Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 17, 2020 FY 2020 GAA WIN0F06213 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202924000
Project ID : P00446982LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
Langongan - Roxas Road Section,
K0105+568 - K0105+643,
K0125+035 - K0125+05,
Palawan
Physical target: CW1 - Construction of Road Slope
Protection Structure:
1,523.00 sq.m.
Allocation: Php 30.00 million

TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section,
K0105+500.00 - K0105+560.00,
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure:
1,282.93 sq.m.
Allocation: Php 30.00 Million
July 17, 2020 2020 WIN0C03955 GAA 2020 July 7, 2020 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Road (S00561LZ) K0495+455 – K0495+675;
Physical Target: CW1 : 5,700 Square meters;
Allocation= Php 100,000,000

To: Kalinga-Abra Road (S00561LZ) K0495+455 – K0495+675;
Physical Target: CW1 : 5,176.50 Square meters; Allocation= Php 100,000,000


July 17, 2020 2020 WIN0G02924 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 310204100913000
Project ID: P00401080MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

FROM:

Lanuza- Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur

Type of Work: CW1 - Construction of Gravel Road

Physical Target: 6.857 lane km

Unit Cost: P16.887852M

Allocation: P115.800M

EAO: P4.200M

TOTAL: P120.0M

TO:

Lanuza- Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur

Type of Work: CW1 - Construction of Gravel Road

Physical Target: 2.00 lane km

Unit Cost: P57.90M

ESTIMATED COST: P115.800M

EAO: P4.200M

TOTAL: P120.0M
July 17, 2020 2020 WIN0G02882 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. 300117207555000
Project ID: P00444309MN

LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Road Widening, Daang Maharlika (Agusan-Davao Section) Canayugan Section, Bayugan City, Agusan del Sur

Type of Work: CW1 - Road Widening

Physical Target: -

Unit Cost: -

Allocation: P19.800M

EAO: P200.0T

TOTAL: P20.0M

TO:

Road Widening, Daang Maharlika (Agusan-Davao Section) Canayugan -Mabuhay Section, Bayugan City, Agusan del Sur

Type of Work: CW1 - Road Widening

Physical Target: 1.156 lane km

Unit Cost: P17.128028M

Allocation: P19.800M

EAO: P200.0T

TOTAL: P20.0M
July 17, 2020 FY 2020 GAA WIN0F06208 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300112200131000
Project ID : P00449290LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Local infrastructure Program

FROM:
Construction of Roads with Slip/Slope Collapse along
Calapan North Road,
Calapan, Oriental Mindoro
K0042+000 - K0042+500
Physical Target: CW1 - Construction of Slope Protection
Structure : 7,417.34 sq.m.
Allocation: Php 144.500 Million

TO:
Construction of Roads with Slip/Slope Collapse along
Calapan North Road,
Calapan, Oriental Mindoro
K0042+000.00 - K0042+080.00,
K0042+140.00 - K0042+240.00,
K0042+360.00 - K0042+424.85
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 6,684.90 sq.m.
Allocation: Php 144.500 Million
July 17, 2020 FY 2020 GAA WIN0F06207 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202187000
Project ID: P00446498LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects

FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package C,
15+0-00 - 20+000, Palawan
Physical Target: CW1 - Construction of Concrete Road
0 Lane Km
Allocation : Php 55.00 Million

TO:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package C,
Sta. 261+740.00 - Sta. 261+790.10,
Sta. 261+820.50 - Sta. 263+461.60,
Sta. 261+790.10 - Sta. 261+820.50,
Palawan
Physical Target: CW1 - Construction of Gravel Road
3.3824 Lane Km
CW2 - Construction of Concrete Bridge
290.016 sq.m.
Allocation: Php 55.00 Million
July 17, 2020 2020 WIN0G02933 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. 300104218747000
Project ID: P00440297MN

Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities

FROM:

Construction of (Completion) of Multipurpose Building, Brgy. San Vicente, San Francisco, Agusan del Sur

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: P4,950,000/No. of Building

Allocation: P4,950,000

EAO: P50,000

TOTAL: P5,000,000

TO:

Construction of (Completion) of Multipurpose Building, Brgy. San Vicente, Loreto, Agusan del Sur

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: P4,950,000/No. of Building

Allocation: P4,950,000

EAO: P50,000

TOTAL: P5,000,000
July 16, 2020 FY 2020 GAA WIN0F06142 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No.: 300117206542000
Project ID: P00447558LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads

FROM:
Construction of Iba Road including Bridge,
Brgy. Pitogo, Rizal, Occidental Mindoro
Sta. 1+600
Physical Target: CW1 - Construction of Concrete Road
3.169 Lane KM
CW2 - Construction of Bailey Bridge
85.80 sq.m.
Allocation: Php 47.00 Million

TO:
Construction of Iba Road including Bridge,
Brgy. Pitogo, Rizal, Occidental Mindoro
Sta. 1+600
Physical Target: CW1 - Construction of Concrete Road
3.169 Lane Km
CW2 - Construction of Bailey Bridge
96.00 sq.m.
Allocation: Php 47.00 Million

July 16, 2020 FY 2020 GAA WIN0F06141 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200111000
Project ID: P00449185LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North road (S00008MR),
K0022+500 to K0023+100
Physical Target : CW1 - Construction of Road Slope Protection
4,022.00 sq.m.
Allocation: Php 97.00 Million

TO;
Calapan north Road ( S00008MR ),
K0022+500 - K0022+700,
K0022+820 - K0022+857.60
Physical Target: CW1 - Construction of Road Slope Protection
4,330.00 sq.m.
Allocation: Php 97.00 Million
July 16, 2020 FY 2020 GAA WIN0F06134 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 3102100604000
Project ID : P00400349LZ

