July 17, 2020 |
FY 2020 GAA |
WIN0F06213 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202924000
Project ID : P00446982LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
Langongan - Roxas Road Section,
K0105+568 - K0105+643,
K0125+035 - K0125+05,
Palawan
Physical target: CW1 - Construction of Road Slope
Protection Structure:
1,523.00 sq.m.
Allocation: Php 30.00 million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
Langongan - Roxas Road Section,
K0105+500.00 - K0105+560.00,
Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure:
1,282.93 sq.m.
Allocation: Php 30.00 Million |
July 17, 2020 |
2020 |
WIN0C03955 |
GAA 2020 |
July 7, 2020 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga-Abra Road (S00561LZ) K0495+455 – K0495+675;
Physical Target: CW1 : 5,700 Square meters;
Allocation= Php 100,000,000
To: Kalinga-Abra Road (S00561LZ) K0495+455 – K0495+675;
Physical Target: CW1 : 5,176.50 Square meters; Allocation= Php 100,000,000
|
July 17, 2020 |
2020 |
WIN0G02924 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 310204100913000
Project ID: P00401080MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Lanuza- Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur
Type of Work: CW1 - Construction of Gravel Road
Physical Target: 6.857 lane km
Unit Cost: P16.887852M
Allocation: P115.800M
EAO: P4.200M
TOTAL: P120.0M
TO:
Lanuza- Tandag Bypass Road (SDCR Alternate Route), Tandag Section, Surigao del Sur
Type of Work: CW1 - Construction of Gravel Road
Physical Target: 2.00 lane km
Unit Cost: P57.90M
ESTIMATED COST: P115.800M
EAO: P4.200M
TOTAL: P120.0M |
July 17, 2020 |
2020 |
WIN0G02882 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. 300117207555000
Project ID: P00444309MN
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Road Widening, Daang Maharlika (Agusan-Davao Section) Canayugan Section, Bayugan City, Agusan del Sur
Type of Work: CW1 - Road Widening
Physical Target: -
Unit Cost: -
Allocation: P19.800M
EAO: P200.0T
TOTAL: P20.0M
TO:
Road Widening, Daang Maharlika (Agusan-Davao Section) Canayugan -Mabuhay Section, Bayugan City, Agusan del Sur
Type of Work: CW1 - Road Widening
Physical Target: 1.156 lane km
Unit Cost: P17.128028M
Allocation: P19.800M
EAO: P200.0T
TOTAL: P20.0M |
July 17, 2020 |
FY 2020 GAA |
WIN0F06208 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300112200131000
Project ID : P00449290LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Local infrastructure Program
FROM:
Construction of Roads with Slip/Slope Collapse along
Calapan North Road,
Calapan, Oriental Mindoro
K0042+000 - K0042+500
Physical Target: CW1 - Construction of Slope Protection
Structure : 7,417.34 sq.m.
Allocation: Php 144.500 Million
TO:
Construction of Roads with Slip/Slope Collapse along
Calapan North Road,
Calapan, Oriental Mindoro
K0042+000.00 - K0042+080.00,
K0042+140.00 - K0042+240.00,
K0042+360.00 - K0042+424.85
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 6,684.90 sq.m.
Allocation: Php 144.500 Million |
July 17, 2020 |
FY 2020 GAA |
WIN0F06207 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202187000
Project ID: P00446498LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects
FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package C,
15+0-00 - 20+000, Palawan
Physical Target: CW1 - Construction of Concrete Road
0 Lane Km
Allocation : Php 55.00 Million
TO:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package C,
Sta. 261+740.00 - Sta. 261+790.10,
Sta. 261+820.50 - Sta. 263+461.60,
Sta. 261+790.10 - Sta. 261+820.50,
Palawan
Physical Target: CW1 - Construction of Gravel Road
3.3824 Lane Km
CW2 - Construction of Concrete Bridge
290.016 sq.m.
Allocation: Php 55.00 Million |
July 17, 2020 |
2020 |
WIN0G02933 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 300104218747000
Project ID: P00440297MN
Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities
FROM:
Construction of (Completion) of Multipurpose Building, Brgy. San Vicente, San Francisco, Agusan del Sur
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: P4,950,000/No. of Building
Allocation: P4,950,000
EAO: P50,000
TOTAL: P5,000,000
TO:
Construction of (Completion) of Multipurpose Building, Brgy. San Vicente, Loreto, Agusan del Sur
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: P4,950,000/No. of Building
Allocation: P4,950,000
EAO: P50,000
TOTAL: P5,000,000 |
July 16, 2020 |
FY 2020 GAA |
WIN0F06142 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No.: 300117206542000
Project ID: P00447558LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads
FROM:
Construction of Iba Road including Bridge,
Brgy. Pitogo, Rizal, Occidental Mindoro
Sta. 1+600
Physical Target: CW1 - Construction of Concrete Road
3.169 Lane KM
CW2 - Construction of Bailey Bridge
85.80 sq.m.
Allocation: Php 47.00 Million
TO:
Construction of Iba Road including Bridge,
Brgy. Pitogo, Rizal, Occidental Mindoro
Sta. 1+600
Physical Target: CW1 - Construction of Concrete Road
3.169 Lane Km
CW2 - Construction of Bailey Bridge
96.00 sq.m.
Allocation: Php 47.00 Million
|
July 16, 2020 |
FY 2020 GAA |
WIN0F06141 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200111000
Project ID: P00449185LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North road (S00008MR),
K0022+500 to K0023+100
Physical Target : CW1 - Construction of Road Slope Protection
4,022.00 sq.m.
Allocation: Php 97.00 Million
TO;
Calapan north Road ( S00008MR ),
K0022+500 - K0022+700,
K0022+820 - K0022+857.60
Physical Target: CW1 - Construction of Road Slope Protection
4,330.00 sq.m.
Allocation: Php 97.00 Million
|
July 16, 2020 |
FY 2020 GAA |
WIN0F06134 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 3102100604000
Project ID : P00400349LZ
OO1: Ensure Safe and Reliable National Road Syatem
Network Development - Road Widening - Secondary Roads
FROM:
Tablas Circumferential Road
K0025+594.27 - K0026+580,
K0029+000 - K0029+765
Physical Target: CW1 - Road Widening - 3.491 Lane Km
Allocation: Php 33.08 Million
TO:
Tablas Circumferential Road
K0025+594.27 - K0026+546.21
Physical Target: CW1 - Road Widening - 1.89388 Lane Km
Allocation: Php 33.08 Million
|
July 16, 2020 |
CY 2020 |
WIN0F06107 |
UACS No. 300107200684000 |
June 1, 2020 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300107200684000
Project ID.: P00449032LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de Lorenzo, Brgy. 388, Manila City
Physical Target: CW1 = Construction of retarding pond / revetment and riverwall = 158.400 l.m.
