Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 26, 2021 2021 WIN1C03804 GAA 2021 May 19, 2021 Cordillera Administrative Region CAR - Regional Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Cal - (S04030LZ) Chainage 0 - Chainage 1250;
Physical Target: CW1: 1.25 Lane Km;
Allocation= Php 25,000,000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Road (S04030LZ)- Chainage 0 - Chainage 830;
Physical Target: CW1: 1.66 Lane Km;
Allocation= Php 25,000,000

May 26, 2021 2021 WIN1F06165 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0906 + 941 – K0907 + 173

Physical Target: Allocation:

CW1-Road Widening : 0.396 Lane Km P 8.036 M

EAO P 0.164 M

Total P 8.200 M

AS MODIFIED:

Daang Maharlika (LT) – K0906 + 941 – K0907 + 173

Physical Target: Allocation:

CW1-Road Widening : 0.466 Lane Km P 8.036 M

EAO P 0.164 M

Total P 8.200 M
May 26, 2021 2021 WIN1F06164 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.110 Lane Km
EAO P 0.050020 M

Total P 2.501 M

AS MODIFIED:

Gov Benjamin “kokoy” T Romualdez Div Rd – (S00254LT) Chainage 0 -Chainage 55, (S00255LT) K0908+997 – K0909+030

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 2.450980 M
: 0.137 Lane Km
EAO P 0.050020 M

Total P 2.501 M
May 26, 2021 2021 WIN1F06177 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Road, Rueda Ext. - Brgy. Rizal, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M

Total P 43.00 M

AS MODIFIED:

Construction of Road, Rueda Ext. - Brgy. Rizal I, Calbayog City, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road P 42.14 M
: 2.90 Lane Km
EAO P 0.86 M

Total P 43.00 M
May 26, 2021 2021 WIN1C03843 FY 2021 GAA December 28, 2020 Region III Regional Office III
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation/Improvement of Eroded Pampanga River Bank, Sta. 0+000 - Sta. 0+100.82, Cansinala, Apalit, Pampanga
May 26, 2021 2021 WIN1C03834 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd - K0092+979 - K0094+000, K0095+000 - K0095+210.50
May 26, 2021 2021 WIN1C03828 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Spurdikes along Pasig-Potrero River (Phase I), Sta. 0+000 - Sta. 0+264, Porac, Pampanga
May 25, 2021 2021 WIN1F06131 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 835

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 3.4153 M
Road : 435.68 Lineal Meters

EAO P 0.0697 M

Total P 3.485 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1041 + 399.32 - K1041 + 732

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 3.4153 M
Road : 441.00 Lineal Meters

EAO P 0.0697 M

Total P 3.485 M
May 25, 2021 2021 WIN1F06133 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0965 + 200, K0980 + 981, K0984 + 300, K0994 + 300

Physical Target: Allocation:

CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 48.00 Lineal Meters

EAO P 0.116 M

Total P 5.800 M

AS MODIFIED:

Daang Maharlika (LT) - K0975 + 200, K0980 + 981, K0984 + 300, K0994 + 300

Physical Target: Allocation:

CW1-Upgrading of Drainage Structure along P 5.684 M
Road: 71.80 Lineal Meters

EAO P 0.116 M

Total P 5.800 M
May 25, 2021 2021 WIN1F06132 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Daang maharlika (LT) – K0974+000 – K0974+247

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 9.800 M
: 0.494 Lane Km
EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Daang Maharlika (LT) – K0974+000 – K0974+716

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 9.800 M
: 1.432 Lane Km
EAO P 0.200 M

Total P 10.00 M
May 25, 2021 2021 WIN1F06138 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0992 + 306.70 - K0992 + 528.70

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 0.444 Lane Km
EAO P 0.20174 M

Total P 10.087 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0992 + 306.70 - K0993 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 9.88526 M
: 1.402 Lane Km
EAO P 0.20174 M

Total P 10.087 M
May 25, 2021 2021 WIN1F06075 GAA FY 2021 January 16, 2021 Region VIII Southern Leyte District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 1.318 Lane Km
EAO P 0.5928 M

Total P 29.64 M

AS MODIFIED:

Liloan-S Ricardo Rd - K1082 + 483 - K1083 + 140, K1083+336-K1083+747

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 29.0472 M
: 2.14 Lane Km
EAO P 0.5928 M

Total P 29.64 M
May 25, 2021 2021 WIN1F06109 GAA FY 2021 January 16, 2021 Region VIII Southern Leyte District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K1100 + 087 - K1100+177

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 0.00 square meters
EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (LT) - K1006 + 801 - K1006+901

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3000 square meters
EAO P 1.00 M

Total P 50.00 M
May 25, 2021 2021 WIN1F06130 GAA FY 2021 January 16, 2021 Region VIII Southern Leyte District Engineering Office
Local Program

Local - National Roads and Bridges - National Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Improvement of Liloan - San Ricardo Road (S00218LT) K1056+-896 - K1070+000, Maasin City, Southern Leyte

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 59.40 M
: 5.383 Lane Km
EAO P 0.60 M

Total P 60.00 M

AS MODIFIED:

Improvement of Liloan - San Ricardo Road (S00218LT) K1078 + 000 - K1078 + 823, K1078 + 839 - K1079 + 676, K1079 + 711 - K1082 + 000 ,K1083 + 200 - K1084 + 415, K1084 + 460 -K1084 + 759, K1084 + 774 - K1086 + 000

Physical Target: Allocation:

CW1-Rehabilitation of Concrete Road P 59.40 M
: 13.380 Lane Km
EAO P 0.60 M

Total P 60.00 M
May 25, 2021 2021 WIN1F06099 GAA FY 2021 January 2, 2021 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0802 + 000 - K0802 + 880

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0803 + 110 - K0803 + 990

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 9.80 M
Asphalt Overlay : 1.76 Lane Km

EAO P 0.20 M

Total P 10.00 M
May 25, 2021 2021 WIN1F06096 GAA FY 2021 January 2, 2021 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd-K0846+820-K0846+848, K0854+100-K0854+123

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M

Total P 20.00 M

AS MODIFIED:

Wright-Taft-Borongan Rd- K0846 + 820 - K0846 + 852, K0847 + 950 - K0848 + 006, K0851 + 905 - K0851 + 965, K0854 + 159 - K0854 + 183

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.60 M
Structure: 2,000 square meters
EAO P 0.40 M

Total P 20.00 M
May 25, 2021 2021 WIN1F06176 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0937 + 808 - K0942 + 643

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 9.518 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd-K0937 + 808 - K0940 + 100

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 4.536 Lane Km

EAO P 1.925 M

Total P 55.00 M
May 25, 2021 2021 WIN1F06171 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085, K1042 + 285 - K1045 + 000

Physical Target: Allocation:

CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 9.336 Lane Km
EAO P 1.872675 M

Total P 53.505 M

AS MODIFIED:

Calubian Jct-Sn Isidro-Tabango-Villaba-Palompon Rd - K1040 + 063 - K1042 + 085

Physical Target: Allocation:

CW1-PreventiveMaintenance of Road: P 51.632325 M
Asphalt Overlay : 4.016 Lane Km
EAO P 1.872675 M

Total P 53.505 M
May 25, 2021 2021 WIN1C03809 SR2021-02-004929 February 17, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Calupaan Flood Control, Sta. 6+044 - Sta. 6+758 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000

To: Construction of Calupaan Flood Control, Sta. 40 + 975 - Sta. 41 + 668 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 648.5 Lineal meters;
Allocation= Php 47,956,000

May 25, 2021 2021 WIN1C03798 SR2021-02-004932 February 17, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Calimag Flood Control, Sta. 5+328 - Sta. 5+708 (LS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000

To: Construction of Calimag Flood Control, Sta. 5 + 823 - Sta. 6 + 132 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 206.5 Lineal meters;
Allocation= Php 20,000,000

May 25, 2021 2021 WIN1C03794 SR2021-02-00437 February 17, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of San Juan Flood Control, Sta. 2+340 - Sta. 3+280 (RS), Alfonso Lista, Ifugao;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000

To: Construction of San Juan Flood Control, Sta. 38 + 023 - Sta. 38 + 792 (LS), Alfonso Lista, Ifugao ;
Physical Target: CW1 : 794.5 Lineal meters;
Allocation= Php 60,000,000

May 25, 2021 2021 WIN1F06102 GAA FY 2021 January 4, 2021 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) K0917+000-K0917+401

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road : 802 Lineal Meters

EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Daang Maharlika (LT) K0917+000-K0917+280

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road : 560 Lineal Meters

EAO P 0.200 M

Total P 10.00 M
May 25, 2021 2021 WIN1F06173 GAA FY 2021 January 4, 2021 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 363

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.538 Lane Km

EAO P 0.17630 M

Total P 8.815 M

AS MODIFIED:

Kiling-Tanauan-Tabontabon-Julita Rd - K0930 + 594 - K0931 + 184

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 8.63870 M
Asphalt Overlay : 1.180 Lane Km

EAO P 0.17630 M

Total P 8.815 M
May 25, 2021 2021 WIN1C03815 SR2021-02-002709 February 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0343 + 734 - K0343 + 751, K0343 + 919 - K0343 + 985, K0344 + 485 - K0344 + 501, K0344 + 649 - K0344 + 677, K0344 + 806 - K0344 + 829, K0345 + 025 - K0345 + 048, K0345 + 542 - K0345 + 565, K0345 + 775 - K0345 + 793, K0346 + 078 - K0346 + 121, K0346 + 564 - K0346 + 581, K0346 + 630 - K0346 + 695, K0347 + 830 - K0347 + 862, K0348 + 000 - K0348 + 100, K0349 + 044 - K0349 + 063, K0349 + 210 - K0349 + 230, K0350 + 548 - K0350 + 570, K0351 + 892 - K0351 + 918, K0353 + 044 - K0353 + 085, K0354 + 698 - K0354 + 758, K0361 + 870 - K0361 + 1000;
Physical Target: CW1 : 8,897.5 Square meters;
Allocation= Php 109,081,000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0347+940 - K0348+000, K0361+715 - K0361+850;
Physical Target: CW1 : 5,124.83 Square meters;
Allocation= Php 109,081,000

May 25, 2021 2021 WIN1C03808 SR2021-02-004939 February 21, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Benguet;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000

To: Construction of Quartering Facility Building, Kalinga Police Provincial Office, Tabuk City, Kalinga ;
Physical Target: CW1 : 1 Number of Facilities;
Allocation= Php 20,000,000


May 25, 2021 2021 WIN1C03799 GAA 2021 May 19, 2021 Cordillera Administrative Region CAR - Regional Office
From: Baguio-Itogon Rd - K0260 + 724 - K0261 + 000;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 20,000,0000

