May 3, 2023 |
FY 2023 |
WIN3F06876 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0077 + 815.97 - K0077 + 847.80 |
May 3, 2023 |
FY 2023 |
WIN3F06858 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0039 + 007.20 - K0039 + 096.51 |
May 3, 2023 |
FY 2023 |
WIN3F06883 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0042 + 100 - K0042 + 125, K0042 + 700 - K0042 + 718, K0042 + 750 - K0042 + 768.30 |
May 3, 2023 |
FY 2023 |
WIN3F07105 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0044 + 120 - K0044 + 160, K0045 + 400 - K0045 + 414 |
May 3, 2023 |
FY 2023 |
WIN3F06875 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0069 + 202 - K0069 + 238.20, K0069+246.60 – K0069+262 |
May 3, 2023 |
FY 2023 |
WIN3F06856 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Lubi-Binoog Rd - K0065 + 440 - K0065 + 480, K0065 + 620 - K0065 + 736, K0065 + 810 - K0065 + 894 |
May 3, 2023 |
FY 2023 |
WIN3F06912 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Odiongan-East-West Rd - K0007 + 177.73 - K0007 + 232.53 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Sibuyan Circumferential Rd - K0015 + 480 - K0016 + 557 |
May 3, 2023 |
FY 2023 |
WIN3F06874 |
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Sibuyan Circumferential Rd - K0051 + 317 - K0051 + 412 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0113 + 865 - K0113 + 966 |
May 3, 2023 |
FY 2023 |
|
RA 11936 |
January 3, 2023 |
Region IV-B |
Romblon District Engineering Office |
Tablas Circumferential Rd - K0113 + 865 - K0113 + 966 |
May 3, 2023 |
FY 2023 |
WIN3F06845 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Romblon District Engineering Office |
Marinduque Circumferential Rd – K005+200-K0006+575 |
May 3, 2023 |
FY 2023 |
|
SR2023-01-003607 |
January 31, 2023 |
Region IV-B |
Romblon District Engineering Office |
Dr Damian Reyes Rd (Boac Side) – K0011+261 – K0012+038, K0012+286 – K0012+336, K0020+000 – K0020+575 |
May 3, 2023 |
2023 |
WIN3F07256 |
SR2023-03-006097 |
March 2, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 840 - K0923 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 110.975 M
Structure: 6,388.89 Square meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0922 + 805 - K0923 + 011
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 110.975 M
Structure: 4,621.88 Square meters
EAO P 4.025 M
Total P 115.00 M
|
May 3, 2023 |
2023 |
WIN3F07229 |
SR2023-01-000744 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1068 - Chainage 1150, Chainage 1200 - Chainage 1300, Chainage 1900 Chainage 1940
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 135.100 M
Structure: 12,529.48 Square meters
EAO P 4.900 M
Total P 140.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+560 - K0927+658, K0927+757 - K0927+813
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 135.100 M
Structure: 5,646.98 Square meters
EAO P 4.900 M
Total P 140.00 M
|
May 3, 2023 |
2023 |
WIN3F07198 |
SR2023-01-000985 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0909+(-687) - K0909+
(-550)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 6,438.78 Square meters
EAO P 4.056430 M
Total P 115.898 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+060 - K0908+140 (L/S), K0908+240 - K0908+377 (L/S)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 4,615.05 Square meters
EAO P 4.056430 M
Total P 115.898 M
|
May 3, 2023 |
2023 |
XII-085 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0023 - Construction of Flood Control Dike along Kabacan River L/S, Barangay Binay, Magpet, North Cotabato |
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+404, K0277+423 - K0277+433, K0280+500 - K0280+525;
Physical Target: 308.92 Square Meters;
Allocation: Php 4,740,000.000"
"To:
Asin (Km. 8)-Nangalisan-Sn Pascual, Tuba, Benguet-LU Bdry Rd - K0277+388 - K0277+398, K0277+408 - K0277+433, K0280+495 - K0280+529;
Physical Target: 459.9 Square Meters;
Allocation: Php 4,740,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Baguio-Bauang Rd - K0291+500 - K0293+342;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 3.698 Lane Km;
Allocation: Php 22,244,000.000"
"To:
Baguio-Bauang Rd - K0291+460 - K0292+860;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Construction of
Road Slope Protection Structure;
Physical Target:
CW1: 2.802 Lane Km
CW2: 440.00 Square Meters ;
Allocation: Php 22,244,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0312+000 - K0313+175;
Physical Target: 2.476 Lane Km;
Allocation: Php 14,894,000.000"
"To:
Cong. Andres Acop Cosalan Rd - K0312+088 - K0313+160;
Physical Target: 2.27 Lane Km;
Allocation: Php 14,894,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0322+717 - K0322+732;
Physical Target: 119.97 Square Meters;
Allocation: Php 1,850,000.000"
"To:
Cong. Andres Acop Cosalan Rd - K0338+090 - K0338+122;
