.0 Square meters
Allocation: Php 10,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04305 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 320101106172000
Project ID: P00525692LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Mababoy Shore Protection, Sitio Mababoy, Barangay Guinhadap, Monreal, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 438.058 Lineal Meters
Allocation: Php 55,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Mababoy Shore Protection, Sitio Mababoy, Barangay Guinhadap, Monreal, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 220.0 Lineal Meters
Allocation: Php 55,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04306 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 320101106180000
Project ID: P00525700LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Shore Protection Structure, Barangay Sitio Busdak, Bartolobac, San Jacinto, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 438.058 Lineal Meters
Allocation: Php 55,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Shore Protection Structure, Barangay Sitio Busdak, Bartolobac, San Jacinto, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 203.0 Lineal Meters
Allocation: Php 55,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04325 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 320101106181000
Project ID: P00525701LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Sitio Dalakit Shore Protection, Sitio Dalakit, Barangay McArthur, Monreal, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 438.058 Lineal Meters
Allocation: Php 55,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Sitio Dalakit Shore Protection, Sitio Dalakit, Barangay McArthur, Monreal, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 218.0 Lineal Meters
Allocation: Php 55,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04210 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 320101106182000
Project ID: P00525702LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Sitio Guiwanon Shore Protection, Sitio Guiwanon, Barangay Danao, San Jacinto, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 438.058 Lineal Meters
Allocation: Php 55,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Sitio Guiwanon Shore Protection, Sitio Guiwanon, Barangay Danao, San Jacinto, Masbate
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 215.0 Lineal Meters
Allocation: Php 55,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04296 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 310104100272000
Project ID: P00505455LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0373+300 – K0374+721
Physical Target: CW1- Reconstruction of Concrete Pavement – 2.844 Lane Km
Allocation: Php 55,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction Upgrading of Damaged Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0387+000 – K0387+400, K0395+000 – K0396+461
Physical Target: CW1- Reconstruction of Concrete Pavement – 1.4286 Lane Km
CW2 - Construction of Drainage Structure along Road – 1,360.70 Lineal meters
Allocation: Php 55,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04101 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS No.: 320102104353000
Project ID: P00526497LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Rehabilitation of Riverwall along Libmanan River within Bicol River Basin, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure - 170.00 Lineal Meters
Allocation: Php 35,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Rehabilitation of Riverwall along Bicol River within Bicol River Basin, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure - 170.00 Lineal Meters
Allocation: Php 35,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04291 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 1st Engineering Office |
UACS No.: 320101106169000
Project ID: P00525689LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Bulawan Flood Control, San Francisco Section, Malilipot, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 461.952 Lineal Meters
Allocation: Php 58,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Bulawan Flood Control, San Francisco Section, Malilipot, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 152.0 Lineal Meters
Allocation: Php 58,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04297 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 1st Engineering Office |
UACS No.: 320101106170000
Project ID: P00525690LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Bulawan Flood Control, San Jose Section, Malilipot, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 461.952 Lineal Meters
Allocation: Php 58,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Bulawan Flood Control, San Jose Section, Malilipot, Albay
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 152.0 Lineal Meters
Allocation: Php 58,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04298 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 1st Engineering Office |
UACS No.: 3201011068110000
Project ID: P00526177LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/Extension Seawall, Pawa, Tabaco City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 200.698 Lineal Meters
Allocation: Php 45,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/Extension Seawall, Pawa, Tabaco City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 103.56 Lineal Meters
Allocation: Php 45,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04287 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310109100656000
Project ID: P00505984LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Comun-Inarado-Peñafrancia Rd – K0530+912 – K0530+980
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,400.0 Square meters
Allocation: Php 7,000,000.00
AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Comun-Inarado-Peñafrancia Rd – K0519+370 – K0519+502, K0523+183 – K0523+210
Physical Target: CW1- Construction of Road Slope Protection Structure – 814.08 Square meters
Allocation: Php 7,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04344 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310109100645000
Project ID: P00505579LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City-Punta de Jesus Rd – K0561+720 – K0562+120
Physical Target: CW1- Construction of Road Slope Protection Structure – 0 Square meters
Allocation: Php 4,000,000.00
AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Legazpi City-Punta de Jesus Rd – K0561+720 – K0562+120