To: Baguio-Itogon Rd - K0260 + 800 - K0260+954;
Physical Target: CW1 : 8,186 Square meters;
Allocation= Php 20,000,0000

May 21, 2021 2021 WIN1F06095 GAA FY 2021 January 4, 2021 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Pulak-Sta Fe Rd - K0911 + 988 - K0912 + 847

Physical Target: Allocation:

CW1-Road Widening: 1.720 Lane Km P 14.700 M

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Tigbao-Pulak-Sta Fe Rd - K0912 + 640 - K0913 + 047

Physical Target: Allocation:

CW1-Road Widening: 0.814 Lane Km P 14.700 M

EAO P 0.300 M

Total P 15.00 M
May 21, 2021 2021 WIN1F06061 GAA FY 2021 January 4, 2021 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd-K0917+(-247)-K0917+407

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 10.25472 M
along Road : 1,308 lineal meters

EAO P 0.20928 M

Total P 10.464 M

AS MODIFIED:

Tacloban-Baybay South Rd-K0917+088.5 + K0917+407

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 10.25472 M
along Road : 590 lineal meters

EAO P 0.20928 M

Total P 10.464 M
May 21, 2021 2021 WIN1F06089 GAA FY 2021 January 4, 2021 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0939 + 088

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.624 Lane Km

EAO P 0.18624 M

Total P 9.312 M

AS MODIFIED:

Mainit-Sn Miguel-Santol Rd - K0938 + 272 - K0938 + 854

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: Asphalt P 9.12576 M
Overlay: 1.164 Lane Km

EAO P 0.18624 M

Total P 9.312 M
May 21, 2021 2021 WIN1F06067 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Allen - Catarman Rd - K0700+214 - K0701+367

Physical Target: Allocation:

CW1-Road Widening: 2.308 Lane Km P 14.700 M

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Allen - Catarman Rd - K0700+214 - K0700+714

Physical Target: Allocation:

CW1-Road Widening: 1.00 Lane Km P 14.700 M

EAO P 0.300 M

Total P 15.00 M
May 21, 2021 2021 WIN1F06085 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0687 + 964 - K0688 + 333

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 18.591 M
: 0.748 Lane Km
EAO P 0.379 M

Total P 18.970 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico) – K0688 + 092 – K0688 + 743

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 18.591 M
: 1.302 Lane Km
EAO P 0.379 M

Total P 18.970 M
May 21, 2021 2021 WIN1F06101 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Allen-Catarman Rd - K0741+300 - K0741+630

Physical Target: Allocation:

CW1-Reconstruction Concrete Pavement : P 14.700 M
0.660 Lane Km
EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Allen-Catarman Rd - K0741+815 - K0742+195

Physical Target: Allocation:

CW1-Reconstruction Concrete Pavement : P 14.700 M
0.778 Lane Km
EAO P 0.300 M

Total P 15.00 M
May 21, 2021 2021 WIN1F06068 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Catarman - Laoang Rd - K0752+000 - K0752+200

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.400 Lane Km
EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Catarman - Laoang Rd - K0763+883.12 - K0764+196.50

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 9.800 M
0.633 Lane Km
EAO P 0.200 M

Total P 10.00 M
May 21, 2021 2021 WIN1F06127 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0961+200 - K0961+863, K0961+948 - K0962+271

Physical Target: Allocation:

CW1-Road Widening:1.976 Lane Km P 29.40 M

EAO P 0.60 M

Total P 30.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0961+200 - K0961+858, K0961+953 - K0962+548

Physical Target: Allocation:

CW1-Road Widening:2.51 Lane Km P 24.432 M

CW2-Construction of Road Slope Protection P 4.968 M
Structure: 1,080.00 Square meters

EAO P 0.60 M

Total P 30.00 M
May 21, 2021 2021 WIN1F06128 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Abuyog-Silago Rd - K0968+380 - K0968+968

Physical Target: Allocation:

CW1-Road Widening: 1.176 Lane Km P 9.80 M

EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Abuyog-Silago Rd - K0968+341 - K0968+968

Physical Target: Allocation:

CW1-Road Widening: 1.254 Lane Km P 9.80 M

EAO P 0.200 M

Total P 10.00 M
May 20, 2021 2021 WIN1F06108 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M

Total P 93.00 M

AS MODIFIED :

Jct Buenavista-Lawaan-Marabut Rd - K0977 + 200 - K0977 + 320,
K0988 + 780 – K0988 + 880, K0993 + 920 – K0994 + 090

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,540.80 square meters
EAO P 3.255 M

Total P 93.00 M
May 20, 2021 2021 WIN1F06103 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Catarman-Calbayog Rd - K0751 + 450 - K0751 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 91.675 M
Structure: 6,333.333 square meters
EAO P 3.325 M

Total P 95.00 M

AS MODIFIED :

Catarman-Calbayog Rd- K0751 + 000 - K0751 + 840, K0778 + 690 - K0779 + 100

Physical Target: Allocation:

CW1-Road Widening: 2.344 Lane Km P 36.616145 M

CW2-Construction of Road Slope Protection P 52.058855 M
Structure: 3,100.64 square meters
EAO P 3.325 M

Total P 95.00 M
May 20, 2021 2021 WIN1F06107 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL :

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 881.10

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500 square meters
EAO P 1.925 M

Total P 55.00 M

AS MODIFIED :

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 395 - K0684 + 475, K0686 + 823.60 - K0686 + 910

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,900.380 square meters
EAO P 1.925 M