Unit Cost (P’000) = P309.46 l.m.
Allocation (P’000) = P 49,500,000
EAO (P’000) = P500,000
Total (P’000) = P 50,000.00
As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de San Sebastian, Brgy. 388, Manila City
Physical Target: CW1 = Construction of retarding pond / revetment and riverwall = 158.400 l.m.
Unit Cost (P’000) = P309.46 l.m.
Allocation (P’000) = P 49,500,000
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00
WIN0F06107
|
July 16, 2020 |
CY 2020 |
WIN0F05997 |
UACS No. 300109200558000 |
June 1, 2020 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300109200558000
Project ID.: P00448808LZ
Local Program
Local – Flood Control and Drainage – Drainage / Protection Works – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de San Kabulusan Phase 5, Brgy. 255 and Brgy. 256,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 142.40 l.m.
Unit Cost (P’000) = P 344.10/ l.m.
Allocation (P’000)= P 49,500,000.00
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00
As Modified
Local – Flood Control and Drainage – Drainage / Protection Works – Local Infrastructure Program
Bank Improvement (Steel Sheet Pile) along Estero de Kabulusan Phase 5, Brgy. 158, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 142.40 l.m.
Unit Cost (P’000) = P 344.10/ l.m.
Allocation (P’000) = P 49,500,000.00
EAO (P’000) = P 500,000
Total (P’000) = P 50,000,000.00
WIN0F05997
|
July 16, 2020 |
CY 2020 |
WIN0F06109 |
UACS No. 300104213423000 |
July 1, 2020 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300104213423000
Project ID.: P004422635LZ
Local Program
Local – Buildings and Other Structures – Multi-Purpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay 276, Zone 25, District I, Manila
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 7,425.0/ bldg.
Allocation (P’000) = P 7,425,000.00
EAO (P’000) = P 75,000
Total (P’000) = P 7,500,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multi-Purpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay 276, Zone 25, District 3, Manila
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 7,425.0/ bldg.
Allocation (P’000)= P 7,425,000.00
EAO (P’000)= P75,000
Total (P’000) = P 7,500,000.00
WIN0F06109
|
July 16, 2020 |
CY 2020 |
WIN0F06170 |
UACS No. 300104213389000 |
June 1, 2020 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104213389000
Project ID.: P00447242LZ
Local Infrastructure Program – Building and other Structures
Buildings and Other Structures – Multi-Purpose/Facilities
Construction of Pamantasan ng Lungsod ng Valenzuela Satellite Building (Phase 2), Brgy. Malinta, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1.00 No. of Bldg.
Unit Cost (P’000) = P 101,376.00/ No. of Bldg.
Allocation = P 101.376 M
EAO = P 1.024 M
Total = P 102.400
As Modified
Local Infrastructure Program – Building and other Structures
Buildings and Other Structures – Multi-Purpose/Facilities
Construction of Pamantasan ng Lungsod ng Valenzuela Satellite Building, Brgy. Malinta, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1.00 No. of Bldg.
Unit Cost (P’000) = P 101,376.00/ No. of Bldg.
Allocation = P 101.376 M
EAO = P 1.024 M
Total = P 102.400
WIN0F06170
|
July 16, 2020 |
FY 2020 GAA |
WIN0F06215 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202937000
Project ID : P00447005LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabiliattion/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and landslide along
San Jose - Port Barton Road Section,
K0016+800 - K0016+910, Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
2,240.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0017+000 - K0017+071, Palawan
Physical Target : CW1 - Construction of Road Slope
Protection Structure :
1,726.25 sq.m.
Allocation: Php 40.00 Million
|
July 16, 2020 |
FY 2020 GAA |
WIN0F06209 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202934000
Project ID : P00447000LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0015+720 - K0015+800,
K0016+150 - K0016+220, Palawan
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
2,040.00 sq.m.
Allocation: Php 40.00 Million
TO:
Rehabilitation/Reconstruction of Roads with Slips,
Slope Collapse and Landslide along
San Jose - Port Barton Road Section,
K0016+315.00 - K0016+381.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure :
1,730.24 sq.m.
Allocation: Php 40.00 Million |
July 16, 2020 |
FY 2020 GAA |
WIN0F06214 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200258000
Project ID : P00449277LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Rehabilitation of Road Slope Protection Structure
along Tablas Circumferential Road,
K0044+571.00 - K0044+921.00
Tablas, Romblon
Physical Target: CW1 - Rehabilitation/Major Repair of
Road Slope Protection Structure:
2,480.26 sq.m.
Allocation: Php 50.00 Million
TO:
Rehabilitation of Slope Protection Structure along
Tablas Circumferential Road,
K0044+574.80 - K0044+660.00
Tablas, Romblon
Physical Target: CW1 - Rehabilitation/Major Repair of
Road Slope Protection Structure:
2,165.08 sq.m.
Allocation: Php 50.00 Million
|
July 16, 2020 |
CY 2020 |
WIN0F0605 |
UACS No. 300116202548000 |
June 1, 2020 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116202548000
Project ID.: P00444976LZ
Local Program – Local – National Roads and Bridges – Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Project
Rehabilitation of Roads along Thomas Manuel, Brgy. Marulas, Valenzuela City
Physical Target: CW1 = Rehabilitation of Paved Road = 0.496 lane km
Unit Cost (P’000) = P 19,758.06/lane km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
As Modified
Local Infrastructure Program – Building and other Structures
Local Program – Local – National Roads and Bridges – Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Project
Rehabilitation of Roads along Thomas Manuel, Brgy. Karuhatan, Valenzuela City
Physical Target: CW1 = Rehabilitation of Paved Road = 0.496 lane km
Unit Cost (P’000) = P 19,758.06/lane km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
WIN0F06057
|
July 16, 2020 |
FY 2020 GAA |
WIN0F06200 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200256000
Project ID : P00449275LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0157+000.00 - K0160+060.00,
K0162+471.00 - K0163+701.00,
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay : 0 Lane Km
Allocation: Php 50.00 Million
TO:
Preventive Maintenance of Road : Asphalt Overlay
Quezon - Punta Baja
K0157+000.00 - K0158+511.00,
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay : 3.084 Lane Km
Allocation: Php 50.00 Million |
July 14, 2020 |
FY 2020 |
WIN0G02987 |
310202100515000 |
May 27, 2020 |
Region IX |
Regional Office IX |
UACS No. 310202100515000
Project ID: P00400308MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Basilan Circumferential Rd
K0002+000 - K0002+800.00,
K0003+020.00 - K0004+000
CW1 - Road Widening: 3.526 lane km.
