Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
October 14, 2019 FY 2019 WIN9G02745 300116202022000 August 6, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300116202022000
Project ID: P00353956MN


Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Upgrading/ Concreting of NRJ Canunan-Guling-Payag-Mabuhay-Pongapong-Poblacion-Guipos-San Pablo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 3.26292 lane km
Unit Cost: P 9,010,000.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00
October 14, 2019 FY 2019 WIN9G02750 300117204958000 August 6, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300117204958000
Project ID: P00355560MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ Concreting of Sugbay Uno - Kagawasan - Poblacion - Bacayawan, Dimataling, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 2.0 lane km.
Unit Cost: P 4,950,000.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00
October 14, 2019 CY 2019 WIN9G02744 300104211319000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211319000
Project ID: P00351964MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Covered Court, Brgy. Limbayan, Pitogo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 2,475,000.00 / building
EAO: P 25,000.00
Allocation: P 2,500,000.00
October 14, 2019 FY 2019 WIN9G02746 300116202021000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300116202021000
Project ID: P00353955MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Opening/ Improvement of Barangay Road from Purok Gabi Tubo - Pait, Dumalinao to Barangay Bag-ong Misamis, San Pablo, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Concrete Road: 0.864 lane km
Unit Cost: P 6,240,000.00 /lane km
EAO: P 110,000.00
Allocation: P 5,500,000.00
October 14, 2019 FY 2019 WIN9G02749 300104211280000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211280000
Project ID: P00343668MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Multi-Purpose Building (Covered Court), Brgy. Guinicolalay Elementary School, Guinicolalay, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,584,000.00 /building
EAO: P 16,000.00
Allocation: P 1,600,000.00
October 14, 2019 FY 2019 WIN9G02743 300104211281000 August 5, 2019 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 300104211281000
Project ID: P00343669MN

Local Program - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program

Construction of Multi-Purpose Building (Hall), Bacayawan, Dimataling, Zamboanga del Sur

Physical Target:
CW-1 - Construction of Multi Purpose Building: 1 building
Unit Cost: P 1,980,000.00 /building
EAO: P 20,000.00
Allocation: P 2,000,000.00
October 14, 2019 FY 2019 WIN9G02772 320102100940000 August 19, 2019 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320102100940000
Project ID: P00322289MN

Local Program - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Tumaga River Basin, Tetuan Section, Zamboanga City

Physical Target:
CW-1 - Construction of Flood Mitigation Structure: 162.03 lm
Unit Cost: P 126,064.00 /lm
EAO: P 416,860.00
Allocation: P 20,843,000.00
October 14, 2019 FY 2019 WIN9G02766 300116202023000 August 22, 2019 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 300116202023000
Project ID: P00353957MN


Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Provincial Road Connecting Brgys. Canacan, Sininan. Banker, Tampilisan, Diampak and Shiolan, Kabasalan, Zamboanga Sibugay (Package 1)

Physical Target:
CW-1 - Construction of Concrete Road: 2.402 lane km
Unit Cost: P 12,239,800.00 /lane km
EAO: P 600,000.00
Allocation: P 30,000,000.00
October 11, 2019 2019 WIN9C03703 SR2019-06-003791 June 7, 2019 Region III Regional Office III
Network Development - Constructions of By-pass and Diversion Roads

Lubao-Guagua-Minalin-Sto. Tomas Road (Lubao-Guagua Section), Pampanga
October 11, 2019 2019 WIN9C03731 FY 2019 GAA April 15, 2019 Region III Regional Office III
Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

Dinadiawan-Ditawini Bypass Road leading to Tourism Sites/ Destinations, Brgy. Ditawini, Dinalungan, Aurora
October 11, 2019 2019 WIN9C03718 FY 2019 GAA (RA 11260) April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Baliwag-Candaba-Sta Ana Rd
K0058 + (-050) - K0058 + 042, K0059 + 060 - K0059 + 452,
K0061 + 951 - K0062 + 979, K0063 + 000 - K0063 + 041,
K0063 + 169 - K0063 + 210, K0063 + 236 - K0063 + 593,
K0063 + 757 - K0063 + 772
October 11, 2019 FY 2019 GAA WIN9G02775 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao City District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.322 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
Rehabilitation of Road, Brgy. Baliok, Davao City
Physical Target:
CW1: 2.064 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,500,000.00
CW1: P 9,405,000.00 (Construction of Concrete Road)
EAO: P 95,000.00
October 11, 2019 FY 2019 GAA WIN9G02779 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Composela Valley
Physical Target:
CW1: 2.320 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Brgy. Langtud, Laak, Compostela Valley
Physical Target:
CW1: 1.880 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
October 11, 2019 FY 2019 GAA WIN9G02778 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.520 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road Junction of 10th Division to Sitio Mahayahay, Tuboran, Mawab
Physical Target:
CW1: 1.180 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
October 11, 2019 2019 WIN9C03729 FY 2019 GAA (RA 11260) April 15, 2019 Region III Bulacan 1st District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads

Malolos City Circumferential Road, Bulacan (Sto. Cristo-Sto. Niño) By pass Road, Bulacan
October 11, 2019 2019 WIN9C03725 SR2019-06-004681 June 18, 2019 Region III Bulacan 1st District Engineering Office
National Roads and Bridges - National Roads

Construction of Guiguinto By-Pass Road (Sta. Rita Kabilang Bakood-Cutcut Road), Guiguinto, Bulacan
October 9, 2019 CY 2019 WIN9F05953 UACS No. 320101102838000 May 30, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102838000
Project ID: P00322721LZ

OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Box Culvert along Irasan Creek Brgy. Sto. Niñ, District I, Parañaque City
Physical Target – CW Construction of Drainage Structure 320.00 lineal meters
Unit Cost: P127,176.44 /l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems.
Construction of Box Culvert along Irasan Creek, Brgy. San Dionisio, District I, Parañaque City
Physical Target: CW1 – Construction of Drainage Structure 420.00 Lineal meters
Unit Cost: P96,896.33/l.m.
Allocation: P40,696,460.00
EAO – P830,540.00
Total: P41,527,000.00
WIN9F05953
October 9, 2019 FY 2019 WIN9B00797 300117204886000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204886000
Project ID: P00355519MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/concreting of Pang, Kalingalan Caluang-Lubhang, Tubig Putih, Luuk, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 2.86 lane km.
Unit Cost: P 16,873,465.03 /lane km
EAO: P 500,000.00
EXCESS: P 1,241,890.01
Allocation: P 50,000,000.00
October 9, 2019 FY 2019 WIN9B00794 300111200067000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200067000
Project ID: P00345284MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panamao, Sulu
K32+000.00 - K33+870.00

Physical Target:
CW-1 - Road Widening: 3.74 lane km
Unit Cost: P 18,049,999.45 /lane km
Physical Target:
ROW: 434.19 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,744.93
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00784 300111200042000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200042000
Project ID: P00345264MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/Concreting of Batu-Batu - Kulape Road, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.858 lane km
Unit Cost: P 32,988,928.21 /lane km
Physical Target:
ROW: 2,500 Sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,299,882.49
Excess: P 1,667,760.68
Allocation: P 100,000,000.00
October 9, 2019 FY 2019 WIN9B00785 300111200047000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200047000
Project ID: P00345273MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Continuation of Boleh Sallang Road, Sibutu, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.44 lane km
Unit Cost: P 15,776,384.34 /lane km
EAO: P 1,400,000.00
Excess: P 105,622.21
Allocation: P 40,000,000.00
October 9, 2019 FY 2019 WIN9B00802 300117204892000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204892000
Project ID: P00347602MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Rehabilitation of Poblacion Road, Maimbung, Sulu, K0+000.00 - K0+520.00

Physical Target:
CW-1 - Rehabilitation of Concrete Road: 1.04 lane km.
Unit Cost: P 13,891,984.63 /lane km
EAO: P 150,000.00
EXCESS : P 402,335.98
Allocaation : P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00780 300111200064000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200064000
Project ID: P00345281MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K26+000.00 - K27+880.00

Physical Target:
CW-1 - Road Widening: 3.76 lane km
Unit Cost: P 17,939,616.61 /lane km
Physical Target:
ROW: 620.63 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 236,853.55
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00800 300117204879000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204879000
Project ID: P00347597MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Duhul Kabbun Road, Maimbung, Sulu
K0+000.00 - K0+640.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.28 lane km.
Unit Cost: P 15,048,521.63 /lane km
EAO: P 200,000.00
EXCESS: P 537,892.31
Allocation: P 20,000,000.00
October 9, 2019 FY 2019 WIN9B00801 300111200044000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200044000
Project ID: P00345267MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/ concreting of Tawi-Tawi Circumferential Road, Parangan - Magsaggaw Section, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 2.72 lane km
Unit Cost: P 34,037,623.35 /lane km
Physical Target:
ROW: 9,500 Sq.m.
Unit Cost: P 1000.00 /sq.m.
EAO: P 3,850,000.00
Excess: P 4,067,664.48
Allocation: P 110,000,000.00
October 9, 2019 FY 2019 WIN9B00791 300111200043000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200043000
Project ID: P00345263MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction/ concreting of Sumangday - Baunu Garing Road, Panglima Sugala, Tawi-Tawi

Physical Target:
CW-1 - Construction of Concrete Road: 4.52 lane km
Unit Cost: P 20,429,137.21 /lane km
EAO: P 3,500,000.00
Excess: P 4,160,299.81
Allocation: P 100,000,000.00
October 9, 2019 FY 2019 WIN9B00798 300117204878000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204878000
Project ID: P00347596MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Darul Jambangan, Maimbung, Sulu, K0+000.00 - K0+580.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.16 lane km.
Unit Cost: P 12,482,197.88 /lane km
EAO: P 150,000.00
EXCESS: P 370,650.46
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00796 300111200056000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200056000
Project ID: P00345278MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening along Pahut - Sanga-Sanga - Batu-Batu Road with ROW, Bonggao, Tawi-Tawi

