October 14, 2019 |
FY 2019 |
WIN9G02745 |
300116202022000 |
August 6, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300116202022000
Project ID: P00353956MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Upgrading/ Concreting of NRJ Canunan-Guling-Payag-Mabuhay-Pongapong-Poblacion-Guipos-San Pablo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 3.26292 lane km
Unit Cost: P 9,010,000.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02750 |
300117204958000 |
August 6, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300117204958000
Project ID: P00355560MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ Concreting of Sugbay Uno - Kagawasan - Poblacion - Bacayawan, Dimataling, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 2.0 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
October 14, 2019 |
CY 2019 |
WIN9G02744 |
300104211319000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211319000
Project ID: P00351964MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Covered Court, Brgy. Limbayan, Pitogo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02746 |
300116202021000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300116202021000
Project ID: P00353955MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Opening/ Improvement of Barangay Road from Purok Gabi Tubo - Pait, Dumalinao to Barangay Bag-ong Misamis, San Pablo, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Concrete Road: 0.864 lane km
Unit Cost: P 6,240,000.00 /lane km
EAO: P 110,000.00
Allocation: P 5,500,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02749 |
300104211280000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211280000
Project ID: P00343668MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Brgy. Guinicolalay Elementary School, Guinicolalay, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,584,000.00 /building
EAO: P 16,000.00
Allocation: P 1,600,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02743 |
300104211281000 |
August 5, 2019 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300104211281000
Project ID: P00343669MN
Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Hall), Bacayawan, Dimataling, Zamboanga del Sur
Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,980,000.00 /building
EAO: P 20,000.00
Allocation: P 2,000,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02772 |
320102100940000 |
August 19, 2019 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 320102100940000
Project ID: P00322289MN
Local Program - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Tumaga River Basin, Tetuan Section, Zamboanga City
Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 162.03 lm
Unit Cost: P 126,064.00 /lm
EAO: P 416,860.00
Allocation: P 20,843,000.00 |
October 14, 2019 |
FY 2019 |
WIN9G02766 |
300116202023000 |
August 22, 2019 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
UACS No. 300116202023000
Project ID: P00353957MN
Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Provincial Road Connecting Brgys. Canacan, Sininan. Banker, Tampilisan, Diampak and Shiolan, Kabasalan, Zamboanga Sibugay (Package 1)
Physical Target:
CW-1 - Construction of Concrete Road: 2.402 lane km
Unit Cost: P 12,239,800.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
October 11, 2019 |
2019 |
WIN9C03703 |
SR2019-06-003791 |
June 7, 2019 |
Region III |
Regional Office III |
Network Development - Constructions of By-pass and Diversion Roads
Lubao-Guagua-Minalin-Sto. Tomas Road (Lubao-Guagua Section), Pampanga |
October 11, 2019 |
2019 |
WIN9C03731 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Regional Office III |
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/ Destinations, Brgy. Ditawini, Dinalungan, Aurora |
October 11, 2019 |
2019 |
WIN9C03718 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Baliwag-Candaba-Sta Ana Rd
K0058 + (-050) - K0058 + 042, K0059 + 060 - K0059 + 452,
K0061 + 951 - K0062 + 979, K0063 + 000 - K0063 + 041,
K0063 + 169 - K0063 + 210, K0063 + 236 - K0063 + 593,
K0063 + 757 - K0063 + 772 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02775 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao City District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.322 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.064 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02779 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Composela Valley
Physical Target:
CW1: 2.320 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Compostela Valley
Physical Target:
CW1: 1.880 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00 |
October 11, 2019 |
FY 2019 GAA |
WIN9G02778 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.520 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.180 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00 |
October 11, 2019 |
2019 |
WIN9C03729 |
FY 2019 GAA (RA 11260) |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads
Malolos City Circumferential Road, Bulacan (Sto. Cristo-Sto. Niño) By pass Road, Bulacan |
October 11, 2019 |
2019 |
WIN9C03725 |
SR2019-06-004681 |
June 18, 2019 |
Region III |
Bulacan 1st District Engineering Office |
National Roads and Bridges - National Roads
Construction of Guiguinto By-Pass Road (Sta. Rita Kabilang Bakood-Cutcut Road), Guiguinto, Bulacan |
October 9, 2019 |
CY 2019 |
WIN9F05953 |
UACS No. 320101102838000 |
May 30, 2019 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101102838000
Project ID: P00322721LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along Irasan Creek Brgy. Sto. Niñ, District I, Parañaque City
Physical Target – CW Construction of Drainage Structure 320.00 lineal meters
Unit Cost: P127,176.44 /l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems.