Total P 55.00 M
May 20, 2021 2021 WIN1F06064 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL :

Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 653 - K1098 + 000

Physical Target: Allocation:

CW1-Road Widening: 5.662 Lane Km P 101.325 M

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED :

Palompon-Isabel-Merida-Ormoc Rd - K1095 + 000 - K1097 + 555, K1097 + 564 - K1098 + 000

Physical Target: Allocation:

CW1-Road Widening: 5.840 Lane Km P 101.325 M

EAO P 3.675 M

Total P 105.00 M
May 20, 2021 2021 WIN1F06056 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL :

Biliran Circumferential Rd - K1070 + 000 - K1072 + 000, K1073 + 000 - K1077 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:12.206 Lane Km

EAO P 2.450 M

Total P 70.00 M

AS MODIFIED :

Biliran Circumferential Rd - K1070 + 000 - K1071 + 950, K1073 + 000 - K1074 + 700

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 67.550 M
Asphalt Overlay:7.264 Lane Km

EAO P 2.450 M

Total P 70.00 M
May 20, 2021 2021 300207100334000 GAA FY 2021 January 25, 2021 Region II Regional Office II
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in Support of National Security - Construction of Multi-Purpose Building, Aurora Police Station with firing range, Aurora, Isabela
May 20, 2021 2021 WIN1F06062 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Wright-Taft-Borongan Rd - K0871 + 260 - K0872 + 160

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED :

Wright-Taft-Borongan Rd - K0871 + 721 - K0871 + 821

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,378.74 square meters
EAO P 3.500 M

Total P 100.00 M
May 20, 2021 2021 WIN1F06076 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Wright-Taft-Borongan Rd - K0872 + 160 - K0872 + 660

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 10,000 square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED :

Wright-Taft-Borongan Rd - K0871 + 821 - K0872 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,382.72 square meters
EAO P 3.500 M

Total P 100.00 M
May 20, 2021 2021 300211100063000 GAA FY 2021 January 25, 2021 Region II Isabela 2nd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Support Program as per R.A. 11239 - Installation/ Application/ Construction of Road safety Devices in identified blackspots along Santiago-Tuguegarao Road K0382+061-K0383+065, K0383+080-K0384+046, K0365+(-580)-K0365+420, K0408+350-K0409+345, K0392+424-K0393+424 and K0367+000-K0368+300
May 20, 2021 2021 WIN1F06090 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL :

Jct Buenavista-Lawaan-Marabut Rd - K0976 + 925 - K0977 + 097

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M

Total P 93.00 M

AS MODIFIED :

Jct Buenavista-Lawaan-Marabut Rd – K0954 + 830 –K0954 + 950, K0962 + 110 – K0962 + 240, K0976 + 925 - K0977 + 097

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 4,735.41 square meters
EAO P 3.255 M

Total P 93.00 M
May 20, 2021 2021 WIN1F06094 GAA FY 2021 February 1, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and Diversion Roads

AS PER GAA/ORIGINAL :

Cabgan-Capinha Diversion Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 53.075 M
3.00 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED :

Cabgan-Capiñahan Diversion Road, Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 53.075 M
1.592 Lane Km

EAO P 1.925 M

Total P 55.00 M
May 20, 2021 2021 WIN1F06100 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
OO2: Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL :

Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+300, Carigara, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 lineal meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED :

Construction of Carigara Tide Embankment, Sta. 0+150-Sta. 0+283, Carigara, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 133.00 lineal meters
EAO P 3.500 M

Total P 100.00 M
May 20, 2021 2021 WIN1F06063 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 11+380.193, Motiong, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 207.475 M
18.571 Lane Km
EAO P 7.525 M

Total P 215.00 M

AS MODIFIED:

Construction of Road, Bonga - Pamamas-An Linooban - Mararangsi-Caluyahan, Sta. 0+000 to Sta. 1+570,Sta. 7+100 to Sta. 10+327.44, Motiong, Samar

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 207.475 M
9.60 Lane Km
EAO P 7.525 M

Total P 215.00 M
May 20, 2021 2021 WIN1F06135 GAA FY 2021 May 6, 2021 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Jct Buenavista-Lawaan-Marabut Rd - K0977 + 097 - K0977 + 200

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 9,300 square meters
EAO P 3.255 M

Total P 93.00 M

AS MODIFIED:

Jct Buenavista-Lawaan-Marabut Rd – K0962 + 600 – K0962 + 840, K0977 + 097 - K0977 + 200, K0982+620 – K0982 + 865, K0984 + 810 – K0985 + 605, K0994 + 265 – K0994 + 360

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.745 M
Structure: 6,758.48 square meters
EAO P 3.255 M

Total P 93.00 M
May 19, 2021 2021 WIN1C03768 FY 2021 December 28, 2020 Region III Tarlac 2nd District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Concepcion - Capas Rd - K0113+200 - K0113+743
May 19, 2021 2021 WIN1C03772 FY2021 December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along Rio Chico River (Matayumtayum Section, Right Bank), Package 2, Sta. 11+419.20 - Sta. 11+505.20, Sta. 13+911.40 - Sta. 14+395.40, La Paz, Tarlac
May 19, 2021 2021 WIN1C03759 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Network Development - Road Widening - Tertiary Roads

Bamban Poblacion Rd - K0099+(-438) - K0099+(-040), K0099+1249 - K0099+1486
May 19, 2021 2021 WIN1C03720 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal River