Physical Target: 185.6 Square Meters;
Allocation: Php 1,850,000.000"
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Pico-Lamtang Rd - K0260+750 - K0261+1965;
Physical Target: 4.44 Lane Km;
Allocation: Php 26,707,000.000"
"To:
Pico-Lamtang Rd - K0260+650 - K0261+1965;
Physical Target: 4.64 Lane Km;
Allocation: Php 26,707,000.000"
|
May 3, 2023 |
2023 |
|
SR2023-01-004168 |
January 31, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Bridge - Construction of New Bridges
AS PER GAA/ORIGINAL:
Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road
Physical Target: Allocation:
CW1-Construction of Bridge: 287.631 P 58.865 M
Square meters
EAO P 2.135 M
Total P 61.00 M
AS MODIFIED:
Raquiza Br. (B00205LT) along Palompon-Isabel-Merida-Ormoc Road
Physical Target: Allocation:
CW1-Construction of Bridge: 508.329 P 58.865 M
Square meters
EAO P 2.135 M
Total P 61.00 M
|
May 3, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"From:
Tawang-Ambiong Rd - K0261+576 - K0261+594, K0263+122 - K0263+136, K0263+947 - K0263+957, K0264+779 - K0264+800;
Physical Target: 363.02 Square Meters;
Allocation: Php 5,280,000.000"
"To:
Tawang-Ambiong Rd - K0261+475 - K0261+500, K0261+572.4 - K0261+600, K0263+115 - K0263+160, K0263+940 - K0263+963, K0264+773.5 - K0264+798;
Physical Target: 525.85 Square Meters;
Allocation: Php 5,280,000.000"
|
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Palawan Circum. Rd (Panalingaan-Tagbita-Latud) - K0253 + 682 - K0253 + 840 |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Construction of Panitian River Flood Control Structure, Sta. 0+131 – Sta. 0+280 B/S Downstream, Barangay Panitian, Quezon, Palawan |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Punta Baja Rd K0189 + 511 - K0189 + 541, K0190 + 000 - K0190 + 037, K0190 + 206 - K0190 + 222, K0190 + 267 - K0190 + 291, K0190 + 641 - K0190 + 691 |
May 3, 2023 |
FY 2023 |
WIN3F06879 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Punta Baja Rd K0154 + 010 - K0154 + 030, K0161 + 580 - K0161 + 618, K0165 + 1029 - K0166 + 002, K0167 + 825 - K0167 + 857 |
May 3, 2023 |
FY 2023 |
WIN3F06878 |
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Quezon-Aramaywan Rd K0158 + 876 - K0158 + 911, K0166 + 960 - K0166 + 1000, K0167 + 050 - K167 + 105 |
May 3, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Palawan 2nd District Engineering Office |
Construction of New Bridges Culimbawang Br. Along Culandanum-Panalingaan Cross Country Road (Phase III) |
May 2, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1021 + 080 - K1021 + 674
Physical Target: Allocation:
CW1-Road Widening- 1.188 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Biliran Circumferential Rd - K1021 + 080 - K1021 + 621
Physical Target: Allocation:
CW1-Road Widening- 1.082 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
|
May 2, 2023 |
2023 |
WIN3F07197 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Biliran District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Biliran Circumferential Rd - K1050 + 175 - K1051 + 217
Physical Target: Allocation:
CW1-Road Widening-2.092 Lane Km P 15.985760 M
EAO P 0.326240 M
Total P 16.312 M
AS MODIFIED:
Biliran Circumferential Rd - K1050 + 175 - K1050 + 209, K1050 + 230 - K1050 +875
Physical Target: Allocation:
CW1-Road Widening-0.713 Lane Km P 15.985760 M
EAO P 0.326240 M
Total P 16.312 M |
May 2, 2023 |
2023 |
WIN3F07169 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0941 + 988 - K0942 + 637, K0942 + 338 - K0943 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.00 M
5.332 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0941 + 988 - K0943 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 49.00 M
4.136 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
May 2, 2023 |
2023 |
WIN3F07179 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 084, K0939 + 1000 - K0940 + 329
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
4.328 Lane Km
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0939 + 641 - K0940 + 329
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 19.600 M
2.9132 Lane Km
EAO P 0.400 M
Total P 20.00 M
|
May 2, 2023 |
2023 |
WIN3E02775 |
SR2023-03-005650 |
May 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0481 + 650 - K0481 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0488 + 250 - K0488 + 450;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3F07027 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Kananga-Tungonan Hot Spring Rd – K0990+(-1060) – K0990+(-704), K0993+603 – K0994+000
Physical Target: Allocation:
CW1-Road Widening: 1.304 Lane Km P 26.805940 M
EAO P 0.547060 M
Total P 27.353 M
AS MODIFIED:
Kananga-Tungonan Hot Spring Road K0990+(-1050) – K0990+(-704)
Physical Target: Allocation:
CW1-Road Widening: 0.692 Lane Km P 26.805940 M
