Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0086+000 - K0086+588, K0087+460 - K0088+000, K0088+000 - K0089+000, K0089+000 - K0089+763
July 15, 2024 2024 WIN4XY00315 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Road - K0071+085 - K0071+166, K0071+178 - K0073+187, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08039 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0075+218 - K0075+628, K0077+000 - K0078+641, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08036 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0073+187 - K0074+226, K0074+280 - K0074+909, K0074+924 - K0075+156, K0075+171 - K0075+218, San Miguel, Bulacan
July 15, 2024 2024 WIN4F08050 FY 2024 GAA December 20, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika Rd - K0068+800 - K0069+173, K0069+209 - K0070+554, K0070+575 - K0070+780, K0070+805 - K0071+085, San Ildefonso, Bulacan
July 15, 2024 2024 WIN4XY00288 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0066+037.50 - K0066+339.10
July 15, 2024 2024 P00820110MN SR2024-01-000507 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Contract ID: 24MD0051
UACS: 320101111447000
Project Name: Libungan River Flood Control Project (Abaga Section - Phase VIII), Abaga, Libungan, Cotabato
Project Amount: ₱ 60,000,000.00
TOW: Construction of Flood Mitigation Structure
Physical Target:
From: 467.742 lineal meters
To: 326.80 lineal meters
July 15, 2024 2024 P00820111MN SR2024-01-000565 January 1, 2024 Region XII Cotabato 1st District Engineering Office
Contract ID: 24MD0052
UACS: 320101111448000
Project Name: Libungan River Flood Control Project (Purok 3 Section), Nalin, Midsayap, Cotabato
TOW: Construction of Flood Mitigation Structure
Physical target:
From: 444.60 lineal meters
To: 381.92 lineal meters
July 15, 2024 2024 WIN4E03456 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310202101619000
Project ID: P00800156MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1185 + 000 - K1186 + 300

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 2.578 Lane Km

Allocation:
TOTAL: P 57,130,000
CW1: P 55,130,450
EAO: P 1,999,550

Unit Cost:
CW1: P 21,384,968.968/Lane Km

TO:

Surigao-Davao Coastal Rd - K1185 + 000 - K1186 + 300

Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
CW3- Off-Carriageway Improvement: Shoulder Paving / Construction

Physical Target:
CW1- 2.578 Lane Km
CW2- 2901.020 Square meters
CW3- 2760 Square meters

Allocation:
TOTAL: P 57,130,000
CW1: P 39,508,110
CW2: P 7,556,210
CW3: P 8,066,130
EAO: P 1,999,550

Unit Cost:
CW1: P 15,325,100.853/Lane Km
CW2: P 2,604.674/Square meters
CW2: P 2,922.511/Square meters
July 15, 2024 2024 P00835807MN SR2024-01-001234 January 27, 2024 Region XII Regional Office XII
Contract ID: 24M00234
UACS: 300219102705000
Project Name: Construction of Riverbank Protection Structure along Rio Grande de Mindanao, Barangay Salimbao (Phase II), Sultan Kudarat, Maguindanao del Norte
Project Cost: ₱ 70,000,000.00
TOW: Construction of Flood Mitigation Structure
Physical target:
From: 469.000 lineal meters
To: 340.000 lineal meters
July 15, 2024 FY 2024 GAA P00835783MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte
Physical Target:
CW1: 450.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Tuganay River, Package 2, Carmen, Davao del Norte
Physical Target:
CW1: 974.27 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00
July 15, 2024 FY 2024 GAA WIN4E03547 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Sta. Teresita Bridge, Malalag, Davao del Sur
Physical Target:
CW1: 333.900 square meters (Construction of Bridge)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Bridge)
EAO: P 600,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Sta. Teresita Bridge, Malalag, Davao del Sur
Physical Target:
CW1: 240.024 square meters (Construction of Bridge)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Bridge)
EAO: P 600,000.00
July 15, 2024 FY 2024 310101101320000 April 30, 2024 Region IX Regional Office IX
UACS No. 310101101320000
Project ID: P00800981MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1689+000 - K1689+191.96, K1689+239.63 - K1689+625, K1690+871 - K1691+000, K1691+850 - K1692+000, K1692+896 - K1694+000, K1696+000 - K1697+108.60
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 12.280 Lane km
Unit Cost: ₱ 13,520,058.63/ Lane-km
EAO: ₱ 6,021,680.00
Allocation: ₱ 172,048,000.00
July 15, 2024 FY 2024 310101101319000 May 23, 2024 Region IX Regional Office IX
UACS No. 310101101319000
Project ID: P00801125MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1675+000 - K1676+000, K1677+000 - K1677+853, K1699+246 - K1699+593
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 7.110 Lane km
Unit Cost: ₱ 13,845,374.82/ Lane-km
EAO: ₱ 3,570,385.00
Allocation: ₱ 102,011,000.00
July 15, 2024 FY 2024 310101101309000 April 30, 2024 Region IX Regional Office IX
UACS No. 310101101309000
Project ID: P00802718MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Lanao-Pagadian-Zamboanga City Rd (S01113MN) K1793+870 - K1794+000, K1796+000 - K1796+981.84, K1797+055.71 - K1800+183.00
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 11.023 Lane km
Unit Cost: ₱ 13,131,633.86/ Lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 15, 2024 FY 2024 GAA WIN4E03549 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1736 + 248
Physical Target:
CW1: 1.000 lane km (Road Widening)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Road Widening)
EAO: P 300,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1736 + 100 - K1736 + 300
Physical Target:
CW1: 0.120 lane km (Road Widening)
CW2: 429.00 square meters (Construction of Road Slope Protection Structure)
CW3: 200.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 6,851,122.80 (Road Widening)
CW2: P 6,496,347.26 (Construction of Road Slope Protection Structure)
CW3: P 894,271.67 (Construction of Drainage Structure along Road)
EAO: P 300,000.00
EXC: P 467,610.48 (Excess)
July 15, 2024 FY 2024 WIN4E03409 310107100643000 April 15, 2024 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310107100643000
Project ID: P00802687MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao – Pagadian – Zamboanga City Road (RN9) K1640+519 – K1640+541.50 L/S

CW1- Construction of Road Slope Protection Structure: 85.04 sq.m.
Unit Cost: ₱ 29,098.31/ sq.m. CW2- Preventive Maintenance of Road/Concrete Reblocking: 0.045 Lane km
Unit Cost: ₱ 9,344,000.00/ Lane km.
EAO: ₱ 105,000.00
Allocation: ₱ 3,000,000.00
July 15, 2024 FY 2024 WIN4E03460 310103101435000 April 24, 2024 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310103101435000
Project ID: P00802711MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Jct Imelda-Alicia Road, Zamboanga Sibugay (S01114MN) K1751 +756 – K1751+847, K1753+424 – K1754+016, K1756+537.50 – K1756+788.50, K1762+000 – K1762+363.50, K1762+400.50 – K1764+198.50

