May 26, 2021 |
2021 |
WIN1C03804 |
GAA 2021 |
May 19, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Cal - (S04030LZ) Chainage 0 - Chainage 1250;
Physical Target: CW1: 1.25 Lane Km;
Allocation= Php 25,000,000
To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Road (S04030LZ)- Chainage 0 - Chainage 830;
Physical Target: CW1: 1.66 Lane Km;
Allocation= Php 25,000,000
|
May 26, 2021 |
2021 |
WIN1F06165 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0906 + 941 – K0907 + 173
Physical Target: Allocation:
CW1-Road Widening : 0.396 Lane Km P 8.036 M
EAO P 0.164 M
Total P 8.200 M
AS MODIFIED:
Daang Maharlika (LT) – K0906 + 941 – K0907 + 173
Physical Target: Allocation:
CW1-Road Widening : 0.466 Lane Km P 8.036 M
EAO P 0.164 M
Total P 8.200 M
|
May 26, 2021 |
2021 |
WIN1F06164 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.110 Lane Km
EAO P 0.050020 M
Total P 2.501 M
AS MODIFIED:
Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55, (S00255LT) K0908+997 – K0909+030
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.137 Lane Km
EAO P 0.050020 M
Total P 2.501 M
|
May 26, 2021 |
2021 |
WIN1F06177 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Road, Rueda Ext. - Brgy. Rizal, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M
Total P 43.00 M
AS MODIFIED:
Construction of Road, Rueda Ext. - Brgy. Rizal I, Calbayog City, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M
Total P 43.00 M
|
May 26, 2021 |
2021 |
WIN1C03843 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation/Improvement of Eroded Pampanga River Bank, Sta. 0+000 - Sta. 0+100.82, Cansinala, Apalit, Pampanga |
May 26, 2021 |
2021 |
WIN1C03834 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd - K0092+979 - K0094+000, K0095+000 - K0095+210.50 |
May 26, 2021 |
2021 |
WIN1C03828 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Spurdikes along Pasig-Potrero River (Phase I), Sta. 0+000 - Sta. 0+264, Porac, Pampanga |
May 25, 2021 |
2021 |
WIN1F06131 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 835
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 3.4153 M
Road : 435.68 Lineal Meters
EAO P 0.0697 M
Total P 3.485 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 732
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 3.4153 M
Road : 441.00 Lineal Meters
EAO P 0.0697 M
Total P 3.485 M
|
May 25, 2021 |
2021 |
WIN1F06133 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0965 + 200, K0980 + 981, K0984 + 300, K0994 + 300
Physical Target: Allocation:
CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 48.00 Lineal Meters
EAO P 0.116 M
Total P 5.800 M
AS MODIFIED:
Daang Maharlika (LT) - K0975 + 200, K0980 + 981, K0984 + 300, K0994 + 300
Physical Target: Allocation:
CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 71.80 Lineal Meters
EAO P 0.116 M
Total P 5.800 M
|
May 25, 2021 |
2021 |
WIN1F06132 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang maharlika (LT) – K0974+000 – K0974+247
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 9.800 M
: 0.494 Lane Km
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (LT) – K0974+000 – K0974+716
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 9.800 M
: 1.432 Lane Km
EAO P 0.200 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06138 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0992 + 306.70 - K0992 + 528.70
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 0.444 Lane Km
EAO P 0.20174 M
Total P 10.087 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0992 + 306.70 - K0993 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 1.402 Lane Km
EAO P 0.20174 M
Total P 10.087 M
|
May 25, 2021 |
2021 |
WIN1F06075 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 1.318 Lane Km
EAO P 0.5928 M
Total P 29.64 M
AS MODIFIED:
Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140, K1083+336-K1083+747
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 2.14 Lane Km
EAO P 0.5928 M
Total P 29.64 M
|
May 25, 2021 |
2021 |
WIN1F06109 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1100 + 087 - K1100+177
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 0.00 square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K1006 + 801 - K1006+901
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3000 square meters
EAO P 1.00 M
Total P 50.00 M
|
May 25, 2021 |
2021 |
WIN1F06130 |
GAA FY 2021 |
January 16, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Improvement of Liloan - San Ricardo Road (S00218LT) K1056+-896 - K1070+000, Maasin City, Southern Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 59.40 M
: 5.383 Lane Km
EAO P 0.60 M
