May 22, 2017 |
GAA FY 2017 |
WIN7G01473 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads With Slips, Slope Collapse, and Landslide - Secondary
Construction of Slope Protection Structure Including Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Road (Malalag-Malita-JAS-G) -
K1665+388 - K1666+016, K1668+300 - K1669+180
TO: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads With Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslide Along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Paving of Shoulder (Kinanga-Biton Section), Davao Occidental -
K1665+599 - K1666+023, K1668+300 - K1669+180
ALLOCATION: Php 138.337 Million |
May 22, 2017 |
GAA FY 2017 |
WIN7G01491 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Mati-Tarragona By-Pass (Tagabakid-Lucatan Road), including ROW, Davao Oriental
TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Improvement of Mati-Tarragona Bypass Road (Tagabakid-Lucatan Road) including ROW, Davao Oriental
ALLOCATION: Php 200.00 Million |
May 22, 2017 |
GAA FY 2017 |
WIN7G01511 |
GAA FY 2017 R.A. 10924 |
January 1, 2016 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Bypass Road at Jct. Mamay Road-La Verna-Davao City Diversion incl. ROW, Davao City
TO: FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Concreting of Bypass Road at Jct. Mamay-La Verna-Davao City Diversion Including RROW, Davao City
ALLOCATION: Php 207.256 Million
|
May 19, 2017 |
2017 |
WIN7E01562 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/Improvement of Bungang Guinto River, Sta. 0+300 - Sta. 0+760, San Lorenzo, Mexico, Pampanga |
May 19, 2017 |
2017 |
WIN7E01561 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Roads, Rehabilitation / Improvement of Mesalipit-Talba Road, Bacolor, Pampanga, Km 0+342 to Km 1+272 (R.A. 9506-Bacolor Rehabilitation Act) |
May 19, 2017 |
2017 |
WIN7E01564 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Primary - Manila North Road, K0058+076+K0058+171, K0058+184 - K0058+279, K0059+978 - K0060+084, K0060+096 - K0060+191, K0061+220 - K0061+308, K0061+360 - K0061+454, K0062+460 - K0062+546, K0062+603 - K0062+690 |
May 19, 2017 |
2017 |
WIN7E01575 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads and Pathway, Masile, City of Malolos, Bulacan |
May 19, 2017 |
2017 |
WIN7E01612 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Health Center/Day Care Building, Bunlo, Bocaue, Bulacan |
May 19, 2017 |
2017 |
WIN7E04611 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Roads, San Francisco, Bulakan, Bulacan |
May 19, 2017 |
2017 |
WIN7E01574 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Brgy. Road, Bungahan, Malolos, Bulacan |
May 19, 2017 |
GAA FY 2017 |
WIN7G01497 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Rehabilitation/Reconstruction/Upgrading - Secondary
Reconstruction from Asphalt to Concrete, Construction of Road Slope Protection Structure and Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1624+000 - K1625+795, K1625+813 - K1626+780, K1626+780 - K1627+177, K1627+177 - K1628+000,
K1630+100 - K1630+345, K1630+800 - K1631+600, K1632+630 - K1632+707, K1633+075 - K1633+165
TO: MFO 1 - National Road Network Services:
Rehabilitation/Reconstruction/Upgrading - Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Slope Protection and Paving of Shoulders (Lacaron-Kidalapong Section), Davao Occidental -
K1624+000 - K1625+440, K1626+000 - K1626+780, K1626+780 - K1627+177, K1627+177 - K1628+000,
K1630+100 - K1630+345, K1630+800 - K1631+600, K1632+630 - K1632+707, K1633+075 - K1633+165
ALLOCATION: Php 168.241 Million |
May 19, 2017 |
2017 |
WIN7E01598 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure with outfall going to Angat River, Cambaog Section, Bustos, Bulacan |
May 18, 2017 |
2017 |
WIN7E01641 |
UACS No. 292004020200500 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
Locally Funded Projects – Flood Control and Drainage – Drainage/Protection Works: Rehabilitation of Drainage System Brgy. 310 Zone 31, Sta. Cruz, Manila City (Rehabilitation/Major Repair of Drainage Structure)
UACS No. 292004020200500
Physical Target / Cost
Original: 170 lm
Unit Cost (P’000): P52,941T/lm
Allocation Cost (P’000): P9,000
WIN7E01641
As Modified
Locally Funded Projects – Flood Control and Drainage – Drainage/Protection Works: Rehabilitation of Drainage System Brgy. 310 and Brgy. 312, Zone 31, Sta. Cruz, Manila City (Rehabilitation/Major Repair of Drainage Structure)
UACS No. 292004020200500
Modified: 643.52 lm
Unit Cost: P13,986T/lm
Estimated Cost (P’000): P9,000
WIN7E01641
|
May 18, 2017 |
2017 |
WIN7C01724 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities -
Construction of Multipurpose Building at Rebokon Elementary School, Brgy. Rebokon, Dumalinao, Zamboanga del Sur,
Allocation: P 2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 18, 2017 |
2017 |
WIN7C01728 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities -
Construction of Multipurpose Building at Antonio National High School, Brgy. Begong, Tigbao, Zamboanga del Sur
Allocation: P2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 18, 2017 |
2017 |
WIN7G01458 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd (Datu Lumok Section) S01184MN, Lapuyan, Zamboanga del Sur
Sta. 17+000 - Sta. 18+199
Allocation: P37.48 Million
Physical Target: 2.398 lane km
Unit Cost: P15,629,691.41/lane km. |
May 18, 2017 |
2017 |
WIN7G01465 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd (Salambuyan Section) S01184MN, Lapuyan, Zamboanga del Sur, Sta. 22+415 - Sta. 23+063
Allocation: P17.50 Million
Physical Target: 1.296 lane km
Unit Cost: P13,503,086.42/lane km |
May 18, 2017 |
2017 |
WIN7G01467 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (unpaved to paved) along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd - (S01175MN)
K1717+020 - K1717+369 (with exception)
K1718+109 - K1718+253,
K1724+020 - K1724+720,
K1724+720 - K1724+883
Allocation: P45.00 Million
Physical Target: 2.684 lane km
Unit Cost: P16,766,020.86/lane km |
May 18, 2017 |
2017 |
WIN7G01466 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Sibuguey River Flood Control (Phase I), Poblacion, Bayog, Zamboanga del Sur,
Sta. 0+000 - Sta. 0+442.20
Allocation: P 45.00 Million
Physical Target: 442.20 lm.
Unit Cost: P101,763.91/lm |
May 18, 2017 |
2017 |
WIN7G01495 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities
Construction of Multipurpose Building at Tipasan Elementary School, Brgy. Tipasan, Lapuyan, Zamboanga del Sur
Allocation: P2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 17, 2017 |
CY 2017 |
WIN7E01476 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Tangal, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01478 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Santa Teresa, Magsaysay
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 17, 2017 |
Cy 2017 |
WIN7E01487 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Araw at Bituin (Poblacion ),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01488 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. San Agustin, Sablayan
Occidental Mindoro
1 Bldg.
Php 2.0 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01498 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Bansalay, Mamburao
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
2017 |
165003014100085 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 4th District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Primary Roads
Daang Maharlika (LZ) - K0315 + 488 - K0315 + 761, K0320 + 962, K0321 + 055, K0321 + 055 - K0321 + 080, K0321 + 258 - K0321 + 304, K0321 + 328 - K0321 + 431, K0321 + 445 - K0321 + 500, K0321 + 500 - K0321 + 566, K0321 + 580 - K0321 + 589, K0321 + 605 - K0321 + 618.5, K0321 + 680 - K0321 + 760, K0321 + 984.50 - K0322 + 008, K0322 + 129 - K0322 + 164, K0329 + 418 - K0330 + 417, K0335 + 897 - K0336 + 333, K0339 + 110 - K0339 + 332, K0339 + 398 - K0339 + 468, K0339 + 468 - K0339 + 515.5, K0339 + 538.7 - K0339 + 579, K0339 + 570 - K0339 + 588, K0339 + 830 - K0339 + 848, K0339 + 848 - K0339 + 900, K0339 + 900 - K0339 + 928, K0339 + 928 - K0340 + 000, K0340 + 000 - K0340 + 240, K0341 + 411 - K0342 + 042, (S00812LZ)
|
May 17, 2017 |
2017 |
103004010310718 |
GAA FY 2017 |
January 31, 2017 |
Region II |
Isabela 1st District Engineering Office |
Locally-Funded Projects
Buildings and Other Structures
Multipurpose/Facilities: Construction of Barangay Health Center, Barangay Manaring, Ilagan, Isabela
|
May 17, 2017 |
2017 |
292004020200517 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Locally Funded Projects: Flood Control and Drainage- Drainage/Protection Works: Construction of Riverbank Protection and Extention of Training Dike along Cagayan River |
May 16, 2017 |
FY 2017 |
WIN7F04610 |
UACS No. 103004010310215 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects:
Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Barangay Hall, Masambong, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310215
Physical Target/Cost
Per GAA/Original: 1 Bldg.
Unit Cost: P10,000.00/Bldg.
Allocation: Php 10M
WIN7F04610
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building, Brgy. Masambong, Quezon City (Construction of Multi Purpose Building)
UACS No. 103004010310215
Physical Target/Cost
As Modified: 1 Bldg.
Unit Cost: P10,000.00/Bldg.