Physical Target:
CW-1 - Road Widening: 3.604 lane km
Unit Cost: P 18,930,439.28 /lane km
Physical Target:
ROW: 75,000 sq.m
Unit Cost: P 1,000.00 / sq.m.
EAO: P 5,250,000.00
Excess: P 1,524,696.80
Allocation: P 150,000,000.00
October 9, 2019 FY 2019 WIN9B00793 300111200041000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200041000
Project ID: P00345262MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Construction of Romandier - Camp Andres National Road, Panamao,Sulu, K31+600.00 - K32+600.00, K34+000.00 - K36+000.00, K39+000.00 - K39+110.00

Physical Target:
CW-1 - Construction of Concrete Road: 6.22 lane km
Unit Cost: P 17,886,367.25 /lane km
Physical Target:
ROW: 1,176.45 Sq.m.
Unit Cost: P 300.00 /sq.m.
EAO: P 3,893,862.15
Allocation: P 115,500,000.00
October 9, 2019 FY 2019 WIN9B00786 300117204882000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204882000
Project ID: P00355516MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road along Gulangan, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.09 lane km.
Unit Cost: P 13,261,122.50 /lane km
EAO: P 150,000.00
EXCESS: P 395,376.48
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00795 300117204890000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204890000
Project ID: P00355523MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/ concreting of Road, Tubig Samin, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.03 lane km.
Unit Cost: P 14,040,108.65 /lane km
EAO: P 150,000.00
EXCESS: P 388,688.09
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00782 300111200066000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200066000
Project ID: P00345283MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K30+000.00 - K31+850.00

Physical Target:
CW-1 - Road Widening: 3.70 lane km
Unit Cost: P 18,243,023.71 /lane km
Physical Target:
ROW: 461.14 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,362,471.57
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00787 300111200065000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200065000
Project ID: P00345282MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Romandier - Camp Andres - Tandu Bato National Road, Panglima Estino, Sulu
K28+000.00 - K29+820.00

Physical Target:
CW-1 - Road Widening: 3.64 lane km
Unit Cost: P 18,556,622.84 /lane km
Physical Target:
ROW: 299.26 sq.m
Unit Cost: P 300.00 /sq.m.
EAO: P 2,364,113.75
Allocation: P 70,000,000.00
October 9, 2019 FY 2019 WIN9B00790 300117204883000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204883000
Project ID: P00355517MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road along Pataw, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.08 lane km.
Unit Cost: P 13,377,147.04 /lane km
EAO: P 150,000.00
EXCESS: P 402,681.20
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00788 300117204880000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204880000
Project ID: P00355515MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Garid - Kan Mindus Road, Luuk, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.59 lane km.
Unit Cost: P 18,193,346.38 /lane km
EAO: P 300,000.00
EXCESS: P 772,579.26
Allocation: P 30,000,000.00
October 9, 2019 FY 2019 WIN9B00783 300117204884000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204884000
Project ID: P00347599MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Pandan Niog to Lumah Dapdap, Pangutaran, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 0.79 lane km.
Unit Cost: P 14,637,365.24 /lane km
EAO: P 120,000.00
EXCESS: P 316,481.46
Allocation: P 12,000,000.00
October 9, 2019 FY 2019 WIN9B00789 300111200063000 August 14, 2019 Region IX Regional Office IX
UACS No. 300111200063000
Project ID: P00345280MN


Local Program - National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Jolo - Taglibi - Tiptipon National Road, Panamao, Sulu
K22+000.00 - K24+790.00

Physical Target:
CW-1 - Road Widening: 5.58lane km
Unit Cost: P 18,041,161.49 /lane km
Physical Target:
ROW: 1,022.93 sq.m
Unit Cost: P 300.00 /sq.m
EAO: P 3,523,438.84
Allocation: P 104,500,000.00
October 9, 2019 FY 2019 WIN9B00792 300117204888000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204888000
Project ID: P00355521MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction/concreting of Road, Laum, Maimbung, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 0.95 lane km.
Unit Cost: P 15,230,395.22 /lane km
EAO: P 150,000.00
EXCESS: P 381,124.54
Allocation: P 15,000,000.00
October 9, 2019 FY 2019 WIN9B00781 300117204877000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204877000
Project ID: P00355514MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Brgy. Alu Layag-Layag Road, Parang, Sulu

