Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
February 26, 2024 FY 2023 WIN3B01074 300222100117000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 300222100117000
Project ID: P00732407MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Barangays Basnunuk, Tubig Dakula and Jakarta, 83 + 000.00 - Sta. 84+ 030.00, Languyan, Tawi-Tawi

CW1- Construction of Concrete Road: 2.060 lane km
Unit Cost: ₱ 23,422,320.10 /lane km

EAO: ₱ 500,000.00
EXCESS: ₱ 1,250,000.00
Allocation: ₱ 50,000,000.00
February 26, 2024 FY 2023 300222100123000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100123000
Project ID: P00732413MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Pagsalipangan - Maimbung, Barangay Laum, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300222100125000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100125000
Project ID: P00732415MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Maimbung - Indanan, Barangay Tabu Bato, Maimbung Sulu

CW1- Construction of Concrete Road: 0.88 lane km
Unit Cost: ₱ 11,250,000.00 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300221102344000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102344000
Project ID: P00735035MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting Road at Brgy. Gulangan, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.864 lane km
Unit Cost: ₱ 11,458,333.33 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 WIN3B01078 300217100181000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300217100181000
Project ID: P00733933MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Rehabilitation of Jolo - Taglibi - Tiptipon Road, Sta. 021 + 500 - Sta. 025 + 000, Sulu

CW1- Rehabilitation of Concrete Road: 7.0 lane km
Unit Cost: ₱ 15,164,285.7 /lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 WIN3B01063 310106100856000 March 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 310106100856000
Project ID: P00706247MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sibutu-Ligayan Road - Chainage 116.16 - Chainage 2120

CW1- Rehabilitation of Paved Road: 4.008 lane km
Unit Cost: ₱ 15,794,411.18 /lane km

EAO: ₱ 2,296,000.00
Allocation: ₱ 65,600,000.00
February 26, 2024 FY 2023 WIN3B01094 300219101752000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300219101752000
Project ID: P00735025MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Sapah Maluwang River, Kandang Poblacion, Maimbung, Sulu


CW1- Construction of Flood Mitigation Structure: 272.0 ln.m
Unit Cost: ₱ 90,618.40 /ln.m.
CW1 Cost: ₱ 26,648,205.12

CW2- Construction of Flood Mitigation Structure: 272.0 ln.m.
Unit Cost: ₱ 86,771.30 /ln.m.
CW2 Cost: ₱ 23,601,794.88

EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 26, 2024 FY 2023 300222100121000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100121000
Project ID: P00732411MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Lantong - Lagasan Asibih Access from Parang - Maimbung Road, Barangay Lantong, Maimbung, Sulu


CW1- Construction of Concrete Road: 0.850 lane km
Unit Cost: ₱ 11,647,058.82 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 300215102740000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 300215102740000
Project ID: P00735020MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Banaran Island Circumferential Road, Barangay Tonggusong Banaran - Look Road, Sapa-Sapa, Tawi-Tawi

CW1- Construction of Concrete Road: 1.556 lane km
Unit Cost: ₱ 21,086,118.25 /lane km

EAO: ₱ 1,190,000.00
Allocation: ₱ 34,000,000.00
February 26, 2024 FY 2023 WIN3B01068 310106100855000 March 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 310106100855000
Project ID: P00706246MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads


Bongao-Pahut-Sanga-Sanga Rd - Chainage 0 - Chainage 1519.29, Chainage 6123.14- Chainage 7630

CW1- Rehabilitation of Paved Road: 6.052 lane km
Unit Cost: ₱ 17,539,656.31 /lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 300221102350000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102350000
Project ID: P00735038MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Road at Brgy. Tubig Samin, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.84 lane km
Unit Cost: ₱ 11,785,714.28 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 310104100489000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 310104100489000
Project ID: P00707604MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Rehabilitation/Reconstruction Damaged Paved Roads Jct. Timbangan Romandier Road (STA.0013 + 000 - STA. 0015 + 560.36, STA. 15+601.69 - STA. 16+000)

CW1- Reconstruction to Concrete Pavement: 5.917 lane km
Unit Cost: ₱ 17,939,834.37/lane km

EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 25, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 005 - K0900 + 719

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,355.00 Lineal meters

EAO P .920 M

Total P 46.00 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 719

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 45.080 M
Road: 1,607.00 Lineal meters

EAO P .920 M

Total P 46.00 M
February 25, 2024 2023 WIN3F07398 SR2023-03-007216 March 15, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(1067- K0905 +619), Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.530 M
Street Lighting: 4.705 Km

EAO P 1.470 M

Total P 42.00 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Trece Martirez S00010LT (Chainage-0, Chainage 533) Rizal Avenida Extension Road S00006LT (Chainage-0 - Chainage 110), Rizal Ave (R00074LT) (S00009LT) (Chainage-0 - Chainage 353) & Rizal Avenida Extension Road S00016LT (K0905+(-1067)- K0905 +619), Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.530 M
Street Lighting: 288.00 Number of Streetlights