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 - Sta. 10+340, Capas, Tarlac
May 19, 2021 2021 WIN1C03732 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac
May 19, 2021 2021 WIN1C03757 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Local Infrastructure Program - Local Roads and Bridges - Local Roads

Construction of Road, Barangay Balanoy to Barangay Dumarais, La Paz, Tarlac
May 19, 2021 2021 WIN1C03752 FY 2021 GAA December 28, 2020 Region III Pampanga 3rd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Manila North Road - K0093+735 - K0094+443
May 13, 2021 2021 WIN1C03764 GAA 2021 May 31, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 271;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0342 + 770 - K0342 + 857, K0343 + 107 - K0343 + 215, K0347 + 055 - K0347 + 150;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 200,000,000
May 13, 2021 2021 WIN1C03767 SR2021-02-004935 February 17, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+360.00, 325+510.00 - 325+960.00 (Hapid), Lamut, Ifugao;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000

To: Construction of Flood Control along Ibulao River Sta 323+800.00 - 324+400.00, 325+680.00 - 326+060.00 (Hapid), Lamut, Ifugao ;
Physical Target: CW1 : 980 Lineal meters;
Allocation= Php 70,000,000
May 13, 2021 2021 WIN1C03780 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0271+800;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 125,000,000

To: Asset Preservation - Preventive Maintenance - Asphalt Overlay (Instapave) along Gov Bado Dangwa National Road- K0264+050 - K0275+229;
Physical Target: CW1 : 20.958 Lane Km;
Allocation= Php 125,000,000
May 13, 2021 2021 WIN1C03763 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 942, K0342 + 220 - K0342 + 358;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0341 + 104 - K0341 + 314, K0341 + 798 - K0341 + 910;
Physical Target: CW1 : 8,845.4 Square meters;
Allocation= Php 200,000,000
May 13, 2021 2021 WIN1C03779 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0299+000 - K0319+726;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 300,000,000

To: Preventive Maintenance of Road: Asphalt Overlay/Item 304-A (Slurry Surface Treatment 12mm) with Correction - Benguet - Nueva Vizcaya Road, K0288+000 - K0319+726;
Physical Target: CW1 : 64.002 Lane Km;
Allocation= Php 300,000,000
May 13, 2021 2021 WIN1C03778 GAA 2021 May 4, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 486 - K0309 + 616, K0313 + 900 - K0314 + 000, K0316 + 225 - K0316 + 525, K0320 + 241 - K0320 + 442;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 200,000,000

To: Gov. Bado Dangwa National Rd - K0308 + 979 - K0309 + 085, K0309 + 510 - K0309 + 616, K0313 + 900 - K0314 + 000;
Physical Target: CW1 : 8,526.50 Square meters;
Allocation= Php 200,000,000
May 7, 2021 2021 WIN1G02897 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. 300118200324000
Project ID: P00551488MN

FROM:

Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Union - Malinao Bridge, General Luna, Surigao del Norte

Type of Work / Physical Target - CW1 - Construction of
Bridge / 1,666.452 sq.m.

Unit Cost: P 81,070.44 / sq.m.

Allocation: P 135,100,000

EAO: P 4,900,000

Total: P 140,000,000

TO:

Local Program - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Union - Malinao Bridge, General Luna, Surigao del Norte

Type of Work / Physical Target - CW1 - Construction of Steel
Bridge / 1,958.544 sq.m.

Unit Cost: P 68,979.81 / sq.m.

Allocation: P 135,100,000

EAO: P 4,900,000

Total: P 140,000,000
May 5, 2021 2021 WIN1E02219 FY 2021 RA 11518 January 25, 2021 Region XIII Agusan del Norte District Engineering Office
UACS No. 310203100495000
Project ID: P00501569MN

FROM:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Pandanon-Magallanes Rd - K1221 + 450 - K1222 + 061

Type of Work/Physical Target: CW1 - Road Widening / 1.250 lane km
Unit Cost: P15,680,000 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000

TO:
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Pandanon-Magallanes Rd - K1219 + 785.50 - K1220 + 000, K1221 + 450 - K1222 + 120

Type of Work/Physical Target: CW1 - Road Widening / 1.835 lane km
Unit Cost: P10,681,199 / lane km
Allocation: P19,600,000
EAO: P400,000
TOTAL: P20,000,000
May 3, 2021 2021 WIN1C03734 GAA 2021 April 27, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0259 +000, La Trinidad, Benguet ;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000

To: Asphalt Overlay along Pico - Lamtang Road (S00401LZ), K0255 + (-555) - K0260 + 750,
La Trinidad, Benguet;
Physical Target: CW1 : 12.61 Lane Km;
Allocation= Php 100,000,000
April 28, 2021 FY 2021 WIN1C03725 FY 2021 GAA December 28, 2020 Region III Regional Office III
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Baler Casiguran Road (Dinadiawan - Casiguran), K0276+280 - K0276+410
April 28, 2021 FY 2021 WIN1C03733 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Flood Management - Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Improvement of Concrete Slope Protection along Angat River, Sta. Barbara Section, Baliuag, Sta. 0+238.8 to Sta. 0+380.8
April 28, 2021 FY 2021 WIN1C03732 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage System

