May 9, 2024 FY 2024 300226115243000 April 4, 2024 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300226115243000 Project ID: P00833822MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Multi-Purpose Building, Brgy. Labi, Ipil, Zamboanga Sibugay


CW1 - Construction of Multi-Purpose Building: 1 Number of Building
Unit Cost: ₱ 4,950,000.00/ Number of Building
EAO: ₱ 50,000.00
Allocation: ₱ 5,000,000.00
May 9, 2024 FY 2024 310204102856000 April 3, 2024 Region IX Zamboanga del Norte 4th District Engineering Office
UACS No. 310204102856000
Project ID: P00800789MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Lituban - Andres Micubo By-Pass Road, Siocon, Zamboanga del Norte

CW1- Construction of Concrete Road/ 1.800 Lane-km
Unit Cost: ₱ 16,333,333.33 /Lane-km
EAO:600,000.00
Allocation: ₱ 30,000,000.00
May 9, 2024 FY 2024 310103101697000 April 4, 2024 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310103101697000
Project ID: P00800967MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Imelda-Bayog-Kumalarang-Lapuyan-Margosatubig Rd - K1761 + 000 - K1762 + 303


CW1 - Preventive Maintenance - Asphalt Overlay: 5.056 Lane km
Unit Cost: ₱ 7,247,464.40/ Lane km
EAO: ₱ 747,820.00
Allocation: ₱ 37,391,000.00
May 9, 2024 FY 2024 300214100802000 February 23, 2024 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300214100802000 Project ID: P00833212MN

Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Streetlights along Alicia-Malangas Rd - K1749 + (-220) - K1761 + 289


CW1 - Road Safety: Roadway Lighting/ 473 Number of Units
Unit Cost: ₱ 174,230.44/ Number of Units CW2 - Road Safety: Solar Reflectorized Pavement Studs/ 1,340 Number of Units
Unit Cost: ₱ 10,514.18/ Number of Units
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
May 9, 2024 FY 2024 300214100804000 February 23, 2024 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300214100804000 Project ID: P00833213MN

Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Streetlights along Olutanga Circumferential Road - K1788 + 463 - K1791 + 000, K1792 + 800 - K1794 + 303, K1814 + 400 - K1815 + 500, K1817 + 000 - K1818 + 300, K1821 + 180 - K1821 + 685, K1841 + 000 - K1841 + 100

CW1 - Road Safety: Roadway Lighting/ 282 Number of Units
Unit Cost: ₱ 177,429.96/ Number of Units CW2 - Road Safety: Solar Reflectorized Pavement Studs/ 839 Number of Units
Unit Cost: ₱ 10,524.14/ Number of Units
EAO: ₱ 2,135,000.00
Allocation: ₱ 61,000,000.00
May 7, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00805162LZ
UACS : 310101101257000

FROM :
Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0429 + 183 - K0429 + 250, K0429 + 264 - K0429 + 385, K0429 + 404 - K0429 + 440, K0429 + 450 - K0429 + 495, K0429 + 516 - K0429 + 570

Physical Target :
Preventive Maintenance of Road - Concrete Reblocking - 1.019 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0422 + 466 - K0422 + 738

Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 1.168 Lane Km
May 7, 2024 FY 2024 P00801205MN GAA 2024 January 1, 2024 Region XII Saranggani District Engineering Office
Asset Preservation Program- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Amount: ₱ 44,208,000.00
From: Sarangani- Davao Del Sur Coastal Rd - K1664+367 - K1664+441, K1664+570 - K1665+125, K1665+228- K1666+479; Reconstruction to Concrete Pavement Road: 4.595 Lane km

To: Sarangani- Davao Del Sur Coastal Rd - K1664+283 - K1664+436, K1664+560 - K1665+213, K1665+226 - K1666+473; Reconstruction to Concrete Pavement Road: 4.833 Lane km

May 7, 2024 FY 2024 P00800545MN SR2024-01-002330 January 27, 2024 Region XII Saranggani District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Amount: ₱ 126,600,000.00
From: Maitum-Lake Sebu Rd, K1777 + 300- K1777+426, K1777+446- K1777+495, K1779+00- K1779+200; Construction of Road Slope Protection Structure: 3,375.00 SQ.M

To: Maitum-Lake Sebu Rd, K1777 + 275- K1777+426, K1777+446- K1777+630; Construction of Road Slope Protection Structure: 7,020.00 SQ.M
May 7, 2024 FY 2024 P00803703MN SR2024-01-002446 January 27, 2024 Region XII Saranggani District Engineering Office
Network Development Program- Construction of By-Pass and Diversion Roads
Amount: ₱ 75,000,000.00
Poblacion Malungon- Sta. Maria Bypass Road, Malungon Sarangani Province
Type of Work: Construction of Concrete Road
Physical Target: From: 3.00 lane km To: 7.731 lane km
May 7, 2024 FY 2024 P00833137MN GAA 2024 January 1, 2024 Region XII Saranggani District Engineering Office
Convergence and Special Support Program:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Amount: ₱ 1,370,000.00
From: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd - K1665 + 700 - K1666 + 300, Lun Padidu, Malapatan, Sarangani; Road Safety: Pavement Markings 594.00 Lineal meter

