June 11, 2018 |
FY 2018 |
WIN8G02076 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300117201372000
Project ID: P00258798LZ
Local Program – Local Infrastructure Program – Local Roads and Bridges – Local Roads –
Construction of Road, Brgy. Bantugan/San Vicente, Presentacion/San Jose, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 0.356 lane-km
Unit Cost: CW1 – Php 5.56M /lane-km
Estimated Cost: Php 2.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01728 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100041000
Project ID: P00200739LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Goa-Digdigon-San Isidro Road - K0492+633 - K0492+875, K0494+248 - K0495+352, K0495+368 - K0495+613.50
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,605.70 lm.
Unit Cost: CW1 – Php 14.67T/lm.
Estimated Cost: Php 39.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01728 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100042000
Project ID: P00200740LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Construction/Upgrading/ Rehabilitation of Drainage along National Roads –Tertiary Roads – Jct Digdigon (Goa)-Tinambac Rd – K0496+(-449) – K0496+074, K0502+813 – K0503+122, K0503+529 – K0503+832, K0504+611 – K0504+727, K0504+758 – K0504+826, K0505+000 – K0505+358
Physical Target - CW1 - Construction of Drainage Structure along Road/ 2,319.00 lm.
Unit Cost: CW1 – Php 13.10/lm.
Estimated Cost: Php 31.0M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 3101051000120000
Project ID: P00200501LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads – Pili-Tigaon-Albay Bdry Rd – K0474+727.00 – K0474+918.00, K0475+140 – K0476+071.00, K0480+175.00 – K0480+585.00
Physical Target - CW1 – Rehabilitation of Paved Road/ 3.066 lane-km
Unit Cost: CW1 – Php 11.024M /lane-km
Estimated Cost: Php 34.489M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01725 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310105100036000
Project ID: P00200499LZ
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation Program - Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads – Presentacion-Maligaya Rd – K0535+400 – K0535+700, K0535+927 – K0536+000, K0537+135 – K0537+205, K0537+380 – K0537+463.70, K0537+576 – K0537+974, K0542+408 – K0542+601, K0543+378 – K0543+477, K0543+803 – K0544+049, K0544+284.30 – K0544+434
Physical Target - CW1 – Rehabilitation of Paved Road/ 2.8226 lane-km
Unit Cost: CW1 – Php 22.37M /lane-km
Estimated Cost: Php 65.427M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01992 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310106100146000
Project ID: P00200638LZ
OO1: Ensure Safe and Reliable National Road System – sset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads – Tigaon-Goa-San Jose-Guijalo via San Vicente Rd – K0550+1002 – K0551+335
Physical Target - CW1 – Rehabilitation of Paved Road/ 0.4618 lane-km
Unit Cost: CW1 – Php 26.86M /lane-km
Estimated Cost: Php 12.659 M
(As Modified
|
June 11, 2018 |
FY - 2018 |
WIN8F05509 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Local Program
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects -
Local Roads and Bridges - Local Roads
FROM:
Repair/rehabilitation of Bucana Hanging Bridge,
Taytay, Palawan
CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php
TO:
CW1: Rehabilitation/Major Repair of Bridge
Number of Bridge - 1
Allocation: 5,000,000 Php |
June 11, 2018 |
FY 2018 |
WIN8G01846 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100199000
Project ID: P00202638LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Managnag (Tigaon-Goa-San Jose-Lagonoy-Guihalo via San Vicente Road) – Himanag Road, Lagonoy, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.0 lane-km
CW2 – Construction of Concrete Road/ 1.50 lane-km
Unit Cost: CW1 – Php 13.475M /lane-km
CW2 – Php 14.700M /lane-km
Estimated Cost: Php 50.0 M
(As Modified)
|
June 11, 2018 |
2018 |
300116200524000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
LOCAL Program: Local – National Roads and Bridges – Local Roads – Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, Alicia-Angadanan-San Guillermo-Cauayan City, Naguilian Road, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G01781 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100198000
Project ID: P00201160LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Calabanga – Tinambac Road (Tinambac Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.26 lane-km
Unit Cost: CW1 – Php 21.681M /lane-km
Estimated Cost: Php 50.0 M
(As Modified) |
June 11, 2018 |
FY - 2018 |
WIN8F05482 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
El Nido - jct. New Ibajay leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan
CW1: 2.000 lane km ( Construction of Concrete Road )
Allocation: 25,000,000 Php
TO:
El Nido - Jct. New Ibajay Road leading to Ille Cave,
Brgy. New Ibajay, El Nido, Palawan
CW1: 1.560 lane km ( Construction of Concrete Road )
Allocation: 25,000,00 Php
|
June 11, 2018 |
FY 2018 |
WIN8G02089 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310204100154000
Project ID: P00202636LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Jct. Nato-Sabang Coastal Road (Sagñay-Tigaon Section), Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.4632 lane-km
Unit Cost: CW1 – Php 39.18M /lane-km
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100007000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Bypass Road, incl. ROW and Slope Protection, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G02011 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100102000
Project ID: P00202634LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lagonoy-Caramoan Road, incl. ROW, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 2.40 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 38.90M /lane-km
ROW Acquisition – Php 52.43/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G01729 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310205100103000
Project ID: P00202635LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Lalud-Garchitorena Road, incl. ROW and Bridge, Camarines Sur
Physical Target - CW1 – Construction of Concrete Road/ 6.11776 lane-km
Right-of-Way Acquisition (ROW)/ 60,000.00 sq.m.
