October 20, 2020 |
FY 2020 |
WIN0G03025 |
310305100839000 |
June 22, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100839000
Project ID: P00400785MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Sibuguey Br. (B00480MN) along Lanao - Pagadian - Zamboanga City Rd
CW1 - Widening of Bridge: 677.34 sq.m.
Unit Cost: P 145,449.51/sq.m.
EAO: P 3,448,157.24
Excess: P 33,068.52
Allocation: P 102,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03144 |
310204100792000 |
July 2, 2020 |
Region IX |
Regional Office IX |
'UACS No. 310204100792000
Project ID: P00401262MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Road
Buenavista - Bolong Bypass Road, Package 2, Zamboanga City
CW1 - Construction of Concrete Road: 1.74 lane km.
Unit Cost: P 79,404,178.94/lane km.
ROW: 29,103.00 sq.m.
Unit Cost: P 343.64/sq.m.
EAO: P 4,835,714.50
Allocation: P 153,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03117 |
320101104223000 |
June 18, 2020 |
Region IX |
Regional Office IX |
'UACS No. 320101104223000
Project ID: P00420381MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Kumalarang River, Isabela City
CW1 - Construction of Revetment: 588.42 lm
Unit Cost: P 180,580.46/lm
EAO: P 3,719,000.43
Excess: P 8,844.30
Allocation: P 109,985,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03106 |
300116203186000 |
July 23, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203186000
Project ID: P00443640MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of local roads, Junction Imelda - Alicia Road, Brgy. Mountain View, Payao, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 5.857 lane km.
Unit Cost: P 7,529,451.94/lane km.
EAO: P 900,000.00
Allocation: P 45,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03103 |
310101100371000 |
July 24, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310101100371000
Project ID: P00400521MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City - Zamboanga City Rd
K1666+846 - K1667+310,
K1666+(-034) - K1666+(-400)
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 3.32 lane km.
Unit Cost: P 7,768,861.45/lane km.
EAO: P 526,380.00
Allocation: P 26,319,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03105 |
300117207300000 |
July 27, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207300000
Project ID: P00444009MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Brgy. Guripan, Mahayag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.3476 lane km
Unit Cost: P 8,434,145.51/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03079 |
300117207299000 |
July 15, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207299000
Project ID: P00444007MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Concreting, Brgy. Dapiwak, Dumingag, Zamboanga del Dur
Physical Target:
CW-1- Construction of Concrete Road: 2.622 lane km
Unit Cost: P7,551,487.41/Lane km
EAO: P 200,000.00
Allocation: P 20,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03087 |
300203100518000 |
July 14, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100518000
Project ID: P00431600MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Bugwak Spring, Brgy. Lower Dimalinao, Molave, Zamboanga del Sur
CW1 - Construction of Concrete Road: 1.39 lane km.
Unit Cost: P 10,575,539.57/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03094 |
310201100474000 |
July 15, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100474000
Project ID: P00400273MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Jct. Blancia - Molave - Josefina Rd
K1655+611.8 - K1657+527
CW1 - Road Widening: 3.8304 lane km.
Unit Cost: P 16,123,642.44/lane km.
EAO: P 2,240,000.00
Allocation: P 64,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03100 |
300116203183000 |
July 14, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
'UACS No. 300116203183000
Project ID: P00443637MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Concreting of NRJ Lantian - San Isidro - Balimbingan - Luy-A - Tabuan - NRJ Camanga Road (NRJ Lantian - San Isidro Section) Labangan, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 4.40 lane km.
Unit Cost: P 11,136,363.64/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03091 |
310104100248000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310104100248000
Project ID: P00400627MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Jct. Aurora - Ozamis City Rd
K1655+025 - K1655+570,
K1655+616 - K1655+880,
K1655+940 - K1656+965
CW1 - Reconstruction to Concrete Pavement: 3.668 lane km.
Unit Cost: P 8,015,267.18/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03090 |
310212100153000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310212100153000
Project ID: P00401558MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Eastern Bobongan - Sominot - Midsalip - Dumingag Rd
K1664+538 - K1664+894.15,
K1665+162.12 - K1665+205
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.79806 lane km
Unit Cost: P 13,507,756.31/lane km
EAO: P 220,000.00
Allocation: P 11,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03020 |
310203100385000 |
June 18, 2020 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310203100385000
Project ID: P00400233MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dipolog - Polanco - Piñan - Jct Oroquieta Rd
K1811+290.80 - K1812+242,
K1812+267 - K1812+735.60
CW1 - Road Widening: 2.8436 lane km.
Unit Cost: P 13,227,520.00/lane km.
ROW: 6,666.67 Square meter
Unit Cost: P 300/ Sq. m.
EAO: P 779,560.00
Excess: P 584,670.00
Allocation: P 40,978,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03096 |
300116203197000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203197000
Project ID: P00443650MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Improvement/Construction/Concreting of Labasan - Camanga Road (Phase III), Brgy. Bagong Silang, Siay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.262 lane km.
Unit Cost: P 7,765,451.66/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0F06299 |
300116203193000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203193000
Project ID: P00443646MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road Phase II, Brgy. Malagandis, Titay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.38 lane km.