To: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd – K1664+902 - K1666 + 340, Lun Padidu, Malapatan, Sarangani; Road Safety: Pavement Markings:
1,434.00 Lineal meter
May 7, 2024 FY 2024 P00833139MN GAA 2024 January 1, 2024 Region XII Saranggani District Engineering Office
Convergence and Special Support Program:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Amount: ₱ 1,520,000.00
From: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd - K1673 + 500 - K1673 + 700;
TOW: Road Safety: Pavement Markings: 200.00 Lineal meter

To: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd - K1673 + 500 - K1673 + 800
TOW: Road Safety: Pavement Markings: 300.00 Lineal meter
May 7, 2024 FY 2024 P00833136MN GAA 2024 January 1, 2024 Region XII Saranggani District Engineering Office
Convergence and Special Support Program:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Amount: ₱ 1,870,000.00
From: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd - K1654 + 000 - K1656 + 000, Barangay Maribulan, Alabel, Sarangani
TOW: Road Safety: Pavement Markings:2,009.00 Lineal meter

To: Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Sarangani-Davao del Sur Coastal Rd – K1654+000- K1654+135, K1654+462- K1656+000, Barangay Maribulan, Alabel, Sarangani
TOW: Road Safety: Pavement Markings: 1,547.00 Lineal meter
May 7, 2024 FY 2024 P00800491MN GAA 2024 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Contract ID: 24MD0037
Amount: ₱ 39,312,000.00

From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1686 + 800 - K1686 + 879
TOW: Construction of Road Slope Protection Structure:1,572.48 Square meters
To: Davao-Cotabato Road (Jct Digos-Cotabato Sect) – K1686+787.94 – K1686+992.96
TOW: Construction of Road Slope Protection Structure: 2,985.77 Square meters
May 7, 2024 FY 2024 P00800550MN GAA 2024 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Primary Roads

Contract ID: 24MD0023
Amount: ₱ 9,600,000.00

From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1714 + 570 - K1714 + 610
TOW: Construction of Road Slope Protection Structure: 400 Square meters

To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1714 + 564.40 - K1714 + 628.60
TOW: Construction of Road Slope Protection Structure: 884.86 Square meters
May 7, 2024 FY 2024 P00800551MN GAA 2024 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Contract ID: 24MD0024
Amount: ₱ 16,800,000.00
From: Dualing-New Panay-Midsayap Rd - K1694 + 280 - K1694 + 350
TOW: Construction of Road Slope Protection Structure:
700 Square meters

To: Dualing-New Panay-Midsayap Rd - K1694 + 280 - K1694 + 360, K1694 + 302 – K1694 + 349.70
TOW: Construction of Road Slope Protection Structure:1,685.62 Square meters
May 7, 2024 FY 2024 P00800532MN SR2024-01-002561 January 27, 2024 Region XII Regional Office XII
Network Development - Paving of Unpaved Roads - Tertiary Roads
Contract ID: 24M00211
Type of Work: Paving of Unpaved Roads:
Physical Target: 3.820 lane-km
Amount: ₱ 146,000,000.00

From: Demoloc-Little Baguio-Alabel Rd (S00221MN), K1694 + 275 - K1696 + 185

To: Demoloc-Little Baguio-Alabel Rd (S00221MN), K1695 + 146.5 - K1697 + 057.5
May 7, 2024 FY 2024 P00800502MN SR2024-01-003500 January 29, 2024 Region XII South Cotabato 2nd District Engineering Office
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
P00800502MN
Amount: P60,000,000.00
From : Surallah-Lake Sebu-Maitum Rd - K1764 + 375 - K1764 + 452, K1764 + 583 - K1764 + 694, K1764 + 955 - K1765 + 045, K1766 + 140 - K1766 + 208, K1766 + 250 - K1766 + 290, K1766 + 356 - K1766 + 677, K1766 + 832 - K1767 + 000, K1769+370 - K 1769+395
Construction of Road Slope Protection Structure: 3875 Sq.m.

To: Surallah-Lake Sebu-Maitum Rd K1762 + 460 - K1762 + 848, K1762 + 860 - K1762 + 980, K1763 + 060 - K1763 + 600, K1764 + 375 - K1764 + 454, K1764 + 582 - K1764 + 689, K1764 + 945 - K1765 + 018, K1766 + 140 - K1766 + 211, K1766 + 255 - K1766 + 295, K1766 + 360 - K1766 + 677, K1766 + 832 - K1767 + 000, K1767 + 440 - K1767 + 660, K1769 + 360 - K1769 + 400
Construction of Road Slope Protection Structure: 7143 Sq.m.
May 7, 2024 FY 2024 P00800371MN GAA 2024 January 1, 2024 Region XII South Cotabato 2nd District Engineering Office
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Amount: ₱15,999,000.00
From: Surallah-Lake Sebu-Maitum Rd - K1751 + 550 - K1752 + 105; Construction of Drainage Structure along Road: 565 Lineal meters
To: Surallah-Lake Sebu-Maitum Rd - K1751 + 320 - K1751 + 400, K1751 + 540 – K1752 + 085
CW-1- Construction of Drainage Structure along Road:
555.00 linear meter, CW-2- Construction of Road Slope Protection Structure: 650.10 square meter

