Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 21, 2018 GAA FY 2018 WIN8F05619 UACS No. 300103200093000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Mataas na Paaralang Neptali A. Gonzales Annex, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00

As Modified
UACS No. 300103200093000
Project ID: P00256004LZ
WIN8F05619
Local Program – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Building and Other Structures – Multipurpose/ Facilities –
Construction of Multi – Purpose Building including Completion of Facilities and Ground Improvement at Senator Neptali A. Gonzales Integrated School, Barangay, Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P24,500.00/bldg.
Allocation (‘000): P 24,500.00
EAO (‘000) P 500.00 M
Total (‘000) : P 25,000.00
June 21, 2018 FY 2018 GAA WIN8C03249 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Construction of Concrete Road)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 34,025,900.00 (Construction of Concrete Road)
ROW: P 62,474,100.00 (ROW Acquisition)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Missing Links/New Roads
Fatima-Malabog Road (Malabog-Gumitan), incl. ROW, Davao City
Physical Target:
CW1: 1.601 Lane Km (Reconstruction to Concrete Pavement)
ROW: 16,006.510 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 41,346,900.00 (Reconstruction to Concrete Pavement)
CW2: P 49,478,900.00 (Construction of Road Slope Protection Structure)
ROW: P5,674,200.00 (ROW Acquisition)
EAO: P 3,500,000.00
June 21, 2018 FY 2018 GAA WIN8C03250 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 54,046,755.00 (Construction of Concrete Road)
ROW: P 11,172,770.00 (ROW Acquisition)
EAO: P 2,365,475.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Jct. R. Castillo St. (Ubalde Section) incl. ROW, Davao City
Physical Target:
CW1: 0.762 Lane Km (Rehabilitation of Paved Road)
CW2: 762 Lineal meters (Construction of Drainage Structures along Road)
ROW: 1,929.667 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 67,585,000.00
CW1: P 9,377,554.00 (Construction of Concrete Road)
CW2 : P 31,430,052.00 (Construction of Drainage Structures along Road)
ROW: P 24,411,919.00 (ROW Acquisition)
EAO: P 2,365,475.00
June 21, 2018 FY 2018 GAA WIN8C03251 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office


MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program
Construction of Bypass and Diversion Roads
Bypass Road at Jct Daang Maharlika-Eliong-
Jct Acacia Road, Davao City
Physical Target:
CW1: 8.755 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,714,000.00
CW1: P 15,399,720.00 (Construction of Concrete Road)
EAO: P 314,280.00
June 21, 2018 FY 2018 GAA WIN8C03252 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1512+460 – K1513+775
Physical Target:
CW1: 2.34 lane km (Road Widening)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 19,340,300.00 (Construction of Concrete Road)
ROW: P 23,012,360.00 (ROW Acquisition)
EAO: P 864,340.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening
Davao City Diversion Road Including ROW – K1513+000 – K1515+080, K1515+911
Physical Target:
CW1: 1.263 lane km (Road Widening)
CW2: 592 lineal meters (Construction of Drainage Structure along Road)
ROW: 3,389.333 square meters (ROW Acquisition)
Allocation:
TOTAL: P 43,217,000.00
CW1: P 18,603,340.00 ( Road Widening)
CW2: P 12,926,200.00 (Construction of Drainage Structure along Road)
ROW: P 10,823,120.00 (ROW Acquisition)
EAO: P 864,340.00
June 20, 2018 FY 2018 WIN8G02360 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Secondary Roads - Arayat – Magalang – Mabalacat Rd
June 20, 2018 FY 2018 WIN8G02395 FY 2018 GAA January 4, 2018 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Secondary Roads – Repair / Rehabilitation (Asphalt Overlay) Overlay with Pavement Markings along Roman Expressway, K0102+447 – K0102+768, K0106+200 – K0106+748, K0107+739 – K0108+298, K0109+000 – K0110+710, K0111+586 – K0111+994, Hermosa, Orani, Samal and Abucay Bataan
June 20, 2018 GAA FY 2018 WIN8F05604 UACS No. 300116200318000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.754 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P13,968.07/lane km
Allocation: P 24,500.00 M
Total: P 25,000.00 M

As Modified
UACS No. 300116200318000
Project ID: P00240609LZ
WIN8F05604
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects = Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system – Balubaran Road, Brgy. Malinta (from MacArthur HW to L Prodon St. Maysam Road), Poblacion Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road 1.306 lane km
EAO (‘000) – P 500.00
Unit Cost (P’000): P18,759.57/lane km
Allocation: P 24,500.00
Total: P 25,000.00 M
June 20, 2018 GAA FY 2018 WIN8F05606 UACS No. 320101100586000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1-Construction of Flood Mitigation Structure = 1,925.00 l.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P34.373/l.m.
Allocation: P 46.060 M
Total: P 47.00 M

As Modified
UACS No. 320101100586000
Project ID: P00220653LZ
WIN8F05606
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Wall/ Riprapping along the Bank of Creeks with Dredging in Brgy. 177, Caloocan City
Physical Target: CW1- Construction of Flood Mitigation Structure = 450.00 l.m.
CW2 – Dredging/Desilting = 8,017.80 cu.m.
EAO (‘000) – P 0.94 M
Unit Cost (P’000): P89.344/l.m.
: P0.730/ cu.m.
Allocation: P 40.205 M
P 5.855 M
Total: P 47.00 M
June 20, 2018 GAA FY 2018 WIN8F05609 UACS No. 310204100054000 January 1, 2018 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=2.680 lane km
Unit Cost (P’000): P50,770.52/ lane km
Allocation: P 136,065.00
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00

