June 21, 2018 |
GAA FY 2018 |
WIN8F05619 |
UACS No. 300103200093000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Mataas na Paaralang Neptali A. Gonzales Annex, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00
As Modified
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Senator Neptali A. Gonzales Integrated School, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00
|
June 21, 2018 |
FY 2018 GAA |
WIN8C03249 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Construction of Concrete Road)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 34,025,900.00 (Construction of Concrete Road)
ROW: P 62,474,100.00 (ROW Acquisition)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Reconstruction to Concrete Pavement)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 41,346,900.00 (Reconstruction to Concrete Pavement)
CW2: P 49,478,900.00 (Construction of Road Slope Protection Structure)
ROW: P5,674,200.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
June 21, 2018 |
FY 2018 GAA |
WIN8C03250 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 54,046,755.00 (Construction of Concrete Road)
ROW: P 11,172,770.00 (ROW Acquisition)
EAO: P 2,365,475.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
CW2: 762 Lineal meters (Construction of Drainage Structures along Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 9,377,554.00 (Construction of Concrete Road)
CW2 : P 31,430,052.00 (Construction of Drainage Structures along Road)
ROW: P 24,411,919.00 (ROW Acquisition)
EAO: P 2,365,475.00 |
June 21, 2018 |
FY 2018 GAA |
WIN8C03251 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00 |
June 21, 2018 |
FY 2018 GAA |
WIN8C03252 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1512+460 – K1513+775
Physical Target:
CW1: 2.34 lane km (Road Widening)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 19,340,300.00 (Construction of Concrete Road)
ROW: P 23,012,360.00 (ROW Acquisition)
EAO: P 864,340.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1513+000 – K1515+080, K1515+911
Physical Target:
CW1: 1.263 lane km (Road Widening)
CW2: 592 lineal meters (Construction of Drainage Structure along Road)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 18,603,340.00 ( Road Widening)
CW2: P 12,926,200.00 (Construction of Drainage Structure along Road)
ROW: P 10,823,120.00 (ROW Acquisition)
EAO: P 864,340.00 |
June 20, 2018 |
FY 2018 |
WIN8G02360 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 3rd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Arayat – Magalang – Mabalacat Rd |
June 20, 2018 |
FY 2018 |
WIN8G02395 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation (Asphalt Overlay) Overlay with Pavement Markings along Roman Expressway, K0102+447 – K0102+768, K0106+200 – K0106+748, K0107+739 – K0108+298, K0109+000 – K0110+710, K0111+586 – K0111+994, Hermosa, Orani, Samal and Abucay Bataan |
June 20, 2018 |
GAA FY 2018 |
WIN8F05604 |
UACS No. 300116200318000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.754 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P13,968.07/lane km
Allocation: P 24,500.00 M
Total: P 25,000.00 M
As Modified
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.306 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P18,759.57/lane km
Allocation: P 24,500.00
Total: P 25,000.00 M
|
June 20, 2018 |
GAA FY 2018 |
WIN8F05606 |
UACS No. 320101100586000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1-Construction of Flood Mitigation Structure = 1,925.00 l.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P34.373/l.m.
Allocation: P 46.060 M
Total: P 47.00 M
As Modified
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1- Construction of Flood Mitigation Structure = 450.00 l.m.
CW2 – Dredging/Desilting = 8,017.80 cu.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P89.344/l.m.
: P0.730/ cu.m.
Allocation: P 40.205 M
P 5.855 M
Total: P 47.00 M
|
June 20, 2018 |
GAA FY 2018 |
WIN8F05609 |
UACS No. 310204100054000 |
January 1, 2018 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=2.680 lane km
Unit Cost (P’000): P50,770.52/ lane km
Allocation: P 136,065.00
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00
As Modified
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=3.604 lane km
ROW: A = 200 sq.m. = 118.91/sq.m. = P23.781.15
Unit Cost (P’000): P31,153.37/ lane km
Allocation: P 112,283.95
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00
|
June 20, 2018 |
GAA FY 2018 |
WIN8F05605 |
UACS No. 310205100131000 |
January 1, 2018 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.160 lane km
Unit Cost (P’000): P74,926.68/ lane km
Allocation: P 311,695.00
EAO (‘000): P 11,305
Total (‘000): P 323,000.00
As Modified
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.344 lane km
ROW – A = 20,653 sq.m
Unit Cost (P’000): P17,805.85/ lane km
P11.35/ sq.m.