Unit Cost: P 27,949,000.00/lane km.
ROW: 15,680.75533 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,449,132.43
Excess: P 3,300,000.00
Allocation: P 110,000,000.00 |
July 14, 2020 |
2020 |
WIN0C03890 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Abra - Ilocos Norte Road, K0431+570 - K0431+920;
Physical Target: CW1 : 7,762.5 Square meters; Allocation= Php 149,975,000
To: Abra - Ilocos Norte Road, K0431+710 - K0431+920;
Physical Target: CW1 : 8,090 Square meters; Allocation= Php 149,975,000
|
July 14, 2020 |
2020 |
WIN0C03878 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Abra - Ilocos Norte Road, K0446+615- K0446+840;
Physical Target: CW1 : 7,150 Square meters; Allocation= Php 125,075,000
To: Abra - Ilocos Norte Road, K0446+030 - K0446+080, K0446+615- K0446+840;
Physical Target: CW1 : 6,429.50 Square meters; Allocation= Php 125,075,000
|
July 14, 2020 |
2020 |
WIN0C03889 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Abra - Ilocos Norte Road, K0447+540- K0447+700;
Physical Target: CW1 : 7,370 Square meters; Allocation= Php 111,360,000
To: Abra - Ilocos Norte Road, K0447+540- K0447+700, K0448+960 - K0449+100;
Physical Target: CW1 : 5,680 Square meters; Allocation= Php 111,360,000
|
July 14, 2020 |
2020 |
WIN0C03892 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+200 - K0453+700;
Physical Target: CW1 : 8,250 Square meters; Allocation= Php 144,500,000
To: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0453+601 - K0453+850;
Physical Target: CW1 : 7,605 Square meters; Allocation= Php 144,500,000
|
July 14, 2020 |
2020 |
WIN0C03877 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+100 - K0474+600 ; Physical Target: CW1 : 8,250 Square meters; Allocation= Php 144,500,000
To: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide, Abra-Kalinga Road K0474+104 - K0474+295;
Physical Target: CW1 : 7,627.50 Square meters; Allocation= Php 144,500,000
|
July 14, 2020 |
2020 |
WIN0C03884 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0216 + 820 - K0217 + 000, K0222 + 195 - K0222 + 216, K0228 + 050 - K0228 + 178, K0228 + 204 - K0228 + 274, K0228 + 804 - K0228 + 870;
Physical Target: CW1 : 14,652 Square meters; Allocation= Php 252,623,000
To: Kennon Rd - K0228+067 - K0228+170, K0229+090 - K0229+270, K0238+150 - K0238+225, K0238+813 - K0238+870;
Physical Target: CW1 : 13,388 Square meters; Allocation= Php 252,623,000
|
July 14, 2020 |
2020 |
WIN0C03863 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0235 + 833 - K0236 + 016, K0237 + 340 - K0237 + 385, K0237 + 362 - K0237 + 368, K0238 + 150 - K0238 + 195; Physical Target: CW1 : 5,556 Square meters; Allocation= Php 85,192,000
To: Kennon Rd - K0237+280- K0237+391; Physical Target: CW1 : 3,375.90 Square meters; Allocation= Php 85,192,000
|
July 14, 2020 |
2020 |
WIN0C03849 |
GAA 2020 |
June 29, 2020 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Improvement and Rehabilitation of Sadsadan-Bacalinao-Salin Access Road, Besao, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 5,000,000
To: Improvement and Rehabilitation of Sadsadan-Balicanao-Salin Access Road, Bauko, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 5,000,000
|
July 14, 2020 |
2020 |
WINC03882 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Improvement of Bagnen Norte-Brgy. Sur Provincial Road located at the vegetable producing Bauko, Mountain Province;
Physical Target: CW1 : 0.502 Lane Km; Allocation= Php 5,000,000
To: Improvement of Bagnen Oriente-Bagnen Proper Provincial Road located at the vegetable producing Bauko, Mountain Province;
Physical Target: CW1 : 0.502 Lane Km; Allocation= Php 5,000,000
|
July 14, 2020 |
2020 |
WIN0C03868 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction/Rehabilitation/Improvement of Local Road, Brgy. Ankileng, Sagada, Mountain Province;
Physical Target: CW1 : 0.360 Lane Km; Allocation= Php 10,000,000
To: Construction/Rehabilitation/Improvement of Local Road, Brgy. Ankileng, Sagada, Mountain Province;
Physical Target: CW1 : 0.600 Lane Km; Allocation= Php 10,000,000
|
July 14, 2020 |
2020 |
WIN0C03885 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Saliok Flood Control, Paracelis, Mountain Province;
Physical Target: CW1 : 430 Lineal meters; Allocation= Php 30,000,000
To: Construction of Flood Mitigation Structure - Construction of Saliok Flood Control, Natonin, Mountain Province;
Physical Target: CW1 : 430 Lineal meters; Allocation= Php 30,000,000
|
July 14, 2020 |
2020 |
WIN0C03895 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Rehabilitation of Local Road at Brgy. Dagadag ili via Lusong Mankayan, Benguet; Physical Target: CW1 : 0.550 Lane Km;
Allocation= Php 5,000,000
To: Rehabilitation of Local Road at Dagadag ili via Lusong, Balili, Mankayan, Benguet;
Physical Target: CW1 : 0.544 Lane Km; Allocation= Php 5,000,000
|
July 14, 2020 |
2020 |
WIN0C03896 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Concreting of Road at Liwant Pakedlan, Tabio, Mankayan, Benguet towards Balili Road connecting to the National Road at Tubo, Sapid, Mankayan, Benguet;
Physical Target: CW1 : 0.500 Lane Km; Allocation= Php 5,000,000
To: Concreting of Road at Liwang Pakedlan, Tabio, Mankayan, Benguet towards Balili Road connecting to the National Road at Tubo, Sapid, Mankayan, Benguet;
Physical Target: CW1 : 0.500 Lane Km; Allocation= Php 5,000,000
|
July 14, 2020 |
2020 |
WINC03880 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement of Baguiney Tulodan to Batio, Cattubo Road, Cattubo, Atok, Benguet;
Physical Target: CW1 : 0.320 Lane Km;
Allocation= Php 3,000,000
To: Improvement of Baguingey Tulodan to Botiao, Cattubo Road, Cattubo, Atok, Benguet; Physical Target: CW1 : 0.320 Lane Km; Allocation= Php 3,000,000
|
July 14, 2020 |
2020 |
