May 24, 2024 |
2024 |
300214100663000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) As Per R.A. 11239, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0344 + 349 - K0344 + 623, K0348 + 424 - K0348 + 456, K0356 + 831 - K0356 + 994, K0346 + 771 – K0347 + 000, K0347 + 993 – K0348 + 424
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) As Per R.A. 11239, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0344 + (-037.40) – K0345 + 000, K0346 + 278.40 – K0346 + 748, K0356 + 000 – K0356 + 674.50, K0356 + 831 – K0357 + 004.10 |
May 24, 2024 |
2024 |
300214100666000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund – Motor Vehicle User's Charge (MVUC) as
per R.A.11239 Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Daang Maharlika (LZ) – K0423 + 144 – K0423 + 262
TO:
Special Road Fund – Motor Vehicle User's Charge (MVUC) as per
R.A.11239 Rehabilitation/Reconstruction/ Upgrading of
Damaged Paved Roads - Daang Maharlika (LZ) – K0402 + 1144 – K0402 + 1998.70, K0405 + 163 – K0405 + 861, K0413 +
954.60 – K0414 + 990.90, K0423 + 144 – K0423 +
239.30, K0435 + 076 – K0435 + 605, K0436 + 890 –
K0437 + 096.80, K0437 + 390.70 – K0437 +
553.30, K0439 + 579.40 – K0439+700, K0457 +
246.60 – K0457 + 508.50, K0457 + 535.30 – K0457
+ 616.40, K0458 + 167.20 – K0458+ 389, K0459
+ 628 – K0459 + 777.50
|
May 24, 2024 |
2024 |
310204102806000 |
FY 2024 GAA |
January 1, 2024 |
Region II |
Regional Office II |
Network Development – Construction of Bypass and Diversion Roads
Ramon – Cordon – Diadi Bypass Road, Cordon, Isabela
|
May 24, 2024 |
2024 |
310104100640000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Asset Preservation Program – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0383 + 003 – K0383 + 668, K0383 + 740 – K0383 + 1629
TO:
Asset Preservation Program – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0383 + 003 – K0383 + 565.4, K0383 + 836.5 – K0383 + 1602.80 |
May 24, 2024 |
FY 2024 |
P00800367MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
Contract ID: 24MC0022
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Amount: ₱12,000,000.00
From: Magpet-Nowa-Doroluman-Greenfield Rd –
K1644 + 500 - K1644 + 514
TOW: Construction of Drainage Structure along Road
Physical Target: 14.00 Lineal Meters
To: Magpet-Nowa-Doroluman-Greenfield Rd –
K1643 + 843 - K1643 + 857, K1644 + 500 - K1644 + 514
TOW: Construction of Drainage Structure along Road
Physical Target: 28.00 Lineal Meters |
May 24, 2024 |
FY 2024 |
P00800496MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
Contract ID: 24MC0017
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Amount: ₱50,000,000.00
TOW: Construction of Road Slope Protection Structure
Physical Target: 2,259.38 Square Meters
From: Paco – Roxas - Arakan Valley - Jct Davao - Bukidnon Rd – K1667+450 - K1667+465
To: Paco – Roxas - Arakan Valley - Jct Davao - Bukidnon Rd – K1667+557 - K1667+607 |
May 24, 2024 |
FY 2024 |
P00800494MN |
SR2024-01-000914 |
January 26, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
Contract ID: 24MC0011
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Amount: ₱75,000,000.00
From: Paco – Roxas - Arakan Valley - Jct Davao - Bukidnon Rd – K1666+800 - K1666+850
TOW: Construction of Road Slope Protection Structure
Physical Target: 3,499.77 Square Meters
To: Paco – Roxas – Arakan Valley - Jct Davao - Bukidnon Rd – K1666+620 - K1666+766
TOW: Construction of Road Slope Protection Structure
Physical Target: 3,500.00 Square Meters
|
May 23, 2024 |
FY 2024 GAA |
P00803801MN |
FY 2024 GAA RA 11975 |
January 15, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1515 + 000 - K1518 + 000
Physical Target:
CW1: 5.084 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Babak-Samal-Kaputian Rd - K1515 + 000 - K1518 + 935
Physical Target:
CW1: 7.674 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 23, 2024 |
FY 2024 GAA |
P00821196MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Manat River leading to Agusan River, Barangay New Visayas, Montevista, Davao de Oro
Physical Target:
CW1: 631.400 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Flood Mitigation Structure)
EAO: P 5,250,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Manat River leading to Agusan River, Barangay New Visayas, Montevista, Davao de Oro
Physical Target:
CW1: 865.480 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Flood Mitigation Structure)
EAO: P 5,250,000.00 |
May 23, 2024 |
FY 2024 GAA |
P00832694MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Callawa Proper-Purok 5, 14, and 15 Road connecting Cassava Processing Area in support of Cassava, Banana and Cacao Industries of Brgy, Callawa, Buhangin District, Davao City, Davao del Sur
Physical Target:
CW1: 1.547 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00
TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Callawa Proper-Purok 5, 14, and 15 Road connecting Cassava Processing Area in support of Cassava, Banana and Cacao Industries of Brgy, Callawa, Buhangin District, Davao City, Davao del Sur
Physical Target:
CW1: 1,382.74 square meters (Construction of Road Slope Protection Structure)
CW2: 0.392 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 25,480,000.00 (Construction of Road Slope Protection Structure)
CW1: P 8,820,000.00 (Construction of Concrete Road)
EAO: P 700,000.00 |
May 23, 2024 |
FY 2024 GAA |
WIN4E03355 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Dahican-Lawigan Rd - K1721 + 418 - K1723 + 820
Physical Target:
CW1: 4.804 lane km (Road Widening)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Road Widening)
EAO: P 800,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Dahican-Lawigan Rd - K1721 + 372 - K1723 + 190
Physical Target:
CW1: 3.636 lane km (Road Widening)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Road Widening)
EAO: P 800,000.00 |
May 23, 2024 |
2024 |
|
SR2024-02-008174 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0715 + 000 - K0715 + 282, K0723 + 000 - K0723 + 586, K0724 + 579 - K0724 + 650
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.900785 M
: 2.442 Lane Km
EAO P 1.048215 M
Total P 29.949 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0715 + 000 - K0715 + 282, K0723 + 000 - K0723 + 586, K0724 + 579 - K0724 + 650
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.900785 M
: 2.178 Lane Km
EAO P 1.048215 M
Total P 29.949 M |
May 22, 2024 |
2024 |
WIN4F07948 |
FY 2024 GAA |