Physical Target:
CW-1 - Construction of Concrete Road: 1.21 lane km.
Unit Cost: P 15,889,803.02 /lane km
EAO: P 200,000.00
EXCESS: P 573,338.35
Allocation: P 20,000,000.00
October 9, 2019 FY 2019 WIN9B00799 300117204876000 August 14, 2019 Region IX Regional Office IX
UACS No. 300117204876000
Project ID: P00347595MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Batu Ugis Road, Maimbung, Sulu
K0+000.00 - K0+610.00

Physical Target:
CW-1 - Construction of Concrete Road: 1.22 lane km.
Unit Cost: P 15,793,028.20 /lane km
EAO: P 200,000.00
EXCESS: P 532,505.59
Allocation: P 20,000,000.00
October 8, 2019 2019 WIN9C03719 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Slope Protection / Flood Control, Bangan Seawall, Sta. 0+365 - Sta. 0+455, Botolan, Zambales
October 8, 2019 2019 WIN9C03707 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Local Roads and Bridges - Local Roads

Construction of road leading to tourism port and facilities at freeport area, Mariveles, Bataan
October 8, 2019 2019 WIN9C03716 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Widening of Road - Naval St., Cupang North, City of Balanga, Bataan
October 8, 2019 2019 WIN9C03710 FY 2019 GAA April 15, 2019 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Elliptical Rd - K0165+(-060) - K0165+060, K0166+000 - K0166+200, K0166+400 - K0166+610
October 8, 2019 CY 2019 WIN9F05948 UACS No. 300116201499000 May 28, 2019 National Capital Region North Manila District Engineering Office
UACS No. 300116201499000
Project ID: P00345616LZ
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.796 lane km
Unit Cost: P17,236,180/ lane km
Allocation: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00

As Modified
Local Program
Local Roads – Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Asphalt Overlay with Concrete Reblocking along Dapitan Street from Chainage 704.0 to Chainage 1119.50. Manila City
Physical Target: CW1-Preventive Maintenance: Asphalt Overlay L=0.831 lane km
Unit Cost: P16,510,228/ lane km
Estimated Cost: P13,720,000.00
EAO – 280,000.00
Total: P14,000,000.00
WIN9F05948
October 8, 2019 2019 WIN9C03711 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Roads Puroks 4-6 San Antonio, Lubao, Pampanga
October 8, 2019 2019 WIN9C03722 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
National Roads and Bridges - National Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects

Road Widening Jose Abad Santos Avenue (JASA) - K0093+956.20 - K0094+433.61, Lubao, Pampanga
October 3, 2019 CY 2019 WIN9F05941 UACS No. 320101102899000 June 13, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102899000
Project ID: P00320509LZ

OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga PH4, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System at Gawad Kalinga, Brgy. Marcelo Green, Parañaque City, Metro Manila
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 687 Lineal Meters
Unit Cost (P’000) – P21.39738/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05941
October 3, 2019 CY 2019 WIN9F05947 UACS No. 320101102855000 May 14, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102855000
Project ID: P00322730LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase IV), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117 Lineal meters
Unit Cost (P’000) – P167.52137/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement /Sheet Piling along Coastal Service Road (Phase V), Parañaque City, Metro Manila
Physical Target – CW1 Construction of Flood Mitigation Structure 117.60 Lineal meters
Unit Cost (P’000) – P166.6667/l.m.
Allocation (P’000) – P19,600.00
EAO (Allocation P’000) – P400.00
Total – P20,000,000.00
WIN9F05947
October 3, 2019 CY 2019 WIN9F0552 UACS No. 320101102896000 June 21, 2019 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 320101102896000
Project ID: P00320496LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along the Mañalac Avenue and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 600 Lineal Meters
Unit Cost (P’000) – P24,500/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00

As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Upgrading of Drainage System along Dungon St. and its Vicinity, Brgy. San Martin de Porres, Parañaque City
Physical Target – CW1-Rehabilitation/Major Repair of Drainage Structure 585 Lineal Meters
Unit Cost (P’000) – P25,128/l.m.
Allocation (P’000) – P14,700.00
EAO (Allocation P’000) – P300.00
Total – P15,000,000.00
WIN9F05952
October 3, 2019 CY 2019 WIN9F05945 UACS No. 310112100070000 June 25, 2019 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 310112100070000
Project ID: P00300002LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0013+620.50 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 523.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Allocation (P’000) – P9,800.00
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – 10,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
Gov W Pascual K0014+084.5 – K0014+292
Physical Target – CW1 – Construction of Drainage Structure along Road L= 207.5 l.m.
Unit Cost (P’000) – P18,720.00/lineal meter
Physical Target – P47,202.00 lineal meter
EAO (Allocation P’000) – P200.00
Total (Allocation P’000) – P9,794.447
Excess (Allocation P’000) – P5.553
Total (Allocation P’000) – 10,000.00
WIN9F05945
October 3, 2019 CY 2019 WIN9F05939 UACS No. 320101102904000 June 17, 2019 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101102904000
Project ID: P00320523LZ
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Ramitex Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 0.00 Lineal Meter
Unit Cost (P’000) – P ---/Lineal Meter
Allocation – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M