Allocation: P 77,348.60
EAO (‘000): P 11,305
Total (‘000): P 323,000.00
|
June 20, 2018 |
GAA FY 2018 |
WIN8F05607 |
UACS No. 320101100147000 |
January 1, 2018 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+199 to Sta. 1+989), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 210 lm
EAO P 2.625 M
Unit Cost: P 344,642.86 / lm
Allocation: P 72.375 M
Total: P 75 M
As Modified
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+226 to Sta. 2+048), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 178.0 lm
EAO P 1.50 M
Excess: 0.377 M
Unit Cost: P 411,028.09 / lm
Allocation: P 73.163 M
Total: P 75 M
|
June 20, 2018 |
FY 2018 |
WIN8G02364 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300204100016000
Project ID: P00230361LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy 2-Brgy.1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 – Construction of Concrete Road/ 0.504 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,621.650 sq.m.
Unit Cost: CW1 – Php 35.09 M /lane-km
CW2 – Php 5,182.35/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02340 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300202100009000
Project ID: P00230378LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaport - Guinobatan-Jovellar-Donsol Road Leading to Pilar Port, Albay
Physical Target: CW1 – Construction of Concrete Road/ 4.76 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,610.20 lm.
Unit Cost: CW1 – Php 12.37 M /lane-km
Estimated Cost: Php 80.0 M
CW2 – Php 7,013.10/lm.
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02333 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200122000
Project ID: P00257843LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco – Cogon Coastal Road and Shore Protection, Gubat Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.752 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,936.40 sq.m.
Unit Cost: CW1 – Php 34.40 M /lane-km
CW2 – Php 36,477.49/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02342 |
FY 2018 GAA R.A. 10964 |
November 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200129000
Project ID: P00257850LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Caloocan-Tabunan-Paghuliran Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.63822 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,350.69 sq.m.
Unit Cost: CW1 – Php 59.58 M /lane-km
CW2 – Php 43,290.93/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02401 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200132000
Project ID: P00257853LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Diamante-Perlas Coastal Road and Shore Protection, Prieto Diaz, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.772 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,9,87.90 sq.m.
Unit Cost: CW1 – Php 32.06 M /lane-km
CW2 – Php 36,093.08/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02362 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200136000
Project ID: P00257857LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Luna Candol – Balud del Sur Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.762 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,962.150 sq.m.
Unit Cost: CW1 – Php 32.59 M /lane-km
CW2 – Php 36,526.22/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02343 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200145000
Project ID: P00257866LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Pobalcion Norte, Central and Sur Coastal Road and Shore Protection, Barcelona, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6702 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,476.56 sq.m.
Unit Cost: CW1 – Php 44.08 M /lane-km
CW2 – Php 43,346.79/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02341 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200152000
Project ID: P00257873LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of San Vicente-San Rafael Coastal Rd and Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.604 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,555.30 sq.m.
Unit Cost: CW1 – Php 52.55 M /lane-km
CW2 – Php 41,638.47/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02411 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 300116200158000
Project ID: P00257879LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Zone 2 – Sabang – San Vicente Coastal Rd with Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.86558 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,498.65 sq.m.
Unit Cost: CW1 – Php 39.08 M /lane-km
CW2 – Php 41,817.60/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02351 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310108100015000
Project ID: P00200842LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Catanduanes Cir Rd - K0155+000 - k0156+020
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 7,603.20 sq.m.
Unit Cost: CW1 – Php 19,195.54/sq.m.