Construction of Box Culvert along Irasan Creek, Brgy. San Dionisio, District I, Parañaque City
Physical Target: CW1 – Construction of Drainage Structure 420.00 Lineal meters
Unit Cost: P96,896.33/l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
WIN9F05953
|
October 9, 2019 |
FY 2019 |
WIN9B00797 |
300117204886000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204886000
Project ID: P00355519MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/concreting of Pang, Kalingalan Caluang-Lubhang, Tubig Putih, Luuk, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 2.86 lane km.
Unit Cost: P 16,873,465.03 /lane km
EAO: P 500,000.00
EXCESS: P 1,241,890.01
Allocation: P 50,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00794 |
300111200067000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200067000
Project ID: P00345284MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panamao, Sulu
K32+000.00 - K33+870.00
Physical Target:
CW-1 - Road Widening: 3.74 lane km
Unit Cost: P 18,049,999.45 /lane km
Physical Target:
ROW: 434.19 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,744.93
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00784 |
300111200042000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200042000
Project ID: P00345264MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/Concreting of Batu-Batu - Kulape Road, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.858 lane km
Unit Cost: P 32,988,928.21 /lane km
Physical Target:
ROW: 2,500 Sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,299,882.49
Excess: P 1,667,760.68
Allocation: P 100,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00785 |
300111200047000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200047000
Project ID: P00345273MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Continuation of Boleh Sallang Road, Sibutu, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.44 lane km
Unit Cost: P 15,776,384.34 /lane km
EAO: P 1,400,000.00
Excess: P 105,622.21
Allocation: P 40,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00802 |
300117204892000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204892000
Project ID: P00347602MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Poblacion Road, Maimbung, Sulu, K0+000.00 - K0+520.00
Physical Target:
CW-1 - Rehabilitation of Concrete Road: 1.04 lane km.
Unit Cost: P 13,891,984.63 /lane km
EAO: P 150,000.00
EXCESS : P 402,335.98
Allocaation : P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00780 |
300111200064000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200064000
Project ID: P00345281MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K26+000.00 - K27+880.00
Physical Target:
CW-1 - Road Widening: 3.76 lane km
Unit Cost: P 17,939,616.61 /lane km
Physical Target:
ROW: 620.63 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 236,853.55
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00800 |
300117204879000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204879000
Project ID: P00347597MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Duhul Kabbun Road, Maimbung, Sulu
K0+000.00 - K0+640.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.28 lane km.
Unit Cost: P 15,048,521.63 /lane km
EAO: P 200,000.00
EXCESS: P 537,892.31
Allocation: P 20,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00801 |
300111200044000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200044000
Project ID: P00345267MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ concreting of Tawi-Tawi Circumferential Road, Parangan - Magsaggaw Section, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 2.72 lane km
Unit Cost: P 34,037,623.35 /lane km
Physical Target:
ROW: 9,500 Sq.m.
Unit Cost: P 1000.00 /sq.m.
EAO: P 3,850,000.00
Excess: P 4,067,664.48
Allocation: P 110,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00791 |
300111200043000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200043000
Project ID: P00345263MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction/ concreting of Sumangday - Baunu Garing Road, Panglima Sugala, Tawi-Tawi
Physical Target:
CW-1 - Construction of Concrete Road: 4.52 lane km
Unit Cost: P 20,429,137.21 /lane km
EAO: P 3,500,000.00
Excess: P 4,160,299.81
Allocation: P 100,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00798 |
300117204878000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204878000
Project ID: P00347596MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Darul Jambangan, Maimbung, Sulu, K0+000.00 - K0+580.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.16 lane km.