Total P 60.00 M
AS MODIFIED:
Improvement of Liloan - San Ricardo Road (S00218LT) K1078 + 000 - K1078 + 823, K1078 + 839 - K1079 + 676, K1079 + 711 - K1082 + 000 ,K1083 + 200 - K1084 + 415, K1084 + 460 -K1084 + 759, K1084 + 774 - K1086 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Concrete Road P 59.40 M
: 13.380 Lane Km
EAO P 0.60 M
Total P 60.00 M
|
May 25, 2021 |
2021 |
WIN1F06099 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0802 + 000 - K0802 + 880
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0803 + 110 - K0803 + 990
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km
EAO P 0.20 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06096 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd-K0846+820-K0846+848, K0854+100-K0854+123
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M
Total P 20.00 M
AS MODIFIED:
Wright-Taft-Borongan Rd- K0846 + 820 - K0846 + 852, K0847 + 950 - K0848 + 006, K0851 + 905 - K0851 + 965, K0854 + 159 - K0854 + 183
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M
Total P 20.00 M
|
May 25, 2021 |
2021 |
WIN1F06176 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Basey-Marabut-Pinamitinan Rd - K0937 + 808 - K0942 + 643
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 9.518 Lane Km
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Basey-Marabut-Pinamitinan Rd-K0937 + 808 - K0940 + 100
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 4.536 Lane Km
EAO P 1.925 M
Total P 55.00 M
|
May 25, 2021 |
2021 |
WIN1F06171 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085, K1042 + 285 - K1045 + 000
Physical Target: Allocation:
CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 9.336 Lane Km
EAO P 1.872675 M
Total P 53.505 M
AS MODIFIED:
Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085
Physical Target: Allocation:
CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 4.016 Lane Km
EAO P 1.872675 M
Total P 53.505 M
|
May 25, 2021 |
2021 |
WIN1C03809 |
SR2021-02-004929 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Calupaan Flood Control, Sta. 6+044 - Sta. 6+758 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000
To: Construction of Calupaan Flood Control, Sta. 40 + 975 - Sta. 41 + 668 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000
|
May 25, 2021 |
2021 |
WIN1C03798 |
SR2021-02-004932 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Calimag Flood Control, Sta. 5+328 - Sta. 5+708 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Calimag Flood Control, Sta. 5 + 823 - Sta. 6 + 132 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000
|
May 25, 2021 |
2021 |
WIN1C03794 |
SR2021-02-00437 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of San Juan Flood Control, Sta. 2+340 - Sta. 3+280 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000
To: Construction of San Juan Flood Control, Sta. 38 + 023 - Sta. 38 + 792 (LS), Alfonso Lista, Ifugao ;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000
|
May 25, 2021 |
2021 |
WIN1F06102 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) K0917+000-K0917+401
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road : 802 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Daang Maharlika (LT) K0917+000-K0917+280
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 9.800 M
Road : 560 Lineal Meters
EAO P 0.200 M
Total P 10.00 M
|
May 25, 2021 |
2021 |
WIN1F06173 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 363
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.538 Lane Km
EAO P 0.17630 M
Total P 8.815 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 184
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.180 Lane Km
EAO P 0.17630 M
Total P 8.815 M |
May 25, 2021 |
2021 |
WIN1C03815 |
SR2021-02-002709 |
February 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0343 + 734 - K0343 + 751, K0343 + 919 - K0343 + 985, K0344 + 485 - K0344 + 501, K0344 + 649 - K0344 + 677, K0344 + 806 - K0344 + 829, K0345 + 025 - K0345 + 048, K0345 + 542 - K0345 + 565, K0345 + 775 - K0345 + 793, K0346 + 078 - K0346 + 121, K0346 + 564 - K0346 + 581, K0346 + 630 - K0346 + 695, K0347 + 830 - K0347 + 862, K0348 + 000 - K0348 + 100, K0349 + 044 - K0349 + 063, K0349 + 210 - K0349 + 230, K0350 + 548 - K0350 + 570, K0351 + 892 - K0351 + 918, K0353 + 044 - K0353 + 085, K0354 + 698 - K0354 + 758, K0361 + 870 - K0361 + 1000;
Physical Target: CW1 : 8,897.5 Square meters;
Allocation= Php 109,081,000
To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0347+940 - K0348+000, K0361+715 - K0361+850;
Physical Target: CW1 : 5,124.83 Square meters;
Allocation= Php 109,081,000
|
May 25, 2021 |