As Modified
UACS No. 310204100054000
Project ID: P00200942LZ
WIN8F05609
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
C-6, Napindan – M.L. Quezon Ave., Taguig City
Physical Target: CW1-Construction of Concrete Road L=3.604 lane km
ROW: A = 200 sq.m. = 118.91/sq.m. = P23.781.15
Unit Cost (P’000): P31,153.37/ lane km
Allocation: P 112,283.95
EAO (‘000): P 4,935 M
Total (‘000): P 141,000.00

June 20, 2018 GAA FY 2018 WIN8F05605 UACS No. 310205100131000 January 1, 2018 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.160 lane km
Unit Cost (P’000): P74,926.68/ lane km
Allocation: P 311,695.00
EAO (‘000): P 11,305
Total (‘000): P 323,000.00

As Modified
UACS No. 310205100131000
Project ID: P002022779LZ
WIN8F05605
Organizational Outcome 1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Mindanao Avenue Extension Segment 2C, Phase I and Phase II, incl. ROW, Caloocan City and Valenzuela City
Physical Target: CW1-Construction of Concrete Road L=4.344 lane km
ROW – A = 20,653 sq.m
Unit Cost (P’000): P17,805.85/ lane km
P11.35/ sq.m.
Allocation: P 77,348.60
EAO (‘000): P 11,305
Total (‘000): P 323,000.00
June 20, 2018 GAA FY 2018 WIN8F05607 UACS No. 320101100147000 January 1, 2018 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+199 to Sta. 1+989), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 210 lm
EAO P 2.625 M
Unit Cost: P 344,642.86 / lm
Allocation: P 72.375 M
Total: P 75 M

As Modified
UACS No. 320101100147000
Project ID: P00222432LZ – CW1
WIN8F05607
Organizational Outcome 2: Protect Lives and Properties
Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Riverwall and Road Dike, (Sta. 2+226 to Sta. 2+048), (Phase I), Brgy. Dampalit, Malabon City
Physical Target: CW1 – Construction of Revetment: 178.0 lm
EAO P 1.50 M
Excess: 0.377 M
Unit Cost: P 411,028.09 / lm
Allocation: P 73.163 M
Total: P 75 M
June 20, 2018 FY 2018 WIN8G02364 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100016000
Project ID: P00230361LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy 2-Brgy.1 Road connecting Ligao-Pioduran Road and Pioduran-Donsol Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target: CW1 – Construction of Concrete Road/ 0.504 lane-km
CW2 - Construction of Road Slope Protection Structure/ 9,621.650 sq.m.
Unit Cost: CW1 – Php 35.09 M /lane-km
CW2 – Php 5,182.35/sq.m.
Estimated Cost: Php 70.0 M
(As Modified)

June 20, 2018 FY 2018 WIN8G02340 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300202100009000
Project ID: P00230378LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaport - Guinobatan-Jovellar-Donsol Road Leading to Pilar Port, Albay
Physical Target: CW1 – Construction of Concrete Road/ 4.76 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,610.20 lm.
Unit Cost: CW1 – Php 12.37 M /lane-km
Estimated Cost: Php 80.0 M
CW2 – Php 7,013.10/lm.
(As Modified)
June 20, 2018 FY 2018 WIN8G02333 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200122000
Project ID: P00257843LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Balud del Norte – Cota na Daco – Cogon Coastal Road and Shore Protection, Gubat Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.752 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,936.40 sq.m.
Unit Cost: CW1 – Php 34.40 M /lane-km
CW2 – Php 36,477.49/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02342 FY 2018 GAA R.A. 10964 November 29, 2017 Region V Regional Office V
UACS No.: 300116200129000
Project ID: P00257850LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Caloocan-Tabunan-Paghuliran Coastal Road with Shore Protection, Matnog, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.63822 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,350.69 sq.m.
Unit Cost: CW1 – Php 59.58 M /lane-km
CW2 – Php 43,290.93/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02401 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Regional Office V
UACS No.: 300116200132000
Project ID: P00257853LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Diamante-Perlas Coastal Road and Shore Protection, Prieto Diaz, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.772 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,9,87.90 sq.m.
Unit Cost: CW1 – Php 32.06 M /lane-km
CW2 – Php 36,093.08/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02362 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200136000
Project ID: P00257857LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Luna Candol – Balud del Sur Coastal Road and Shore Protection, Gubat, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.762 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,962.150 sq.m.
Unit Cost: CW1 – Php 32.59 M /lane-km
CW2 – Php 36,526.22/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02343 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200145000
Project ID: P00257866LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Pobalcion Norte, Central and Sur Coastal Road and Shore Protection, Barcelona, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.6702 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,476.56 sq.m.
Unit Cost: CW1 – Php 44.08 M /lane-km
CW2 – Php 43,346.79/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02341 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200152000
Project ID: P00257873LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of San Vicente-San Rafael Coastal Rd and Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.604 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,555.30 sq.m.
Unit Cost: CW1 – Php 52.55 M /lane-km
CW2 – Php 41,638.47/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02411 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300116200158000
Project ID: P00257879LZ
LOCAL PROGRAM – Local Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects – Construction of Zone 2 – Sabang – San Vicente Coastal Rd with Shore Protection, Bulan, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 0.86558 lane-km
CW2 - Construction of Road Slope Protection Structure/ 1,498.65 sq.m.
Unit Cost: CW1 – Php 39.08 M /lane-km
CW2 – Php 41,817.60/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02351 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310108100015000
Project ID: P00200842LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Catanduanes Cir Rd - K0155+000 - k0156+020
Physical Target: CW1 - Construction of Road Slope Protection Structure/ 7,603.20 sq.m.
Unit Cost: CW1 – Php 19,195.54/sq.m.
Estimated Cost: Php 151.241 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03206 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 299 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 12,350 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1484 + (-844) - K1484 + 068,
K1484 + 722 - K1485 + 825, K1493 + 316 - K1493 + 825,
K1495 + 000 - K1495 + 151, K1495 + 229 - K1495 + 384,
K1496 + 765 - K1497 + 190, K1498 + 000 - K1498 + 068,
K1499 + 370 - K1500 + 040
Physical Target:
CW1: 13,560.34 square meters (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 20,620,000.00
CW1: P 20,207,600.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 412,400.00
June 20, 2018 FY 2018 WIN8G02324 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310101100018000
Project ID: P00202666LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Preventive Maintenance – Primary Roads – Daang Maharlika (LZ) – K0576+1000 – K0578+000, K0578+250 – K0578+480, K0579+000 – K0579+705, K0580+930 – K0581+300, K0581+780 – K0581+845, K0581+845 – K0582+000, K0591+200 – K0591+817, K0591+817 – K0593+447, K0593+581 – K0593+656, K0593+656 – K0593+922, K0595+470 – K0595+810, K0595+947 – K0596+095, K0598+073 – K0598+276, K0599+386 – K0599+751
Physical Target: CW1 -Preventive Maintenance of Road: Asphalt Overlay/ 21.295 lane-km
Unit Cost: CW1 – Php 7.84 M /lane-km
Estimated Cost: Php 173.0 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02331 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310204100117000
Project ID: P00201073LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads – Gubat bypass Road, incl. ROW, Sorsogon
Physical Target: CW1 – Construction of Concrete Road/ 3.965 lane-km
Right-of-Way Acquisition (ROW)/ 38,032.40 sq.m.
Unit Cost: CW1 – Php 18.25 M /lane-km
ROW Acquisition – Php 634.33/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)