Estimated Cost: Php 10M
WIN7F04610
|
May 16, 2017 |
2017 |
WIN7G01479 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: LIP - Buildings and Other Structures
Completion of Multi-Purpose Bldg. - Brgy. Sumo-sumo, Tago, Surigao del Sur (Phase II)
Allocation : Php 2.00 Million
Physical Target : 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01476 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: LIP - Buildings and Other Structures - Multipurpose / Facilities
Completion of Multi-Purpose Bldg. - Brgy. Pakwan, Lanuza, Surigao del Sur
Allocation : Php 2.00 Million
Physical Target: 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01478 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and declared Tourism Destinations - To Declared Tourism Destinations
Construction/Improvement of Access Roads leading to Declared Tourist Destination, NRJ Cagwait White Beach Road (WHITE BEACH RESORT), Cagwait, Surigao del Sur, Sta. 0+465.50 - Sta. 1+480
Allocation: Php 30.00 Million
Physical Target: 2.0201 lane km |
May 16, 2017 |
2017 |
WIN7G01477 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Completion of Multi-Purpose Bldg. - Brgy. San Isidro, Marihatag, Surigao del Sur (Phase III)
Allocaion : Php 2.00 Million
Physical Target: 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01483 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
Network Development : Construction of Bypasses/Diversion Roads, including ROW
Construction of Tago-La Paz By-Pass Road, Tago, Surigao del Sur, Sta. 1302+700 - Sta. 1303+020
Allocation: Php 3.63 Million
Physical Target : 0.5045 lane km |
May 16, 2017 |
2017 |
WIN7G01475 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: VIILP - Roads and Bridges - Local Roads
Concreting of Cagbo-Awasian Road with Construction of Bridge, Tandag City, Surigao del Sur, Sta. 0+000 - Sta. 1+280
Allocation:
- Php 35.00 Million (Total)
- Php 30,611,295.49 (Construction of Concrete Road)
- Php 4,388,704.51 (Construction of Bridge)
Physical Target:
- 2.56 lane km (Construction of Concrete Road)
- 114.48 sq.m. (Construction of Bridge) |
May 15, 2017 |
CY 2017 |
WIN7E01509 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building,
Brgy. Labangan Iling, San Jose,
Occidental Mindoro
1 Bldg
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01504 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multi-Purpose/Facilities
Construction of Multi-Purpose Building
Brgy. Cabra, ubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 15, 2017 |
CY 2017 |
WIN7E01505 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Binakas, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Muiti-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01502 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally- Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facillities
Construction of Multi-Purpose Building
Brgy. Ipil, San Jose, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIIN7E01467 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multi-Purpose/Facilities
Construction of Multi-Purpose Building
Brgy. Guitna ( Poblacion ), Looc,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01464 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Poblacion, Calintaan,
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 15, 2017 |
CY 2017 |
WIN7E01472 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Ansiray, San Jose, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building)
|
May 15, 2017 |
CY 2017 |
WIN7E01475 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Surville ( Poblacion ), Lubang
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01517 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Muitipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Likas ng Silangan ( Poblacion ),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01514 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Agkawayan, Looc, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY2017 |
WIN7E01512 |
GAA CY 2017 RA 10924 |
December 28, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Burol, Locc, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
FY 2017 |
WIN7F04581 |
UACS No. 103004010309928 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects:
VIILP – Buildings and Other Structures – Multipurpose/Facilities, Construction of Multi-Purpose Building, Brgy. Sto. Domingo along Araneta Avenue, Quezon City (Construction of Multi Purpose Building)
UACS No. 103004010309928
Physical Target / Cost
GAA/Original: 1 Bldg.
Unit Cost: P10,000.00/Bldg.
Allocation: Php10M
WIN7F04581
As Modified
Locally Funded Projects: VIILP – Buildings and Other Structures – Multipurpose/Facilities, Construction of Multi-Purpose Building, Brgy. Sto. Domingo, Quezon City (Construction of Multi Purpose Building)
UACS No. 103004010309928
As Modified: 1 Bldg.
Unit Cost: P10,000.0/Bldg.
Estimated Cost: Php 10M
WIN7F04581
|
May 15, 2017 |
FY 2017 |
WIN7E01566 |
FY 2017 APPROVED MODIFICATION |
April 21, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: "MFO 1: National Road Network Services – Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary : Construction of Drainage Structure along Road – Nueva Vizcaya- Ifugao- Mt Province Rd
K0301+509, K0295+700-K0295+800,
K0301+100-K0301+400, K0312+600-K0313+107, K0314+140-K0314+240
(Construction of Drainage Structure along Road)
Physical Target = 1150 lm"
To: "MFO 1: National Road Network Services – Asset Preservation of National Roads – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary : Construction of Drainage Structure along Road – Nueva Vizcaya- Ifugao- Mt Province Rd
K0301+509, K0295+700-K0295+800,
K0301+100-K0301+400, K0312+600-K0313+107, K0314+060-K0314+198
(Construction of Drainage Structure along Road) ; Physical Target = 1151.50 lm
|
May 15, 2017 |
FY 2017 |
WIN7E01567 |
FY 2017 APPROVED MODIFICATION |
April 21, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: "MFO 1: National Road Network Services – Network Development – Off-Carriageway Improvement including drainage – Secondary : Off-Carriageway Improvement: Shoulder Paving/ Construction – Nueva Vizcaya-Ifugao-Mt Province Rd.