2021 |
WIN1C03808 |
SR2021-02-004939 |
February 21, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Benguet;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000
To: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Kalinga ;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000
|
May 25, 2021 |
2021 |
WIN1C03799 |
GAA 2021 |
May 19, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-Itogon Rd - K0260 + 724 - K0261 + 000;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 20,000,0000
To: Baguio-Itogon Rd - K0260 + 800 - K0260+954;
Physical Target: CW1 : 8,186 Square meters;
Allocation= Php 20,000,0000
|
May 21, 2021 |
2021 |
WIN1F06095 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Pulak-Sta Fe Rd - K0911 + 988 - K0912 + 847
Physical Target: Allocation:
CW1-Road Widening: 1.720 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Tigbao-Pulak-Sta Fe Rd - K0912 + 640 - K0913 + 047
Physical Target: Allocation:
CW1-Road Widening: 0.814 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06061 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd-K0917+(-247)-K0917+407
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 10.25472 M
along Road : 1,308 lineal meters
EAO P 0.20928 M
Total P 10.464 M
AS MODIFIED:
Tacloban-Baybay South Rd-K0917+088.5 + K0917+407
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 10.25472 M
along Road : 590 lineal meters
EAO P 0.20928 M
Total P 10.464 M
|
May 21, 2021 |
2021 |
WIN1F06089 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0939 + 088
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.624 Lane Km
EAO P 0.18624 M
Total P 9.312 M
AS MODIFIED:
Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0938 + 854
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.164 Lane Km
EAO P 0.18624 M
Total P 9.312 M
|
May 21, 2021 |
2021 |
WIN1F06067 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Allen - Catarman Rd - K0700+214 - K0701+367
Physical Target: Allocation:
CW1-Road Widening: 2.308 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Allen - Catarman Rd - K0700+214 - K0700+714
Physical Target: Allocation:
CW1-Road Widening: 1.00 Lane Km P 14.700 M
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06085 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0687 + 964 - K0688 + 333
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 18.591 M
: 0.748 Lane Km
EAO P 0.379 M
Total P 18.970 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0688 + 092 – K0688 + 743
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 18.591 M
: 1.302 Lane Km
EAO P 0.379 M
Total P 18.970 M
|
May 21, 2021 |
2021 |
WIN1F06101 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Allen-Catarman Rd - K0741+300 - K0741+630
Physical Target: Allocation:
CW1-Reconstruction Concrete Pavement : P 14.700 M
0.660 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Allen-Catarman Rd - K0741+815 - K0742+195
Physical Target: Allocation:
CW1-Reconstruction Concrete Pavement : P 14.700 M
0.778 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
May 21, 2021 |
2021 |
WIN1F06068 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman - Laoang Rd - K0752+000 - K0752+200
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.400 Lane Km
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Catarman - Laoang Rd - K0763+883.12 - K0764+196.50
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.633 Lane Km
EAO P 0.200 M
Total P 10.00 M
|
May 21, 2021 |
2021 |
WIN1F06127 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0961+200 - K0961+863, K0961+948 - K0962+271
Physical Target: Allocation:
CW1-Road Widening:1.976 Lane Km P 29.40 M
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0961+200 - K0961+858, K0961+953 - K0962+548
Physical Target: Allocation:
CW1-Road Widening:2.51 Lane Km P 24.432 M
CW2-Construction of Road Slope Protection P 4.968 M
Structure: 1,080.00 Square meters
EAO P 0.60 M
Total P 30.00 M
|
May 21, 2021 |
2021 |
WIN1F06128 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Abuyog-Silago Rd - K0968+380 - K0968+968
Physical Target: Allocation:
CW1-Road Widening: 1.176 Lane Km P 9.80 M
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Abuyog-Silago Rd - K0968+341 - K0968+968
Physical Target: Allocation:
CW1-Road Widening: 1.254 Lane Km P 9.80 M
EAO P 0.200 M
Total P 10.00 M
|
May 20, 2021 |
2021 |
WIN1F06108 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED :
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320,
K0988 + 780 – K0988 + 880, K0993 + 920 – K0994 + 090
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,540.80 square meters
EAO P 3.255 M
