Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 11, 2018 FY 2018 WIN8G02076 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 300117201372000
Project ID: P00258798LZ
Local Program – Local Infrastructure Program – Local Roads and Bridges – Local Roads –
Construction of Road, Brgy. Bantugan/San Vicente, Presentacion/San Jose, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 0.356 lane-km
Unit Cost: CW1 – Php 5.56M /lane-km
Estimated Cost: Php 2.0M
(As Modified)

June 11, 2018 FY 2018 WIN8G01728 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310112100041000
Project ID: P00200739LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Goa-Digdigon-San Isidro Road - K0492+633 - K0492+875, K0494+248 - K0495+352, K0495+368 - K0495+613.50
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,605.70 lm.
Unit Cost: CW1 – Php 14.67T/lm.
Estimated Cost: Php 39.0M
(As Modified)

June 11, 2018 FY 2018 WIN8G01728 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310112100042000
Project ID: P00200740LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads –Tertiary Roads – Jct Digdigon (Goa)-Tinambac Rd – K0496+(-449) – K0496+074, K0502+813 – K0503+122, K0503+529 – K0503+832, K0504+611 – K0504+727, K0504+758 – K0504+826, K0505+000 – K0505+358
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,319.00 lm.
Unit Cost: CW1 – Php 13.10/lm.
Estimated Cost: Php 31.0M
(As Modified)
June 11, 2018 FY 2018 WIN8G01725 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
June 11, 2018 FY 2018 WIN8G01725 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
June 11, 2018 FY 2018 WIN8G01725 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310105100036000
Project ID: P00200499LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads – Presentacion-Maligaya Rd – K0535+400 – K0535+700, K0535+927 – K0536+000, K0537+135 – K0537+205, K0537+380 – K0537+463.70, K0537+576 – K0537+974, K0542+408 – K0542+601, K0543+378 – K0543+477, K0543+803 – K0544+049, K0544+284.30 – K0544+434
Physical Target - CW1 – Rehabilitation of Paved Road/ 2.8226 lane-km
Unit Cost: CW1 – Php 22.37M /lane-km
Estimated Cost: Php 65.427M
(As Modified)
June 11, 2018 FY 2018 WIN8G01992 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310106100146000
Project ID: P00200638LZ
OO1: Ensure Safe and Reliable National Road System – sset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads – Tigaon-Goa-San Jose-Guijalo via San Vicente Rd – K0550+1002 – K0551+335
Physical Target - CW1 – Rehabilitation of Paved Road/ 0.4618 lane-km
Unit Cost: CW1 – Php 26.86M /lane-km
Estimated Cost: Php 12.659 M
(As Modified

June 11, 2018 FY - 2018 WIN8F05509 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Local Roads and Bridges - Local Roads

FROM:
Repair/rehabilitation of Bucana Hanging Bridge,
Taytay, Palawan

CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php

TO:
CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php
June 11, 2018 FY 2018 WIN8G01846 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310205100199000
Project ID: P00202638LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Managnag (Tigaon-Goa-San Jose-Lagonoy-Guihalo via San Vicente Road) – Himanag Road, Lagonoy, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.0 lane-km
CW2 – Construction of Concrete Road/ 1.50 lane-km
Unit Cost: CW1 – Php 13.475M /lane-km
CW2 – Php 14.700M /lane-km
Estimated Cost: Php 50.0 M
(As Modified)

June 11, 2018 2018 300116200524000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
LOCAL Program: Local – National Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Concrete Road, Alicia-Angadanan-San Guillermo-Cauayan City, Naguilian Road, Isabela
June 11, 2018 FY 2018 WIN8G01781 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310205100198000
Project ID: P00201160LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Calabanga – Tinambac Road (Tinambac Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.26 lane-km
Unit Cost: CW1 – Php 21.681M /lane-km
Estimated Cost: Php 50.0 M
(As Modified)
June 11, 2018 FY - 2018 WIN8F05482 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
El Nido - jct. New Ibajay leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan

CW1: 2.000 lane km ( Construction of Concrete Road )
Allocation: 25,000,000 Php

TO:
El Nido - Jct. New Ibajay Road leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan

CW1: 1.560 lane km ( Construction of Concrete Road )
Allocation: 25,000,00 Php

June 11, 2018 FY 2018 WIN8G02089 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310204100154000
Project ID: P00202636LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Jct. Nato-Sabang Coastal Road (Sagñay-Tigaon Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.4632 lane-km
Unit Cost: CW1 – Php 39.18M /lane-km
Estimated Cost: Php 100.0 M
(As Modified)

June 11, 2018 2018 310204100007000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Bypass Road, incl. ROW and Slope Protection, Isabela
June 11, 2018 FY 2018 WIN8G02011 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310205100102000
Project ID: P00202634LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lagonoy-Caramoan Road, incl. ROW, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.40 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 38.90M /lane-km
ROW Acquisition – Php 52.43/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)

