Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
March 3, 2024 FY2023 300215102759000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102759000
Project ID: P00733819MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities

Construction of Concrete Road along Siay - Godod Road, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 3.814 lane km
Unit Cost: ₱ 17,049,657.45 /lane km

CW2 - Construction of Road Slope Protection Structure: 5,567 sq.m.
Unit Cost: ₱ 3,919.99 /sq.m.

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102758000 April 17, 2022 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102758000
Project ID: P00733818MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Concrete Road along Sandayong - Godod - Salug Road (Sandayong - Miampic Section), Zamboanga Sibugay

CW1 - Construction of Concrete Road : 5.06034 lane km
Unit Cost: ₱ 20,580,568.72 /lane km

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102757000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102757000
Project ID: P00733817MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Concrete Road along Salug - Godod - Kabasalan Road, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 4.266 lane km
Unit Cost: ₱ 17,989,005.91 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,579 sq.m.
Unit Cost: ₱ 3,919.7 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102756000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102756000
Project ID: P00733816MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Concrete Road along Naga (Bulansing) - Titay (Palomoc) Road, ZamboangaSibugay

CW1 - Construction of Concrete Road : 5.0 lane km
Unit Cost: ₱ 15,618,813.69 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,234 sq.m.
Unit Cost: ₱ 3,919.4 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102754000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102754000
Project ID: P00733814MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Concrete Road along Ipil - Labason Road (Via Titay and Kalawit), Zamboanga Sibugay

CW1 - Construction of Concrete Road : 4.88 lane km
Unit Cost: ₱ 14,868,972.72 /lane km

CW2 - Construction of Road Slope Protection Structure: 3,646 sq.m.
Unit Cost: ₱ 3,919.2 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102753000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102753000
Project ID: P00733813MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading to Barangay Silingan - Barangay Taruc, R.T. Lim, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 4.4191lane km
Unit Cost: ₱ 17,873,405.41 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,007 sq.m.
Unit Cost: ₱ 3,919.1 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.0
March 3, 2024 FY2023 300215102752000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102752000
Project ID: P00733812MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading to Barangay Silingan - Barangay Palmera, R.T. Lim, Zamboanga Sibugayy

CW1 - Construction of Concrete Road : 3.75 km
Unit Cost: ₱ 20,630,034.88 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,420 sq.m.
Unit Cost: ₱ 3,920.4 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102751000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102751000
Project ID: P00733811MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading to Barangay Logan - Barangay Upper Pangi, Ipil, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 3.88 lane km
Unit Cost: ₱ 18,312,449.44 /lane km

CW2 - Construction of Road Slope Protection Structure: 4,030 sq.m.
Unit Cost: ₱ 3,920.02 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102750000 April 19, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102750000
Project ID: P00733810MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading to Barangay Banker - Barangay Sininan, Kabasalan, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 3.97 lane km
Unit Cost: ₱ 19,551,445.71 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,355 sq.m.
Unit Cost: ₱ 3,919.64 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 300215102749000 April 17, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.300215102749000
Project ID: P00733809MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road leading Barangay Upper Pangi - Barangay Logan, Ipil, Zamboanga Sibugay

CW1 - Construction of Concrete Road : 5.0989 lane km
Unit Cost: ₱ 14,862,725.83 /lane km

CW2 - Construction of Road Slope Protection Structure: 2,823 sq.m.
Unit Cost: ₱ 3,920.1 /sq.m

EAO: ₱ 3,150,000.00
Allocation: ₱ 90,000,000.00
March 3, 2024 FY2023 310109101368000 March 14, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.310109101368000
Project ID: P00706400MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Ipil-Magdaup Wharf Rd - K2015+153 - K2015+260, K2016+490 - K2016+700

CW1 - Construction of Road Slope Protection Structure: 4,490 sq.m.
Unit Cost: ₱ 3,895.05 /sq.m

CW2 - Road Widening : 0.634 lane km
Unit Cost: ₱ 16,421,461.72 /lane km

ROW Acquisition: ₱ 5,000 sq.m
Unit Cost: ₱ 300.00 /sq.m.

EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00
March 3, 2024 FY2023 310107100570000 March 13, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.310107100570000
Project ID: P00706399MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Ipil-Liloy-Sindangan Rd- K2000+560 - K2000+860, K2004+095 - K2004+220, K2004+560 - K2004+600, K2004+640 - K2004+650, K2005+000 - K2005+060, K2011+178 - K2011+834

CW1 - Construction of Road Slope Protection Structure: 6,200 sq.m.
Unit Cost: ₱ 3,927.88 /sq.m

CW2 - Road Widening : 1.312 lane km
Unit Cost: ₱ 12,032,861.51 /lane km

ROW Acquisition: 6,666.7 sq.m
Unit Cost: ₱ 300.00 /sq.m.