Physical Target: CW1- Construction of Road Slope Protection Structure – 511.70 Square meters
Allocation: Php 4,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04331 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310202100830000
Project ID: P00505273LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening - Secondary Roads – Daang Maharlika Jct-Legazpi-Sto. Domingo-Tabaco-Camarines Sur Bdry Rd – K0535+160 – K0535+710
Physical Target: CW1- Road Widening – 1.10 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening - Secondary Roads – Daang Maharlika Jct-Legazpi-Sto. Domingo-Tabaco-Camarines Sur Bdry Rd – K0535+000 – K0535+080
Physical Target: CW1- Road Widening – 0.16 Lane Km
ROW - ROW Acquisition – 710.0 Square meters
Allocation: Php 10,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04316 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300117207615000
Project ID: P00562571LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Buhatan-Gaba Toruism Ridge View/Cross Country Road, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Concrete Road - 8.581 lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Buhatan-Gaba Toruism Ridge View/Cross Country Road, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Concrete Road – 4.80 lane Km
Allocation: Php 100,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04294 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 300107201205000
Project ID: P00561821LZ
AS PER GAA:
Local Program -Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program – Construction of Mangagat Flood Control System, Barangay Galicia, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 361.165 Lineal Meters
Allocation: Php 35,000,000.00
AS MODIFIED:
Local Program -Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program – Construction of Mangagat Flood Control System, Barangay Galicia, Rapu-Rapu, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 145.0 Lineal Meters
Allocation: Php 35,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04138 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 310104100305000
Project ID: P00505453LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0456+(-692) – K0456+(-627)
Physical Target: CW1- Reconstruction of Concrete Pavement – 0.26 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Primary Roads – Daang Maharlika (LZ) – K0461+103 – K0461+210, K0464+273-K0464+445
Physical Target: CW1- Reconstruction of Concrete Pavement – 0.082 Lane Km
CW2 – Rehabilitation/Major Repair of Drainage Structure along Road – 331.0 Lineal meters
Allocation: Php 5,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04209 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 310202100832000
Project ID: P00505008LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0477+000 – K0477+333
Physical Target: CW1- Road Widening – 0.666 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd - K0477+000 – K0477+235
Physical Target: CW1- Road Widening – 0.47 Lane Km
Allocation: Php 10,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04283 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 320102104129000
Project ID: P00526345LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and principal Rivers – Rehabilitation of Flood Control Structure along Bicol River – Santiago Old Nabua Section, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 540.0 Lineal Meters
Allocation: Php 80,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and principal Rivers – Rehabilitation of Flood Control Structure along Barit River – Santiago Old Nabua Section, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 582.50 Lineal Meters
Allocation: Php 80,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C034228 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 320102104131000
Project ID: P00526347LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation /Improvement of Revetment along Bicol River Downstream of Sto. Domingo Bridge, Right Side, Brgy. Topas, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 540.0 Lineal Meters
Allocation: Php 80,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation /Improvement of Revetment along Bicol River Downstream of Sto. Domingo Bridge, Right Side, Brgy. Sto. Domingo, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 553.0 Lineal Meters
Allocation: Php 80,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04062 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 5th District Engineering Office |
UACS No.: 320102104373000
Project ID: P00526517LZ
AS PER GAA:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation/Improvement along Barit River Downstream of Sto. Domingo Bridge, Right Side, Brgy. Sto. Domingo, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 340.0 Lineal Meters
Allocation: Php 50,000,000.00
AS MODIFIED:
OO2: Protect Lives and Properties Against Major Floods - Construction /Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers – Rehabilitation/Improvement along Bicol River Downstream of Sto. Domingo Bridge, Right Side, Brgy. Sto. Domingo, Nabua, Camarines Sur
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 340.0 Lineal Meters
Allocation: Php 50,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04339 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310108100531000
Project ID: P00505988LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd – K0553+090 – K0553+122, K0533+230 – K0553+260, K0555+719 – K0555+800, K0556+1053 – K0556+1080, K0556+967 – K0556+999, K0559+865 – K0559+910, K0563+700 – K0563+817
Physical Target: CW1- Construction of Road Slope Protection Structure – 5,865.0 Square meters
Allocation: Php 51,635,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd – K0553+090 – K0553+122, K0533+230 – K0553+260, K0555+719 – K0555+800, K0556+1053 – K0556+1080, K0556+967 – K0556+999, K0559+865 – K0559+910, K0563+700 – K0563+817, K0568+107 – K0568+150
Physical Target: CW1- Construction of Road Slope Protection Structure – 4,086.20 Square meters
Allocation: Php 51,635,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04039 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 300116203423000
Project ID: P00561894LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Construction. Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Construction of Scout Fuentabella-Tamban-Mabini road, Goa, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 5.814 Lane km.