Unit Cost: P 10,652,173.91/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03099 |
310104100252000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 310104100252000
Project ID: P00400630MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1814+816 - K1814+987,
K1815+185 - K1815+327,
K1845+237 - K1845+296,
K1846+000 - K1846+210,
K1846+326 - K1846+371,
K1846+371 - K1846+448,
K1846+550 - K1846+587,
K1846+587 - 1846+614,
K1846+614 - K1846+677,
K1846+677 - K1846+791
CW1 - Reconstruction of Concrete Pavement: 1.4465 lane km.
Unit Cost: P 10,518,147.25/lane km.
EAO: P 310,500.00
Allocation: P 15,525,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03092 |
310212100157000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 310212100157000
Project ID: P00400480MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Crossing Sta. Clara - Sandayong Road
K1795+593 - K1795+623,
K1796+682 - K1796+765,
K1796+786 - K1796+858,
K1801+753 - K1801+861,
K1801+915 - K1802+000,
K1810+415 - K1810+519
Physical Target:
CW-1 - Paving of Unpaved Roads: 0.964 lane km
Unit Cost: P 14,006,680.50/lane km
EAO: P 275,560.00
Allocation: P 13,778,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03095 |
310201100599000 |
July 15, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310201100599000
Project ID: P00400320MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Ipil - Liloy - Sindangan Rd
K1996+(-863) - K1996+(-656),
K2002+680 - K2003+000,
K2011+837.84 - K2012+097
CW1 - Road Widening: 1.55832 lane km.
Unit Cost: P 17,090,448.55/lane km.
ROW: 6,060.00 Sq. m.
Unit Cost: P 300.00/Sq.m.
EAO: P 544,260.00
Excess: P 36,360.00
Allocation: P 29,031,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03107 |
300116203196000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203196000
Project ID: P00443649MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of the Provincial Road connecting Brgy Canacan - Sininan - Banker - Tampilisan - Diampak - Siolan, Brgy. Sininan, Kabasalan, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 0.804 lane km.
Unit Cost: P 12,189,054.73/lane km.
EAO: P 200,000.00
Allocation: P 10,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03102 |
300116203194000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
'UACS No. 300116203194000
Project ID: P00443647MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Local Road, Brgy. Banco, Titay, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 1.56692 lane km.
Unit Cost: P 9,381,461.72/lane km.
EAO: P 300,000.00
Allocation: P 15,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03104 |
310101100375000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No.310101100375000
Project ID: P00400527MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Ipil - Liloy - Sindangan Rd
K1996+000 - K1996+287,
K1998+000 - K1998+216,
K1998+614 - K1999+000
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 1.778 lane km.
Unit Cost: P 11,513,622.05/lane km.
EAO: P 417,780.00
Allocation: P 20,889,000.00
|
October 20, 2020 |
FY 2020 |
WIN0G03044 |
300116203192000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116203192000
Project ID: P00443645MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of the Access Road of Ipil Airport, Ipil, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 4.42026 lane km.
Unit Cost: P 11,085,320.77/lane km.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03041 |
300107200939000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300107200939000
Project ID: P00444672MN
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Local Infrastructure Program
Construction of River Wall along the Sibuguey River from Brgy. Minsulao to Brgy. Paruk, Siay, Zamboanga Sibugay
Physical Target:
CW1- Construction of Flood Mitigation Structure: 58.50 ln.m.
Unit Cost: P 33,846.15/ln.m.
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
October 20, 2020 |
FY 2020 |
WIN0G03067 |
310201100600000 |
June 26, 2020 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310201100600000
Project ID: P00401391MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1801+497 - K1802+921.38
CW1 - Road Widening: 3.39176 lane km.
Unit Cost: P 10,910,659.95/lane km.
ROW: 11,666.667 Sq. m.
Unit Cost: P 300.00/Sq.m.
EAO: P 756,660.00
Excess: P 70,000.00
Allocation: P 41,333,000.00 |
October 19, 2020 |
FY 2020 |
WIN0G03155 |
310204100794000 |
July 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310204100794000
Project ID: P00401266MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Road
Labangan - Pagadian City - Dumalinao By-Pass Road. Package A, Zamboanga del Sur
CW1 - Construction of Concrete Road: 6.562 lane km.
Unit Cost: P 15,687,196.44/lane km.
ROW: 11,525.80 sq.m.
Unit Cost: P 300.00/sq.m.
EAO: P 3,602,878.41
Allocation: P 110,000,000.00 |
October 16, 2020 |
FY 2020 |
WINOG03163 |
310102100405000 |
July 3, 2020 |
Region IX |
Regional Office IX |
UACS No. 310102100405000
Project ID: P00400513MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Zamboanga City - Labuan - Limpapa Rd
K1939+(-848) - K1943+820
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 11.40 lane km.
Unit Cost: P 8,610,103.50/lane km.
EAO: P 3,435,431.30
Excess: P 2,409,388.78
Allocation: P 104,000,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03165 |
310101100262000 |
August 24, 2020 |
Region IX |
Regional Office IX |
UACS No. 310101100262000
Project ID: P00400526MN
Organizational Outcome 1:
Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+153.76 - K1743+492.27
CW1 - Preventive Maintenance of Road: Concrete Reblocking: 6.677 lane km.
Unit Cost: P 14,632,897.88/lane km.