June 11, 2018 FY 2018 WIN8G01729 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310205100103000
Project ID: P00202635LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lalud-Garchitorena Road, incl. ROW and Bridge, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 6.11776 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 13.812M /lane-km
ROW Acquisition – Php 200.00/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
June 11, 2018 2018 310204100330000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads

Cauayan City - Cabatuan Diversion Road, incl. ROW, Isabela
June 11, 2018 2018 310204100329000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, incl. ROW, Isabela
June 11, 2018 FY 2018 WIN8G02315 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Apalit – Macabebe – Masantol Rd, K0055+(-680) – K0055+(-200), K0057+106 – K0057+484, K0057+566 – K0057+642, K0057+642 – K0057+696, K0058+067 – K0058+411, K0062+062 – K0063+250
June 11, 2018 FY 2018 WIN8G02318 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Sapang Boracan, Gugu Creek and Macabacle Creek, Bacolor, Pampanga
June 11, 2018 FY 2018 WIN8G02316 FY 2018 GAA January 4, 2018 Region III Pampanga 1st District Engineering Office
Local Program – Flood Control and Drainage – Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Dredging / Excavation with Slope Protection at Aling Nena Creek (Sta. 0+000 – Sta. 0+440, Sta. 0+452 – Sta. 1+180), Mexico, Pampanga
June 11, 2018 FY 2018 WIN8G02321 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Sn Antonio – Floridablanca Rd, K0089+140 – K0089+690
June 11, 2018 2018 WIN8G02250 WIN8G02250 April 17, 2018 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:10.00 Lane-Km; Allocation = Php 100,000,000

To: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:5.714 Lane-Km; Allocation = Php100,000,000
June 11, 2018 FY 2018 WIN8G02330 FY 2018 GAA January 4, 2018 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges – Local Roads – Improvement of Road Connectivity to APFD Road, Lubao Diversion Road, Lubao, Pampanga
June 11, 2018 2018 310204100023000 GAA FY 2018 January 1, 2018 Region II Nueva Vizcaya District Engineering Office
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Bambang Bypass Road, including ROW, Nueva Vizcaya
June 11, 2018 2018 310202100024000 GAA FY 2018 January 1, 2018 Region II Isabela 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Road
Cabagan-Sta. Maria Road
K0450+000 - K0450+540, K0454+274.50 - K0454+882.65, K0448+(-700) - K0448+(-441.65), K0448+(-736.67) - K0448+(-441.65), K0448+(-441.65) - K0450+000
June 11, 2018 FY 2018 WIN8G02301 FY 2018 GAA R.A. 10964 December 29, 2016 Region V Regional Office V
UACS No.: 310204100100000
Project ID: P00201071LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Daraga Albay Diversion Road, Albay
Physical Target - CW1 - Road Widening/ 13.50 lane-km
Unit Cost: CW1 – Php 17.87M /lane-km
Estimated Cost: Php 250.0 M
(As Modified)
June 11, 2018 FY 2018 WIN8G02246 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310205100145000
Project ID: P00201157LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Poblacion Morocborocan-Guinahadap Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.48 lane-km
CW2 - Construction of Road Slope Protection Structure/ 7,046.38 sq.m
Unit Cost: CW1 – Php 31.18M /lane-km
CW2 – Php 2.72T/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)

June 11, 2018 FY 2018 WIN8G02248 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310104100035000
Project ID: P00200416LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Rolando A Andaya Highway – K0338+000 – K0339+533, K0339+569 – K0340+668
Physical Target - CW1 - Reconstruction from Paved to Concrete/ 5.788 lane-km
Unit Cost: CW1 – Php 13.97 M /lane-km
Estimated Cost: Php 83.819 M
(As Modified)