OO1: Ensure Safe and Reliable National Road Syatem

Network Development - Road Widening - Secondary Roads

FROM:
Tablas Circumferential Road
K0025+594.27 - K0026+580,
K0029+000 - K0029+765
Physical Target: CW1 - Road Widening - 3.491 Lane Km
Allocation: Php 33.08 Million

TO:
Tablas Circumferential Road
K0025+594.27 - K0026+546.21
Physical Target: CW1 - Road Widening - 1.89388 Lane Km
Allocation: Php 33.08 Million
July 16, 2020 CY 2020 WIN0F06107 UACS No. 300107200684000 June 1, 2020 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300107200684000
Project ID.: P00449032LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de Lorenzo, Brgy. 388, Manila City
Physical Target: CW1 = Construction of retarding pond / revetment and riverwall = 158.400 l.m.
Unit Cost (P’000) = P309.46 l.m.
Allocation (P’000) = P 49,500,000
EAO (P’000) = P500,000
Total (P’000) = P 50,000.00

As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de San Sebastian, Brgy. 388, Manila City
Physical Target: CW1 = Construction of retarding pond / revetment and riverwall = 158.400 l.m.
Unit Cost (P’000) = P309.46 l.m.
Allocation (P’000) = P 49,500,000
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00
WIN0F06107
July 16, 2020 CY 2020 WIN0F05997 UACS No. 300109200558000 June 1, 2020 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300109200558000
Project ID.: P00448808LZ
Local Program
Local – Flood Control and Drainage – Drainage / Protection Works – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de San Kabulusan Phase 5, Brgy. 255 and Brgy. 256,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 142.40 l.m.
Unit Cost (P’000) = P 344.10/ l.m.
Allocation (P’000)= P 49,500,000.00
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00

As Modified
Local – Flood Control and Drainage – Drainage / Protection Works – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de Kabulusan Phase 5, Brgy. 158, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 142.40 l.m.
Unit Cost (P’000) = P 344.10/ l.m.
Allocation (P’000) = P 49,500,000.00
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00
WIN0F05997
July 16, 2020 CY 2020 WIN0F06109 UACS No. 300104213423000 July 1, 2020 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 300104213423000
Project ID.: P004422635LZ
Local Program
Local – Buildings and Other Structures – Multi-Purpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay 276, Zone 25, District I, Manila
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 7,425.0/ bldg.
Allocation (P’000) = P 7,425,000.00
EAO (P’000) = P 75,000
Total (P’000) = P 7,500,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multi-Purpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay 276, Zone 25, District 3, Manila
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 7,425.0/ bldg.
Allocation (P’000)= P 7,425,000.00
EAO (P’000)= P75,000
Total (P’000) = P 7,500,000.00
WIN0F06109
July 16, 2020 CY 2020 WIN0F06170 UACS No. 300104213389000 June 1, 2020 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300104213389000
Project ID.: P00447242LZ
Local Infrastructure Program – Building and other Structures
Buildings and Other Structures – Multi-Purpose/Facilities
Construction of Pamantasan ng Lungsod ng Valenzuela Satellite Building (Phase 2), Brgy. Malinta, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1.00 No. of Bldg.
Unit Cost (P’000) = P 101,376.00/ No. of Bldg.
Allocation = P 101.376 M
EAO = P 1.024 M
Total = P 102.400

As Modified
Local Infrastructure Program – Building and other Structures
Buildings and Other Structures – Multi-Purpose/Facilities
Construction of Pamantasan ng Lungsod ng Valenzuela Satellite Building, Brgy. Malinta, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1.00 No. of Bldg.
Unit Cost (P’000) = P 101,376.00/ No. of Bldg.
Allocation = P 101.376 M
EAO = P 1.024 M
Total = P 102.400
WIN0F06170
July 16, 2020 FY 2020 GAA WIN0F06215 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202937000
Project ID : P00447005LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabiliattion/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section,
K0016+800 - K0016+910, Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
2,240.00 sq.m.
Allocation: Php 40.00 Million

TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0017+000 - K0017+071, Palawan
Physical Target : CW1 - Construction of Road Slope
Protection Structure :
1,726.25 sq.m.
Allocation: Php 40.00 Million

July 16, 2020 FY 2020 GAA WIN0F06209 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202934000
Project ID : P00447000LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0015+720 - K0015+800,
K0016+150 - K0016+220, Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
2,040.00 sq.m.
Allocation: Php 40.00 Million

TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0016+315.00 - K0016+381.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
1,730.24 sq.m.
Allocation: Php 40.00 Million
July 16, 2020 FY 2020 GAA WIN0F06214 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200258000
Project ID : P00449277LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Rehabilitation of Road Slope Protection Structure
along Tablas Circumferential Road,
K0044+571.00 - K0044+921.00
Tablas, Romblon
Physical Target: CW1 - Rehabilitation/Major Repair of
Road Slope Protection Structure:
2,480.26 sq.m.
Allocation: Php 50.00 Million

TO:
Rehabilitation of Slope Protection Structure along
Tablas Circumferential Road,
K0044+574.80 - K0044+660.00
Tablas, Romblon
Physical Target: CW1 - Rehabilitation/Major Repair of
Road Slope Protection Structure:
2,165.08 sq.m.
Allocation: Php 50.00 Million
July 16, 2020 CY 2020 WIN0F0605 UACS No. 300116202548000 June 1, 2020 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116202548000
Project ID.: P00444976LZ
Local Program – Local – National Roads and Bridges – Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Project
Rehabilitation of Roads along Thomas Manuel, Brgy. Marulas, Valenzuela City
Physical Target: CW1 = Rehabilitation of Paved Road = 0.496 lane km
Unit Cost (P’000) = P 19,758.06/lane km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00