Total P 93.00 M |
May 20, 2021 |
2021 |
WIN1F06103 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Catarman-Calbayog Rd - K0751 + 450 - K0751 + 700
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 91.675 M
Structure: 6,333.333 square meters
EAO P 3.325 M
Total P 95.00 M
AS MODIFIED :
Catarman-Calbayog Rd- K0751 + 000 - K0751 + 840, K0778 + 690 - K0779 + 100
Physical Target: Allocation:
CW1-Road Widening: 2.344 Lane Km P 36.616145 M
CW2-Construction of Road Slope Protection P 52.058855 M
Structure: 3,100.64 square meters
EAO P 3.325 M
Total P 95.00 M
|
May 20, 2021 |
2021 |
WIN1F06107 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL :
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 881.10
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500 square meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED :
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 910
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,900.380 square meters
EAO P 1.925 M
Total P 55.00 M
|
May 20, 2021 |
2021 |
WIN1F06064 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL :
Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 653 - K1098 + 000
Physical Target: Allocation:
CW1-Road Widening: 5.662 Lane Km P 101.325 M
EAO P 3.675 M
Total P 105.00 M
AS MODIFIED :
Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 564 - K1098 + 000
Physical Target: Allocation:
CW1-Road Widening: 5.840 Lane Km P 101.325 M
EAO P 3.675 M
Total P 105.00 M
|
May 20, 2021 |
2021 |
WIN1F06056 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL :
Biliran Circumferential Rd - K1070 + 000 - K1072 + 000, K1073 + 000 - K1077 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:12.206 Lane Km
EAO P 2.450 M
Total P 70.00 M
AS MODIFIED :
Biliran Circumferential Rd - K1070 + 000 - K1071 + 950, K1073 + 000 - K1074 + 700
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:7.264 Lane Km
EAO P 2.450 M
Total P 70.00 M
|
May 20, 2021 |
2021 |
300207100334000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in Support of National Security - Construction of Multi-Purpose Building, Aurora Police Station with firing range, Aurora, Isabela |
May 20, 2021 |
2021 |
WIN1F06062 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Wright-Taft-Borongan Rd - K0871 + 260 - K0872 + 160
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Wright-Taft-Borongan Rd - K0871 + 721 - K0871 + 821
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,378.74 square meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
WIN1F06076 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Wright-Taft-Borongan Rd - K0872 + 160 - K0872 + 660
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Wright-Taft-Borongan Rd - K0871 + 821 - K0872 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,382.72 square meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
300211100063000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Isabela 2nd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Support Program as per R.A. 11239 - Installation/ Application/ Construction of Road safety Devices in identified blackspots along Santiago-Tuguegarao Road K0382+061-K0383+065, K0383+080-K0384+046, K0365+(-580)-K0365+420, K0408+350-K0409+345, K0392+424-K0393+424 and K0367+000-K0368+300 |
May 20, 2021 |
2021 |
WIN1F06090 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL :
Jct Buenavista-Lawaan-Marabut Rd - K0976 + 925 - K0977 + 097
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED :
Jct Buenavista-Lawaan-Marabut Rd – K0954 + 830 –K0954 + 950, K0962 + 110 – K0962 + 240, K0976 + 925 - K0977 + 097
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,735.41 square meters
EAO P 3.255 M
Total P 93.00 M
|
May 20, 2021 |
2021 |
WIN1F06094 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and Diversion Roads
AS PER GAA/ORIGINAL :
Cabgan-Capinha Diversion Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 53.075 M
3.00 Lane Km
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED :
Cabgan-Capiñahan Diversion Road, Leyte
Physical Target: Allocation:
CW1- Construction of Concrete Road: P 53.075 M
1.592 Lane Km
EAO P 1.925 M
Total P 55.00 M
|
May 20, 2021 |
2021 |
WIN1F06100 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL :
Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+300, Carigara, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 lineal meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED :
Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+283, Carigara, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 133.00 lineal meters
EAO P 3.500 M
Total P 100.00 M
|