Unit Cost: CW1 – Php 13.812M /lane-km
ROW Acquisition – Php 200.00/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100330000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1; Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Cauayan City - Cabatuan Diversion Road, incl. ROW, Isabela |
June 11, 2018 |
2018 |
310204100329000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 3rd District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, incl. ROW, Isabela |
June 11, 2018 |
FY 2018 |
WIN8G02315 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Apalit – Macabebe – Masantol Rd, K0055+(-680) – K0055+(-200), K0057+106 – K0057+484, K0057+566 – K0057+642, K0057+642 – K0057+696, K0058+067 – K0058+411, K0062+062 – K0063+250 |
June 11, 2018 |
FY 2018 |
WIN8G02318 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage System – Rehabilitation / Improvement of Sapang Boracan, Gugu Creek and Macabacle Creek, Bacolor, Pampanga |
June 11, 2018 |
FY 2018 |
WIN8G02316 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 1st District Engineering Office |
Local Program – Flood Control and Drainage – Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects – Dredging / Excavation with Slope Protection at Aling Nena Creek (Sta. 0+000 – Sta. 0+440, Sta. 0+452 – Sta. 1+180), Mexico, Pampanga |
June 11, 2018 |
FY 2018 |
WIN8G02321 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Sn Antonio – Floridablanca Rd, K0089+140 – K0089+690 |
June 11, 2018 |
2018 |
WIN8G02250 |
WIN8G02250 |
April 17, 2018 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:10.00 Lane-Km; Allocation = Php 100,000,000
To: Improvement/ Concreting of Luta-Ponghal-Buyabuyan-Olilicon Road, Lagawe, Ifugao; Physical Target:5.714 Lane-Km; Allocation = Php100,000,000
|
June 11, 2018 |
FY 2018 |
WIN8G02330 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges – Local Roads – Improvement of Road Connectivity to APFD Road, Lubao Diversion Road, Lubao, Pampanga |
June 11, 2018 |
2018 |
310204100023000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
Bambang Bypass Road, including ROW, Nueva Vizcaya |
June 11, 2018 |
2018 |
310202100024000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Isabela 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Road
Cabagan-Sta. Maria Road
K0450+000 - K0450+540, K0454+274.50 - K0454+882.65, K0448+(-700) - K0448+(-441.65), K0448+(-736.67) - K0448+(-441.65), K0448+(-441.65) - K0450+000 |
June 11, 2018 |
FY 2018 |
WIN8G02301 |
FY 2018 GAA R.A. 10964 |
December 29, 2016 |
Region V |
Regional Office V |
UACS No.: 310204100100000
Project ID: P00201071LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of By-Pass and Diversion Roads - Daraga Albay Diversion Road, Albay
Physical Target - CW1 - Road Widening/ 13.50 lane-km
Unit Cost: CW1 – Php 17.87M /lane-km
Estimated Cost: Php 250.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02246 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310205100145000
Project ID: P00201157LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – Poblacion Morocborocan-Guinahadap Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.48 lane-km
CW2 - Construction of Road Slope Protection Structure/ 7,046.38 sq.m
Unit Cost: CW1 – Php 31.18M /lane-km
CW2 – Php 2.72T/sq.m.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02248 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310104100035000
Project ID: P00200416LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads – Rolando A Andaya Highway – K0338+000 – K0339+533, K0339+569 – K0340+668
Physical Target - CW1 - Reconstruction from Paved to Concrete/ 5.788 lane-km
Unit Cost: CW1 – Php 13.97 M /lane-km
Estimated Cost: Php 83.819 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02251 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310205100151000
Project ID: P00201158LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Construction of Missing Links/New Roads – San Fernando-San Jacinto Monreal Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 5.578 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,242 lm.
Unit Cost: CW1 – Php 20.81 M /lane-km
CW2 – Php 5.47 T/lm.
Estimated Cost: Php 150.0 M
(As Modified) |
June 11, 2018 |
FY 2018 |
WIN8G02303 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 310203100061000
Project ID: P00201467LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program – Road Widening – Tertiary Roads – Sipocot-Cabusao Rd – K0395+200 – K0398+100
Physical Target - CW1 – Road Widening/ 5.7070 lane-km
CW2 - Construction of Drainage Structure along Road/ 3,835 lm.
Unit Cost: CW1 – Php 17.53 M /lane-km
CW2 – Php 11.66 M/lm.
Estimated Cost: Php 150.0 M
(As Modified)
|
June 11, 2018 |
2018 |
310204100036000 |
GAA FY 2018 |
January 1, 2018 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Bayombong-Solano Bypass Road, incl. ROW, Nueva Vizcaya |
June 11, 2018 |
FY 2018 |
WIN8G02247 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100294000
Project ID: P00223244LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Cadacan River, Sto. Domingo Section Sta. 28+889.33 - Sta.29+365, Sta. 29+370 - Sta. 29+621.18, Sta. 29+709.67 - Sta.29+862.29, rightside, Irosin, Sorsogon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 879.47 lm
Unit Cost: CW1 – Php 109.73 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
|
June 11, 2018 |
FY 2018 |
WIN8G02302 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100295000
Project ID: P00223245LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures along Casini Section, Sta. 22+067 - Sta.22+146, Sta.22+067 - Sta.358.70, Sta.22+155.31 - Sta.22+439.89, Sta.24+595.18 - Sta.24+795, Sta.24+700 - Sta.24+780, Sta.24+822 - Sta.24+918, Irosin, Sorsgon
Physical Target - CW1 – Construction of Flood Mitigation Structure/ 1,031.10 lm
Unit Cost: CW1 – Php 93.59 T/lm.
Estimated Cost: Php 100.0 M
(As Modified
|
June 11, 2018 |
FY 2018 |
WIN8G02311 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100334000
Project ID: P00223284LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta.0+217.00 - Sta.0+574.05, Sta.0+596 - Sta.0+835.40, Sta.0+217 - Sta.0+573.58, Sta.0+606 - Sta.0+932.68, Sitio Buco, Buyo, Manito, Albay
Physical Target - CW1- Construction of Dike/ 1,279.71 lm.