EAO P 0.547060 M
Total P 27.353 M
|
May 2, 2023 |
2023 |
WIN3E02779 |
SR2023-03-005630 |
May 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 100 - K0489 + 200;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0488 + 000 - K0488 + 200;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02783 |
SR2023-03-005634 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 400 - K0489 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0489 + 680 - K0489 + 800;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02799 |
SR2023-03-005633 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0438 + 250 - K0489 + 350;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0489 + 460 - K0489 + 630;
Physical Target: 3577 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02777 |
SR2023-03-005800 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Kennon Rd - K0241 + (-060) - K0241 + 100;
Physical Target: 5555.556 Square meters;
Allocation: Php 100,000,000.000
To:
Kennon Rd - K0241 + 798 - K0241 + 920;
Physical Target: 2980.600 Square meters;
Allocation: Php 100,000,000.000
|
May 2, 2023 |
2023 |
WIN3E02790 |
SR2023-03-005817 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0350 + 660 - K0350 + 775, Banaue, Ifugao;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000.000
To:
Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0351 + 160 - K0351 + 260, K0351 + 300 - K0351 + 400, Banaue, Ifugao;
Physical Target: 4,454 Square meters;
Allocation: Php 120,000,000.000
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 850 (Lawig Side), Lamut, Ifugao;
Physical Target: 550 Lineal meters;
Allocation: Php 39,500,000.000
To:
Construction of Flood Control along Lamut River, Sta. 18 + 300 - Sta. 18 + 900, (Lawig Side), Lamut, Ifugao;
Physical Target: 616 Lineal meters;
Allocation: Php 39,500,000.000
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 420 (Manaan Section), Tinoc, Ifugao;
Physical Target: 460 Lineal meters;
Allocation: Php 33,170,000.000
To:
Construction of Flood Control along Tinoc River, Sta. 98 + 960 - Sta. 99 + 440, (Manaan Section), Tinoc, Ifugao;
Physical Target: 480 Lineal meters;
Allocation: Php 33,170,000.000
|
May 2, 2023 |
2023 |
WIN3E02826 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 800 (Ahin Section), Tinoc, Ifugao;
Physical Target: 490 Lineal meters;
Allocation: Php 30,810,000.000
To:
Construction of Flood Control along Tinoc River, Sta. 21 + 310 - Sta. 21 + 385, Sta. 22 + 000 - Sta. 22 + 070, Sta. 22 + 700 - Sta. 22 + 750, Sta. 22 + 900 - Sta. 22 + 950, Sta. 23 + 050 - Sta. 23 + 150, (Ahin Section), Tinoc, Ifugao;
Physical Target: 345 Lineal meters;
Allocation: Php 30,810,000.000
|
May 2, 2023 |
2023 |
WIN3E02814 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0270+015 - K0270+045, K0272+720 - K0272+750;
Physical Target: 2680.36 Square Meters;
Allocation: Php 30,000,000.000"
"To:
Baguio-Bontoc Rd - K0266+600 - K0266+700, K0267+150 - K0267+180, K0268+850 - K0268+920, K0272+713 - K0272+770;
Physical Target: 1602 Square Meters;
Allocation: Php 30,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02791 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+350, K0320+345 - K0320+410;
Physical Target: 2692.09 Square Meters;
Allocation: Php 35,074,000.000"
"To:
Baguio-Bontoc Rd - K0317+820 - K0317+837, K0318+012 - K0318+049, K0318+052 - K0318+070, K0318+320 - K0318+396, K0320+345 - K0320+410;
Physical Target: 1810 Square Meters;
Allocation: Php 35,074,000.000"
|
May 2, 2023 |
2023 |
WIN3E02817 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+390, K0334+630 - K0334+670, K0342+955 - K0342+975;
Physical Target: 540 Square Meters;
Allocation: Php 9,000,000.000"
"To:
Abatan-Mankayan-Cervantes Rd - K0334+360 - K0334+375, K0335+470 - K0335+511, K0342+955 - K0342+974, K0348+350 - K0348+368;
Physical Target: 417 Square Meters;
Allocation: Php 9,000,000.000"
|
May 2, 2023 |
2023 |
WIN3F07029 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:3,594.930 Square meters
EAO P 0.390 M
Total P 19.500 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1013 + 064 - K1013 + 710, K1015 + 100 - K1015 +503
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: Paving of P 19.110 M
Shoulders:1,883 Square meters
EAO P 0.390 M
Total P 19.500 M
|
May 2, 2023 |
2023 |
WIN3E02785 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0277+000 - K0277+032, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1912.3 Square Meters;
Allocation: Php 21,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0276+725 - K0276+910, K0276+920 - K0277+040, K0278+250 - K0278+370, K0279+912 - K0279+942;
Physical Target: 1353.75 Square Meters;
Allocation: Php 21,000,000.000"
|
May 2, 2023 |
2023 |
WIN3F07068 |
SR2023-01-004153 |