June 20, 2018 FY 2018 WIN8G02350 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02350 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310202100067000
Project ID: P00201386LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Secondary Roads – Iriga City-Sn Isidro-Sagrada-Sn Ramon-Hanawan Rd – K0471+840 – K0472+1008, K0474+000 – K0475+000, K0489+135.55 – K0489+455
Physical Target: CW1 - Road Widening/ 4.9809 lane-km
Unit Cost: CW1 – Php 14.95092 M /lane-km
Estimated Cost: Php 77.170 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03178 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,379 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/Upgrading/Rehabiliation of Drainage along National Roads
Magsaysay Ave - K1510 + (-499) - K1510 + 680
Physical Target:
CW1: 1,509 lineal meters (Rehabilitation/Major Repair of Drainage Structure along Road)
Allocation:
TOTAL: P 32,390,000.00
CW1: P 31,742,200.00 (Rehabilitation/Major Repair of Drainage Structure along Road)
EAO: P 647,800.00
June 20, 2018 FY 2018 WIN8G02361 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Network Development Program – Road Widening – Primary Roads – Daang Maharlika (LZ) K0129+378.65 – K0129+419.50, K0129+738.50 – K0130+000, K0131+926 – K0132+000, K0132+914 – K0133+000, K0134+169 – K0134+180, K0143+584 – K0145+790
June 20, 2018 FY 2018 WIN8G02293 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program – Local Roads and Bridges - Local Roads – Construction of Road, Brgy. Saverona - Brgy. Villa Rosenda, Talugtug, Nueva Ecija
June 20, 2018 FY 2018 WIN8G02307 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Local Program – Local Roads and Bridges - Local Roads –Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Project - Rehabilitation of Science City of Muñoz – Talugtug Road, Science City of Muñoz and Talugtug, Nueva Ecija
June 20, 2018 FY 2018 WIN8G02310 FY 2018 GAA January 4, 2018 Region III Nueva Ecija 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Construction / Rehabilitation of Flood Control Dikes, Brgy. Bacayao, Guimba, Nueva Ecija
June 20, 2018 FY 2018 GAA WIN8C03205 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 2.520 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 22,324,400.00 (Reconstruction from Paved to Concrete)
EAO: P 455,600.00