Unit Cost: P 12,482,197.88 /lane km
EAO: P 150,000.00
EXCESS: P 370,650.46
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00796 |
300111200056000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200056000
Project ID: P00345278MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening along Pahut - Sanga-Sanga - Batu-Batu Road with ROW, Bonggao, Tawi-Tawi
Physical Target:
CW-1 - Road Widening: 3.604 lane km
Unit Cost: P 18,930,439.28 /lane km
Physical Target:
ROW: 75,000 sq.m
Unit Cost: P 1,000.00 / sq.m.
EAO: P 5,250,000.00
Excess: P 1,524,696.80
Allocation: P 150,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00793 |
300111200041000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200041000
Project ID: P00345262MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Romandier - Camp Andres National Road, Panamao,Sulu, K31+600.00 - K32+600.00, K34+000.00 - K36+000.00, K39+000.00 - K39+110.00
Physical Target:
CW-1 - Construction of Concrete Road: 6.22 lane km
Unit Cost: P 17,886,367.25 /lane km
Physical Target:
ROW: 1,176.45 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 3,893,862.15
Allocation: P 115,500,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00786 |
300117204882000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204882000
Project ID: P00355516MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road along Gulangan, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.09 lane km.
Unit Cost: P 13,261,122.50 /lane km
EAO: P 150,000.00
EXCESS: P 395,376.48
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00795 |
300117204890000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204890000
Project ID: P00355523MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/ concreting of Road, Tubig Samin, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.03 lane km.
Unit Cost: P 14,040,108.65 /lane km
EAO: P 150,000.00
EXCESS: P 388,688.09
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00782 |
300111200066000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200066000
Project ID: P00345283MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K30+000.00 - K31+850.00
Physical Target:
CW-1 - Road Widening: 3.70 lane km
Unit Cost: P 18,243,023.71 /lane km
Physical Target:
ROW: 461.14 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,471.57
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00787 |
300111200065000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200065000
Project ID: P00345282MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K28+000.00 - K29+820.00
Physical Target:
CW-1 - Road Widening: 3.64 lane km
Unit Cost: P 18,556,622.84 /lane km
Physical Target:
ROW: 299.26 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,364,113.75
Allocation: P 70,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00790 |
300117204883000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204883000
Project ID: P00355517MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road along Pataw, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.08 lane km.
Unit Cost: P 13,377,147.04 /lane km
EAO: P 150,000.00
EXCESS: P 402,681.20
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00788 |
300117204880000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204880000
Project ID: P00355515MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Garid - Kan Mindus Road, Luuk, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.59 lane km.
Unit Cost: P 18,193,346.38 /lane km
EAO: P 300,000.00
EXCESS: P 772,579.26
Allocation: P 30,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00783 |
300117204884000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204884000
Project ID: P00347599MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Pandan Niog to Lumah Dapdap, Pangutaran, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 0.79 lane km.
Unit Cost: P 14,637,365.24 /lane km
EAO: P 120,000.00
EXCESS: P 316,481.46
Allocation: P 12,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00789 |
300111200063000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300111200063000
Project ID: P00345280MN
Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Jolo - Taglibi - Tiptipon National Road, Panamao, Sulu
K22+000.00 - K24+790.00
Physical Target:
CW-1 - Road Widening: 5.58lane km
Unit Cost: P 18,041,161.49 /lane km
Physical Target:
ROW: 1,022.93 sq.m
Unit Cost: P 300.00 /sq.m
EAO: P 3,523,438.84
Allocation: P 104,500,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00792 |
300117204888000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204888000
Project ID: P00355521MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/concreting of Road, Laum, Maimbung, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 0.95 lane km.
Unit Cost: P 15,230,395.22 /lane km
EAO: P 150,000.00
EXCESS: P 381,124.54
Allocation: P 15,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00781 |
300117204877000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204877000
Project ID: P00355514MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Brgy. Alu Layag-Layag Road, Parang, Sulu
Physical Target:
CW-1 - Construction of Concrete Road: 1.21 lane km.