January 31, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Libungao-Matag-ob-Palompon Rd - K1016 + 822 - K1016 + 906, K1020 + 100 - K1020 + 360, K1022 + 148 - K1022 + 490
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,999.910 Square meters
EAO P 2.800 M
Total P 80.00 M
AS MODIFIED:
Libungao-Matag-ob-Palompon Road – K1016+822 – K1016+906, K1020+100 – K1020+360, K1022+388 – K1022+730
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 77.200 M
Structure: 3,182.550 Square meters
EAO P 2.800 M
Total P 80.00 M
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 440 Square Meters;
Allocation: Php 6,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0293+930 - K0293+990, K0297+840 - K0297+890;
Physical Target: 540.5 Square Meters;
Allocation: Php 6,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02812 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+060 - K0338+086, K0338+515 - K0338+560, K0338+875 - K0338+890, K0339+360 - K0339+440;
Physical Target: 2006.03 Square Meters;
Allocation: Php 32,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0324+445 - K0324+470, K0331+540 - K0331+575, K0338+515 - K0338+560, K0342+625 - K0342+665, K0344+415 - K0344+426;
Physical Target: 1317.6 Square Meters;
Allocation: Php 32,000,000.000"
|
May 2, 2023 |
2023 |
WIN3F07069 |
SR2023-01-004151 |
January 31, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1115 + 338 - K1115 + 407
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.262500 M
Structure: 5,138.890 Square meters
EAO P 3.237500 M
Total P 92.500 M
AS MODIFIED:
Merida-Lundag-Puting Bato-Consolacion-Isabel Rd - K1115 + 338 - K1115 + 407
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.262500 M
Structure: 2,872.650 Square meters
EAO P 3.237500 M
Total P 92.500 M
|
May 2, 2023 |
2023 |
WIN3E02806 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0342+490 - K0342+505, K0350+840 - K0350+910;
Physical Target: 510 Square Meters;
Allocation: Php 8,000,000.000"
"To:
Gov. Bado Dangwa National Rd - K0342+490 - K0342+505, K0348+434 - K0348+530;
Physical Target: 326 Square Meters;
Allocation: Php 8,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02788 |
SARO-BMB-A-23-0013115 |
March 31, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov Bado Dangwa National Road - K0286+740 - K0286+840, Kapangan, Benguet;
Physical Target: 2777.78 Square Meters;
Allocation: Php 50,000,000.000"
"To:
Gov Bado Dangwa National Road - K0287+070 - K0287+130, Kapangan, Benguet;
Physical Target: 2237.5 Square Meters;
Allocation: Php 50,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02822 |
SR2023-01-001686 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Calamagan Section, Sta. 0+012 - Sta. 0+472 (L.S), Sta. 0+012 - Sta. 0+447 (R.S), Sta. 11+474 - Sta. 12+174 (L.S), Sta. 11+743 - Sta. 12+068 (R.S), Buguias, Benguet;
Physical Target: 1920 Lineal meters;
Allocation: Php 75,000,000.000"
"To:
Construction of Flood Mitigation Structure along Agno River, Calamagan Section, Sta. 11+008 - Sta. 11+700 (R.S), Sta. 11+008 - Sta. 11+713 (L.S), Buguias, Benguet;
Physical Target: 1195 Lineal meters;
Allocation: Php 75,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02825 |
SR2023-01-001683 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Baoknit Section, Sta. 9+846 - Sta. 10+306 (R.S), Sta. 10+076 - Sta. 10+480 (L.S), Sta. 10+360 - Sta. 11+088 (R.S), Sta. 10+491 - Sta. 10+556 (L.S), Sta. 0+540 - Sta. 0+671 (L.S), Sta. 0+556 - Sta. 0+688 (R.S), Buguias, Benguet;
Physical Target: 1920 Lineal meters;
Allocation: Php 75,000,000.000"
"To:
Construction of Flood Mitigation Structure along Agno River, Baoknit Section, Sta. 9+945 - Sta. 10+555 (L.S), Sta. 9+928 - Sta. 10+524 (R.S), Buguias, Benguet;
Physical Target: 1200 Lineal meters;
Allocation: Php 75,000,000.000"
|
May 2, 2023 |
2023 |
|
SARO-BMB-A-23-0014197 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction/Opening of Community Access Road from Pidpid, Alilem, Ilocos Sur, Sinacbat, Bakun, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: 0.372 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction/Opening of Community Access Road from Pidpid, Alilem, Ilocos Sur, Sinacbat, Bakun, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: 0.4 Lane Km;
Allocation: Php 5,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02803 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0378 + 494 - K0378 + 736, K0399 + 503 - K0400 + 790, K0414 + 230 - K0414 + 511;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 3.38 Lane Km;
Allocation: Php 16,120,000.000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0399 + 503 - K0400 + 790, K0414 + 230 - K0414 + 511;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 2.228 Lane Km;
Allocation: Php 16,120,000.000"
|
May 2, 2023 |
2023 |
|
SR2023-03-005725 |