Estimated Cost: Php 151.241 M
(As Modified)
|
June 20, 2018 |
FY 2018 GAA |
WIN8C03206 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 299 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 12,350 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 229 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 13,560.34 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00
|
June 20, 2018 |
FY 2018 |
WIN8G02324 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310101100018000
Project ID: P00202666LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Primary Roads – Daang Maharlika (LZ) – K0576+1000 – K0578+000, K0578+250 – K0578+480, K0579+000 – K0579+705, K0580+930 – K0581+300, K0581+780 – K0581+845, K0581+845 – K0582+000, K0591+200 – K0591+817, K0591+817 – K0593+447, K0593+581 – K0593+656, K0593+656 – K0593+922, K0595+470 – K0595+810, K0595+947 – K0596+095, K0598+073 – K0598+276, K0599+386 – K0599+751
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 21.295 lane-km
Unit Cost: CW1 – Php 7.84 M /lane-km
Estimated Cost: Php 173.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02331 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310204100117000
Project ID: P00201073LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads – Gubat bypass Road, incl. ROW, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 3.965 lane-km
Right-of-Way Acquisition (ROW)/ 38,032.40 sq.m.
Unit Cost: CW1 – Php 18.25 M /lane-km
ROW Acquisition – Php 634.33/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02350 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02350 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
|
June 20, 2018 |
FY 2018 GAA |
WIN8C03178 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,379 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,509 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00
|
June 20, 2018 |
FY 2018 |
WIN8G02361 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) K0129+378.65 – K0129+419.50, K0129+738.50 – K0130+000, K0131+926 – K0132+000, K0132+914 – K0133+000, K0134+169 – K0134+180, K0143+584 – K0145+790 |
June 20, 2018 |
FY 2018 |
WIN8G02293 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program – Local Roads and Bridges - Local Roads – Construction of Road, Brgy. Saverona - Brgy. Villa Rosenda, Talugtug, Nueva Ecija |
June 20, 2018 |
FY 2018 |
WIN8G02307 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Program – Local Roads and Bridges - Local Roads –Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project - Rehabilitation of Science City of Muñoz – Talugtug Road, Science City of Muñoz and Talugtug, Nueva Ecija |
June 20, 2018 |
FY 2018 |
WIN8G02310 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Nueva Ecija 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction / Rehabilitation of Flood Control Dikes, Brgy. Bacayao, Guimba, Nueva Ecija |
June 20, 2018 |
FY 2018 GAA |
WIN8C03205 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 2.520 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 22,324,400.00 (Reconstruction from Paved to Concrete)
EAO: P 455,600.00
TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 1.046 lane kilometers (Reconstruction to Concrete Pavement)
CW2: 269 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 18,237,800.00 (Reconstruction from Paved to Concrete)
CW2: P 4,086,600.00 (Construction of Drainage Structure along Road)
EAO: P 455,600.00
|
June 20, 2018 |
FY 2018 |
WIN8G02336 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100298000
Project ID: P00223248LZ
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – construction of Flood Control Structures along Downstream of Rangas Bridge both sides Sta. 0+562 – Sta. 0+690, Sta. 0+562 – Sta. 0+677.66, Sta. 1+761 – Sta. 2+034.57, Sta. 0+425 – Sta. 0+549, Sta. 0+450 – Sta. 0+544, irosin, Sorsogon
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 735.23 lm
Unit Cost: CW1 – Php 131.25 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02327 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads – Upgrading of Brgy. Road, Umbuyan Road, Perez, Bulakan, Bulacan |
June 20, 2018 |
FY 2018 |
WIN8G02328 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100333000
Project ID: P00223283LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/improvement of Kamanitohan River Flood Control Dike (Upstream of Kamanitohan Bridge), Sta. 2+372 – Sta. 3+002.20, pobalacion It-Ba, Manito, Albay
Physical Target: CW1 – Construction of Dike/ 630.20 lm
Unit Cost: CW1 – Php 153.126 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
|
June 20, 2018 |
FY 2018 GAA |
WIN8C03185 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 300 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 838 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00
|
June 20, 2018 |
FY - 2018 |
WIN8F05572 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon
CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
TO:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon
CW1: 0.3128 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
|
June 20, 2018 |
FY 2018 |
WIN8G02349 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100022000
Project ID: P00222428LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Guinobatan, Albay for critical sections of Barangays San Francisco, Travesia, Iraya, Pobalcion and Morera, Guinobatan, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 1,213.80 lm
Unit Cost: CW1 – Php 119.254 T/lm.