EAO P 1.470 M

Total P 42.00 M
February 25, 2024 2023 WIN3F07298 SARO-BMB-A-23-0013913 June 3, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0904+017, Tacloban City

Physical Target: Allocation:

CW1-Road Safety: P 29.890 M
Street Lighting: 3.417 Km

EAO P .610 M

Total P 30.500 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00244LT) K0911+ (-472) - K0914+017, Tacloban City

Physical Target: Allocation:

CW1-Road Safety: P 29.890 M
Street Lighting: 209.00 Number of Streetlights

EAO P .610 M

Total P 30.500 M
February 25, 2024 2023 WIN3F07301 SARO-BMB-A-23-0013913 June 3, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-110) - K0916+568, Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.376 M
Street Lighting: 4.615 Km

EAO P .824 M

Total P 41.200 M

AS MODIFIED:

Installation of Solar LED Street Lights Along Tacloban - Baybay South Road (S00246LT) K0915+ (-1000) - K0916+568, Tacloban, City

Physical Target: Allocation:

CW1-Road Safety: P 40.376 M
Street Lighting: 283.00 Number of Streetlights

EAO P .824 M

Total P 41.200 M
February 25, 2024 2023 WIN3F07242 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Avenida Veteranos St - (S00003LT) Chainage 110 - Chainage 641, Chainage 430 - Chainage 641

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 13.230 M
Road: 742.00 Lineal meters

EAO P .270 M

Total P 13.500 M

AS MODIFIED:

Avenida Veteranos St - (S00003LT) Chainage 121 - Chainage 641, Chainage 581 - Chainage 641

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 13.230 M
Road: 580.00 Lineal meters
EAO P .270 M

Total P 13.500 M
February 25, 2024 2023 WIN3F07604 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

AS PER GAA/ORIGINAL:

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage P 4.900 M
Structure: 378.761 Lineal meters

EAO P .100 M

Total P 5.00 M

AS MODIFIED:

Construction of Drainage System from Daang Maharlika Road to Tanghas Lirang Creek, Tacloban City, Leyte

Physical Target: Allocation:

CW1-Construction of Drainage Stucture P 4.900 M
along Road: 177.14 Lineal meters

EAO P .100 M

Total P 5.00 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + 089 - K0903 + 969, K0904 + 093 - K0904 + 360

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 9.016 M
2.456 Lane Km

EAO P .184 M

Total P 9.200 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + (-071), K0903 + 072 - K0903 + 242, K0903 + 442 - K0903 + 696

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 9.016 M
0.968 Lane Km

EAO P .184 M

Total P 9.200 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-131) - K0903 + 089

Physical Target: Allocation:

CW1-Road Widening: P 10.780 M
0.440 Lane Km

EAO P .220 M

Total P 11.000 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0903 + (-123) - K0903 + (-081), K0903 + (-081) - K0903 + 089

Physical Target: Allocation:

CW1-Road Widening P 10.780 M
0.382 Lane Km

EAO P .220 M

Total P 11.000 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0902 + 115 - K0902 + 940

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,650.00 Lineal meters

EAO P .948 M

Total P 47.400 M

AS MODIFIED:

Daang Maharlika (LT) - K0902 + 147 - K0902 + 287, K0902 + 347 - K0902 + 937

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 46.452 M
Road: 1,460 Lineal meters

EAO P .948 M

Total P 47.400 M
February 24, 2024 2023 WIN3F07378 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0906 + 261 - K0906 + 505, K0906 + 705 - K0907 + 030

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.871540 M
Road: 1,140 Lineal meters

EAO P .201460 M

Total P 10.073 M

AS MODIFIED:

Daang Maharlika (LT) - K0906 + 323 - K0906 + 649

Physical Target: Allocation:

CW1-Construction of Drainage Structure Along P 9.871540 M
Road: 326.00 Lineal meters

EAO P .201460 M

Total P 10.073 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0907 + 030 - K0910 + 173, K0908 + (-830) - K0910 + 472

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 944.00 Lineal meters

EAO P .600 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0909 + 574 - K0910 + 472

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 954.00 Lineal meters

EAO P .600 M

Total P 30.00 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 145 - K0900 + 585

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 31.260040 M
1.760 Lane Km

EAO P .637960 M

Total P 31.898 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an) - K0900 + 105 - K0900 + 880

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 31.260040 M
2.43 Lane Km

EAO P .637960 M

Total P 31.898 M
February 24, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0908 + (-677) - K0908 +131

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 808.00 Lineal meters

EAO P .600 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0908 + (-677) - K0908 +103