As Modified
Local Infrastructure Program – Building and other Structures
Local Program – Local – National Roads and Bridges – Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Project
Rehabilitation of Roads along Thomas Manuel, Brgy. Karuhatan, Valenzuela City
Physical Target: CW1 = Rehabilitation of Paved Road = 0.496 lane km
Unit Cost (P’000) = P 19,758.06/lane km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
WIN0F06057
July 16, 2020 FY 2020 GAA WIN0F06200 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200256000
Project ID : P00449275LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0157+000.00 - K0160+060.00,
K0162+471.00 - K0163+701.00,
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay : 0 Lane Km
Allocation: Php 50.00 Million

TO:
Preventive Maintenance of Road : Asphalt Overlay
Quezon - Punta Baja
K0157+000.00 - K0158+511.00,
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay : 3.084 Lane Km
Allocation: Php 50.00 Million
July 14, 2020 FY 2020 WIN0G02987 310202100515000 May 27, 2020 Region IX Regional Office IX
UACS No. 310202100515000
Project ID: P00400308MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Basilan Circumferential Rd
K0002+000 - K0002+800.00,
K0003+020.00 - K0004+000

CW1 - Road Widening: 3.526 lane km.
Unit Cost: P 27,949,000.00/lane km.
ROW: 15,680.75533 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,449,132.43
Excess: P 3,300,000.00
Allocation: P 110,000,000.00
July 14, 2020 2020 WIN0C03890 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Abra - Ilocos Norte Road, K0431+570 - K0431+920;
Physical Target: CW1 : 7,762.5 Square meters; Allocation= Php 149,975,000

To: Abra - Ilocos Norte Road, K0431+710 - K0431+920;
Physical Target: CW1 : 8,090 Square meters; Allocation= Php 149,975,000

July 14, 2020 2020 WIN0C03878 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Abra - Ilocos Norte Road, K0446+615- K0446+840;
Physical Target: CW1 : 7,150 Square meters; Allocation= Php 125,075,000

To: Abra - Ilocos Norte Road, K0446+030 - K0446+080, K0446+615- K0446+840;
Physical Target: CW1 : 6,429.50 Square meters; Allocation= Php 125,075,000
July 14, 2020 2020 WIN0C03889 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Abra - Ilocos Norte Road, K0447+540- K0447+700;
Physical Target: CW1 : 7,370 Square meters; Allocation= Php 111,360,000

To: Abra - Ilocos Norte Road, K0447+540- K0447+700, K0448+960 - K0449+100;
Physical Target: CW1 : 5,680 Square meters; Allocation= Php 111,360,000

July 14, 2020 2020 WIN0C03892 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+200 - K0453+700;
Physical Target: CW1 : 8,250 Square meters; Allocation= Php 144,500,000

To: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+601 - K0453+850;
Physical Target: CW1 : 7,605 Square meters; Allocation= Php 144,500,000

July 14, 2020 2020 WIN0C03877 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+100 - K0474+600 ; Physical Target: CW1 : 8,250 Square meters; Allocation= Php 144,500,000

To: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+104 - K0474+295;
Physical Target: CW1 : 7,627.50 Square meters; Allocation= Php 144,500,000
July 14, 2020 2020 WIN0C03884 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0216 + 820 - K0217 + 000, K0222 + 195 - K0222 + 216, K0228 + 050 - K0228 + 178, K0228 + 204 - K0228 + 274, K0228 + 804 - K0228 + 870;
Physical Target: CW1 : 14,652 Square meters; Allocation= Php 252,623,000

To: Kennon Rd - K0228+067 - K0228+170, K0229+090 - K0229+270, K0238+150 - K0238+225, K0238+813 - K0238+870;
Physical Target: CW1 : 13,388 Square meters; Allocation= Php 252,623,000

July 14, 2020 2020 WIN0C03863 GAA 2020 June 30, 2020 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0235 + 833 - K0236 + 016, K0237 + 340 - K0237 + 385, K0237 + 362 - K0237 + 368, K0238 + 150 - K0238 + 195; Physical Target: CW1 : 5,556 Square meters; Allocation= Php 85,192,000

To: Kennon Rd - K0237+280- K0237+391; Physical Target: CW1 : 3,375.90 Square meters; Allocation= Php 85,192,000
July 14, 2020 2020 WIN0C03849 GAA 2020 June 29, 2020 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Improvement and Rehabilitation of Sadsadan-Bacalinao-Salin Access Road, Besao, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 5,000,000

To: Improvement and Rehabilitation of Sadsadan-Balicanao-Salin Access Road, Bauko, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 5,000,000


July 14, 2020 2020 WINC03882 GAA 2020 June 30, 2020 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Improvement of Bagnen Norte-Brgy. Sur Provincial Road located at the vegetable producing Bauko, Mountain Province;
Physical Target: CW1 : 0.502 Lane Km; Allocation= Php 5,000,000

To: Improvement of Bagnen Oriente-Bagnen Proper Provincial Road located at the vegetable producing Bauko, Mountain Province;
Physical Target: CW1 : 0.502 Lane Km; Allocation= Php 5,000,000

July 14, 2020 2020 WIN0C03868 GAA 2020 June 30, 2020 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction/Rehabilitation/Improvement of Local Road, Brgy. Ankileng, Sagada, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 10,000,000

To: Construction/Rehabilitation/Improvement of Local Road, Brgy. Ankileng, Sagada, Mountain Province;
Physical Target: CW1 : 0.600 Lane Km; Allocation= Php 10,000,000

July 14, 2020 2020 WIN0C03885 GAA 2020 June 30, 2020 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Saliok Flood Control, Paracelis, Mountain Province;
Physical Target: CW1 : 430 Lineal meters; Allocation= Php 30,000,000