November 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Lubao Bypass Rd - Chainage 5251.36 - Chainage 5879 |
May 22, 2024 |
2024 |
WIN4XY00179 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) - K0090+000 - K0090+299.50 |
May 22, 2024 |
2024 |
WIN4XY00195 |
SR2024-01-004962 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads -Tertiary Roads
AS PER GAA/ORIGINAL:
Calbayog Diversion Rd - K0737 + 000 - K0738 + 514
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 49.698465 M
Road: 3,028.00 Lineal meters
EAO P 1.802535 M
Total P 51.501 M
AS MODIFIED:
Calbayog Diversion Rd - K0737 + 572 – K0737 + 852, K0737 + 928 – K0738 + 291, K0738 + 295 – K0738 + 323, K0738 + 328 – K0738 + 545, K0738 + 627 – K0738 + 908
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 29.07136213 M
Road: 1,276 Lineal meters
CW2-RoadWidening: 1.322 Lane Km P 20.12710287M
ROW-ROW Acquisition: 241.00 Square meters P 0.500 M
EAO P 1.802535 M
Total P 51.501 M
|
May 22, 2024 |
2024 |
|
GAA 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Calbayog Diversion Rd - K0727 + 640 - K0727 + 892
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 24.500 M
Asphalt Overlay: 1.008 Lane Km
EAO P 0.500 M
Total P 25.00 M
AS MODIFIED:
Calbayog Diversion Rd - K0727 + 000 - K0727 + 348.15
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 16.96391874 M
Asphalt Overlay: 0.701 Lane Km
CW2-Preventive Maintenance of Road: P 7.53608126 M
Concrete Reblocking : 0.701 Lane Km
EAO P 0.500 M
Total P 25.00 M
|
May 22, 2024 |
2024 |
|
GAA 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Barangay San Agustin – Barangay Hinugacan Road, Gandara, Samar
Physical Target: Allocation:
CW1-Construction of Gravel Road P 24.750 M
: 0.65 Lane Km
EAO P 0.250 M
Total P 25.00 M
AS MODIFIED:
Construction of Road, Barangay San Agustin – Barangay Hinugacan Road (Phase 1), Gandara, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 16.89877010 M
: 1.10 Lane Km
CW2-Construction of Drainage Structure P 7.85122990 M
along Road: 1,000.00 Lineal meters
EAO P 0.250 M
Total P 25.00 M
|
May 22, 2024 |
FY 2024 |
P00800166MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 3rd District Engineering Office |
Amount: ₱ 49,488,000.00
UACS No. 310202101781000
From: Bukidnon-Cotabato Rd - K1624 + 633 -K1626 + 048
Road Widening : 2.828 Lane Km
To: Bukidnon-Cotabato Rd - K1624 +471 – K1625 + 646
Road Widening : 2.360 Lane Km
|
May 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310105101268000
Project ID: P00801229MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads
FROM:
NRJ Cuevas-Sampaguita Rd - K1387 + 167 - K1388 + 300
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.340 Lane Km
Allocation:
TOTAL: P 31,361,000
CW1: P 30,733,780
EAO: P 627,220
Unit Cost:
CW1: P 13,134,094.02/Lane Km
TO:
NRJ Cuevas-Sampaguita Rd - K1387 + 280 - K1388 + 300
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.114 Lane Km
Allocation:
TOTAL: P 31,361,000
CW1: P 30,733,780
EAO: P 627,220
Unit Cost:
CW1: P 14,538,211.92/Lane Km
|
May 22, 2024 |
2024 |
WIN4E03333 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300221106983000
Project ID: P00837272MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Concreting of Purok 10 Agpangon to Purok 11 Barangay Poblacion, La Paz, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.641 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,700,000
EAO: P 300,000,000
Unit Cost:
CW1: P 11,245,740.25/Lane Km
TO:
Concreting of Purok 10 Agpangon to Purok 11 Barangay Poblacion, La Paz, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.880 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,700,000
EAO: P 300,000,000
Unit Cost:
CW1: P 15,797,872.34/Lane Km
|
May 21, 2024 |
2024 |
WIN4F07970 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0026+023 - K0026+573, K0028+210 - K0028+582, K0029+500 - K0029+914, K0034+057 - K0034+160, K0034+273 - K0035+749 |
May 21, 2024 |
2024 |
|
GAA FY 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Calbayog Diversion Rd - K0733 + 030 - K0733 +286
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 25.186 M
Asphalt Overlay: 1.024 Lane Km
EAO P .514 M
Total P 25.7 M
AS MODIFIED:
Calbayog Diversion Rd - K0733 + 306 - K0736 +665.65
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 17.434 M
Asphalt Overlay: 0.721 Lane Km
CW2- Preventive Maintenance of Road: P 7.752 M
Concrete Re-blocking: 0.721 Lane Km
EAO P .514 M
Total P 25.7 M
|
May 21, 2024 |
2024 |
WIN4XY00180 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Angeles-Porac-Floridablanca-Dinalupihan Rd - K0110+700 - K0111+000, K0112+000 - K0112+218.85 |
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0652 + 388 - K0652 + 442;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
648.150 Square meters;
Allocation:
Php 11,200,000"
"To:
Apayao-Ilocos Norte Rd - K0652 + 360 - K0652 + 410;
Type of Work:
CW1: Construction of Slope Protection Structure
CW2: Reconstruction to Concrete Pavement;
Physical Target:
CW1: 740.69 Square meters
CW2: 0.10 Lane Km;
Allocation:
Php 11,200,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0659 + 100 - K0659 + 115;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
310.2 Square meters;
Allocation:
Php 6,450,000"
"To:
Apayao-Ilocos Norte Rd - K0659 + 050 - K0659 + 250;
Type of Work:
CW1: Construction of Slope Protection Structure
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 398.76 Square meters
CW2: 212 Lineal meters;
Allocation:
Php 6,450,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0646 + 620 - K0646 + 640;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
334.4 Square meters;
Allocation:
Php 6,500,000"
"To:
Apayao-Ilocos Norte Rd - K0652 + 280 - K0652 + 360;
Type of Work:
Construction of Slope Protection Structure;
Physical Target:
406.60 Square meters;
Allocation:
Php 6,500,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0647 + 050 - K0647 + 065;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
315.8 Square meters;
Allocation:
Php 6,330,000"
"To:
Apayao-Ilocos Norte Rd - K0647 + 050 - K0647 + 065;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
429.30 Square meters;
Allocation:
Php 6,330,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0655 + 230 - K0655 + 250;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
323 Square meters;
Allocation:
Php 6,340,000"
"To:
Apayao-Ilocos Norte Rd - K0658 + 820 - K0659 + 050;
Type of Work:
CW1: Construction of Slope Protection Structure
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 180 Square meters
CW2: 303.3 Lineal meters;
Allocation:
Php 6,340,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0348 + 950 - K0350 + 250, K0353 + 900 - K0354 + 150, K0360 + 350 - K0360 + 500, K0361 + 250 - K0361 + 300, K0362 + 350 - K0362 + 500;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1878 Lineal meters;
Allocation:
Php 16,262,000"
"To:
Cong. Andres Acop Cosalan Rd - K0348 + 950 - K0350 + 250, K0353 + 900 - K0354 + 150, K0360 + 250 - K0360 + 500, K0361 + 470 - K0361 + 250, K0362 + 350 - K0362 + 500;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1905 Lineal meters;
Allocation:
Php 16,262,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Cong. Andres Acop Cosalan Rd - K0348 + 510 - K0348 + 535, K0348 + 973 - K0349 + 000;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Rehabilitation / Major Repair of Road Slope Protection Structure;
Physical Target:
CW1: 336.06 Square meters
CW2: 150 Square meters;
Allocation:
Php 5,350,000"
"To:
Cong. Andres Acop Cosalan Rd - K0348 + 510 - K0348 + 535, K0364+030 - K0364+065;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
439 Square meters;
Allocation:
Php 5,350,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Abatan-Mankayan-Cervantes Rd - K0346 + 620 - K0346 + 722, K0347 + 375 - K0347 + 400;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Rehabilitation / Major Repair of Road Slope Protection Structure;
Physical Target:
CW1: 408.18 Square meters
CW2: 100 Square meters;
Allocation:
Php 5,590,000"
"To:
Abatan-Mankayan-Cervantes Rd - K0341+940 - K0341+965, K0346 + 620 - K0346 + 722;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
502 Square meters;
Allocation:
Php 5,590,000"
|
May 20, 2024 |
2024 |
WIN4E03314 |
SR2024-01-003941 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Paneg-an Section, Sta. 4+000 - Sta. 4+702 (B.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1404 Lineal meters;
Allocation:
Php 65,000,000"
"To:
Construction of Flood Mitigation Structure along Agno River, Paneg-an Section, Sta. 3+228 - Sta. 4+402 (BS), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1120 Lineal meters;
Allocation:
Php 65,000,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Construction of Flood Control Structure along Ibulao River, Sta. 325+450 - Sta. 325+685 and Sta. 325+080 - Sta. 325+250, Hapid, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
405 Lineal meters;
Allocation:
Php 30,000,000"
"To:
Construction of Flood Control Structure along Ibulao River, Sta. 325+444 - Sta. 325+685 and Sta. 332+180 - Sta. 332+350, Hapid, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
411 Lineal meters;
Allocation:
Php 30,000,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 41830 - Chainage 41860, Chainage 43251 - Chainage 43306, Chainage 44835 - Chainage 44887, Chainage 44849 - Chainage 44876, Chainage 45368 - Chainage 45428, Chainage 45438 - Chainage 45478, Chainage 45886 - Chainage 46086, Chainage 47070 - Chainage 47100;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
3052.06 Square meters;
Allocation:
Php 34,000,000"
"To:
Kiangan-Tinoc-Buguias Road, Chainage 27705 - Chainage 27768, Chainage 38876 - Chainage 38921, , Chainage 41830 - Chainage 41860 , Chainage 43251 - Chainage 43306, Chainage 44835 - Chainage 44887, Chainage 45368 - Chainage 45428, Chainage 45438 - Chainage 45478, Chainage 47070 - Chainage 47100;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
2586.05 Square meters;
Allocation:
Php 34,000,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Nueva Vizcaya-Ifugao-Mt Province Rd - K0338 + 296, K0338 + 852, K0340 + 1208, K0340 + 511, K0342 + 338;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
120 Lineal meters;
Allocation:
Php 18,033,000"
"To:
Nueva Vizcaya-Ifugao-Mt Province Rd - K0338 + 296, K0338 + 852, K0340 + 1208, K0340 + 511, K0342 + 338;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
293.00 Lineal meters;
Allocation:
Php 18,033,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0355 + 793 - K0356 + 126, K0365 + 533, K0367 + 498, K0367 + 560, K0367 + 644, K0367 + 874, K0369 + 321, K0370 + 746;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
236 Lineal meters;
Allocation:
Php 26,200,000"
"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0355 + 793 - K0356 + 126, K0365 + 533, K0367 + 498, K0367 + 560, K0367 + 644, K0367 + 874, K0369 + 321, K0370 + 746;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
348.55 Lineal meters;
Allocation:
Php 26,200,000"
|
May 20, 2024 |
2024 |
|
SR2024-01-004333 |
January 29, 2024 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
"From:
Nueva Vizcaya-Ifugao-Mt Province Rd - K0335 + 621, K0336 + 909, K0336 + 979, K0337 + 439, K0337 + 985, K0338 + 167, K0338 + 316, K0338 + 683, K0338 + 760, K0339 + 049, K0339 + 071, K0339 + 383, K0340 + 065, K0340 + 219, K0340 + 347, K0340 + 459, K0340 + 810, K0340 + 861, K0340 + 960, K0340 + 960, K0340 + 1054, K0340 + 1229, K0340 + 1229 - K0341 + 000, K0341 + 008 - K0341 + 396, K0341 + 188, K0341 + 396, K0341 + 525, K0341 + 764, K0342 + 190, K0342 + 316, K0342 + 584, K0342 + 771, K0342 + 771 - K0343 + 062, K0343 + 062, K0343 + 510, K0343 + 706, K0343 + 942, K0344 + 205, K0344 + 431, K0345 + 622, K0358 + 480, K0361 + 410;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1784 Lineal meters;
Allocation:
Php 62,404,000"
"To:
Nueva Vizcaya-Ifugao-Mt Province Rd - K0335 + 621, K0336 + 909, K0336 + 979, K0337 + 439, K0337 + 985, K0338 + 167, K0338 + 316, K0338 + 683, K0338 + 760, K0339 + 049, K0339 + 071, K0339 + 383, K0340 + 065, K0340 + 219, K0340 + 347, K0340 + 459, K0340 + 810, K0340 + 861, K0340 + 960, K0340 + 1054, K0340 + 1229, K0340 + 1229 - K0341 + 000, K0341 + 008 - K0341 + 396, K0341 + 188, K0341 + 396, K0341 + 525, K0341 + 764, K0342 + 190, K0342 + 316, K0342 + 584, K0342 + 771, K0342 + 771 - K0343 + 062, K0343 + 062, K0343 + 510, K0343 + 706, K0343 + 942, K0344 + 205, K0344 + 431, K0345 + 622, K0358 + 480, K0361 + 410;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
1,847.27 Lineal meters;
Allocation:
Php 62,404,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0390 + 931 - K0391 + 517, K0463 + 462 - K0463 + 669;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
1.562 Lane Km;
Allocation:
Php 15,699,000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0463 + 667 - K0463 + 1152;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.970 Lane Km