EAO: P 3,419,635.07
Excess: P 282,505.79
Allocation: P 101,406,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03166 |
310305100836000 |
July 14, 2020 |
Region IX |
Regional Office IX |
UACS No. 310305100836000
Project ID: P00400901MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Dicayo Br. (B00425MN) along Dipolog - Sindangan - Liloy Rd (Phase II)
CW1 - Widening of Bridge: 1,486.714 sq.m.
Unit Cost: P 12,997.57/sq.m.
EAO: P 676,328.50
Allocation: P 20,000,000.00 |
October 16, 2020 |
FY 2020 |
WIN0G03164 |
310201100482000 |
August 24, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100482000
Project ID: P00400270MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City - Zamboanga City Rd
K1875+880 - K1882+040
CW1 - Road Widening:6.32 lane km.
Unit Cost: P 17,431,843.26/lane km.
ROW: 33,333.33 sq. m.
Unit Cost: P 300/sq. m.
EAO: P 3,855,923.73
Excess: P 829,826.86
Allocation: P 124,855,000.00 |
October 15, 2020 |
2020 |
310203100317000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 1st District Engineering Office |
Network Development - Road Widening - Tertiary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Dect) - K0566 + (-228) - K0566 +1192 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03145 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 3+440 to Sta. 3+632, Davao City
Physical Target:
CW1: 100.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Davao River, Sta. 2+437 to Sta. 2+557, Davao City
Physical Target:
CW1: 120.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Revetment)
EAO: P 1,050,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03151 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi and Matina Balusong, Both Bank, Davao City
Physical Target:
CW1: 185.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Matina River, Matina Bridge Upstream, Matina Pangi and Matina Balusong, Both Bank, Davao City
Physical Target:
CW1: 143.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03147 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 3+000 to Sta. 3+326, Davao City
Physical Target:
CW1: 170.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 32,200,000.00 (Construction of Revetment)
EAO: P 800,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Lasang River, Sta. 1+905 to Sta. 2+075, Davao City
Physical Target:
CW1: 170.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 32,200,000.00 (Construction of Revetment)
EAO: P 800,000.00 |
October 9, 2020 |
FY 2020 GAA |
WIN0G03146 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties among Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Lasang River Flood Control, Sta. 38+999 - Sta. 39+464, Sta. 39+992 - 40+231, Right Bank, Davao City
Physical Target:
CW1: 650.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties among Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Lasang River Flood Control, Sta. 40+925 - Sta. 41+575, Right Bank, Davao City
Physical Target:
CW1: 650.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
October 8, 2020 |
2020 |
WIN0C03883 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100448000
Project ID: P00400456LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0356 + 076– K0357 + 377, K0357 + 406 – K0357 +894, K0357 + 920 – K0360 + 111
Physical Target: CW1 – Road Widening – 3.956 Lane Km
Amount: Php 150,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads - Daang Maharlika (LZ) – K0356 + 076– K0357 + 377, K0357 + 406 – K0357 +894, K0357 + 920 – K0358 + 819
Physical Target: CW1 – Road Widening – 5.3276 Lane Km
CW2 – Construction of Drainage Structure along Road – 5,277.40 Lineal meters
Amount: Php 150,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03865 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100489000
Project ID: P00401503LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0056 + 300 – K0058 + 000, K0059 + 252 – K0060 + 854, K0060 + 869 – K0062 + 527
Physical Target: CW1 – Road Widening – 10.046 Lane Km
Amount: Php 145,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0064 + 540 – K0066 + 380
Physical Target: CW1 – Road Widening – 3.689 Lane Km
CW2 – Construction of Drainage Structure along Road – 3,697.74 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 3,947.44 Square meters
Amount: Php 145,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03898 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310201100453000
Project ID: P00401507LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads – Rolando A Andaya Highway – K0300 + 000 – K0301 + 395
Physical Target: CW1 – Road Widening – 2.75 Lane Km
CW2 – Construction of Drainage Structure along Road – 2,895 Lineal meters
Amount: Php 120,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development – Road Widening – Primary Roads – Rolando A Andaya Highway – K0300 + 000 – K0301 + 526
Physical Target: CW1 – Road Widening – 3.012 Lane Km
CW2 – Construction of Drainage Structure along Road – 2,322 Lineal meters
Amount: Php 120,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03984 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310305100819000
Project ID: P00402060LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Pili Airport Br. (B00418LZ) along Pili-Airport Rd
Physical Target: CW1 – Widening of Permanent Bridges – 558.09 Square meters.
Amount: Php 60,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges – Pili Airport Br. (B00418LZ) along Pili-Airport Rd
Physical Target: CW1 – Widening of Permanent Bridges – 623.61 Square meters.
Amount: Php 60,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03926 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310108100314000
Project ID: P00402090LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0489 + 488 - K0489 + 566, K0490 + 352 - K0490 + 510, K0490 + 720 - K0490 + 743, K0493 + 048 - K0493 + 128, K0493 + 600 - K0493 + 765, K0495 + 580 - K0495 + 680, K0497 + 171 - K0497 + 211, K0497 + 455 - K0497 + 475, K0497 + 520 - K0497 + 555, K0498 + 300 - K0498 + 340
Physical Target: CW1 - Construction of Road Slope Protection – 21,811 Sq.m.