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 11+056 to Sta. 11+536, Capas, Tarlac
April 27, 2021 2021 WIN1C03722 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Network Development - Off-Carriageway Improvement - Primary Roads - Tarlac - Sta. Rosa Rd, K0132+380 - K0132+460, K0132+460 - K0132+780, K0132+780 - K0133+320
April 27, 2021 FY2021 WIN1C03720 FY 2021 GAA December 28, 2020 Region III Tarlac 2nd District Engineering Office
Construction / Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+036 to Sta. 10+340, Capas, Tarlac
April 27, 2021 FY 2021 WIN1C03721 FY 2021 GAA December 28, 2020 Region III Regional Office III
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Pantabangan - Canili - Basal - Baler Rd, K0178+550 - K0178+618
March 18, 2021 FY 2020 GAA WIN0G02894 FY 2020 GAA RA 11465 January 1, 2020 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+386 - K1513+520 (R/S), K1513+722 - K1513+775,
K1513+875 - K1514+020
Physical Target:
CW1: 1.370 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00

TO: Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Road Widening along Davao Div Rd -
K1511+535 - K1513+700, K1514+100 - K1514+581,
K1514+646 - K1515+000
Physical Target:
CW1: 2.741 lane km (Road Widening)
Allocation:
TOTAL: P 41,753,000.00
CW1: P 40,917,940.00 (Road Widening)
EAO: P 835,060.00
March 17, 2021 FY 2020 GAA WIN0F06037 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202186000
Project ID : P0044649LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Road
Sumbiling - Canipaan, Package B, 5+000 - 10+000, Palawan
CW-1 Construction of Concrete Road: 0 Lane Km
Allocation: 55.00 Million

TO:
Construction of Missing links/New Road
Sumbiling - Canipaan, Package B,
Sta. 258+756.30 - Sta. 259+920, Palawan
CW-1 Construction of Gravel Road : 2.2674 sq.m.
Allocation : 55.00 Million

March 17, 2021 FY 2020 GAA WIN0F06386 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300117206589000
Project ID : P00447608LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 20.00 Million

TO:
Construction of Odiongan By-pass Road (Phase 4),
Odiongan, Romblon
CW-1 Construction of Concrete Road : 0.016 Lane Km
CW-1 Construction of Concrete Bridge : 244.224 sq.m
Allocation : 20.00 Million
March 17, 2021 FY 2020 GAA WIN0F06380 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202185000
Project ID : P00446496LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A,
0+000 - 5+000, Palawan
CW-1 Construction of Concrete Road : 0 Lane Km
Allocation : 55.00 Million

TO:
Construction of Missing Links/New Roads
Sumbiling - Canipaan, Package A
Sta. 258+641.00 - Sta. 258+756.30, Palawan
CW-1 Construction of Gravel Road : 0.7706 Lane Km
CW-2 Construction Of Concrete Bridge : 286.20 sq m
Allocation : 55.00 Million
March 16, 2021 FY 2020 GAA WIN0F06031 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202940000
Project ID : P00447010LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Sofronio Espanola - Quezon Cross Country Road
( Pulot nterior - Tagusao Section), Package A
(Sta. 162+820 - Sta. 173+019), Palawan
CW-1 Construction of Concrete Road: 2027 Lane Km
Allocation : 50.00Million

TO:
Construction of Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package A
(Sta. 191+315.80 - Sta. 191+935.50), Palawan
CW-1 Construction of Concrete Road: 1.23940Lane Km
Allocation : 50.00 Million
March 16, 2021 FY 2020 GAA WIN0F06381 FY 2020 GAA DPWH Infra Projects January 14, 2020 Region IV-B Regional Office IV-B
UACS No.: 300116202920000
Project ID : P00446974LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/ Improvement of
Various Infrastructure including Local Projects

FROM:
Construction of Access Road,
New Agutaya - Alimanguan Tourism Road Leading to
San Vicente Long Beach, San Vicente, Palawan
CW- Construction of Concrete Road: 0 Lane Km
Allocation - 35.00 Million

TO:
Construction of Access Road -
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
CW-1 Construction of Concrete Road : 1.055 Lane Km
Allocation : 35.00 Million
March 3, 2021 GAA CY 2020 WIN0F06361 UACS No. 300107200682000 April 1, 2020 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300107200682000
Project ID.: P00449030LZ
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=250 l.m.
Unit Cost (P’000) = P 198.00 / l.m.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00

As Modified
Local Program
Local – Flood Control and Drainage – Flood Control Structures / Facilities – Local Infrastructure Program
Rehabilitation of Parañaque River Mouth (Phase 1), Brgy. Don Galo, Parañaque City, Metro Manila
Physical Target: CW1 = Rehabilitation/Major Repair of Flood Control Structure L=618 l.m.
Unit Cost (P’000) = P 75.652 / l.m.
Allocation = P 46,752,750.00
EAO = P 472,250.00
FCR Amount = P 47,225,000.00
FLR Amt. Excess = P 2,775,000.00
Original Allocation = P 50,000,000.00
WIN0F06361
March 3, 2021 GAA CY 2020 WIN0F06221 UACS No. 300104213601000 April 1, 2020 National Capital Region Metro Manila 2nd District Engineering Office
As per GAA/Original
UACS No. 300104213601000
Project ID.: P00442222LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortuna Village, Barangay San Isidro, Parañaque City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00 / No. of Bldg.
Allocation (P’000) = P 6,800.00
EAO (P’000)= P 200.00
Total (P’000) = P 7,000.00