EAO: ₱ 860,000.00
Allocation: ₱ 43,000,000.00
March 3, 2024 FY2023 310104100493000 March 13, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.310104100493000
Project ID: P00706253MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1706+037.87 - K1766+164.45, K1770+475 - K1770+588.24, K1773+313 - K1773+383, K1776+950 - K1777+026.37, K1778+580.83 - K1778+661.86, K1781+435 - K1782+200, K1783+195 - K1783+958, K1788+800 - K1789+195, K1975+390 - K1796+460, K1801+655 - K1802+127, K1807+000 - K1807+560

CW1 - Reconstruction to Concrete Pavement: 7.7808 lane km
Unit Cost: ₱ 10,953,200.89 /lane km

CW2 - Road Widening : 0.43888 lane km
Unit Cost: ₱ 9,468,828.65 /lane km

ROW Acquisition: 1,000 sq.m
Unit Cost: ₱ 300.00 /sq.m.

EAO: ₱ 3,252,655.00
Allocation: ₱ 92,933,000.00
March 3, 2024 FY2023 310101101083000 March 13, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.310101101083000
Project ID: P00706090MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1811 + 712- K1812 + 000

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 0.568 lane km
Unit Cost: ₱ 6,052,535.211 lane km
EAO: ₱ 70,160.00

Allocation: ₱ 3,508,000.00
March 3, 2024 FY2023 310101101082000 March 13, 2023 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No.310101101082000
Project ID: P00706089MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1803 + 000 - K1803 + 538

CW1 - Preventive Maintenance of Road: Asphalt Overlay: 2.152 lane km
Unit Cost: ₱ 5,461,951.67 lane km
EAO: ₱ 239,880.00

Allocation: ₱ 11,994,000.00
March 2, 2024 FY 2023 300221102349000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS NO. 300221102349000
Project ID: P00735037MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities


Concreting of Road at Brgy. Tandu Patong, Maimbung, Sulu

CW1: Construction of Concrete Road: 0.530 lane km

Unit Cost: ₱ 11,927,710.80 / lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300221102351000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS NO. 300221102351000
Project ID: P00735039MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities


Concreting of Road at Brgy. Bangkal, Patikul, Sulu

CW1: Construction of Concrete Road: 0.838 lane km

Unit Cost: ₱ 11,813,842.48 / lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300221102353000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS NO. 300221102353000
Project ID: P00735041MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities


Concreting of Road at Brgy. Anuling, Patikul, Sulu

CW1: Construction of Concrete Road: 0.83 lane km

Unit Cost: ₱ 11,927,710.84/ lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300222100127000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS NO. 300222100127000
Project ID: P00732417MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Sitio Arakan - Sitio Mosque, Barangay Tandu Patong, Maimbung Sulu


CW1: Construction of Concrete Road: 0.87 lane km

Unit Cost: ₱ 11,379,310.34 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300222100128000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS NO. 300222100128000
Project ID: P00732418MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Tandu Patong - Kabbun Maas, Barangay Tandu Patong, Maimbung, Sulu

CW1: Construction of Concrete Road: 0.736 lane km

Unit Cost: ₱ 13,451,086.95 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 310107100562000 March 21, 2023 Region IX Zamboanga del Norte 2nd District Engineering Office
UACS No. 310107100562000
Project ID: P00706386MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Dipolog-Sindangan-Liloy Rd (S01057MN) - K1874 + 155 - K1874 + 494

CW1- Construction of Road Slope Protection Structure/ 2,622.56 sq. m.
Unit Cost: ₱ 18,684.03/ sq. m.
EAO: ₱ 1,000,000.00
Allocation: ₱50,000,000.00
March 2, 2024 FY 2023 300222100120000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100120000
Project ID: P00732410MN

Convergence and Special Support Program (CSSP): Basic Infrastructure Program (BIP): Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities


Construction of Road, Ipil - Patao, Barangay Patao, Maimbung, Sulu

CW1: Construction of Concrete Road: 0.530 lane km
Unit Cost: ₱ 12,375,000.00 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300215102737000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300215102737000
Project ID: P00735018MN

Convergence and Special Support Program (CSSP): Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction/Improvement of Road, Indanan-Maimbung, Maimbung, Sulu

CW1: Construction of Concrete Road: 2.65 lane km
Unit Cost: ₱ 10,924,528.3 /lane km
EAO: ₱ 1,050,000.00

Allocation: ₱ 30,000,000.00
March 2, 2024 FY 2023 310305101838000 March 21, 2023 Region IX Zamboanga del Norte 2nd District Engineering Office
UACS No. 310305101838000
Project ID: P00706604MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges

Piao Br. (B00429MN) along Dipolog-Sindangan-Liloy Rd

CW1- Widening of Bridge: 723.51 Square Meters
Unit Cost: ₱ 78,794.83/Square Meters
ROW Acquisition 2,506.08 sq.m.
Unit Cost: ₱ 368.492/sq.m.
EAO: ₱ 2,067,678.51
Allocation: ₱ 60,000,000.00
March 2, 2024 FY 2023 300215102735000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 300215102735000
Project ID: P00735016MN

Convergence and Special Support Program (CSSP): Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road, Sapa-Sapa-Kohec National Highway, Sapa-Sapa, Tawi-Tawi

CW1: Construction of Concrete Road: 7.98 lane km
Unit Cost: ₱ 21,162,280.7 /lane km
EAO: ₱ 6,125,000.00

Allocation: ₱ 175,000,000.00
March 2, 2024 FY 2023 300222100119000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300215102735000
Project ID: P00735016MN