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 29.400 M
Road: 780.00 Lineal meters

EAO P .600 M

Total P 30.00 M
February 23, 2024 2023 WIN3F07319 GAA FY 2023 January 2, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0912+765,K0913+002-K0913+726

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 48.020 M
Road 2,178.00 Lineal meters

EAO P 0.980 M

Total P 49.00 M

AS MODIFIED:

Sn Jose-Manlurip-MacArthur Park Rd-K0912+400-K0913+700

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 48.020 M
Road 1,812.00 Lineal meters

EAO P 0.980 M

Total P 49.00 M
February 23, 2024 2023 WIN3F07473 SR2023-03-006366 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties

Flood Management _ Construction/Maintenance of Flood Mitigation Structures and Drainage System

AS PER GAA/ORIGINAL:

Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 19.300 M
Structure: 60.00 Lineal meters

EAO P 0.700 M

Total P 20.00 M

AS MODIFIED:

Construction of Subang Daku Flood Control (San Isidro Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 19.300 M
Structure: 50.00 Lineal meters

EAO P 0.700 M

Total P 20.00 M
February 23, 2024 2023 WIN3F07464 SR2023-03-006352 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage System

AS PER GAA/ORIGINAL:

Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Shoreline Protection Structure - Jct. Himay-angan - Silago - Abuyog Bdry. Rd. -(S00228LT) along Hinunangan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 196.00 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 23, 2024 2023 WIN3F07383 SR2023-03-006355 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Flood Management-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Shoreline Protection Structure - Liloan San Ricardo Rd. (S00218LT) - along Liloan Section, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 255.00 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 23, 2024 2023 SR2023-01-003513 January 31, 2023 Region VIII Southern Leyte Sub-District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction (Completion) of Multi-Purpose Building, Barangay Samoje, San Juan, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Construction (Completion) of Multi-Purpose Building, Barangay Somoje, San Juan, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi-Purpose P 1.980 M
Building: 1 Number of Building

EAO P 0.02 M

Total P 2.00 M
February 23, 2024 2023 WIN3F07317 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT)-K0904+365-K0904+940

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 23.211300 M
along Road: 1,150.00 Lineal meters

EAO P 0.473700 M

Total P 23.685 M

AS MODIFIED:

Daang Maharlika (LT)-K0904+343-K0904+612,K0904+617-K0904+689

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 23.211300 M
along Road: 682.00 Lineal meters

EAO P 0.473700 M

Total P 23.685 M

February 23, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0898 + (-122) - K0898 + 462

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 12.152 M
along Road: 584 Lineal meters

EAO P 0.248 M

Total P 12.400 M

AS MODIFIED:

Daang Maharlika (LT) - K0899 + 299 - K0899+654

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 12.152 M
along Road: 355 Lineal meters

EAO P 0.248 M

Total P 12.400 M
February 22, 2024 2023 WIN3F07036 SR2023-12-015070 December 15, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Bagahupi-Babtngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927+(348)-K0927+(-310)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters

EAO P 3.675 M

Total P 105.00 M
February 22, 2024 2023 WIN3F07450 SR2023-09-013365 September 15, 2023 Region VIII Regional Office VIII
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Basey-Maydolong, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 193.00 M
: 14.502 Lane Km

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Construction of Road, Basey-Maydolong, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 144.92696675 M
: 2.72 Lane Km

CW1-Construction of Drainage Structure P 48.07303325 M
along Road: 2,240.00 Lineal meters

EAO P 7.00 M

Total P 200.00 M
February 22, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening- Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista-Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista-Borongan City Road, Eastern Samar- K1013+000 - K1014+573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750M

Total P 50.00 M
February 22, 2024 2023 WIN3F07376 GAA FY 2023 January 1, 2023 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1044 + 972 - K1045 + 160, K1045 + 860 - K1046 + 445

Physical Target: Allocation:

CW1-Road Widening ; 1.39 Lane Km P 19.600 M

EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1044 + 972 - K1045 + 145, K1045 + 860 - K1046 + 445

Physical Target: Allocation:

CW1-Road Widening ;0.738 Lane Km P 12.306892 M

CW2-Construction of Drainage Structure P 4.405137 M
: 680.00 Lineal meters

CW3-Construction of Road Slope Protection P 2.887971 M
Structure: 38.670 Square meters

EAO P 0.400 M

Total P 20.00 M

February 22, 2024 2023 WIN3F07664 SARO-BMB-A-23-0013838 March 6, 2023 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL:

Palo West Bypass Road, Leyte

Physical Target: Allocation:

CW1-Widening of Bridge: 146.40 Square meters P 77.200 M

EAO P 2.800 M

Total P 80.00 M

AS MODIFIED:

Palo West Bypass Road, Leyte

Physical Target: Allocation:

CW1-Widening of Bridge: 209.88 Square meters P 38.99531136 M

CW2-Road Widening: 0.69 Lane Km P 38.20468864 M

EAO P 2.800 M

Total P 80.00 M
February 22, 2024 2023 WIN3F07465 SR2023-03-006370 March 3, 2023 Region VIII Southern Leyte Sub-District Engineering Office
OO2; Protect Lives and Properties

Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 356.317 Lineal meters

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Construction of Subang daku Flood Control (Zone 5 Section), Sogod, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 48.250 M
Structure: 120 Lineal meters

EAO P 1.750 M

Total P 50.00 M
February 22, 2024 2023 WIN3F07241 SR2023-09-013268 September 7, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT)-K0898+482-K0898+706,K0900+202-K0900+372,K0900+965-K0901+908,K0903+883-K0905+416,K0905+472-K0906+630

Physical Target: Allocation:

CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 16.488 Lane Km

EAO P 4.305 M

Total P 123.00 M

AS MODIFIED:

Daang Maharlika (LT)-K0901+247-K0901+908, K0904+103-K0905+416, K0905+472-K0906+569

Physical Target: Allocation:

CW1-Prventive Maintenance of Road: P 118.695 M
Asphalt Overlay: 12.688 Lane Km

EAO P 4.305 M

Total P 123.00 M
February 22, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd-K0915+(-908)-K0915+(-319)

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 2.594 Lane Km

EAO P 0.303820 M

Total P 15.191 M

AS MODIFIED:

Tacloban-Baybay South Rd-K0915+(-894)-K0915+(-439)

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.887180 M
Asphalt Overlay: 1.820 Lane Km

EAO P 0.303820 M

Total P 15.191 M
February 22, 2024 2023 WIN3F07243 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Justice Romualdez St - (S00005LT) Chainage 85-Chainage 872

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 1.574 Lane KM

EAO P 0.184340 M

Total P 9.217 M

AS MODIFIED:

Justice Romualdez St - (S00005LT) Chainage 005-Chainage 256

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.032660 M
Asphalt Overlay: 0.662 Lane KM

EAO P 0.184340 M

Total P 9.217 M
February 22, 2024 2023 WIN3F07196 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Sn Jose-Candahug Rd-K0913+(-956)-K0914+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 4.802 Lane Km

EAO P 0.562420 M

Total P 28.121 M

AS MODIFIED:

Sn Jose-Candahug Rd-K0913+(-586)-K0914+000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road : P 27.558580 M
Asphalt Overlay: 3.912 Lane Km

EAO P 0.562420 M

Total P 28.121 M
February 22, 2024 2023 GAA FY 2023 January 1, 2023 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0900+005,K0900+585-K0901+000,K0901+184-K0901+199,K0902+358-K0903+056

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 5.710 Lane Km

EAO P 0.672060 M

Total P 33.603 M

AS MODIFIED:

Leyte-Samar Rd (via Guintigui-an)- K0899+555-K0899+992

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 32.930940 M
Asphalt Overlay: 1.748 Lane Km

EAO P 0.672060 M

Total P 33.603 M
February 21, 2024 FY 2023 GAA WIN3E02958 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Tres de Mayo-Goma Road leading to Mahilak Falls, Goma, Digos City, Davao del Sur
Physical Target:
CW1: 0.900 lane km (Construction of Concrete Road)
CW2: 200 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 12,851,303.69 (Construction of Concrete Road)
CW2: P 1,848,696.31 (Construction of Drainage Structure along Road)
EAO: P 300,000.00
February 21, 2024 FY 2023 GAA P00734160MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.221 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road at Barangay Sto. Nino, Panabo City, Davao del Norte
Physical Target:
CW1: 0.418 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
February 21, 2024 FY 2023 GAA P00734279MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road (Purok 2, Lansones to Mariangas), Brgy. San Roque, Panabo City, Davao del Norte
Physical Target:
CW1: 5.086 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
February 21, 2024 FY 2023 GAA P00734285MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road from Purok 1 Unit, Poblacion to Purok 5 Unit 2, Sto. Nino, Brgy. Kinamayan, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 0.216 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
February 21, 2024 FY 2023 GAA P00705977MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1474+327 - K1474+422, K1474+889 - K1473+042,
K1472+1000 - K1473+078, K1473+545 - K1473+640
Physical Target:
CW1: 426.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476+580 - K1476+988
Physical Target:
CW1: 408.00 lm (Construction of Drainage Structure Along Road)
Allocation:
TOTAL: P 18,200,000.00
CW1: P 17,563,000.00 (Construction of Concrete Road)
EAO: P 637,000.00
February 15, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista - Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista - Borongan City Road, Eastern Samar - K1013 + 000 - K1014 + 573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
February 15, 2024 2023 WIN3F07036 SR2023-12-015070 December 5, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) Chainage 000-Chainage 100, Chainage 166-Chainage 417