As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-purpose Building at Fortunata Village, Barangay San Isidro, Parañaque City
Construction of Slope Protection and Linear Parks along Taguig River, Brgy. Sta. Ana, Taguig City
Physical Target: CW1 = Construction of Multi-purpose building – 1 Bldg
Unit Cost (P’000) = P 6,800.00
Allocation (P’000) = P 148,282.29
EAO (P’000) = P 200.00
Total (P’000) = P 7,000.00
WIN0F06221
January 26, 2021 FY 2020 WIN1E02201 310201100469000 April 29, 2020 Region IX Regional Office IX
UACS No. 310201100469000
Project ID: P00400315MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Oroquieta National Rd -
K1808 + 882.51 - K1808+950,
K1810 + 900 - K1810+975,
K1817 + 700 - K1818 + 580,
K1818 + 800 - K1819 + 220,
K1819 + 420 - K1820 + 113,
K1826 + 086 - K1826 + 535

CW1 - Road Widening: 5.174 lane km.
Unit Cost: P 18,538,857.45/lane km.
ROW: 35,742.4995 sq. m.
Unit Cost: P 300/ sq.m.
EAO: P 3,357,201.70
Allocation: P 110,000,000.00
January 20, 2021 2020 WIN0G02993 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310107100187000
Project ID: P00400110MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (Surigao-Agusan Sect) - K1172 + 386 - K1172 + 440

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 1,020.00 sq.m.

Unit Cost: Php 9.80T / sq.m.

Allocation: Php 9.996M

EAO: Php 204.0T

Total: Php 10.200M

TO:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (Surigao-Agusan Sect) - K1172 + 435 - K1172 + 467.4

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 724.89 sq.m.

Unit Cost: Php 13.789678T / sq.m.

Allocation: Php 9.996M

EAO: Php 204.0T

Total: Php 10.200M
January 20, 2021 2020 WIN0G02989 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Agusan del Norte District Engineering Office
UACS No. 310109100509000
Project ID: P00400005MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1275 + 000 - K1275 + 070, K1276 + 371 - K1276 + 463

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 2,172 sq.m.

Unit Cost: Php 22.559853T / sq.m.

Allocation: Php 49.0M

EAO: Php 1.0M

Total: Php 50.0M

TO:

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Agusan-Malaybalay Rd - K1274 + 901 - K1275 + 072, K1276 + 371 - K1276 + 467.57

Type of Work/Physical Target:

CW1 - Construction of Road Slope Protection Structure / 3,403.51 sq.m.

Unit Cost: Php 14.396902T / sq.m.

Allocation: Php 49.0M

EAO: Php 1.0M

Total: Php 50.0M
January 20, 2021 FY 2020 WIN0G03220 300117207302000 July 23, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300117207302000
Project ID: P00444014MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Brgy. Salvador, Dumingag, Zamboanga del Sur

Physical Target:
CW-1- Construction of Concrete Road: 1.968 lane km
Unit Cost: P 7,545,731.71/Lane km
EAO: P 150,000.00
Allocation: P 15,000,000.00
January 20, 2021 FY 2020 WIN0G03227 310203100384000 July 23, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
'UACS No. 310203100384000
Project ID: P00401557MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Jct. Aurora-Monte Alegre-Jct Labangan Rd-
K1630+(-260) - K1630+776

CW1 - Road Widening: 2.072 lane km.
Unit Cost: P 14,189,189.19/lane km.
EAO: P 600,000.00
Allocation: P 30,000,000.00
January 20, 2021 FY 2020 WIN0G02884 310201100596000 July 24, 2020 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310201100596000
Project ID: P00400272MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Jct Aurora-Ozamis City Rd -
K1631 + 220 - K1631 + 700

CW1 - Road Widening: 0.96 lane km.
Unit Cost: P 35,729,166.67/lane km.
EAO: P 700,000.00
Allocation: P 35,000,000.00
January 20, 2021 FY 2020 WIN0G03219 300202100170000 September 21, 2020 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300202100170000
Project ID: P00431597MN

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports

Access Road leading to Panubigan Wharf, Zamboanga City, Zamboanga del Sur

CW1 - Construction of Concrete Road: 1.132 lane km.
Unit Cost: P 19,825,088.00/lane km.
EAO: P 458,000.00
Allocation: P 22,900,000.00
January 15, 2021 2020 310204100692000 GAA FY 2020 February 11, 2020 Region II Regional Office II
Network Development - Construction of Bypass and Diversion Roads - Alicia-Angadanan-San Guillermo- Cauayan City - Naguilian Alternate Route, Package 1, Isabela
January 15, 2021 2020 300203100244000 GAA FY 2020 February 11, 2020 Region II Quirino District Engineering Office
Construction/Improvement of Access Road Declared Tourism Destinations - Access Road leading to MAddela Eco-Park, Maddela, Quirino
January 15, 2021 2020 310203100324000 GAA FY 2020 February 11, 2020 Region II Quirino District Engineering Office
Network Development Program - Road Widening - Tertiary Roads - Dumabato - Balligui Road - K0372+877 - K0373+836 (S04758LZ), Maddela, Quirino
January 15, 2021 2020 WIN0G02868 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Regional Office XIII
UACS No. 300111200157000
Project ID: P00444717MN

FROM:

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-126) - K0001 + 129, Dinagat

Type of Work/Physical Target:

CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 0.000 sq.m.

Unit Cost: Php 0.000 / sq.m.

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00

TO:

LOCAL PROGRAM - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of Roads with Slips, Slope Collapse and Landslide Secondary Roads - Dinagat - Loreto Road - K0001 + (-146) - K0001 + 102.5, Dinagat

Type of Work/Physical Target:

CW1 - Rehabilitation / Major Repair of Road Slope Protection Structure / 4,044.075 sq.m.