CW2: 898 Square meters;
Allocation:
Php 15,699,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0390 + 931 - K0391 + 517, K0463 + 462 - K0463 + 669;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
1.562 Lane Km;
Allocation:
Php 15,699,000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0463 + 667 - K0463 + 1152;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.970 Lane Km
CW2: 898 Square meters;
Allocation:
Php 15,699,000"
|
May 20, 2024 |
2024 |
|
SR2024-01-005167 |
January 30, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Nambaran-Isabela Rd;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
9.000 Lane Km;
Allocation:
Php 200,000,000"
"To:
Nambaran-Isabela Rd - K0509+(-903) - K0520+865;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Road Widening;
Physical Target:
CW1: 27.953 Lane Km
CW2: 7.798 Lane Km;
Allocation:
Php 200,000,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calbayog-Catarman Rd-K0790 + 735.5 - K0790 + 898
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 2,538.250 Square meters
EAO P 0.800 M
Total P 40.00 M
AS MODIFIED:
Calbayog-Catarman Rd-K0786 + (-090) - K0786 + (-010), K0786 + 025 - K0786 + 085
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 39.200 M
Structure: 2,676.80 Square meters
EAO P 0.800 M
Total P 40.00 M
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0650 + 076 - K0650 + 129, K0659 + 540.5 - K0659 + 551, K0664 + 640 - K0664 + 643;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 613.5 Square meters
CW2: 43 Lineal meters;
Allocation:
Php 12,300,000"
"To:
Kabugao-Pudtol-Luna-Cagayan Bdry Rd - K0650 + 076 - K0650 + 129, K0659 + 509 - K0659 + 563.5, K0664 + 640 - K0664 + 643;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 906.252 Square meters
CW2: 44.5 Lineal meter;
Allocation:
Php 12,300,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao-Ilocos Norte Rd - K0647 + 200 - K0647 + 286 ;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
2064 Square meters;
Allocation:
Php 35,000,000"
"To:
Apayao-Ilocos Norte Rd - K0647 + 120 - K0647 + 320 ;
Type of Work:
CW1: Construction of Road Slope Protection Structure;
Physical Target:
2,341.58;
Allocation:
Php 35,000,000"
|
May 20, 2024 |
2024 |
WIN4E03327 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Apayao (Calanasan)-Ilocos Norte Rd - K0619 + 670 - K0619 + 763;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
1922.5 Square meters;
Allocation:
Php 30,760,000"
"To:
Apayao (Calanasan)-Ilocos Norte Rd - K0619 + 650 - K0619 + 800;
Type of Work:
CW1: Construction of Slope Protection Structure
CW2: Reconstruction to Concrete Pavement;
Physical Target:
CW1: 1895.96 Square meters
CW2: 0.118 Lane Km;
Allocation:
Php 30,760,000"
|
May 20, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
"From:
Construction (Completion) of Malasakit Center, Far North Luzon Gen. Hospital and Training Center, San Isidro, Luna, Apayao;
Type of Work:
Construction of Other Building;
Physical Target:
1 Number of Building;
Allocation:
Php 10,000,000"
"To:
Construction (Completion) of Malasakit Center, Far North Luzon Gen. Hospital and Training Center, Quirino, Luna, Apayao;
Type of Work:
Construction of Other Building;
Physical Target:
1;
Allocation:
Php 10,000,000"
|
May 17, 2024 |
FY 2024 |
WIN4E03334 |
310201101309000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101309000
Project ID: P00800214MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd - K1684+620 - K1684+674, K1684+697.15 - K1684+750.19, K1690+514.4 - K1690+554.76, K1690+586 - K1690+642.45, K1691+661.92 - K1691+713.5, K1694+770 - K1694+827, K1694+866 - K1694+924.31, K1706+021.76 - K1706 + 167.73, K1715 + 560 - K1715+590, K1715+640 - K1716+191.29, K1716+232 - K1716+362.63
CW1- Road Widening/2.457 Lane-km
Unit Cost: ₱ 25,613,160.44/lane-km CW2- Construction of Road Slope Protection Structure/9,676.69 sq.m. Unit Cost: ₱ 1,316.45/sq.m.
ROW Acquisition - 9,600.00 sq.m.
Unit Cost: ₱ 500.00/ sq.m.
EAO: ₱2,918,615.00
Allocation: ₱83,389,000.00 |
May 17, 2024 |
FY 2024 GAA |
P00837224MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road - Jct. Tagum City Diversion Road, Prk. Bautista to Prk. Abaca, Mankilam, Tagum City, Davao del Norte
Physical Target:
CW1: 1.760 lane km (Construction of Concrete Road)
CW2: 1,589.340 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 26,744,018.00 (Construction of Concrete Road)
CW2: P 22,755,982.00 (Construction of Drainage Structure along Road)
EAO: P 500,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road - Jct. Tagum City Diversion Road, Prk. Bautista to Prk. Abaca, Mankilam, Tagum City, Davao del Norte
Physical Target:
CW1: 1.688 lane km (Construction of Concrete Road)
CW2: 1,518.150 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 26,292,290.00 (Construction of Concrete Road)
CW2: P 22,207,710.00 (Construction of Drainage Structure along Road)
EAO: P 500,000.00 |
May 17, 2024 |
FY 2024 |
|
300215103998000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215103998000
Project ID: P00834832MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Road - Salug - Godod - Kabasalan Road, Zamboanga Sibugay
CW1- Construction of Concrete Road: 8.633 Lane km
Unit Cost: ₱ 18,443,762.31 Lane km
EAO: ₱ 5,775,000.00
Allocation: ₱ 165,000,000.00 |
May 17, 2024 |
FY 2024 GAA |
P00834907MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road and Drainage, Carmen, Davao del Norte
Physical Target:
CW1: 1.444 lane km (Construction of Concrete Road)
CW2: 466.000 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 19,575,759.00 (Construction of Concrete Road)
CW2: P 9,374,241.00 (Construction of Drainage Structure along Road)
EAO: P 1,050,000.00
TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road and Drainage, Carmen, Davao del Norte
Physical Target:
CW1: 1.670 lane km (Construction of Concrete Road)
CW2: 1,143.000 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 14,240,618.00 (Construction of Concrete Road)
CW2: P 14,709,382.00 (Construction of Drainage Structure along Road)
EAO: P 1,050,000.00 |
May 16, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Gapan-Fort Magsaysay Rd - K0104+000 - K0106+258.43 |
May 16, 2024 |
2024 |
WIN4F07955 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800222LZ
UACS : 310201101268000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0486 + 250 - K0488 + 393.75