As Modified
OO2: Protect Lives and Properties Against Major Flood
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Canal (Open Channel) along Bragados Creek, Brgy. Bagbaguin, Valenzuela City
Physical Target – CW1-Construction of Drainage Structure 390.00 Lineal Meter
Unit Cost (P’000) – P 87.95/Lineal Meter
Estimated – P34.300 M
EAO (Allocation) – P0.700 M
Total – P 35.000 M
WIN9F05939
October 3, 2019 2019 WIN9G02767 FY2019 GAA RA 11260 April 29, 2019 Region XIII Regional Office XIII
UACS No. 310201100362000
Project ID: P00303789MN

OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1175 + 605 - K1177 + 340, K1183 + 815 - K1185 + 194

CW1: Road Widening 6.238 lane km
UNIT COST: PHP 17.01667M/lane km
ALLOCATION: PHP 106.150M

EAO: PHP 3.850M

TOTAL: PHP 110.0M

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1175 + 394 - K1176 + 960

CW1: Road Widening 3.132 lane km
UNIT COST: PHP 33.89208M/lane km
ALLOCATION: PHP 106.150M

EAO: PHP 3.850M

TOTAL: PHP 110.0M
October 3, 2019 2019 WIN9G02765 FY2019 GAA RA 11260 April 29, 2019 Region XIII Regional Office XIII
UACS No. 310108100204000
Project ID: P00304404MN

OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1188+589.6 - K1188+727.6

CW1: Construction of Road Slope Protection Structure
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M

TO:

Surigao-Davao Coastal Rd - K1188+580 - K1188+740

CW1: Construction of Road Slope Protection Structure/ 6,450/SQ.M
UNIT COST: PHP 18.215T
ALLOCATION: PHP 117.48682M
EAO: PHP 4.26118M
TOTAL: PHP 121.748M
October 3, 2019 2019 WIN9G02773 FY2019 GAA RA 11260 April 29, 2019 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. 310204100602000
Project ID: P00303977MN

OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads

FROM:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

CW1: Construction of Concrete Road / 3.164 lane km
UNIT COST: PHP 16.88902M / lane km
ALLOCATION: PHP 53.436875M
EAO: PHP 1.938125M
TOTAL: PHP 55.375M

TO:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

CW1: Construction of Concrete Road / 0.414 lane km
UNIT COST: PHP 39.54676M / lane km
ALLOCATION: PHP 16.372359M

CW2: Construction of Road Slope Protection Structure / 1,031.15 sq.m
UNIT COST: PHP 35.945T / sq.m
ALLOCATION: PHP 37.064516M

EAO: PHP 1.938125M
TOTAL: PHP 55.375M
October 2, 2019 2019 WIN9C03541 FY 2019 GAA April 29, 2019 Region V Camarines Norte District Engineering Office
UACS No. 320102100913000
Project ID: P00323026LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Brgy. Mantigbi, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River - Construction of Labo River Flood Control Project, Vinzons, Camarines Norte
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 70.0 Ln.m.

October 2, 2019 2019 WIN9C03546 FY 2019 GAA April 29, 2019 Region V Camarines Sur 1st District Engineering Office
UACS No. 320101103575000
Project ID: P00321229LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Yabo River Revetment, (North Villazar and Sooc Section), Sipocot and Lupi, Camarines Sur
Allocation: Php 49,212,000
Physical Target: CW1 - Construction of Revetment - 624.0 Ln.m.
October 2, 2019 2019 WIN9C03527 FY 2019 GAA April 29, 2019 Region V Camarines Sur 1st District Engineering Office
UACS No. 310107100087000
Project ID: P00300377LZ

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 040 - K0312 + 067, K0312 + 383 - K0312 + 514, K0327 + 465 - K0327 + 480, K0329 +415 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,750.0 Sq.M.

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Rolando R Andaya Highway - K0312 + 033 - K0312 + 080, K0312 + 378 - K0312 + 555, K0327 + 465 - K0327 + 480, K0329 +405 - K0329 + 522
Allocation: Php 32,000,000
Physical Target: CW1 - Construction of Road Slope Protection Structure - 2,935.0 Sq.M.
October 2, 2019 2019 WIN9C03609 FY 2019 GAA April 29, 2019 Region V Albay 3rd Engineering Office
UACS No. 310105100263000
Project ID: P00301428LZ

FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 059 - K0522 + 153, K0522 + 805 - K0523 + 000, K0530 + 561 - K0530 + 611, K0530 + 850 - K0530 + 900, K0532 + 000 - K0532 + 100, K0534 + 780 - K0535 + 160, K0538 + 367 - K0538 + 557
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 2.54 Ln.Km.

TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Ligao-Pio Duran Rd - K0520 + 930 - K0520 + 1130, K0522 + 805 - K0523 + 000, K0530 + 850 - K0530 + 900, K0534 + 780 - K0535 + 160
Allocation: Php 14,306,000
Physical Target: CW1 - Reconstruction to Concrete Pavement - 1.672 Ln.Km.
October 2, 2019 2019 WIN9C03561 FY 2019 GAA April 29, 2019 Region V Sorsogon 2nd District Engineering Office
UACS No. 320101103625000
Project ID: P00321289LZ

FROM:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon City
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m.

TO:
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure, Upstream Both Sides, Brgy. Fabrica, Bulan, Sorsogon
Allocation: Php 25,000,000
Physical Target: CW1 - Construction of Flood Mitigation Structure - 179.0 Ln.m.
October 2, 2019 2019 WIN9C03534 FY 2019 GAA April 28, 2019 Region V Masbate 1st District Engineering Office
UACS No. 300116201862000
Project ID: P00353905LZ

FROM:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target: CW1 - Construction of Concrete Road - 0.40Lane KM

TO:
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Concrete Road, Poblacion-Morocborocan-Guinhadap Road leading to San Miguel Island Dive Site and Lighthouse, Halea Nature Park, Paborito Rock Garden, Danao Beach, Lapuslapus Blue Lagoon, Tres Marias Island, Guilatayan Bird Sanctuary, Boronbangkaso Rock Formation, Brgy. Guinhadap, Monreal, Masbate
Allocation: Php 10,000,000
Physical Target:
CW1 - Construction of Concrete Road - 0.120Lane KM
CW2 - Construction of Slope Protection Structure - 150 Sq.M.
October 2, 2019 2019 WIN9G02752 320102100665000 August 15, 2019 Region IX Regional Office IX
UACS No. 320102100665000
Project ID: P00321933MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure, Salug Daku Flood Control, Mahayag, Zamboanga del Sur
Sta. 1+540.00 - Sta. 2+092.00,
Sta. 2+092.24 - Sta. 2+148.00

Physical Target: 608.00 ln.m.
Unit Cost: P161,891.45/ln.m.
EAO: P3,570,000.00
Allocation: P 102,000,000.00
October 2, 2019 2019 WIN9C03656 FY 2019 GAA April 29, 2019 Region V Camarines Sur 4th District Engineering Office
UACS No. 300106200214000
Project ID: P00353270LZ

FROM:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Pili, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 1.0 Square Meter.

TO:
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Disaster Mitigation Structure using Rock Fall Technology along Pili-Tigaon-Albay and Lagonoy-Presentacion Boundary Roads, Sagñay and Presentacion, Camarines Sur
Allocation: Php 20,000,000
Physical Target: CW1 - Construction of Slope Protection Structure - 861.90 Square Meter.
October 2, 2019 2019 WIN9G02751 310204100495000 August 15, 2019 Region IX Regional Office IX
UACS No. 310204100495000
Project ID: P00303807MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-pass and Diversion Roads

Zamboanga City Diversion Road, (Cabaluay - Zambowood - Mampang Section), Zamboanga City

Physical Target: 7.38 lane km.
Unit Cost: P 15,001,587.44/lane km.
ROW Acquisition: 16,666.66 sq.m.
Unit Cost: P 300/sq.m.
EAO: P 3,874,910.04
Excess: P 413,374.64
Allocation: P 120,000,000.00
October 2, 2019 2019 WIN9G02754 320102100663000 August 15, 2019 Region IX Regional Office IX
UACS No. 320102100663000
Project ID: P00322966MN

OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Dicayo River (Downstream), Barangay Daanglungsod, Katipunan, Zamboanga del Norte

Physical Target: 428.00 sq.m.
Unit Cost: P 172,095.81/sq.m.
EAO: P 2,577,995.17
Allocation: P 76,235,000.00
October 2, 2019 2019 WIN9G02715 310108100273000 July 23, 2019 Region IX Zamboanga del Norte 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Rizal - Dakak - Dapitan Coastal Loop National Road
K1804+780 - K1805+280,
K1817+200 - K1817+282

Physical Target: 5,523.24 sq.m.
Unit Cost: P 3,548.64/sq.m.
EAO: P 400,000.00
Allocation: P 20,000,000.00
October 1, 2019 FY 2019 GAA WIN9G02735 FY 2019 GAA RA 11260 January 1, 2019 Region XI Regional Office XI
FROM: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 5.240 Lane Km (Construction of Concrete Road)
ROW: 52,400.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 142,560,000.00 (Construction of Concrete Road)
ROW: P 6,000,000.00 (ROW Acquisition)
EAO: P 1,440,000.00