K0304+128-K0304+789, K0304+789-K0305+226, K0305+226-K0305+293, K0309+000-K0310+000, K0312+668-K0313+000, K0313+118- K0314+000, K0314+040-K0314+270, K0314+630-K0314+733, K0318+000-K0318+139, K0318+175-K0318+436, K0319+082-K0319+151, K0319+588-K0319+635, K0319+696-K0319+806, K0319+806-K0320+032, K0320+520-K0320+662, K0321+099-K0321+444, K0321+444-K0321+595, K0321+595-K0321+734, K0321+734-K0321+784, K0322+051-K0322+124, K0322+310-K0322+418
(Off-Carriageway Improvement: Shoulder Paving/ Construction) ; Physical Target = 10,046.80 sq.m"
To: "MFO 1: National Road Network Services – Network Development – Off-Carriageway Improvement including drainage – Secondary : Off-Carriageway Improvement: Shoulder Paving/ Construction – Nueva Vizcaya-Ifugao-Mt Province Rd.
K0304+128-K0304+789, K0304+789-K0305+226, K0305+226-K0305+293, K0309+000-K0310+000, K0312+668-K0313+000, K0313+118- K0314+000, K0314+040-K0314+270, K0314+630-K0314+733, K0318+000-K0318+139, K0318+175-K0318+436, K0319+082-K0319+151, K0319+588-K0319+635, K0319+696-K0319+806, K0319+806-K0320+032, K0320+520-K0320+662, K0321+099-K0321+444, K0321+444-K0321+595, K0321+595-K0321+734, K0321+734-K0321+784, K0322+051-K0322+124, K0322+310-K0322+418, K0318+530-K0318+898, K0321+800-K0321+871, K0322+418-K0322+601, K0322+632-K0322+793, K0323+115-K0324+000, K0324+000-K0324+738, K0324+786-K0325+000, K0325+000-K0325+641, K0328+931-K0331+000
(Shoulder Paving/ Construction) ; Physical Target = 0.158 lane-km
|
May 15, 2017 |
FY 2017 |
WIN7E01560 |
FY 2017 APPROVED MODIFICATION |
April 12, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From : "Locally Funded Projects – Roads and Bridges – Local Roads : Rehabilitation and Concreting of Luha – Ponghal Road, Lagawe, Ifugao
(Construction of Concrete Road)
To: "Locally Funded Projects – Roads and Bridges – Local Roads : Rehabilitation and Concreting of Luta – Ponghal Road, Lagawe, Ifugao
(Construction of Concrete Road) ; Physical Target = 0.158 lane-km |
May 15, 2017 |
GAA FY 2017 |
WIN7C01723 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Rehabilitation of Concrete Road, Construction of Concrete Bridge and Construction of Road Slope Protection Structure - By-Pass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road including Bridge and ROW, Davao City (SITE A) (Package 3)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Widening/Improvement of Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including Construction of Davao River Bridge II and RROW, Davao City (SITE A) (Package 3)
ALLOCATION: Php 267.107 Million |
May 15, 2017 |
GAA FY 2017 |
WIN7C01734 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1: National Road Network Services:
Network Development - Off-Carriageway Improvement Including Drainage - Secondary
Off-Carriageway Improvement: Shoulder Paving/Construction and Construction of Road Slope Protection Structure - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1638+465 - K1639+110, K1639+361 - K1639+726, K1639+894 - K1642+324, K1642+1009 - K1644+612,
K1644+756 - K164S+354, K1646+423 - K1648+500, K1646+098 - K1646+158
TO: MFO 1: National Road Network Services:
Network Development - Off-Carriageway Improvement Including Drainage - Secondary
Improvement of Off-Carriageway Along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Reblocking of Damaged Pavement ans Slope Protection (Culaman Section), Davao Occidental -
K1638+465 - K1639+110, K1639+361 - K1639+726, K1639+894 - K1642+324, K1642+1009 - K1644+612,
K1644+756 - K1645+354, K1646+098 - K1646+158, K1646+423 - K1648+500,
ALLOCATION: Php 114.508 Million |
May 12, 2017 |
CY 2017 |
WIN7E01421 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
Mindoro West Coastal Road
K0354+590 - K0355+500,
K0398+453 - K0400+922
L = 5,850 lm
Php 46,766,016.00
( Construction of Drainage Structure
along Road ) |
May 12, 2017 |
CY 2017 |
WIN7E01471 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/ Facilities
Construction of Multi-Purpose Building
Brgy. Banaag ng Pag-asa (Poblacion ),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 12, 2017 |
CY 2017 |
WIN7E01479 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation
of Drainage along National Roads
- Secondary Road
Jct. MWCR San Jose Airport-
Jct. Bubog Road
K0238+(-1110) - K0239+830
L = 4,828 lm
Php 49.00 Million
( Construction of Drainage
Structure along Road ) |
May 12, 2017 |
CY 2017 |