Unit Cost: P 15,889,803.02 /lane km
EAO: P 200,000.00
EXCESS: P 573,338.35
Allocation: P 20,000,000.00 |
October 9, 2019 |
FY 2019 |
WIN9B00799 |
300117204876000 |
August 14, 2019 |
Region IX |
Regional Office IX |
UACS No. 300117204876000
Project ID: P00347595MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Batu Ugis Road, Maimbung, Sulu
K0+000.00 - K0+610.00
Physical Target:
CW-1 - Construction of Concrete Road: 1.22 lane km.
Unit Cost: P 15,793,028.20 /lane km
EAO: P 200,000.00
EXCESS: P 532,505.59
Allocation: P 20,000,000.00 |
October 8, 2019 |
2019 |
WIN9C03719 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection / Flood Control, Bangan Seawall, Sta. 0+365 - Sta. 0+455, Botolan, Zambales |
October 8, 2019 |
2019 |
WIN9C03707 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Local Roads and Bridges - Local Roads
Construction of road leading to tourism port and facilities at freeport area, Mariveles, Bataan |
October 8, 2019 |
2019 |
WIN9C03716 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Widening of Road - Naval St., Cupang North, City of Balanga, Bataan
|
October 8, 2019 |
2019 |
WIN9C03710 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Elliptical Rd - K0165+(-060) - K0165+060, K0166+000 - K0166+200, K0166+400 - K0166+610 |
October 8, 2019 |
CY 2019 |
WIN9F05948 |
UACS No. 300116201499000 |
May 28, 2019 |
National Capital Region |
North Manila District Engineering Office |
UACS No. 300116201499000
Project ID: P00345616LZ
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.796 lane km
Unit Cost: P17,236,180/ lane km
Allocation: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
As Modified
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.831 lane km
Unit Cost: P16,510,228/ lane km
Estimated Cost: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
WIN9F05948
|
October 8, 2019 |
2019 |
WIN9C03711 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads
Concreting of Roads Puroks 4-6 San Antonio, Lubao, Pampanga |
October 8, 2019 |
2019 |
WIN9C03722 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 2nd District Engineering Office |
National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Road Widening Jose Abad Santos Avenue (JASA) - K0093+956.20 - K0094+433.61, Lubao, Pampanga |
October 3, 2019 |
CY 2019 |
WIN9F05941 |
UACS No. 320101102899000 |
June 13, 2019 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101102899000
Project ID: P00320509LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga PH4, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05941
|
October 3, 2019 |
CY 2019 |
WIN9F05947 |
UACS No. 320101102855000 |
May 14, 2019 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101102855000
Project ID: P00322730LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase IV), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117 Lineal meters
Unit Cost (P’000) – P167.52137/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase V), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117.60 Lineal meters
Unit Cost (P’000) – P166.6667/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00
WIN9F05947
|
October 3, 2019 |
CY 2019 |
WIN9F0552 |
UACS No. 320101102896000 |
June 21, 2019 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 320101102896000
Project ID: P00320496LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along the Mañalac Avenue and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 600 Lineal Meters
Unit Cost (P’000) – P24,500/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along Dungon St. and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 585 Lineal Meters
Unit Cost (P’000) – P25,128/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05952
|
October 3, 2019 |
CY 2019 |
WIN9F05945 |
UACS No. 310112100070000 |
June 25, 2019 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 310112100070000
Project ID: P00300002LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0013+620.50 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 523.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Allocation (P’000) – P9,800.00
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – 10,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0014+084.5 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 207.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Physical Target – P47,202.00 lineal meter
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – P9,794.447
Excess (Allocation P’000) – P5.553
Total (Allocation P’000) – 10,000.00
WIN9F05945
|
October 3, 2019 |
CY 2019 |
WIN9F05939 |
UACS No. 320101102904000 |