Unit Cost: CW1 - Php 75.41 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02308 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100335000
Project ID: P00223285LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta. 0+340 – Sta.0+944, Sta.0+967.59 - Sta.1+258, Sta.0+660 - Sta.0+944 Cawayan, Manito, Albay
Physical Target - CW1 - Construction of Dike/ 1,178.41 lm
Unit Cost: CW1 - Php 81.89 T/lm
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
FY 2018 |
WIN8G02249 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Regional Office V |
UACS No.: 320101100329000
Project ID: P00223279LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation/Improvement of Buyo River Flood Control Dike, Sta.1+420 – Sta.1+771.11, Sta.1+460 – Sta.1+852.55, Sta.2+114 – Sta.2+200, Sta.2+200 – Sta.2+370, Buyo, Manito, Albay
Physical Target - CW1 – Construction of Dike/ 999.66 lm
Unit Cost: CW1 – Php 96.53 T/lm.
Estimated Cost: Php 100.0 M
(As Modified)
|
June 11, 2018 |
2018 |
WIN8G02139 |
WIN8G02139 |
April 12, 2018 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 110 - K0608 + 135; Physical Target:1,185 Square meters; Allocation = Php 12,000,000
To: Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide-Apayao-Ilocos Norte Rd - K0608 + 090 - K0608 + 146.40; Physical Target:1,185 Square meters; Allocation = Php 12,000,000
|
June 11, 2018 |
2018 |
WIN8C03045 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
Convergence and Special Support Program -Construction/Improvement of Access Roads leading to Declared Tourism Destination
FROM:
NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte
Type of Work: Construction of Concrete Road
Physical Target: 1.714 Lane Km
Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)
TO:
NRJ Brgy. Campo-Brgy. Payapag Road leading to Sitio Little Baguio Falls and Farm, Brgy. Payapag, Bacuag, Surigao del Norte
Type of Work: Construction of Concrete Road
Physical Target: 2.7416 Lane Km
Allocation: Php 30,000,000.00 (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (EAO)
|
June 9, 2018 |
FY 2018 |
WIN8G02375 |
SR2018-01-000919 |
January 26, 2018 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads
Daang Maharlika (LZ), K0169+112.96 - K0169+210, K0169+330 - K0169+390, K0169+470 - K0169+490, K0169+730 - K0169+931.43, K0202+091 - K0204+130, K0204+175 - K0205+100, K0205+200 - K0206+174, K0206+249 - K0206+448, K0206+468 - K0206+887
|
June 8, 2018 |
FY 2018 |
WIN8C03110 |
UACS No. 300116201166000 |
June 4, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201166000
Project ID: P00258448MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Access Road Leading to Veterans - Lumbia - Timalang, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.6 Lane km
Unit Cost: P 8,750,000.00/ Lane km
EAO: P 1.0 M
Allocation: P 50 M
|
June 8, 2018 |
FY 2018 |
WIN8C03066 |
UACS No. 300203100524000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300203100524000
Project ID: P00230342MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Busay Falls, Doña Josefa, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.47804 Lane km
Unit Cost: P 16,576,006.06/ Lane km
EAO: P 0.50 M
Allocation: P 25 M |
June 8, 2018 |
FY 2018 |
WIN8C03067 |
UACS No. 300203100525000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300203100525000
Project ID: P00230343MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
NRJ leading to Looc-Labuan Beach, Tungawan, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.23 Lane km
Unit Cost: P 19,918,699.19/ Lane km
EAO: P 0.50 M
Allocation: P 25 M |
June 8, 2018 |
FY 2018 |
WIN8C03063 |
UACS No. 300116201169000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201169000
Project ID: P00258449MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Upgrading/ Concrete Paving of Access Road leading to Provincial Capitol, Ipil Heights, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 5.09537 Lane km
Unit Cost: P 9,616,573.48/ Lane km
EAO: P 1.0 M
Allocation: P 50M |
June 8, 2018 |
FY 2018 |
WIN8C03080 |
UACS No. 310101100110000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 310101100110000
Projects ID: P00200006MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Ipil-Liloy- Sindangan Rd
K1998+677.00 - K1998+690.50
K1998+714.00 - K1998+723.00
K1998+768.00 - K1998+817.50
K1998+822.00 - K1998+858.00
K1998+916.50 - K1998+934.50
K1998+943.50 - K1998+979.50
K1998+984.00 - K1998+997.50
K1999+004.50 - K1999+103.50
Physical Target:
CW-1- Concrete Reblocking: 0.45 Lane km
Unit Cost: P 9,819,600/lane km
EAO: P 0.09018 M
Allocation: P 4.509M |
June 8, 2018 |
FY 2018 |
WIN8C03111 |
UACS No. 300116201170000 |
June 4, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201170000
Project ID: P00258450MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Upgrading/Concrete Paving of Access Road to IBT Circumferential Road going to Taway, Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 2.90726 Lane km
Unit Cost: P 10,112,614.63/ Lane km
EAO: P 0.60M
Allocation: P 30M |
June 8, 2018 |
FY - 2018 |
WIN8F05510 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Southern Mindoro Engineering District Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROM:
Mindoro Oriental/Occidental East Coastal Rd
K0200+942 - K0201+369,
K0202+697 - K0202+777
CW1: 904.00 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php
TO:
Mindoro oriental/Occidental East Coastal Rd
K0201+070 - K0201+368.30,
K0202+697 - K0202+777.00
CW1: 361.30 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php |
June 8, 2018 |
FY - 2018 |
WIN8F05510 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Metro Manila 3rd District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROM:
Mindoro Oriental/Occidental East Coastal Rd
K0200+942 - K0201+369,
K0202+697 - K0202+777
CW1: 904.00 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php
TO:
Mindoro oriental/Occidental East Coastal Rd