Amount: Php 125,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0497 + 580 - K0497 + 680.44
Physical Target: CW1 - Construction of Road Slope Protection – 5,068 Sq.m.
Amount: Php 125,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03969 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100760000
Project ID: P00402253LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Sorsogon City Coastal By-Pass Road Package 6
Physical Target: CW1 - Construction of Gravel Road – 2.504 Lane Km
Amount: Php 200,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Sorsogon City Coastal By-Pass Road Package 6
Physical Target: CW1 - Construction of Gravel Road – 2.594 Lane Km
CW2 - Construction of Road Slope Protection – 4,249.42 Sq.m
Amount: Php 200,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03875 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100762000
Project ID: P00402267LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Tagkawayan-Labo Diversion Road, (Labo Section), Camarines Norte
Physical Target: CW1 - Construction of Concrete Bridge – 1,240.2 Square meters
Amount: Php 130,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Tagkawayan-Labo Diversion Road, (Labo Section), Camarines Norte
Physical Target: CW1 - Construction of Concrete Bridge – 1,760.59 Square meters
Amount: Php 130,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03887 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100459000
Project ID: P00402411LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target: Construction of Concrete Road – 1.644 Lane Km
CW2 - Construction of Road Slope Protection – 3,372.80 Sq.m.
CW3 - Construction of Drainage Structure along Road – 1,644.50 Lineal meters.
Amount: Php 50,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Naga-Jct. Magarao-Canaman-Libmanan Jct. PPH Road (Skybridge), Camarines Sur
Physical Target: Construction of Concrete Road – 1.565 Lane Km
CW2 - Construction of Road Slope Protection – 1,564.5 Square meters
CW3 - Construction of Drainage Structure along Road – 3,196.40 Lineal meters.
ROW – ROW Acquisition – 3,911.25 Square meters
Amount: Php 50,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03887 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310204100754000
Project ID: P00402412LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road, Albay
Physical Target: Construction of Concrete Road – 1.691 Lane Km
CW2 - Construction of Road Slope Protection – 2,167.35 Sq.m.
CW3 - Construction of Drainage Structure along Road – 805.75 Lineal meters.
ROW – ROW Acquisition – 14,055 Square meters
Amount: Php 100,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road, Albay
Physical Target: Construction of Concrete Road – 1.57276 Lane Km
CW2 - Construction of Road Slope Protection – 2,310.34 Sq.m.
CW3 - Construction of Drainage Structure along Road – 746.66 Lineal meters.
ROW – ROW Acquisition – 14,055 Square meters
Amount: Php 100,000,000.00
|
October 8, 2020 |
2020 |
WIN0C03927 |
FY 2020 GAA RA 11465 |
January 22, 2020 |
Region V |
Regional Office V |
UACS No.: 310108100315000
Project ID: P00402598LZ
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0499 + 470 - K0499 + 500, K0499 + 720 - K0499 + 760, K0499 + 865 - K0499 + 900, K0500 + 235 - K0500 + 250, K0500 + 390 - K0500 + 440, K0500 + 540 - K0500 + 560, K0500 + 740 - K0500 + 755, K0501 + 230 - K0501 + 260, K0501 + 390 - K0501 + 410, K0501 + 500 - K0501 + 630, K0501 + 680 - K0501 + 745, K0502 + 710 - K0502 + 755, K0503 + 890 - K0503+1000, K0504 + 220 - K0504 + 252, K0504 + 348 - K0504 + 400, K0504 + 690 - K0504 + 750, K0505 + 000 - K0505 + 065, K0505 + 640 - K0505 + 700, K0505 + 970 - K0506 + 060, K0506 + 200 - K0506 + 255, K0507 + 170 - K0507 + 320
Physical Target: CW1 - Construction of Road Slope Protection – 20,441 Sq.m.
Amount: Php 125,000,000.00
TO:
OO1: Ensure Safe and Reliable National Road System – Asset preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0497 + 680.44 – K0497 + 744.50, K0506 + 080.00 – K0506 + 190.00
Physical Target: CW1 - Construction of Road Slope Protection – 5,457 Sq.m.