June 17, 2019 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101102904000
Project ID: P00320523LZ
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Ramitex Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 0.00 Lineal Meter
Unit Cost (P’000) – P ---/Lineal Meter
Allocation – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M
As Modified
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Bragados Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 390.00 Lineal Meter
Unit Cost (P’000) – P 87.95/Lineal Meter
Estimated – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M
WIN9F05939
|
October 3, 2019 |
2019 |
WIN9G02767 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Regional Office XIII |
UACS No. 310201100362000
Project ID: P00303789MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1175 + 605 - K1177 + 340, K1183 + 815 - K1185 + 194
CW1: Road Widening 6.238 lane km
UNIT COST: PHP 17.01667M/lane km
ALLOCATION: PHP 106.150M
EAO: PHP 3.850M
TOTAL: PHP 110.0M
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1175 + 394 - K1176 + 960
CW1: Road Widening 3.132 lane km
UNIT COST: PHP 33.89208M/lane km
ALLOCATION: PHP 106.150M
EAO: PHP 3.850M
TOTAL: PHP 110.0M |
October 3, 2019 |
2019 |
WIN9G02765 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Regional Office XIII |
UACS No. 310108100204000
Project ID: P00304404MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1188+589.6 - K1188+727.6
CW1: Construction of Road Slope Protection Structure
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M
TO:
Surigao-Davao Coastal Rd - K1188+580 - K1188+740
CW1: Construction of Road Slope Protection Structure/ 6,450/SQ.M
UNIT COST: PHP 18.215T
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M |
October 3, 2019 |
2019 |
WIN9G02773 |
FY2019 GAA RA 11260 |
April 29, 2019 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. 310204100602000
Project ID: P00303977MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
FROM:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
CW1: Construction of Concrete Road / 3.164 lane km
UNIT COST: PHP 16.88902M / lane km
ALLOCATION: PHP 53.436875M
EAO: PHP 1.938125M
TOTAL: PHP 55.375M
TO:
Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur
CW1: Construction of Concrete Road / 0.414 lane km
UNIT COST: PHP 39.54676M / lane km
ALLOCATION: PHP 16.372359M
CW2: Construction of Road Slope Protection Structure / 1,031.15 sq.m
UNIT COST: PHP 35.945T / sq.m
ALLOCATION: PHP 37.064516M
EAO: PHP 1.938125M
TOTAL: PHP 55.375M |
October 2, 2019 |
2019 |
WIN9C03541 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Norte District Engineering Office |
UACS No. 320102100913000
Project ID: P00323026LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Brgy. Mantigbi, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.
|
October 2, 2019 |
2019 |
WIN9C03546 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No. 320101103575000
Project ID: P00321229LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot and Lupi, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.
|
October 2, 2019 |
2019 |
WIN9C03527 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Sur 1st District Engineering Office |
UACS No. 310107100087000
Project ID: P00300377LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 040 - K0312 + 067, K0312 + 383 - K0312 + 514, K0327 + 465 - K0327 + 480, K0329 +415 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,750.0 Sq.M.
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 033 - K0312 + 080, K0312 + 378 - K0312 + 555, K0327 + 465 - K0327 + 480, K0329 +405 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,935.0 Sq.M. |
October 2, 2019 |
2019 |
WIN9C03609 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Albay 3rd Engineering Office |
UACS No. 310105100263000
Project ID: P00301428LZ
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 059 - K0522 + 153, K0522 + 805 - K0523 + 000, K0530 + 561 - K0530 + 611, K0530 + 850 - K0530 + 900, K0532 + 000 - K0532 + 100, K0534 + 780 - K0535 + 160, K0538 + 367 - K0538 + 557
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 2.54 Ln.Km.
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 805 - K0523 + 000, K0530 + 850 - K0530 + 900, K0534 + 780 - K0535 + 160
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 1.672 Ln.Km. |
October 2, 2019 |
2019 |
WIN9C03561 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS No. 320101103625000
Project ID: P00321289LZ
FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon City
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m.
TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m. |
October 2, 2019 |
2019 |
WIN9C03534 |
FY 2019 GAA |
April 28, 2019 |
Region V |
Masbate 1st District Engineering Office |
UACS No. 300116201862000
Project ID: P00353905LZ
FROM:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.40Lane KM
TO:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target:
CW1 - Construction of Concrete Road - 0.120Lane KM
CW2 - Construction of Slope Protection Structure - 150 Sq.M.
|
October 2, 2019 |
2019 |
WIN9G02752 |
320102100665000 |
August 15, 2019 |
Region IX |
Regional Office IX |
UACS No. 320102100665000
Project ID: P00321933MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure, Salug Daku Flood Control, Mahayag, Zamboanga del Sur
Sta. 1+540.00 - Sta. 2+092.00,
Sta. 2+092.24 - Sta. 2+148.00
Physical Target: 608.00 ln.m.
Unit Cost: P161,891.45/ln.m.
EAO: P3,570,000.00
Allocation: P 102,000,000.00 |
October 2, 2019 |
2019 |
WIN9C03656 |
FY 2019 GAA |
April 29, 2019 |
Region V |
Camarines Sur 4th District Engineering Office |
UACS No. 300106200214000
Project ID: P00353270LZ
FROM:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Pili, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 1.0 Square Meter.
TO:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Sagñay and Presentacion, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 861.90 Square Meter. |
October 2, 2019 |
2019 |
WIN9G02751 |
310204100495000 |
August 15, 2019 |
Region IX |
Regional Office IX |
UACS No. 310204100495000
Project ID: P00303807MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-pass and Diversion Roads
Zamboanga City Diversion Road, (Cabaluay - Zambowood - Mampang Section), Zamboanga City
Physical Target: 7.38 lane km.
Unit Cost: P 15,001,587.44/lane km.
ROW Acquisition: 16,666.66 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,874,910.04
Excess: P 413,374.64
Allocation: P 120,000,000.00 |
October 2, 2019 |
2019 |
WIN9G02754 |
320102100663000 |
August 15, 2019 |
Region IX |
Regional Office IX |
UACS No. 320102100663000
Project ID: P00322966MN
OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Dicayo River (Downstream), Barangay Daanglungsod, Katipunan, Zamboanga del Norte
Physical Target: 428.00 sq.m.
Unit Cost: P 172,095.81/sq.m.
EAO: P 2,577,995.17
Allocation: P 76,235,000.00 |
October 2, 2019 |
2019 |
WIN9G02715 |
310108100273000 |
July 23, 2019 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Rizal - Dakak - Dapitan Coastal Loop National Road
K1804+780 - K1805+280,
K1817+200 - K1817+282
Physical Target: 5,523.24 sq.m.
Unit Cost: P 3,548.64/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00 |
October 1, 2019 |
FY 2019 GAA |
WIN9G02735 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Regional Office XI |
FROM: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 5.240 Lane Km (Construction of Concrete Road)
ROW: 52,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,560,000.00 (Construction of Concrete Road)
ROW: P 6,000,000.00 (ROW Acquisition)
EAO: P 1,440,000.00
TO: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 6.08082 Lane Km (Road Widening)
CW2: 1,425.28 sq. m. (Construction of Road Slope Protection)
ROW: 70,841,00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 103,077,000.00 (Road Widening)
CW2: P 30,573,000.00 (Construction of Road Slope Protection)
ROW: P 15,000,000.00 (ROW Acquisition)
EAO: P 1,350,000.00 |
October 1, 2019 |
FY 2019 GAA |
WIN9G02762 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 0.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 1.505 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