CW1 - Preventive Maintenance - Asphalt Overlay: 8.740 Lane km
Unit Cost: ₱ 13,583,474.83/ Lane km CW2- Preventive Maintenance of Road - Concrete Reblocking: 2.513 Lane km Unit Cost: ₱ 10,358,308.79/ Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2024 2024 WIN4E03507 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
802 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
386 Lineal meters;
Allocation:
Php 100,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
July 13, 2024 2024 WIN4XY00321 SR2024-01-006556 January 30, 2024 Region VIII Southern Leyte Sub-District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1060 + 351 - K1061 + 000, K1061 + 416 - K1062 + 402

Physical Target: Allocation:

CW1-Road Widening: P 48.250965 M
3.282 Lane Km

EAO P 1.750035 M

Total P 50.001 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1060 + 476 - K1061 + 000, K1061 + 416 - K1062 + 402

Physical Target: Allocation:

CW1-Road Widening: P 42.07381438 M
3.032 Lane Km

CW2- Construction of Drainage Structure P 6.17715062 M
along the road: 856 Lineal Meters

EAO P 1.750035 M

Total P 50.001 M
July 13, 2024 2024 WIN4F08049 GAA 2024 December 29, 2023 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of River Capacity Enhancement Structure, Brgy. Odiong, Javier, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 99.00 M
Structure: 544.800 Lineal Meters

EAO P 1.00 M

Total P 100.00 M

AS MODIFIED:

Construction of River Capacity Enhancement Structure, Brgy. Odiong, Javier, Leyte

Physical Target: Allocation:

CW1 Construction of Flood Mitigation P 99.00 M
Structure: 440.00 Lineal Meters

EAO P 1.00 M

Total P 100.00 M
July 13, 2024 2024 WIN4F08048 SR2024-01-002174 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.5 M
Structure: 712.635 Lineal Meters

EAO P 3.5 M

Total P 100.00 M

AS MODIFIED:

Construction of Flood Control Structure, Barangay Libtong, San Miguel, Leyte

Physical Target: Allocation:

CW1 Construction of Flood Mitigation P 96.5 M
Structure: 530.00 Lineal Meters

EAO P 3.5 M

Total P 100.00 M
July 13, 2024 2024 WIN4XY00320 FY 2024 GAA January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + 447 - K0907 + 464

Physical Target: Allocation:

CW1-Upgrading of Drainage Structure P 14.7 M
along Road: 17.00 Lineal Meters

EAO P 0.3 M

Total P 15.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0907 + 430 - K0907 + 464, K0924 + 985 – K0924 + 993, K0925 + 1188 – K0925 + 1222

Physical Target: Allocation:

CW1 Upgrading of Drainage Structure P 14.7 M
along Road: 76.00 Lineal Meters

EAO P 0.3 M

Total P15.00 M
July 12, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System, San Jose National High School, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 4.9 M
220 Lineal Meters

EAO P 0.1 M

Total P 5.00 M

AS MODIFIED:

Construction of Drainage System, San Jose National High School, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 4.9 M
464 Lineal Meters

EAO P 0.1 M

Total P 5.00 M
July 12, 2024 2024 WIN4F08042 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure (Drainage), barangay 62-B, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 29.4 M
2,275.565 Lineal Meters

EAO P 0.6 M

Total P 30.00 M

AS MODIFIED:

Construction of Flood Control Structure (Drainage), barangay 62-B, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 29.4 M
1,706 Lineal Meters

EAO P 0.6 M

Total P 30.00 M
July 12, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage Structure, Barangay 50, Tacloban City

Physical Target: Allocation:

CW1-Construction of Drainage Structure: P 9.8 M
450.00 Lineal Meters

EAO P 0.2 M

Total P 10.00 M

AS MODIFIED:

Construction of Drainage Structure, Barangay 50, Tacloban City

Physical Target: Allocation:

CW1- Construction of Drainage Structure: P 9.8 M
519.00 Lineal Meters

EAO P 0.2 M

Total P 10.00 M
July 12, 2024 FY 2024 P00821202MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00224
Amount: 100,000,000.00
Construction of Concrete Revetment along Silway River, Barangay Apopong, General Santos City
July 12, 2024 FY 2024 P00800175MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Contract ID: 24M00181
Amount: 121,791,000.00
From: Surallah-Lake Sebu-Maitum Rd - K1783 + 559 - K1784 + 944
To: Surallah-Lake Sebu-Maitum Rd - K1783 + 559 - K1785 + 469
July 12, 2024 FY 2024 P00801041MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Amount: ₱ 83,887,000.00
Davao-Cotabato Rd (Dual) - Chainage 0 - Chainage 1421
July 12, 2024 2024 WIN4XY00316 GAA FY 2024 January 23, 2024 Region VIII Leyte 4th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) – Multi Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building, Poblacion, Barangay Minuyan Proper, Kananga, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 49.5 M
1.00 Number of Building

EAO P 0.5 M

Total P 50.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Poblacion, Kananga, Leyte

Physical Target: Allocation:

CW1- Construction of Multi Purpose Building: P 49.5 M
1.00 Number of Building

EAO P 0.5 M

Total P 50.00 M
July 11, 2024 FY 2024 P00800364MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱6,000,000.00
From: Makilala-Allah Valley Rd -K1611 + 600 - K1611 + 614
To: Makilala-Allah Valley Rd -K1618 + 103 - K1618 + 117
July 11, 2024 FY 2024 P00800497MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amoun: ₱100,000,000.00
From: Paco- Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd - K1683 + 430 - K1683 + 595
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1684 + 475 – K1684 + 617
July 11, 2024 FY 2024 P00800531MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 21,245,000.00
From: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd – K1642 + 571 – K1642 + 602
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd – K1642 + 546 – K1642 + 628
July 11, 2024 FY 2024 P00801042MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 46,046,000.00
From: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) – K1618+000 - K1618+650
To: Davao-Cotabato Rd (Jct Digos-Cotabato Sect) – K1617+610 - K1618 + 090
July 11, 2024 CY 2024 WIN4F08038 UACS No. 310102101702000 March 19, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310102101702000
Project ID.: P00801743LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0014 + 404 – K0014 + 815
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 3.288 lane km
Unit Cost (P’000) = P 4,470.80/lane km
Allocation (P’000) = P 14,700.00
EAO (P’000) = P 300.00
Total (P’000) = P 15,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0013 + (-030) – K0013 + 222
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 1.580 lane km
Unit Cost (P’000) = P 9,303.80/lane km
Allocation (P’000) = P 14,700.00
EAO (P’000) = P 300.00
Total (P’000) = P 15,000.00
Bar Code #WIN4F08038
July 11, 2024 CY 2024 WIN4F08040 UACS No. 310102101703000 March 19, 2024 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310102101703000
Project ID.: P00801742LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0016 + 600 – K0016 + 846
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 2.214 lane km
Unit Cost (P’000) = P 4,426.38/lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total (P’000) = P 10,000.00