K0201+070 - K0201+368.30,
K0202+697 - K0202+777.00
CW1: 361.30 lineal meters ( Preventive Maintenance of
Road: Concrete Reblocking )
Allocation: 8,064,000 Php |
June 7, 2018 |
FY 2018 GAA |
WIN8C03161 |
FY 2018 GAA R.A. 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Montevista-DNAS Rd -
K1415 + 392 - K1415 + 440, K1415 + 752 - K1415 + 800,
K1416 + 190 - K1416 + 230, K1416 + 700 - K1416 + 770,
K1419 + 670 - K1419 + 705, K1420 + 000 - K1420 + 050,
K1420 + 380 - K1420 + 437, K1420 + 640 - K1420 + 680,
K1420 + 800 - K1420 + 830, K1420 + 950 - K1420 + 970
Physical Target:
CW1 - 4,479.00 sq. m. (Construction of Road Slope Protection Structure)
ALLOCATION:
Total: P 20,500,000.00
CW1 - P 20,090,000.00(Construction of Road Slope Protection Structure)
EAO - P 410,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Montevista-DNAS Rd –
K1415 + 382 – K1415 + 445, K1415 + 755 – K1415 + 786,
K1416 + 190 – K1416 + 220, K1416 + 690 – K1416 + 775,
K1419 + 660 – K1419 + 710, K1420 + 021 – K1420 + 086,
K1420 + 370 – K1420 + 442, K1420 + 530 – K1420 + 575,
K1420 + 630 – K1420 + 685, K1420 + 790 – K1420 + 835
Physical Target:
CW1: 4,874.62 sq. m. (Construction of Road Slope Protection Structure)
ALLOCATION:
Total: P 20,500,000.00
CW1 - P 20,090,000.00(Construction of Road Slope Protection Structure)
EAO - P 410,000.00
|
June 7, 2018 |
FY 2018 GAA |
WIN8C03108 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Protect Lives and Properties
Flood Management - Construction Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Brgy. Naboc, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,614 Lineal meters (Construction of Gravel Road)
CW-2: 24,000 Cubic meters (Channelization)
ROW: 1,286 Square meter (ROW Acquisation)
ALLOCATION
TOTAL: P 85,000,000.00
CW-1: P 74,982,874.00 (Construction of Gravel Road)
CW-2: P 6,825,001.00 (Channelization)
ROW: P 217,125.00
EAO: P 2,975,000.00
TO: Protect Lives and Properties
Flood Management - Construction Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment at Brgy. Naboc, Monkayo, Compostela Valley
Physical Target:
CW-1: 1,390.86 Lineal meters (Construction of Revetment)
CW-2: 116,178 Cubic meters (Channelization)
ROW: 1,286 Square meter (ROW Acquisation)
ALLOCATION
TOTAL: P 85,000,000.00
CW-1: P 59,615,138.00 (Construction of Revetment)
CW-2: P 22,192,737.00 (Channelization)
ROW: P 217,125.00
EAO: P 2,975,000.00
|
June 7, 2018 |
FY 2018 GAA |
WIN8C03160 |
FY 2018 GAA R.A. 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road Network for Public Market with Drainage, Poblacion, Mawab, Compostela Valley
Physical Target:
CW1 - 2.000 Lane Km (Construction of Concrete Road)
ALLOCATION:
Total: P 20,000,000.00
CW1 - P 19,300,000.00 (Construction of Concrete Road)
EAO - P 700,000.00
TO: Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road Network for Public Market with Drainage, Poblacion, Mawab, Compostela Valley
Physical Target:
CW1 - 0.460 Lane Km (Construction of Concrete Road)
CW2 - 1.237 Lane Km (Construction of Gravel Road)
ALLOCATION:
Total: P 20,000,000.00
CW1 - P 8,657,090.00 (Construction of Concrete Road)
CW2 - P 10,642,910.00 (Construction of Gravel Road)
EAO - P 700,000.00
|
June 7, 2018 |
2018 |
310106100106000 |
GAA 2018 |
January 1, 2018 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Abbag-Guingin Bdry Rd (S04752LZ) - K0387+134 - K0387+262, K0387+442 - K0387+575, K0387+585 - K0387+607, K0387+749 - K0387+781, K0388+020 - K0388+060.04, K0388+166 - K0388+180, K0388+280 - K0389+100, K0389+100 - K0389+210, K0389+220 - K0389+323, K0389+385 - K0389+398, K0389+700 - K0389+727, K0389+758 - K0389+830, K0389+884 - K0389+897 |
June 7, 2018 |
FY 2018 |
WIN8C03073 |
UACS No. 300111200001000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200001000
Project ID: P00257703MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Construction of Road Including Right-of-Way for the Proposed By-pass National Road along Sumagdang - Menzi - Lanote, Isabela City, Basilan
Physical Target:
CW-1- Construction of Concrete Road: 13.48 Lane km
Unit Cost: P 17,874,708.16/Lane km
Physical Target:
ROW: 996.45 Sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 8,750,000.00
Allocation: P 250,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03060 |
UACS No. 300203100118000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300203100118000
Project ID: P00230016MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destinations
NRJ Ayala- La Paz Road Leading to La Paz Resort, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.22 Lane km
Unit Cost: P 20,048,476.45/Lane km
EAO: P 5,250,000.00
Allocation: P 150,000,000.00 |
June 7, 2018 |
FY 2018 GAA |
WIN8C03109 |
FY 2018 GAA R.A 10964 |
January 1, 2018 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION
FROM: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,720 Lineal meters (Construction of Revetment)
CW-2: 3,051 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 31,697,352.00 (Construction of Revetment)
CW-2: P 2,357,648.00 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00
TO: OO2: Project Lives and Properties
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Revetment, Maco River, Maco, Compostela Valley
Physical Target
CW-1: 1,841.48 Lineal meters (Construction of Revetment)
CW-2: 2,743 Cubic meters (Channelization)
ROW: 1,429 Square meters (ROW Acquisation)
ALLOCATION
Total: P 35,000,000.00
CW-1: P 33,469,880.30 (Construction of Revetment)
CW-2: P 585,119.70 (Channelization)
ROW: P 245,000.00
EAO: P 700,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03071 |
UACS No. 300111200002000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200002000
Project ID: P00257704MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan Including Right-of-Way (ROW)
K0002+000 - K0005+000
Physical Target:
CW-1- Road Widening: 6.00 Lane Km
Unit Cost: P 17,171,180.28/Lane Km
ROW: 42,576.39 sq.m.