To: Construction of Flood Mitigation Structure - Construction of Saliok Flood Control, Natonin, Mountain Province;
Physical Target: CW1 : 430 Lineal meters; Allocation= Php 30,000,000

July 14, 2020 2020 WIN0C03895 GAA 2020 June 30, 2020 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Rehabilitation of Local Road at Brgy. Dagadag ili via Lusong Mankayan, Benguet; Physical Target: CW1 : 0.550 Lane Km;
Allocation= Php 5,000,000

To: Rehabilitation of Local Road at Dagadag ili via Lusong, Balili, Mankayan, Benguet;
Physical Target: CW1 : 0.544 Lane Km; Allocation= Php 5,000,000

July 14, 2020 2020 WIN0C03896 GAA 2020 June 30, 2020 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Concreting of Road at Liwant Pakedlan, Tabio, Mankayan, Benguet towards Balili Road connecting to the National Road at Tubo, Sapid, Mankayan, Benguet;
Physical Target: CW1 : 0.500 Lane Km; Allocation= Php 5,000,000

To: Concreting of Road at Liwang Pakedlan, Tabio, Mankayan, Benguet towards Balili Road connecting to the National Road at Tubo, Sapid, Mankayan, Benguet;
Physical Target: CW1 : 0.500 Lane Km; Allocation= Php 5,000,000

July 14, 2020 2020 WINC03880 GAA 2020 June 30, 2020 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement of Baguiney Tulodan to Batio, Cattubo Road, Cattubo, Atok, Benguet;
Physical Target: CW1 : 0.320 Lane Km;
Allocation= Php 3,000,000

To: Improvement of Baguingey Tulodan to Botiao, Cattubo Road, Cattubo, Atok, Benguet; Physical Target: CW1 : 0.320 Lane Km; Allocation= Php 3,000,000

July 14, 2020 2020 WINC03862 GAA 2020 June 30, 2020 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement and Opening of Beyeng-Legab-Kayapa-Damoco Road, Brgy. Poblacion, Kayapa, Bakun, Benguet;
Physical Target: CW1 : 6.00 Lane Km; Allocation= Php 50,000,000

To: Improvement and Opening of Beyeng-Legab-Kayapa-Damoco Road, Brgy. Poblacion, Kayapa, Bakun, Benguet;
Physical Target: CW1 : 5.600 Lane Km; Allocation= Php 50,000,000

July 14, 2020 2020 WIN0C03915 GAA 2020 July 2, 2020 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement of Lower Cruz Ambassador Road, Lower Cruz Ambassador, Tublay, Benguet;
Physical Target: CW1 : 0.300 Lane Km;
Allocation= Php 3,000,000

To: Improvement of Lower Coroz Ambassador Road, Lower Coroz, Ambassador, Tublay, Benguet;
Physical Target: CW1 : 0.300 Lane Km; Allocation= Php 3,000,000

July 14, 2020 2020 WIN0C03888 GAA 2020 June 30, 2020 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Construction/Repair/Rehabilitation/Improvement of Burnay-Anao Road in Hinyon, Ifugao;
Physical Target: CW1 : 0.30 Lane Km; Allocation= Php 5,000,000

To: Construction/Repair/Rehabilitation/Improvement of Burnay-Anao Road in Hingyon, Ifugao; Physical Target: CW1 : 0.415 Lane Km; Allocation= Php 5,000,000

July 13, 2020 FY 2020 WIN0G02979 320101105354000 June 16, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320101105354000
Project ID: P00420461MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of La Dicha Bridge River Control (Downstream), Sta. 00+000 - Sta. 00+414.70, Malangas, Zamboanga Sibugay

CW1 - Construction of Flood Mitigation Structure: 414.70 lm
Unit Cost: P 70,894.52/lm
EAO: P 600,000.00
Allocation: P 30,000,000.00
July 13, 2020 FY 2020 GAA WIN0G02865 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1773+603 - K1776+421
Physical Target:
CW1: 5.688 lane km (Road Widening)
Allocation:
TOTAL: P 88,386,000.00
CW1: P 85,292,490.00 (Road Widening)
EAO: P 3,093,510.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1771+820 - K1772+530, K1773+603 - K1774+800
Physical Target:
CW1: 3.970 lane km (Road Widening)
Allocation:
TOTAL: P 88,386,000.00
CW1: P 85,292,490.00 (Road Widening)
EAO: P 3,093,510.00
July 13, 2020 FY 2020 GAA WIN0G02961 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Las Arenas-Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 1.940 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Las Arenas-Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 2.080 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
July 13, 2020 FY 2020 GAA WIN0G02965 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road Katipunan, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.960 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road Katipunan, Nabunturan, Compostela Valley
Physical Target:
CW1: 2.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
July 13, 2020 FY 2020 GAA WIN0G02938 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Davao-Cotabato Old Rd -
K1520+745 - K1520+750
Physical Target:
CW1: 600.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Drainage Structure along Road)
EAO: P 400,000.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Davao-Cotabato Old Rd -
K1520+745 - K1520+750
Physical Target:
CW1: 820.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Drainage Structure along Road)
EAO: P 400,000.00
July 13, 2020 FY 2020 GAA WIN0G02973 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Daang Maharlika -
K1508+493 - K1509+684, K1508+192 - K1508+218 (L/S)
Physical Target:
CW1: 2.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,901,000.00
CW1: P 44,002,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 898,020.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Daang Maharlika -
K1508+192 - K1508+900
Physical Target:
CW1: 2.858 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,901,000.00
CW1: P 44,002,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 898,020.00
July 13, 2020 FY 2020 GAA WIN0G02951 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along ABS-CBN - Quimpo Blvd Div. Rd -
K1512+125 - K1512+444 (L/S), K1512+687 - K1513+574 (L/S), K1513+620 - K1515+343
Physical Target:
CW1: 0.600 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,150,000.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along ABS-CBN - Quimpo Blvd Div. Rd -
K1511+(-084) - K1511+409, K1515+198 - K1515+267
Physical Target:
CW1: 6.136 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,150,000.00
July 13, 2020 FY 2020 GAA WIN0G02952 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 150.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 350.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
July 13, 2020 FY 2020 GAA WIN0G02950 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.480 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.266 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00
July 13, 2020 FY 2020 GAA WIN0G02957 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.154 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00
July 10, 2020 FY 2020 WIN0G02985 310204100795000 June 15, 2020 Region IX Regional Office IX
UACS No. 310204100795000
Project ID: P00401265MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