Amount: Php 125,000,000.00
|
September 29, 2020 |
FY 2020 |
WIN0G03129 |
300102200433000 |
July 8, 2020 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300102200433000
Project ID: P00442522MN
Local Program - Buildings and Other Structures - School Buildings - Local Infrastructure Program
Construction of School Building in Makayas Elementary School, Mandih, Sindangan, Zamboanga del Norte
Physical Target:
CW-1- Construction of School Building: 1.00 Building
Unit Cost: P 1,000,000.00/Building
Allocation: P 1,000,000.00 |
September 29, 2020 |
FY 2020 GAA |
WIN0G03141 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1502+480
Physical Target:
CW1: 4,020.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 92,189,000.00
CW1: P 88,962,385.00 (Construction of Drainage Structure along Road)
EAO: P 3,226,615.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1502+480
Physical Target:
CW1: 4,550.00 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 92,189,000.00
CW1: P 88,962,385.00 (Construction of Drainage Structure along Road)
EAO: P 3,226,615.00 |
September 29, 2020 |
FY 2020 GAA |
WIN0G03124 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Davao River, Davao River Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 185.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Davao River, Davao River Bridge Downstream Section, Right Bank, Davao City
Physical Target:
CW1: 315.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00 |
September 29, 2020 |
FY 2020 GAA |
WIN0G03122 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bago River, Sta. 2+370 to Sta. 2+835, Davao City
Physical Target:
CW1: 230.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,050,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure, Bago River, Sta. 3+370 to Sta. 3+422,
Sta. 3+426 to Sta. 3+480, Sta. 3+545 to Sta. 3+848, Sta. 3+851 to Sta. 3+876,
Sta. 3+880 to Sta. 3+897, Sta. 3+901 to Sta. 3+915, Davao City
Physical Target:
CW1: 465.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,050,000.00 |
September 29, 2020 |
FY 2020 GAA |
WIN0G03123 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago River, Bago Aplaya Section, Both Bank, Davao City
Physical Target:
CW1: 120.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilites - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Bago River, Bago Aplaya Section, Both Bank, Davao City
Physical Target:
CW1: 320.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00 |
September 28, 2020 |
2020 |
WIN0C04032 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 2nd District Engineering Office |
National Road and Bridges - National Roads - Local Infrastructure Program
Asphalt Overlay along Olongapo - Bugallon Rd, K0126+(-020) - K0126+226, K0128+574 - K0128+678, K0128+864 - K0129+015, K0130+403 - K0131+560, K0132+355 - K0133+186, K0134+090 - K0134+800, Olongapo City, Zambales |
September 28, 2020 |
FY 2020 |
WIN0G03140 |
320101104222000 |
July 29, 2020 |
Region IX |
Regional Office IX |
'UACS No. 320101104222000
Project ID: P00420380MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Labason Flood Control, (Downstream) 0+000 to 285 0+292 to 0+600 (Upstream) 0+718 to 0+901 at (exception: Osokan Creek) Antonino, Labason, Zamboanga del Norte
CW1 - Construction of Flood Mitigation Structure: 776.00 lm
Unit Cost: P 149,196.79/lm
EAO: P 4,052,184.70
Excess: P 171,109.52
Allocation: P 120,000,000.00 |
September 28, 2020 |
2020 |
WIN0C04048 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Zambales 1st District Engineering Office |
National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Slope Protection along Olongapo Bugallon Road Salaza Section, K0223+800 - K0223+844.55, Palauig, Zambales |
September 28, 2020 |
2020 |
WIN0C04047 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Pampanga 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Rd - K0083+605 - K0083+828, K0083+888 - K0084+679, K0085+428 - K0085+684 |
September 28, 2020 |
FY 2020 |
WIN0G03138 |
310212100123000 |
July 14, 2020 |
Region IX |
Regional Office IX |
UACS No. 310212100123000
Project ID: P00400479MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads
Zamboanga del Sur Coastal Rd - (S01169MN)
Chainage 000 - Chainage 2540,
Chainage 4440 - Chaiange 6528,
Chainage 8080 - Chainage 8600
CW1 - Paving of Unpaved Roads: 10.205 lane km.
Unit Cost: P 13,932,724.05/lane km.
ROW: 26,133.77 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 4,976,420.71
Allocation: P 155,000,000.00 |
September 28, 2020 |
FY 2020 |
WIN0G03139 |
300104217537000 |
July 24, 2020 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300104217537000
Project ID: P00443809MN
Local Program - Buildings and Other Structures - Multipurpose/Facilities - Local Infrastructure Program
Construction of Abaca Processing Building/ Facility, Siayan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.00 Building
Unit Cost: P 3,960,000.00/Building
EAO: P 40,000.00
Allocation: P 4,000,000.00 |
September 28, 2020 |
2020 |
WIN0C04041 |
GAA 2020 |
August 25, 2020 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: Caglayan-Paddig-Cupis Road leading to Nabuagan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao;
Type of Work: CW1: Construction of Concrete Road; Physical Target: CW1 : 2.442 Lane Km;
Allocation= Php 47000000
"To: Caglayan-Paddig-Cupis Road leading to Nabuagan River, Banselan Cave, Cupis Loomweaving, Brgy. Caglayan (New Pob.), Conner, Apayao;
Type of Work: CW1: Construction of Concrete Road
CW2: Construction of Concrete Road;
Physical Target: CW1: 1.002 Lane Km
CW2: 1.44 Lane Km;
Allocation= Php 47000000"
|
September 28, 2020 |
2020 |
WIN0G02996 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 300107200965000
Project ID: P00444694MN
LOCAL PROGRAM - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
FROM:
Construction of Agusan River Flood Control Sta 0+000.00+0+120.00 Veruela, 2nd District, Agusan del Sur
Type of Work: CW1 - Construction of Flood Mitigation Structure
Physical Target: -
Unit Cost: -
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000
TO:
Construction of Agusan River Flood Control Sta 0+000.00+0+050.00 Veruela, 2nd District, Agusan del Sur
Type of Work: CW1 - Construction of Flood Mitigation Structure
Physical Target: 50 lm.