Unit Cost: P 300/ Sq.m.
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03069 |
UACS No. 300111200003000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 300111200003000
Project ID: P00257705MN
Local Program
National Roads and Bridges - National Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Basilan Circumferential Road (BCR) Isabela - Maluso Road, Isabela City, Basilan including Road-Right-of-Way (ROW)
K0008+000.00 - K0011+500.00
Physical Target:
CW-1- Road Widening: 7.00 Lane km
Unit Cost: P 16,482,184.90/Lane km
ROW: 1,415.69 Sq.m.
Unit Cost: P 300/Sq.m
EAO: P 4,200,000.00
Allocation: P 120,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03077 |
UACS No. 310201100146000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 310201100146000
Project ID: P00200589MN
OO1: Ensure Safe and Reliable National Road System - Network Development
Road Widening - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1740+498.63 - K1744+551.63
Physical Target:
CW-1- Road Widening: 8.11 Lane km
Unit Cost: P 15,070,371.69/Lane km
ROW: 10,764.29 sq.m.
Unit Cost: P 300/sq.m
EAO: P4,550,000.00
Allocation: P 130,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03076 |
UACS No. 310204100314000 |
May 25, 2018 |
Region IX |
Regional Office IX |
UACS No. 310204100314000
Project ID: P00200312MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Zambowood - Mampang Section), Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 7.32 lane km
Unit Cost: P 18,455,931.99/lane km
ROW: 8.59 sq.m.
Unit Cost: P 300/Sq.m.
EAO: P 4,900,000.00
Allocation: P 140,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03065 |
UACS No. 320101102162000 |
May 25, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 320101102162000
Project ID: P00223435MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/ Extension of Flood Control Structure along Dipolog River, Guinles (Upstream), Polanco, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 269.20 l.m.
Unit Cost: P 109,212.48/l.m.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03079 |
UACS No. 300117202008000 |
May 25, 2018 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 300117202008000
Project ID: P00258879MN
Local Program
Local Infrastructure Program
Local Roads and Bridges
Local Roads
Rehabilitation of Road Leading to the Maniway Peaks and Highland Resort, Rizal, Zamboanga del Norte
Physical Target:
CW-1- Road Concreting: 0.772 lane km
Unit Cost: P 6,411,917.10/lane km
EAO: P 50,000.00
Allocation: P 5,000,000.00 |
June 7, 2018 |
FY 2018 |
WIN8C03072 |
UACS No. 310201100261000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100261000
Project ID: P00200598MN
OO1: Ensure Safe and Reliable National Road
Network Development - Road Widening - Primary Roads
Jct. Aurora - Ozamis City Rd
K1640+400 - K1642+000
Physical Target:
CW-1- Road Widening: 3.20 Lane km
Unit Cost: P 15.313M/Lane km
EAO: P 1.00 M
Allocation: P 50.0 M |
June 7, 2018 |
FY 2018 |
WIN8C03053 |
UACS No. 300203100519000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300203100519000
Project ID: P00230023MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination
NRJ leading to Eden Park Panoramic View/ Zipline and Shrine , Brgy. Bayabas to Brgy. Acad, Aurora, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 2.72 lane km
Unit Cost: P 9.007M/ Lane km
EAO: P 0.50M
Allocation: P 25 M |
June 7, 2018 |
FY 2018 |
WIN8C03064 |
UACS No. 300104204114000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300104204114000
Project ID: P00255192MN
Buildings and Other Structures - Multipurpose/ Facilities
Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Labangon, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Multi Purpose Building: 1.0 Building
Unit Cost: P 2.475 M/ Building
EAO: P 0.025M
Allocation: P 2.5M |
June 7, 2018 |
FY 2018 |
WIN8C03082 |
UACS No. 300204100201000 |
May 25, 2018 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300204100201000
Project ID: P00230033MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones
NRJ to Brgy. San Juan, Aurora-Brgy. Man-ilan, in support of Aurora Coco Activated Carbon, Zamboanga del Sur
Physical Target:
CW-1- Paving of Unpaved Roads: 2.26 lane km
Unit Cost: P 8.673M/lane km
EAO: P 0.400 M
Allocation: P 20.0M |
June 7, 2018 |
FY 2018 |
WIN8C03070 |
UACS No. 300116201165000 |
May 25, 2018 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116201165000
Project ID: P00258447MN
Local Program
Local Roads and Bridges - Local Roads
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Barangay Sanito - Pag-Asa (Going to Fisheries), Ipil, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 3.1673 Lane km
Unit Cost: P 6,188,236.04/ Lane km
EAO: P 0.40M
Allocation: P 20M |
June 6, 2018 |
FY 2018 |
WIN8G02144 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 310204100353000
Project ID: P00201086LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads - Milaor-Pili Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 3.608 lane-km
CW2 - Construction of Road Slope Protection Structure/ 944.12 sq.m.