WIN7E01468 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
of Damaged Paved National Roads
Including Drainage based on Pavement
Management System/Highway
Development management-4 (HDM-4)
- Tertiary road
Jct. MWCR (Labangan ) -
Murtha - Jct. Iriron Road
K0235+491 - K0237+160
(S00142MR)
L = 3.30 lane km
Php 41.065 Milliom
( Reconstruction/Rehabilitation of
Concrete Road ) |
May 12, 2017 |
CY 2017 |
WIN7E01473 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
-Secondary Road
Mindoro West Coastal Road
K0239+000 - K0244+022
L = 10.052 lane km
Php 150,000,000.00
( Road Widening ) |
May 12, 2017 |
GAA FY 2017 |
WIN7G01450 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Rehabilitation of Concrete Road/Road Widening-Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including ROW, Davao City (Site B) (Package 5)
TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Widening/Improvement of Bypass Road at Jct. Davao City Diversion Road-Tigatto Road-Jct. Davao City Diversion Road Including ROW, Davao City (Site B) (Package 5)
ALLOCATION: Php 221.983 Million |
May 12, 2017 |
2017 |
WIN7E01532 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement including Drainage - Tertiary - Ariman - Jct. Bulusan Lake Road - K0618+408 - K0619+741, K0623+741 - K0625+741 [Shoulder Paving/Construction]
Physical target: 9,999 sq.m.
Unit Cost (P'000): P5.00/sq.m.
Allocation (P'000): P50,000.00
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement including Drainage - Tertiary - Ariman - Jct. Bulusan Lake Road - K0618+408 - K0619+741, K0623+741 - K0623+818, K0624+136 - K0626+511 [Shoulder Paving/Construction]
Physical target: 15,344 sq.m.
Unit Cost (P'000): P3.26/sq.m.
Estimated Cost (P'000): P50,000.00
|
May 12, 2017 |
2017 |
WIN7E01529 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Cadac-an River, (Downstream), Sta. 0+428 to Sta. 0+628, both sides, Binanuahan, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 572 lm
Unit Cost (P'000): P78.67/lm
Allocation (P'000): P45,000.00
As. MODIFIED:
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Cadac-an River, (Downstream), Sta. 0+436 to Sta. 0+722, both sides, Binanuahan, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 572 lm
Unit Cost (P'000): P78.67/lm
Estimated Cost (P'000): P45,000.00
|
May 12, 2017 |
FY2017 |
WIN7C01701 |
GAA2017 |
February 1, 2017 |
Region VIII |
Leyte 4th District Engineering Office |
As per GAA:
Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4(HDM-4) - Secondary
Preventive Maintenance of Road: Asphalt Overlay-Villaba-Palompon Road, K1060+469 - K1064+469
As Modified:
Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4(HDM-4) - Secondary
Preventive Maintenance based on Pavement Management System/Highways Development and Management-4 (HDM-4)-Secondary,Villaba-Palompon Road, S00159LT K1060+469 - K1065+335 |
May 12, 2017 |
2017 |
WIN7E01531 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Cadac-an River, left Side, Downstream Section, Brgy. Taboc, Juban, Sorsogon [ Construction of Flood Mitigation Structure]
Physical Target: 483 lm.
Unit Cost (P'000): P93.17/lm
Allocation (P'000): P45,000.00
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure along Cadac-an River,
Left Side, Upstream Section, Brgy. Taboc, Juban, Sorsogon [ Construction of Flood Mitigation Structure]
Physical Target: 483 lm.
Unit Cost (P'000): P93.17/lm
Estimated Cost (P'000): P45,000.00 |
May 12, 2017 |
2017 |
WIN7EOl 537 |
FY 2017 GAA RA 10924 |
November 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA;
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Rangas River Downstream both side, Sta.
0+440 - 0+687, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 450 lm.
Unit Cost (P'000): P111.11/lm
Allocation (P'000): P50,000.00
As MODIFIED;
MFO 2 - Flood Management Services - Construction/
Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure, Rangas River Downstream both side, Sta.
0+460 - 0+709, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 498 lm.
Unit Cost (P'000): P100.40/lm
Estimated Cost (P'000): P50,000.00
|
May 12, 2017 |
2017 |
WIN7E01530 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon 2nd District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structure and Drainage Systems - Construction of Flood Control Structure, Rangas River, Downstream, both side, Sta. 0+687 - 0+931, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 450 lm.