WINC03862 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement and Opening of Beyeng-Legab-Kayapa-Damoco Road, Brgy. Poblacion, Kayapa, Bakun, Benguet;
Physical Target: CW1 : 6.00 Lane Km; Allocation= Php 50,000,000
To: Improvement and Opening of Beyeng-Legab-Kayapa-Damoco Road, Brgy. Poblacion, Kayapa, Bakun, Benguet;
Physical Target: CW1 : 5.600 Lane Km; Allocation= Php 50,000,000
|
July 14, 2020 |
2020 |
WIN0C03915 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Improvement of Lower Cruz Ambassador Road, Lower Cruz Ambassador, Tublay, Benguet;
Physical Target: CW1 : 0.300 Lane Km;
Allocation= Php 3,000,000
To: Improvement of Lower Coroz Ambassador Road, Lower Coroz, Ambassador, Tublay, Benguet;
Physical Target: CW1 : 0.300 Lane Km; Allocation= Php 3,000,000
|
July 14, 2020 |
2020 |
WIN0C03888 |
GAA 2020 |
June 30, 2020 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction/Repair/Rehabilitation/Improvement of Burnay-Anao Road in Hinyon, Ifugao;
Physical Target: CW1 : 0.30 Lane Km; Allocation= Php 5,000,000
To: Construction/Repair/Rehabilitation/Improvement of Burnay-Anao Road in Hingyon, Ifugao; Physical Target: CW1 : 0.415 Lane Km; Allocation= Php 5,000,000
|
July 13, 2020 |
FY 2020 |
WIN0G02979 |
320101105354000 |
June 16, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 320101105354000
Project ID: P00420461MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of La Dicha Bridge River Control (Downstream), Sta. 00+000 - Sta. 00+414.70, Malangas, Zamboanga Sibugay
CW1 - Construction of Flood Mitigation Structure: 414.70 lm
Unit Cost: P 70,894.52/lm
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02865 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1773+603 - K1776+421
Physical Target:
CW1: 5.688 lane km (Road Widening)
Allocation:
TOTAL: P 88,386,000.00
CW1: P 85,292,490.00 (Road Widening)
EAO: P 3,093,510.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1771+820 - K1772+530, K1773+603 - K1774+800
Physical Target:
CW1: 3.970 lane km (Road Widening)
Allocation:
TOTAL: P 88,386,000.00
CW1: P 85,292,490.00 (Road Widening)
EAO: P 3,093,510.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02961 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Las Arenas-Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 1.940 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Las Arenas-Araibo, Pantukan, Compostela Valley
Physical Target:
CW1: 2.080 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02965 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road Katipunan, Nabunturan, Compostela Valley
Physical Target:
CW1: 1.960 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road Katipunan, Nabunturan, Compostela Valley
Physical Target:
CW1: 2.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02938 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Davao-Cotabato Old Rd -
K1520+745 - K1520+750
Physical Target:
CW1: 600.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Drainage Structure along Road)
EAO: P 400,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage along Davao-Cotabato Old Rd -
K1520+745 - K1520+750
Physical Target:
CW1: 820.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Drainage Structure along Road)
EAO: P 400,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02973 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Daang Maharlika -
K1508+493 - K1509+684, K1508+192 - K1508+218 (L/S)
Physical Target:
CW1: 2.280 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,901,000.00
CW1: P 44,002,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 898,020.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay along Daang Maharlika -
K1508+192 - K1508+900
Physical Target:
CW1: 2.858 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,901,000.00
CW1: P 44,002,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 898,020.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02951 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along ABS-CBN - Quimpo Blvd Div. Rd -
K1512+125 - K1512+444 (L/S), K1512+687 - K1513+574 (L/S), K1513+620 - K1515+343
Physical Target:
CW1: 0.600 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,150,000.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance along ABS-CBN - Quimpo Blvd Div. Rd -
K1511+(-084) - K1511+409, K1515+198 - K1515+267
Physical Target:
CW1: 6.136 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,150,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02952 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 150.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago Gallera Creek, Rosalina Village Section, Brgy. Bago Gallera, Davao City
Physical Target:
CW1: 350.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02950 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.480 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Reconstruction to Concrete Pavement: Jct. E. Quirino Ave. - Mt. Apo - Gen Luna St. - Mt. Mayon St. - J. Abad Santos - Camus St. Road leading to People’s Park, Davao City
Physical Target:
CW1: 1.266 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Reconstruction to Concrete Pavement)
EAO: P 400,000.00 |
July 13, 2020 |
FY 2020 GAA |
WIN0G02957 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at 1st Avenue, Juna Subd., Matina Crossing, Davao City
Physical Target:
CW1: 1.154 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 12,600,000.00
CW1: P 12,348,000.00 (Construction of Concrete Road)
EAO: P 252,000.00 |
July 10, 2020 |
FY 2020 |
WIN0G02985 |
310204100795000 |
June 15, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100795000
Project ID: P00401265MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City By-Pass Road (Culianan - Patalon Section), Package 3, Zamboanga City
CW1 - Road Widening: 9.42 lane km.
Unit Cost: P 15,269,000.00/lane km.
ROW: 687.617 sq. m.
Unit Cost: P 1,519.74/ sq.m.