May 7, 2024 FY 2024 P00800372MN GAA 2024 January 1, 2024 Region XII South Cotabato 2nd District Engineering Office
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Amount: ₱ 18,001,000.00
From: Construction of Drainage Structure along Road - Surallah-Lake Sebu-Maitum Rd - K1758 + 109 - K1759 + 219
TOW: Construction of Drainage Structure along Road:
1,118.00 linear meter
To: Construction of Drainage Structure along Road - Surallah-Lake Sebu-Maitum Rd - K1758 + 105 – K1758 + 312, K1758 +324 – K1758 + 800, K1758 + 801.50 – K1758 + 824, K1758 +839 – K1759 + 172
TOW: Construction of Drainage Structure along Road: 1,046.50 linear meter
May 7, 2024 FY 2024 P00800138MN SR2024-01-003522 January 29, 2024 Region XII South Cotabato 2nd District Engineering Office
Network Development Program–Road Widening-Tertiary Roads

Amount: ₱ 53,006,000.00

From: Surallah-Lake Sebu-Maitum Rd - K1748 + 500 - K1749 + 488
CW-1- Road Widening: 2.00 lane-km, CW-2-Construction of Road Slope Protection Structure: 2300 square meter


To: Surallah-Lake Sebu-Maitum Rd - K1749 + 078 - K1750 + 285
CW-1- Road Widening: 2.42 lane-km; CW-2-Construction of Road Slope Protection Structure: 6370 square meter
May 7, 2024 FY 2024 P00800256MN GAA 2024 January 1, 2024 Region XII South Cotabato 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Amount: ₱ 39,543,000.00
From: Off-Carriageway Improvement: Construction of Traffic Island -Midsayap-Marbel Rd - K1770 + 000 - K1773 + 155
Off-Carriageway Improvement: Construction of Traffic Island 3,191square meters

To: Off-Carriageway Improvement: Construction of Traffic Island - Midsayap-Marbel Rd - K1770 + 000 - K1777 + 000
Off-Carriageway Improvement: Construction of Traffic Island
4,760.40 square meters
May 7, 2024 FY 2024 P00800257MN GAA 2024 January 1, 2024 Region XII South Cotabato 2nd District Engineering Office
Network Development Program – Off-Carriageway Improvement – Secondary Roads
Amount: ₱ 34,700,000.00
Off-Carriageway Improvement: Construction of Traffic Island -Midsayap-Marbel Rd - K1780 + 500- K1783 + 500
TOW: Off-Carriageway Improvement: Construction of Traffic Island
2,200 square meters

To: Off-Carriageway Improvement: Construction of Traffic Island - Midsayap-Marbel Rd - K1780 + 500 - K1786 + 595
TOW: Off-Carriageway Improvement: Construction of Traffic Island
4,272.40 square meters

May 7, 2024 FY 2024 P00800258MN GAA 2024 January 1, 2024 Region XII South Cotabato 2nd District Engineering Office
Network Development Program – Off-Carriageway Improvement – Secondary Roads
Amount: ₱ 10,900,000.00
From:Midsayap-Marbel Rd - K1787 + 500 - K1788 + 400
To: Midsayap – Marbel Rd – K1787+300 – K1789+210
May 7, 2024 2024 300214100653000 GAA 2024 January 3, 2024 Region II Regional Office II
From:

Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0379 + 000 - K0379 + 358, K0380 + 000 - K0380 + 257, K0382 + (-433) - K0382 + 000

To:

Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0379 + 000 - K0379 + 358, K0380 + 000 - K0380 + 257, K0382 + (-433) - K0382 + (-215.9)
May 7, 2024 2024 300214100664000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0395 + 931 - K0397 + 209, K0401 + 820 - K0402 + 000

TO:

Convergence and Special Support Program: Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0421 + 000 - K0422 + 000, K0435 + 605 - K0435 + 738
May 6, 2024 2024 XII-031 GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
24MC0015 - Construction of Road Slope Protection Structure along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1666 + 533 - K1666 + 620
May 6, 2024 2024 XII-023 GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
24MC0016 Construction of Road Slope Protection Structure along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1667 + 100 - K1667 + 360
May 6, 2024 FY 2024 P00800164MN SR2024-01-000308 January 26, 2024 Region XII Cotabato 1st District Engineering Office
UACS No. 310201101347000
Project ID: P00800164MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

FROM: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1669 + 116 - K1669 + 708, K1672 + 358 - K1674 + 000

TO: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1669 + 000 - K1669 + 726.31, K1672 + 614.00 - K1673 + 606.15
May 6, 2024 FY 2024 P00800141MN SR2024-01-004784 January 29, 2024 Region XII Regional Office XII
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Road Widening: 10.412 lane-km ; ₱ 156,190,000.00

From: Digos-Makar Rd - K1636 + 000 - K1638 + 000, K1646 + 000 - K1649 + 202
To: Digos-Makar Rd - K1635 + 383 - K1638 + 200, K1646 + 000 - K1648 + 363
May 6, 2024 FY 2024 P00833085MN SR2024-01-000910 January 26, 2024 Region XII Regional Office XII
Contract ID: 24M00109
Amount: ₱ 21,910,000.00
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