June 11, 2018 FY 2018 WIN8G02251 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310205100151000
Project ID: P00201158LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – San Fernando-San Jacinto Monreal Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 5.578 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,242 lm.
Unit Cost: CW1 – Php 20.81 M /lane-km
CW2 – Php 5.47 T/lm.
Estimated Cost: Php 150.0 M
(As Modified)
June 11, 2018 FY 2018 WIN8G02303 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 310203100061000
Project ID: P00201467LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Tertiary Roads – Sipocot-Cabusao Rd – K0395+200 – K0398+100
Physical Target - CW1 – Road Widening/ 5.7070 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,835 lm.
Unit Cost: CW1 – Php 17.53 M /lane-km
CW2 – Php 11.66 M/lm.
Estimated Cost: Php 150.0 M
(As Modified)
June 11, 2018 2018 310204100036000 GAA FY 2018 January 1, 2018 Region II Nueva Vizcaya District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Bayombong-Solano Bypass Road, incl. ROW, Nueva Vizcaya
June 11, 2018 FY 2018 WIN8G02247 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100294000
Project ID: P00223244LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Cadacan River, Sto. Domingo Section Sta. 28+889.33 - Sta.29+365, Sta. 29+370 - Sta. 29+621.18, Sta. 29+709.67 - Sta.29+862.29, rightside, Irosin, Sorsogon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 879.47 lm
Unit Cost: CW1 – Php 109.73 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
June 11, 2018 FY 2018 WIN8G02302 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100295000
Project ID: P00223245LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Casini Section, Sta. 22+067 - Sta.22+146, Sta.22+067 - Sta.358.70, Sta.22+155.31 - Sta.22+439.89, Sta.24+595.18 - Sta.24+795, Sta.24+700 - Sta.24+780, Sta.24+822 - Sta.24+918, Irosin, Sorsgon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 1,031.10 lm
Unit Cost: CW1 – Php 93.59 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
June 11, 2018 FY 2018 WIN8G02311 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100334000
Project ID: P00223284LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta.0+217.00 - Sta.0+574.05, Sta.0+596 - Sta.0+835.40, Sta.0+217 - Sta.0+573.58, Sta.0+606 - Sta.0+932.68, Sitio Buco, Buyo, Manito, Albay
Physical Target - CW1- Construction of Dike/ 1,279.71 lm.
Unit Cost: CW1 - Php 75.41 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
June 11, 2018 FY 2018 WIN8G02308 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100335000
Project ID: P00223285LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta. 0+340 – Sta.0+944, Sta.0+967.59 - Sta.1+258, Sta.0+660 - Sta.0+944 Cawayan, Manito, Albay
Physical Target - CW1 - Construction of Dike/ 1,178.41 lm
Unit Cost: CW1 - Php 81.89 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
June 11, 2018 FY 2018 WIN8G02249 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 320101100329000
Project ID: P00223279LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Buyo River Flood Control Dike, Sta.1+420 – Sta.1+771.11, Sta.1+460 – Sta.1+852.55, Sta.2+114 – Sta.2+200, Sta.2+200 – Sta.2+370, Buyo, Manito, Albay
Physical Target - CW1 – Construction of Dike/ 999.66 lm
Unit Cost: CW1 – Php 96.53 T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
June 11, 2018 2018 WIN8G02139 WIN8G02139 April 12, 2018 Cordillera Administrative Region Apayao 1st District Engineering Office
From: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 110 - K0608 + 135; Physical Target:1,185 Square meters; Allocation = Php 12,000,000

To: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 090 - K0608 + 146.40; Physical Target:1,185 Square meters; Allocation = Php 12,000,000
June 11, 2018 2018 WIN8C03045 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
Convergence and Special Support Program -Construction/Improvement of Access Roads leading to Declared Tourism Destination

FROM:

NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte

Type of Work: Construction of Concrete Road
Physical Target: 1.714 Lane Km

Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)

TO:

NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte

Type of Work: Construction of Concrete Road
Physical Target: 2.7416 Lane Km

Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)
June 9, 2018 FY 2018 WIN8G02375 SR2018-01-000919 January 26, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads

Daang Maharlika (LZ), K0169+112.96 - K0169+210, K0169+330 - K0169+390, K0169+470 - K0169+490, K0169+730 - K0169+931.43, K0202+091 - K0204+130, K0204+175 - K0205+100, K0205+200 - K0206+174, K0206+249 - K0206+448, K0206+468 - K0206+887
June 8, 2018 FY 2018 WIN8C03110 UACS No. 300116201166000 June 4, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201166000
Project ID: P00258448MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Access Road Leading to Veterans - Lumbia - Timalang, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.6 Lane km
Unit Cost: P 8,750,000.00/ Lane km
EAO: P 1.0 M
Allocation: P 50 M
June 8, 2018 FY 2018 WIN8C03066 UACS No. 300203100524000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300203100524000
Project ID: P00230342MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Busay Falls, Doña Josefa, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.47804 Lane km
Unit Cost: P 16,576,006.06/ Lane km
EAO: P 0.50 M
Allocation: P 25 M
June 8, 2018 FY 2018 WIN8C03067 UACS No. 300203100525000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300203100525000
Project ID: P00230343MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Looc-Labuan Beach, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.23 Lane km
Unit Cost: P 19,918,699.19/ Lane km
EAO: P 0.50 M
Allocation: P 25 M
June 8, 2018 FY 2018 WIN8C03063 UACS No. 300116201169000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201169000
Project ID: P00258449MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Upgrading/ Concrete Paving of Access Road leading to Provincial Capitol, Ipil Heights, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.09537 Lane km
Unit Cost: P 9,616,573.48/ Lane km
EAO: P 1.0 M
Allocation: P 50M
June 8, 2018 FY 2018 WIN8C03080 UACS No. 310101100110000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310101100110000
Projects ID: P00200006MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Ipil-Liloy- Sindangan Rd
K1998+677.00 - K1998+690.50
K1998+714.00 - K1998+723.00
K1998+768.00 - K1998+817.50
K1998+822.00 - K1998+858.00
K1998+916.50 - K1998+934.50
K1998+943.50 - K1998+979.50
K1998+984.00 - K1998+997.50
K1999+004.50 - K1999+103.50
Physical Target:
CW-1- Concrete Reblocking: 0.45 Lane km
Unit Cost: P 9,819,600/lane km
EAO: P 0.09018 M
Allocation: P 4.509M
June 8, 2018 FY 2018 WIN8C03111 UACS No. 300116201170000 June 4, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201170000
Project ID: P00258450MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Upgrading/Concrete Paving of Access Road to IBT Circumferential Road going to Taway, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 2.90726 Lane km
Unit Cost: P 10,112,614.63/ Lane km
EAO: P 0.60M
Allocation: P 30M
June 8, 2018 FY - 2018 WIN8F05510 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Southern Mindoro Engineering District Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads

FROM:
Mindoro Oriental/Occidental East Coastal Rd
K0200+942 - K0201+369,
K0202+697 - K0202+777

CW1: 904.00 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php

TO:
Mindoro oriental/Occidental East Coastal Rd
K0201+070 - K0201+368.30,
K0202+697 - K0202+777.00

CW1: 361.30 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php
June 8, 2018 FY - 2018 WIN8F05510 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Metro Manila 3rd District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads

FROM:
Mindoro Oriental/Occidental East Coastal Rd
K0200+942 - K0201+369,
K0202+697 - K0202+777

CW1: 904.00 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php

TO:
Mindoro oriental/Occidental East Coastal Rd
K0201+070 - K0201+368.30,
K0202+697 - K0202+777.00

CW1: 361.30 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php
June 7, 2018 FY 2018 GAA WIN8C03161 FY 2018 GAA R.A. 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Montevista-DNAS Rd -
K1415 + 392 - K1415 + 440, K1415 + 752 - K1415 + 800,
K1416 + 190 - K1416 + 230, K1416 + 700 - K1416 + 770,
K1419 + 670 - K1419 + 705, K1420 + 000 - K1420 + 050,
K1420 + 380 - K1420 + 437, K1420 + 640 - K1420 + 680,
K1420 + 800 - K1420 + 830, K1420 + 950 - K1420 + 970
Physical Target:
CW1 - 4,479.00 sq. m. (Construction of Road Slope Protection Structure)
ALLOCATION:
Total: P 20,500,000.00
CW1 - P 20,090,000.00(Construction of Road Slope Protection Structure)
EAO - P 410,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Montevista-DNAS Rd –
K1415 + 382 – K1415 + 445, K1415 + 755 – K1415 + 786,
K1416 + 190 – K1416 + 220, K1416 + 690 – K1416 + 775,
K1419 + 660 – K1419 + 710, K1420 + 021 – K1420 + 086,
K1420 + 370 – K1420 + 442, K1420 + 530 – K1420 + 575,
K1420 + 630 – K1420 + 685, K1420 + 790 – K1420 + 835
Physical Target:
CW1: 4,874.62 sq. m. (Construction of Road Slope Protection Structure)
ALLOCATION:
Total: P 20,500,000.00
CW1 - P 20,090,000.00(Construction of Road Slope Protection Structure)
EAO - P 410,000.00


June 7, 2018 FY 2018 GAA WIN8C03108 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Protect Lives and Properties
Flood Management - Construction Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Brgy. Naboc, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,614 Lineal meters (Construction of Gravel Road)
CW-2: 24,000 Cubic meters (Channelization)
ROW: 1,286 Square meter (ROW Acquisation)
ALLOCATION
TOTAL: P 85,000,000.00
CW-1: P 74,982,874.00 (Construction of Gravel Road)
CW-2: P 6,825,001.00 (Channelization)
ROW: P 217,125.00
EAO: P 2,975,000.00

TO: Protect Lives and Properties
Flood Management - Construction Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Brgy. Naboc, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,390.86 Lineal meters (Construction of Revetment)
CW-2: 116,178 Cubic meters (Channelization)
ROW: 1,286 Square meter (ROW Acquisation)
ALLOCATION
TOTAL: P 85,000,000.00
CW-1: P 59,615,138.00 (Construction of Revetment)
CW-2: P 22,192,737.00 (Channelization)
ROW: P 217,125.00
EAO: P 2,975,000.00
June 7, 2018 FY 2018 GAA WIN8C03160 FY 2018 GAA R.A. 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road Network for Public Market with Drainage, Poblacion, Mawab, Compostela Valley
Physical Target:
CW1 - 2.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 20,000,000.00
CW1 - P 19,300,000.00 (Construction of Concrete Road)
EAO - P 700,000.00

TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road Network for Public Market with Drainage, Poblacion, Mawab, Compostela Valley
Physical Target:
CW1 - 0.460 Lane Km (Construction of Concrete Road)
CW2 - 1.237 Lane Km (Construction of Gravel Road)
ALLOCATION:
Total: P 20,000,000.00
CW1 - P 8,657,090.00 (Construction of Concrete Road)
CW2 - P 10,642,910.00 (Construction of Gravel Road)
EAO - P 700,000.00
June 7, 2018 2018 310106100106000 GAA 2018 January 1, 2018 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Abbag-Guingin Bdry Rd (S04752LZ) - K0387+134 - K0387+262, K0387+442 - K0387+575, K0387+585 - K0387+607, K0387+749 - K0387+781, K0388+020 - K0388+060.04, K0388+166 - K0388+180, K0388+280 - K0389+100, K0389+100 - K0389+210, K0389+220 - K0389+323, K0389+385 - K0389+398, K0389+700 - K0389+727, K0389+758 - K0389+830, K0389+884 - K0389+897
June 7, 2018 FY 2018 WIN8C03073 UACS No. 300111200001000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200001000
Project ID: P00257703MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Including Right-of-Way for the Proposed By-pass National Road along Sumagdang - Menzi - Lanote, Isabela City, Basilan
Physical Target:
CW-1- Construction of Concrete Road: 13.48 Lane km
Unit Cost: P 17,874,708.16/Lane km
Physical Target:
ROW: 996.45 Sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 8,750,000.00
Allocation: P 250,000,000.00
June 7, 2018 FY 2018 WIN8C03060 UACS No. 300203100118000 May 25, 2018 Region IX Regional Office IX
UACS No. 300203100118000
Project ID: P00230016MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destinations
NRJ Ayala- La Paz Road Leading to La Paz Resort, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.22 Lane km
Unit Cost: P 20,048,476.45/Lane km
EAO: P 5,250,000.00
Allocation: P 150,000,000.00
June 7, 2018 FY 2018 GAA WIN8C03109 FY 2018 GAA R.A 10964 January 1, 2018 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION

FROM: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,720 Lineal meters (Construction of Revetment)
CW-2: 3,051 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 31,697,352.00 (Construction of Revetment)
CW-2: P 2,357,648.00 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00