March 2, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0348 + 524 - K0347 + 695, K0348 + 050 - K0348 + 125;
Physical Target: 3,898.8 Square Meters;
Allocation: Php 70,130,000.000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0347 + 524 - K0347 + 695, K0348 + 050 - K0348 + 125;
Physical Target: 4,501.45 Square Meters;
Allocation: Php 70,130,000.000"
|
May 2, 2023 |
2023 |
|
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Palompon-Isabel-Merida-Ormoc Rd - K1106 + 000 - K1106 + 733
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 24.500 M
along Road: 1,466.00 Lineal meters
EAO P 0.500 M
Total P 25.00 M
AS MODIFIED:
Palompon-Isabel-Merida-Ormoc Rd - K1106 + 000 - K1106 + 733
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 24.500 M
along Road: 1,427.00 Lineal meters
EAO P 0.500 M
Total P 25.00 M
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0397 + (-043) - K0397 + (-004), K0397 + 000 - K0397 + 123, K0397 + 013 - K0397 + 049, K0397 + 115 - K0397 + 130, K0407 + 366 - K0407 + 483, K0407 + 649 - K0407 + 700, K0408 + 228 - K0408 + 302, K0409 + (-032) - K0409 + 154;
Physical Target: 4,008.17 Square Meters;
Allocation: Php 45,000,000.000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0397 + (-043) - K0397 + (-004), K0397 + 000 - K0397 + 125, K0397 + 013 - K0397 + 049, K0397 + 115 - K0397 + 130, K0407 + 366 - K0407 + 483, K0407 + 649 - K0407 + 700, K0409 + (-032) - K0409 + 154;
Physical Target: 3,848.60 Square Meters;
Allocation: Php 45,000,000.000"
|
May 2, 2023 |
2023 |
|
SARO-BMB-A-23-0013147 |
February 20, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0344 + 485 - K0344 + 501, K0344 + 649 - K0344 + 677, K0344 + 806 - K0344 + 829, K0345 + 542 - K0345 + 565, K0345 + 775 - K0345 + 793, K0346 + 564 - K0346 + 581, K0346 + 630 - K0346 + 695, K0349 + 044 - K0349 + 062, K0349 + 046 - K0349 + 063, K0349 + 210 - K0349 + 230, K0350 + 548 - K0350 + 570, K0351 + 892 - K0351 + 918, K0353 + 044 - K0353 + 085, K0355 + 601 - K0355 + 706, K0355 + 680 - K0355 + 718, K0360 + 214 - K0360 + 259, K0360 + 282 - K0360 + 321;
Physical Target: 3,123 Square Meters;
Allocation: Php 28,541,000.000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0344 + 649 - K0344 + 677, K0344 + 806 - K0344 + 829, K0345 + 542 - K0345 + 565, K0346 + 564 - K0346 + 581, K0346 + 643 - K0346 + 661.30, K0349 + 046 - K0349 + 063, K0349 + 044 - K0349 + 062, K0349 + 210 - K0349 + 230, K0350 + 548 - K0350 + 570, K0351 + 892 - K0351 + 918, K0353 + 044 - K0353 + 085, K0355 + 601 - K0355 + 706, K0355 + 680 - K0355 + 718, K0360 + 214 - K0360 + 259, K0360 + 282 - K0360 + 321, K0361 + 012 - K0361 + 036, K0361 + 087 - K0361 + 105;
Physical Target: 2,709.30 Square Meters;
Allocation: Php 28,541,000.000"
|
May 2, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Hungduan-Benguet Bdry Rd - K0342 + (-161) - K0342 + (-110), K0342 + 157 - K0342 + 298, K0345 + 800 - K0345 + 860, K0350 + 493 - K0350 + 526, K0351 + 541 - K0351 + 568, K0351 + 881 - K0351 + 901, K0352 + 422 - K0352 + 470;
Physical Target: 2,448 Square Meters;
Allocation: Php 28,146,000.000"
"To:
Banaue-Hungduan-Benguet Bdry Rd - K0342 + (-161) - K0342 + (-110), K0342 + 157 - K0342 + 298, K0345 + 800 - K0345 + 860, K0350 + 493 - K0350 + 526, K0351 + 541 - K0351 + 568, K0352 + 422 - K0352 + 470, K0343 + 977 - K0343 + 998, K0352 + (-021) - K0352 + 009 ;
Physical Target: 2,413.88 Square Meters;
Allocation: Php 28,146,000.000"
|
May 2, 2023 |
2023 |
|
SR2023-01-001786 |
January 30, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Construction of Busilac Flood Control, Sta. 27 + 753 - Sta. 29 + 623 (LS), Alfonso Lista, Ifugao ;
Physical Target: 1,000 Linear Meters;
Allocation: Php 90,000,000.000"
"To:
Construction of Busilac Flood Control, Sta. 27 + 753 - Sta. 28+951 (LS), Alfonso Lista, Ifugao;
Physical Target: 1,198 Linear Meters;
Allocation: Php 90,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02778 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Construction of Slope Protection Structure, DPWH Ifugao 2nd DEO, Talite, Aguinaldo, Ifugao;
Physical Target: 1,716.03 Square Meters;
Allocation: Php 20,000,000.000"
"To:
Construction of Slope Protection Structure, DPWH Ifugao 2nd DEO, Talite, Aguinaldo, Ifugao;
Physical Target: 1,321.94 Square Meters;
Allocation: Php 20,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02793 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Balbalan-Pinukpuk Rd - K0499 + 3298 - K0499 + 3458, K0509 + 1036 - K0509 + 1047, K0518 + 739 - K0518 + 867, K0518 + 972 - K0518 + 975;
Physical Target: 0.604 Lane Km;
Allocation: Php 10,071,000.000"
"To:
Balbalan-Pinukpuk Rd - K0499 + 3298 - K0499 + 3458, , K0518 + 972 - K0519 + 085;
Physical Target: 0.428 Lane Km;
Allocation: Php 10,071,000.000"
|
May 2, 2023 |
2023 |
WIN3E02787 |
SARO-BMB-A-23-0014341 |