As Modified
As per GAA/Original
UACS No. 310102101703000
Project ID.: P00801742LZ
OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program – Preventive Maintenance – Secondary Roads

Commonwealth Ave – K0016 + 735 – K0016 + 801
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.659 lane km
Unit Cost (P’000) = P 14,871.02/lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total (P’000) = P 10,000.00
Bar Code #WIN4F08040
July 11, 2024 FY 2024 P00801047MN GAA 2024 January 1, 2024 Region XII Cotabato 2nd District Engineering Office
Contract ID:
Amount: ₱ 18,152,000.00
From: Magpet – Nowa – Doroluman - Greenfield Rd – K1629+366 - K1630+000, K1634+000 - K1634+726
To: Magpet – Nowa – Doroluman - Greenfield Rd –
K1629 + (-212) - K1629 + 768
July 11, 2024 2024 310104100633000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0292 + 000 - K0293 + 225, K0293 + 356 - K0294 + 100, K0294 + 152 - K0294 + 407, K0294 + 660 - K0295 + 980

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0292 + 000 - K0293 + 225, K0293 + 356 - K0294 + 100, K0294 + 152 - K0294 + 407, K0294 + 660 - K0295 + 980, K0296 + 000 - K0299 + 000
July 11, 2024 2024 300214100662000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0309 + (-890) - K0309 + (-606), K0310 + 522 - K0310 + 814, K0317 + 000 - K0318 + 131

TO:

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0309 + (-890) - K0309 + (-606), K0310 + 522 - K0310 + 814, K0316 + 003 - K0317 + 247
July 11, 2024 2024 310104100632000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Daang Maharlika (LZ) - K0246 + 504 - K0248 + 000, K0253 + 000 - K0253 + 643, K0254 + 652 - K0255 + 766

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads -Daang Maharlika (LZ) – K0248 + 000 - K0249 + 000, K0252 + 000 - K0253 + 000, K0253 + 000 - K0253 + 643, K0253 + 643 - K0254 + 652, K0254 + 652 - K0255 + 766, K0256 + 406 - K0257 + 000, K0260 + 081 - K0262 + 000
July 11, 2024 2024 300214100995000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 - Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Street Lights along Daang Maharlika (LZ) (S00857LZ) - K0252 + 272 - K0253 + 270, Barangay Macate, Bambang, Nueva Vizcaya

TO:

Special Road Fund – Motor Vehicle User's Charge (MVUC) as per R.A.11239 - Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Street Lights – Daang Maharlika (LZ) – K0252 + 002 – K0253 + 000, Barangay Macate, Bambang, Nueva Vizcaya
July 11, 2024 2024 310110100500000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Cagayan Valley Road K0477 + 331 - K0478 + 580

TO:

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Cagayan Valley Road K0477 + 230.40 - K0477 + 714.70
July 11, 2024 2024 310101101187000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0318 + 600 - K0323 + 000, K0324 + 000 - K0324 + 722, K0328 + 492 - K0330 + 000

TO:

Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0318 + 600 - K0321 + 497, K0366 + 337 - K0367 + 431.50
July 11, 2024 FY 2024 300215104985000 June 7, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300215104985000
Project ID: P00834956MN


Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Landang Gua, Zamboanga City

CW1 - Construction of Concrete Road: 2.72 Lane Km
Unit Cost: ₱ 7,807,503.82 CW2- Construction of Road Slope Protection Structure: 869.04 sq.m.
Unit Cost: ₱ 3,755.40/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00
July 11, 2024 FY 2024 WIN4E03498 300215104984000 June 11, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300215104984000
Project ID: P00834955MN


Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Pasilmanta, Zamboanga City

CW1 - Construction of Concrete Road: 2.54 Lane Km
Unit Cost: ₱ 8,058,746.59/Lane Km CW2- Construction of Road Slope Protection Structure: 515.685 sq.m.
Unit Cost: ₱ 7,816.37/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00
July 11, 2024 FY 2024 WIN4E03502 300215104987000 June 11, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300215104987000
Project ID: P00834958MN


Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Busay, Zamboanga City

CW1 - Construction of Concrete Road: 2.56 Lane Km
Unit Cost: ₱ 8,416,037.34/ Lane Km CW2- Construction of Road Slope Protection Structure: 776.44 sq.m.
Unit Cost: ₱ 3,805.76/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00
July 11, 2024 FY 2024 WIN4E03517 300215104986000 June 11, 2024 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300215104986000
Project ID: P00834957MN


Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Landang Laum, Zamboanga City

CW1 - Construction of Concrete Road: 2.42 Lane Km
Unit Cost: ₱ 8,422,650.94/ Lane Km CW2- Construction of Road Slope Protection Structure: 1,395.64 sq.m.
Unit Cost: ₱ 2,950.03/ sq.m.
EAO: ₱ 500,000.00
Allocation: ₱ 25,000,000.00
July 11, 2024 FY 2024 300214100810000 May 23, 2024 Region IX Regional Office IX
UACS No. 300214100810000 Project ID: P00833086MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City Rd - K1864+245 - K1864+670, K1871+351 - K1872+000, K1879+000 - K1880+000, K1882+000 - K1882+449, K1882+449 - K1882+996.46, K1922+763 - K1923+700

CW1 - Rehabilitation of Paved Road: 8.01 Lane Km
Unit Cost: ₱ 8,734,394.506/ Lane Km
EAO: ₱ 2,537,500.00
Allocation: ₱ 72,500,000.00
July 11, 2024 FY 2024 300214100815000 May 29, 2024 Region IX Regional Office IX
UACS No. 300214100815000 Project ID: P00833093MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City Rd -Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Pagadian City-Zamboanga City Rd
K1680+721.87 - K1680+735.37,
К1681+176.89 - К1681+181.24,
K1680+739.76 - K1680+762.23 (Inner R.S), K1680+753.15 -K1680+762.14 (Inner LS), K1680+781.35 - K1680+784.97 (Inner RS), K1680+769.12 - K1680+784.97 (Inner LS), K1680+780.49 - K1680+784.97 (Outer LS), K1680+796.92 - K1680+801.39 (Inner RS), K1680+805.56 - K1680+810.61 (Inner LS), K1680+803.68 - K1680+806 (Outer LS), K1680+819.64 - K1680+822.34 (Outer LS), K1680+868.68 - K1680+873.72 (Inner LS), K1680+886.21 - K1680+888.27 (Outer LS), K1681+035.02 - K1681+051.07 (Inner RS), K1681+067.66 -K1681+082.37 (Outer RS), K1681+104.95 - K1681+120.99 (Outer RS), K1681+118.49 - K1681+122.95 (Inner RS), K1681+121.06 - K1681+122.97 (Outer LS), K1681+131.91 - K1681+145.46 (Inner RS), K1681+154.46 - K1681+163.34 (Inner RS), K1681+219.11 - K1681+244.09 (Outer LS), К1676+831 - K1677+000,
K1689+910 - K1689+998