Unit Cost: CW1 – Php 9.55M /lane-km
CW2 – Php 15.39T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02143 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No.: 310204100354000
Project ID: P00201087LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of By-Pass and Diversion Roads – Pamplona-San Fernando Bypass Road, Camarines Sur
Physical Target - CW1 – Construction of Gravel Road/ 2.914 lane-km
CW2 - Construction of Road Slope Protection Structure/ 772.10 sq.m.
Unit Cost: CW1 – Php 11.85M /lane-km
CW2 – Php 18.73T/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02141 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 300116200987000
Project ID: P00240931LZ
Local Program – Local Roads and Bridges – Local Roads – Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects – Construction of San Juan-San Julian Road, Sta. 0+000 - Sta. 0+483, Irosin, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 0.966 lane-km
Unit Cost: P6.09M/lane-km
Estimated Cost: Php 6.00M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02175 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No.: 320101101743000
Project ID: P00220510LZ
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structure along Binanuahan River (Downstream), Juban, Sorsogon
Physical Target - CW1 - Construction of Flood Mitigation Structure/ 400.00 lm.
Unit Cost: Php 98.00T/ lm
Estimated Cost: Php 40.00M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01910 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 3102305100056000
Project ID: P00202268LZ
OO1: Ensure Safe and Reliable National Road System – Bridge Program - Widening of Permanent Bridges - Manulbi Br. (B00012MT) along Jct Milagros-Baleno-Lagta Rd
Physical Target - CW1 - Widening of Bridge/456.86 sq.m.
Unit Cost: CW1- Php 116.17T/sq.m.
Estimated Cost: Php 55.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02014 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310205100200000
Project ID: P00201162LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Malubi-Cabangcalan-Dayhagan-Tinigban-Mataba Road, incl. ROW and Slope Protection, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 1.17 lane-km
CW2 - Construction of Road Slope Protection/ 3,015.00 sq.m.
Right-of-Way Acquisition/ 19,020.00 sq.m.
Unit Cost: CW1 – Php 22.455M /lane-km
CW2 – Php 1.966T/sq.m.
ROW Acquisition – Php 883.28/sq.m.
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01891 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 31020510020200
Project ID: P00201163LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Construction of Missing Links/New Roads - Mandaon-Dayhagan Road, Masbate
Physical Target - CW1 – Construction of Concrete Road/ 2.10 lane-km
Unit Cost: CW1 - Php 23.333M
Estimated Cost: Php 50.0M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01862 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310208100096000
Project ID: P00201556LZ
OO1: Ensure Safe and Reliable National Road System – Network Development Program - Off-Carriageway Improvement - Secondary Roads – Jct Milagros-Baleno-Lagta-Rd – K0044+797 – K0045+527
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,140.00 sq.m.
Unit Cost: CW1 - Php 5,954.33/sq.m.
Estimated Cost: Php 25.154M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01885 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310208100099000
Project ID: P00201560LZ
OO1: Ensure Safe and Reliable National Road System – Off-Carriageway Improvement - Secondary Roads – Masbate-Milagros Rd - K0003+407 - K0004+134, K0026+313 - K0026+480
Physical Target - CW1 - Off-Carriageway improvement: Shoulder Paving/Construction/ 4,622.00 sq.m.
Unit Cost: CW1 - Php 5,798.80/sq.m.
Estimated Cost: Php 27.349M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G01865 |
FY 2018 GAA R.A. 10964 |
December 29, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310108100113000
Project ID: P00200852LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Jct Milagros-Baleno-Lagta Rd - K0079+902 - K0080+608
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 4,917.60 sq.m.
Unit Cost: CW1 - Php7,449.24/sq.m.
Estimated Cost: Php 37.380M
(As Modified)
|
June 6, 2018 |
FY 2018 |
WIN8G02015 |
FY 2018 GAA R.A. 10964 |
December 28, 2017 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310108100032000
Project ID: P00200845LZ
OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads – Masbate-Milagros Rd - K0007+075 - K0007+325, K0008+120 - K0008+318, K0008+369 - K0008+485, K0008+531 - K0008+580, K0008+922 - K0009+584, K0008+901 - K0009+584
Physical Target - CW2 - Construction of Road Slope Protection Structure/ 16,250.12 sq.m.
Unit Cost: CW1 - 3,718.64/sq.m.