Zamboanga City By-Pass Road (Culianan - Patalon Section), Package 3, Zamboanga City

CW1 - Road Widening: 9.42 lane km.
Unit Cost: P 15,269,000.00/lane km.
ROW: 687.617 sq. m.
Unit Cost: P 1,519.74/ sq.m.
EAO: P 5,034,264.80
Excess: 84,598.01
Allocation: P 150,000,000.00
July 10, 2020 FY 2020 WIN0G02978 300117207278000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300117207278000
Project ID: P00443976MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Tetuan, Zamboanga City

Physical Target:
CW-1- Rehabilitation of Paved Road: 3.12 lane km
Unit Cost: P 6,346,153.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00
July 10, 2020 2020 WIN0C03912 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 019 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000

To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 000 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000


July 10, 2020 2020 WIN0C03914 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.614 Lane Km; Allocation= Php 21,305,000

To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.459 Lane Km; Allocation= Php 21,305,000
July 10, 2020 2020 WIN0C03924 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0504 + 392;
Physical Target: CW1 : 910 Square meters; Allocation= Php 20,000,000

To: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0505 + 000, K0507 + 400 – K0510 + 013;
Physical Target: CW1 : 2,860.06 Square meters; Allocation= Php 20,000,000

July 10, 2020 2020 WIN0C03906 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Constructionof Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000

To: Construction of Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 2.600 Lane Km; Allocation= Php 20,000,000

July 10, 2020 2020 WIN0C03913 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 5,000,000

To: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0.800 Lane Km; Allocation= Php 5,000,000

July 10, 2020 2020 WIN0C03923 GAA 2020 July 2, 2020 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 0 Lane Km;
Allocation= Php 15,000,000

To: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 2.478 Lane Km; Allocation= Php 15,000,000
July 10, 2020 CY 2020 WIN0F06117 UACS No. 320101104344000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 320101104344000
Project ID.: P00421447LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 5), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 6), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN0F06117
July 10, 2020 CY 2020 WIN0F06119 UACS No. 300104213532000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300104213532000
Project ID.: P00447360LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 20,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Brgy. Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 20,000.00
WIN0F06119
July 9, 2020 CY 2020 WIN0F06177 UACS No. 300104213533000 June 1, 2020 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300104213533000
Project ID.: P00447362LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Brgy. Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
WIN0F06177
July 8, 2020 2020 WIN0G02909 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200151000
Project ID: P00444711MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P69,480,000

EAO: P2,520,000

TOTAL: P72,000,000

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,364.70 sq.m

Unit Cost: P29,382 / sq.m

Allocation: P69,480,000

EAO: P2,520,000

TOTAL: P72,000,000
July 8, 2020 2020 WIN0G02937 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200153000
Project ID: P00444713MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+596 – K1195+773, Brgy. Hayanggabon, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P85,035.80M

EAO: P3,084.20M

TOTAL: P88.120M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+570 – K1195+747, Brgy. Hayanggabon, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,897.74 sq.m.

Unit Cost: P29.346T/sq.m.

Allocation: P85,035.80M

EAO: P3,084.20M

TOTAL: P88.120M
July 8, 2020 2020 WIN0G02955 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200152000
Project ID: P00444712MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1184+(-197) – K1184+045, Brgy Cabugo, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P86,811.40M

EAO: P3,148.60M

TOTAL: P89.960M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1183+947 – K1184+065, Brgy Cabugo, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,959.01 sq.m

Unit Cost: P29,338T / sq.m

Allocation: P86,811.40M

EAO: P3,148.60M

TOTAL: P89.960M
July 8, 2020 2020 WIN0G02914 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200159000
Project ID: P00444718MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P87,683.760M

EAO: P3,180.240M

TOTAL: P90.864M

TO:

Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 3,312.82 sq.m

Unit Cost: P26.468T / sq.m

Allocation: P87,683.760M

EAO: P3,180.240M

TOTAL: P90.864M
July 7, 2020 FY 2020 GAA WIN0F06161 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310102100493000
Project ID: P00401078LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation: Preventive Maintenance - Secondary Roads

FROM:
Puerto Princesa North Road,
K0019+800 - K0021+000,
K0021+082 - K0022+186,
K0027+000 - K0027+823,
K0030+123 - K0031+928,
K0033+023 - K0034+154,
K0035+900 - K0036+281,
K0036+964 - K0037+009,
K0038+068 - K0039+868,
K0050+258 - K0050+286,
K0054+326 - K0055+022
Physical Target: CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 19.794 Lane Km
Allocation: Php 29.373 Million

TO:
Puerto Princesa North Road,
K0040+500 - K0041+781,
K0049+654 - K0050+341,
K0053+509 - K0054+959,
K0057+309 - K0058+768,
K0059+318 - K0059+654,
K0062+450 - K0062+480,
K0069+804 - K0070+972,
K0071+218 - K0072+863,
K0074+227 - K0075+581,
K0076+432 - K0077+923,
K0078+004 - K0080+890
Physical Target : CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 2.8935 Lane Km
Allocation: Php 29.373 Million
July 7, 2020 FY 2020 GAA WIN0F06163 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310105100393000
Project ID: P00402571LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads

FROM:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.416 Lane Km
Allocation: Php 38.622 Million

TO:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
K0027+292 - K0027+665
Physical Target: CW1 - Reconstruction to Concrete Pavement :
3.162 Lane Km
Allocation: Php 38.622 Lane Km

July 7, 2020 FY 2020 WIN0G02974 300116203176000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300116203176000
Project ID: P00443630MN

Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Local Road, Brgy. Panubigan, Zamboanga City

Physical Target:
CW-1 - Construction of Concrete Road: 3.480 lane km.
Unit Cost: P 14,224,000.00/lane km.
EAO: P 500,000.00
Allocation: P 50,000,000.00
July 7, 2020 FY 2020 WIN0G02977 300117207277000 June 2, 2020 Region IX Zamboanga City 2nd District Engineering Office
'UACS No. 300117207277000
Project ID: P00443973MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Talon-talon, Zamboanga City

Physical Target:
CW-1- Rehabilitation of Paved Road: 3.3755 lane km
Unit Cost: P 5,865,000.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00
July 7, 2020 FY 2020 WIN0G02971 320101104227000 May 26, 2020 Region IX Regional Office IX
UACS No. 320101104227000
Project ID: P00420385MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+666.25 - 3+074.25), Zamboanga del Norte

CW1 - Construction of Revetment: 408.00 lm
Unit Cost: P 237,248.78/lm
ROW : 16,048.61407 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,387,912.61
Allocation: P 105,000,000.00
July 7, 2020 2020 WIN0G02913 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 310201100516000
Project ID: P00401461MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72

Type of Work: CW1 - Road Widening

Physical Target: 2.703 Lane Km

Unit Cost: P18.564558 M / Lane Km

Allocation: P50,180,000

EAO: P1,820,000

TOTAL: P52,000,000

TO:

Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72, K1163+600 - K1163+660

Type of Work: CW1 - Road Widening

Physical Target: 3.351 Lane Km

Unit Cost: P14.974634 M / Lane Km

Allocation: P50,180,000

EAO: P1,820,000

TOTAL: P52,000,000
July 7, 2020 2020 WIN0G02900 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200155000
Project ID: P00444715MN

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Kinalablaban, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P84,230,990M

EAO: P3,055,010M

TOTAL: P87.286M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,870.08 sq.m

Unit Cost: P29.348T / sq.m

Allocation: P84,230,990M

EAO: P3,055,010M

TOTAL: P87.286M
July 7, 2020 2020 WIN0G02912 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200150000
Project ID: P00444710MN

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K1197+265 – K1197+500, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P83,899.03M

EAO: P3,042.97M

TOTAL: P86.942M

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K119+867 – K1196+085, Brgy. Cagdianao, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,858.88 sq.m

Unit Cost: P29.347T/sq.m

Allocation: P83,899.03M

EAO: P3,042.97M

TOTAL: P86.942M
July 7, 2020 2020 WIN0G02906 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300117207584000
Project ID: P00444340MN

Local Infrastructure Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Concreting of Road, Brgy. Campo-Pautao, Gigaquit, Surigao del Norte

Type of Work: CW1 - Construction of Concrete Road

Physical Target: -

Unit Cost: -

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000

TO:

Concreting of Road, Brgy. Campo-Pautao, Bacuag, Surigao del Norte

Type of Work: CW1 - Construction of Concrete Road

Physical Target: 2.012 Lane Km

Unit Cost: P9.840954 M/Lane Km

Allocation: P19,800,000

EAO: P200,000

TOTAL: P20,000,000
July 7, 2020 2020 WIN0G02885 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300111200156000
Project ID: P00444716MN

Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+870, Brgy. Wangke, Claver, Surigao Del Norte

Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target: -

Unit Cost: -

Allocation: P87,077,740

EAO: P3,158,260

TOTAL: P90,236,000

TO:

Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+868, Brgy. Wangke, Claver, Surigao Del Norte

Type of Work: CW1 - Construction of Road Slope Protection Structure

Physical Target: 2,967.66 sq.m

Unit Cost: P29,342/sq.m

Allocation: P87,077,740

EAO: P3,158,260

TOTAL: P90,236,000
July 7, 2020 2020 WIN0G02910 FY 2020 RA 11465 January 24, 2020 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. 300104218865000
Project ID: P00444524MN

Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities

FROM:

Construction (Completion) of Multi-Purpose Building, Bgy. Cagnoig, San Francisco, Surigao del Norte

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: -

Allocation: P1,000,000

EAO: -

TOTAL: P1,000,000

TO:

Construction (Completion) of Multi-Purpose Building, Bgy. Cagniog, Surigao City, Surigao del Norte

Type of Work: CW1 - Construction of Multi Purpose Building

Physical Target: 1 Number of Building

Unit Cost: P1.0M/ Building

Allocation: P1,000,000

EAO: -

TOTAL: P1,000,000
July 3, 2020 FY 2020 GAA WIN0F06174 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Romblon District Engineering Office
UACS No.: 310108100388000
Project ID: P00400141LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Secondary Roads

FROM:
Tablas Circumferential Road
K0040+106 - K0040+206
Physical target : CW1 - Construction of Road Slope
Protection Structure : 1,666.67 sq.m.
Allocation: Php 30.00 Million

TO:
Tablas Circumferential road
K0040+138.35 - K0040+163.96
Physical Target : CW1 - Construction of Road Slope
Protection Structure : 1,238.70 sq.m.
Allocation: Php 30.00 Million
July 3, 2020 FY 2020 GAA WIN0F06165 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206534000
Project ID: P00447543LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation/Improvement of Botilao - Ipil Road,
Sta. 0+000 - Sta. 1+000,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road :
11.096 Lane Km
Allocation: Php 98.750 Million