CW1 - Rehabilitation of Paved Road: 0.762 Lane Km
Unit Cost: ₱ 10,223,681.10/ Lane Km
EAO: ₱ 282,555.00
Allocation: ₱ 8,073,000.00
July 11, 2024 FY 2024 310107100642000 April 1, 2024 Region IX Regional Office IX
UACS No. 310107100642000
Project ID: P00800405MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1704+161 - K1704+229, K1721 + 900 - K1722+000
CW1- Construction of Road Slope Protection Structure: 2,768.7 sq.m.
Unit Cost: ₱ 10,456.17/sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
July 11, 2024 FY 2024 310102101627000 May 23, 2024 Region IX Regional Office IX
UACS No. 310102101627000
Project ID: P00800972MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Zamboanga City-Labuan-Limpapa Rd-
K1955+700.00 - 1955+900.00, K1956+200.00 - 1956+500.00, К1956+700.00 - K1956+755.41, K1956+755.41 - K1956+757.49, K1956+757.49 - K1957+080.00, К1957+080.00 - К1957+957.01, К1957+957.01 - K1958+000.00, K1958+000.00 - K1958+230.82, K1945+539.00 - K1946+779.00, K1946+825.00 - K1947+101.00, K1947+101.00 - K1948+748.00
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 15.455 Lane km
Unit Cost: ₱ 11,663,668.71/ Lane-km
EAO: ₱ 6,538,000.00
Allocation: ₱ 186,800,000.00
July 11, 2024 FY 2024 UACS No. 310102101627000 Project ID: P00800972MN OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Prev 310204102631000 May 23, 2024 Region IX Regional Office IX
UACS No. 310204102631000
Project ID: P00801297MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Construction of NRJ Sangali Bypass Road, Zamboanga City
CW1- Construction of Concrete Road: 2.27 Lane Km
Unit Cost: ₱ 29,747,969.06/ Lane Km
EAO: ₱ 2,450,000.00 Excess: 22,110.23
Allocation: ₱ 70,000,000.00
July 11, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310205101298000
Project ID: P00800275MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

NRJ Maug-La Purisima-New Tubigon, Package 5, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 5.34 Lane Km

Allocation:
TOTAL: P 89,000,000
CW1: P 85,885,000
EAO: P 3,115,000

Unit Cost:
CW1: P 16,083,333.33/Lane Km

TO:

NRJ Maug-La Purisima-New Tubigon, Package 5, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 5.85 Lane Km

Allocation:
TOTAL: P 89,000,000
CW1: P 85,885,000
EAO: P 3,115,000

Unit Cost:
CW1: P 14,681,196.58/Lane Km
July 11, 2024 2024 WIN4E03441 FY 2024 GAA, R.A 11975 December 25, 2024 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310105101068000
Project ID: P00801215MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads

FROM:

NJR Bah-Bah-Talacogon Rd - K1311 + 776 - K1312 + 079, K1314 + 396 - K1314 + 963, K1314 + 1006 - K1317 + 138

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 6.574 Lane Km

Allocation:
TOTAL: P 73,634,000
CW1: P 71,056,810
EAO: P 2,577,190

Unit Cost:
CW1: P 10,808,763.31/Lane Km

TO:

NJR Bah-Bah-Talacogon Rd – K1311+776 – K1312+079, K1312+112.00 – K1312+364.20, K1312+620 – K1313+450, 1313+640 – K1313+718, K1314+387 – K1314+450, K1314+560 – K1314+890, K1315+677.00 – K1315+718.20, K1316+724.00 – K1316+900.80

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 4.24 Lane Km

Allocation:
TOTAL: P 73,634,000
CW1: P 69,834,185.04
EAO: P 2,532,814.96
EXCESS: P1,267,000


Unit Cost:
CW1: P 16,470,326.66/Lane Km
July 11, 2024 2024 310303101595000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Bridge - Retrofitting/ Strengthening of Permanent Bridges - Magapit Suspension Br. (B01113LZ) along Bangag-Magapit Rd


TO:

Bridge - Retrofitting/ Strengthening of Permanent Bridges - Magapit Suspension Br. (B01113LZ) along Jct Logac-Magapit Rd
July 11, 2024 2024 WIN4F08041 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road with Drainage, Barangay 97 Cabalawan, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 9.9 M
0.750 Lane Km

EAO P 0.1 M

Total P 10.00 M

AS MODIFIED:

Construction of Road with Drainage, Barangay 97 Cabalawan, Tacloban City, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 3.18368755 M
0.78 Lane Km

CW2- Construction of Drainage Structure: P 6.71631245 M
655 Lineal Meters

EAO P 0.1 M

Total P 10.00 M
July 10, 2024 2024 310202101639000 GAA 2024 January 3, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0634 + 000 - K0635 + 200

TO:

Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0634 + 689 - K0635 + 833
July 10, 2024 2024 SR2024-02-008119 February 1, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0810 + 134 - K0812 + 000, K0812 + 839 - K0813 + 120, K0813 + 600 - K0815 + 550, K0817 + 500 - K0817 + 648


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 332.64322 M
13.632 Lane Km

EAO P 12.06478 M

Total P 334.708 M

AS MODIFIED:

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0810 + 134 - KO810 + 500, K0815 + 000 - K0815 + 550, K0817 + 500 - K0817 + 648, K0818 + 000 - K0819 + 000, K0821 + 800 - K0822 + 000, K0827 + 305 - K0828 +000, K0829 + 200 - K0829 + 632, K0832 + 000 - K0833 + 000, K0864 + 400 - K0865 + 779, K0865 + 804 - K0866 + 802, K0866 + 841 - K0867 + 402, K0867 + 536 - K0868 + 928, K0869 + 426 - K0869 + 790, K0870 + 152 - K0870 + 606, K0870 +622 - K0870 + 647, K0870 + 688 - K0870 + 704, K0870 + 749 - K0870 + 817, K0870 + 821 - K0870 +842, K0871 +165 - K0871 + 233, K0871 + 410 - K0871 + 459, K0871 + 515 - K0871 + 953, K0872 + 099 - K0872 + 760


Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 332.64322 M
21.966 Lane Km

EAO P 12.06478 M

Total P 334.708 M
July 10, 2024 2024 WIN4F08035 SR2024-01-002146 January 27, 2024 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Dapdap River, Brgy Dapdap, Alangalang, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.5 M
Structure: 712.635 Lineal Meters

EAO P 3.5 M

Total P 100.00 M

AS MODIFIED:

Construction of Flood Control Structure along Dapdap River, Brgy Dapdap, Alangalang, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.5 M
Structure: 567 Lineal Meters

EAO P 3.5 M

Total P 100.00 M
July 10, 2024 2024 310109101552000 GAA 2024 January 2, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - San Vicente-Gutan-Lubac-Anguib Rd - K0649 + 200 - K0649 + 265

TO:

Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - San Vicente-Gutan-Lubac-Anguib Rd - K0644 + 089 - K0644 + 150, K0649 + 200 - K0649 + 265
July 10, 2024 2024 310202101638000 GAA 2024 January 3, 2024 Region II Regional Office II
FROM:

Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Dugo-Mission Sect) - K0576 + 448 - K0576 + 798, K0579 + 122 - K0579 + 407, K0579 + 549 - K0580 + 000

TO:

Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Dugo-Mission Sect) - K0576 + 448 - K0576 + 794, K0579 + 080 - K0579 + 111.57, K0579 + 140.18 - K0579 + 411.53, K0579 + 439.94 - K0579 + 664.94
July 10, 2024 2024 P00800042MN SR2024-01-000099 January 24, 2024 Region X Bukidnon 1st District Engineering Office
P00800042MN
310201101327000
OO1: Ensure Safe and Reliable National Road System- Network Development - Road Widening - Primary Roads

FROM:
Sayre Highway - K1482 + 453 - K1483 + 636
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 2.358 Lane Km
Allocation:
CW1: Php 69,576,500.00
EAO: Php 2,523,500.00

TO:
Sayre Highway - K1481 + 883 - K1482 + 049, K1482 + 453 - K1483 + 636
Type of Work:
CW1- Road Widening
Physical Target:
CW1 - 2.696 Lane Km
ROW Aquisition - 21,659 Square Meters
Allocation:
CW1: Php 67,076,500.00
ROW Acquisition: Php 2,500,000.00
EAO: Php 2,523,500.00

July 10, 2024 2024 P00800043MN SR2024-01-000108 January 24, 2024 Region X Bukidnon 1st District Engineering Office
P00800043MN
310202101599000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

FROM:
Kalapong- Talaingod- Valencia (Bukidnon) Rd - K1543+000 - K1545+000
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 4.00 Lane Km
Allocation
CW1: Php 75,986,030.00
EAO: Php 2,755,970.00

TO:
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1543 + 000 - K1544 + 506
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 3.012 Lane Km
Allocation:
CW1: Php 75,986,030.00
EAO: Php 2,755,970.00



July 10, 2024 2024 P00800438MN GAA FY 2024 January 1, 2024 Region X Lanao del Norte 1st District Engineering Office
P00800438MN
310107100696000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads


FROM:
Linamon-Zamboanga Rd - K1557 + 250 - K1557 + 315
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 780.00 Square Meter
Allocation:
CW1 - Php 19,600,000.00
EAO - Php 400,000.00



TO:
Linamon-Zamboanga Rd - K1557 + 230 - K1557 + 315
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 1,020.00 Square Meter
Allocation:
CW1 - Php 19,600,000.00
EAO - Php 400,000.00
July 10, 2024 2024 300204101351000 GAA 2024 January 3, 2024 Region II Cagayan 1st District Engineering Office
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) - Access Road leading to Fish Landing and Bagoong Processing, Sitio Namuyucan, San Jose, Gonzaga, Cagayan
July 10, 2024 2024 P00800046MN GAA FY 2024 January 1, 2024 Region X Bukidnon 2nd District Engineering Office
P00800046MN
310201101448000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:
Bukidnon Davao City Rd - K1598 + 323 - K1598 + 646
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 0.646 Lane Km
Allocation
CW1: Php 12,740,000.00
EAO: Php 260,000.00

TO:
Bukidnon Davao City Rd - K1598 + 297 - K1598 + 585
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 0.576 Lane Km
Allocation
CW1: Php 12,740,000.00
EAO: Php 260,000.00
July 10, 2024 2024 P00830297MN GAA FY 2024 January 1, 2024 Region X Lanao del Norte 1st District Engineering Office
P00830297MN
300214101301000
CSSP - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - -

FROM:
Installation of Roadway Lighting Structures along Linamon-Zamboanga National Highway, Maigo, Lanao del Norte
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 – 50.00 Number of Units
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00

TO:
Installation of Roadway Lighting Structures along Linamon-Zamboanga National Highway, Maigo, Lanao del Norte
Type of Work:
CW1 - Road Safety: Roadway Lighting
Physical Target:
CW1 – 44.00 Number of Units
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
July 10, 2024 2024 P00800336MN GAA FY 2024 January 1, 2024 Region X Bukidnon 2nd District Engineering Office
P00800336MN
310110100539000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

FROM:
Sayre Highway - K1547 + 750 - K1548 + 000, K1548 + 200 - K1548 + 300
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 818 Lineal Meters
Allocation:
CW1: Php 8,820,000.00
EAO: Php 180,000.00

TO:
Sayre Highway - K1547 + 711 - K1548 + 000, K1548 + 280 - K1548 + 350
Type of Work:
CW1- Construction of Drainage Structure along Road
CW2- Off-Carriageway Improvement: Shoulder Paving/ Construction
Physical Target:
CW1- 610 Lineal Meters
CW2- 590.50 Square Meters
Allocation:
CW1: Php 6,659,889.54
CW2: Php 2,160,110.46
EAO: Php 180,000.00
July 10, 2024 2024 P00800997MN GAA FY 2024 January 1, 2024 Region X Bukidnon 2nd District Engineering Office
P00800997MN
310101101327000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

FROM:
Bukidnon-Davao City Rd - K1588 + 000 - K1589 + 588
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.260 Lane Km
Allocation:
CW1: Php 85,885,000.00
EAO: Php 3,115,000.00

TO:
Bukidnon-Davao City Rd - K1587 + 714 - K1588 + 000, K1589+443 - K1590 + 111, K1590 + 126 - K1590 + 380
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.244 Lane Km
Allocation:
CW1: Php 85,885,000.00
EAO: Php 3,115,000.00
July 10, 2024 2024 P00803757MN SR2024-03-013346 March 16, 2024 Region X Regional Office X
P00803757MN
310101101333000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