From: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Digos-Makar Rd - K1594 + 000 - K1595 + 000
Reconstruction to Concrete Pavement:
1.994 lane-km
To: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Digos-Makar Rd - K1594 + 000 - K1595 + 324
Reconstruction to Concrete Pavement:
2.6484 lane-km
May 2, 2024 2024 WIN4XY00173 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Rehabilitation of Exiting Dike along Lucung River (Susuba Section), Phase 4, Sta. 0+000.00 - Sta. 0+634.48, Capas, Tarlac
May 2, 2024 2024 WIN4XY00174 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Rehabilitation of Existing Dike along Lucung River (Susuba Section), Phase 3, Sta. 0+000.00 - Sta. 0+612.15,Capas, Tarlac
April 30, 2024 2024 FY 2024 GAA November 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank) U/S of Rio Chico Bridge, Phase 2, Sta. 14+837.48 to Sta. 15+27869, La Paz, Tarlac
April 30, 2024 2024 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank) U/S of Rio Chico Bridge, Phase 1), Sta. 14+395.50 to Sta. 14+837.48, La Paz, Tarlac
April 30, 2024 2024 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure

Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package J, Sta. 4+764.08 - Sta. 5+169.10, Concepcion, Tarlac
April 30, 2024 2024 FY 2024 GAA December 20, 2023 Region III Tarlac 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Concepcion-Capas Rd - K0109+(-321) - K0109+(-405), K0109+459 - K0109+500, K0115+783 - K0115+844
April 29, 2024 2024 310104100636000 GAA 2024 January 3, 2024 Region II Regional Office II
From: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0399+008 - K0400+009

To: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0395+931 - K0397+098, K0401+820 - K0402+160, K0408+008 - K0409+598, K0409+641 - K0409+853
April 29, 2024 GAA GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00802561LZ
UACS : 310105101158000

FROM :
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Sn Fernando Rd - K0002 + 269 - K0002 + 319, K0002 + 717 - K0002 + 802, K0003 + 624 - K0003 + 683, K0009 + 846 - K0009 + 850, K0009 + 966 - K0010 + 000, K0010 + 238 - K0010 + 586, K0011 + 678 - K0011 + 1010

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.838 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Sn Fernando Rd - K0002 + 259 - K0002 + 317, K0002 + 717 - K0002 + 802, K0003 + 630 - K0003 + 693, K0005 + 000 - K0005 + 036, K0010 + 238 - K0010 + 558, K0010 + 561 - K0010 + 586, K0011 + 678 - K0011 + 1010

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.838 Lane Km
April 29, 2024 2024 GAA 2024 January 19, 2024 Region V Masbate 1st District Engineering Office
Project ID : P00802562LZ
UACS : 310105101159000

FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Sn Fernando Rd - K0015 + 650 - K0015 + 819, K0016 + 573 - K0016 + 789, K0018 + 609 - K0018 + 935, K0019 + 000 - K0019 + 101, K0019 + 198 - K0019 + 270

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.776 Lane Km


TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Sn Fernando Rd - K0016 + 573 - K0016 + 789, K0018 + 598 - K0018 + 935, K0019 + 000 - K0019 + 097, K0019 + 198 - K0019 + 284, K0019 + 726 - K0019 + 816, K0021 + 182 - K0021 + 244

Physical Target :
CW1 - Rehabilitation of Paved Road - 1.776 Lane Km
April 29, 2024 2024 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837433LZ
UACS : 300214100753000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0333 + 000 - K0335 + 000, K0343 + 206 - K0344 + 000

Physical Target :
CW1 - Rehabilitation of Paved Road - 5.632 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0343 + 350 - K0345 + 000, K0346 + 031 - K0347 + 220, K0349 + 457 - K0349 + 556

Physical Target :
CW1 - Rehabilitation of Paved Road - 5.878 Lane Km
April 29, 2024 FY 2024 P00800169MN SR2024-01-004730 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M0007
Network Development
Road Widening - Primary Roads, Road Widening
FROM: Digos-Makar Rd - K1594 + 000 - K1597 + 800, K1600 + 120 - K1601 + 545
TO: Digos-Makar Rd - K1594 + 000 - K1597 + 800, K1600 + 167 - K1600 + 300
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0270+105 - K0271+168
April 26, 2024 FY 2024 GAA P00802419MN FY 2024 GAA RA 11936 January 1, 2024 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1593 + 000 - K1549 + 000,
K1594 + 000 - K1595 + 000, K1595 + 000 - K1595 + 200
Physical Target:
CW1: 4.414 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1593 + 000 - K1594 + 000,
K1594 + 000 - K1595 + 000, K1595 + 000 - K1595 + 200
Physical Target:
CW1: 8.828 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
April 26, 2024 2024 FY 2024 GAA November 20, 2023 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Road

Baler-Casiguran Rd (Baler-Dinadiawan) - K0249+194 - K0249+520, K0249+980 - K0250+375, K0250+825 - K0251+000, K0258+757 - K0258+813, 0258+882- K0258+921, K0259+160 - K0259+200, K0259+472 - K0259+544, K0259+806 - K0259+821, K0259+847 - K0259+862, K0260+489 -K0260+529.20, K0274+562 - K0274+612, K0274+860 - K0275+076, K0275+340 - K0275+974, K0279+795.30 - K0279+820, K0280+469.70 - K0280+740,K0280+767.60 - K0280+776.10, K0280+785.20 - K0281+000
April 26, 2024 FY 2024 GAA WIN4E03307 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao Oriental 1st District Engineering Office
WIN4E03307 (Davao Oriental 1st District Engineering Office_2)
UACS No. 310202101774000
Project ID: P00800107MN