TO: Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Declared Tourism Destinations
Ponciano St.-Bangoy St.-Jacinto Extension St. leading to Marco Polo Hotel-Aldevinco Shopping Center-Madrazo Fruit Stands-Central Bank, Brgy. 34D, Davao city
Physical Target:
CW1: 1.046 lane kilometers (Reconstruction to Concrete Pavement)
CW2: 269 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 22,780,000.00
CW1: P 18,237,800.00 (Reconstruction from Paved to Concrete)
CW2: P 4,086,600.00 (Construction of Drainage Structure along Road)
EAO: P 455,600.00
June 20, 2018 FY 2018 WIN8G02336 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100298000
Project ID: P00223248LZ
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – construction of Flood Control Structures along Downstream of Rangas Bridge both sides Sta. 0+562 – Sta. 0+690, Sta. 0+562 – Sta. 0+677.66, Sta. 1+761 – Sta. 2+034.57, Sta. 0+425 – Sta. 0+549, Sta. 0+450 – Sta. 0+544, irosin, Sorsogon
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 735.23 lm
Unit Cost: CW1 – Php 131.25 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02327 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads – Upgrading of Brgy. Road, Umbuyan Road, Perez, Bulakan, Bulacan
June 20, 2018 FY 2018 WIN8G02328 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100333000
Project ID: P00223283LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program –
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/improvement of Kamanitohan River Flood Control Dike (Upstream of Kamanitohan Bridge), Sta. 2+372 – Sta. 3+002.20, pobalacion It-Ba, Manito, Albay
Physical Target: CW1 – Construction of Dike/ 630.20 lm
Unit Cost: CW1 – Php 153.126 T/lm.
Estimated Cost: Php 100.00 M
(As Modified)
June 20, 2018 FY 2018 GAA WIN8C03185 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 300 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation/Improvement of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 838 lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 50,000.00
June 20, 2018 FY - 2018 WIN8F05572 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program

FROM:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Roads,
Brgy. Tubigon Proper, Ferrol, Romblon

CW1: 0.3128 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
June 20, 2018 FY 2018 WIN8G02349 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100022000
Project ID: P00222428LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction and Improvement of Flood Control Dikes in Guinobatan, Albay for critical sections of Barangays San Francisco, Travesia, Iraya, Pobalcion and Morera, Guinobatan, Albay
Physical Target: CW1 – Construction of Flood Mitigation Structure/ 1,213.80 lm
Unit Cost: CW1 – Php 119.254 T/lm.
Estimated Cost: Php 150.00 M
(As Modified)
June 20, 2018 FY 2018 WIN8G02335 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Plaridel – Pulilan Div Rd, K0042+(-784) – K0042+058
June 20, 2018 FY 2018 WIN8G02326 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Construction of Road, Sitio Buga, Sta. Elena, Hagonoy, Bulacan
June 20, 2018 FY 2018 WIN8G02402 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0032+000 – K0033+000
June 20, 2018 FY 2018 WIN8G02393 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0051+000 – K0051+750
June 20, 2018 FY - 2018 WIN8F05564 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program

FROM:
Construction of Roads,
Brgy. Gabawan, Odiongan, Romblon

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Roads,
Brgy, Gabawan, Odiongan, Romblon

CW1: 0.148 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

June 20, 2018 FY 2018 WIN8G02398 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Bigaa – Plaridel via Bulacan & Malolos Rd, K0036+035 – K0036+093, K0036+226 – K0036+426, K0042+625 – K0043+716.6
June 20, 2018 FY - 2018 WIN8F05562 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
- Local Infrastructure Program

FROM:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon

CW1: 0.704 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php

TO:
Construction of Road at Sitio Timbaon, Brgy. Tulay,
Odiongan, Romblon

CW1: 0.446 lane km ( Construction of Concrete Road )
Allocation: 4,000,000 Php
June 20, 2018 FY 2018 GAA WIN8C03212 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 15,680,000.00 (Construction of Concrete Road)
EAO: P 320,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Alternate Road from Region XI to Region X (Jct Davao City Diversion Road-Catalunan Grande-Talandag-Sumimao-Panalum-Tapak-Cabanglasan-Aglayan, Malaybalay), Davao City
Physical Target:
CW1: 0.776 lane km (Construction of Concrete Road)
CW2: 114.48 square meters (Construction of Concrete Bridge)
CW3: 3,880 square meters (ROW Acquisition)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 6,490,320.00 (Construction of Concrete Road)
CW2: P 6, 069,680.00 (Construction of Concrete Bridge)
CW3: P 3,120,000.00 (ROW Acquisition)
EAO: P 320,000.00
June 20, 2018 FY 2018 GAA WIN8C03220 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1501 + 229 - K1501 + 267,
K1510 + 018 - K1510 + 041, K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704
Physical Target:
CW1: 4,950.00 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1510 + 018 - K1510 + 041,
K1510 + 081 - K1510 + 115, K1510 + 669 - K1510 + 704,
K1510 + 920 - K1510 + 960
Physical Target:
CW1: 6,739.30 Square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
June 20, 2018 FY 2018 GAA WIN8C03225 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+293), Right Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge,(Sta. 40+231 – Sta. 40+785, Sta. 40+924 – Sta. 41+078), Right Bank, Davao City
Physical Target:
CW1: 708 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
June 20, 2018 FY 2018 GAA WIN8C03227 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge (Sta. 38+798 - Sta. 39+290), Left Bank, Davao City
Physical Target:
CW1: 496 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2 : Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Lasang River, Pañalum Section, Protecting Pañalum Bridge, Sta. 38+999 – Sta. 39+464, Sta. 39+992 – Sta. 40+231), Left Bank, Davao City
Physical Target:
CW1: 704 Lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
June 20, 2018 FY 2018 GAA WIN8C03238 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 1.800 lane km (Road Widening)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 85,981,500.00 (Road Widening)
EAO: P 3,118,500.00

TO: OO1 : Ensure Safe and Reliable National Road System
Network Development Program - Road Widening -
Secondary Roads
Construction of Jct. Davao-Cotabato Old Road (Bago Gallera Section), leading to Philippine Coconut Authority (PCA), Davao City
Physical Target:
CW1: 2.426 lane km (Road Widening)
ROW: 7,278 Square Meters (ROW Acquisition)
Allocation:
TOTAL: P 89,100,000.00
CW1: P 49,591,500.00 (Road Widening)
ROW: P 36,390,000.00 (ROW Acquisition)
EAO: P 3,118,500.00
June 20, 2018 FY 2018 GAA WIN8C03214 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,040 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00