May 20, 2021 |
2021 |
WIN1F06063 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 11+380.193, Motiong, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 207.475 M
18.571 Lane Km
EAO P 7.525 M
Total P 215.00 M
AS MODIFIED:
Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 1+570,Sta. 7+100 to Sta. 10+327.44, Motiong, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 207.475 M
9.60 Lane Km
EAO P 7.525 M
Total P 215.00 M
|
May 20, 2021 |
2021 |
WIN1F06135 |
GAA FY 2021 |
May 6, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Jct Buenavista-Lawaan-Marabut Rd - K0977 + 097 - K0977 + 200
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M
Total P 93.00 M
AS MODIFIED:
Jct Buenavista-Lawaan-Marabut Rd – K0962 + 600 – K0962 + 840, K0977 + 097 - K0977 + 200, K0982+620 – K0982 + 865, K0984 + 810 – K0985 + 605, K0994 + 265 – K0994 + 360
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.745 M
Structure: 6,758.48 square meters
EAO P 3.255 M
Total P 93.00 M
|
May 19, 2021 |
2021 |
WIN1C03768 |
FY 2021 |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Concepcion - Capas Rd - K0113+200 - K0113+743 |
May 19, 2021 |
2021 |
WIN1C03772 |
FY2021 |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank), Package 2, Sta. 11+419.20 - Sta. 11+505.20, Sta. 13+911.40 - Sta. 14+395.40, La Paz, Tarlac |
May 19, 2021 |
2021 |
WIN1C03759 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development - Road Widening - Tertiary Roads
Bamban Poblacion Rd - K0099+(-438) - K0099+(-040), K0099+1249 - K0099+1486 |
May 19, 2021 |
2021 |
WIN1C03720 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 - Sta. 10+340, Capas, Tarlac |
May 19, 2021 |
2021 |
WIN1C03732 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac |
May 19, 2021 |
2021 |
WIN1C03757 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads
Construction of Road, Barangay Balanoy to Barangay Dumarais, La Paz, Tarlac |
May 19, 2021 |
2021 |
WIN1C03752 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Road - K0093+735 - K0094+443 |
May 13, 2021 |
2021 |
WIN1C03764 |
GAA 2021 |
May 31, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 271;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 150;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 200,000,000
|
May 13, 2021 |
2021 |
WIN1C03767 |
SR2021-02-004935 |
February 17, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+360.00, 325+510.00 - 325+960.00 (Hapid), Lamut, Ifugao;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
To: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+400.00, 325+680.00 - 326+060.00 (Hapid), Lamut, Ifugao ;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
|
May 13, 2021 |
2021 |
WIN1C03780 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0271+800;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000
To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0275+229;
Physical Target: CW1 : 20.958 Lane Km;
Allocation= Php 125,000,000
|
May 13, 2021 |
2021 |
WIN1C03763 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 942, K0342 + 220 - K0342 + 358;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 910;
Physical Target: CW1 : 8,845.4 Square meters;
Allocation= Php 200,000,000
|
May 13, 2021 |
2021 |
WIN1C03779 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0299+000 - K0319+726;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 300,000,000
To: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0288+000 - K0319+726;
Physical Target: CW1 : 64.002 Lane Km;
Allocation= Php 300,000,000
|
May 13, 2021 |
2021 |
WIN1C03778 |
GAA 2021 |
May 4, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 486 - K0309 + 616, K0313 + 900 - K0314 + 000, K0316 + 225 - K0316 + 525, K0320 + 241 - K0320 + 442;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000
To: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 510 - K0309 + 616, K0313 + 900 - K0314 + 000;
Physical Target: CW1 : 8,526.50 Square meters;
Allocation= Php 200,000,000
|
May 7, 2021 |
2021 |
WIN1G02897 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300118200324000
Project ID: P00551488MN
FROM:
Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Union - Malinao Bridge, General Luna, Surigao del Norte
Type of Work / Physical Target - CW1 - Construction of
Bridge / 1,666.452 sq.m.
Unit Cost: P 81,070.44 / sq.m.
Allocation: P 135,100,000
EAO: P 4,900,000
Total: P 140,000,000
TO:
Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Union - Malinao Bridge, General Luna, Surigao del Norte
Type of Work / Physical Target - CW1 - Construction of Steel
Bridge / 1,958.544 sq.m.
Unit Cost: P 68,979.81 / sq.m.