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1547 + 631 - K1547 + 752
Physical Target:
CW1: 0.242 lane km (Road Widening)
Allocation:
TOTAL: P 1,936,000.00
CW1: P 1,897,280.00 (Road Widening)
EAO: P 38,720.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1547 + 631 - K1547 + 704
Physical Target:
CW1: 0.146 lane km (Road Widening)
ROW: 1,941.80 square meters (ROW Acquisition)
Allocation:
TOTAL: P 1,936,000.00
CW1: P 1,597,280.00 (Road Widening)
ROW: P 300,000.00 (ROW Acquisition)
EAO: P 38,720.00
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika (LZ) - K0086+116-K0086+321, K0086+331 - K0087+076, K0087+107 -K0087+276, K0090+000 - K0090+915, K0091+873 - K0092+355
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0141+642 -K0142+006, K0150+986 - K0152+000, K0152+172 - K0153+258, K0163+847 - K0164+441, K0164+475 - K0165+663
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0056+005 - K0056+300, K0056+420 - K0056+457.80
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0093+761 - K0094+500
April 26, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Jose Abad Santos Ave (JASA) - K0089+034 - K0089+266.62, K0090+480.78 - K0091+000
April 26, 2024 FY 2024 P00800135MN SR2024-01-004711 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M00175

Road Widening - Primary Roads
FROM: Cotabato-Marbel Rd - K1737 + 850 - K1738 + 502
TO: Cotabato-Marbel Rd - K1737 + 850 - K1738 + 461
April 26, 2024 FY 2024 P00800170MN SR2024-01-004747 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M00008

OO1: Ensure Safe and Reliable National Road System
Network Development
Road Widening - Primary Roads
FROM: Digos-Makar Rd - K1601 + 580 - K1607 + 206
TO: Digos-Makar Rd - K1600 + 300 - K1601 + 542, K1602 + 000 - K1606 + 007
April 26, 2024 FY 2024 P00800174MN SR2024-01-004776 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M00107

OO1: Ensure Safe and Reliable National Road System
Network Development
Road Widening - Primary Roads

FROM: Digos-Makar Rd - K1624 + 291 - K1627 + 529
TO: Digos-Makar Rd - K1624 + 330 - K1627 + 417
April 26, 2024 FY 2024 P00800173MN SR2024-01-004764 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M00106

Network Development
Road Widening - Primary Roads
PROJECT DESCRIPTION:
FROM: Digos-Makar Rd - K1619 + 906 - K1623 + 348, K1623 + 388 - K1624 + 291
TO: Digos-Makar Rd - K1620 + 322 - K1623 + 337, K1623 + 417 - K1624 + 330
April 26, 2024 FY 2024 P00800171MN SR2024-01-004753 January 29, 2024 Region XII Regional Office XII
CONTRACT: 24M00009
Network Development
Road Widening - Primary Roads
PROCJECT DESCRIPTION
FROM: Digos-Makar Rd - K1607 + 206 - K1612 + 927
TO: Digos-Makar Rd - K1606 + 007 - K1612 + 961
April 25, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310104100786000
Project ID: P00803570MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 220 - K1277 + 495

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 0.550 Lane Km

Allocation:
TOTAL: P 21,791,000
CW1: P 21,355,180
EAO: P 435,820

Unit Cost:
CW1: P 38,827,600/Lane Km

TO:

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 120 - K1277 + 518

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 0.826 Lane Km

Allocation:
TOTAL: P 21,791,000
CW1: P 21,355,180
EAO: P 435,820

Unit Cost:
CW1: P 25,853,728.81/Lane Km

April 24, 2024 2024 WIN4E03301 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3000 - Chainage 3185, Chainage 4185 - Chainage 4225;
Type of Work:
Paving of Unpaved Roads;
Physical Target:
0.225 Lane Km;
Allocation:
Php 2,351,000"

"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 763 - Chainage 830;
Type of Work:
CW1: Paving of Unpaved Roads
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.134 Lane Km
CW2: 108 Square meters;
Allocation:
Php 2,351,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 1st District Engineering Office
"From:
Construction of Flood Control Structure along Lagawe River, Sta. 5+400 - Sta. 5+800, Boliwong, Lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
400 Lineal meters;
Allocation:
Php 30,000,000"

"To:
Construction of Flood Control Structure along Lagawe River, Sta. 5+350.50 - Sta. 5+800, Boliwong, lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
449.5 Lineal meters;
Allocation:
Php 30,000,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 1st District Engineering Office
"From:
Construction of Flood Control Structure along Tinoc River, Sta. 98+400 - Sta. 98+940 (Manaan Section), Tinoc, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
540 Lineal meters;
Allocation:
Php 40,000,000"