Physical Target :
CW1 - Road Widening - 5.808 Lane Km
CW2 - Construction of Drainage Structure along Road - 4221.16 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3095 Square meters
Row - Row Acquisition - 290.6 Square meters
TO
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0486 + 297.75 - K0488 + 393.75
Physical Target :
CW1 - Road Widening - 4.20 Lane Km
CW2 - Construction of Drainage Structure along Road - 5185.80 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3876 Square meters
Row - Row Acquisition - 10500 Square meters |
May 16, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00802125LZ
UACS : 310101101264000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) K0448 + 622 - K0450 + 595, K0454 + 207 - K0455 + 013, K0436 + (-888) - K0438 + 000
Physical Target :
Preventive Maintenance of Road - Asphalt Overlay - 22.7 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) K0448 + 622 - K0450 + 595, K0454 + 207 - K0455 + 013, K0436 + (-888) - K0437 + 258
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 19.72 Lane Km |
May 15, 2024 |
FY 2024 GAA |
P00800096MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1517 + 820 - K1517 + 889,
K1517 + 917 - K1517 + 1003, K1518 + 138 - K1518 + 502
Physical Target:
CW1: 1.038 lane km (Road Widening)
Allocation:
TOTAL: P 33,230,000.00
CW1: P 32,565,400.00 (Road Widening)
EAO: P 664,600.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1517 + 820 - K1517 + 889,
K1517 + 917 - K1517 + 1003, K1518 + 138 - K1518 + 502
Physical Target:
CW1: 0.963 lane km (Road Widening)
CW2: 662.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 33,230,000.00
CW1: P 14,798,000.00 (Road Widening)
CW2: P 17,767,400.00 (Construction of Road Slope Protection Structure)
EAO: P 664,600.00 |
May 15, 2024 |
FY 2024 GAA |
P00800100MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos-Makar Rd - K1589 + 1172 - K1590 + 280, K1590 + 340 - K1590 + 391
Physical Target:
CW1: 0.772 lane km (Road Widening)
ROW: 3,860.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 26,300,000.00
CW1: P 16,887,500.00 (Road Widening)
ROW: P 8,492,000.00 (ROW Acquisition)
EAO: P 920,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos-Makar Rd - K1589 + 1172 - K1590 + 132, K1590 + 194 - K1590 + 282,
K1590 + 342 - K1590 + 393, K1590 + 432 - K1590 + 666
Physical Target:
CW1: 0.952 lane km (Road Widening)
ROW: 3,860.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 26,300,000.00
CW1: P 16,887,500.00 (Road Widening)
ROW: P 8,492,000.00 (ROW Acquisition)
EAO: P 920,500.00 |
May 15, 2024 |
FY 2024 GAA |
P00800091MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Daang Maharlika (MN) - K1444 + 988 - K1445 + 780
Physical Target:
CW1: 1.584 lane km (Road Widening)
CW2: 980.00 square meters (Construction of Road Slope Protection Structure)
ROW: 11,880.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 86,500,000.00
CW1: P 49,129,115.00 (Road Widening)
CW2: P 22,763,385.00 (Construction of Road Slope Protection Structure)
ROW: P 11,580,000.00 (ROW Acquisition)
EAO: P 3,027,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Daang Maharlika (MN) - K1444 + 988 - K1445 + 1058
Physical Target:
CW1: 1.9801 lane km (Road Widening)
CW2: 1,504.00 square meters (Construction of Road Slope Protection Structure)
ROW: 7,920.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 86,500,000.00
CW1: P 42,242,838.00 (Road Widening)
CW2: P 39,299,662.00 (Construction of Road Slope Protection Structure)
ROW: P 1,930,000.00 (ROW Acquisition)
EAO: P 3,027,500.00 |
May 15, 2024 |
FY 2024 GAA |
P00800454MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1438 + 865 - K1438 + 965
Physical Target:
CW1: 1,200.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1438 + 865 - K1438 + 965
Physical Target:
CW1: 1,260.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,050,000.00 |
May 15, 2024 |
FY 2024 GAA |
P00800216MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Daang Maharlika (MN) - K1486 + 781 - K1487 + 205,
K1487 + 650 - K1488 + 057, K1489 + 857 - K1489 + 870
Physical Target:
CW1: 0.954 lane km (Road Widening)
ROW: 4,674.80 square meters (ROW Acquisition)
Allocation:
TOTAL: P 76,128,000.00
CW1: P 36,731,760.00 (Road Widening)
ROW: P 36,731,760.00 (ROW Acquisition)
EAO: P 2,664,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Daang Maharlika (MN) - K1486 + 781 - K1487 + 205, K1487 + 574 - K1487 + 671,
K1487 + 711 - K1488 + 057, K1489 + 857 - K1489 + 870
Physical Target:
CW1: 0.920 lane km (Road Widening)
ROW: 4,892.851 square meters (ROW Acquisition)
Allocation:
TOTAL: P 76,128,000.00
CW1: P 36,731,760.00 (Road Widening)
ROW: P 36,731,760.00 (ROW Acquisition)
EAO: P 2,664,480.00 |
May 15, 2024 |
FY 2024 GAA |
P00800453MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1426 + 850 - K1426 + 955
Physical Target:
CW1: 1,260.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1426 + 850 - K1426 + 955
Physical Target:
CW1: 1,214.99 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,050,000.00 |
May 15, 2024 |
FY 2024 GAA |
P00802422MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1496 + 612 - K1498 + 500
Physical Target:
CW1: 3.856 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1496 + 268 - K1496 + 448, K1496 + 532 - K1498 + 075
Physical Target:
CW1: 7.052 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 15, 2024 |
FY 2024 GAA |
P00801020MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Davao City Div Rd - K1509 + 066 - K1511 + 113
Physical Target:
CW1: 7.876 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Davao City Div Rd - K1508 + 580 - K1508 + 760, K1509 + 066 - K1509 + 955
Physical Target:
CW1: 5.694 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 15, 2024 |
2024 |
|
FY 2024 GAA |
November 20, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Nueva Ecija - Aurora Rd - K0215+340 - K0215+920 |
May 15, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0097+(-881) - K0097+000, K0097+000 - K0097+180, K0098+000 - K0098+066, K0101+728.60 - K0101+1003, K0102+000 - K0102+186.30, K0102+272.50 - K0102+468.30, K0102+486.70 - K0102+965, K0103+000 - K0103+181.70, K0103+287.60 - K0103+324.80, K0103+368.70 - K013+1010, K0104+000 - K0104+099.20,K0104+147.30 - K0104+287, K0104+313.10 - K0104+488.30, K0104+551.50 - K0104+631.80, K0104+696.40 - K0105+016 |
May 15, 2024 |
FY 2024 GAA |