Unit Cost (P'000): P100.00/lm
Allocation (P'000): P45,000.00
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structure and Drainage Systems - Construction of Flood ControlStructure, Rangas River, Downstream, both side, Sta. 0+709.40 - 0+931 Left Side, Sta. 0+709.60 - 0+920 Right Side, Juban, Sorsogon [Construction of Flood Mitigation Structure]
Physical Target: 432 lm.
Unit Cost (P'000): P104.17/lm
Estimated Cost (P'000): P45,000.00
|
May 12, 2017 |
FY2017 |
WIN7C01649 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Construction of Road Slope Protection Structure - Calbayog Diversion Road, K0736+920 - K0737+000, K0737+700 - K0737+800
As Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Calbayog Diversion Road, K0741+280 - K0741+380, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01651 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Local Infrastructure Program - Roads and Bridges - National Road
Construction of Drainage System along Daang Maharlika, K0711+250 - K0712+000
As Modified:
Local Infrastructure Program - Roads and Bridges - National Road
Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) K0711+516 - K0712+750, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01650 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Major Repair of Flood Control Structures - Rehabilitation/Improvement of Flood Control Structure, Upstream of Jibatang River (Sta. 0+348.6 - Sta. 0+697.2), at Brgy. Lonoy, Calbayog City, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Flood Control Structure, Upstream of Jibatang River (Sta. 0+348.6 - Sta. 0+697.2), at Brgy. Lonoy, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01642 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
LIP - Roads and Bridges - National Roads
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) K0790+500 - K0790+550
As Modified:
LIP - Roads and Bridges - National Roads
Construction of Slope Protection along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) K0782+132 - K0782+250 (L/S), K0783+-480 - K0783+565, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01653 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
LIP - Roads and Bridges - National Roads
Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) K0782+900 - K0782+960
As Modified:
LIP - Roads and Bridges - National Roads
Construction of Slope Protection along Daang Maharlika (SM) (San Isidro - San Juanico Br.) K0773+(-002) - K0773+111(R/S), K0773+267 - K0773+302(R/S), K0773+554 - K0773+638(R/S), K0773+589 - K0773+638(L/S), K0773+703 - K0773+726(L/S), K0773+787 - K0773+856(L/S), K0774+560 - K0774+673 (R/S), Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01657 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Calbayog Diversion Road - K0727+-600 - K0729+400
As Modified:
Network Development - Improvement/Widening of National Roads - Tertiary
Improvement/Widening of Calbayog Diversion Road, K0727+(-600) - K0729+400, Samar 1stLD
|
May 12, 2017 |
FY2017 |
WIN7C01641 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - to Declared Tourism Destinations
Construction of Road Slope Protection Structure - Access road leading to Bangon Falls (Slope Protection), Brgy. Tinaplacan, Calbayog City, Samar
As Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - to Declared Tourism Destinations
Construction/Improvement of Access road leading to Bangon Falls (Slope Protection), Brgy. Tinaplacan, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01626 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) - K0742+000 - K0742+054; K0742+086 - K0742+798; K0742+820 - K0743+374; K0759+000 - K0760+769; K0760+813 - K0761+693; K0760+813 - K0761+693
As Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement/Widening of Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) - K0742+000 - K0742+054; K0742+086 - K0742+798; K0742+820 - K0743+374; K0759+000 - K0760+769; K0760+813 - K0761+693; (including RROW Payment) Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01655 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Jibatang River (Upstream), Brgy. Lonoy, Calbayog City, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Jibatang River (Upstream), Brgy. Lonoy, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01652 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structure/Facilities
Construction of Flood Control Downstream of Malaga River, Phase I, Brgy. Malaga, Calbayog City, Samar
As Modified:
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structure/Facilities
Construction of Flood Control Structure along Malaga River (Downstream), Brgy. Malaga, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01656 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Arapison River, Brgy. Cagsumje, Sta. Margarita, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Arapison River, Brgy. Cagsumje, Sta. Margarita, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01625 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Gandara River (Upstream), Brgy. Ngoso, Gandara, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structures along Gandara River (Upstream), Brgy. Ngoso, Gandara, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01634 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Calbayog River (Upstream), Brgy. Hamorawon, Calbayog City, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structures along Calbayog River (Upstream), Brgy. Hamorawon,