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta. Cruz-Barugo-Carigara Rd-(S00066LT) K0927 +(-348)-K0927+(-310)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 3,990.32 Square meters

EAO P 3.675 M

Total P 105.00 M
February 14, 2024 2023 WIN1F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development-Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista-Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening :3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista-Borongan City Road, Eastern Samar-K1013+000-K1014+573

Physical Target: Allocation:

CW1-Road Widening :3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
February 14, 2024 2023 WIN1F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development-Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista-Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening :3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista-Borongan City Road, Eastern Samar-K1013+000-K1014+573

Physical Target: Allocation:

CW1-Road Widening :3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
February 14, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development-Road Widening- Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista - Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista - Borongan City Road, Eastern Samar-K1013+000 - K1014 + 573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
February 14, 2024 2023 WIN3F07742 SR2023-03-006194 March 2, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development-Road Widening- Secondary Roads

AS PER GAA/ORIGINAL:

JCT Buenavista - Borongan City Road, Eastern Samar

Physical Target: Allocation:

CW1-Road Widening: 3.333 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

JCT Buenavista - Borongan City Road, Eastern Samar-K1013+000 - K1014 + 573

Physical Target: Allocation:

CW1-Road Widening: 3.174 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
January 9, 2024 2023 WIN4E03231 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : P00732109MN
Project ID: 300214100465000

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on NRJ BCIR-Capitol-Bonbon Road in support of Proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 22.403 Km

Allocation:
TOTAL: P 200,000,00
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 8,614,917.64/Km

TO:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on NRJ BCIR-Capitol-Bonbon Road in support of Proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 672 Number of Units

Allocation:
TOTAL: P 200,000,00
CW1: P 192,143,261.29
EAO: 6,968,926.58
Excess: P 887,812.13

Unit Cost:
CW1: P 285,927.47/Number of Unit
January 9, 2024 2023 WIN4E03232 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : P00732110MN
Project ID: 300214100466000

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on Daang Maharlika (Agusan-Davao Road) (Ampayon - Antongalon - Taligaman - De Oro - Tabon-Tabon Section), Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 33.605 Km

Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000

Unit Cost:
CW1: P 8,614,789.47/Km

TO:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on Daang Maharlika (Agusan-Davao Road) (Ampayon - Antongalon - Taligaman - De Oro - Tabon-Tabon Section), Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 1048 Number of Units

Allocation:
TOTAL: P 300,000,000
CW1: P 287,863,040.05
EAO: P 10,440,628.40
Excess: P 1,696,331.55

Unit Cost:
CW1: P 274,678.47/Number of Unit
January 9, 2024 2023 WIN4E03232 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : P00732110MN
Project ID: 300214100466000

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on Daang Maharlika (Agusan-Davao Road) (Ampayon - Antongalon - Taligaman - De Oro - Tabon-Tabon Section), Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 33.605 Km

Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000

Unit Cost:
CW1: P 8,614,789.47/Km

TO:

Installation of Solar Street Lights, Pavement Markings and Solar Studs on Daang Maharlika (Agusan-Davao Road) (Ampayon - Antongalon - Taligaman - De Oro - Tabon-Tabon Section), Butuan City, Agusan Del Norte

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 1048 Number of Units

Allocation:
TOTAL: P 300,000,000
CW1: P 287,863,040.05
EAO: P 10,440,628.40
Excess: P 1,696,331.55

Unit Cost:
CW1: P 274,678.47/Number of Unit
December 14, 2023 2023 WIN3F07750 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Candaba - San Miguel Rd - K0074+219 - K0074+243
December 14, 2023 2023 WIN3F07751 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Candaba - Sn Miguel Rd - K0074+209.50 - K0074+219
December 14, 2023 2023 WIN3F07752 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Candaba - Sn Miguel Rd - K0074+304 - K0074+371
December 14, 2023 2023 WIN3F07753 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Candaba - Sn Miguel Rd - K0074+243 - K0074+304
December 6, 2023 2023 WIN3F07714 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713697LZ
UACS : 310305101945000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Salvacion Br. (B04902LZ) along Nabua - Bato - Libon (Tandaay-Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 236.22 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Salvacion Br. (B04902LZ) along Nabua - Bato - Libon (Tandaay-Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 149.27 Square Meters
December 6, 2023 2023 WIN3F07714 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713697LZ
UACS : 310305101945000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Salvacion Br. (B04902LZ) along Nabua - Bato - Libon (Tandaay-Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 236.22 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Salvacion Br. (B04902LZ) along Nabua - Bato - Libon (Tandaay-Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 149.27 Square Meters
December 6, 2023 2023 WIN3F07719 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713700LZ
UACS : 310305101941000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge Widening of Permanent Bridge - Tapayas Br. (B00470LZ) along Nabua - Balatan Rd