Convergence and Special Support Program (CSSP): Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Sitio Pasil - Sitio Tau Luuk, Barangay Ipil, Maimbung, Sulu

CW1: Construction of Concrete Road: 0.90 lane km
Unit Cost: ₱ 11,000,000.00 /lane km
EAO: ₱ 100,000.00

Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 300222100126000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300215102735000
Project ID: P00735016MN

Convergence and Special Support Program (CSSP): Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Sitio Lakahan - Sitio Pitak, Barangay Matatal, Maimbung, Sulu

CW1: Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km
EAO: ₱ 100,000.00

Allocation: ₱ 10,000,000.00
March 2, 2024 FY 2023 310202101481000 April 12, 2023 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310202101481000
Project ID: P00705451MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Liloy-Siocon Rd - K2005 + 944 - K2006 + 380, K2006 + 655 - K2007 + 307

CW1 - Road Widening: 2.186 Lane km
Unit Cost: ₱ 15,690,759.38/ Lane km
EAO: ₱ 700,000.00
Allocation: ₱ 35,000,000.00
March 2, 2024 FY 2023 310109101366000 March 27, 2023 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 310109101366000
Project ID: P00706379MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Dumalinao-Margosatubig Rd - K1682 + 990 - K1683 + 035, K1701 + 850 - K1701 + 905, K1701 + 911 - K1701 + 941, K1716 + 320 - K1716 + 335


CW1- Construction of Road Slope Protection Structure/ 1,350.00 sq. m.
Unit Cost: ₱ 9,800.00/ sq. m.
EAO: ₱ 270,000.00
Allocation: ₱13,500,000.00
March 2, 2024 FY 2023 310109101363000 March 27, 2023 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 310109101363000
Project ID: P00706397MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Sindangan-Bayog-Lakewood Rd - K1744 + 110 - K1744 + 130, K1746 + 930 - K1746 + 983,


CW1- Construction of Road Slope Protection Structure: 3,000.00 sq. m.
Unit Cost: ₱ 9,800.00/ sq. m.
EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00
March 2, 2024 FY 2023 WIN3E02637 310201101101000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201101101000
Project ID: P00705438MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1627 + 200 - K1629 + 320

CW1 - Road Widening: 4.24 Lane km
Unit Cost: ₱ 18,884,433.96/ Lane km
ROW Acquisition 21,200 sq.m.
Unit Cost: ₱ 92.217/sq.m.
EAO: ₱ 2,975,000.00
Allocation: ₱ 85,000,000.00
March 2, 2024 FY 2023 WIN3E02640 310201101212000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201101212000
Project ID: P00705461MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1651 + 724 - K1652 + 047, K1656 + 460 - K1657 + 007


CW1 - Road Widening: 1.742 Lane km
Unit Cost: ₱ 10,947,967.85/ Lane km
ROW Acquisition 8,710 sq.m.
Unit Cost: ₱ 45.617/sq.m.
EAO: ₱ 397,320.00
Allocation: ₱ 19,866,000.00
March 2, 2024 FY 2023 WIN3E03024 310203100737000 May 29, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100737000
Project ID: P00705944MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct Switch-Jct Monte Alegre Rd - K1642 + (-135) - K1642 + 351


CW1 - Road Widening: 0.972 Lane km
Unit Cost: ₱ 19,855,967.08/ Lane km
ROW Acquisition 4,860.00 sq.m.
Unit Cost: ₱ 61.728/sq.m.
EAO: ₱ 400,000.00
Allocation: ₱ 20,000,000.00
March 2, 2024 FY 2023 WIN3E02638 310203100649000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100649000
Project ID: P00705943MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct Aurora-Monte Alegre-Jct Labangan Rd - K1653 + 466 - K1655 + 187

CW1 - Road Widening: 3.442 Lane km
Unit Cost: ₱ 12,689,581.29/ Lane km
CW2 - Construction of Slope Protection Structure: 2,985.50 sq.m
Unit Cost: ₱ 9,235.443/ sq.m
ROW Acquisition 11,530.00 sq.m.
Unit Cost: ₱ 97.57/sq.m.
EAO: ₱ 2,625,000.00
Allocation: ₱ 75,000,000.00
March 2, 2024 FY 2023 WIN3E02661 310203100738000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100738000
Project ID: P00705945MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct Switch-Jct Monte Alegre Rd - K1647 + 000 - K1647 + 500


CW1 - Road Widening: 1.00 Lane km
Unit Cost: ₱ 21,181,720.00/ Lane km
EAO: ₱ 432,280.00
Allocation: ₱ 21,614,000.00
March 2, 2024 FY 2023 WIN3E03003 310104100596000 May 29, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310104100596000
Project ID: P00706239MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1649 + 220 - K1651 + 007

CW1 - Reconstruction to Concrete Pavement: 3.78 Lane Km
Unit Cost: ₱ 12,962,962.96
EAO: ₱ 1,000,000.00
Allocation: ₱ 50,000,000.00
March 2, 2024 FY 2023 310104100598000 April 12, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310104100598000
Project ID: P00706240MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Jct Aurora-Ozamis City Rd - K1651 + 385 - K1652 + 569