March 13, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"From:
Construction of Drainage Canal System in Barangay Malucsad (Abis Creek), Pasil, Kalinga and Barangay Balbalasang (Balbalasang Elementary School), Balbalan, Kalinga;
Physical Target: 463.756 Lineal Meters;
Allocation: Php 5,000,000.000"
"To:
Construction of Drainage Canal System in Barangay Malucsad (Abis Creek), Pasil, Kalinga and Barangay Balbalasang (Balbalasang Elementary School), Balbalan, Kalinga;
Physical Target: 185 Lineal Meters;
Allocation: Php 5,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02815 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Mt Prov-Ilocos Sur via Tue Rd K0402+474 - K0402+510, K0406+046 - K0406+170, K0408+237 - K0408+331, K0409+891 - K0409+959;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 709 Square Meters;
Allocation: Php 6,886,000.000"
"To:
Mt Prov-Ilocos Sur via Tue Rd K0402+474 - K0402+510, K0406+046 - K0406+170, K0408+237 - K0408+331, K0408+891 - K0408+959;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 424.55 Square Meters
CW2: 950 Square Meters ;
Allocation: Php 6,886,000.000"
|
May 2, 2023 |
2023 |
WIN3E02786 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd (S04030LZ) Chainage 2130 - Chainage 2586;
Physical Target: 0.456 Lane Km;
Allocation: Php 7,838,000.000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd (S04030LZ) Chainage 1500 - Chainage 1680;
Physical Target: 0.36 Lane Km;
Allocation: Php 7,838,000.000"
|
May 2, 2023 |
2023 |
WIN3E02771 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Mt. Province- Ifugao Rd (Kiling- Paracelis Sect)- K0469 + 313 - K0471 + 105;
Physical Target: 4389.6 Square Meters ;
Allocation: Php 18,377,000.000"
"To:
Mt. Province- Ifugao Rd (Kiling- Paracelis Sect)- K0469 + 000 - K0469 + 760;
Physical Target: 2546 Square Meters;
Allocation: Php 18,377,000.000"
|
May 2, 2023 |
2023 |
WIN3E02753 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0455 + 600 - K0455 + 615, K0455 + 743 - K0455 + 760, K0457 + 485 - K0457 + 510, K0458 + 1288 - K0458 + 1320, K0458 + 223 - K0458 + 238, K0458 + 285 - K0458 + 320, K0458 + 340 - K0458 + 390, K0459 + 720 - K0459 + 825, K0460 + 620 - K0460 + 665, K0461 + 700 - K0461 + 735, K0463 + 028 - K0463 + 088, K0463 + 445 - K0463 + 465, K0463 + 995 - K0463 + 1015;
Physical Target: 4356.01 Square Meters ;
Allocation: Php 34,978,000.000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0455 + 600 - K0455 + 615, K0455 + 743 - K0455 + 759.8, K0457 + 485 - K0457 + 510, K0458 + 1288 - K0458 + 1314.8, K0458 + 223 - K0458 + 238, K0458 + 298 - K0458 + 324.8, K0458 + 350 - K0458 + 385.6, K0459 + 720 - K0459 + 800, K0460 + 620 - K0460 + 665, K0461 + 700 - K0461 + 733.3, K0463 + 028 - K0463 + 087.7, K0463 + 445 - K0463 + 465.1, K0463 + 995 - K0463 + 1015;
Physical Target: 2805 Square Meters;
Allocation: Php 34,978,000.000"
|
May 2, 2023 |
2023 |
WIN3E02754 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0427 + 180 - K0427 + 200, K0436 + 967 - K0437 + 007, K0437 + 794 - K0437 +824, K0438 + 230 - K438 + 260, K0451 + 225 - K0451 +250, K0451 + 310 - K0451 + 330, K0451 + 575 - K0451 +590, K0451 + 620 - K0451 + 645, K0452 +540 - K0452 + 575, K0452 +714 - K0452 +732, K0455 + 505 - K0455 +557;
Physical Target: 2395.01 Square Meters ;
Allocation: Php 21,953,000.000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0427 + 180 - K0427 + 200, K0436 + 978 - K0437 + 007, K0437 + 794 - K0437 +824, K0438 + 220 - K438 + 258, K0451 + 225 - K0451 +251, K0451 + 310 - K0451 + 330, K0451 + 575 - K0451 +590, K0451 + 620 - K0451 + 645, K0452 +540 - K0452 + 575, K0452 +714 - K0452 +734, K0455 + 532 - K0455 +555;
Physical Target: 1678 Square Meters;
Allocation: Php 21,953,000.000"
|
May 2, 2023 |
2023 |
WIN3E02752 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0388 + (-100) – K0388 + (-055), K0391 + 900 - K0391 + 915, K0400 + 912 – K0400 + 934, K0403 + 795 - K0403 + 825, K0404 + 073 - K0404 + 088, K0404 + 291 - K0404 + 326, K0405 + 641 - K0405 + 657, K0405 + 689 - K0405 +705, K0405 + 870 - K0405 + 892;
Physical Target: 2026.1 Square Meters ;
Allocation: Php 17,219,000.000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0391 + 900 - K0391 + 915, K0403 + 795 - K0403 + 825, K0404 + 073 - K0404 + 088, K0404 + 291 - K0404 + 326, K0405 + 641 - K0405 + 657, K0405 + 700 - K0405 +716, K0405 + 870 - K0405 + 892;
Physical Target: 1175 Square Meters;
Allocation: Php 17,219,000.000"
|
May 2, 2023 |
2023 |
WIN3E02824 |
SR2023-01-002214 |
January 30, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of Duli Flood Control, Sta. 123 + 400 - Sta. 123 + 800 (R.S.), Sta. 123 + 800 - Sta. 124 + 400 (R.S.), Bunot, Paracelis, Mountain Province;
Physical Target: 1000 Lineal Meters;
Allocation: Php 65,000,000.000"
"To:
Construction of Duli Flood Control, Sta. 123 + 580 - Sta. 123 + 680 (R.S.), Sta. 123 + 800 - Sta. 124 + 350 (R.S.), Bunot, Paracelis, Mountain Province;
Physical Target: 600 Lineal Meters;
Allocation: Php 65,000,000.000"
|
May 2, 2023 |
FY 2023 GAA |
WIN3E02823 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structures along Cateel River (Barangay Central), Sta. 0+000 - Sta. 0+540, Cateel, Davao Oriental
Physical Target:
CW1: 540.00 lineal meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structures along Cateel River (Barangay Central), Sta. 0+000 - Sta. 0+540, Cateel, Davao Oriental
Physical Target:
CW1: 355.00 lineal meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.000 |
May 2, 2023 |
FY 2023 GAA |
WIN3E02809 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - (S01455MN) - Chainage 3792 - Chainage 4172, Chainage 4337 - Chainage 4550
Physical Target:
CW1: 1.186 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,008,000.00
CW1: P 14,707,840.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,160.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - (S01455MN) - Chainage 3792 - Chainage 4172
Physical Target:
CW1: 0.793 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,008,000.00
CW1: P 14,707,840.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,160.00 |
May 2, 2023 |
2023 |
WIN3F07165 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of By-Pass Road leading to Enrique Garcia Senior Avenue (EGSA), Balanga City, Bataan |
May 2, 2023 |
FY 2023 GAA |
WIN3E02794 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1505+847 - K1506+000,
K1506+112 - K1506+417, K1507+000 - K1507+475
Physical Target:
CW1: 1.846 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,850,000.00
CW1: P 20,433,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 417,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1505+735 - K1506+000, K1506+112 - K1506+417
Physical Target:
CW1: 0.912 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,850,000.00
CW1: P 20,433,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 417,000.00 |
May 2, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-Purpose Building, Barangay Baguion, Calumpit, Bulacan |
May 2, 2023 |
2023 |
WIN3F06935 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd – K0984 + 060 – K0984 + 875, K0990 + 000 – K0990 + 416
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 43.927520 M
Asphalt Overlay: 4.924 Lane Km
EAO P 0.896480 M
Total P 44.824 M
AS MODIFIED:
Palo-Carigara-Ormoc Road – K0984 + 060 – K0984 + 875, K0990 + 000 – K0990+ 089
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 43.927520 M
Asphalt Overlay: 3.616 Lane Km
EAO P 0.896480 M
Total P 44.824 M
|
May 2, 2023 |
2023 |
|
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Dayhagan-Salvacion-Coob-Libertad Rd – K1007 + 520 – K1008 + 416
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 32.241020 M
Asphalt Overlay: 3.614 Lane Km
EAO P 0.657980 M
Total P 32.899 M
AS MODIFIED:
Dayhagan-Salvacion-Coob-Libertad Road, K1007 + 520 – K1008 + 329
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 32.241020 M
Asphalt Overlay: 3.300 Lane Km
EAO P 0.657980 M
Total P 32.899 M
|
May 2, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (LZ) - K0202+000 - K0202+050, K0205+681 - K0206+442, K0206+894 - K0207+000 |
May 2, 2023 |
FY 2023 GAA |
P00707746MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1514+850 - K1516+200, K1518+620 - K1518+834, Davao City
Physical Target:
CW1: 3.138 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1514+850 - K1516+200, K1518+620 - K1518+771, Davao City
Physical Target:
CW1: 4.628 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 2, 2023 |
2023 |
WIN3F07237 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Jct Pinagpanaan - Rizal - Pantabangan Rd - K0153+125 - K0153+346, K0166+000 - K0166+036, K0166+076 -K0166+206, K0166+301 - K0166+768 |
May 2, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Tulaoc - Sto. Domingo Rd - K0061+538 - K0062+539 |
May 2, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Simon - Baliwag Rd - K0068+858 - K0069+000, K0071+000 - K0071+866 |
May 2, 2023 |
2023 |
WIN3F06938 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Sto. Rosario – Villaba Rd – K1002 + (-666) – K1002 + 633
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.177 M
Asphalt Overlay: 2.598 Lane Km
EAO P 0.473 M
Total P 23.650 M
AS MODIFIED:
Sto. Rosario – Villaba Road – Sta. K1002 + (-666) – K1002 + 305
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.177 M
Asphalt Overlay: 1.942 Lane Km
EAO P 0.473 M
Total P 23.650 M
|
May 2, 2023 |
2023 |
WIN3F07028 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Libungao-Matag-ob-Palompon Rd – K0991+475 – K0992+000, K0998+518 – K0999+000, K1003+380 – K1003+831, K1012+404 – K1012+664, K1016+000 – K1016+250