WIN4E03338 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1650 + 081 - K1651 + 000
Physical Target:
CW1: 1.868 lane km (Road Widening)
Allocation:
TOTAL: P 14,944,000.00
CW1: P 14,645,120.00 (Road Widening)
EAO: P 298,880.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1650 + 081 - K1650 + 342
Physical Target:
CW1: 0.522 lane km (Road Widening)
CW2: 538.00 square meters (Construction of Road Slope Protection Structure)
ROW: 3,351.60 square meters (ROW Acquisition)
Allocation:
TOTAL: P 14,944,000.00
CW1: P 6,968,780.00 (Road Widening)
CW2: P 4,736,340.00 (Construction of Road Slope Protection Structure)
ROW: P 2,940,000.00 (ROW Acquisition)
EAO: P 298,880.00 |
May 15, 2024 |
FY 2024 GAA |
WIN4E03339 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multipurpose Building (Boston District Elementary School), Central, Caraga, Davao Oriental
Physical Target:
CW1: 1.00 number of buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multipurpose Building (Boston District Elementary School), Central, Boston, Davao Oriental
Physical Target:
CW1: 1.00 number of buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi-Purpose Building)
EAO: P 50,000.00 |
May 14, 2024 |
FY 2024 GAA |
P00800188MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1559 + 404 - K1562 + 000
Physical Target:
CW1: 5.191 lane km (Road Widening)
ROW: 38,933.955 square meters (ROW Acquisition)
Allocation:
TOTAL: P 152,000,000.00
CW1: P 106,922,000.00 (Road Widening)
ROW: P 39,758,000.00 (ROW Acquisition)
EAO: P 5,320,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1558 + 648 - K1562 + 000
Physical Target:
CW1: 6.702 lane km (Road Widening)
ROW: 50,265.000 square meters (ROW Acquisition)
Allocation:
TOTAL: P 152,000,000.00
CW1: P 137,030,000.00 (Road Widening)
ROW: P 9,650,000.00 (ROW Acquisition)
EAO: P 5,320,000.00 |
May 14, 2024 |
FY 2024 GAA |
P00832695MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Sitio Tibungol-Purok 13 Road connecting to future Cacao & Coconut Processing Area in Support of Cacao, Banana & Coconut Industries of Barangay Pandaitan, Paquibato District, Davao City, Davao del Sur
Physical Target:
CW1: 0.951 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
Sitio Tibungol-Purok 13 Road connecting to future Cacao & Coconut Processing Area in Support of Cacao, Banana & Coconut Industries of Barangay Pandaitan, Paquibato District, Davao City, Davao del Sur
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
CW2: 240.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 10,486,000.00 (Construction of Concrete Road)
CW2: P 9,114,000.00 (Construction of Road Slope Protection Structure)
EAO: P 400,000.00 |
May 14, 2024 |
FY 2024 GAA |
P00800095MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1516 + 232 - K1516 + 250, K1516 + 331 - K1516 + 349,
K1516 + 481 - K1516 + 519, K1516 + 820 - K1516 + 905
Physical Target:
CW1: 0.318 lane km (Road Widening)
Allocation:
TOTAL: P 7,950,000.00
CW1: P 7,791,000.00 (Road Widening)
EAO: P 159,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1513 + 156 - K1513 + 356,
K1513 + 391 - K1513 + 480, K1516 + 820 - K1516 + 905
Physical Target:
CW1: 0.663 lane km (Road Widening)
Allocation:
TOTAL: P 7,950,000.00
CW1: P 7,791,000.00 (Road Widening)
EAO: P 159,000.00 |
May 14, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction/Rehabilitation of Multipurpose (Senior Citizens Building), Municipality of Aliaga, Nueva Ecija |
May 14, 2024 |
2024 |
WIN4F07934 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Roman Expressway- K0123+249 - K0123+320 |
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100710000
Project ID: P00801255MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1356 + 790 - K1356 + 805, K1356 + 859 - K1357 + 636, K1357 + 759 - K1357 + 800, K1358 + 000 - K1358 + 500, K1359 + 000 - K1360 + 519, K1366 + 000 - K1367 + 000
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.704 Lane Km
Allocation:
TOTAL: P 231,120,000
CW1: P 223,030,800
EAO: P 8,089,200
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1356 + 790 - K1356 + 805, K1356 + 859 - K1357 + 636, K1357 + 759 - K1357 + 800, K1359 + 000 - K1360 + 519, K1366 + 000 - K1367 + 000
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 10.426 Lane Km
Allocation:
TOTAL: P 231,120,000
CW1: P 223,030,800
EAO: P 8,089,200
Unit Cost:
CW1: P 21,391,789.76/Lane Km
|
May 14, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank) U/S of Rio Chico Bridge, Phase 1, Sta. 14+395.50 to Sta. 14+837.48, La Paz, Tarlac |
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100708000
Project ID: P00801254MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1346 + 000 - K1347 + 760, K1347 + 962 - K1348 + 896, K1349 + 487 - K1350 + 000, K1355 + 276 - K1356 + 441
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 8.744 Lane Km
Allocation:
TOTAL: P 262,320,000
CW1: P 253,138,800
EAO: P 9,181,200
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1346 + 000 - K1347 + 760, K1347 + 962 - K1348 + 896, K1349 + 487 - K1350 + 000, K1355 + 276 - K1356 + 441
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 14.425 Lane Km
Allocation:
TOTAL: P 262,320,000
CW1: P 253,138,800
EAO: P 9,181,200
Unit Cost:
CW1: P 17,548,616.98/Lane Km
|
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100706000
Project ID: P00801253MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581, K1321 + 532 - K1323 + 379, K1323 + 621 - K1324 + 191, K1333 + 300 - K1333 + 390, K1340 + 000 - K1340 + 228, K1341 + 742 - K1341 + 858, K1343 + 006 - K1343 + 559
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 8.882 Lane Km
Allocation:
TOTAL: P 266,460,000
CW1: P 257,133,900
EAO: P 9,326,100
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581, K1321 + 532 - K1323 + 180, K1323 + 200 - K1323 + 379, K1323 + 621 - K1324 + 191, K1333 + 300 - K1333 + 390, K1340 + 000 - K1340 + 228, K1343 + 006 - K1343 + 559
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 9.254 Lane Km
Allocation:
TOTAL: P 266,460,000
CW1: P 257,133,900
EAO: P 9,326,100
Unit Cost:
CW1: P 27,786,243.79/Lane Km
|
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100708000
Project ID: P00801254MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1346 + 000 - K1347 + 760, K1347 + 962 - K1348 + 896, K1349 + 487 - K1350 + 000, K1355 + 276 - K1356 + 441
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 8.744 Lane Km
Allocation:
TOTAL: P 262,320,000
CW1: P 253,138,800
EAO: P 9,181,200