Allocation: P 135,100,000
EAO: P 4,900,000
Total: P 140,000,000 |
May 5, 2021 |
2021 |
WIN1E02219 |
FY 2021 RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310203100495000
Project ID: P00501569MN
FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Pandanon-Magallanes Rd - K1221 + 450 - K1222 + 061
Type of Work/Physical Target: CW1 - Road Widening / 1.250 lane km
Unit Cost: P15,680,000 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000
TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Pandanon-Magallanes Rd - K1219 + 785.50 - K1220 + 000, K1221 + 450 - K1222 + 120
Type of Work/Physical Target: CW1 - Road Widening / 1.835 lane km
Unit Cost: P10,681,199 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000 |
May 3, 2021 |
2021 |
WIN1C03734 |
GAA 2021 |
April 27, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0259 +000, La Trinidad, Benguet ;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0260 + 750,
La Trinidad, Benguet;
Physical Target: CW1 : 12.61 Lane Km;
Allocation= Php 100,000,000
|
April 28, 2021 |
FY 2021 |
WIN1C03725 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Baler Casiguran Road (Dinadiawan - Casiguran), K0276+280 - K0276+410 |
April 28, 2021 |
FY 2021 |
WIN1C03733 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Improvement of Concrete Slope Protection along Angat River, Sta. Barbara Section, Baliuag, Sta. 0+238.8 to Sta. 0+380.8 |
April 28, 2021 |
FY 2021 |
WIN1C03732 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac |
April 27, 2021 |
2021 |
WIN1C03722 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads - Tarlac - Sta. Rosa Rd, K0132+380 - K0132+460, K0132+460 - K0132+780, K0132+780 - K0133+320 |
April 27, 2021 |
FY2021 |
WIN1C03720 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Tarlac 2nd District Engineering Office |
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac |
April 27, 2021 |
FY 2021 |
WIN1C03721 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Pantabangan - Canili - Basal - Baler Rd, K0178+550 - K0178+618 |
March 18, 2021 |
FY 2020 GAA |
WIN0G02894 |
FY 2020 GAA RA 11465 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+386 - K1513+520 (R/S), K1513+722 - K1513+775,
K1513+875 - K1514+020
Physical Target:
CW1: 1.370 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00
TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+535 - K1513+700, K1514+100 - K1514+581,
K1514+646 - K1515+000
Physical Target:
CW1: 2.741 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00 |
March 17, 2021 |
FY 2020 GAA |
WIN0F06037 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202186000
Project ID : P0044649LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package B, 5+000 - 10+000, Palawan
CW-1 Construction of Concrete Road: 0 Lane Km
Allocation: 55.00 Million
TO:
Construction of Missing links/New Road
Sumbiling - Canipaan, Package B,
Sta. 258+756.30 - Sta. 259+920, Palawan
CW-1 Construction of Gravel Road : 2.2674 sq.m.
Allocation : 55.00 Million
|
March 17, 2021 |
FY 2020 GAA |
WIN0F06386 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300117206589000
Project ID : P00447608LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 20.00 Million
TO:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0.016 Lane Km
CW-1 Construction of Concrete Bridge : 244.224 sq.m
Allocation : 20.00 Million
|
March 17, 2021 |
FY 2020 GAA |
WIN0F06380 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202185000
Project ID : P00446496LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A,
0+000 - 5+000, Palawan
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 55.00 Million
TO:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A
Sta. 258+641.00 - Sta. 258+756.30, Palawan
CW-1 Construction of Gravel Road : 0.7706 Lane Km
CW-2 Construction Of Concrete Bridge : 286.20 sq m
Allocation : 55.00 Million
|
March 16, 2021 |
FY 2020 GAA |
WIN0F06031 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202940000
Project ID : P00447010LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot nterior - Tagusao Section), Package A
(Sta. 162+820 - Sta. 173+019), Palawan
CW-1 Construction of Concrete Road: 2027 Lane Km
Allocation : 50.00Million
TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package A
(Sta. 191+315.80 - Sta. 191+935.50), Palawan
CW-1 Construction of Concrete Road: 1.23940Lane Km
Allocation : 50.00 Million |
March 16, 2021 |
FY 2020 GAA |
WIN0F06381 |
FY 2020 GAA DPWH Infra Projects |
January 14, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300116202920000
Project ID : P00446974LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects
FROM:
Construction of Access Road,
New Agutaya - Alimanguan Tourism Road Leading to
San Vicente Long Beach, San Vicente, Palawan
CW- Construction of Concrete Road: 0 Lane Km
Allocation - 35.00 Million
TO:
Construction of Access Road -
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
CW-1 Construction of Concrete Road : 1.055 Lane Km
Allocation : 35.00 Million |
March 3, 2021 |
GAA CY 2020 |
WIN0F06361 |
UACS No. 300107200682000 |
April 1, 2020 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300107200682000
Project ID.: P00449030LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=250 l.m.
Unit Cost (P’000) = P 198.00 / l.m.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00
As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=618 l.m.
Unit Cost (P’000) = P 75.652 / l.m.
Allocation = P 46,752,750.00
EAO = P 472,250.00
FCR Amount = P 47,225,000.00
FLR Amt. Excess = P 2,775,000.00
Original Allocation = P 50,000,000.00
WIN0F06361 |
March 3, 2021 |
GAA CY 2020 |
WIN0F06221 |
UACS No. 300104213601000 |
April 1, 2020 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104213601000
Project ID.: P00442222LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortuna Village, Barangay San Isidro, Parañaque City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00 / No. of Bldg.