CW1 - Reconstruction to Concrete Pavement: 2.368 Lane Km
Unit Cost: ₱ 11,057,280.41/Lane Km
EAO: ₱ 534,360.00
Allocation: ₱ 26,718,000.00
March 2, 2024 FY 2023 310105100968000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310105100968000
Project ID: P00706241MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1661 + (-699) - K1661 + (-516.46), K1661 + (-043) - K1661 + 300, K1670 + 521 - K1670 + 763.37, K1670 + 898 - K1671 + 823.80

CW1 - Rehabilitation of Paved Road: 3.3838 Lane km
Unit Cost: ₱ 13,032,685.15/ Lane km
EAO: ₱ 900,000.00
Allocation: ₱ 45,000,000.00
March 2, 2024 FY 2023 WIN3E02664 310106101000000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310106101000000
Project ID: P00706244MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Eastern Bobongan-Sominot-Midsalip-Dumingag Rd - Chainage 1115 - Chainage 1690.40, Chainage 510 - Chainage 1115

CW1 - Rehabilitation of Paved Road: 2.361 Lane km
Unit Cost: ₱ 15,067,344.35
EAO: ₱ 726,000.00
Allocation: ₱ 36,300,000.00
March 2, 2024 FY 2023 310107100566000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100566000
Project ID: P00706392MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Tucuran Jct-Karomatan Jct Rd - K1652 + 940 - K1653 + 050

CW1 - Construction of Road Slope Protection Structure: 819.82 sq.m.
Unit Cost: ₱ 4,781.537
EAO: ₱ 80,000.00
Allocation: ₱ 4,000,000.00
March 2, 2024 FY 2023 310107100567000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100567000
Project ID: P00706393MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Tucuran Jct-Karomatan Jct Rd - K1652 + 920.84 - K1653 + 147.80

CW1 - Construction of Road Slope Protection Structure: 757.722 sq.m.
Unit Cost: ₱ 6,466.75
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00
March 2, 2024 FY 2023 310107100568000 March 13, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100568000
Project ID: P00706394MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Jct Blancia-Molave-Josefina Rd - K1684 + (-050) - K1684 + (-020), K1684 + (-210) - K1684 + (-120), K1686 + 160 - K1686 + 308

CW1 - Construction of Road Slope Protection Structure: 3,816.62 sq.m.
Unit Cost: ₱ 5,135.434
EAO: ₱ 400,000.00
Allocation: ₱ 20,000,000.00
March 2, 2024 FY 2023 310108101635000 June 26, 2023 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No.310108101635000
Project ID: P00706395MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Sindangan-Siayan-Dumingag-Mahayag Rd (Mahayag-Dumingag Sect) - K1680 + 780 - K1680 + 940


CW1 - Construction of Road Slope Protection Structure: 1,254.10 sq.m.
Unit Cost: ₱ 3,485.889/sq.m.
CW2 - Off Carriageway Improvement: Shoulder Paving/Construction: 924.00 sq.m.
Unit Cost: ₱ 1,102.105/sq.m.
EAO: ₱ 110,000.00
Allocation: ₱ 5,500,000.00
March 2, 2024 2023 WIN3E03209 SR2023-03-006981 March 15, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0416 + 400 - K0426 + 500;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"

"To:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0416 + 938 - K0426 + 392;
Type of Work:
CW1: Road Safety: Guardrails
CW2: Road Safety: Roadway Lighting;
Physical Target:
CW1: 501 meters
CW2: 212 units ;
Allocation: Php 100,000,000.000"
March 2, 2024 2023 WIN3E03220 SR2023-03-006983 March 15, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0427 + 000 - K0431 + 100;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"

"To:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0427 + 023 - K0430 + 967;
Type of Work:
CW1: Road Safety: Guardrails
CW2: Road Safety: Roadway Lighting;
Physical Target:
CW1: 656 meters
CW2: 165 units ;
Allocation: Php 100,000,000.000"
March 2, 2024 2023 WIN3E03222 SR2023-03-006985 March 15, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0431 + 100 - K0432 + 000;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"

"To:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0431 + 104 - K0432 + 050;
Type of Work:
CW1: Preventive Maintenance of Road: Concrete Reblocking
CW2: Road Safety: Guardrails
CW3: Road Safety: Roadway Lighting;
Physical Target:
CW1: 1372.5 Lane Km
CW2: 734 meters
CW3: 60 units ;
Allocation: Php 100,000,000.000"
March 2, 2024 2023 WIN3E03219 SR2023-03-006986 March 15, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0432 + 000 - K0433 + 650;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"

"To:
Installation of Road Safety Devices Along Abra-Ilocos Norte Rd - K0432 + 058 - K0433 + 460;
Type of Work:
CW1: Preventive Maintenance of Road: Concrete Reblocking
CW2: Road Safety: Guardrails
CW3: Road Safety: Roadway Lighting;
Physical Target:
CW1: 1417.5 Lane Km
CW2: 734 meters
CW3: 60 units ;
Allocation: Php 100,000,000.000"
March 2, 2024 2023 WIN3E03221 SR2023-03-006990 March 15, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Installation of Road Safety Devices Along Abra-Kalinga Rd - K0432 + 600 - K0450 + 000;
Type of Work: Road Safety: Pavement markings;
Physical Target: 15.951 Lane Km;
Allocation: Php 100,000,000.000"