Physical Target :
CW1 Widening of Bridge - 190.32 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Tapayas Br. (B00470) along Nabua - Balatan Rd

Physical Target :
CW1 - Widening of Bridge - 136.62 meters
December 6, 2023 2023 WIN3F07720 GAA 2023 December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00742211LZ
UACS : 300225100837000

From :
Convergence and Special Support Program - Basic Infrastructure Program - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Breakwater, Barangay Pinagtigasan, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 43.97 Lineal Meters


TO :
Convergence and Special Support Program - Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Breakwater, Barangay Pinagtigasan, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 31 Lineal Meters
December 6, 2023 2023 WIN3E03226 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : P00732151MN
Project ID: 300215102833000

CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Rehabilitation of Road, Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Las Nieves, Agusan del Norte

Type of Work:
CW1- Rehabilitation of Concrete Road

Physical Target:
CW1- 30.979 Lane Km

Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 4,672,520.09/Lane Km

TO:

Rehabilitation of Road, Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Las Nieves, Agusan del Norte

Type of Work:
CW1- Rehabilitation of Concrete Road

Physical Target:
CW1- 7.6799 Lane Km

Allocation:
TOTAL: P 150,000,00
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 18,847,901.67/Lane Km
December 5, 2023 2023 WIN3F07716 GAA 2023 December 26, 2022 Region V Regional Office V
Project ID : P00742199LZ
UACS : 300225100825000

From :
CSSP - BIP - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Labo River Control Structure, Sitio Mandalig, Brgy. Cagbalogo, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 764.005 Lineal Meters


TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Labo River Control Structure, Sitio Mandalig, Brgy. Cagbalogo, Vinzons, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 270 Lineal Meters
December 5, 2023 2023 GAA 2023 December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Projects ID : P00742200LZ
UACS : 300225100826000

From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Daet River Control Structure, Gubat Section, Brgy. Gubat, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structure 389 Lineal Meters


TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Daet River Control Structure, Gubat Section, Brgy. Gubat, Daet, Camarines Norte

Physical Target :
CW1 - Construction of Flood Mitigation Structures 384 Lineal Meters
December 5, 2023 2023 WIN3F07721 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713694LZ
UACS : 310305101942000


From :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Malawag Br. (B04899LZ) along Nabua - Bato - Libon (Tandaay - Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 251.46 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System -Bridge - Widening of Permanent Bridge - Matawag Br. (B04899LZ) along Nabua - Bato - Libon (Tandaay - Buluan, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 167.49 Square meters
December 5, 2023 2023 WIN3F07715 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713695LZ
UACS : 310305101943000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - San Roque Br. (B04900LZ) along Nabua - Bato - Libon (Tandaay - Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 182.88 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - San Roque Br. (B04900LZ) along Nabua - Bato - Libon (Tandaay - Buluang, Bato) Rd

Physical Target :
CW1 - Widening of Bridge 182.88 Square Meters
December 5, 2023 2023 WIN3F07715 GAA 2023 December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00713695LZ
UACS : 310305101943000

From :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Cawacagan Br. (B04901LZ) along Nabua - Bato - Libon (Tandaay - Buluan, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 182.88 Square Meters


TO :
OO1 Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridge - Cawacagan Br. (B04901LZ) along Nabua - Bato - Libon (Tandaay - Buluan, Bato) Rd

Physical Target :
CW1 - Widening of Bridge - 126.5 Square Meters
November 30, 2023 2023 300215102465000 GAA 2023 January 3, 2023 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings Facilities

Construction of Tuguegarao Circumferential Dike Road, Tuguegarao City, Cagayan - Phase II Package 2
November 17, 2023 2023 WIN3F07667 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00741983LZ
UACS : 300221103585000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public buildings/ Facilities - Concreting of Road, Brgy. Malinao, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.802 Lane Km


TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public buildings/ Facilities - Concreting of Road, Brgy. Malinao, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.379 Lane Km
November 17, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00744141LZ
UACS : 300229100264000

From :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II, San Pedro Elementary Shool, San Pedro, Viga, Catanduanes

Physical Target :
CW1 - Construction of Water Supply Systems - 1 Number of Water Supply Systems


TO :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II, Viga Central Elementary Shool, San Pedro, Viga, Catanduanes

Physical Target :
CW1 - Construction of Water Supply Systems - 1 Number of Water Supply Systems
November 16, 2023 2023 WIN3F07668 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00740270LZ
UACS : 300218100101000

From :
CSSP - SIPAG - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 9.308 Lane Km


TO :
CSSP - SIPAG - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 3.760 Lane Km
November 16, 2023 2023 WIN3F07675 FY 2023 GAA December 26, 2021 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00740271LZ
UACS : 300218100102000