|
October 1, 2019 |
FY 2019 GAA |
WIN9G02768 |
FY 2019 GAA RA 11260 |
January 1, 2019 |
Region XI |
Davao de Oro 1st District Engineering Office |
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 0.740 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 3.100 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00 |
October 1, 2019 |
2019 |
WIN9C03704 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Improvement of Sapang Are Creek, Sta. 0+144.70 - Sta. 0+165.30, Sta. 1+305 - Sta. 1+405.30 at Apalit, Pampanga |
October 1, 2019 |
2019 |
WIN9C03708 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin Tail Dike Section), K0068+033 - K0069+000, K0070+800 - K0071+246, K0071+292 - K0071+325, K0071+375 - K0071+387.50, K0071+425.70 - K0071+437.7, K0071+618.4 - K0071+637.4, K0071+930.5 - K0071+963.8, K0071+976.5 - K0071+995 |
October 1, 2019 |
2019 |
WIN9C03709 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Nueva Ecija 1st District Engineering Office |
Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building (Covered Court, Mini Gym with Stage), Brgy. Namulandayan, Lupao, Nueva Ecija |
September 23, 2019 |
2019 |
WIN9C03681 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0072+098 - K0072+873, K0073+344 - K0074+458.70 |
September 23, 2019 |
2019 |
WIN9C03682 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0071+894 - K0072+964 |
September 23, 2019 |
2019 |
WIN9C03678 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Candaba - Sn Miguel Rd - K0080+000 - K0080+133, K0080+806 - K0080+930, K0081+057 - K0081+228, K0081+403 - K0081+705, K0083+000 - K0083+252, K0084+000 - K0084+083 |
September 23, 2019 |
2019 |
WIN9C03689 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bahay Pare - Sn Luis - Sto. Domingo Rd - K0065+122 - K0065+181, K0065+610 - K0065+796, K0065+808 - K0066+109
|
September 23, 2019 |
2019 |
WIN9C03684 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Improvement of Slope Protection along Sto. Tomas - Minalin - Macabebe Road (Pasac - Culcul Portion), Minalin, Pampanga |
September 23, 2019 |
2019 |
WIN9C03683 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Tulauc - Sto. Domingo Rd - K0060+(-546) - K0063+906 |
September 20, 2019 |
2019 |
WIN9C03665 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Pulilan - Calumpit Rd - K0043+455 - K0044+000, K0045+000 - K0045+800, K0046+500 - K0047+550, K0047+880.80 - K0048+150, K0049+(-316) - K0049+397, K0049+683 - K0049+729, K0050+370 - K0050+660, K0051+170 - K0051+350, K0051+470 - K0051+500, K0051+580 - K0051+730, K0052+060 - K0052+135, K0052+360 - K0052+400, K0052+760 - K0052+800 |
September 20, 2019 |
2019 |
WIN9C03677 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 1st District Engineering Office |
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Old Cagayan Valley Rd - K0043+-855 - K0043+-704 |
September 20, 2019 |
FY - 2019 |
WIN9F05920 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. 300112200047000
Project ID: P00353633LZ
Local Program
National Roads and Bridges - National Roads -
Local Infrastructure Program
FROM:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+060 - K0061+240,
K0061+840 - K0061+900,
Torrijos, Marinduque
Cw1 - Construction of Road Slope Protection Structure -
3,686.00 sq.m.
Unit Cost - Php 25.784/ sq.m.
Allocation - Php 96.00Million
TO:
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+000 - K0062+047,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure -
4,360.00 sq.m.
Unit Cost - Php 21.798/ sq.m.