EAO: P 5,034,264.80
Excess: 84,598.01
Allocation: P 150,000,000.00 |
July 10, 2020 |
FY 2020 |
WIN0G02978 |
300117207278000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300117207278000
Project ID: P00443976MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Tetuan, Zamboanga City
Physical Target:
CW-1- Rehabilitation of Paved Road: 3.12 lane km
Unit Cost: P 6,346,153.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
July 10, 2020 |
2020 |
WIN0C03912 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 019 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Rd. (Pinukpuk-Abbut Section) - K0532 + 000 - K0533 + 000;
Physical Target: CW1 : 2.03 Lane Km; Allocation= Php 10,113,000
|
July 10, 2020 |
2020 |
WIN0C03914 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.614 Lane Km; Allocation= Php 21,305,000
To: Mt. Province Bdry.-Calanan-Pinukpuk-Abbut Road (Cagaluan-Calanan Section) – K0472 + 000 – K0472 + 865, K0474 + 160 – K0475 + 032;
Physical Target: CW1 : 3.459 Lane Km; Allocation= Php 21,305,000
|
July 10, 2020 |
2020 |
WIN0C03924 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0504 + 392;
Physical Target: CW1 : 910 Square meters; Allocation= Php 20,000,000
To: Kalinga-Cagayan Road (Calanan-Enrile Section), K0503 + 000 – K0505 + 000, K0507 + 400 – K0510 + 013;
Physical Target: CW1 : 2,860.06 Square meters; Allocation= Php 20,000,000
|
July 10, 2020 |
2020 |
WIN0C03906 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Constructionof Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 20,000,000
To: Construction of Pinukpuk-Balbalan Road (Bal-Aba-aba Section), Brgy. Ballayangon, Pinukpuk, Kalinga;
Physical Target: CW1 : 2.600 Lane Km; Allocation= Php 20,000,000
|
July 10, 2020 |
2020 |
WIN0C03913 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 5,000,000
To: Construction of Road from Bangao to Brgy. Lower Mangali, Tanudan, Kalinga;
Physical Target: CW1 : 0.800 Lane Km; Allocation= Php 5,000,000
|
July 10, 2020 |
2020 |
WIN0C03923 |
GAA 2020 |
July 2, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 0 Lane Km;
Allocation= Php 15,000,000
To: Upgrading/Improvement of Cabaruan-Balong Road, Brgy. Cabaruan, Tabuk City, Kalinga; Physical Target: CW1 : 2.478 Lane Km; Allocation= Php 15,000,000
|
July 10, 2020 |
CY 2020 |
WIN0F06117 |
UACS No. 320101104344000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 320101104344000
Project ID.: P00421447LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 5), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structures and Tributaries, Brgy. Payatas (Phase 6), Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structures = 600 l.m.
Unit Cost (P’000) = P81.67/l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN0F06117
|
July 10, 2020 |
CY 2020 |
WIN0F06119 |
UACS No. 300104213532000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300104213532000
Project ID.: P00447360LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 20,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Enrique, Brgy. Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 20,000.00
WIN0F06119
|
July 9, 2020 |
CY 2020 |
WIN0F06177 |
UACS No. 300104213533000 |
June 1, 2020 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300104213533000
Project ID.: P00447362LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Holy Spirit, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building at Don Jose, Brgy. Commonwealth, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P19,800/bldg..
Allocation (P’000) = P 19,800.00
EAO = P 200.00
Total (P’000) = P 20,000.00
WIN0F06177
|
July 8, 2020 |
2020 |
WIN0G02909 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200151000
Project ID: P00444711MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P69,480,000
EAO: P2,520,000
TOTAL: P72,000,000
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Bacuag Section, K1161+011 – K1161+238, Brgy. Pob., Bacuag, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,364.70 sq.m
Unit Cost: P29,382 / sq.m
Allocation: P69,480,000
EAO: P2,520,000
TOTAL: P72,000,000 |
July 8, 2020 |
2020 |
WIN0G02937 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200153000
Project ID: P00444713MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+596 – K1195+773, Brgy. Hayanggabon, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P85,035.80M
EAO: P3,084.20M
TOTAL: P88.120M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Hayanggabon Section, K1195+570 – K1195+747, Brgy. Hayanggabon, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,897.74 sq.m.
Unit Cost: P29.346T/sq.m.
Allocation: P85,035.80M
EAO: P3,084.20M
TOTAL: P88.120M |
July 8, 2020 |
2020 |
WIN0G02955 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200152000
Project ID: P00444712MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1184+(-197) – K1184+045, Brgy Cabugo, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P86,811.40M
EAO: P3,148.60M
TOTAL: P89.960M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Cabugo Section, K1183+947 – K1184+065, Brgy Cabugo, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,959.01 sq.m
Unit Cost: P29,338T / sq.m
Allocation: P86,811.40M
EAO: P3,148.60M
TOTAL: P89.960M |
July 8, 2020 |
2020 |
WIN0G02914 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200159000
Project ID: P00444718MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P87,683.760M
EAO: P3,180.240M
TOTAL: P90.864M
TO:
Rehabilitation / Reconstrustion of National Roads with Slips, Slope Collapse and Landslide Daang Maharlika Road, Lipata-Surigao Section, K1116+142 - K1116+268.50, Brgy. Lipata, Surigao City
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 3,312.82 sq.m
Unit Cost: P26.468T / sq.m
Allocation: P87,683.760M
EAO: P3,180.240M
TOTAL: P90.864M |
July 7, 2020 |
FY 2020 GAA |
WIN0F06161 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310102100493000
Project ID: P00401078LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation: Preventive Maintenance - Secondary Roads
FROM:
Puerto Princesa North Road,
K0019+800 - K0021+000,
K0021+082 - K0022+186,
K0027+000 - K0027+823,
K0030+123 - K0031+928,
K0033+023 - K0034+154,
K0035+900 - K0036+281,
K0036+964 - K0037+009,
K0038+068 - K0039+868,
K0050+258 - K0050+286,
K0054+326 - K0055+022
Physical Target: CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 19.794 Lane Km
Allocation: Php 29.373 Million
TO:
Puerto Princesa North Road,
K0040+500 - K0041+781,
K0049+654 - K0050+341,
K0053+509 - K0054+959,
K0057+309 - K0058+768,
K0059+318 - K0059+654,
K0062+450 - K0062+480,
K0069+804 - K0070+972,
K0071+218 - K0072+863,
K0074+227 - K0075+581,
K0076+432 - K0077+923,
K0078+004 - K0080+890
Physical Target : CW1 - Preventive Maintenance of Road:
Concrete Reblocking - 2.8935 Lane Km
Allocation: Php 29.373 Million |
July 7, 2020 |
FY 2020 GAA |
WIN0F06163 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310105100393000
Project ID: P00402571LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads -
Secondary Roads
FROM:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.416 Lane Km
Allocation: Php 38.622 Million
TO:
Puerto Princesa South Road,
K0022+300 - K0022+450,
K0022+800 - K0022+997,
K0023+109 - K0023+760,
K0025+300 - K0025+510,
K0027+292 - K0027+665
Physical Target: CW1 - Reconstruction to Concrete Pavement :
3.162 Lane Km
Allocation: Php 38.622 Lane Km
|
July 7, 2020 |
FY 2020 |
WIN0G02974 |
300116203176000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300116203176000
Project ID: P00443630MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road, Brgy. Panubigan, Zamboanga City
Physical Target:
CW-1 - Construction of Concrete Road: 3.480 lane km.