Estimated Cost: Php 62.620M
(As Modified)
|
June 5, 2018 |
2018 |
WIN8C03081 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM -
CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS
FROM:
Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte
Project ID No. – P00230261MN
Physical Target: 1.006 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO)
TO:
Construction/Improvement of Access Road leading to Borongkot Beach, Brgy. Banban, Tagana-an, Surigao del Norte
Project ID No. – P00230261MN
Physical Target: 2.0128 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 25,000,000.00 (Total)
Php 24,500,000.00 (Road)
Php 500,000.00 (EAO) |
June 5, 2018 |
2018 |
WIN8C03075 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS
FROM:
NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte
Project ID No. – P00230320MN
Physical Target: 1.25 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
TO:
NRJ Poblacion Alegria Road Leading to Mainit Lake Boat Landing Facility, Brgy. Poblacion (Alegria), Alegria, Surigao del Norte
Project ID No. – P00230320MN
Physical Target: 0.9798 Lane Km
Type of Work: Construction of Concrete Road
Allocation: Php 22,000,000.00 (Total)
Php 21,560,000.00 (Road)
Php 440,000.00 (EAO)
|
June 5, 2018 |
2018 |
WIN8C03090 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development – Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao - Agusan Sect) – K1160 + 784 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 325 - K1163 + 501
Project ID No. P00200694MN
Scope of Work: Road Widening
Physical Target: 5.306 Lane Km
Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO)
TO:
Daang Maharlika (Surigao - Agusan Sect) – K1162 + 084.72 - K1162 + 180, K1162 + 400 - K1163 + 080, K1163 + 080 - K1163 + 136.09, K1163 + 165.91 - K1163 + 200, K1163 + 200 - K1163 + 270, K1163 + 270 - K1163 + 303.09, K1163 + 332.91 - K1163 + 365, K1163 + 365 - K1163 + 497.8
Project ID No. P00200694MN
Scope of Work: Road Widening and Upgrading / Raising of Grade
Physical Target: 4.04272 Lane Km
Allocation: Php 87,868,000.00 (Total)
Php 84,792,620.00 (Widening)
Php 3,075,380.00 (EAO) |
June 5, 2018 |
2018 |
WIN8C03092 |
FY 2018 GAA RA 10964 |
December 19, 2017 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
LOCAL PROGRAM - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
FROM:
NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte
Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.000 Lane Km
Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO)
TO:
NRJ Lipata - Punta Bilar - Lo-oc - Mabua - Ipil Road, Surigao del Norte
Project ID No. – P00240324MN
Scope of Work: Construction of Concrete Road
Physical Target: 0.0502 Lane Km
Allocation - Php 1,250,000.00 (Total)
- Php 1,225,000 (Road)
- Php 25,000 (EAO) |
June 4, 2018 |
2018 |
WIN8G02186 |
WIN8G02186 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0422+000; Physical Target:17.924 Lane Km; Allocation = Php 100,000,000
To: Repair/Rehabilitation/Improvement of Abra-Ilocos Norte Road with Selective Reblocking and Asphalt Overlay, Abra - Ilocos Norte Road K0433+000-K0442+000; Physical Target:10.992 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02100 |
WIN8G02100 |
April 5, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Drainage Canal, Brgy. Poblacion, Bangued, Abra; Physical Target:128.3 meters; Allocation = Php 1,500,000
To: Rehabilitation of Drainage Canal, Brgy. Patucannay, Bangued, Abra; Physical Target:128.30 meters; Allocation = Php1,500,000
|
June 4, 2018 |
2018 |
WIN8G02203 |
WIN8G02203 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Ilocos Sur Road with Selective Reblocking and Asphalt Overlay, K0387+(-957) - K0408+190; Physical Target:10.074 Lane Km; Allocation = Php 100,000,000
To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Secondary Road, Abra-Ilocos Sur Road K0400+000-K0408+000; Physical Target:16.144 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02204 |
WIN8G02204 |
April 23, 2018 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Repair/Rehabilitation/Improvement of Abra-Kalinga Norte Road with Selective Reblocking and Asphalt Overlay, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:16.438 Lane Km; Allocation = Php 100,000,000
To: Organizational Outcome 1: Ensure safe and Reliable National Road System/ Asset Preservation Program/ Preventive Maintenance/ Tertiary Road, Abra-Kalinga Norte Road, K0429+850, K0434+800-K0435+551, K0438+000-K0440+000, K0447+000-K0449+000; Physical Target:14.68 Lane Km; Allocation = Php100,000,000
|
June 4, 2018 |
2018 |
WIN8G02138 |
WIN8G02138 |
April 23, 2018 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:ROW : 5,000 Square meters, CW1 : 1.40 Lane Km, CW2 : 6,800 Square meters, CW3 : 477 Square meters; Allocation = Php 100,000,000
To: Construction of Missing Links/ New Roads - Tuel Jct - Ambongdolan Jct (Section 3 of BLISTT Outer Ring Circumferential Road) incl ROW, Bridge and Slope Protection, Tublay, Benguet; Physical Target:CW1 : 2.40 Lane Km, CW2 : 8,800 Square meters, CW3 : 443.61 Square meters; Allocation = Php100,000,000
|
June 4, 2018 |
FY 2018 |
WIN8G02288 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Local Program – Local – Buildings and Other Structures – Multipurpose / Facilities – Construction / Improvement of Multi-Purpose Building, Atlag, Malolos City, Bulacan |
June 4, 2018 |
FY 2018 |
WIN8G02295 |
FY 2018 GAA |
January 4, 2018 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems Construction / Rehabilitation / Improvement of Dike / Seawall at Tibaguin, Hagonoy, Bulacan |
June 4, 2018 |
FY 2018 GAA |
WIN8C03095 |
FY 2018 GAA RA 10964 |
January 1, 2018 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Roads
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City
Physical Target:
CW1: 1.514 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development
Construction of Bypass and Diversion Road
Jct. Davao City Diversion ROad - Cabantian Road (Banco Extension Road), incl. ROW, Davao City
Physical Target:
CW1: 1.718 lane km (Construction of Concrete Road)
ROW: 7,570.00 sq.m.
Allocation:
TOTAL: P 135,000,000.00
CW1: P 40,908,280.00 (Construction of Concrete Road)
ROW: P 89,366,720.00
EAO: P 4,725,000.00 |
June 1, 2018 |
FY - 2018 |
WIN8C02816 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Convergence and Special Support - Construction/Improvement of Access Roads leading to Seaports
FROM:
Little Caramay - TDC - Pagdanan leading to proposed
port, San Vicente, Palawan
CW1: 4.832 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php
TO:
Little Caramay - TDC - Pagdanan leading to Proposed
Port, San Vicente, Palawan
CW1: 2.42 lane km ( Construction of Concrete Road )
Allocation: 80,000,000 Php
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05552 |
UACS No. 300103200108000 |
January 1, 2018 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300103200108000
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Addition Hills, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
As Modified
Project ID: P0024789LZ
WIN8F05552
Local Program
Local - Building and Other Structures – Multipurpose/ Facilities – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction/Completion of Multi – Purpose Building (Hall) and Completion of Facilities at National Center for Mental Health, Barangay Mauway, Mandaluyong City
Physical Target: CW1-Construction of Multi-Purpose Building – 1.0
Unit Cost (P’000): P6,860.00/bldg.