TO: Local Program
Flood Control and Drainage
Drainage/Protection Works - Construction/Repair/ Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Rehabilitation of Drainage along
ABS-CBN Quimpo Blvd. Diversion Road (Jct. Tulip Drive-Jct. Ecoland Terminal), Davao City
Physical Target:
CW1: 2,609 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 61,200,000.00
CW1: P 59,058,000.00 (Construction of Drainage Structure)
EAO: P 2,142,000.00
June 20, 2018 FY 2018 GAA WIN8C03226 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00

TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Dumoy, Davao City
Physical Target:
CW1: 3.840 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,850,000.00 (Construction of Concrete Road)
EAO: P 150,000.00
June 20, 2018 FY 2018 GAA WIN8C03218 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00

TO: Local Program
Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 2.986 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 11,000,000.00
CW1: P 10,890,000.00 (Construction of Concrete Road)
EAO: P 110,000.00
June 19, 2018 FY - 2018 WIN8F05571 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Gravel Road -
Construction of barangay Punta - Barangay Limon Sur
Jct Looc - Odionga Road, Romblon

CW1: 4.072 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php

TO:
Construction of Gravel Road -
Construction of Barangay Punta - Barangay Limon Sur
Jct Looc - Odiongan Road, Romblon

CW1: 5.71 lane km ( Construction of Gravel Road )
Allocation: 80,000,000 Php
June 19, 2018 FY - 2018 WIN8F05563 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon

CW1; 1.759 lane km ( Construction of Concrete Road )
Allocation; 10,000,000php

TO:
Construction of Roads -
Brgy. Tanagan and Brgy. Victoria,
San Andres, Romblon

CW1: 1.320 lane km ( Construction of Concrete Road )
Allocation; 10,000,000 Php
June 19, 2018 FY - 2018 WIN8F05570 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including local Projects

FROM:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon

CW1: 5.040 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php

TO:
Construction of Gravel Road - Construction of Road,
Sitio Bariri, Hinag-oman, Ferrol, Romblon

CW1: 6.12 lane km ( Construction of Gravel Road )
Allocation: 85,500,000 Php
June 19, 2018 FY 2018 GAA WIN8C03241 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
CW1: 14.704 Lane Km (Construction of Gravel Road)
CW2: 763.2 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Alternate Road from Region XI to Region X (Jct. Davao City Diversion Road – Catalunan Grande – Talandag – Sumimao – Panalum – Tapak – Cabangsalan – Aglayan, Malaybalay), Package B, incl. ROW and Bridge, Davao City
Physical Target:
Physical Target:
CW1: 6.251 Lane Km (Construction of Gravel Road)
CW2: 429.3 sq. m. (Construction of Concrete Bridge)
ROW: 28,046.512 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 157,179,200.00 (Construction of Gravel Road)
CW2: P 109,045,000.00 (Construction of Concrete Bridge)
ROW: P 23,275,800.00
EAO: P 10,500,000.00
June 19, 2018 FY 2018 WIN8C03208 UACS No. 300204100068000 June 6, 2018 Region IX Regional Office IX
UACS No. 300204100068000
Project ID: P00230035MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Road Network of the Philippine Halal Hub-The Asian Halal Center (Zamboanga Economic Zone), Talisayan, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 8.23 lane km
Unit Cost: P 14,656,743.61/lane km
EAO: P 4,375,000.00
Allocation: P 125,000,000.00
June 19, 2018 FY 2018 WIN8C03201 UACS No. 310204100147000 June 6, 2018 Region IX Regional Office IX
UACS No. 310204100147000
Project ID: P00200300MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road, (Surabay - San Fernandino), Zamboanga Sibugay
Physical Target:
CW-1- Construction of Gravel Road: 17.15 lane km
Unit Cost: P 16,588,921.28/lane km
ROW: 16,666.67 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 10,500,000.00
Allocation: P 300,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03244 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.884 Lane Km (Construction of Asphalt Road)
CW2: 2,926 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 145,444,800.00 (Construction of Asphalt Road)
CW2: P 96,258,750.00 (Construction of Road Slope Protection Structure)
EAO: P 8,766,450.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 2, Davao City
Physical Target:
CW1: 1.140 Lane Km (Construction of Asphalt Road)
CW2: 3,867.36 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.443 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 250,470,000.00
CW1: P 147,033,933.69 (Construction of Asphalt Road)
CW2: P 89,578,561.93 (Construction of Road Slope Protection Structure)
CW3: P 5,091,054.38 (Construction of Gravel Road)
EAO: P 8,766,450.00
June 19, 2018 FY 2018 WIN8C03200 UACS No. 310204100045000 June 6, 2018 Region IX Regional Office IX
UACS No. 310204100045000
Project ID: P00200295MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong Coastal Bypass Road, (Mala - Bolong Section) including Bridge, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road:4.52 lane km
Unit Cost: P 25,012,754.78/ lane km
ROW: 9,141.16 sq.m.
Unit Cost: P 300/sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00
June 19, 2018 FY 2018 WIN8C03180 UACS No. 310203100125000 June 5, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100125000
Project ID: P00200780MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora- Monte Alegre - Jct. Labangan Rd
K1649+400 - K1650+281
Physical Target:
CW-1- Road Widening: 1.762 lane km
Unit Cost: P 22.247 M
EAO: 0.800 M
Allocation: P 40.0 M
June 19, 2018 FY 2018 WIN8C03203 UACS No. 300104204148000 June 5, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300104204148000
Project ID: P00257128MN
Local Program
Local - Buildings and Other Structures
Multipurpose/ Facilities - Local Infrastructure Program
Construction of a Multi-purpose Building (Livelihood Center), Barangay Upper Salug Daku, Mahayag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 1.980 M/ Building
EAO: P 0.020 M
Allocation: P 2.0 M
June 19, 2018 FY - 2018 WIN8F05573 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )

CW1: 7.590 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php

TO:
Construction of Guinhayaan, Looc - Danao Norte -
Sta. Fe National Road leading to Malbog Port, Looc,
Romblon ( Phase 2 )

CW1: 4.25536 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php
June 19, 2018 FY 2018 WIN8C03202 UACS No. 310203100126000 June 5, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310203100126000
Project ID: P00201351MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Tertiary Roads
Jct. Aurora - Monte Alegre - Labangan Jct Rd
K1640+400 - K1641+320
Physical Target:
CW-1- Road Widening: 1.84 lane km
Unit Cost: P 13.848M/Lane km
EAO: P 0.520 M
Allocation: P 26.0 M
June 19, 2018 FY 2018 GAA WIN8C03239 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 2.216 Lane Km (Construction of Asphalt Road)
CW2: 4,367 sq. m. (Construction of Road Slope Protection Structure)
ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 171,075,200.00 (Construction of Asphalt Road)
CW2: P 143,664,375.00 (Construction of Road Slope Protection Structure)
ROW: 193,000,000.00
EAO: P 18,415,425.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue-Sta. Ana Wharf-R. Castillo (Bago Aplaya-Times Beach), Package 6, incl. ROW, Davao City
Physical Target:
CW1: 1.516 Lane Km (Construction of Asphalt Road)
CW2: 7,332.134 sq. m. (Construction of Road Slope Protection Structure)
CW3: 0.400 Lane Km (Construction of Gravel Road)
ROW: ROW: 20,000 sq.m.
Allocation:
TOTAL: P 526,155,000.00
CW1: P 173,410,201.12 (Construction of Asphalt Road)
CW2: P 138,012,372.97 (Construction of Road Slope Protection Structure)
CW3: P 3,317,000.91 (Construction of Gravel Road)
ROW: 193,000,000.00
EAO: P 18,415,425.00
June 19, 2018 FY 2018 GAA WIN8C03211 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley

Physical Target:
CW1: 3.381 Lane Km (Construction of Gravel Road)
CW2: 286 sq.m. (Construction of Concrete Bridge)
ROW: 20,408 sq.m.
Allocation:
TOTAL: P 110,000,000.00
CW1: P 83,955,000.00 (Construction of Concrete Road)
CW2: P 20,265,000.00 (Construction of Concrete Bridge)
ROW: P 1,930,000.00
EAO: P 3,850,000.00

TO: Local Program
Local – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Brgy. Mahayahay, Maragusan – Brgy. Singapore – Brgy. Anitapan – Brgy. Mascareg – Brgy. Cabuyuan, incl. ROW, Mabini Compostela Valley

Physical Target:
CW1: 4.20 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 110,000,000.00
CW1: P 104,220,000.00 (Construction of Concrete Road)
ROW: P 1,930,000.00
EAO: P 3,850,000.00
June 19, 2018 FY 2018 WIN8C03123 UACS No. 310110100040000 June 4, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310110100040000
Project ID: P00201582MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Pagadian City - Zamboanga City Road
K1866+000 - K1866+079
K1866+307 - K1866+366
K1866+497 - K1866+621
K1866+788 - K1867+336
K1867+561 - K1867+727
K1867+851 - K1868+000
K1869+800 - K1870+675
Physical Target:
CW-1- Construction of Drainage Structure along Road: 2,000.00 l.m
Unit Cost: P 6,571.80/l.m.
ROW: 395 sq.m
Unit Cost: P 1,012.66/sq.m.
EAO: P 276,400.00
Allocation: P 13,820,000.00
June 19, 2018 FY 2018 GAA WIN8C03179 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 0.400 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00

TO: Local Program
Local - National Local Roads and Bridges - Local Roads – Local Infrastructure Program
Construction of Road, Brgy. 9-A, Davao City
Physical Target:
CW1: 1.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
June 19, 2018 FY 2018 WIN8C03120 UACS No. 300109200206000 June 4, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200206000
Project ID: P00250069MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Kasanyangan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 300.00 l.m.
Unit Cost: P 6,600.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03191 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 160 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. 8-A, Davao City
Physical Target:
CW1: 489 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
June 19, 2018 FY 2018 WIN8C03215 UACS No. 300109200204000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200204000
Project ID: P00250055MN
Local Program
Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 170.00 l.m.
Unit Cost: P 5,882.35/ l.m.
Allocation: P 1,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03181 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 300 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage / Protection Works – Local Infrastructure Program
Construction of Drainage System, Brgy. Baliok, Davao City
Physical Target:
CW1: 1,061 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,994,000.00 (Construction of Drainage Structure)
EAO: P 60,000.00
June 19, 2018 FY 2018 WIN8C03209 UACS No. 300107200219000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300107200219000
Project ID: P00250064MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities - Local Infrastructure Program
Construction of Flood Control, Brgy. Boalan, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 44.00 l.m.
Unit Cost: P 22,727.27/ l.m
Allocation: P 1,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03184 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: : Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 400 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Bucana 76-A, Davao City
Physical Target:
CW1: 1,150 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 8,000,000.00
CW1: P 7,920,000.00 (Construction of Drainage Structure)
EAO: P 80,000.00
June 19, 2018 FY 2018 GAA WIN8C03195 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 130 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00