"To:
Installation of Road Safety Devices Along Abra-Kalinga Rd - K0441 + 001.80 - K0449 + 943;
Type of Work:
CW1: Road Safety: Guardrails
CW2: Road Safety: Roadway Lighting;
Physical Target:
CW1: 734 meters
CW2: 134 units ;
Allocation: Php 100,000,000.000"
February 28, 2024 FY 2023 WIN3E02985 300214100453000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100453000
Project ID: P00733756MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1885+000 - Sta. 1895+000

CW1- Road Safety: Street Lighting: 1,365 No. of Units
Unit Cost: ₱ 98,974.36/ No. of Units
EAO: ₱ 4,900,000.00
Allocation: ₱ 140,000,000.00
February 28, 2024 FY 2023 WIN3E028993 300214100454000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100454000
Project ID: P00733757MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 10+245.27 to Sta. 13+732.95

CW1- Road Safety: Street Lighting: 464 No. of Units
Unit Cost: ₱ 103,987.07
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 28, 2024 FY 2023 WIN3E02986 300214100456000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100456000
Project ID: P00733759MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 13+732.95 to Sta. 17+220.64

CW1- Road Safety: Street Lighting: 464 No. of Units
Unit Cost: 103,987.07/ No. of Units
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 28, 2024 FY 2023 WIN3E03051 300219101755000 May 15, 2023 Region IX Regional Office IX
UACS No. 300219101755000
Project ID: P00733978MN


Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Layawan River, De Venta Perla Bridge (Upstream) Sergio Osmeña, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 217.0 ln.m
Unit Cost: ₱ 316,849.07/ln.m
EAO: ₱ 2,493,750.00
Allocation: ₱ 71,250,000.00
February 28, 2024 FY 2023 WIN3E03035 300215102731000 May 8, 2023 Region IX Regional Office IX
UACS No. 300215102731000
Project ID: P00733799MN


Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

Construction of Bunguiao-Tolosa-Lapakan Bypass Road, Zamboanga City


CW1- Construction of Gravel Road: 6.08 Lane km
Unit Cost: ₱ 23,807,565.79 Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 28, 2024 2023 300215102734000 May 8, 2023 Region IX Regional Office IX
UACS NO. 300215102734000
Project ID: P00733802MN


Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Muti - Buenavista Bypass Road Package 1, Zamboanga City


CW1: Construction of Concrete Road: 18.68 Lane Km

Unit Cost: ₱ 7,748,929.34/Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

February 28, 2024 2023 WIN3E02968 300215102733000 May 8, 2023 Region IX Regional Office IX
UACS NO. 300215102733000
Project ID: P00733801MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Mangusu - Muti Coastal Road Package 1, Zamboanga City

CW1: Construction of Concrete Road: 8.08 Lane Km
Unit Cost: ₱ 17,914,603.96/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

February 28, 2024 2023 WIN3E03060 300215102732000 May 8, 2024 Region IX Regional Office IX
UACS NO. 300215102732000
Project ID: P00733800MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Bunguiao - Quiniput Road, Zamboanga City

CW1: Construction of Concrete Road: 6.59 Lane Km
Unit Cost: ₱ 21,965,098.63/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00



February 28, 2024 2023 WIN3E03000 300219101756000 May 17, 2023 Region IX Regional Office IX
UACS NO. 300219101756000
Project ID: P00733979MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure (Revetment/Bank Protection) along Salug Daku River, Salug Daku Bridge, Sergio Osmeña, Zamboanga del Norte

CW1: Construction of Flood Mitigation Structure: 560.0 ln.m

Unit Cost: ₱ 172,321.42/ ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00


February 27, 2024 FY 2023 310104100492000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100492000
Project ID: P00706252MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1758 + 650 - K1759 + 231, K1759 + 261 - K1760 + 075, K1760 + 153 - K1760 + 776, K1764 + 330 - K1764 + 849, K1767 + 000 - K1768 + 000, K1769 + 000.00 – K1770 + 000.00, K1771 + 576.00 – K1771 + 759.00

CW1- Reconstruction to Concrete Pavement 9.44 lane-km
Unit Cost: ₱10,733,580.51 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 27, 2024 FY 2023 310305101843000 April 25, 2023 Region IX Regional Office IX
UACS No. 310305101843000
Project ID: P00706632MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges

Talinga Br. (B00458MN) along Dipolog-Sindangan-Liloy Rd (Phase I)

CW1- Widening of Bridge: 2,312.50 Square Meters
Unit Cost: ₱ 62,594.59/Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 310306100249000 May 31, 2023 Region IX Regional Office IX
UACS No. 310306100249000
Project ID: P00706633MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Construction of New Bridges


Liba Br. along Sindangan-Bayog-Lakewood Road (Phase II)

CW1- Construction of Bridge: 867.186 Square Meters
Unit Cost: ₱ 114,695.31 /Square Meters
CW2- Construction of Road Slope Protection Structure: 1,510.62 Square Meters
Unit Cost: ₱ 29,979.63 /Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03169 310204102140000 July 31, 2023 Region IX Regional Office IX
UACS No. 310204102140000
Project ID: P00706812MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads


Buenavista - Bolong By-Pass Road, Package 8, Zamboanga City

CW1- Construction of Gravel Road: 1.09 Lane Km
Unit Cost: ₱ 134,083,512.14/Lane Km
ROW Acquisition 4,666.667 sq.m.
Unit Cost: ₱ 1,500.00/sq.m.
EAO: ₱ 5,300,814.50
Excess: ₱ 548,157.27
Allocation: ₱ 159,000,000.00

February 27, 2024 2023 WIN3F07367 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0788 + 000 - K0792 + 000

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 107.333090 M
: 11.861 Lane Km

EAO P 3.892910M

Total P 111.226 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0789+000 - K0789+083, K0789+310 - K0789+467, K0789+817 - K0789+841, K0789+916 - K0790+184, K0790+401- K0790+475, K0790+535 - K0790+556, K0790+614 - K0790+820, K0791+74 - K0791+192, K0791+390 - K0791+451, K0791+629 - K0791+649, K0792+286 - K0792+312, K0792+821 - K0792+857, K0792+943 - K0792+985, K0831+277 - K0831+409, K0831+481 - K0831+503, K0831+610 - K0831+954, K0834+107 - K0834+170, K0834+299 - K0834+450, K0834+571 - K0834+775, K0834+838 – K0834+862, K0835+42 – K0835+057, K0835+216 – K0835+254, K0835+508 – K0835+552, K0835+844 – K0835+883, K0835+960 – K0836+018, K0836+123 – K0836+274, K0836+313 – K0836+372, K0836+467 – K0836+470, K0836+557 – K0836+950, K0837+083 - K0837+098, K0837+191 - K0837+410, K0837+500 - K0837+580, K0837+642 - K0837+686, K0837+893 - K0838+000, K0848+000 - K0848+874, K0848+968 - K0849+474

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 107.333090 M
: 9.776 Lane Km

EAO P 3.892910M

Total P 111.226 M
February 27, 2024 FY 2023 310204102142000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102142000
Project ID: P00706814MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 10, Zamboanga City

CW1- Construction of Concrete Road/ 6.72 Lane-km
Unit Cost: ₱ 20,913,690.48 /Lane-km
ROW Acquisition 57,000.00 sq.m.
Unit Cost: ₱ 175.44/sq.m.
EAO: ₱ 5,460,000.00
Allocation: ₱ 156,000,000.00
February 27, 2024 FY 2023 310204102143000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102143000
Project ID: P00706815MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 11, Zamboanga City

CW1- Construction of Concrete Road: 7.02 lane-km
Unit Cost: ₱ 19,195,156.70 /Lane-km
ROW Acquisition 50,020.00 sq.m
Unit Cost: ₱ 199.92/sq.m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 2023 WIN3F07740 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Wright - Taft - Borongan Road (S00123SM) K0828+(-581) - K0859 + 931

Physical Target: Allocation:

CW1-Road Widening: 65.114 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Wright - Taft - Borongan Road (S00123SM) K0828+(-409) - K0830 + 861

Physical Target: Allocation:

CW1-Road Widening: 7.1 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M
February 27, 2024 2023 WIN3F07741 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Basey - Marabut - Pinamitinan Rd. (S00124SM) k0909 + (-1024) - k0951 + 169

Physical Target: Allocation:

CW1-Road Widening: 88.890 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M

AS MODIFIED:

Basey - Marabut - Pinamitinan Rd. (S00124SM) –K0914+000-K0915+000,K0936+000-K0937+000,K0939+000-K0940+000,K0940+000-K0941+000,K0946+000-K0947+000,K0947+000-K0948+000,K0948+000-K0948+875

Physical Target: Allocation:

CW1-Road Widening: 9.652 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M
February 27, 2024 2023 WIN3F07477 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 383 Lineal meters

EAO P 4.025 M

Total P 115.00 M
February 27, 2024 FY 2023 310104100494000 April 25, 2023 Region IX Regional Office IX
UACS No. 310104100494000
Project ID: P00706835MN


OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd - K1880 + 375 - K1881 + 375, K1881 + 540.00 – K1883 + 000.00

CW1- Reconstruction to Concrete Pavement: 4.920 Lane Km
Unit Cost: ₱ 9,806,910.57/Lane Km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 2023 WIN3F07557 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure:819.530 Lineal meters
EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure:220 Lineal meters
EAO P 4.025 M

Total P 115.00 M
February 27, 2024 FY 2023 310104100496000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100496000
Project ID: P00706837MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1880 + 000 - K1881 + 000, K1883 + 000 - K1883 + 322


CW1- Reconstruction to Concrete Pavement: 2.64 Lane-km
Unit Cost: ₱ 12,334,454.55 /Lane-km
EAO: ₱ 1,181,040.00
Allocation: ₱ 33,744,000.00
February 27, 2024 2023 WIN3F07492 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 250 Lineal meters

EAO P 4.025 M

Total P 115.00 M
February 27, 2024 2023 WIN3F07718 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar

Physical Target: Allocation:

CW1-Construction of Drainage P 101.325 M
Structure: 7,953.979 Lineal meters
EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar

Physical Target: Allocation:

CW1-Construction of Drainage P 101.325 M
Structure: 1,531.71 Lineal meters
EAO P 3.675 M