Estimated Cost: Php 150.00 M
(As Modified)
|
June 20, 2018 |
FY 2018 |
WIN8G02335 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Plaridel – Pulilan Div Rd, K0042+(-784) – K0042+058 |
June 20, 2018 |
FY 2018 |
WIN8G02326 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Sitio Buga, Sta. Elena, Hagonoy, Bulacan |
June 20, 2018 |
FY 2018 |
WIN8G02402 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0032+000 – K0033+000 |
June 20, 2018 |
FY 2018 |
WIN8G02393 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0051+000 – K0051+750 |
June 20, 2018 |
FY - 2018 |
WIN8F05564 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Construction of Roads,
Brgy. Gabawan, Odiongan, Romblon
CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
TO:
Construction of Roads,
Brgy, Gabawan, Odiongan, Romblon
CW1: 0.148 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
|
June 20, 2018 |
FY 2018 |
WIN8G02398 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0036+035 – K0036+093, K0036+226 – K0036+426, K0042+625 – K0043+716.6 |
June 20, 2018 |
FY - 2018 |
WIN8F05562 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program
FROM:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon
CW1: 0.704 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php
TO:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon
CW1: 0.446 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php |
June 20, 2018 |
FY 2018 GAA |
WIN8C03212 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 15,680,000.00 (Construction of Concrete Road)
EAO: P 320,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.776 lane km (Construction of Concrete Road)
CW2: 114.48 square meters (Construction of Concrete Bridge)
CW3: 3,880 square meters (ROW Acquisition)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 6,490,320.00 (Construction of Concrete Road)
CW2: P 6, 069,680.00 (Construction of Concrete Bridge)
CW3: P 3,120,000.00 (ROW Acquisition)
EAO: P 320,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03220 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1501 + 229 - K1501 + 267,
K1510 + 018 - K1510 + 041, K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704
Physical Target:
CW1: 4,950.00 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1510 + 018 - K1510 + 041,
K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704,
K1510 + 920 - K1510 + 960
Physical Target:
CW1: 6,739.30 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03225 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+293), Right Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge,(Sta. 40+231 – Sta. 40+785, Sta. 40+924 – Sta. 41+078), Right Bank, Davao City
Physical Target:
CW1: 708 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03227 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+290), Left Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge, Sta. 38+999 – Sta. 39+464, Sta. 39+992 – Sta. 40+231), Left Bank, Davao City
Physical Target:
CW1: 704 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03238 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 1.800 lane km (Road Widening)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 85,981,500.00 (Road Widening)
EAO: P 3,118,500.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 2.426 lane km (Road Widening)
ROW: 7,278 Square Meters (ROW Acquisition)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 49,591,500.00 (Road Widening)
ROW: P 36,390,000.00 (ROW Acquisition)
EAO: P 3,118,500.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03214 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,040 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00
TO: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,609 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03226 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00
TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 3.840 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00 |
June 20, 2018 |
FY 2018 GAA |
WIN8C03218 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00
TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 2.986 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00 |
June 19, 2018 |
FY - 2018 |
WIN8F05571 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Gravel Road -
Construction of barangay Punta - Barangay Limon Sur
Jct Looc - Odionga Road, Romblon
CW1: 4.072 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php
TO:
Construction of Gravel Road -
Construction of Barangay Punta - Barangay Limon Sur
Jct Looc - Odiongan Road, Romblon
CW1: 5.71 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php |
June 19, 2018 |
FY - 2018 |
WIN8F05563 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon
CW1; 1.759 lane km ( Construction of Concrete Road )
Allocation; 10,000,000php
TO:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon
CW1: 1.320 lane km ( Construction of Concrete Road )
Allocation; 10,000,000 Php |
June 19, 2018 |
FY - 2018 |
WIN8F05570 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including local Projects
FROM:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon
CW1: 5.040 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php