Unit Cost: P 14,224,000.00/lane km.
EAO: P 500,000.00
Allocation: P 50,000,000.00 |
July 7, 2020 |
FY 2020 |
WIN0G02977 |
300117207277000 |
June 2, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
'UACS No. 300117207277000
Project ID: P00443973MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads, Brgy. Talon-talon, Zamboanga City
Physical Target:
CW-1- Rehabilitation of Paved Road: 3.3755 lane km
Unit Cost: P 5,865,000.00/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
July 7, 2020 |
FY 2020 |
WIN0G02971 |
320101104227000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104227000
Project ID: P00420385MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Extension of flood control structure (revetment) along Dapitan River, Tutua-Polo Section, (2+666.25 - 3+074.25), Zamboanga del Norte
CW1 - Construction of Revetment: 408.00 lm
Unit Cost: P 237,248.78/lm
ROW : 16,048.61407 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,387,912.61
Allocation: P 105,000,000.00 |
July 7, 2020 |
2020 |
WIN0G02913 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 310201100516000
Project ID: P00401461MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72
Type of Work: CW1 - Road Widening
Physical Target: 2.703 Lane Km
Unit Cost: P18.564558 M / Lane Km
Allocation: P50,180,000
EAO: P1,820,000
TOTAL: P52,000,000
TO:
Daang Maharlika (Surigao - Agusan Section) - K1160 + 784 - K1162 + 084.72, K1163+600 - K1163+660
Type of Work: CW1 - Road Widening
Physical Target: 3.351 Lane Km
Unit Cost: P14.974634 M / Lane Km
Allocation: P50,180,000
EAO: P1,820,000
TOTAL: P52,000,000 |
July 7, 2020 |
2020 |
WIN0G02900 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200155000
Project ID: P00444715MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Kinalablaban, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P84,230,990M
EAO: P3,055,010M
TOTAL: P87.286M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Kinalablaban Section, K1201+724 – K1201+953, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,870.08 sq.m
Unit Cost: P29.348T / sq.m
Allocation: P84,230,990M
EAO: P3,055,010M
TOTAL: P87.286M |
July 7, 2020 |
2020 |
WIN0G02912 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200150000
Project ID: P00444710MN
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K1197+265 – K1197+500, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P83,899.03M
EAO: P3,042.97M
TOTAL: P86.942M
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road Cagdianao Section, K119+867 – K1196+085, Brgy. Cagdianao, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,858.88 sq.m
Unit Cost: P29.347T/sq.m
Allocation: P83,899.03M
EAO: P3,042.97M
TOTAL: P86.942M |
July 7, 2020 |
2020 |
WIN0G02906 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117207584000
Project ID: P00444340MN
Local Infrastructure Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Concreting of Road, Brgy. Campo-Pautao, Gigaquit, Surigao del Norte
Type of Work: CW1 - Construction of Concrete Road
Physical Target: -
Unit Cost: -
Allocation: P19,800,000
EAO: P200,000
TOTAL: P20,000,000
TO:
Concreting of Road, Brgy. Campo-Pautao, Bacuag, Surigao del Norte
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 2.012 Lane Km
Unit Cost: P9.840954 M/Lane Km
Allocation: P19,800,000
EAO: P200,000
TOTAL: P20,000,000 |
July 7, 2020 |
2020 |
WIN0G02885 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300111200156000
Project ID: P00444716MN
Local Infrastructure Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+870, Brgy. Wangke, Claver, Surigao Del Norte
Type of Work: CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target: -
Unit Cost: -
Allocation: P87,077,740
EAO: P3,158,260
TOTAL: P90,236,000
TO:
Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Surigao-Davao Coastal Road, Wangke Section, K1183+670 – K1183+868, Brgy. Wangke, Claver, Surigao Del Norte
Type of Work: CW1 - Construction of Road Slope Protection Structure
Physical Target: 2,967.66 sq.m
Unit Cost: P29,342/sq.m
Allocation: P87,077,740
EAO: P3,158,260
TOTAL: P90,236,000 |
July 7, 2020 |
2020 |
WIN0G02910 |
FY 2020 RA 11465 |
January 24, 2020 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300104218865000
Project ID: P00444524MN
Local Infrastructure Program - Buildings And Other Structures - Multipurpose / Facilities
FROM:
Construction (Completion) of Multi-Purpose Building, Bgy. Cagnoig, San Francisco, Surigao del Norte
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: -
Allocation: P1,000,000
EAO: -
TOTAL: P1,000,000
TO:
Construction (Completion) of Multi-Purpose Building, Bgy. Cagniog, Surigao City, Surigao del Norte
Type of Work: CW1 - Construction of Multi Purpose Building
Physical Target: 1 Number of Building
Unit Cost: P1.0M/ Building
Allocation: P1,000,000
EAO: -
TOTAL: P1,000,000 |
July 3, 2020 |
FY 2020 GAA |
WIN0F06174 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No.: 310108100388000
Project ID: P00400141LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
FROM:
Tablas Circumferential Road
K0040+106 - K0040+206
Physical target : CW1 - Construction of Road Slope
Protection Structure : 1,666.67 sq.m.
Allocation: Php 30.00 Million
TO:
Tablas Circumferential road
K0040+138.35 - K0040+163.96
Physical Target : CW1 - Construction of Road Slope
Protection Structure : 1,238.70 sq.m.