Allocation (‘000): P 6,860.00 M
EAO (‘000) P 140.00 M
Total (‘000) : P 7,000.00 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05536 |
UACS No. 320101100499000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. Don Galo, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=900 lineal meter
Unit Cost (P’000): P54.44/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
As Modified
UACS No. 320101100499000
Project ID: P00221544LZ
WIN8F05536
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement / Dredging of Villanueva Creek and Sapang Buwaya Creek Junction, Brgy. San Dionisio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=323 lineal meter
Unit Cost (P’000): P151.702/ lineal meter
Allocation (‘000) : P 49,000.00
EAO (‘000) P 1,000.00
Total (‘000): P 50,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05551 |
UACS No. 320101100497000 |
January 1, 2018 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymar Village, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=480 lineal meter
Unit Cost (P’000): P40.83/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
As Modified
UACS No. 320101100497000
Project ID: P00222779LZ
WIN8F05551
002: Protect Lives and Properties
Flood Management – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sapang Buwaya Creek, Reymanville Village, Brgy. San Antonio, Parañaque City
Physical Target: CW1 Construction of Mitigation Structure L=440 lineal meter
Unit Cost (P’000): P44.54/ lineal meter
Allocation (‘000) : P 19,600.00
EAO (‘000) P 400.00
Total (‘000): P 20,000.00
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05538 |
UACS No. 300116200365000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.158 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P9,309.55/ lane km
Allocation: P 20.090 M
Total: P 20.50 M
As Modified
UACS No. 300116200365000
Project ID: P00240263LZ
WIN8F05538
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Rehabilitation of Roads and Drainage in Makipot St., Brgy. Malinta, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.420 Lane Km
EAO (‘000) – P 0.410 M
Unit Cost (P’000): P14,147.89/ lane km
Estimated Cost: P 20.090 M
Total: P 20.5 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05537 |
UACS No. 300116200373000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 2.200 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P11,581.82/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
As Modified
UACS No. 300116200373000
Project ID: P00240629LZ
WIN8F05537
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Upgrading of Claudio Molina St., Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.620 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P15,728.40/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05546 |
UACS No. 300116200320000 |
January 1, 2018 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.500 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P16,986.67/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
As Modified
UACS No. 300116200320000
Project ID: P00240612LZ
WIN8F05546
Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including
Local Projects – Local Roads and Bridges
Local Roads and Bridges – Local Roads
Improvement of Road and drainage system - Claudio Molina St., Veinte Reales (from T. Santiago St., to Mercury St.) Brgy. Veinte Reales, Valenzuela City
Physical Target: CW1-Rehabilitation of Concrete Road = 1.014 Lane Km
EAO (‘000) – P 0.520 M
Unit Cost (P’000): P25,128.21/ lane km
Allocation: P 25.480 M
Total: P 26.0 M
|
June 1, 2018 |
GAA FY 2018 |
WIN8F05547 |
UACS No. 310105100020000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-510 – K0012+920
Physical Target: CW1-Rehabilitation of Paved Road L = 7.15 lane km
Unit Cost (P’000): P13,489.75/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05547
Local Program
001: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Elliptical Road – K0012+-505 – K0013+483
Physical Target: CW1-Rehabilitation of Paved Road L = 9.03 lane km
Unit Cost (P’000): P10,681.25/ lane km
Allocation (‘000): P 96,451.75
EAO (‘000) P 3,498.25
Total (‘000) : P 99,950.00
|
June 1, 2018 |
FY - 2018 |
WIN8C02829 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
Convergence Special Support Program
Cnvergence and Special Support -
Construction/Improvement of Access Roads leading to Airports
FROM:
New Ibajay - Mabini - Sandoval Access Road leading to Taytay Airport
CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000,000 Php
TO:
New Ibahay - Mabini - Sandoval Access Road leading to Taytay Airport , Taytay, Palawan
CW1: 4.98 lane km ( Construction of Gravel Road )
Allocation: 70,000.000 Php |
June 1, 2018 |
GAA FY 2018 |
WIN8F05545 |
UACS No. 310112100011000 |
January 1, 2018 |
National Capital Region |
Quezon City 2nd Engineering District Office |
UACS No. 310112100011000
Project ID: P00200705LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-174
Physical Target: CW1-Upgrading of Drainage along Road L = 1,132 lineal meter
Unit Cost (P’000): P 9.22 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
As Modified
UACS No. 310105100020000
Project ID: P00200427LZ
WIN8F05545
001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Balete Drive – K0010+-740 – K0010+-290
Physical Target: CW1-Upgrading of Drainage along Road L = 800 lineal meter
Unit Cost (P’000): P 13.06 / lineal meter
Allocation (‘000): P 10,446.80
EAO (‘000) P 213.20
Total (‘000): P 10,660.00
|
June 1, 2018 |
FY - 2018 |
WIN8C02825 |
FY - 2018 GAA DPWH Infra Program |
December 19, 2017 |
Region IV-B |
Palawan 1st District Engineering Office |
001 - Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/upgrading
of Damaged Paved Roads - Secondary Roads
FROM:
Puerto Princesa North Rd
K0173+439 - K0173+611
CW1: 0.344 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php
TO;
Puerto Princesa North Rd
K0173+420 - K0173+580
CW1: 0.32 lane km ( Rehabilitation of Paved Road )
Allocation: 10,000,000 Php |