TO:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon
CW1: 6.12 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php |
June 19, 2018 |
FY 2018 GAA |
WIN8C03241 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 14.704 Lane Km (Construction of Gravel Road)
CW2: 763.2 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
Physical Target:
CW1: 6.251 Lane Km (Construction of Gravel Road)
CW2: 429.3 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03208 |
UACS No. 300204100068000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 300204100068000
Project ID: P00230035MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road Network of the Philippine Halal Hub-The Asian Halal Center (Zamboanga Economic Zone), Talisayan, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 8.23 lane km
Unit Cost: P 14,656,743.61/lane km
EAO: P 4,375,000.00
Allocation: P 125,000,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03201 |
UACS No. 310204100147000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100147000
Project ID: P00200300MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road, (Surabay - San Fernandino), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Gravel Road: 17.15 lane km
Unit Cost: P 16,588,921.28/lane km
ROW: 16,666.67 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 10,500,000.00
Allocation: P 300,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03244 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.884 Lane Km (Construction of Asphalt Road)
CW2: 2,926 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 145,444,800.00 (Construction of Asphalt Road)
CW2: P 96,258,750.00 (Construction of Road Slope Protection Structure)
EAO: P 8,766,450.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.140 Lane Km (Construction of Asphalt Road)
CW2: 3,867.36 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.443 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 147,033,933.69 (Construction of Asphalt Road)
CW2: P 89,578,561.93 (Construction of Road Slope Protection Structure)
CW3: P 5,091,054.38 (Construction of Gravel Road)
EAO: P 8,766,450.00
|
June 19, 2018 |
FY 2018 |
WIN8C03200 |
UACS No. 310204100045000 |
June 6, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100045000
Project ID: P00200295MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Mala - Bolong Section) including Bridge, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road:4.52 lane km
Unit Cost: P 25,012,754.78/ lane km
ROW: 9,141.16 sq.m.
Unit Cost: P 300/sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03180 |
UACS No. 310203100125000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310203100125000
Project ID: P00200780MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora- Monte Alegre - Jct. Labangan Rd
K1649+400 - K1650+281
Physical Target:
CW-1- Road Widening: 1.762 lane km
Unit Cost: P 22.247 M
EAO: 0.800 M
Allocation: P 40.0 M |
June 19, 2018 |
FY 2018 |
WIN8C03203 |
UACS No. 300104204148000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300104204148000
Project ID: P00257128MN
Local Program
Local - Buildings and Other Structures
Multipurpose/ Facilities - Local Infrastructure Program
Construction of a Multi-purpose Building (Livelihood Center), Barangay Upper Salug Daku, Mahayag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 1.980 M/ Building
EAO: P 0.020 M
Allocation: P 2.0 M |
June 19, 2018 |
FY - 2018 |
WIN8F05573 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )
CW1: 7.590 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
TO:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )
CW1: 4.25536 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php |
June 19, 2018 |
FY 2018 |
WIN8C03202 |
UACS No. 310203100126000 |
June 5, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310203100126000
Project ID: P00201351MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora - Monte Alegre - Labangan Jct Rd
K1640+400 - K1641+320
Physical Target:
CW-1- Road Widening: 1.84 lane km
Unit Cost: P 13.848M/Lane km
EAO: P 0.520 M
Allocation: P 26.0 M |
June 19, 2018 |
FY 2018 GAA |
WIN8C03239 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 2.216 Lane Km (Construction of Asphalt Road)
CW2: 4,367 sq. m. (Construction of Road Slope Protection Structure)
ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 171,075,200.00 (Construction of Asphalt Road)
CW2: P 143,664,375.00 (Construction of Road Slope Protection Structure)
ROW: 193,000,000.00
EAO: P 18,415,425.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 1.516 Lane Km (Construction of Asphalt Road)
CW2: 7,332.134 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.400 Lane Km (Construction of Gravel Road)
ROW: ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 173,410,201.12 (Construction of Asphalt Road)
CW2: P 138,012,372.97 (Construction of Road Slope Protection Structure)
CW3: P 3,317,000.91 (Construction of Gravel Road)
ROW: 193,000,000.00
EAO: P 18,415,425.00
|
June 19, 2018 |
FY 2018 GAA |
WIN8C03211 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley
Physical Target:
CW1: 3.381 Lane Km (Construction of Gravel Road)
CW2: 286 sq.m. (Construction of Concrete Bridge)
ROW: 20,408 sq.m.