TO: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,841.48 Lineal meters (Construction of Revetment)
CW-2: 2,743 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 33,469,880.30 (Construction of Revetment)
CW-2: P 585,119.70 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00
June 7, 2018 FY 2018 WIN8C03071 UACS No. 300111200002000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200002000
Project ID: P00257704MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan Including Right-of-Way (ROW)
K0002+000 - K0005+000
Physical Target:
CW-1- Road Widening: 6.00 Lane Km
Unit Cost: P 17,171,180.28/Lane Km
ROW: 42,576.39 sq.m.
Unit Cost: P 300/ Sq.m.
EAO: P 4,200,000.00
Allocation: P 120,000,000.00
June 7, 2018 FY 2018 WIN8C03069 UACS No. 300111200003000 May 25, 2018 Region IX Regional Office IX
UACS No. 300111200003000
Project ID: P00257705MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan including Road-Right-of-Way (ROW)
K0008+000.00 - K0011+500.00
Physical Target:
CW-1- Road Widening: 7.00 Lane km
Unit Cost: P 16,482,184.90/Lane km
ROW: 1,415.69 Sq.m.
Unit Cost: P 300/Sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00
June 7, 2018 FY 2018 WIN8C03077 UACS No. 310201100146000 May 25, 2018 Region IX Regional Office IX
UACS No. 310201100146000
Project ID: P00200589MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+498.63 - K1744+551.63
Physical Target:
CW-1- Road Widening: 8.11 Lane km
Unit Cost: P 15,070,371.69/Lane km
ROW: 10,764.29 sq.m.
Unit Cost: P 300/sq.m
EAO: P4,550,000.00
Allocation: P 130,000,000.00
June 7, 2018 FY 2018 WIN8C03076 UACS No. 310204100314000 May 25, 2018 Region IX Regional Office IX
UACS No. 310204100314000
Project ID: P00200312MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Zambowood - Mampang Section), Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.32 lane km
Unit Cost: P 18,455,931.99/lane km
ROW: 8.59 sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
June 7, 2018 FY 2018 WIN8C03065 UACS No. 320101102162000 May 25, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 320101102162000
Project ID: P00223435MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Extension of Flood Control Structure along Dipolog River, Guinles (Upstream), Polanco, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 269.20 l.m.
Unit Cost: P 109,212.48/l.m.
EAO: P 600,000.00
Allocation: P 30,000,000.00
June 7, 2018 FY 2018 WIN8C03079 UACS No. 300117202008000 May 25, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300117202008000
Project ID: P00258879MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Rehabilitation of Road Leading to the Maniway Peaks and Highland Resort, Rizal, Zamboanga del Norte
Physical Target:
CW-1- Road Concreting: 0.772 lane km
Unit Cost: P 6,411,917.10/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00
June 7, 2018 FY 2018 WIN8C03072 UACS No. 310201100261000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201100261000
Project ID: P00200598MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Primary Roads
Jct. Aurora - Ozamis City Rd
K1640+400 - K1642+000
Physical Target:
CW-1- Road Widening: 3.20 Lane km
Unit Cost: P 15.313M/Lane km
EAO: P 1.00 M
Allocation: P 50.0 M
June 7, 2018 FY 2018 WIN8C03053 UACS No. 300203100519000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300203100519000
Project ID: P00230023MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination
NRJ leading to Eden Park Panoramic View/ Zipline and Shrine , Brgy. Bayabas to Brgy. Acad, Aurora, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.72 lane km
Unit Cost: P 9.007M/ Lane km
EAO: P 0.50M
Allocation: P 25 M
June 7, 2018 FY 2018 WIN8C03064 UACS No. 300104204114000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300104204114000
Project ID: P00255192MN
Buildings and Other Structures - Multipurpose/ Facilities
Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Labangon, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 2.475 M/ Building
EAO: P 0.025M
Allocation: P 2.5M
June 7, 2018 FY 2018 WIN8C03082 UACS No. 300204100201000 May 25, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300204100201000
Project ID: P00230033MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones
NRJ to Brgy. San Juan, Aurora-Brgy. Man-ilan, in support of Aurora Coco Activated Carbon, Zamboanga del Sur
Physical Target:
CW-1- Paving of Unpaved Roads: 2.26 lane km
Unit Cost: P 8.673M/lane km
EAO: P 0.400 M
Allocation: P 20.0M
June 7, 2018 FY 2018 WIN8C03070 UACS No. 300116201165000 May 25, 2018 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116201165000
Project ID: P00258447MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Barangay Sanito - Pag-Asa (Going to Fisheries), Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 3.1673 Lane km
Unit Cost: P 6,188,236.04/ Lane km
EAO: P 0.40M
Allocation: P 20M
June 6, 2018 FY 2018 WIN8G02144 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 310204100353000
Project ID: P00201086LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Milaor-Pili Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 3.608 lane-km
CW2 - Construction of Road Slope Protection Structure/ 944.12 sq.m.
Unit Cost: CW1 – Php 9.55M /lane-km
CW2 – Php 15.39T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)

June 6, 2018 FY 2018 WIN8G02143 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Camarines Sur 1st District Engineering Office
UACS No.: 310204100354000
Project ID: P00201087LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads – Pamplona-San Fernando Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.914 lane-km
CW2 - Construction of Road Slope Protection Structure/ 772.10 sq.m.
Unit Cost: CW1 – Php 11.85M /lane-km
CW2 – Php 18.73T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)


June 6, 2018 FY 2018 WIN8G02141 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon 2nd District Engineering Office
UACS No.: 300116200987000
Project ID: P00240931LZ
Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of San Juan-San Julian Road, Sta. 0+000 - Sta. 0+483, Irosin, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 0.966 lane-km
Unit Cost: P6.09M/lane-km
Estimated Cost: Php 6.00M
(As Modified)
June 6, 2018 FY 2018 WIN8G02175 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Sorsogon 2nd District Engineering Office
UACS No.: 320101101743000
Project ID: P00220510LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structure along Binanuahan River (Downstream), Juban, Sorsogon
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 400.00 lm.
Unit Cost: Php 98.00T/ lm
Estimated Cost: Php 40.00M
(As Modified)
June 6, 2018 FY 2018 WIN8G01910 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 3102305100056000
Project ID: P00202268LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program - Widening of Permanent Bridges - Manulbi Br. (B00012MT) along Jct Milagros-Baleno-Lagta Rd
Physical Target - CW1 - Widening of Bridge/456.86 sq.m.
Unit Cost: CW1- Php 116.17T/sq.m.
Estimated Cost: Php 55.0M
(As Modified)
June 6, 2018 FY 2018 WIN8G02014 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310205100200000
Project ID: P00201162LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, incl. ROW and Slope Protection, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 1.17 lane-km
CW2 - Construction of Road Slope Protection/ 3,015.00 sq.m.
Right-of-Way Acquisition/ 19,020.00 sq.m.
Unit Cost: CW1 – Php 22.455M /lane-km
CW2 – Php 1.966T/sq.m.
ROW Acquisition – Php 883.28/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
June 6, 2018 FY 2018 WIN8G01891 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 31020510020200
Project ID: P00201163LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Mandaon-Dayhagan Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.10 lane-km
Unit Cost: CW1 - Php 23.333M
Estimated Cost: Php 50.0M
(As Modified)