Allocation: Php 30.00 Million |
July 3, 2020 |
FY 2020 GAA |
WIN0F06165 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206534000
Project ID: P00447543LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Improvement of Botilao - Ipil Road,
Sta. 0+000 - Sta. 1+000,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road :
11.096 Lane Km
Allocation: Php 98.750 Million
TO:
Rehabilitation/Improvement of Botilao - Ipit Road,
Sta. 0+000 - Sta. 5+548,
Sta. Cruz, Marinduque
Physical Target: CW1 - Rehabilitation Paved Road
11.096 Lane Km
Allocation: Php 98.750 Million
|
July 3, 2020 |
FY 2020 GAA |
WIN0F06162 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. 310105100394000
Project ID: P00401304LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+045
Physical Target: CW1 - Reconstruction to Concrete Pavement :
1.796 Lane Km
Allocation: Php 28.736 Million
TO:
Puerto Princesa South Road,
K0030+126 - K0030+657,
K0030+748 - K0031+180
Physical Target: CW1 - Reconstruction to Concrete Pavement :
2.066 Lane Km
Allocation: Php 28.736 Mllion
|
July 3, 2020 |
FY 2020 GAA |
WIN0F06164 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202941000
Project ID: P00447012LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 173+079 - Sta. 184+500 ), Palawan
Physical Target: CW1 - Construction of Concrete Road:
3.41 Lane Km
Allocation: Php 50.00 Million
TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Package B
( Sta. 191+935.50 - Sta. 193+175.00), Palawan
Physical Target: CW1 - Construction of Gravel Road :
2.479 Lane Km
Allocation: 50.00 Million |
July 2, 2020 |
FY 2020 GAA |
WIN0F6167 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202188000
Project ID: P00446499LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D, 20+000 - 25+000,
Palawan
Physical Target: CW-1 Construction of Concrete Road:
0 Lane Km
Allocation: Php 55.00 Million
TO:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package D,
Sta. 263+461.00 - Sta. 267+035,
Palawan
Physical Target: CW-1 Construction of Gravel Road:
7.1468 Lane Km
Allocation: Php 55.00 Million
|
July 2, 2020 |
FY 2020 GAA |
WIN0F06168 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202207000
Project ID: P00446513LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 182+000 - Sta.188+500), Palawan
Physical Target : CW-1 Construction of Concrete Road :
3.30 Lane km
Allocation: Php 55.00 Million
TO:
Constructon of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package C,
(Sta. 193+175.00 - Sta. 198+000.00), Palawan
Physical Target : CW-1 Construction of Gravel Road:
9.65 Lane Km
Allocation : Php 55.00 Million
|
July 2, 2020 |
FY 2020 GAA |
WIN0F06169 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310105100392000
Project ID : P00401308LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads
FROM:
Irawan - Tagburos Rd.
K0012+1046 - K0013+000,
K0012+953 - K0012+1046,
K0013+000 - K0013+785,
K0018+000 - K0018+305
Physical Target: CW1 - Reconstruction to Concrete Pavement:
2.41 Lane Km
Allocation: Php 38.490 Million
TO:
Irawan - Tagburos rd.
K0012+953 - K0013+745,
K0018+000 - K0018+415
Physical Target : CW1 - Reconstruction to Concrete Pavement:
2.55 Lane Km
Allocation : Php 38.490 million |
July 2, 2020 |
2020 |
310205100341000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Missing Links/ New Roads - Roxas - Paracelis Road, Isabela |
July 2, 2020 |
2020 |
310204100399000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Bypass and Diversion Roads - Bambang Bypass Road, Nueva Vizcaya |
June 30, 2020 |
FY 2020 |
WIN0G02936 |
320101104224000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104224000
Project ID: P00420382MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of revetment, Kumalarang River, Isabela City, Basilan
CW1 - Construction of Revetment: 620.00 lm
Unit Cost: P 173,751.00/lm
ROW : 945.9768 sq. m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,770,403.13
Allocation: P 111,780,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02949 |
310102100403000 |
May 26, 2020 |
Region IX |
Regional Office IX |
UACS No. 310102100403000
Project ID: P00400517MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) -
K1924 + 204 - K1924 + 755,
K1925 + 000 - K1927 + 000,
K1929 + 477 - K1930 + 000,
K1932 + 000 - K1933 + 000,
K1935 + 092 - K1936 + 518.00,
K1936 + 548 - K1937 + 000,
K1938 + 000 - K1939 + 097,
K1939 + 1000 - K1939 + 2000,
K1939 + 3000 - K1939 + 4000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 18.198 lane km.
Unit Cost: P 5,598,000.00/lane km.
EAO: P 3,566,077.29
Allocation: P 105,454,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02879 |
310205100265000 |
May 13, 2020 |
Region IX |
Regional Office IX |
UACS No. 310205100265000
Project ID: P00401272MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads
Midsalip - Buboan Road, Zamboanga del Sur
CW1 - Construction of Concrete Road: 4.24 lane km.
Unit Cost: P 23,171,000.00/lane km.
ROW: 11,041.25867 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,438,711.87
Allocation: P 105,000,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02880 |
310201100481000 |
May 4, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100481000
Project ID: P00400269MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd -
K1875+940 - K1878+880.00
CW1 - Road Widening: 5.88 lane km.
Unit Cost: P 18,864,000.00/lane km.
ROW: 33,333.333 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,882,356.94
Excess: P 48,159.06
Allocation: P 124,855,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02941 |
310106100523000 |
June 9, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100523000
Project ID: P00400621MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Dipolog - Polanco - Piñan - Jct. Oroquieta Rd -
K1827+969.80 - K1828+687
CW1 - Reconstruction from Pave to Concrete: 1.4164 lane km.
Unit Cost: P 7,887,600.00/lane km.
EAO: P 228,000.00
Allocation: P 11,400,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02945 |
310105100468000 |
June 8, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310105100468000
Project ID: P00400626MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads
Rizal - Dakak - Dapitan Coastal Loop Rd
K1840+557 - K1840+905,
K1843+674 - K1843+995,
K1844+828 - K1844+903,
K1845+419 - K1845+518,
K1846+107 - K1846+195.40
CW1 - Reconstruction from Pave to Concrete: 1.8628 lane km.
Unit Cost: P 17,869,160.00/lane km.
ROW: 1,500.00 sq.m.