TO:
Rehabilitation/Improvement of Botilao - Ipit Road,
Sta. 0+000 - Sta. 5+548,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road
11.096 Lane Km
Allocation: Php 98.750 Million

July 3, 2020 FY 2020 GAA WIN0F06162 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. 310105100394000
Project ID: P00401304LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+045
Physical Target: CW1 - Reconstruction to Concrete Pavement :
1.796 Lane Km
Allocation: Php 28.736 Million

TO:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+180
Physical Target: CW1 - Reconstruction to Concrete Pavement :
2.066 Lane Km
Allocation: Php 28.736 Mllion
July 3, 2020 FY 2020 GAA WIN0F06164 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202941000
Project ID: P00447012LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 173+079 - Sta. 184+500 ), Palawan
Physical Target: CW1 - Construction of Concrete Road:
3.41 Lane Km
Allocation: Php 50.00 Million

TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 191+935.50 - Sta. 193+175.00), Palawan
Physical Target: CW1 - Construction of Gravel Road :
2.479 Lane Km
Allocation: 50.00 Million
July 2, 2020 FY 2020 GAA WIN0F6167 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202188000
Project ID: P00446499LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D, 20+000 - 25+000,
Palawan
Physical Target: CW-1 Construction of Concrete Road:
0 Lane Km
Allocation: Php 55.00 Million

TO:

Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D,
Sta. 263+461.00 - Sta. 267+035,
Palawan
Physical Target: CW-1 Construction of Gravel Road:
7.1468 Lane Km
Allocation: Php 55.00 Million
July 2, 2020 FY 2020 GAA WIN0F06168 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202207000
Project ID: P00446513LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 182+000 - Sta.188+500), Palawan
Physical Target : CW-1 Construction of Concrete Road :
3.30 Lane km
Allocation: Php 55.00 Million

TO:
Constructon of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 193+175.00 - Sta. 198+000.00), Palawan
Physical Target : CW-1 Construction of Gravel Road:
9.65 Lane Km
Allocation : Php 55.00 Million
July 2, 2020 FY 2020 GAA WIN0F06169 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310105100392000
Project ID : P00401308LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads

FROM:
Irawan - Tagburos Rd.
K0012+1046 - K0013+000,
K0012+953 - K0012+1046,
K0013+000 - K0013+785,
K0018+000 - K0018+305
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.41 Lane Km
Allocation: Php 38.490 Million

TO:
Irawan - Tagburos rd.
K0012+953 - K0013+745,
K0018+000 - K0018+415
Physical Target : CW1 - Reconstruction to Concrete Pavement:
2.55 Lane Km
Allocation : Php 38.490 million
July 2, 2020 2020 310205100341000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela
July 2, 2020 2020 310204100399000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Bypass and Diversion Roads - Bambang Bypass Road, Nueva Vizcaya
June 30, 2020 FY 2020 WIN0G02936 320101104224000 May 26, 2020 Region IX Regional Office IX
UACS No. 320101104224000
Project ID: P00420382MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of revetment, Kumalarang River, Isabela City, Basilan

CW1 - Construction of Revetment: 620.00 lm
Unit Cost: P 173,751.00/lm
ROW : 945.9768 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,770,403.13
Allocation: P 111,780,000.00
June 30, 2020 FY 2020 WIN0G02949 310102100403000 May 26, 2020 Region IX Regional Office IX
UACS No. 310102100403000
Project ID: P00400517MN

Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) -
K1924 + 204 - K1924 + 755,
K1925 + 000 - K1927 + 000,
K1929 + 477 - K1930 + 000,
K1932 + 000 - K1933 + 000,
K1935 + 092 - K1936 + 518.00,
K1936 + 548 - K1937 + 000,
K1938 + 000 - K1939 + 097,
K1939 + 1000 - K1939 + 2000,
K1939 + 3000 - K1939 + 4000


CW1 - Preventive Maintenance of Road: Asphalt Overlay: 18.198 lane km.
Unit Cost: P 5,598,000.00/lane km.
EAO: P 3,566,077.29
Allocation: P 105,454,000.00
June 30, 2020 FY 2020 WIN0G02879 310205100265000 May 13, 2020 Region IX Regional Office IX
UACS No. 310205100265000
Project ID: P00401272MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Midsalip - Buboan Road, Zamboanga del Sur

CW1 - Construction of Concrete Road: 4.24 lane km.
Unit Cost: P 23,171,000.00/lane km.
ROW: 11,041.25867 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,438,711.87
Allocation: P 105,000,000.00
June 30, 2020 FY 2020 WIN0G02880 310201100481000 May 4, 2020 Region IX Regional Office IX
UACS No. 310201100481000
Project ID: P00400269MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd -
K1875+940 - K1878+880.00

CW1 - Road Widening: 5.88 lane km.
Unit Cost: P 18,864,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,882,356.94
Excess: P 48,159.06
Allocation: P 124,855,000.00
June 30, 2020 FY 2020 WIN0G02941 310106100523000 June 9, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100523000
Project ID: P00400621MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Dipolog - Polanco - Piñan - Jct. Oroquieta Rd -
K1827+969.80 - K1828+687

CW1 - Reconstruction from Pave to Concrete: 1.4164 lane km.
Unit Cost: P 7,887,600.00/lane km.
EAO: P 228,000.00
Allocation: P 11,400,000.00
June 30, 2020 FY 2020 WIN0G02945 310105100468000 June 8, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310105100468000
Project ID: P00400626MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Rizal - Dakak - Dapitan Coastal Loop Rd
K1840+557 - K1840+905,
K1843+674 - K1843+995,
K1844+828 - K1844+903,
K1845+419 - K1845+518,
K1846+107 - K1846+195.40