TO: Local Program - National Roads and Bridges - National Roads
Local Infrastructure Program
Montevista-DNAS Road (DNAS-Laak), Compostela Valley
Physical Target:
CW1: 6.08082 Lane Km (Road Widening)
CW2: 1,425.28 sq. m. (Construction of Road Slope Protection)
ROW: 70,841,00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 103,077,000.00 (Road Widening)
CW2: P 30,573,000.00 (Construction of Road Slope Protection)
ROW: P 15,000,000.00 (ROW Acquisition)
EAO: P 1,350,000.00
October 1, 2019 FY 2019 GAA WIN9G02762 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 0.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Mawab-Maragusan Road to Brgy. Limbo to Brgy. Panangan, Maco, Compostela Valley
Physical Target:
CW1: 1.505 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
October 1, 2019 FY 2019 GAA WIN9G02768 FY 2019 GAA RA 11260 January 1, 2019 Region XI Davao de Oro 1st District Engineering Office
FROM: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 0.740 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Opening of Road, Purok 5, Datu Davao, Laak, Compostela Valley
Physical Target:
CW1: 3.100 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Gravel Road)
EAO: P 200,000.00
October 1, 2019 2019 WIN9C03704 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation / Improvement of Sapang Are Creek, Sta. 0+144.70 - Sta. 0+165.30, Sta. 1+305 - Sta. 1+405.30 at Apalit, Pampanga
October 1, 2019 2019 WIN9C03708 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin Tail Dike Section), K0068+033 - K0069+000, K0070+800 - K0071+246, K0071+292 - K0071+325, K0071+375 - K0071+387.50, K0071+425.70 - K0071+437.7, K0071+618.4 - K0071+637.4, K0071+930.5 - K0071+963.8, K0071+976.5 - K0071+995
October 1, 2019 2019 WIN9C03709 FY 2019 GAA April 15, 2019 Region III Nueva Ecija 1st District Engineering Office
Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building (Covered Court, Mini Gym with Stage), Brgy. Namulandayan, Lupao, Nueva Ecija
September 23, 2019 2019 WIN9C03681 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect) - K0072+098 - K0072+873, K0073+344 - K0074+458.70
September 23, 2019 2019 WIN9C03682 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0071+894 - K0072+964
September 23, 2019 2019 WIN9C03678 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Candaba - Sn Miguel Rd - K0080+000 - K0080+133, K0080+806 - K0080+930, K0081+057 - K0081+228, K0081+403 - K0081+705, K0083+000 - K0083+252, K0084+000 - K0084+083
September 23, 2019 2019 WIN9C03689 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bahay Pare - Sn Luis - Sto. Domingo Rd - K0065+122 - K0065+181, K0065+610 - K0065+796, K0065+808 - K0066+109
September 23, 2019 2019 WIN9C03684 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation / Improvement of Slope Protection along Sto. Tomas - Minalin - Macabebe Road (Pasac - Culcul Portion), Minalin, Pampanga
September 23, 2019 2019 WIN9C03683 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Tulauc - Sto. Domingo Rd - K0060+(-546) - K0063+906
September 20, 2019 2019 WIN9C03665 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Pulilan - Calumpit Rd - K0043+455 - K0044+000, K0045+000 - K0045+800, K0046+500 - K0047+550, K0047+880.80 - K0048+150, K0049+(-316) - K0049+397, K0049+683 - K0049+729, K0050+370 - K0050+660, K0051+170 - K0051+350, K0051+470 - K0051+500, K0051+580 - K0051+730, K0052+060 - K0052+135, K0052+360 - K0052+400, K0052+760 - K0052+800
September 20, 2019 2019 WIN9C03677 FY 2019 GAA April 15, 2019 Region III Bulacan 1st District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Old Cagayan Valley Rd - K0043+-855 - K0043+-704
September 20, 2019 FY - 2019 WIN9F05920 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Marinduque District Engineering Office
UACS No. 300112200047000
Project ID: P00353633LZ

Local Program

National Roads and Bridges - National Roads -
Local Infrastructure Program

FROM:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+060 - K0061+240,
K0061+840 - K0061+900,
Torrijos, Marinduque
Cw1 - Construction of Road Slope Protection Structure -
3,686.00 sq.m.
Unit Cost - Php 25.784/ sq.m.
Allocation - Php 96.00Million

TO:

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide
Marinduque Circumferential Road,
K0061+000 - K0062+047,
Torrijos, Marinduque
CW1 - Construction of Road Slope Protection Structure -
4,360.00 sq.m.
Unit Cost - Php 21.798/ sq.m.
Allocation - Php 96.00 Million
September 20, 2019 2019 WIN9C03669 FY 2019 GAA April 15, 2019 Region III Bataan 1st District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation / Major Repair of Flood Control Structures

Rehabilitation of Flood Control Structures along Pagalanggang River (Tucop Section), Sta. 0+118 - Sta. 0+332.40, Brgy. Tucop, Dinalupihan, Bataan
September 20, 2019 2019 WIN9C03686 FY 2019 GAA April 15, 2019 Region III Pampanga 2nd District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program