Unit Cost: Php 13,124.14 / sq.m.

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00
January 14, 2021 FY 2020 WIN0G03226 300116203187000 July 23, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300116203187000
Project ID: P00443641MN


Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Concreting of local roads-Junction Imelda-Alicia Road, Binangonan-Nanan Road, Payao, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Concrete Road: 6.276 Lane Km
Unit Cost: P 7,026,768.64/Lane Km
EAO: P 900,000.00
Allocation: P 45,000,000.00
January 14, 2021 FY 2020 WIN0G03218 300116203189000 July 24, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300116203189000
Project ID: P00443643MN


Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Concreting of local roads-Junction leading to Dumpok-Baluyan Road, Imelda, Zamboanga Sibugay

Physical Target:
CW-1 - Construction of Concrete Road: 4.389 Lane Km
Unit Cost: P 7,814,992.03/Lane Km
EAO: P 700,000.00
Allocation: P 35,000,000.00
January 14, 2021 FY 2020 WIN0G03223 300117207307000 July 24, 2020 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300117207307000
Project ID: P00444026MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Local Road from Brgy. Labrador - Poblacion, Buug, Zamboanga Sibugay

Physical Target:
CW-1- Construction of Concrete Road: 1.394 lane km
Unit Cost: P 7,101,865.14/Lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00
January 8, 2021 2020 WIN0G02873 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Butuan City District Engineering Office
UACS No. 310212100165000
Project ID: P00400405MN

FROM:

OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + 000, K1245 + 149 - K1246 + 420, K1246 + 537 - K1246 + 621, K1249 + 400 - K 1249 + 860, (S00441MN) K1241 + 875 - K1242 + 028

Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 6.028 lane km

Unit Cost: Php 11,584,582 / lane km

Allocation: Php 69,831,860.00

EAO: Php 1,425,140.00

Total: Php 71,257,000.00

TO:

OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

Butuan City-Pianing-Tandag Rd - (S00435MN) K1243 + (-998) - K1243 + (-090), K1245 + 272 - K1246 + 458, K1246 + 571 - K1246 + 661.50, K1249 + 439 - K 1249 + 930, (S00441MN) K1241 + 924 - K1242 + 028

Type of Work/Physical Target:
CW1 - Paving of Unpaved Roads / 5.655 lane km

Unit Cost: Php 12,348,693 / lane km

Allocation: Php 69,831,860.00

EAO: Php 1,425,140.00

Total: Php 71,257,000.00
January 8, 2021 2020 WIN0G02862 FY 2020 GAA RA 11465 January 24, 2020 Region XIII Butuan City District Engineering Office
UACS No. 300204100435000
Project ID: P00431499MN

FROM:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work/Physical Target:

CW1 - Road Widening / 2.2 lane km

Unit Cost: Php 24,125,000 / lane km

Allocation: Php 53,075,000.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00

TO:

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

NRJ BCIR-Mayor Democrito D. Plaza II Ave. Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte

Type of Work/Physical Target:

CW1 - Widening of Bridge / 172.10 sq.m
CW2 - Construction of Slope Protection Structure / 965.19 sq.m

Unit Cost1: Php 97,369.55 / sq.m
Unit Cost2: Php 37,627.51 / sq.m

Estimated Cost1: Php 16,757,300.00
Estimated Cost2: Php 36,317,700.00

EAO: Php 1,925,000.00

Total: Php 55,000,000.00
January 7, 2021 2020 WIN0C04101 GAA 2020 December 1, 2020 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 270 Square meters;
Allocation= Php 44000000

To: Demonstration Br. (B02184LZ) along Kennon Rd;
Type of Work: Replacement of Bridge;
Physical Target: CW1 : 442.274 Square meters; Allocation= Php 44000000
January 7, 2021 2020 WIN0C04091 GAA 2020 November 27, 2020 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 964.0 Square meters;
Allocation= Php 20000000

To: Tawang-Ambiong Rd - K0263 + 870 - K0263 + 900;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 240.0 Square meters
CW2: 724.0 Square meters;
Allocation= Php 20000000
January 7, 2021 2020 WIN0C04089 GAA 2020 November 27, 2020 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 260 Lineal meters;
Allocation= Php 50000000

"To: Construction of Sipa Flood Control Structure, Sta Marcela, Apayao;
Type of Work: CW1: Construction of Flood Mitigation Structure
CW2: Construction of Flood Mitigation Structure;
Physical Target: CW1 : 170.5 Lineal meters
CW2 : 121.5 Lineal meters;
Allocation= Php 50000000"
January 6, 2021 2020 WIN0C04088 GAA 2020 November 11, 2020 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000

To: Construction of Roads, Mongol-Talboc, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Slope Protection Structure
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 198 Square Meters
CW2 : 0.956 Lane Km;
Allocation= Php 15000000
January 6, 2021 2020 WIN0C03692 GAA 2020 December 9, 2020 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Concrete Road; Physical Target: CW1 : 1.0 Lane Km;
Allocation= Php 15000000

"To: Construction of Roads, Palaad-Ayangan, Mayoyao, Ifugao;
Type of Work: CW1 : Construction of Gravel Road
CW2 : Construction of Gravel Road;
Physical Target: CW1 : 0.248 Lane Km
CW2 : 0.752 Lane Km;
Allocation= Php 15000000"

Pages