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1346 + 000 - K1347 + 760, K1347 + 962 - K1348 + 896, K1349 + 487 - K1350 + 000, K1355 + 276 - K1356 + 441
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 14.425 Lane Km
Allocation:
TOTAL: P 262,320,000
CW1: P 253,138,800
EAO: P 9,181,200
Unit Cost:
CW1: P 17,548,616.98/Lane Km
|
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100706000
Project ID: P00801253MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581, K1321 + 532 - K1323 + 379, K1323 + 621 - K1324 + 191, K1333 + 300 - K1333 + 390, K1340 + 000 - K1340 + 228, K1341 + 742 - K1341 + 858, K1343 + 006 - K1343 + 559
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 8.882 Lane Km
Allocation:
TOTAL: P 266,460,000
CW1: P 257,133,900
EAO: P 9,326,100
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581, K1321 + 532 - K1323 + 180, K1323 + 200 - K1323 + 379, K1323 + 621 - K1324 + 191, K1333 + 300 - K1333 + 390, K1340 + 000 - K1340 + 228, K1343 + 006 - K1343 + 559
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 9.254 Lane Km
Allocation:
TOTAL: P 266,460,000
CW1: P 257,133,900
EAO: P 9,326,100
Unit Cost:
CW1: P 27,786,243.79/Lane Km
|
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300214100861000
Project ID: P00833091MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (Agusan-Davao Sect) - K1241 + (-321) - K1243 + 000
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 4.644 Lane Km
Allocation:
TOTAL: P 169,541,000
CW1: P 163,607,065
EAO: P 5,933,935
Unit Cost:
CW1: P 35,229,772.83/Lane Km
TO:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (Agusan-Davao Sect) - K1241 + (-321) - K1241 + 510, K1242 + 025 - K1243 + 800
Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5.216 Lane Km
CW2- 2,160 Square meters
Allocation:
TOTAL: P 169,541,000
CW1: P 96,539,565
CW2: P 67,067,500
EAO: P 5,933,935
Unit Cost:
CW1: P 35,229,772.83/ Lane Km
CW2: P 31,049.77/ Square meters
|
May 14, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100701000
Project ID: P00801247MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1243 + 000 - K1246 + 000
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 6.014 Lane Km
Allocation:
TOTAL: P 150,199,000
CW1: P 144,942,035
EAO: P 5,256,965
Unit Cost:
CW1: P 24,100,770.70/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1243 + 800 - K1244 + 670, K1244 + 690 - K1246 + 000
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 8.748 Lane Km
Allocation:
TOTAL: P 150,199,000
CW1: P 144,942,035
EAO: P 5,256,965
Unit Cost:
CW1: P 16,568,591.11/Lane Km
|
May 14, 2024 |
FY 2024 GAA |
P00832627MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Acacia Road - Purok New Visayas leading to Safari Land Crocodile Park, Brgy. Acacia, Davao City
Physical Target:
CW1: 428.571 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00
TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Acacia Road - Purok New Visayas leading to Safari Land Crocodile Park, Brgy. Acacia, Davao City
Physical Target:
CW1: 490.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00 |
May 14, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Concepcion-Capas Rd - K0109+(-321) - K0109+(-045); K0109+459 - K0109+500; K0115+783- K0115+844 |
May 14, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank) U/S of Rio Chico Bridge, Phase 2, Sta. 14+837.48 to Sta. 15+278.69, La Paz, Tarlac |
May 14, 2024 |
FY 2024 GAA |
P00855094MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Building and Other Structures - Multipurpose/Facilities - National Building Program
Completion of Multipurpose Building PRC 11 Dpwh Region 11, Davao City
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,750,000.00
TO: Local Program - Building and Other Structures - Multipurpose/Facilities - National Building Program
Completion of Multipurpose Building PRC Region 11, Davao City
Physical Target:
CW1: 1 number of buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,750,000.00 |
May 14, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Parua River (Castillo Section, Left Bank), Package J, Sta. 4+764.08 to Sta. 5+169.10, Concepcion, Tarlac |
May 14, 2024 |
FY 2024 GAA |
P00800094MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1513 + 1014 - K1514 + 015, K1513 + 156 - K1513 + 356,
K1513 + 391 - K1513 + 582, K1514 + 316 - K1514 + 444, K1514 + 845 - K1514 + 904
Physical Target:
CW1: 1.272 lane km (Road Widening)
Allocation:
TOTAL: P 36,440,000.00
CW1: P 35,771,200.00 (Road Widening)
EAO: P 728,800.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1513 + 480 - K1513 + 582, K1513 + 961 - K1514 + 015,
K1514 + 316 - K1514 + 444, K1514 + 845 - K1514 + 904
Physical Target:
CW1: 0.502 lane km (Road Widening)
CW2: 1,170.07 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 36,440,000.00
CW1: P 12,877,200.00 (Road Widening)
CW2: P 22,834,000.00 (Construction of Road Slope Protection Structure)
EAO: P 728,800.00 |
May 13, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Salingao Section, Sta. 0+162 - Sta. 0+402 (B.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
480 Lineal meters;
Allocation:
Php 20,000,000"
"To:
Construction of Flood Mitigation Structure along Agno River, Salingao Section, Sta. 0+022 - Sta. 0+306 (BS), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
421 Lineal meters;
Allocation:
Php 20,000,000"
|
May 13, 2024 |
2024 |
|
SR2024-01-003946 |
January 29, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Flood Mitigation Structure along Agno River, Tin-apan Section, Sta. 0+068 - Sta. 0+593 (B.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1050 Lineal meters;
Allocation:
Php 70,000,000"
"To:
Construction of Flood Mitigation Structure along Agno River, Tin-apan Section, Sta. 0+058 - Sta. 0+650 (B.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1110 Lineal meters;
Allocation:
Php 70,000,000"
|
May 13, 2024 |
2024 |
|
SR 2024-001-004212 |
January 29, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 34710 - Chainage 34862, Chainage 37193 - Chainage 37271, Chainage 39907 - Chainage 39961;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
1903 Square meters;
Allocation:
Php 49,070,000"
"To:
Kiangan-Tinoc-Buguias Rd - (S00634LZ) Chainage 24531 - Chainage 24578, Chainage 27854 - Chainage 27893, Chainage 34710 - Chainage 34862, Chainage 37193 - Chainage 37281, Chainage 39907 - Chainage 39961, Tinoc, Ifugao;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