Allocation - Php 96.00 Million
|
September 20, 2019 |
2019 |
WIN9C03669 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation / Major Repair of Flood Control Structures
Rehabilitation of Flood Control Structures along Pagalanggang River (Tucop Section), Sta. 0+118 - Sta. 0+332.40, Brgy. Tucop, Dinalupihan, Bataan |
September 20, 2019 |
2019 |
WIN9C03686 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 2nd District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Upgrading / Concreting of Road w/ drainage canal at San Miguel (Villa Rosemarie), Guagua, Pampanga |
September 20, 2019 |
2019 |
WIN9C03657 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Bulacan 2nd District Engineering Office |
Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Replacement of Dulong Bayan Bridge, City of San Jose Del Monte, Bulacan |
September 20, 2019 |
2019 |
WIN9C03697 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 2nd District Engineering Office |
Network Development - Construction of By-Pass and Diversion Roads
Subic Bypass Road Extension (Naugsol - Tipo - Dinalupihan), Zambales
|
September 20, 2019 |
FY - 2019 |
WIN9F05921 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203770000
Project ID: P00354847LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction of Roads - P. Viana St., to Rizal St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane-Km
Unit Cost - Php 4,950.00/ lane-km
Allocation - Php 5.00 Million
TO:
Construction of Roads, P. Viana St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Constructon of Concrete Road - 0.626 Lane-km
Unit Cost - Php 7,907.35/ lane-km
Allocation - Php 5.00 Million
|
September 20, 2019 |
2019 |
WIN9C03687 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Malabon - Malimanga - Sinabacan Flood Control Phase II, Candelaria, Zambales |
September 20, 2019 |
2019 |
WIN9C03693 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Local Program - Buildings and Other Structures - Multipurpose /Facilities
Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects
Construction of Multi-Purpose Building at Brgy. Casabaan, Cabangan, Zambales |
September 20, 2019 |
FY - 2019 |
WIN9F05923 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203767000
Project ID: P00354844LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 3,960.00/ lane - km
Allocation - Php 4.00 Million
TO:
Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1- Construction of Concrete Road - 0.650 Lane - Km
Unit Cost - Php 6,092.31/ lane - km
Allocation - Php 4.00 Million |
September 20, 2019 |
2019 |
WIN9C03661 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Zambales 1st District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Slope Protection / Flood Control at Nayum River Control, Sta. 0+100 - Sta. 0+338.50, Sta. Cruz, Zambales |
September 20, 2019 |
FY - 2019 |
WIN9F05931 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203766000
Project ID: P00354843LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM;
Construction of Road, San nicolas St., & San Isidro St.,
to Sitio Dapi Bagong Silang, Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 4,950.00/ lane - km
Allocation - Php 5.00 Million
TO:
Construction of Road, San Nicolas Extension and
Sitio Dapi Bagong Silang, Barangay 9, Mamburao,
Occidental Mindoro
CW1 - Construction of Concrete Road - 0.800 Lane - Km
Unit Cost - Php 6,187.50/ lane - km
Allocation - Php 5.00 Million
|
September 20, 2019 |
2019 |
WIN9C03659 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Dimabuno, Dipaculao, Aurora |
September 20, 2019 |
2019 |
WIN9C03699 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads
Concreting of Dimanpudso to San Joaquin Road, Ma. Aurora, Aurora
|
September 20, 2019 |
2019 |
WIN9C03685 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Local Roads and Bridges - Local Roads
Concreting of Road, Brgy. Reserva, Baler, Aurora |
September 20, 2019 |
FY - 2019 |
WIN9F05930 |
FY - 2019 GAA DPWH Infra Program |
April 15, 2019 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. 300117203765000
Project ID: O00354842LZ
Local Program
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Road - 1.0 Lane-Km
Unit Cost - Php 3,960.00/ lane - km
Allocation Php 4.00 million
TO:
Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.468 Lane - Km
Unit Cost - Php 8,461.54/ lane - km
Allocation - Php 4.00 Million
|
September 20, 2019 |
2019 |
WIN9C03670 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Flood Control and Drainage - Drainage / Protection Works
Construction of Drainage Canal at Buton St., Brgy. Sabang, Baler, Aurora |
September 20, 2019 |
2019 |
WIN9C03666 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Network Development - Paving of Unpaved Roads - Secondary Roads
Nueva Ecija - Aurora Rd - K0172+097 - K0172+158, K0173+900 - K0174+357 |
September 20, 2019 |
2019 |
WIN9C03673 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Aurora District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Baler - Cemento via Dicaloyungan, K0231+640 - K0231+882, K0231+1000 - K0233+068, K0236+481 - K0237+000 |
September 20, 2019 |
2019 |
WIN9C03690 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0067+433 - K0067+571 |
September 20, 2019 |
2019 |
WIN9C03692 |
FY 2019 GAA |
April 15, 2019 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sn Simon - Baliwag Rd - K0059+-171 - K0059+024 |