Unit Cost: P297,000/lm
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000 |
September 28, 2020 |
2020 |
WIN0G02999 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 300117207562000
Project ID: P00444326MN
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Construction of Bunawan - Veruela Road, Bunawan, Agusan Del Sur
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 1.200 lane km
Unit Cost: P12.375M/ lane km
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000
TO:
Construction of Bunawan - Veruela Road, Bunawan, Agusan Del Sur
Type of Work: CW1 - Construction of Concrete Road
Physical Target: 0.756 lane km
Unit Cost: P19.64286M/ lane km
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000 |
September 28, 2020 |
2020 |
WIN0G03010 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. 300107200964000
Project ID: P00444693MN
LOCAL PROGRAM - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
FROM:
Flood Control Project - Construction of Riverbank Protection of Ihawan River - Sta. 0+000.00-0+140.00, Loreto, Agusan del Sur
Type of Work: CW1 - Construction of Flood Mitigation Structure
Physical Target: -
Unit Cost: -
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000
TO:
Flood Control Project - Construction of Riverbank Protection of Ihawan River - Sta. 0+000.00-0+140.00, Loreto, Agusan del Sur
Type of Work: CW1 - Construction of Flood Mitigation Structure
Physical Target: 60.0 lm.
Unit Cost: P247.50T/ lm.
Allocation: P14,850,000
EAO: P150,000
TOTAL: P15,000,000 |
September 28, 2020 |
FY 2020 |
WIN0G03137 |
300116202215000 |
July 8, 2020 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300116202215000
Project ID: P00443345MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ Improvement of Access Road along Jct. Dipolog - Sindangan Road connecting to Bago Dalongdong (Joaquin Macias) in support of Rice, Rubber, COconut and Abaca Industries, Sindangan, Zamboanga del Norte
Physical Target:
CW-1 - Construction of Concrete Road: 4.960 Lane km
Unit Cost: P 14,591,733.87/Lane km
EAO: P 2,625,000.00
Allocation: P 75,000,000.00 |
September 24, 2020 |
FY 2020 GAA |
WIN0G03134 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-DNAS Rd -
K1413+260 - K1431+320, K1416+772 - K1416+792, K1419+680 - K1419+699,
K1422+850 - K1422+920, K1428+000 - K1428+150, K1430+900 - K1431+050,
K1431+440 - K1431+520
Physical Target:
CW1: 5,997.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,220,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-DNAS Rd -
K1413+465 - K1431+520, K1416+772 - K1416+880, K1419+680 - K1419+700,
K1420+184 - K1420+358, K1420+840 - K1422+917, K1423+920 - K1423+960,
K1424+580 - K1424+680, K1425+048 - K1425+139
Physical Target:
CW1: 5,310.786 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,220,000.00 |
September 24, 2020 |
FY 2020 GAA |
WIN0G03128 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1493+200 - K1493+320
Physical Target:
CW1: 1,233.33 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 15,680,000.00 (Construction of Road Slope Protection Structure)
EAO: P 320,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1493+237 - K1493+300
Physical Target:
CW1: 850.50 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 16,000,000.00
CW1: P 15,680,000.00 (Construction of Road Slope Protection Structure)
EAO: P 320,000.00 |
September 24, 2020 |
FY 2020 GAA |
WIN0G03142 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-DNAS Rd -
K1420+446 - K1420+532, K1431+060 - K1431+200
Physical Target:
CW1: 904.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Road Slope Protection Structure)
EAO: P 200,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Montevista-DNAS Rd -
K1420+442 - K1420+531, K1431+070 - K1431+200
Physical Target:
CW1: 777.45 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Road Slope Protection Structure)
EAO: P 200,000.00 |
September 24, 2020 |
FY 2020 GAA |
WIN0G03130 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1395+700 - K1395+820, K1399+300 - K1399+370
Physical Target:
CW1: 4,560.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 71,000,000.00
CW1: P 68,515,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,485,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1395+650 - K1395+791, K1399+120 - K1399+170
Physical Target:
CW1: 2,916.34 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 71,000,000.00
CW1: P 68,515,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,485,000.00 |
September 24, 2020 |
FY 2020 GAA |
WIN0G03132 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1585+300 - K1585+450, K1588+350 - K1588+375, K1588+900 - K1588+945, K1593+440 - K1594+220, K1600+360 - K1600+868, K1601+873 - K1601+905, K1602+680 - K1602+935
Physical Target:
CW1: 7,275.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 74,305,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,695,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1585+300 - K1585+430, K1588+350 - K1588+375, K1588+877 - K1588+909, K1593+500 - K1593+658, K1600+360 - K1600+860, K1601+873 - K1601+905, K1602+680 - K1602+935
Physical Target:
CW1: 7,275.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 77,000,000.00
CW1: P 74,305,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,695,000.00 |
September 23, 2020 |
FY 2020 GAA |
WIN0G03127 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1608+000 - K1610+000
Physical Target:
CW1: 4.000 lane km (Road Widening)
ROW: 40,000.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 74,500,000.00
CW1: P 67,550,000.00 (Road Widening)
ROW: P 4,500,000.00 (ROW Acquisition)
EAO: P 2,450,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1608+660 - K1610+000
Physical Target:
CW1: 2.680 lane km (Road Widening)
CW2: 1,727.850 sq.m. (Construction of Road Slope Protection Structure)
ROW: 20,800.00 sq.m. (ROW Acquisition)