"To:
Construction of Flood Control Structure along Tinoc River, Sta 98+350 - Sta 98+940 (Manaan Section), Tinoc, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
590 Lineal meters;
Allocation:
Php 40,000,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 2nd District Engineering Office
"From:
Construction of Flood Control Structure along Ibulao River, Sta. 342+100 - Sta. 342+370, Caba, Lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
270 Lineal meters;
Allocation:
Php 20,000,000"

"To:
Construction of Flood Control Structure along Ibulao River, Sta. 342+125 - Sta. 342+424 Caba, Lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
299 Lineal meters;
Allocation:
Php 20,000,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 1st District Engineering Office
"From:
Construction of Flood Control Structure along Lagawe River, Sta. 0+650 - Sta. 1+325, Poblacion South, Lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
675 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Flood Control Structure along Lagawe River, Sta. 0+650 - Sta. 1+445, Poblacion South, Lagawe, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
795 Lineal meters;
Allocation:
Php 50,000,000"
April 24, 2024 2024 SR2024-01-003984 January 29, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Construction of Road along Pongo-Copcopit-Dangadangan, Bakun, Benguet;
Type of Work:
Construction of Concrete Road;
Physical Target:
14 Lane Km;
Allocation:
Php 92,000,000"

"To:
Construction of Road along Pongo-Copcopit-Dangadangan, Bakun, Benguet;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 10.236 Lane Km
CW2: 3286 Square meters;
Allocation:
Php 92,000,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 1st District Engineering Office
"From:
Construction of Flood Control Structure along Lamut River, Sta. 10+700 - Sta. 10+970, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
270 Lineal meters;
Allocation:
Php 20,000,000"

"To:
Construction of Flood Control Structure along Lamut River, Sta. 10+690 - Sta. 10+970, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
280 Lineal meters;
Allocation:
Php 20,000,000"
April 24, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Apayao 2nd District Engineering Office
"From:
Asphalt Overlay along Kabugao-Pudtol-Luna-Cagayan Boundary Road, Luna, Apayao;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
2.42 Lane Km;
Allocation:
Php 20,000,000"

"To:
Asphalt Overlay along Kabugao - Pudtol - Luna - Cagayan Boundary Road- K0680 + 730 - K0682 +124, Luna, Apayao ;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
2.626 Lane Km;
Allocation:
Php 20,000,000"
April 24, 2024 2024 XII-026 GAA 2024 RA 11975 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
24MC0024 - Road Widening along Paco-Roxas-Arakan Valley-Jct Davao-Bukidnon Rd - K1645+ 570 - K1646+413, Antipas, Cotabato
April 23, 2024 2024 WIN4XY00156 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Meycauayan-Camalig-Bahay Pari Rd - K0025+205.57 - K0025+985.57, K0025+985.57 - K0026+320, K0027+520- K0027+720
April 23, 2024 2024 WIN4XY00163 FY 2024 GAA December 20, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) - K0329+838 - K0330+402
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) -K0266+360 -K0267+469
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler-Casiguran Rd (Dinadiawan-Casiguran Sect) - K0333+424 - K0334+217
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road, Barangay Cabisuculan, Catalanacan, Labney, Magtanggol, Maragol, Science City of Muñoz, Nueva Ecija
April 23, 2024 2024 FY 2024 GAA November 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Brgy. Alula Talugtug - Saverona, Talugtug - Saverona, Talugtug via Villa Rosenda, Talugtug, Nueva Ecija
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction (Completion) Multi-Purpose Building, Carranglan Central School, Brgy. DL Maglanoc, Carranglan, Nueva Ecija
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Jct Tablang - Gabaldon Rd - K0136+(-734) - K0136+000, K0136+000 - K0137+000, K0137+000- K0138+000, K0140+000 - K0140+029, K0140+140 - K0140+678, K0140+729 - K0141+140, K0141+855.70 - K0142+000, K0143+000 - K0143+511, K0146+958 - K0147+311, K0147+319 - K0147+690, K0147+736- K0147+1034, K0147+1071 - K0149+000
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Antonio - Floridablanca Rd - K0087+765.85 - K0087+896.66
April 23, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Jose Abad Santos Ave (JASA) - K0090+299.50 - K0090+480.78
April 22, 2024 2024 WIN4F07911 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837962LZ
UACS : 300215103862000

FROM :
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities/ - Construction of Daet - San Vicente - San Lorenzo - Circumferential Road, San Lorenzo, Camarines Norte, Package II

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 5.192 Lane Km
CW2 - Construction of Road Slope Protection Structure - 5142.08 Square meters


TO :
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities/ - Construction of Daet - San Vicente - San Lorenzo - Circumferential Road, San Lorenzo Ruiz, Camarines Norte, Package II

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 5.192 Lane Km
CW2 - Construction of Road Slope Protection Structure - 5142.08 Square meters
April 22, 2024 2024 310104100635000 FY 2024 GAA January 2, 2024 Region II Regional Office II
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika - K0359+(-382) - K0359+000, K0359+229 - K0359+509, K0360+000 - K0360+171
April 22, 2024 2024 WIN4F07909 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00837963LZ
UACS : 300215103863000

FROM :
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Daet - San Vicente - San Lorenzo - Circumferential Road, San Lorenzo, Camarines Norte, Package III

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 3.78422 Lane Km
CW2 - Construction of Drainage Structure along Road - 2241..88 Lineal meters