From :
CSSP - SIPAG - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 9.308 Lane Km


TO :
CSSP - SIPAG - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 3.760 Lane Km
November 16, 2023 2023 WIN3F07676 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00741979LZ
UACS : 300221103581000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public buildings/ Facilities - Concreting of Road, Brgy. Bagamelon, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.802 Lane Km


TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public buildings/ Facilities - Concreting of Road, Brgy. Bagamelon, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.379 Lane Km
November 16, 2023 2023 WIN3F07677 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00741980LZ
UACS : 300221103582000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, San Antonio Road, Brgy. San Antonio, Milaor, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane Km


TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, San Antonio Road, Brgy. San Antonio, Milaor, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 1.520 Lane Km
November 16, 2023 2023 WIN3F07671 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00741981LZ
UACS : 3002211003583000

From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Construction of Road Opening, Dalupaon - Tinalmud Road, Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 1.284 Lane Km


TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major Strategic Public Buildings/ Facilities - Construction of Road Opening, Dalupaon - Tinalmud Road, Brgy. Dalupaon, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.607 Lane Km
November 14, 2023 2023 WIN3F07727 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Doña Remedios Trinidad - Dingalan Road, Aurora Section, Phase 2
November 13, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Rehabilitation of Multi-Purpose Building, Camp Olivas ES, San Nicolas, City of San Fernando, Pampanga
November 11, 2023 FY 2023 WIN3E03154 320101109335000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109335000
Project ID: P00721529MN


OO2: Protect Lives and Properties Against Major Floods: Construction and Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Culianan River, Mercedes Section, Barangay Mercedes, Zamboanga City

CW1: Construction of Flood Mitigation Structure: 236.0 ln.m.
Unit Cost: ₱347,776.18/ln.m.
EAO: ₱ 2,976,820.00
Allocation: ₱ 85,052,000.00
November 11, 2023 FY 2023 WIN3E03156 310204102141000 July 31, 2023 Region IX Regional Office IX
UACS No. 310204102141000
Project ID: P00706813MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 9, Zamboanga City

CW1- Construction of Gravel Road: 0.96 lane km
Unit Cost: ₱ 132,042,022.94/lane km
CW1 Cost: ₱ 126,760,342.02
Right of Way Acquisition: 2,000.00 sq.m.
Unit Cost: ₱ 1,500.00 /sq.m.
ROW Cost: ₱ 3,000,000.00
EAO: ₱ 4,597,525.36

EXCESS: ₱ 142,132.61
Allocation: ₱ 134,500,000.00
November 11, 2023 FY 2023 WIN1E03153 320102105556000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105556000
Project ID: P00721630MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers


Construction of Flood Control Structure along Dipolog River,
(Polanco Bridge Abutment A), Polanco, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 337.0 ln.m.
Unit Cost: ₱ 286,350.14/ln.. m.
EAO: ₱ 3,500,000.00

Allocation: ₱ 100,000,000.00
November 11, 2023 FY 2023 WIN3E03152 320101109338000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109338000
Project ID: P00721532MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems


Construction of Tumaga River Flood Control (Guiwan - Tugbungan Section)
with Esplanade, Package 2, Zamboanga City


CW1- Construction of Flood Mitigation Structure: 236.0 ln.m.
Unit Cost: ₱ 520,813.83 /ln. m.

CW2- Construction of Concrete Road: 0.472 lane km
Unit Cost: ₱ 46,266,813.83 /lane km
EAO: ₱ 5,250,000.00

Allocation: ₱ 150,000,000.00
November 11, 2023 FY 2023 WIN3E03151 320101109337000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109337000
Project ID: P00721531MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems


Construction of Tumaga River Flood Control (Guiwan - Tugbungan Section)
with Esplanade, Package 1, Zamboanga City


CW1- Construction of Flood Mitigation Structure: 245.0 ln.m.
Unit Cost: ₱ 499,652.79/ln. m.

CW2- Construction of Concrete Road: 0.490 lane km
Unit Cost: ₱ 45,581,769.39/lane km
EAO: ₱ 5,250,000.00

Allocation: ₱ 150,000,000.00
November 11, 2023 FY 2023 WIN3E03150 320101109336000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109336000
Project ID: P00721530MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems


Construction of Tumaga River Flood Control (Tugbungan Section), Zamboanga City


CW1- Construction of Flood Mitigation Structure: 301.0 ln.m.
Unit Cost: ₱ 480,897.01/ln.m.