Upgrading / Concreting of Road w/ drainage canal at San Miguel (Villa Rosemarie), Guagua, Pampanga
September 20, 2019 2019 WIN9C03657 FY 2019 GAA April 15, 2019 Region III Bulacan 2nd District Engineering Office
Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Replacement of Dulong Bayan Bridge, City of San Jose Del Monte, Bulacan
September 20, 2019 2019 WIN9C03697 FY 2019 GAA April 15, 2019 Region III Zambales 2nd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads

Subic Bypass Road Extension (Naugsol - Tipo - Dinalupihan), Zambales
September 20, 2019 FY - 2019 WIN9F05921 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203770000
Project ID: P00354847LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Construction of Roads - P. Viana St., to Rizal St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane-Km
Unit Cost - Php 4,950.00/ lane-km
Allocation - Php 5.00 Million

TO:

Construction of Roads, P. Viana St., Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Constructon of Concrete Road - 0.626 Lane-km
Unit Cost - Php 7,907.35/ lane-km
Allocation - Php 5.00 Million
September 20, 2019 2019 WIN9C03687 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Malabon - Malimanga - Sinabacan Flood Control Phase II, Candelaria, Zambales
September 20, 2019 2019 WIN9C03693 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Local Program - Buildings and Other Structures - Multipurpose /Facilities

Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects

Construction of Multi-Purpose Building at Brgy. Casabaan, Cabangan, Zambales
September 20, 2019 FY - 2019 WIN9F05923 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203767000
Project ID: P00354844LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 3,960.00/ lane - km
Allocation - Php 4.00 Million

TO:

Construction of Road, Sitio Bagong Silang to Dapi Proper &
Deped Payompon, Barangay 9, Mamburao, Occidental Mindoro
CW1- Construction of Concrete Road - 0.650 Lane - Km
Unit Cost - Php 6,092.31/ lane - km
Allocation - Php 4.00 Million
September 20, 2019 2019 WIN9C03661 FY 2019 GAA April 15, 2019 Region III Zambales 1st District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Slope Protection / Flood Control at Nayum River Control, Sta. 0+100 - Sta. 0+338.50, Sta. Cruz, Zambales
September 20, 2019 FY - 2019 WIN9F05931 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203766000
Project ID: P00354843LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM;

Construction of Road, San nicolas St., & San Isidro St.,
to Sitio Dapi Bagong Silang, Barangay 9,
Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 1.0 Lane - Km
Unit Cost - Php 4,950.00/ lane - km
Allocation - Php 5.00 Million

TO:

Construction of Road, San Nicolas Extension and
Sitio Dapi Bagong Silang, Barangay 9, Mamburao,
Occidental Mindoro
CW1 - Construction of Concrete Road - 0.800 Lane - Km
Unit Cost - Php 6,187.50/ lane - km
Allocation - Php 5.00 Million
September 20, 2019 2019 WIN9C03659 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Road, Brgy. Dimabuno, Dipaculao, Aurora
September 20, 2019 2019 WIN9C03699 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Dimanpudso to San Joaquin Road, Ma. Aurora, Aurora

September 20, 2019 2019 WIN9C03685 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Local Roads and Bridges - Local Roads

Concreting of Road, Brgy. Reserva, Baler, Aurora
September 20, 2019 FY - 2019 WIN9F05930 FY - 2019 GAA DPWH Infra Program April 15, 2019 Region IV-B Mindoro Occidental District Engineering Office
UACS No. 300117203765000
Project ID: O00354842LZ

Local Program

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:

Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Road - 1.0 Lane-Km
Unit Cost - Php 3,960.00/ lane - km
Allocation Php 4.00 million

TO:

Construction of Road, F. Alcaide to Capitol Road,
Barangay 9, Mamburao, Occidental Mindoro
CW1 - Construction of Concrete Road - 0.468 Lane - Km
Unit Cost - Php 8,461.54/ lane - km
Allocation - Php 4.00 Million

September 20, 2019 2019 WIN9C03670 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Flood Control and Drainage - Drainage / Protection Works

Construction of Drainage Canal at Buton St., Brgy. Sabang, Baler, Aurora
September 20, 2019 2019 WIN9C03666 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Network Development - Paving of Unpaved Roads - Secondary Roads

Nueva Ecija - Aurora Rd - K0172+097 - K0172+158, K0173+900 - K0174+357
September 20, 2019 2019 WIN9C03673 FY 2019 GAA April 15, 2019 Region III Aurora District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Baler - Cemento via Dicaloyungan, K0231+640 - K0231+882, K0231+1000 - K0233+068, K0236+481 - K0237+000
September 20, 2019 2019 WIN9C03690 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0067+433 - K0067+571
September 20, 2019 2019 WIN9C03692 FY 2019 GAA April 15, 2019 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Simon - Baliwag Rd - K0059+-171 - K0059+024

Pages