FROM:
Sayre Highway K1476 + 026 - K1479 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.844 Lane Km
Allocation:
Total: Php 114,750,000.00
CW1: Php 110,733,750.00
EAO: Php 4,016,250.00

TO:
Sayre Highway K1482+432 - K1483+000, K1483 + 659 - K1487+000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-7.790 Lane Km
Allocation:
Total: Php 114,750,000.00
CW1: Php 110,733,750.00
EAO: Php 4,016,250.00
July 10, 2024 2024 310101101184000 GAA 2024 January 3, 2024 Region II Isabela 4th District Engineering Office
FROM:

Asset Preservation - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0329+164-K0331+000

TO:

Asset Preservation - Preventive Maintenance - Primary Roads - Santiago-Tuguegarao Rd - K0329+911-K0331+675
July 10, 2024 2024 P00800073MN SR2024-01-002830 January 27, 2024 Region X Lanao del Norte 1st District Engineering Office
P00800073MN
310201101321000
OO1 - Network Development Program - Road Widening - Primary Roads

FROM:

Linamon-Zamboanga Rd - K1545 +
651 - K1545 + 660, K1547 + 543 -
K1547 + 547, K1547 + 569 - K1547
+ 584, K1550 + 000 - K1551 + 600,
K1551 + 601 - K1554 + 140, K1554
+ 142 - K1555 + 926, K1555 + 928 -
K1556 + 008, K1556 + 009 - K1558
+ 374, K1558 + 479.80 - K1558 +
618, K1558 + 619 - K1560 + 096,
K1560 + 134.15 - K1561 + 014,
K1561 + 030.30 - K1562 + 527,
K1562 + 528 - K1562 + 532, K1562
+ 610.20 - K1563 + 215, K1564 +
680 - K1566 + 257, K1566 + 258 -
K1566 + 261, K1566 + 299.70 -
K1566 + 590, K1566 + 646.65 -
K1566 + 752, K1568 + 346 - K1568
+ 919, K1568 + 921 - K1568 + 925,
K1569 + 000 - K1570 + 034, K1570
+ 035 - K1570 + 039, K1570 + 100 -
K1570 + 104, K1571 + 590 - K1573
+ 257
Type of Work:
CW1 - Road Widening
ROW – ROW Acquisition
Physical Target:
CW1 – 3.192 lane km
ROW – 33.497 lane km
Allocation:
CW1 - Php 83,711,820.00
ROW – Php 2,904,650.00
EAO - Php 3,141,530.00


TO:

Linamon-Zamboanga Rd K1547+516 - K1547+547, K1547+569 - K1547+580, K1550+000 - K1550+391, K1551+212 - 1551+277, K1553+647 - K1553+693, K1571+590 - K1572+235, K1572+944 - K1573+257
Type of Work:
CW1 - Road Widening
CW2 - Construction of Road Slope Protection Structure
ROW – ROW Acquisition
Physical Target:
CW1 – 2.823 lane km
CW2 – 2,307.95 Square meter
ROW – 1,970.00 Square meter
Allocation:
CW1 - Php 65,897,450.00
ROW – Php 17,814,370.00
EAO - Php 3,141,530.00
July 10, 2024 2024 P00800074MN SR2024-01-002832 January 27, 2024 Region X Lanao del Norte 1st District Engineering Office
P00800074MN
310201101322000
OO1 - Network Development Program - Road Widening - Primary Roads

FROM:
Linamon-Zamboanga Rd - K1573 + 257 - K1573 + 860, K1573 + 885 - K1574 + 042, K1574 + 122 - K1574 + 250, K1575 + 641 - K1575 + 643
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 1.780 lane km
Allocation:
CW1 - Php 49,015,245.00
EAO – Php 1,777,755.00

TO:
Linamon-Zamboanga Rd - K1573 + 257 - K1573 + 860, K1573 + 885 - K1574 + 042, K1574 + 122 - K1574 + 250
Type of Work:
CW1 - Road Widening
CW2 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 1.776 lane km
CW2 – 1,451.90 Square meter
Allocation:
CW1 - Php 42,073,440.00
CW2 – Php 6,941,800.00
EAO – Php 1,777,755.00
July 10, 2024 2024 P00800057MN SR2024-01-001817 January 27, 2024 Region X Bukidnon 3rd District Engineering Office
P00800057MN
310201101326000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:
Sayre Highway - K1445 + 075 - K1446 + 483
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.91 Lane Km
Allocation:
CW1: Php 70,203,750.00
EAO: Php 2,546,250.00

TO:
Sayre Highway - K1445 + 075 - K1445 + 885
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure
Physical Target:
CW1- 1.62 Lane Km
CW2- 1,400.20 Lineal Meters
Allocation:
CW1: Php 52,619,750.00
CW2: Php 17,584,000.00
EAO: Php 2,546,250.00
July 10, 2024 2024 P00803759MN SR2024-03-013348 March 16, 2024 Region X Regional Office X
P00803759MN
310101101335000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

FROM:
Sayre Highway K1488 + 324 - K1490 + 106, K1490 + 122 - K1490 + 970, K1491 + 175 - K1492 + 000, K1493 + 805 - K1494 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-2.420 Lane Km
Allocation:
Total: Php 144,885,000.00
CW1: Php 139,814,025.00
EAO: Php 5,070,975.00

TO:
Sayre Highway K1488 + 324 - K1490 + 088, K1490 + 122 - K1490 + 970, K1491 + 175 - K1492 + 000, K1493 + 805 - K1494 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-10.680 Lane Km
Allocation:
Total: Php 144,885,000.00
CW1: Php 139,814,025.00
EAO: Php 5,070,975.00
July 10, 2024 2024 P00801163MN GAA FY 2024 January 1, 2024 Region X Lanao del Norte 1st District Engineering Office
P00801163MN
310104100686000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:
Linamon-Zamboanga Rd - K1546 + 306 - K1546 + 401, K1546 + 958 - K1547 + 153, K1566 + 000 - K1566 + 261, K1566 + 728 - K1566 + 762, K1567 + 710 - K1567 + 738, K1567 + 750.82 - K1567 + 773, K1568 + 387 - K1568 + 404, K1569 + 000 - K1570 + 039, K1574 + 996 - K1575 + 379, K1585 + 871 - K1586 + 000
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 4.738 lane km
Allocation:
CW1 - Php 59,958,345.00
EAO – Php 2,174,655.00