Allocation:
TOTAL: P 110,000,000.00
CW1: P 83,955,000.00 (Construction of Concrete Road)
CW2: P 20,265,000.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 3,850,000.00
TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley
Physical Target:
CW1: 4.20 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 104,220,000.00 (Construction of Concrete Road)
ROW: P 1,930,000.00
EAO: P 3,850,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03123 |
UACS No. 310110100040000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310110100040000
Project ID: P00201582MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Pagadian City - Zamboanga City Road
K1866+000 - K1866+079
K1866+307 - K1866+366
K1866+497 - K1866+621
K1866+788 - K1867+336
K1867+561 - K1867+727
K1867+851 - K1868+000
K1869+800 - K1870+675
Physical Target:
CW-1- Construction of Drainage Structure along Road: 2,000.00 l.m
Unit Cost: P 6,571.80/l.m.
ROW: 395 sq.m
Unit Cost: P 1,012.66/sq.m.
EAO: P 276,400.00
Allocation: P 13,820,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03179 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 0.400 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
TO: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 1.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03120 |
UACS No. 300109200206000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200206000
Project ID: P00250069MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Kasanyangan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 300.00 l.m.
Unit Cost: P 6,600.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03191 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 160 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 489 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03215 |
UACS No. 300109200204000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200204000
Project ID: P00250055MN
Local Program
Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 170.00 l.m.
Unit Cost: P 5,882.35/ l.m.
Allocation: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03181 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 300 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 1,061 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03209 |
UACS No. 300107200219000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300107200219000
Project ID: P00250064MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program
Construction of Flood Control, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 44.00 l.m.
Unit Cost: P 22,727.27/ l.m
Allocation: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03184 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: : Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 400 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 1,150 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03195 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 130 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00
TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 236 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03124 |
UACS No. 300109200207000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200207000
Project ID: P00250070MN
Local Program
Local - Flood Control and Drainage
Drainage/Slope Protection Works - Local Infrastructure Program
Construction of Drainage System, Sangali, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 110.00 l.m.
Unit Cost: P 18,000.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03030 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 16,850,120.00 (Construction of Concrete Road)
EAO: P 343,880.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.664 lane km (Reconstruction to Concrete Pavement)
CW2: 1,640.84 sq.m. (Additional Lane Width)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 9,782,360.00 ((Reconstruction to Concrete Pavement)
CW2: P 7,067,760.00 (Additional Lane Width)
EAO: P 343,880.00 |
June 19, 2018 |
FY 2018 |
WIN8C03217 |
UACS No. 300108200063000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300108200063000
Projecct ID: P00257487MN
Local Program
Flood Control and Drainage
Drainage/ Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage Facilities at Villahermosa Housing, Luyahan, Pasonanca, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 631.55 l.m.
Unit Cost: P 7,758.68894/ l.m.
EAO: P 100,000.00
Allocation: P 5,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03046 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 0.510 lane kilometers (Construction of Concrete Road)
CW2: 3.164 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 4,272,800.00 (Construction of Concrete Road)
CW2: P 23,255,400.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 3.392 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 27,528,200.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03243 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.8063 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03122 |
UACS No. 310105100166000 |
June 4, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310105100166000
Project ID: P00200117MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1959+598.5 - K1959+639
K1962+185.5 - K1962+799
K1963+841 - K1963+935.5
K1964+266.5 - K1964+738.5
K1966+018 - K 1966+945
K1972+928 - K1973+206
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 0.810 lane km
Unit Cost: P 9,254,345.68/ lane km
EAO: P 152,980.00
Allocation: P 7,649,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03052 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 2.52 Lane Km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 22,618,400.00 (Reconstruction from Paved to Concrete)
EAO: P 461,600.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 1.09 Lane Km (Reconstruction from Paved to Concrete)
CW2: 664 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 7,759,430.00 (Reconstruction from Paved to Concrete)
CW2: P 14,858,970.00 (Construction of Drainage Structure)
EAO: P 461,600.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03240 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 7.17934 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 |
WIN8C03216 |
UACS No. 310202100001000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310202100001000
Project ID: P00200706MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Airport Road incl. ROW - (S01208MN)
Chainage 000 - Chainage 493
Physical Target:
CW-1- Road Widening: 0.5352 lane km
Unit Cost: P 31,310,756.93/ lane km
ROW: 72,300.00 sq.m.
