CPE Result for First Level Positions August 2024
CPE Result for Second Level Positions August 2024
CPE Result for First Level Positions July 2024
CPE Result for Second Level Positions July 2024
NLEX-SLEX Connector Caloocan-España Section
Submitted by dpwhadmin on
CAVITEX C5 Link Sucat Interchange
Submitted by dpwhadmin on
Panguil Bay Bridge
Submitted by dpwhadmin on
Updated APP of DPWH Pampanga 1st District Engineering Office
DPWH Strengthens 50-Year Old Bridge in Abra
The Department of Public Works and Highways (DPWH) has recently completed the retrofitting of Don Mariano Marcos Bridge along Abra-Kalinga Road, enhancing transportation safety and infrastructure resilience in the Municipality of Dolores, Abra.
The project covers the repair and upgrading of the bridge that connects Barangays Bumagcat, Tayum, and Mudiit.
The old bridge requires retrofitting to meet current seismic load requirements of the structure, and conform to the latest standard design guidelines, criteria, and specifications of the Department.
Pages