Allocation (P’000) = P 6,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 7,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortunata Village, Barangay San Isidro, Parañaque City
Construction of Slope Protection and Linear Parks along Taguig River, Brgy. Sta. Ana, Taguig City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00
Allocation (P’000) = P 148,282.29
EAO (P’000) = P 200.00
Total (P’000) = P 7,000.00
WIN0F06221 |
January 26, 2021 |
FY 2020 |
WIN1E02201 |
310201100469000 |
April 29, 2020 |
Region IX |
Regional Office IX |
UACS No. 310201100469000
Project ID: P00400315MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Dipolog-Oroquieta National Rd -
K1808 + 882.51 - K1808+950,
K1810 + 900 - K1810+975,
K1817 + 700 - K1818 + 580,
K1818 + 800 - K1819 + 220,
K1819 + 420 - K1820 + 113,
K1826 + 086 - K1826 + 535
CW1 - Road Widening: 5.174 lane km.
Unit Cost: P 18,538,857.45/lane km.
ROW: 35,742.4995 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,357,201.70
Allocation: P 110,000,000.00 |
January 20, 2021 |
2020 |
WIN0G02993 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310107100187000
Project ID: P00400110MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (Surigao-Agusan Sect) - K1172 + 386 - K1172 + 440
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 1,020.00 sq.m.
Unit Cost: Php 9.80T / sq.m.
Allocation: Php 9.996M
EAO: Php 204.0T
Total: Php 10.200M
TO:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (Surigao-Agusan Sect) - K1172 + 435 - K1172 + 467.4
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 724.89 sq.m.
Unit Cost: Php 13.789678T / sq.m.
Allocation: Php 9.996M
EAO: Php 204.0T
Total: Php 10.200M |
January 20, 2021 |
2020 |
WIN0G02989 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. 310109100509000
Project ID: P00400005MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Agusan-Malaybalay Rd - K1275 + 000 - K1275 + 070, K1276 + 371 - K1276 + 463
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 2,172 sq.m.
Unit Cost: Php 22.559853T / sq.m.
Allocation: Php 49.0M
EAO: Php 1.0M
Total: Php 50.0M
TO:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Agusan-Malaybalay Rd - K1274 + 901 - K1275 + 072, K1276 + 371 - K1276 + 467.57
Type of Work/Physical Target:
CW1 - Construction of Road Slope Protection Structure / 3,403.51 sq.m.
Unit Cost: Php 14.396902T / sq.m.
Allocation: Php 49.0M
EAO: Php 1.0M
Total: Php 50.0M
|
January 20, 2021 |
FY 2020 |
WIN0G03220 |
300117207302000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300117207302000
Project ID: P00444014MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Brgy. Salvador, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Concrete Road: 1.968 lane km
Unit Cost: P 7,545,731.71/Lane km
EAO: P 150,000.00
Allocation: P 15,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G03227 |
310203100384000 |
July 23, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
'UACS No. 310203100384000
Project ID: P00401557MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct. Aurora-Monte Alegre-Jct Labangan Rd-
K1630+(-260) - K1630+776
CW1 - Road Widening: 2.072 lane km.
Unit Cost: P 14,189,189.19/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G02884 |
310201100596000 |
July 24, 2020 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310201100596000
Project ID: P00400272MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Jct Aurora-Ozamis City Rd -
K1631 + 220 - K1631 + 700
CW1 - Road Widening: 0.96 lane km.
Unit Cost: P 35,729,166.67/lane km.
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
January 20, 2021 |
FY 2020 |
WIN0G03219 |
300202100170000 |
September 21, 2020 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300202100170000
Project ID: P00431597MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports
Access Road leading to Panubigan Wharf, Zamboanga City, Zamboanga del Sur
CW1 - Construction of Concrete Road: 1.132 lane km.
Unit Cost: P 19,825,088.00/lane km.
EAO: P 458,000.00
Allocation: P 22,900,000.00 |
January 15, 2021 |
2020 |
310204100692000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Regional Office II |
Network Development - Construction of Bypass and Diversion Roads - Alicia-Angadanan-San Guillermo- Cauayan City - Naguilian Alternate Route, Package 1, Isabela |
January 15, 2021 |
2020 |
300203100244000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Quirino District Engineering Office |
Construction/Improvement of Access Road Declared Tourism Destinations - Access Road leading to MAddela Eco-Park, Maddela, Quirino |
January 15, 2021 |
2020 |
310203100324000 |
GAA FY 2020 |
February 11, 2020 |
Region II |
Quirino District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads - Dumabato - Balligui Road - K0372+877 - K0373+836 (S04758LZ), Maddela, Quirino |
January 15, 2021 |
2020 |
WIN0G02868 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Regional Office XIII |
UACS No. 300111200157000
Project ID: P00444717MN
FROM:
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126) - K0001 + 129, Dinagat
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 0.000 sq.m.