Total P 105.00 M
February 27, 2024 FY 2023 WIN3E02896 310204102116000 April 25, 2023 Region IX Regional Office IX
UACS No. 310204102116000
Project ID: P00707613MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

By-Pass and Diversion Roads - Cawit to Baluno (Sta. 0+000 to Sta. 0+311.23, Sta. 0+326.41 – Sta. 1+340.00), Zamboanga

CW1- Construction of Concrete Road: 2.65 Lane-km
Unit Cost: ₱ 36,415,094.34/lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 310104100495000 April 25, 2023 Region IX Regional Office IX
UACS No. 310104100495000
Project ID: P00707780MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads


Pagadian City-Zamboanga City Rd – K1889 + 075.00 – K1889 + 275.00, K1898 + 101.70 – K1901 + 319.020, K1908 + 169.30 – K1908 + 566.30, K1910 + 892.00 – K1912 + 435.90, K1913 + 471.00 – K1913 + 779.00

CW1- Reconstruction to Concrete Pavement: 4.702 lane-km
Unit Cost: ₱ 10,245,993.19 /lane-km
EAO: ₱ 1,747,340.00
Allocation: ₱ 49,924,000.00
February 27, 2024 FY 2023 310104100497000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100497000
Project ID: P00707781MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1883 + 322 - K1885 + 000, K1886 + 000 - K1887 + 277, K1888 + 570 - K1889 + 017

CW1- Reconstruction to Concrete Pavement: 6.80 lane-km
Unit Cost: ₱ 12,076,265.44 /lane-km
EAO: ₱ 2,978,395.00
Allocation: ₱ 85,097,000.00
February 27, 2024 FY 2023 310104100498000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100498000
Project ID: P00707782MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd – K1895 + 898.70 – K1896 + 175.60, K1902 + 605.60 – K1906 + 044.90, K1909 + 384.20 – K1909 + 947.30, K1913 + 138.00 – K1913 + 471.00

CW1- Rehabilitation of Paved Road: 4.162 lane-km
Unit Cost: ₱ 10,128,326.53 /lane-km
EAO: ₱ 1,528,905.00
Allocation: ₱ 43,683,000.00
February 27, 2024 FY 2023 WIN3E02705 320101110237000 March 9, 2023 Region IX Regional Office IX
UACS No. 320101110237000
Project ID: P00721221MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section(B00549MN) (Downstream - Rightside) along Pagadian City - Zamboanga City Road(S01453MN), Barangay Bogayo, Kumalarang, Zamboanga del Sur

CW1- Construction of Flood Mitigation Structure; 481.00 ineal Meters
Unit Cost: ₱ 220,686.07/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
February 27, 2024 FY 2023 WIN3E02829 320101109326000 March 31, 2023 Region IX Regional Office IX
UACS No. 320101109326000
Project ID: P00721229MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase V) Tungawan, Zamboanga Sibugay

CW1- Construction of Flood Mitigation Structure: 613.00 lineal Meters
Unit Cost: ₱ 173,164.763/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
February 27, 2024 FY 2023 WIN3E02867 320102105920000 April 17, 2023 Region IX Regional Office IX
UACS No. 320102105920000
Project ID: P00721402MN


OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 2

CW1- Construction of Flood Mitigation Structure: 84.60 Lineal Meters
Unit Cost: ₱ 570,330.97 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY 2023 WIN3E02866 320102105921000 April 17, 2023 Region IX Regional Office IX
UACS No. 320102105921000
Project ID: P00721403MN


OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 3

CW1- Construction of Flood Mitigation Structure: 81.80 Lineal Meters
Unit Cost: ₱ 589,853.30 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY 2023 WIN3E03050 320102105555000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105555000
Project ID: P00721404MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (revetment Wall) along Sibuguey River, Barangay Santa Barbara, Imelda, Zamboanga Sibugay

CW1- Construction of Revetment: 331.0 ln.m
Unit Cost: ₱ 291,540.78/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 WIN3E03013 320101109312000 March 31, 2023 Region IX Regional Office IX
UACS No. 320101109312000
Project ID: P00721521MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure Tumaga River ( Tetuan-Tugbungan Section ), Package
1, Zamboanga City


CW1- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 185,590.92/Lineal Meters
CW2- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 148,704.69/Lineal Meters
EAO: ₱ 5,250,000.00
Allocation: ₱150,000,000.00
February 27, 2024 FY 2023 320101109313000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109313000
Project ID: P00721522MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure, Ilaya Bridge, Abutment B, Downstream Section, Dapitan City, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 361.00 ln.m
Unit Cost: ₱ 267,313.02/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 WIN3E02956 320101109314000 April 24, 2023 Region IX Regional Office IX
UACS No. 320101109314000
Project ID: P00721523MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Conctrol Structure along Kabasalan River (Downstream), Barangay Banker, Kabasalan, Zamboanga Sibugay

CW1- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 147,410.94/ln.m
CW2- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 102,697.05/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00
February 27, 2024 FY 2023 WIN3E03014 320101109315000 April 24, 2023 Region IX Regional Office IX
UACS No. 320101109315000
Project ID: P00721524MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Kabasalan River (Upstream), Barangay Banker, Kabasalan, Zamboanga Sibugay