Allocation:
TOTAL: P 74,500,000.00
CW1: P 39,619,330.00 (Road Widening)
CW2: P 27,930,670.00 (Construction of Road Slope Protection Structure)
ROW: P 4,500,000.00 (ROW Acquisition)
EAO: P 2,450,000.00 |
September 23, 2020 |
FY 2020 GAA |
WIN0G03133 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1407+700 - K1401+900, K1407+700 - K1407+780
Physical Target:
CW1: 6,400.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 96,000,000.00
CW1: P 92,640,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,360,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1407+700 - K1401+900, K1407+700 - K1407+780, K1395+962 - K1396+034
Physical Target:
CW1: 2,779.20 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 96,000,000.00
CW1: P 92,640,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,360,000.00 |
September 23, 2020 |
FY 2020 GAA |
WIN0G03131 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1388+450 - K1388+480, K1388+795 - K1388+970
Physical Target:
CW1: 4,000.00 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,100,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) -
K1388+442 - K1388+485, K1388+795 - K1388+960, K1401+490 - K1401+600
Physical Target:
CW1: 2,486.80 sq.m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,100,000.00 |
September 22, 2020 |
2020 |
WIN0C03922 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Nueva Ecija - Aurora Road (K0196+230 - K0196+277), Aurora |
September 22, 2020 |
2020 |
WIN0C03922 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Nueva Ecija - Aurora Road (K0196+230 - K0196+277), Aurora |
September 22, 2020 |
2020 |
WIN0C03917 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along A. Castaneda - Ma. Aurora San Luis Road (K0198+120 - K0198+171.84), Aurora |
September 22, 2020 |
2020 |
WIN0C03916 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Nueva Ecija - Aurora Road (K0212+155 - K0212+203), Aurora
|
September 22, 2020 |
2020 |
WIN0C04033 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Baler - Casiguran Road (Dinadiawan - Casiguran Section) K0297+060 - K0297+143, K0297+190 - K0297+300, Casiguran, Aurora
|
September 22, 2020 |
2020 |
WIN0C03935 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - National Roads and Bridges - National Roads
Slope Protection along Nueva Ecija - Aurora Road (K0184+800 - K0184+880, K0184+980 - K0185+090) |
September 22, 2020 |
2020 |
WIN0C04007 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Slope Protection along Nueva Ecija - Aurora Road (K0190+740 - K0190+890, K0191+211 - K0191+260) |
September 22, 2020 |
2020 |
WIN0C03965 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads
Construction of Slope Protection along Nueva Ecija - Aurora Road (K0204+325 - K0204+386), Aurora
|
September 22, 2020 |
2020 |
WIN0C04005 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads
Construction of Slope Protection along Nueva Ecija - Aurora Road (K0171+150 - K0171+195.52), Aurora
|
September 22, 2020 |
2020 |
WIN0C03970 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Baler - Casiguran Road (Baler - Dinadiawan) K0259+735 - K0259+775, Casiguran, Aurora
|
September 22, 2020 |
2020 |
WIN0C03968 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Local Infrastructure Program - National Roads and Bridges - National Roads
Slope Protection along Nueva Ecija - Aurora Road (K0176+200 - K0176+360) |
September 22, 2020 |
2020 |
WIN0C03919 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Baler - Casiguran Road (Dinadiawan - Casiguran Section) K0302+490 - K0302+570, Casiguran, Aurora |
September 22, 2020 |
2020 |
WIN0C03918 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Baler - Casiguran Road (Dinadiawan - Casiguran Section) K0292+910 - K0292+988, Aurora |
September 22, 2020 |
2020 |
WIN0C03920 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along Madela - Dinadiawan Road (K0410+100 - K0410+146), Aurora
|
September 22, 2020 |
2020 |
WIN0C03921 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Aurora District Engineering Office |
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
National Roads and Bridges
Construction of Slope Protection along A. Castaneda - Ma. Aurora San Luis Road (K0211+175 - K0211+310), Aurora |
September 21, 2020 |
FY 2020 GAA |
WIN0G02857 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1477+680 - K1478+400, K1478+812 - K1479+280
Physical Target:
CW1: 2.452 Lane Km (Road Widening)
ROW: 10,666.20 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 34,189,000.00
CW1: P 28,605,220.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 583,780.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd -
K1477+680 - K1478+400, K1478+812 - K1479+280
Physical Target:
CW1: 3.630 Lane Km (Road Widening)
ROW: 10,666.20 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 34,189,000.00
CW1: P 28,605,220.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 583,780.00 |
September 18, 2020 |
FY 2020 GAA |
WIN0G03003 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete Road, Lumatab to Binuangan, Maco, Compostela Valley
Physical Target:
CW1: 2.400 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete Road, Lumatab to Binuangan, Maco, Compostela Valley
Physical Target:
CW1: 3.700 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00 |
September 15, 2020 |
FY 2020 GAA |
WIN0G03108 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Water Management Facilities - Water Supply - Construction/ Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Water system, Taglawig, Nabunturan, Compostela Valley
Physical Target:
CW1: 1 Water Supply System (Construction of Water Supply System)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Water Supply System)
EAO: P 60,000.00
TO: Local Program - Water Management Facilities - Water Supply - Construction/ Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Water system, Taglawig, Maco, Compostela Valley