Unit Cost: Php 0.000 / sq.m.
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00
TO:
LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-146) - K0001 + 102.5, Dinagat
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 4,044.075 sq.m.
Unit Cost: Php 13,124.14 / sq.m.
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03226 |
300116203187000 |
July 23, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203187000
Project ID: P00443641MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of local roads-Junction Imelda-Alicia Road, Binangonan-Nanan Road, Payao, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 6.276 Lane Km
Unit Cost: P 7,026,768.64/Lane Km
EAO: P 900,000.00
Allocation: P 45,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03218 |
300116203189000 |
July 24, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300116203189000
Project ID: P00443643MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Concreting of local roads-Junction leading to Dumpok-Baluyan Road, Imelda, Zamboanga Sibugay
Physical Target:
CW-1 - Construction of Concrete Road: 4.389 Lane Km
Unit Cost: P 7,814,992.03/Lane Km
EAO: P 700,000.00
Allocation: P 35,000,000.00 |
January 14, 2021 |
FY 2020 |
WIN0G03223 |
300117207307000 |
July 24, 2020 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300117207307000
Project ID: P00444026MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Road from Brgy. Labrador - Poblacion, Buug, Zamboanga Sibugay
Physical Target:
CW-1- Construction of Concrete Road: 1.394 lane km
Unit Cost: P 7,101,865.14/Lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
January 8, 2021 |
2020 |
WIN0G02873 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 310212100165000
Project ID: P00400405MN
FROM:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + 000, K1245 + 149 - K1246 + 420, K1246 + 537 - K1246 + 621, K1249 + 400 - K 1249 + 860, (S00441MN) K1241 + 875 - K1242 + 028
Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 6.028 lane km
Unit Cost: Php 11,584,582 / lane km
Allocation: Php 69,831,860.00
EAO: Php 1,425,140.00
Total: Php 71,257,000.00
TO:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads
Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + (-090), K1245 + 272 - K1246 + 458, K1246 + 571 - K1246 + 661.50, K1249 + 439 - K 1249 + 930, (S00441MN) K1241 + 924 - K1242 + 028
Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 5.655 lane km
Unit Cost: Php 12,348,693 / lane km
Allocation: Php 69,831,860.00
EAO: Php 1,425,140.00
Total: Php 71,257,000.00 |
January 8, 2021 |
2020 |
WIN0G02862 |
FY 2020 GAA RA 11465 |
January 24, 2020 |
Region XIII |
Butuan City District Engineering Office |
UACS No. 300204100435000
Project ID: P00431499MN
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Road Widening / 2.2 lane km
Unit Cost: Php 24,125,000 / lane km
Allocation: Php 53,075,000.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Widening of Bridge / 172.10 sq.m
CW2 - Construction of Slope Protection Structure / 965.19 sq.m
Unit Cost1: Php 97,369.55 / sq.m
Unit Cost2: Php 37,627.51 / sq.m
Estimated Cost1: Php 16,757,300.00
Estimated Cost2: Php 36,317,700.00
EAO: Php 1,925,000.00
Total: Php 55,000,000.00 |
January 7, 2021 |
2020 |
WIN0C04101 |
GAA 2020 |
December 1, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 270 Square meters;
Allocation= Php 44000000
To: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 442.274 Square meters; Allocation= Php 44000000
|
January 7, 2021 |
2020 |
WIN0C04091 |
GAA 2020 |
November 27, 2020 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 964.0 Square meters;
Allocation= Php 20000000
To: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 240.0 Square meters
CW2: 724.0 Square meters;
Allocation= Php 20000000
|
January 7, 2021 |
2020 |
WIN0C04089 |
GAA 2020 |
November 27, 2020 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 260 Lineal meters;
Allocation= Php 50000000
"To: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: CW1: Construction of Flood Mitigation Structure
CW2: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 170.5 Lineal meters
CW2 : 121.5 Lineal meters;
Allocation= Php 50000000"
|
January 6, 2021 |
2020 |
WIN0C04088 |
GAA 2020 |
November 11, 2020 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000
To: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Slope Protection Structure
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 198 Square Meters
CW2 : 0.956 Lane Km;
Allocation= Php 15000000 |
January 6, 2021 |
2020 |
WIN0C03692 |
GAA 2020 |
December 9, 2020 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000
"To: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Gravel Road
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 0.248 Lane Km
CW2 : 0.752 Lane Km;
Allocation= Php 15000000"
|