June 6, 2018 FY 2018 WIN8G01862 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310208100096000
Project ID: P00201556LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Secondary Roads – Jct Milagros-Baleno-Lagta-Rd – K0044+797 – K0045+527
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,140.00 sq.m.
Unit Cost: CW1 - Php 5,954.33/sq.m.
Estimated Cost: Php 25.154M
(As Modified)
June 6, 2018 FY 2018 WIN8G01885 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310208100099000
Project ID: P00201560LZ
OO1: Ensure Safe and Reliable National Road System – Off-Carriageway Improvement - Secondary Roads – Masbate-Milagros Rd - K0003+407 - K0004+134, K0026+313 - K0026+480
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,622.00 sq.m.
Unit Cost: CW1 - Php 5,798.80/sq.m.
Estimated Cost: Php 27.349M
(As Modified)
June 6, 2018 FY 2018 WIN8G01865 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310108100113000
Project ID: P00200852LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Jct Milagros-Baleno-Lagta Rd - K0079+902 - K0080+608
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 4,917.60 sq.m.
Unit Cost: CW1 - Php7,449.24/sq.m.
Estimated Cost: Php 37.380M
(As Modified)
June 6, 2018 FY 2018 WIN8G02015 FY 2018 GAA R.A. 10964 December 28, 2017 Region V Masbate 1st District Engineering Office
UACS No.: 310108100032000
Project ID: P00200845LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Masbate-Milagros Rd - K0007+075 - K0007+325, K0008+120 - K0008+318, K0008+369 - K0008+485, K0008+531 - K0008+580, K0008+922 - K0009+584, K0008+901 - K0009+584
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 16,250.12 sq.m.
Unit Cost: CW1 - 3,718.64/sq.m.
Estimated Cost: Php 62.620M
(As Modified)

June 5, 2018 2018 WIN8C03081 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM -
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS

FROM:

Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte

Project ID No. – P00230261MN
Physical Target: 1.006 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)


TO:

Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte

Project ID No. – P00230261MN
Physical Target: 2.0128 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)
June 5, 2018 2018 WIN8C03075 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS

FROM:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 1.25 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)

TO:

NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte

Project ID No. – P00230320MN
Physical Target: 0.9798 Lane Km
Type of Work: Construction of Concrete Road

Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
June 5, 2018 2018 WIN8C03090 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development – Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao - Agusan Sect) – K1160 + 784 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 325 - K1163 + 501


Project ID No. P00200694MN
Scope of Work: Road Widening
Physical Target: 5.306 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)

TO:

Daang Maharlika (Surigao - Agusan Sect) – K1162 + 084.72 - K1162 + 180, K1162 + 400 - K1163 + 080, K1163 + 080 - K1163 + 136.09, K1163 + 165.91 - K1163 + 200, K1163 + 200 - K1163 + 270, K1163 + 270 - K1163 + 303.09, K1163 + 332.91 - K1163 + 365, K1163 + 365 - K1163 + 497.8


Project ID No. P00200694MN
Scope of Work: Road Widening and Upgrading / Raising of Grade
Physical Target: 4.04272 Lane Km

Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)
June 5, 2018 2018 WIN8C03092 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Surigao del Norte 2nd District Engineering Office
LOCAL PROGRAM - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

FROM:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.000 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)

TO:

NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte

Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.0502 Lane Km

Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)
June 4, 2018 2018 WIN8G02186 WIN8G02186 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0422+000; Physical Target:17.924 Lane Km; Allocation = Php 100,000,000

To: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0442+000; Physical Target:10.992 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02100 WIN8G02100 April 5, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation of Drainage Canal, Brgy. Poblacion, Bangued, Abra; Physical Target:128.3 meters; Allocation = Php 1,500,000

To: Rehabilitation of Drainage Canal, Brgy. Patucannay, Bangued, Abra; Physical Target:128.30 meters; Allocation = Php1,500,000
June 4, 2018 2018 WIN8G02203 WIN8G02203 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Sur Road with Selective Reblocking and Asphalt Overlay, K0387+(-957) - K0408+190; Physical Target:10.074 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Secondary Road, Abra-Ilocos Sur Road K0400+000-K0408+000; Physical Target:16.144 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02204 WIN8G02204 April 23, 2018 Cordillera Administrative Region Abra District Engineering Office
From: Repair/Rehabilitation/Improvement of Abra-Kalinga Norte Road with Selective Reblocking and Asphalt Overlay, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:16.438 Lane Km; Allocation = Php 100,000,000