Unit Cost: P 689.00/sq.m
EAO: P 679,320.00
Allocation: P 35,000,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02934 |
310111100241000 |
June 9, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310111100241000
Project ID: P00400398MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Jct. Polo - Dapitan Park Natl Rd
K1825+(-260) - K1825+180
K1826+172 - K1827+300
CW1 - Construction of Drainage Structure along Road: 1.572 lm.
Unit Cost: P 10,145,370.00/lm
ROW: 400.00 sq.m.
Unit Cost: P 1,000.00/sq.m
EAO: P 325,480.00
Allocation: P 16,674,000.00 |
June 30, 2020 |
FY 2020 |
WIN0G02939 |
310106100524000 |
June 8, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310106100524000
Project ID: P00400624MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Piñan - Mutia Rd
K1817+916 - K1818+000,
K1818+928 - K1819+178,
K1822+572 - K1823+194.60,
K1826+807 - K1826+901
CW1 - Reconstruction from Paved to Concrete: 2.0992 lane km.
Unit Cost: P 11,341,520.00/lane km.
ROW: 466.00 sq.m.
Unit Cost: P 100.00/sq.m
EAO: P 485,880.00
Allocation: P 24,760,000.00 |
June 29, 2020 |
2020 |
WIN0C03858 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0067+571 - K0067+653 |
June 24, 2020 |
FY 2020 GAA |
WIN0F06118 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Marinduque District Engineering Office |
UACS No.: 300117206532000
Project ID: P00449344LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Rehabilitation of Bolo - Pulang lupa road,
Sta. 1+076 - Sta. 2+076,
Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
50831 lane km
Allocation: Php 80.00 Million
TO:
Rehabilitation of Bolo - Pulang Lupa Road,
Sta. 1+076 - Sta. 3+991.5
Torrijos, Marinduque
Physical Target: CW1 - Rehabilitation of Paved Road:
5.831 lane km
Allocation: Php 80.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06113 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200147000
Project ID: P00449205LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive maintenance of Road: Asphalt Overlay
Quezon - Punta Baja
K0146+(-187.00) - K0150+465.00
Palawan
Physical Target: CW1 - Preventive Maintenance of Road:
Asphalt Overlay: 0 Lane Km
Allocation: Php 55.00 Million
TO:
Preventive Maintenance of Road: Asphalt Overlay
Quezon - punta Baja
K0146+(-187.00) - K0147+414.00
Palawan
Physical Target: CW1 - Preventive maintenance of Road:
Asphalt Overlay : 3.292 Lane Km
Allocation: Php 55.00 Million |
June 24, 2020 |
FY 2020 GAA |
WIN0F06092 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200255000
Project ID: P00449274LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road : Asphalt Overlay -
PPSr Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0142+730.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 2.069 Lane Km
Allocation : Php 40.00 Million
TO:
Preventive Maintenance of Road ; Asphalt Overlay -
PPSR Jct. (Abo-Abo) - Quezon
K0138+550.00 - K0139+568.00
Palawan
Physical Target : CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 2.138 Lane Km
Allocation: Php 40.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06087 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310203100272000
Project ID: P00402592LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM:
Coron - Busuanga Rd
K0005+124 - K0008+029,
k0008+469 - k0008+755,
k0013+582 - k0013+896,
k0013+950 - k0014+100
Physical Target: CW1 - Road Widening : 7.388 Lane Km
Allocation: php 107.478 Million
TO:
Coron - Busuanga Rd
K0005+124 - K0007+919,
K0008+489 - K0009+577.50
Physical target: CW1 - Road Widening : 7.827 Lane Km
Allocation: Php 107.478 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06088 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310202100481000
Project ID: P00400415LZ
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM:
Puerto Princesa North Rd
K0149+308 - K0152+625
Physical Target : CW1 - Road Widening - 6.758 Lane Km
Allocation: Php 125.00 Million
TO:
Puerto Princesa North Rd
K0149+308 - K0152+765
Physical Target : CW1 - Road Widening - 7.038 Lane Km
Allocation: Php 125.00 Million |
June 24, 2020 |
FY 2020 GAA |
WIN0F06091 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 310305100942000
Project ID: P00402596LZ
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridge
FROM:
Widening of Permanent Bridge - Dayandante Bridge I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 235.161 sq.m.
Allocation: Php 25.00 Million
TO:
Widening of Permanent Bridge - Dayandante I (B00221PW)
along Puerto Princesa North Rd
Physical Target : CW1 - Widening of Bridge : 207.800 sq.m.
Allocation: Php 25.00 Million
|
June 24, 2020 |
FY 2020 GAA |
WIN0F06004 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200251000
Project ID: P00449270LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0181+630.00,
K0182+000.00 - K0183+506.00,
Palawan
Physical Target : Preventive Maintenance of Road -
Asphalt overlay : 0 Lane Km
Allocation: Php 50.00 Million
TO:
Preventive Maintenance of Road : Asphalt Overlay of
Aramaywan - Berong,
K0176+000.00 - K0176+1061.00,
K0176+1185.00 - K0176+1482.00,
Palawan
Physical Target : Preventive Maintenance of Road :
Asphalt Overlay - 2.716 Lane Km
Allocation : Php 50.00 Million |
June 23, 2020 |
FY 2020 GAA |
WIN0F06121 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200113000
Project ID: P00449187LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0036+400 to K0036+900
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,022.00 sq.m.
Allocation: PHP 97.00 Million
TO:
Calapan North Road (S00008MR),
K0036+180 to K0036+302.20
Physical Target: CW1 - Construction of Road Slope
Protection Structure - 4,344.00 sq.m.
Allocation: Php 97.00 Million |
June 23, 2020 |
FY 2020 GAA |
WIN0F6120 |
FY 2020 GAA DPWH Infra Program |
January 6, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300111200114000
Project ID: P00449188LZ
LOCAL PROGRAM
National Roads and Bridges - National Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Calapan North Road (S00008MR),
K0037+300 to K0037+800
Physical Target: CW1 - Construction of Road Slope
Protection Structure : 4,094.00 sq.m.
Allocation: Php 98.00 Million
TO:
Calapan North Road (S00008MR),
K0037+300 to K0037+473.10
Physical Target: CW1 - Construction of Road Slope
Protection Structure: 4,367.00 sq.m.
Allocation: Php 98.00 Million
|