CW1 - Reconstruction from Pave to Concrete: 1.8628 lane km.
Unit Cost: P 17,869,160.00/lane km.
ROW: 1,500.00 sq.m.
Unit Cost: P 689.00/sq.m
EAO: P 679,320.00
Allocation: P 35,000,000.00
June 30, 2020 FY 2020 WIN0G02934 310111100241000 June 9, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310111100241000
Project ID: P00400398MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Jct. Polo - Dapitan Park Natl Rd
K1825+(-260) - K1825+180
K1826+172 - K1827+300

CW1 - Construction of Drainage Structure along Road: 1.572 lm.
Unit Cost: P 10,145,370.00/lm
ROW: 400.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 325,480.00
Allocation: P 16,674,000.00
June 30, 2020 FY 2020 WIN0G02939 310106100524000 June 8, 2020 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100524000
Project ID: P00400624MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Piñan - Mutia Rd
K1817+916 - K1818+000,
K1818+928 - K1819+178,
K1822+572 - K1823+194.60,
K1826+807 - K1826+901

CW1 - Reconstruction from Paved to Concrete: 2.0992 lane km.
Unit Cost: P 11,341,520.00/lane km.
ROW: 466.00 sq.m.
Unit Cost: P 100.00/sq.m
EAO: P 485,880.00
Allocation: P 24,760,000.00
June 29, 2020 2020 WIN0C03858 FY 2020 GAA January 7, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0067+571 - K0067+653
June 24, 2020 FY 2020 GAA WIN0F06118 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Marinduque District Engineering Office
UACS No.: 300117206532000
Project ID: P00449344LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Rehabilitation of Bolo - Pulang lupa road,
Sta. 1+076 - Sta. 2+076,
Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
50831 lane km
Allocation: Php 80.00 Million

TO:
Rehabilitation of Bolo - Pulang Lupa Road,
Sta. 1+076 - Sta. 3+991.5
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.831 lane km
Allocation: Php 80.00 Million

June 24, 2020 FY 2020 GAA WIN0F06113 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200147000
Project ID: P00449205LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0146+(-187.00) - K0150+465.00
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay: 0 Lane Km
Allocation: Php 55.00 Million

TO:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - punta Baja
K0146+(-187.00) - K0147+414.00
Palawan
Physical Target: CW1 - Preventive maintenance of Road:
Asphalt Overlay : 3.292 Lane Km
Allocation: Php 55.00 Million
June 24, 2020 FY 2020 GAA WIN0F06092 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200255000
Project ID: P00449274LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road : Asphalt Overlay -
PPSr Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0142+730.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 2.069 Lane Km
Allocation : Php 40.00 Million

TO:
Preventive Maintenance of Road ; Asphalt Overlay -
PPSR Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0139+568.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 2.138 Lane Km
Allocation: Php 40.00 Million
June 24, 2020 FY 2020 GAA WIN0F06087 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310203100272000
Project ID: P00402592LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM:
Coron - Busuanga Rd
K0005+124 - K0008+029,
k0008+469 - k0008+755,
k0013+582 - k0013+896,
k0013+950 - k0014+100
Physical Target: CW1 - Road Widening : 7.388 Lane Km
Allocation: php 107.478 Million

TO:
Coron - Busuanga Rd
K0005+124 - K0007+919,
K0008+489 - K0009+577.50
Physical target: CW1 - Road Widening : 7.827 Lane Km
Allocation: Php 107.478 Million

June 24, 2020 FY 2020 GAA WIN0F06088 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310202100481000
Project ID: P00400415LZ

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:
Puerto Princesa North Rd
K0149+308 - K0152+625
Physical Target : CW1 - Road Widening - 6.758 Lane Km
Allocation: Php 125.00 Million

TO:
Puerto Princesa North Rd
K0149+308 - K0152+765
Physical Target : CW1 - Road Widening - 7.038 Lane Km
Allocation: Php 125.00 Million
June 24, 2020 FY 2020 GAA WIN0F06091 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 310305100942000
Project ID: P00402596LZ

OO1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridge

FROM:
Widening of Permanent Bridge - Dayandante Bridge I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 235.161 sq.m.
Allocation: Php 25.00 Million

TO:
Widening of Permanent Bridge - Dayandante I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 207.800 sq.m.
Allocation: Php 25.00 Million
June 24, 2020 FY 2020 GAA WIN0F06004 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200251000
Project ID: P00449270LZ

LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0181+630.00,
K0182+000.00 - K0183+506.00,
Palawan
Physical Target : Preventive Maintenance of Road -
Asphalt overlay : 0 Lane Km
Allocation: Php 50.00 Million

TO:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong,
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0176+1482.00,
Palawan
Physical Target : Preventive Maintenance of Road :
Asphalt Overlay - 2.716 Lane Km
Allocation : Php 50.00 Million
June 23, 2020 FY 2020 GAA WIN0F06121 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200113000
Project ID: P00449187LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0036+400 to K0036+900
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,022.00 sq.m.
Allocation: PHP 97.00 Million

TO:
Calapan North Road (S00008MR),
K0036+180 to K0036+302.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,344.00 sq.m.
Allocation: Php 97.00 Million
June 23, 2020 FY 2020 GAA WIN0F6120 FY 2020 GAA DPWH Infra Program January 6, 2020 Region IV-B Regional Office IV-B
UACS No.: 300111200114000
Project ID: P00449188LZ

LOCAL PROGRAM

National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Calapan North Road (S00008MR),
K0037+300 to K0037+800
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,094.00 sq.m.
Allocation: Php 98.00 Million

TO:
Calapan North Road (S00008MR),
K0037+300 to K0037+473.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,367.00 sq.m.
Allocation: Php 98.00 Million