2538.88 Square meters;
Allocation:
Php 49,070,000"
|
May 13, 2024 |
2024 |
|
SR2024-01-005364 |
January 30, 2024 |
Cordillera Administrative Region |
CAR - Regional Office |
"From:
Construction of Masablang Flood Control Structure (Section 2M), Sta. 112+780 - Sta. 112+980 (Left Side) and Sta. 113+025 - Sta. 113+275 (Both Side);
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.50 Lineal meters;
Allocation:
Php 100,000,000"
"To:
Construction of Masablang Flood Control Structure (Section 2M), Sta. 112+780 - Sta. 113+312 (Both Side);
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1050 Lineal meters;
Allocation:
Php 100,000,000"
|
May 13, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Nueva Ecija - Aurora Rd - K0174+260 - K0174+482; K0179+047 - K0179+599 |
May 13, 2024 |
FY 20204 |
P00801061MN |
310102101932000 |
January 2, 2024 |
Region XII |
South Cotabato 1st District Engineering Office |
Asset Preservation Program- Preventive Maintenance - Secondary Roads
Contract ID: 24MB0061
From: Makar-Kiamba Rd - K1667 + 243 - K1667 + 254, K1667 + 254 - K1667 + 393
Preventive Maintenance of Road: Asphalt Overlay:
0.878 lane-km
To:Makar-Kiamba Rd - K1667 + 243 - K1667 + 254, K1667 + 254 - K1667 + 394
Preventive Maintenance of Road: Asphalt Overlay:
0.884 lane-km
|
May 13, 2024 |
FY 20204 |
P00800143MN |
310102101932000 |
January 2, 2024 |
Region XII |
South Cotabato 1st District Engineering Office |
Network Development Program - Road Widening - Secondary Roads
Contract ID: 24MB0063
Amount:₱ 11,266,000.00
From: Albert Morrow Blvd - K1650 + 878 - K1651 + 503
Road Widening: 1.20 lane-km
To: Albert Morrow Blvd - K1650 + 878 - K1651 + 501
Road Widening: 1.196 lane-km
|
May 13, 2024 |
FY 2024 GAA |
P00803776MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1422 + 514 - K1423 + 1085
Physical Target:
CW1: 5.386 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1423 + 139 - K1423 + 1085
Physical Target:
CW1: 5.676 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 13, 2024 |
FY 2024 GAA |
P00800098MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1448 + 585 - K1450 + 197
Physical Target:
CW1: 1.692 lane km (Road Widening)
ROW: 2,329.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,663,000.00
CW1: P 32,967,295.00 (Road Widening)
ROW: P 15,922,500.00 (ROW Acquisition)
EAO: P 1,773,205.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1448 + 666 - K1449 + 293, K1449 + 471 - K1449 + 882
Physical Target:
CW1: 1.431 lane km (Road Widening)
ROW: 4,383.68 square meters (ROW Acquisition)
Allocation:
TOTAL: P 50,663,000.00
CW1: P 32,967,295.00 (Road Widening)
ROW: P 15,922,500.00 (ROW Acquisition)
EAO: P 1,773,205.00 |
May 13, 2024 |
FY 2024 GAA |
P00801127MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1497 + 669 - K1498 + 065
Physical Target:
CW1: 2.391 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,048,000.00
CW1: P 42,506,320.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,541,680.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1497 + 653 - K1498 + 296
Physical Target:
CW1: 2.676 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 44,048,000.00
CW1: P 42,506,320.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,541,680.00 |
May 9, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Nueva Ecija - Aurora Rd - K0142+745 - K0142+981; K0143+000 - K0143+200; K0147+435.50 - K0147+993; K0148+000 - K0148+045 |
May 9, 2024 |
FY 2024 |
|
300226115231000 |
April 4, 2024 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS: 300226115231000
Project ID: P00836345MN
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Brgy. Fernandino, Roseller Lim, Zamboanga Sibugay
CW1 - Construction of Multi-Purpose Building: 1 Number of Building
Unit Cost: ₱ 9,900,000.00/ Number of Building
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
May 9, 2024 |
2024 |
|
SR2024-01-008091 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0939 + 300 - K0939 + 770, K0947 + 000 - K0948 + 613, K0948 + 659 - K0949 + 288, K0965 + 204 - K0956 + 581, K0956 +606 - K0957 + 000, K0958 + 118 - K0958 + 804
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 215.041565 M
Asphalt Overlay: 16.074 Lane Km
EAO P 7.799435 M
Total P 22.841 M
AS MODIFIED:
Daang Maharlika (LT) - K0939 + 300 - K0939 + 770, K0947 + 000 - K0948 + 613, K0948 + 659 - K0949 + 288, K0956 + 204 - K0956 + 581, K0956 +606 - K0957 + 000, K0958 + 118 - K0958 + 804
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 215.041565 M
Asphalt Overlay: 16.074 Lane Km
EAO P 7.799435 M
Total P 22.841 M
|
May 9, 2024 |
2024 |
|
SR2024-02-008179 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0791 + 649 - K0791 + 649, K0796 + 558 - K0797 + 000, K0806 + 120 - K0807 + 000, K0822 + 000 - K0824 + 500, K0824 + 500 - K0825 + 000, K0826 + 000 - K0826 + 200
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 164.050 M
: 10.208 Lane Km
EAO P 5.950 M
Total P 170.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0791 + 649 - K0792 + 200, K0796 + 558 - K0797 + 000, K0806 + 120 - K0807 + 000, K0822 + 000 - K0824 + 500, K0824 + 500 - K0825 + 000, K0826 + 000 - K0826 + 200
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 164.050 M
: 10.208 Lane Km
EAO P 5.950 M
Total P 170.00 M |
May 9, 2024 |
FY 2024 |
|
300219102957000 |
April 4, 2024 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300219102957000
Project ID: P00835860MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure at Barangay Nazareth, Kabasalan, Zamboanga Sibugay
CW1 - Construction of Flood Mitigation Structure: 150.00 Lineal meters
Unit Cost: ₱ 196,000.00/Lineal meters
EAO: ₱ 600,000.00
Allocation: ₱ 30,000,000.00 |
May 9, 2024 |
FY 2024 |
P00800142MN |
SR2024-01-005125 |
January 30, 2024 |
Region XII |
Regional Office XII |
Network Development - Road Widening - Primary Roads
Contract ID: 24M00151
Amount: ₱ 5,000,000.00
Type of Work: Road Widening
Physical Target: 0.400 Lane Km
Project Name:
From: Makar-Marbel Rd - K1658 + 240 - K1658 + 440
To: Makar-Marbel Rd - K1658 + 014 - K1658 + 214
|
May 9, 2024 |
FY 2024 |
P00800142MN |
SR2024-01-005125 |
January 30, 2024 |
Region XII |
Regional Office XII |
Network Development - Road Widening - Primary Roads
Contract ID: 24M00151
Amount: ₱ 5,000,000.00
Type of Work: Road Widening
Physical Target: 0.400 Lane Km
Project Name:
From: Makar-Marbel Rd - K1658 + 240 - K1658 + 440
To: Makar-Marbel Rd - K1658 + 014 - K1658 + 214
|