Physical Target:
CW1: 1 Water Supply System (Construction of Water Supply System)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,940,000.00 (Construction of Water Supply System)
EAO: P 60,000.00 |
September 15, 2020 |
FY 2020 GAA |
WIN0G03111 |
FY 2020 GAA RA 11465 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Licanan Main Road, Purok Virgo, Sitio Licanan, Brgy. Lasang, Davao City
Physical Target:
CW1: 0.625 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Licanan Main Road, Purok Virgo, Sitio Licanan, Brgy. Lasang, Davao City
Physical Target:
CW1: 0.360 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
September 15, 2020 |
FY 2020 |
WIN0G02873 |
320101104226000 |
May 6, 2020 |
Region IX |
Regional Office IX |
UACS No. 320101104226000
Project ID: P00420384MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Extension of flood control at Saaz River, San Ramon, Zamboanga City
CW1 - Construction of Flood Mitigation Structure: 953.00 lm
Unit Cost: P 118,799.00/lm
EAO: P 3,962,561.74
Excess: P 464,388.46
Allocation: P 117,643,000.00 |
September 15, 2020 |
2020 |
310209100200000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Batanes District Engineering Office |
Network Development - Off-Carriageway Improvement -Tertiary Roads - Basco - Mahatao - Ivana - Uyugan - Imnajbu Rd - K0002 + 514 - K0002 + 771 |
September 15, 2020 |
2020 |
310101100297000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Kalinga - Cagayan Rd (Calanan - Enrile Section) - K0442 + 394.63 - K0442 + 677 |
September 11, 2020 |
FY 2020 GAA |
WIN0G03098 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment along Mawab River Phase II, Brgy. Poblacion, Mawab, Compostela Valley
Physical Target:
CW1: 360.929 lm (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 59,400,000.00 (Construction of Revetment)
EAO: P 600,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment along Mawab River Phase II, Brgy. Poblacion, Mawab, Compostela Valley
Physical Target:
CW1: 603.926 lm (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 59,400,000.00 (Construction of Revetment)
EAO: P 600,000.00 |
September 11, 2020 |
FY 2020 GAA |
WIN0G03093 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Repair/Rehabilitation/Improvement of Road along Asuncion-San Isidro-Laak-Veruela Road, Compostela Valley
Physical Target:
CW1: 6.400 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Repair/Rehabilitation/Improvement of Road along Asuncion-San Isidro-Laak-Veruela Road, Compostela Valley
Physical Target:
CW1: 3.894 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Road Widening)
EAO: P 500,000.00 |
September 11, 2020 |
FY 2020 GAA |
WIN0G03089 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Davao River (Crocodile Park Section), Right Bank, Davao City
Physical Target:
CW1: 120.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Revetment)
EAO: P 400,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/ Facilities - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure along Davao River (Crocodile Park Section), Right Bank, Davao City
Physical Target:
CW1: 1950.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00 |
September 10, 2020 |
2020 |
WIN0C04036 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide Along Abra-Kalinga Road K0474+100 - K0474+350; Physical Target: CW1 : 3,140 Square meters; Allocation= Php 55,000,000
To: Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide Along Abra-Kalinga Road K0474+295 - K0474+365;
Physical Target: CW1 : 2,740 Square meters; Allocation= Php 55,000,000
|
September 10, 2020 |
2020 |
WIN0C04025 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Reconstruction of Roads with Slips/Slope Collapse and Landslide Along Abra-Kalinga Road K0453+200 - K0453+450; Physical Target: CW1 : 3,140 Square meters; Allocation= Php 55,000,000
To: Rehabilitation/Reconstruction of Roads with Slips/Slope Collapse and Landslide Along Abra-Kalinga Road K0474+365 - K0474+430;
Physical Target: CW1 : 2,702.50 Square meters;
Allocation= Php 55,000,000
|
September 10, 2020 |
2020 |
WIN0C04020 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Concreting of Road Brgy. Pakawit, Phase 1, Pinukpuk, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 2,000,000
To: Concreting of Road Brgy. Pakawit, Phase 1, Pinukpuk, Kalinga;
Physical Target: CW1 : 0.250 Lane Km;
Allocation= Php 2,000,000
|
September 10, 2020 |
2020 |
WIN0C04035 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Road Katao, Brgy. Lacnog, Tabuk City, Kalinga;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 5,000,000
To: Construction of Road Katao, Brgy. Lacnog, Tabuk City, Kalinga;
Physical Target: CW1 : 0.520 Lane Km;
Allocation= Php 5,000,000
|
September 10, 2020 |
2020 |
WIN0C04021 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, K0488 + 165 - K0488 + 291;
Type of Work: Construction of Concrete Road;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, K0492 + 136 - K0492 + 320;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 5,185.05 Square meters; Allocation= Php 100,000,000
|
September 10, 2020 |
2020 |
WIN0C04022 |
GAA 2020 |
August 26, 2020 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, K0488 + 416 - K0488 + 541;
Type of Work: Construction of Concrete Road;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Mt. Province Boundary - Calanan-Pinukpuk-Abbut Road, K0529 + 104 - K0529 + 192;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 5,208.66 Square meters; Allocation= Php 100,000,000
|
September 8, 2020 |
2020 |
WIN0C03949 |
FY 2020 GAA |
January 7, 2020 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Roads and Bridges - Local Roads
Concreting of Talugtog - Lupao via Maasin, Talugtog and Lupao, Nueva Ecija
|