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 31.386460 M
Concrete Reblocking: 5.958 Lane Km
EAO P 0.640540M
Total P 32.027 M
AS MODIFIED:
Libungao-Matag-ob-Palompon Rd, K0991+475 – K0991+606, K0991+623 – K0991+635, K0991+689 – K0991+895, K0991+971 – K0991+985, K0998+(-18) – K0998+022, K0998+089 – K0998+235, K0998+322 – K0998+421, K0998+603 – K0998+645, K0998+695 – K0998+775, K0998+897 – K0998+1002, K1012+404 – K1012+496, K1016+066 – K1016+185, K1016+235 – K1016+328
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 31.386460 M
Concrete Reblocking: 2.358 Lane Km
EAO P 0.640540M
Total P 32.027 M
|
May 2, 2023 |
FY 2023 GAA |
WIN3E02807 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+003 - K1786+068
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1780+529 - K1780+600
Physical Target:
CW1: 4,330.94 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 2, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Tulaoc - Sto. Domingo Rd - K0060+(-388) - K0060+(-031)
|
May 2, 2023 |
2023 |
WIN3F07205 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Lubao Bypass Rd - Chainage 0 - Chainage 321.50 |
May 2, 2023 |
FY 2023 GAA |
WIN3E02808 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1780+477 - K1780+530
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd -
K1780+738 - K1780+780, K1781+035 - K1781+130
Physical Target:
CW1: 4,163.405 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 2, 2023 |
2023 |
WIN3F07181 |
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Palompon-Isabel-Merida-Ormoc Rd - K1072 + 035 - K1072 + 100
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 1,831.500 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Palompon-Isabel-Merida-Ormoc Rd - K1072 + 035 - K1072 + 100
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 1,930.860 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 2, 2023 |
2023 |
WIN3E02801 |
SARO-BMB-A-23-0014283 |
March 13, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of local roads. Bayyo, Bontoc, Mt. Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.327 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction of local roads. Bayyo, Bontoc, Mt. Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1 - 0.130 Lane Km
CW2: 232.70 Square Meters ;
Allocation: Php 5,000,000.000"
|
May 2, 2023 |
2023 |
|
SARO-BMB-A-23-0014283 |
March 13, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction (Improvement) of Kin-iway-Besao West Road (Lamegsan Road Section), Besao, Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.327 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction (Improvement) of Kin-iway-Besao West Road (Lamegsan Road Section), Besao, Mountain Province;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Drainage Structure along Road ;
Physical Target:
CW1: 0.212 Lane Km
CW2: 58.0 Lineal Meter ;
Allocation: Php 5,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02792 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Construction of Road, Betwagan, Sadanga, Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.327 Lane Km;
Allocation: Php 5,000,000.000"
"To:
Construction of Road, Betwagan, Sadanga, Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 0.1423 Lane Km
CW2: 98.09 Square Meters ;
Allocation: Php 5,000,000.000"
|
May 2, 2023 |
2023 |
WIN3E02784 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"From:
Baguio-Bontoc Rd - K0343+087 - K0343+152, K0369+814 - K0369+910, K0375+900 - K0376+070;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 693.6 Lane Km;
Allocation: Php 11,061,000.000"
"To:
Baguio-Bontoc Rd - K0343+087 - K0343+152, K0370+107 - K0370+252, K0370+420 - K0370+500;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 421.40 Square Meters
CW2: 679.20 Square Meters ;
Allocation: Php 11,061,000.000"
|
May 2, 2023 |
2023 |
|
GAA FY 2023 |
January 25, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
Convergence and Special Support Program
BIP – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Sitio Coob, Barangay Liloan, Ormoc City Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 7.920 M
0.157 Lane Km
EAO P 0.80 M
Total P 8.00 M
AS MODIFIED:
Construction of Road, Sitio Coob, Barangay Libertad, Ormoc City, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 7.920 M
0.980 Lane Km
EAO P 0.80 M
Total P 8.00 M
|
May 2, 2023 |
2023 |
|
SR2023-03-007174 |
March 15, 2023 |
Region VIII |
Leyte 4th District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Albuera Diversion Road (Phase 2), Albuera Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 144.750 M
: 3.300 Lane Km
EAO P 5.250 M
Total P 150.00 M
AS MODIFIED:
Construction of Road, Albuera Diversion Road (Phase 2), Albuera Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 144.750 M
: 3.200 Lane Km
EAO P 5.250 M