Unit Cost: P 1,012.04471/sq.m.
EAO: P 3,261,650.00
Allocation: P 93,190,000.00 |
June 19, 2018 |
FY 2018 |
WIN8G02407 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 3rd District Engineering Office |
Local Roads and Bridges – Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of New Road including Drainage leading to Pampanga Economic Zone (PEZ), Angeles City, Pampanga |
June 19, 2018 |
FY 2018 GAA |
WIN8C03242 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.5443 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
|
June 19, 2018 |
FY 2018 GAA |
WIN8C03199 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.391 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00
TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.094 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03213 |
UACS No. 300109200205000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300109200205000
Project ID: P00250068MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Bungiao, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 520.00 l.m.
Unit Cost: P 3,807.69/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03194 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd - K1507 + 815 - K1510 + 905
Physical Target:
CW1: 6,020 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd – K1508 + 280 – K1510 + 905
Physical Target:
CW1: 5,206 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00 |
June 19, 2018 |
FY 2018 |
WIN8C03210 |
UACS No. 300106200141000 |
June 6, 2018 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300106200141000
Project ID: P00257639MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control at Sta. Maria Creek, Sta. Maria, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 187.32 l.m.
Unit Cost: P 15,695.07/l.m.
EAO: P 60,000.00
Allocation: P 3,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03134 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 185 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 350 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
June 19, 2018 |
FY 2018 GAA |
WIN8C03174 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 1.130 lane kilometers (Construction of Concrete Road)
CW2: 1,340 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 15,503,600.00 (Construction of Concrete Road)
CW2: P 9,849,000.00 lane kilometers (Construction of Drainage Structure)
EAO: P 517,400.00
TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 0.278 lane kilometers (Construction of Concrete Road)
CW2: 406 lineal meters(Construction of Drainage Structure)
CW3: 1.722 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 1,625,580.00 (Construction of Concrete Road)
CW2: P 2,322,600.00 lane kilometers (Construction of Drainage Structure)
CW3: P 21,404,420.00 (Reconstruction to Concrete Pavement)
EAO: P 517,400.00 |
June 18, 2018 |
FY - 2018 |
WIN8F05578 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Marinduque District Engineering Office |
Local Program
Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program
FROM:
Construction of Multi-Purpose Building,
Brgy. Binuga, Boac, Marinduque
CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php
TO:
Construction/Completion of Multi-Purpose Building,
Brgy. Binunga, Boac, Marinduque
CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php
|
June 18, 2018 |
FY - 2018 |
WIN8F05565 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon
CW1: 7.15 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
TO:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon
CW1: 3.80 lane km ( Construction of Gravel Road )
Allocation : 100,000,000 Php |
June 18, 2018 |
FY - 2018 |
WIN8F05568 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon
CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
TO:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon
CW1: 0.456 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php |
June 18, 2018 |
FY - 2018 |
WIN8F05567 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs: Local Infrastructure Program
Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblon
CW1: 5.303 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php
TO:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblom
CW1: 6021 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php
|
June 18, 2018 |
FY - 2018 |
WIN8F05566 |
FY - 2018 GAA DPWH Infra PRogram |
December 19, 2017 |
Region IV-B |
Romblon District Engineering Office |
Local Programs : Local Infrastructure Program
Local - national Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon
CW1: 0.190 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php
TO:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon
CW1: 0.296 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php
|
June 18, 2018 |
FY 2018 GAA |
WIN8C03171 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 994 – K1589 + 1077,
K1589 + 454 – K1591 + 160
Physical Target:
CW1: 16,780 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)
EAO: P 2,830,450.00
TO: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 935 – K1589 + 987,
K1589 + 997 – K1589 + 1065,
K1589 + 1071 – K1589 + 1225,
K1590 + 454 – K1590 + 560,
K1590 + 658 – K1590 + 798,
K1590 + 800 – K1591 + 040,
K1591 + 062 – K1591 + 164
Physical Target:
CW1: 5,093 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)
EAO: P 2,830,450.00
|