Calbayog City, Samar 1st LD |
May 12, 2017 |
FY2017 |
WIN7C01627 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Labuyao River Control (Sta. 0+000 - Sta. 0+352, Calbayog City, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, Labuyao River Control (Sta. 0+000 - Sta. 0+352, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY 2017 |
WIN7C01623 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Flood Control Downstream of Malaga River Phase 2, Calbayog City, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Malaga River (Upstream) Sta. 0+156 - Sta. 0+307, Brgy. Malaga, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY 2017 |
WIN7C01625 |
Gaa2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Construction/Maintenance of Flood Mitigation Structures and Drainage Structures
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Gandara River (Upstream), Brgy. Ngoso, Gandara, Samar
As Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Structures
Construction of Flood Control Structures along Gandara River (Upstream), Brgy. Ngoso, Gandara, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01631 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Local Infrastructure Program - Roads and Bridges - Local Roads
Construction of Gandara-Matuguinao Rd. Sta. 10+039.7 - Sta. 11+971.20
As Modified:
Local Infrastructure Program - Roads and Bridges - Local Roads
Construction of Gandara-Matuguinao Rd. Sta. 8+000 - Sta. 11+300, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01621 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Local Infrastructure Program - Roads and Bridges - Local Roads
Construction of Road, Brgy. San Joaquin to Lulugayan Falls, Calbayog City, Samar
As Modified:
Local Infrastructure Program - Roads and Bridges - Local Roads
Construction of Road, Brgy. San Joaquin to Lulugayan Falls, Calbayog City, Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01629 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Road Slope Protection Structure Calbayog-Catarman Rd - K0790+500 - K0790+540; K0790+850 - K0790+900; K0791+300 - K0791+350; K0792+010 - K0792+060; K0792+500 - K0792+550; K0793+200 - K0793+220
As Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Calbayog-Catarman Rd - K0790+468.5 - K0790+521.5; K0790+682 - K0790+769; K0790+850 - K0790+873; K0790+915.5 - K0790+941.5; K0790+947 - K0790+964; K0791+236 - K0791+323; Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01630 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
LIP - Roads and Bridges - National Roads
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) K0790+200 - K0790+300
As Modified:
LIP - Roads and Bridges - National Roads
Construction of Slope Protection along Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) K0760+123 - K0760+219 (R/S), K0760+309 - K0760+375 (R/S), K0775+411 - K0775+581(L/S), K0775+840 - K0775+900 (R/S), K0776+100 - K0776+152 (R/S), Samar 1st LD
|
May 12, 2017 |
2017 |
165003030800330 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Construction/ Improvement of Access Roads leading to Airports, Seaports, and to Declared Tourism Destinations - To Declared Tourism Destinations, Abuan River-Base Eco-Tourism, Sindon Bayabo, Ilagan City, Isabela
|
May 12, 2017 |
FY2017 |
WIN7C01624 |
GAA2017 |
February 1, 2017 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) including RROw - K0778+400.4 - K0778+442; K0778+442 - K0778+590;K0778+590 - K0779+100; K0780+586 - K0782+000; K0782+310 - K0782+344; K0782+368 - K0782+476; K0782+524 - K0782+905; K0782+947 - K0783+600; K0782+000 - K0783+000; K0783+086 - K0783+600; K0783+086 - K0783+600
As Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement /Widening of Daang Maharlika (SM) (Sn Isidro - Sn Juanico Br.) - K0778+400.20 - K0778+442; K0778+442 - K0778+590;K0778+590 - K0779+100; K0780+586 - K0782+000; K0782+310 - K0782+344; K0782+368 - K0782+476; K0782+524 - K0782+905; K0782+947 -K0783+600; K0782+000 - K0783+000; K0783+086 - K0783+600, (including RROW Payment) Samar 1st LD
|
May 12, 2017 |
FY2017 |
WIN7C01622 |
GAA2017 |
February 1, 2016 |
Region VIII |
Samar 1st District Engineering Office |
As per GAA:
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) including RROW - K0691+000 - K0692+510; K0692+548 - K0693+000; K0693+736 - K0694+000; K0693+737 - K0694+001
As Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement/Widening of Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br.) including RROW - K0691+000 - K0692+510; K0692+548 - K0693+000; K0693+736 - K0694+000, Samar 1st LD
|
May 12, 2017 |
2017 |
165003016900029 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 2nd District Engineering Office |