TO:
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Daet - San Vicente - San Lorenzo - Circumferential Road, San Lorenzo Ruiz, Camarines Norte, Package III

Physical Target :
CW1 - Reconstruction to Concrete Pavement - 3.78422 Lane Km
CW2 - Construction of Drainage Structure along Road - 2241..88 Lineal meters
April 22, 2024 2024 WIN4F07910 GAA 2024 January 19, 2024 Region V Masbate 1st District Engineering Office
Project ID : P00839339LZ
UACS : 300221106129000

FROM :
CONVERGENCE AND SPECIAL SUPPORT - Basic Infrastructure (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Construction of Road, Barangay Panique, San Pascual, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 1.2 Lane Km


TO :
CONVERGENCE AND SPECIAL SUPPORT - Basic Infrastructure (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Construction of Road, Barangay Mapanique, San Pascual, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 1.2 Lane Km
April 22, 2024 2024 WIN4XY00161 GAA 2024 January 19, 2024 Region V Camarines Norte District Engineering Office
Project ID : P00841402LZ
UACS : 300226113515000

FROM :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), Guisican Elementary School, Barangay Guisican, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings



TO :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), Florence Elementary School, Barangay Guisican, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
April 22, 2024 2024 WIN4XY00161 GAA 2024 January 19, 2024 Region V Camarines Norte District Engineering Office
Project ID : P00841402LZ
UACS : 300226113515000

FROM :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), Guisican Elementary School, Barangay Guisican, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings



TO :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), Florence Elementary School, Barangay Guisican, Labo, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
April 22, 2024 2024 WIN4XY00162 GAA 2024 January 19, 2024 Region V Camarines Norte District Engineering Office
Project ID : P00848247LZ
UACS : 300226113519000

FROM :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), Tabas Elementary School, Barangay Tabas, Paracale, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings


TO :
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building (Covered Court), S. Basillo Elementary School, Barangay Tabas, Paracale, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
April 20, 2024 2024 SR2024-01-005131 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Mt Prov-Ilocos Sur via Tue Rd - K0387 + (-081) - K0401 + 456;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
29.012 Lane Km;
Allocation:
Php 200,000,000"

"To:
Mt Prov-Ilocos Sur via Tue Rd - K0387 + (-081) - K0388 + 189, K0388 + 227 - K0388 + 867, K0388 + 939 - K0388 + 1069, K0389 + 389 - K0389 + 493, K0389 + 549 - K0389 + 618, K0389 + 775 - K0391 + 644, K0391 + 672 - K0400 + 894;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Reconstruction to Concrete Pavement;
Physical Target:
CW1: 25.974 Lane Km
CW2: 2.592 Lane Km;
Allocation:
Php 200,000,000"

April 20, 2024 2024 SR2024-01-005147 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Mt Province-N Vizcaya Rd - K0375+000 - K0375+806, K0375+829 - K0379+681, K0380+071 - K0383+087, K0383+581 - K0384+179, K0384+495 - K0386+225;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
18.932 Lane Km;
Allocation:
Php 150,000,000"

"To:
Mt Province-N Vizcaya Rd - K0375 + 000 - K0375 + 806, K0375 + 829 - K0379 + 300, K0380 + 060 - K0383 + 087, K0383 + 581 - K0384 + 166, K0384 + 495 - K0385 + 880;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
18.932 Lane Km;
Allocation:
Php 150,000,000"
April 20, 2024 2024 SR2024-01-005157 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Mt Prov-Ilocos Sur via Kayan Rd - K0386 + (-034) - K0396 + 281;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
20.76 Lane Km;
Allocation:
Php 150,000,000"

"To:
Mt Prov-Ilocos Sur via Kayan Rd - K0386 + (-034) - K0394 + 349;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Reconstruction to Concrete Pavement;
Physical Target:
CW1: 16.904 Lane Km
CW2: 3.0 Lane Km;
Allocation:
Php 150,000,000"
April 20, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 42813 - Chainage 43246, Chainage 44577, Chainage 44887, Chainage 45301, Chainage 46081, Chainage 46807 - Chainage 46847;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1935 Lineal meters;
Allocation:
Php 22,268,000"

"To:
Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 42685 - Chainage 43246, Chainage 44572, Chainage 44870, Chainage 45301, Chainage 46081, Chainage 46905 - Chainage 47160;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1790 Lineal meters;
Allocation:
Php 22,268,000"
April 20, 2024 2024 SR2024-01-005574 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Flood Control Structure along Lamut River, Sta. 18+900 - Sta. 19+700, Lawig, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
800 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Flood Control Structure along Lamut River, Sta. 18+825 - Sta. 19+570 (L/S), Lawig, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
675 Lineal meters;
Allocation:
Php 50,000,000"
April 20, 2024 2024 SR2024-01-005352 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction (Completion) of Tapao Flood Control (Callangan -Ducligan), Sta.166+200 - Sta. 166+870 (R/5) Balbalasang, Balbalan, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.50 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction (Completion) of Tapao Flood Control (Callangan -Ducligan), Sta.166+200 - Sta. 166+641 (R/S), Sta.166+694 - Sta. 166+878 (R/S), Sta.166+374 - Sta. 166+926 (L/S), Balbalasang, Balbalan, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1128 Lineal meters;
Allocation:
Php 100,000,000"
April 19, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Meycauayan-Camalig-Bahay Pari Rd - K0021+500 0 K0023+753
April 19, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0099+630 - K0099+806
April 9, 2024 FY 2022 WIN2B00882 310103100820000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100820000
Project ID: P00601311MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads

Tungusong-Tubig Indangan Rd - (S00008TW) Chainage 2190 - Chainage 7179.67


CW1 - Preventive Maintenance of Road: Concrete Reblocking: 9.979 Lane Km
Unit Cost: ₱ 5,912,576.21 / Lane Km
EAO: ₱ 2,141,125.00
EXCESS: ₱ 32,276.96
Allocation: ₱ 61,175,000.00
April 9, 2024 FY 2022 WIN2B00885 310103100818000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100818000
Project ID: P00601307MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Tertiary Roads

Sanga-Sanga-Bato-Bato Rd - (S00002TW) Chainage 9080 - Chainage 14827


CW1 - Preventive Maintenance of Road: Concrete Reblocking: 11.494 Lane Km
Unit Cost: ₱ 5,056,224.99 / Lane Km
EAO: ₱ 2,141,125.00
EXCESS: ₱ 917,625.00
Allocation: ₱ 61,175,000.00
April 9, 2024 FY 2022 WIN2B00884 300221101769000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100820000
Project ID: P00601311MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National - Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Lukboh Road, Barangay Saimbangon, Pata, Sulu

CW1 - Construction of Concrete Road: 0.93 Lane Km
Unit Cost: ₱ 10,645,160.00 / Lane Km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
April 9, 2024 FY 2022 WIN2B00883 310202101022000 April 9, 2022 Region IX Regional Office IX
UACS No. 310202101022000
Project ID: P00602305MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Jolo - Indanan - Parang - Silangkan Road (Package 3) - Sta. 9+560 - Sta. 10+500

CW1 - Road Widening: 1.88 Lane Km
Unit Cost: ₱ 17,553,191.49/ Lane Km

ROW Acquisition: 16,666.67 sq...
Unit Cost: ₱ 300.00 /sq.m.

EAO: ₱ 1,400,000.00
EXCESS: ₱ 600,000.00
Allocation: ₱ 40,000,000.00
April 9, 2024 FY 2022 WIN2B00914 310103100814000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100814000
Project ID: P00601306MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Banaran-Lookan Rd - (S00001TW) Chainage 482 - Chainage 5540
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 6.27 Lane Km
Unit Cost: ₱ 9,234,449.76 / Lane Km

EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00
April 9, 2024 FY 2022 WIN2B00977 310105100635000 April 9, 2022 Region IX Regional Office IX
UACS No. 310105100635000
Project ID: P00601292MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jolo Port-Bud Daho-Romadier Rd - K0007 + 800 - K0011 + 540

CW1 - Reconstruction to Concrete Pavement: 7.48 Lane Km
Unit Cost: ₱ 10,160,427.80 / Lane Km
EAO: ₱ 2,800,000.00
EXCESS: ₱ 1,200,000.00
Allocation: ₱ 80,000,000.00
April 9, 2024 FY 2022 WIN2B00897 310103100816000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100816000
Project ID: P00601309MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Asset Preservation - Preventive Maintenance - Tertiary Roads

Bongao-Pahut-Sanga-Sanga Rd - (S00005TW) Chainage 2170 - Chainage 6228.89

CW1 - Preventive Maintenance of Road: Concrete Reblocking: 8.118 Lane Km
Unit Cost: ₱ 7,158,936.93/ Lane Km
EAO: ₱ 2,141,125.00
EXCESS: ₱ 917,625.00
Allocation: ₱ 61,175,000.00
April 9, 2024 FY 2022 WIN2B00912 300221100066000 April 9, 2022 Region IX Regional Office IX
UACS No. 300221100066000
Project ID: P00630787MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Upper Tambaking Access Road from Maimbung - Indanan Road, Barangay Upper Tambaking, Maimbung, Sulu

CW1 - Rehabilitation of Concrete Road: 0.914 Lane Km
Unit Cost: ₱ 9,748,360.00/ Lane Km
EAO: ₱ 90,000.00
Allocation: ₱ 10,000,000.00
April 9, 2024 FY 2022 WIN2B00917 310205100832000 April 9, 2022 Region IX Regional Office IX
UACS No. 310205100832000
Project ID: P00604482MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu

CW1 - Construction of Concrete Roadg: 1.38 Lane Km
Unit Cost: ₱ 20,978,260.87/ Lane Km
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
April 9, 2024 FY 2022 WIN2B00920 310103100819000 April 9, 2022 Region IX Regional Office IX
UACS No. 310103100819000
Project ID: P00601310MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Sibutu-Ligayan Road - (S00007TW) Chainage 5203.09 - Chainage 6511.11, Chainage 7303 - Chainage 11124.96

CW1 - Preventive Maintenance of Road: Concrete Reblocking: 10.26 Lane Km
Unit Cost: ₱ 5,664,351.852/ Lane Km
EAO: ₱ 2,141,125.00
EXCESS: ₱ 917,625.00
Allocation: ₱ 61,175,000.00

Pages