TO: Local Program
Local - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System, Brgy. Maa, Davao City
Physical Target:
CW1: 236 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Drainage Structure)
EAO: P 20,000.00
June 19, 2018 FY 2018 WIN8C03124 UACS No. 300109200207000 June 4, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200207000
Project ID: P00250070MN
Local Program
Local - Flood Control and Drainage
Drainage/Slope Protection Works - Local Infrastructure Program
Construction of Drainage System, Sangali, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 110.00 l.m.
Unit Cost: P 18,000.00/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03030 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.860 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 16,850,120.00 (Construction of Concrete Road)
EAO: P 343,880.00

TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Slaughter House Road until F. Torres Bridge, Package 4, Davao City
Physical Target:
CW1: 0.664 lane km (Reconstruction to Concrete Pavement)
CW2: 1,640.84 sq.m. (Additional Lane Width)
Allocation:
TOTAL: P 17,194,000.00
CW1: P 9,782,360.00 ((Reconstruction to Concrete Pavement)
CW2: P 7,067,760.00 (Additional Lane Width)
EAO: P 343,880.00
June 19, 2018 FY 2018 WIN8C03217 UACS No. 300108200063000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300108200063000
Projecct ID: P00257487MN
Local Program
Flood Control and Drainage
Drainage/ Protection Works - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage Facilities at Villahermosa Housing, Luyahan, Pasonanca, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 631.55 l.m.
Unit Cost: P 7,758.68894/ l.m.
EAO: P 100,000.00
Allocation: P 5,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03046 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 0.510 lane kilometers (Construction of Concrete Road)
CW2: 3.164 lane kilometers (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 4,272,800.00 (Construction of Concrete Road)
CW2: P 23,255,400.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Jct. Davao City Diversion Road-Matina Pangi Road leading to Jaca (Mountain) Resort and DECA Wakeboard Park, Brgy. Matina Pangi, Davao City
Physical Targets:
CW1: 3.392 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 28,090,000.00
CW1: P 27,528,200.00 (Reconstruction from Paved to Concrete)
EAO: P 561,800.00
June 19, 2018 FY 2018 GAA WIN8C03243 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 3, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.8063 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00

June 19, 2018 FY 2018 WIN8C03122 UACS No. 310105100166000 June 4, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310105100166000
Project ID: P00200117MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1959+598.5 - K1959+639
K1962+185.5 - K1962+799
K1963+841 - K1963+935.5
K1964+266.5 - K1964+738.5
K1966+018 - K 1966+945
K1972+928 - K1973+206
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 0.810 lane km
Unit Cost: P 9,254,345.68/ lane km
EAO: P 152,980.00
Allocation: P 7,649,000.00
June 19, 2018 FY 2018 GAA WIN8C03052 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 2.52 Lane Km (Reconstruction from Paved to Concrete)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 22,618,400.00 (Reconstruction from Paved to Concrete)
EAO: P 461,600.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Roxas Avenue - Padre Gomez St. - Palma Gil St. - Camus St. - Legaspi St. leading to People's Park, Davao City
Physical Targets:
CW1: 1.09 Lane Km (Reconstruction from Paved to Concrete)
CW2: 664 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 23,080,000.00
CW1: P 7,759,430.00 (Reconstruction from Paved to Concrete)
CW2: P 14,858,970.00 (Construction of Drainage Structure)
EAO: P 461,600.00
June 19, 2018 FY 2018 GAA WIN8C03240 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 2, incl. ROW, Davao del Norte
Physical Target:
CW1: 7.17934 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
June 19, 2018 FY 2018 WIN8C03216 UACS No. 310202100001000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310202100001000
Project ID: P00200706MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Airport Road incl. ROW - (S01208MN)
Chainage 000 - Chainage 493
Physical Target:
CW-1- Road Widening: 0.5352 lane km
Unit Cost: P 31,310,756.93/ lane km
ROW: 72,300.00 sq.m.
Unit Cost: P 1,012.04471/sq.m.
EAO: P 3,261,650.00
Allocation: P 93,190,000.00
June 19, 2018 FY 2018 WIN8G02407 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Local Roads and Bridges – Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Construction of New Road including Drainage leading to Pampanga Economic Zone (PEZ), Angeles City, Pampanga
June 19, 2018 FY 2018 GAA WIN8C03242 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 12.912 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Construction of Bypass and Diversion Roads
Bukidnon – Compostela Valley Road (Brgy. Namnam, San Fernando, Bukidnon – Laak COmpostela Valley), Package 4, incl. ROW, Davao del Norte
Physical Target:
CW1: 6.5443 Lane Km (Construction of Concrete Road)
ROW: 96,840 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 280,351,800.00 (Construction of Concrete Road)
ROW: 9,148,000.00
EAO: P 10,500,000.00
June 19, 2018 FY 2018 GAA WIN8C03199 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.391 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00