Allocation: Php 34,500,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Construction. Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects – Construction of Scout Fuentabella-Tamban-Mabini road, Goa, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 5.8088 Lane km.
Allocation: Php 34,500,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04260 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 300117209279000
Project ID: P00564832LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road, Nato, Sagñay, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.259 Lane km.
Allocation: Php 2,000,000.00
AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Construction of Road, Nato, Sagñay, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.518 Lane km.
Allocation: Php 2,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04048 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310208100357000
Project ID: P00505285LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Pili-Tigaon-Albay Bdry Rd – K0493+523 – K0494+457, K0494+543 – K0494+610, K0494+666 – K0495+228
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 4,488.75 Square meters
Allocation: Php 13,533,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Pili-Tigaon-Albay Bdry Rd – K0493+523 – K0494+142, K0494+195 – K0494+457, K0494+543 – K0494+610, K0494+666 – K0495+228
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 4,368.99 Square meters
Allocation: Php 13,533,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04015 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310208100359000
Project ID: P00505287LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Secondary Roads – Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd
– K0552+245 – K0552+400, K0553+1074 – K0554+102, K0554+312 – K0554+366, K0555+724 – K0555+867
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 1,820 Square meters
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Secondary Roads – Tigaon-Goa-Sn Jose-Lagonoy-Guijalo via Sn Vicente Rd
– K0552+245 – K0552+400, K0553+1074 – K0554+102, K0554+312 – K0554+366, K0555+724 – K0555+840
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 1,8284 Square meters
Allocation: Php 5,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04041 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310209100315000
Project ID: P00505289LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Jct Digdigon (Goa)-Tinambac Rd – K0502+269 – K0503+280
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 3,333 Square meters
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Jct Digdigon (Goa)-Tinambac Rd – K0502+269 – K0502+815.7, K0502+815.7 – K0503+121, K0503+121 – K0503+241
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 3,3477.4 Square meters
Allocation: Php 10,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04072 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No.: 310209100316000
Project ID: P00505290LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Jct Teres-Garchitorena Rd – K0545+(-180) – K0545+(-044), K0546+041 – K0546+144, K0547+887 – K0548+000
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 1,068 Square meters
Allocation: Php 3,204,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Tertiary Roads – Jct Teres-Garchitorena Rd – K0545+(-180) – K0545+(-044), K0546+041 – K0546+144, K0547+887 – K0547+924
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 828 Square meters
Allocation: Php 3,204,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04271 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310208100361000
Project ID: P00505295LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Secondary Roads – Catanduanes Cir Rd – K0198+578 – K0200+411
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 1,727 Square meters
Allocation: Php 7,840,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program – Off-Carriageway Improvement – Secondary Roads – Catanduanes Cir Rd – K0199+569 – K0199+965
Physical Target: CW1- Off-Carriageway Improvement: Shoulder Paving/Construction – 606 Square meters
ROW - ROW Acquisition – 8,940 Square meters
Allocation: Php 7,840,000.00
|