To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Tertiary Road, Abra-Kalinga Norte Road, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:14.68 Lane Km; Allocation = Php100,000,000
June 4, 2018 2018 WIN8G02138 WIN8G02138 April 23, 2018 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:ROW : 5,000 Square meters, CW1 : 1.40 Lane Km, CW2 : 6,800 Square meters, CW3 : 477 Square meters; Allocation = Php 100,000,000

To: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:CW1 : 2.40 Lane Km, CW2 : 8,800 Square meters, CW3 : 443.61 Square meters; Allocation = Php100,000,000
June 4, 2018 FY 2018 WIN8G02288 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Local Program – Local – Buildings and Other Structures – Multipurpose / Facilities – Construction / Improvement of Multi-Purpose Building, Atlag, Malolos City, Bulacan
June 4, 2018 FY 2018 WIN8G02295 FY 2018 GAA January 4, 2018 Region III Bulacan 1st District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems Construction / Rehabilitation / Improvement of Dike / Seawall at Tibaguin, Hagonoy, Bulacan
June 4, 2018 FY 2018 GAA WIN8C03095 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.514 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Road
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City

Physical Target:
CW1: 1.718 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00
June 1, 2018 FY - 2018 WIN8C02816 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Seaports

FROM:
Little Caramay - TDC - Pagdanan leading to proposed
port, San Vicente, Palawan

CW1: 4.832 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

TO:
Little Caramay - TDC - Pagdanan leading to Proposed
Port, San Vicente, Palawan

CW1: 2.42 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php

June 1, 2018 GAA FY 2018 WIN8F05552 UACS No. 300103200108000 January 1, 2018 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300103200108000
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Addition Hills, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M

As Modified
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
June 1, 2018 GAA FY 2018 WIN8F05536 UACS No. 320101100499000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. Don Galo, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=900 lineal meter
Unit Cost (P’000): P54.44/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00

As Modified
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. San Dionisio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=323 lineal meter
Unit Cost (P’000): P151.702/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
June 1, 2018 GAA FY 2018 WIN8F05551 UACS No. 320101100497000 January 1, 2018 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymar Village, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=480 lineal meter
Unit Cost (P’000): P40.83/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00

As Modified
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymanville Village, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=440 lineal meter
Unit Cost (P’000): P44.54/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
June 1, 2018 GAA FY 2018 WIN8F05538 UACS No. 300116200365000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.158 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P9,309.55/ lane km
Allocation: P 20.090 M
Total: P 20.50 M

As Modified
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.420 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P14,147.89/ lane km
Estimated Cost: P 20.090 M
Total: P 20.5 M
June 1, 2018 GAA FY 2018 WIN8F05537 UACS No. 300116200373000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.200 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P11,581.82/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.620 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P15,728.40/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05546 UACS No. 300116200320000 January 1, 2018 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.500 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P16,986.67/ lane km
Allocation: P 25.480 M
Total: P 26.0 M

As Modified
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.014 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P25,128.21/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
June 1, 2018 GAA FY 2018 WIN8F05547 UACS No. 310105100020000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-510 – K0012+920
Physical Target: CW1-Rehabilitation of Paved Road L = 7.15 lane km
Unit Cost (P’000): P13,489.75/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-505 – K0013+483
Physical Target: CW1-Rehabilitation of Paved Road L = 9.03 lane km
Unit Cost (P’000): P10,681.25/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
June 1, 2018 FY - 2018 WIN8C02829 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Cnvergence and Special Support -
Construction/Improvement of Access Roads leading to Airports

FROM:
New Ibajay - Mabini - Sandoval Access Road leading to Taytay Airport

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000,000 Php

TO:
New Ibahay - Mabini - Sandoval Access Road leading to Taytay Airport , Taytay, Palawan

CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000.000 Php
June 1, 2018 GAA FY 2018 WIN8F05545 UACS No. 310112100011000 January 1, 2018 National Capital Region Quezon City 2nd Engineering District Office
UACS No. 310112100011000
Project ID: P00200705LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-174
Physical Target: CW1-Upgrading of Drainage along Road L = 1,132 lineal meter
Unit Cost (P’000): P 9.22 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00

As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-290
Physical Target: CW1-Upgrading of Drainage along Road L = 800 lineal meter
Unit Cost (P’000): P 13.06 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
June 1, 2018 FY - 2018 WIN8C02825 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/upgrading
of Damaged Paved Roads - Secondary Roads

FROM:
Puerto Princesa North Rd
K0173+439 - K0173+611

CW1: 0.344 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php

TO;
Puerto Princesa North Rd
K0173+420 - K0173+580

CW1: 0.32 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php