TO: OO1 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) incl. ROW -
K1484 + (-979) - K1484 + (-844),
K1485 + 573 - K1485 + 870,
K1486 + 863 - K1487 + 109,
K1487 + 708 - K1488 + 500
Physical Target:
CW1: 2.094 Lane Km (Road Widening)
CW2: 523.338 Square meters (ROW Acquisition)
Allocation:
TOTAL: P 56,400,000.00
CW1: P 44,652,480.00 (Road Widening)
CW2: P 9,773,520.00 (ROW Acquisition)
EAO: P 1,974,000.00
June 19, 2018 FY 2018 WIN8C03213 UACS No. 300109200205000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300109200205000
Project ID: P00250068MN
Local Program
Local - Flood Control and Drainage
Drainage/ Protection Works - Local Infrastructure Program
Construction of Drainage System, Bungiao, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 520.00 l.m.
Unit Cost: P 3,807.69/ l.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03194 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd - K1507 + 815 - K1510 + 905
Physical Target:
CW1: 6,020 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation
Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd – K1508 + 280 – K1510 + 905
Physical Target:
CW1: 5,206 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Drainage Structure along Road)
Allocation:
EAO: P 2,100,000.00
June 19, 2018 FY 2018 WIN8C03210 UACS No. 300106200141000 June 6, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300106200141000
Project ID: P00257639MN
Local Program
Flood Control and Drainage - Flood Control Structures/ Facilities
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Control at Sta. Maria Creek, Sta. Maria, Zamboanga City
Physical Target:
CW-1- Construction of Drainage Structure: 187.32 l.m.
Unit Cost: P 15,695.07/l.m.
EAO: P 60,000.00
Allocation: P 3,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03134 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 185 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment along Lasang River, Lasang Section, Davao City
Physical Target:
CW1: 350 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
June 19, 2018 FY 2018 GAA WIN8C03174 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao City District Engineering Office

MODIFICATION:

FROM: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 1.130 lane kilometers (Construction of Concrete Road)
CW2: 1,340 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 15,503,600.00 (Construction of Concrete Road)
CW2: P 9,849,000.00 lane kilometers (Construction of Drainage Structure)
EAO: P 517,400.00

TO: Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Mabini Extension Road leading to Davao Crocodile Park, Davao City
Physical Targets:
CW1: 0.278 lane kilometers (Construction of Concrete Road)
CW2: 406 lineal meters(Construction of Drainage Structure)
CW3: 1.722 lane kilometers (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,870,000.00
CW1: P 1,625,580.00 (Construction of Concrete Road)
CW2: P 2,322,600.00 lane kilometers (Construction of Drainage Structure)
CW3: P 21,404,420.00 (Reconstruction to Concrete Pavement)
EAO: P 517,400.00
June 18, 2018 FY - 2018 WIN8F05578 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Buildings and Other Structures - Multipurpose/Facilities
- Local Infrastructure Program

FROM:
Construction of Multi-Purpose Building,
Brgy. Binuga, Boac, Marinduque

CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php

TO:
Construction/Completion of Multi-Purpose Building,
Brgy. Binunga, Boac, Marinduque

CW1: 1 Bldg. ( Construction of Multi-Purpose Building )
Allocation: 5,000,000 Php
June 18, 2018 FY - 2018 WIN8F05565 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon

CW1: 7.15 lane km ( Construction of Gravel Road )
Allocation: 100,000,000 Php

TO:
Construction of Tumingad - Canlumay - Patoo Road
leading to Romblon Airport, Phase 2, Odiongan, Romblon

CW1: 3.80 lane km ( Construction of Gravel Road )
Allocation : 100,000,000 Php
June 18, 2018 FY - 2018 WIN8F05568 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Construction of Roads, Brgy. Bangon,
Odiongan, Romblon

CW1: 0.456 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
June 18, 2018 FY - 2018 WIN8F05567 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs: Local Infrastructure Program

Local - National Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblon

CW1: 5.303 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php

TO:
Construction of Gravel Road -
Construction of Claro M. Recto Road and
Odiongan - Tugdan Road leading to Romblon Airport,
Recto, Ferrol, Romblom

CW1: 6021 lane km ( Construction of Gravel Road )
Allocation: 87,000,000 Php
June 18, 2018 FY - 2018 WIN8F05566 FY - 2018 GAA DPWH Infra PRogram December 19, 2017 Region IV-B Romblon District Engineering Office
Local Programs : Local Infrastructure Program

Local - national Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon

CW1: 0.190 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php

TO:
Rehabilitation of Concrete Road -
Improvement/Rehabilitation of Road, Barangay Mabini,
Corcuera, Romblon

CW1: 0.296 lane km ( Rehabilitation of Concrete Road )
Allocation: 2,500,000 Php

June 18, 2018 FY 2018 GAA WIN8C03171 FY 2018 GAA RA 10964 January 1, 2018 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 994 – K1589 + 1077,
K1589 + 454 – K1591 + 160

Physical Target:
CW1: 16,780 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)
EAO: P 2,830,450.00

TO: OO1: Ensure Safe Reliable National Road System – Asset Preservation
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Digos-Makar Rd-
K1589 + 935 – K1589 + 987,
K1589 + 997 – K1589 + 1065,
K1589 + 1071 – K1589 + 1225,
K1590 + 454 – K1590 + 560,
K1590 + 658 – K1590 + 798,
K1590 + 800 – K1591 + 040,
K1591 + 062 – K1591 + 164
Physical Target:
CW1: 5,093 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 80,870,000.00
CW1: P 78,039,550.00 (Construction of Road Slope Protection Structure)