Network Development
Off-Carriageway Improvement including drainage
Tertiary Roads, Off-Carriageway Improvement:Shoulder Paving /Construction-
Naguilian-Sn Mariano Rd - K0408+175-K0409+000, K0409 + 794 - K0409 + 821, K0409 + 821 - K0409 + 934, K0409 + 976 - K0410 + 112, K0410 + 203 - K0410 + 280, K0410 + 280 - K0410 + 520, K0410 + 540 - K0411 + 162, K0411+162-K0411+701, K0411+701-K0411+863
|
May 12, 2017 |
2017 |
165003014600161 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0543 + 880 - K0544 + 300
|
May 12, 2017 |
2017 |
165003014200212 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Secondary Roads
Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0580+000 - K0581+235.50
|
May 12, 2017 |
2017 |
165003016900004 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development
Off-Carriageway Improvement including drainage
Tertiary Roads
Jct Magapit-Capissayan Rd - K0557 + (-265) - K0560 + 252, K0560 + 283 - K0560 + 475 |
May 12, 2017 |
2017 |
165003014600162 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Jct Logac-Lasam-Gagabutan Rd - K0708+601-K0708+710 (L/S), K0708+710-K0708+750 (R/S), K0708+710-K0708+934.60 (L/S), K0708+837-K0708+880 (R/S), K0708+915-K0708+925 (R/S), K0709+655-K0709+748 (B/S)
|
May 12, 2017 |
2017 |
165003014600164 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Jct Logac-Lasam-Gagabutan Rd -K0707+035-K0707+282.30 (L/S), K0707+336.40-K0707+350 (L/S), K0707+425-K0707+630 (L/S), K0707+943.47-K0708+000 (L/S), K708+238.17-K708+310 (L/S), K0708+460-K0708+562.50 (L/S), K0708+593.30-K0708+601.10 (L/S), K0709+070-K0709+322.80 (L/S), K0709+483.60-K0709+610 (L/S), K0709+950-K0710+406.90 (L/S), K0710+593.90-K0710+717.90 (L/S), K0710+964.90-K0710+984.90 (L/S), K0711+071.90-K0711+112.90 (L/S), K0711+232.90-K0711+267.90 (L/S), K0711+292.90-K0711+332.90 (L/S), K0711+437.90-K0711+527.90 (L/S), K707+000-K707+270 (R/S), K0707+400-K0707+479.30 (R/S), K0707+694.60-K0707+850 (R/S), K0707+870-K0708+009 (R/S), K0708+200-K0708+270 (R/S), K0709+450-K0709+481.20 (R/S), K0709+483.60-K0709+561.83 (R/S), K0710+593.90-K0710+684.90 (R/S), K0710+774.90-K0710+940.90 (R/S), K0711+002.9-K0711+063.40 (R/S), K0711+066.90-K0711+134.50 (R/S), K711+332.90-K0711+352.90 (R/S), K0711+437.90-K0711+514.80 (R/S), K0711+554.90-K0711+581.90 (R/S), K0711+586.90-K0711+633.40 (R/S), K0711+681.90-K0711+847.90 (R/S), K0710+437.90-K0710+452.70 (B/S), |
May 11, 2017 |
CY 2017 |
WIN7E01515 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- Local Roads
Concreting of Dungon - Ragasras Barangay Road
Mamburao, Occidental Mindoro
L = 1.214 lane km
Php 5.00 Million
( Construction of Concrete Road ) |
May 11, 2017 |
CY 2017 |
WIN7E01511 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary Road
Jct. MWCR (Tibag) - Wawa Road
K0442+(-594) - K0442+690
L =2,568 lm
Php 23,120,000.00
( Construction of Drainage Structure
along Road )
|
May 11, 2017 |
CY 2017 |
WIN7E01474 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Road
leading to Seaports
Access Road leading to Matabang Port,
Abra de Ilog, Occidental Mindoro
L = 0.168 lane km
Php 4,000,000.00
( Construction of Concrete Road ) |
May 11, 2017 |
CY 2017 |
WIN7E01507 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Construction of By-Passes/Diversion Roads
including ROW
San Jose By-Pass Road
Occidental Mindoro
L = 3.50 lane km
Php 49,900,000.00
( Construction of Concrete Road ) |
May 11, 2017 |
CY 2017 |
WIN7E01516 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Roads and bridges
- Local Roads:
Concreting of Local Road,
Sitio Cosul Annex, Brgy. Mapaya,
San Jose, Occidental Mindoro
L = 0.522 lane km
Php 2,000,000.00
( Construction of Concrete Road ) |
May 11, 2017 |
FY 2017 |
REG7XK01252 |
SR2017-02-002069 |
February 2, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
MFO1-National Road Network Services
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading Gravel to Paved - Sn Antonio Circumferential Rd - K0020+710 - K0022+760, K0022+778 - K0023+805
As Modified:
MFO1-National Road Network Services
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads
Road Upgrading (Unpaved to Paved based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads
Sn Antonio Circumferential Rd - K0020+710 - K0022+760, K0022+920 - K0023+805, Sn Antonio, Northern Samar
|
May 11, 2017 |
FY 2017 |
WIN7C01699 |
SR2017-01-001531 |
January 31, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4(HDM-4) - Primary
Reconstruction from Concrete to Concrete - Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0680+524 - K0683+000, K0690+000 - K0690+565, K0685+970 - K0686+805, K0685+970 - K0686+075, K0686+130 - K0686+267, K0691+000 - K0692+000
As Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4(HDM-4) - Primary Roads
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4(HDM-4) - Primary Roads
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) (S00001SM) - K0680+524 - K0683+000, K0690+000 - K0690+565, K0685+970 - K0686+805, (S0002SM) K0685+970 - K0686+075, K0686+130 - K0686+267, K0691+000 - K0692+000, Northern Samar 1st LD
|