CW1- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 114,761.32/ln.m
CW2- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 102,499.46/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00
February 27, 2024 FY 2023 WIN3E02839 320101109327000 April 3, 2023 Region IX Regional Office IX
UACS No. 320101109327000
Project ID: P00721527MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bacalan Br. Section (B00497MN), Lanao-Pagadian-Zamboanga City Rd (S01113MN), Ipil, Zamboanga Sibugay



CW1- Construction of Flood Mitigation Structure: 336.85 ln.m
Unit Cost: ₱ 300,801.54/ln.m
EAO: ₱ 3,675,000.00
Allocation: ₱105,000,000.00
February 27, 2024 FY 2023 WIN3E02766 320101109334000 March 9, 2023 Region IX Regional Office IX
UACS No. 320101109334000
Project ID: P00721528MN

OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Tictapul River, Barangay Tictapul, ZamboangaCity

CW1- Construction of Flood Mitigation Structure: 346.0 ln. m
Unit Cost: ₱ 376,517.34/ln. m.
EAO: ₱ 4,725,000.00
Allocation: ₱ 135,000,000.00
February 27, 2024 FY 2023 WIN3E03048 320102105557000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105557000
Project ID: P00721631MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Dipolog River, (Conacon-Guinles Section), Polanco, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 192.37 ln.m
Unit Cost: ₱ 351,146.22/ln.m
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00
February 27, 2024 FY 2023 WIN3E03078 320102105558000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105558000
Project ID: P00721632MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment) along Dapitan River, Ilaya-Oyan bridge (Bitoon Section) along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 372.0 ln.m
Unit Cost: ₱ 259,408.60/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 WIN3E03004 320102105559000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105559000
Project ID: P00721633MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment) along Dapitan River, Barcelona-Leop Section, Dapitan City, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 418.0 ln.m
Unit Cost: ₱ 230,861.24/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 WIN3E03052 320102105560000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105560000
Project ID: P00721634MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment/Bank Protection) along Dipolog River, (Sianib Section), Polanco, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 313.0 ln.m
Unit Cost: ₱ 308,306.71/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 300203102202000 April 25, 2023 Region IX Regional Office IX
UACS No. 300203102202000
Project ID: P00731848MN


CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

Brgy. Lukbuton to Brgy. Panigayan leading to White Beach, Malamawi Island, Isabela City, Basilan

CW1- Construction of Concrete Road: 1.46 Lane-km
Unit Cost: ₱ 19,089,154.11/lane-km
EAO: ₱ 1,010,835.00
Allocation: ₱ 28,881,000.00
February 27, 2024 FY 2023 WIN3E02984 300214100448000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100448000
Project ID: P00733751MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239


Installation of Solar LED Street Light along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 00+245.27 - Sta. 10+245.27

CW1- Road Safety: Street Lighting: 1,359 No. of Units
Unit Cost: ₱ 99,411.33/ No. of Units
EAO: ₱ 4,900,000.00
Allocation: ₱ 140,000,000.00

February 27, 2024 FY 2023 WIN3E03031 300214100449000 June 14, 2023 Region IX Regional Office IX
UACS No. 300214100449000
Project ID: P00733752MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Road Safety Devices, Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City


CW1- Road Safety: Street Lighting: 950.00 No. of Units
Unit Cost: ₱ 97,969.73 /No. of Units
CW2- Road Safety: Road Signs: 560.0 Number of Signs
Unit Cost: ₱ 12,048.17 /Number of Signs
CW3- Road Safety: Pavement Markings: 111.818 Lane Km
Unit Cost: ₱ 160,125.66/Lane Km
CW4 Road Safety: Guardrails: 7,563.0 Meters
Unit Cost: ₱ 3,573.56/Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03095 300214100451000 July 18, 2023 Region IX Regional Office IX
UACS No. 300214100451000
Project ID: P00733754MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City

CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62 /No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03114 300214100450000 July 18, 2023 Region IX Regional Office IX
February 27, 2024 FY 2023 WIN3E03114 300214100450000 July 18, 2023 Region IX Regional Office IX
UACS No. 300214100450000
Project ID: P00733753MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1851 + 000 - K1889 + 000, Zamboanga City

CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62/No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E02983 300214100452000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100452000
Project ID: P00733755MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1895+000 - Sta. 1904+499

CW1- Road Safety: Street Lighting: 1,170 No. of Units
Unit Cost: ₱ 98,974.36/ No. of Units
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
February 27, 2024 2023 WIN3E02978 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
From:
Baguio-Bontoc Rd - K0284+000 - K0284+128, K0284+164 - K0284+452, K0284+492 - K0285+565;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6000.67 Square Meters;
Allocation: Php 30,000,000.000

To:
Baguio-Bontoc Rd - K0296+000 - K0297+500;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2305.50 Square meters
CW2: 2058 Square meters ;
Allocation: Php 30,000,000.000
February 27, 2024 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0304+000 - K0305+491;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6008.73 Square Meters;
Allocation: Php 30,000,000.000"

"To:
Baguio-Bontoc Rd - K0298+000 - K0299+600;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Drainage Structures along Road
CW3: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2,360.50 Square meters
CW2: 1,267 lineal meters
CW3: 1,920.50 Square meters ;
Allocation: Php 30,000,000.000"