TO:
Linamon-Zamboanga Rd - K1546 + 000 - K1546 + 306, K1547 + 775 - K1548 + 000, K1566 + 000 - K1566 + 261, K1566 + 728 - K1566 + 759, K1567 + 710 - K1567 + 734, K1567 + 754.50 - K1567 + 769, K1569 + 000 - K1569 + 800, K1585 + 571 - K1585 + 728
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 3.661 lane km
Allocation:
CW1 - Php 59,958,345.00
EAO – Php 2,174,655.00
July 10, 2024 2024 310103101375000 GAA 2024 January 3, 2024 Region II Isabela 4th District Engineering Office
FROM:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Santiago-Baluarte-Quirino Bdry - K0326 + 500 - K0335 + 640

TO:

Asset Preservation - Preventive Maintenance - Tertiary Roads - Santiago-Baluarte-Quirino Bdry - K0326 + 215 - K0333 + 761
July 10, 2024 2024 P00803758MN SR2024-03-013347 March 16, 2024 Region X Regional Office X
P00803758MN
310101101334000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

FROM:
Sayre Highway K1480 + 000 - K1480 + 881, K1480 + 917 - K1481 + 783, K1486 + 048 - K1486 + 319, K1486 + 740 - K1487 + 236
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.160 Lane Km
Allocation:
Total: Php 101,145,000.00
CW1: Php 97,604,925.00
EAO: Php 3,540,075.00

TO:
Sayre Highway K1487 + 000 - K1488 + 324, K1492 + 000 - K1493 + 000, K1494 + 000 - K1496 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.620 Lane Km
Allocation:
Total: Php 101,145,000.00
CW1: Php 97,604,925.00
EAO: Php 3,540,075.00
July 10, 2024 2024 P00800056MN GAA FY 2024 January 1, 2024 Region X Bukidnon 3rd District Engineering Office
P00800056MN
310201101450000
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:
Sayre Highway - K1441 + 812 - K1442 + 100
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.430 Lane Km
Allocation:
CW1: Php 22,050,980.00
EAO: Php 450,020.00

TO:
Sayre Highway - K1441 + 1063 - K1442 + 100
Type of Work:
CW1- Road Widening
CW2- Construction of Slope Protection Structure
Physical Target:
CW1- 0.358 Lane Km
CW2- 1,255.76 Lineal Meters
Allocation:
CW1: Php 14,944,980.00
CW2: Php 7,106,000.00
EAO: Php 450,020.00
July 10, 2024 2024 P00801164MN SR2024-01-002827 January 27, 2024 Region X Lanao del Norte 1st District Engineering Office
P00801164MN
310104100685000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:
Iligan City-Marawi City Rd - K1536 + (-082) - K1536 + 000, K1536 + (-116) - K1536 + (-082),
K1536 + (-129) - K1536 + (-116), K1536 + (-162) - K1536 + (-129), K1536 + (-175) - K1536 +
(-162), K1536 + (-181) - K1536 + (-175), K1536 + (-188) - K1536 + (-181), K1536 + (-206) - K1536
+ (-188), K1536 + (-218) - K1536 + (-206), K1536 + (-228) - K1536 + (-218), K1536 + (-238) -
K1536 + (-228), K1536 + (-308) - K1536 + (-238), K1536 + (-332) - K1536 + (-308), K1536 + (-342)
- K1536 + (-332), K1536 + (-344) - K1536 + (-342), K1536 + (-384) - K1536 + (-344), K1536 +
(-389) - K1536 + (-384), K1536 + (-432) - K1536 + (-389), K1536 + (-527) - K1536 + (-432), K1536
+ (-542) - K1536 + (-527), K1536 + (-635) - K1536 + (-542), K1536 + (-682) - K1536 + (-635),
K1536 + 000 - K1539 + 840
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 8.90 lane km
Allocation:
CW1 - Php 71,681,165.00
EAO – Php 2,599,835.0

TO:
Iligan City-Marawi City Rd - K1536+(-635) - K1536+500, K1545+312 - K1546+000 , K1553+665 - K1554+207, K1554+281 - K1554+331
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road
Physical Target:
CW1 – 4.086 lane km
CW2 – 688 lineal meters
Allocation:
CW1 - Php 58,873,548.18
CW2 – 12,807,616.82
EAO – Php 2,599,835.0
July 10, 2024 2024 P00803770MN SR2024-03-013391 March 16, 2024 Region X Regional Office X
P00803770MN
310101101356000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

FROM:
Sayre Highway K1521+862-K1523
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-5.102 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00

TO:
Sayre Highway K1512 + 366 - K1514 + 000, K1518 + 000 - K1519 + 285
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.390 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
July 10, 2024 2024 P00833111MN GAA FY 2024 January 1, 2024 Region X Bukidnon 3rd District Engineering Office
P00833111MN
300214101277000
CSSP - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:
Installation/Application of Signage and Pavement Markings along Jct. SH- Manolo Fortich-Libona-Indahag Road - K1481 + 000 - K1482 + 000, Barangay Agusan Canyon, Manolo Fortich Bukidnon and Barangay Crossing, Libona, Bukidnon
Type of Work:
CW1- Road Safety- Pavement Markings
Physical Target:
CW1- 990.00 Lineal Meters
Allocation:
CW1: Php 1,641,500.00
EAO: Php 33,500.00

TO:
Installation/Application of Signage and Pavement Markings along Jct. SH- Manolo Fortich-Libona-Indahag Road - K1460 + 366 - K1460 + 736, K1460 + 787.50 - K1461 + 450.50 Barangay Agusan Canyon, Manolo Fortich Bukidnon and Barangay Crossing, Libona, Bukidnon
Type of Work:
CW1- Road Safety- Pavement Markings
Physical Target:
CW1- 990.00 Lineal Meters
Allocation:
CW1: Php 1,641,500.00
EAO: Php 33,500.00
July 10, 2024 2024 P00800536MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00800536MN
310107100702000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:
Ozamis-Pagadian Rd - K1668 + 100 - K1668 + 150
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 2,149.610 Square meter
Allocation:
CW1 - Php 24,500,000.00
EAO – Php 500,000.00

TO:
Ozamis-Pagadian Rd - K1668 + 020 - K1668 + 170
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 – 6,448.830 Square meter
Allocation:
CW1 - Php 24,500,000.00
EAO – Php 500,000.00
July 10, 2024 2024 P00800390MN GAA FY 2024 January 1, 2024 Region X Iligan City District Engineering Office
P00800390MN
310110100543000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage - Primary Roads

FROM:
Overton-Buru-un Bdry Rd - K1535 + 073 - K1535 + 330, K1535 + 575 - K1535 + 877
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 559.00 Lineal Meters
Allocation:
CW1: Php 19,600,000.00
EAO: Php 400,000.00