EAO: ₱ 5,250,000.00

Allocation: ₱ 150,000,000.00
November 9, 2023 2023 WIN3E03205 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 320102105948000
Project ID: P00721661MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Flood Control Structures of Agusan River Basin (Bit-os Section) Package 4, Butuan City

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 347.270 Lineal meters

Allocation:
TOTAL: P 50,000,00
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 141,100.58/Lineal meters

TO:

Construction of Flood Control Structures of Agusan River Basin (Bit-os Section) Package 4, Butuan City

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 63.163 Lineal meters

Allocation:
TOTAL: P 50,000,00
CW1: P 48,022,940
Excess: P 227,060
EAO: P 1,750,000

Unit Cost:
CW1: P 760,301.76/Lineal meters
November 8, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00739879LZ
UACS : 300215102676000

From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Leading to Camarines Sur Iconic Capitol Buildings, Barangay Cadlan, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 7.703 Lane km


TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Leading to Camarines Sur Iconic Capitol Buildings, Barangay Cadlan, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 7.380 Lane km
November 8, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00739879LZ
UACS : 300215102676000

From :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Leading to Camarines Sur Iconic Capitol Building, Barangay Cadlan, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 7.703 Lane km


TO :
CSSP - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Leading to Camarines Sur Iconic Capitol Building, Barangay Cadlan, Pili, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 7.380 Lane km
November 8, 2023 2023 WIN3F07669 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00740228LZ
UACS : 300215103315000

From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Macad - Antipolo Road, Brgy. Macad, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 1.605 Lane Km.


TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Macad - Antipolo Road, Brgy. Macad, Pasacao, Camarines Sur

Physical Target :
CW1 - Construction of Concrete Road - 0.720 Lane Km.
November 7, 2023 2023 WIN3F07700 FY 2023 GAA November 26, 2021 Region V Albay 3rd Engineering Office
Project ID : P00711997LZ
UACS : 310203100704000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ligao - Poblacion Rd - K0503 + (-379) - K0503 + 867

Physical Target :
CW1 - Road Widening - 2.492 Lane Km


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ligao - Poblacion Rd - K0503 + 550 - K0504 + 420


Physical Target :
CW1 - Road Widening - 0.870 Lane Km
November 7, 2023 2023 WIN3F07700 FY 2023 GAA November 26, 2021 Region V Albay 3rd Engineering Office
Project ID : P00711997LZ
UACS : 310203100704000

From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ligao - Poblacion Rd - K0503 + (-379) - K0503 + 867

Physical Target :
CW1 - Road Widening - 2.492 Lane Km


TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ligao - Poblacion Rd - K0503 + 550 - K0504 + 420


Physical Target :
CW1 - Road Widening - 0.870 Lane Km
November 7, 2023 2023 WIN3F07293 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00713040LZ
UACS : 310107100471000

From :
OO1 Ensure Safe ang Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0357 + 425, K0359 + 055 - K0359 + 080, K0359 + 510 - K0359 + 530, K0362 + 903 - K0362 + 940, K0363 + 232 - K0363 + 258, K0364 + 753 - K0364 + 803, K0365 + 205 - K0365 + 247, K0365 + 215 - K0365 + 353

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9800 Square meters


TO :
OO1 Ensure Safe ang Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0357 + 425, K0359 + 055 - K0359 + 080, K0359 + 510 - K0359 + 530, K0362 + 903 - K0362 + 940, K0363 + 232 - K0363 + 258, K0364 + 753 - K0364 + 803, K0365 + 205 - K0365 + 247, K0365 + 215 - K0365 + 237

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 4091.64 Square meters
November 7, 2023 2023 WIN3F07699 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00732981LZ
UACS : 300204100704000

From :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (ROLL-IT) - Balud National Road connecting Barangay Danao in support Agribusiness, Balud, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 6.936 Lane Km
CW2 - Construction of Concrete Bridge - 176.590 Square meters


TO :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (ROLL-IT) - Balud National Road connecting Barangay Danao in support Agribusiness, Balud, Masbate

Physical Target :
CW1 - Construction of Concrete Road - 2.386 Lane Km
CW2 - Construction of Drainage Structure along Road - 2,393 Lineal meters
October 24, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bulacan 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika, K0062+181 - K0063+356, San Ildefonso, Bulacan
October 24, 2023 2023 WIN3F07625 FY 2023 GAA February 17, 2023 Region III Bulacan 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ), K0076+250 - K0076+310, K0083+000 - K0084+000, K0084+000 - K0084+111
October 23, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bulacan 3rd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Mag- asawang Sapa Creek, Phase 4, San Ildefonso, Bulacan
October 23, 2023 2023 WIN3F07612 FY 2023 GAA February 17, 2023 Region III Bulacan 3rd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Maasim River, Sta. 8+400 - Sta. 8+705, Brgy. Upig, San Ildefonso, Bulacan
October 23, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bulacan 3rd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures along San Miguel River, Sta. 00+580 - Sta. 00+932.20 (Downstream), Brgy. Agustin, San Miguel, Bulacan

Pages