TO:
Overton-Buru-un Bdry Rd - K1535 + 073 - K1535 + 370, K1535 + 534 - K1535 + 877
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 640.00 Lineal Meters
Allocation:
CW1: Php 19,600,000.00
EAO: Php 400,000.00
July 10, 2024 2024 P00801236MN SR2024-01-002893 January 27, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00801236MN
310104100688000
OO1 - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:
Ozamis-Oroquieta Rd - K1702 + 835 - K1703 + 000, K1709 + 960 - K1711 + 000, K1717 + 589 - K1718 + 398
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 4.026 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO – Php 2,100,000.00

TO:
Ozamis-Oroquieta Rd - K1709 + 000 - K1711 + 000, K1717 + 589 - K1718 + 398
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 – 5.620 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO – Php 2,100,000.00
July 10, 2024 2024 P00803771MN SR2024-01-002891 January 27, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803771MN
310101101357000
OO1 - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:
Asphalt Overlay Ozamis - Pagadian Road (Ozamiz Section) , K1695 + 409 K1696 + 687, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.556 lane km
Allocation:
CW1 - Php 144,750,000.00
EAO - Php 5,250,000.00

TO:
Asphalt Overlay Ozamis - Pagadian Road (Ozamiz Section), K1695 + 000 - K1695 + 391, K1695 + 421 - K1699 + 831.70, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 13.033 lane km
Allocation:
CW1 - Php 144,750,000.00
EAO - Php 5,250,000.00
July 10, 2024 2024 P00800543MN GAA FY 2024 January 1, 2024 Region X Iligan City District Engineering Office
P00800543MN
310107100695000
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:
Overton-Buru-un Bdry Rd - K1534 + 846 - K1534 + 939
Type of Work:
CW1- Construction of Road Slope Protection/ Structure
Physical Target:
CW1- 2,369.67 Square Meters
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00

TO:
Overton-Buru-un Bdry Rd - K1533 + 313 - K1533 + 380 - K1534 + 840 - K1535 + 000
Type of Work:
CW1- Construction of Road Slope Protection/ Structure
Physical Target:
CW1- 2,060.00 Square Meters
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00
July 10, 2024 2024 P00803773MN SR2024-01-002890 January 27, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803773MN
310101101359000
OO1 - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:
Asphalt Overlay Ozamis - Oroquieta Road (Ozamiz - Clarin Section), K1703 + 000 - K1704 + 252, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.50 lane km
Allocation:
CW1 - Php 135,100,000.00
EAO - Php 4,900,000.00

TO:
Asphalt Overlay Ozamis - Oroquieta Road (Ozamiz - Clarin Section), K1701 + 526.000 - K1705 + 022.00, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 12.850 lane km
Allocation:
CW1 - Php 135,100,000.00
EAO - Php 4,900,000.00
July 10, 2024 2024 P00803816MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803816MN
310102101923000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:
Asphalt Overlay Ozamis Port Road, 0 - 105, 117 - 556, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 1.088 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00

TO:
Asphalt Overlay Ozamis Port Road, 10.40 - 105, 117 - 428, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 0.811 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
July 10, 2024 2024 P00803817MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803817MN
310102101924000
OO1 - Asset Preservation Program - Preventive Maintenance - Secondary Roads


FROM:
Asphalt Overlay Ozamis Port Road Dual, 0 - 439, 451 - 556, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 1.088 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00

TO:
Asphalt Overlay Ozamis Port Road Dual, 130 - 439, 451 - 545.60, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 0.807 lane km
Allocation:
CW1 - Php 9,800,000.00
EAO - Php 200,000.00
July 10, 2024 2024 P00801244MN GAA FY 2024 January 1, 2024 Region X Iligan City District Engineering Office
P00801244MN
310104100777000
OO1: Ensure Safe and Reliable National Road System - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:
Misamis Oriental-Ma Cristina Bdry Rd - K1512+(-140) - K1512+040
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 0.360 Lane Km
Allocation:
CW1: Php 7,288,260.00
EAO: Php 148,740.00

TO:
Misamis Oriental-Ma Cristina Bdry Rd - K1512+(-140) - K1512+135
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.550 Lane Km
Allocation:
CW1: Php 7,288,260.00
EAO: Php 148,740.00
July 10, 2024 2024 P00803828MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803828MN
310103101705000
OO1 - Asset Preservation Program - Preventive Maintenance - Tertiary Roads


FROM:
Asphalt Overlay Tan Avenue Road, K1686 + 669 - K1687 + 1071, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 2.824 lane km
Allocation:
CW1 - Php 39,200,000.00
EAO - Php 800,000.00

TO:
Asphalt Overlay Tan Avenue Road, K1686 + 669 - K1687 + 610, Misamis Occidental
Type of Work:
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1 – 3.804 lane km
Allocation:
CW1 - Php 39,200,000.00
EAO - Php 800,000.00
July 10, 2024 2024 P00803874MN GAA FY 2024 January 1, 2024 Region X Iligan City District Engineering Office
P00803874MN
310204102863000
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

FROM:
Construction of Bypass and Diversion Roads Iligan City-Cagayan de Oro City Alternate Route (Digidaan – Bulua Section) Package II, Iligan City, Lanao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.64 Lane Km
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00

TO:
Construction of Bypass and Diversion Roads Iligan City-Cagayan de Oro City Alternate Route (Digkilaan – Bulua Section) Package II, Iligan City, Lanao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.64 Lane Km
Allocation:
CW1: Php 49,000,000.00
EAO: Php 1,000,000.00

July 10, 2024 2024 P00803844MN SR2024-01-002894 January 27, 2024 Region X Misamis Occidental 2nd District Engineering Office
P00803844MN
310201101320000
OO1 - Network Development Program - Road Widening - Primary Roads

FROM:
Ozamis - Oroquieta Rd - K1707 + 535 - K1708 +200, K1715 + 968 - K1717 + 407, K1717 + 425 - K1717 + 589, K1720 + 184 - K1720 + 665, K1720 + 692 - K1721 + 184
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 – 6.478 lane km
Allocation:
CW1 - Php 57,900,000.00
EAO - Php 2,100,000.00

TO:
Ozamis - Oroquieta Rd - K1707 + 535 - K1708 +200, K1715 + 968 - K1717 + 402.5
Type of Work:
CW1 – Road Widening
CW2 – Construction of Drainage Structure along Road
CW3 – Construction of Road Slope Protection Structure
Physical Target:
CW1 – 4.195 lane km
CW2 – 892.359 lm
CW3 – 2,781.930 Square meter
Allocation:
CW1 – Php 36,267,939.180
CW2 – Php 9,808,678.187
CW3 – Php 11,823,382.633
EAO – Php 2,100,000.00