July 15, 2021 |
FY 2021 GAA |
WIN1F06341 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203101397000
Project ID : P00534414LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM :
Concreting of Purok 4 Sto. Nino Road leading to Ombo Falls
via bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.40 Lane Km
Allocation : Php 105.00Million
TO :
Concreting of Purok 4, Sto. Nino Road leading to Ombo Falls
via Bato ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
3.83 Lane Km
Allocation : Php 105.00 Million
|
July 15, 2021 |
2021 |
WIN1E02584 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300116204620000
Project ID: P00550970MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.440 Lane Km
Allocation:
TOTAL: P 18,000,000
CW1: P 17,640,000
EAO: P 360,000
Unit Cost:
CW1: P 12,250,000/Lane Km
TO:
Construction of Road, Sta. Cruz to Santiago (Lauban to P2 Barangay Santiago), Barangay Sta. Cruz to Barangay Santiago, Loreto, Dinagat Islands
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
Physical Target:
CW1- 1.710 Lane Km
CW2- 1.240 Lane Km
Allocation:
TOTAL: P 18,000,000
CW1: P 16,522,250
CW2: P 1,117,750
EAO: P 360,000
Unit Cost:
CW1: P 9,662,134.50/Lane Km
CW2: P 901,410.48/Lane Km |
July 15, 2021 |
FY 2021 GAA |
WIN1F06370 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200565000
Project ID : P00561416LZ
LOCAL PROGRAM
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0 Lineal meter
Allocation : Php 90.00 Million
TO :
Construction of Pili Flood Control, Looc, Romblon
Physical Target - CW1 - 480.0 Lineal meter
Allocation : Php 90.00 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1F06369 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200574000
Project ID : P00561447LZ
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
0.00 Lineal meter
Allocation : Php 90.00 Million
TO :
Construction of Tuburan Flood Control,
Tuburan, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
486.00 Lineal meter
Allocation : Php 90.00 Million
|
July 15, 2021 |
FY 2021 GAA |
WIN1E02437 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1487+000
Physical Target:
CW1: 5.528 Lane km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Road Widening)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1484+236 - K1485+276
Physical Target:
CW1: 2.080 Lane km (Road Widening)
ROW: 15,600.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,520,130.00 (Road Widening)
ROW: P 2,429,870.00 (ROW Acquisition)
EAO: P 1,050,000.00 |
July 15, 2021 |
FY 2021 GAA |
WIN1E02424 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Panalum-Paquibato Rd -
K1528+288 - K1528+591, K1528+684 - K1530+100
Physical Target:
CW1: 3.680 Lane km (Road Widening)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 120,271,810.00 (Road Widening)
EAO: P 4,362,190.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Mabuhay-Pañalum-Paquibato Rd -
K1524+811 - K1525+470, K1528+1032 - K1530+596
Physical Target:
CW1: 4.966 Lane km (Road Widening)
ROW: 37,245.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 124,634,000.00
CW1: P 85,139,055.00 (Road Widening)
ROW: P 17,971,195.00 (ROW Acquisition)
EAO: P 3,739,750.00
EXC: P 17,784,000.00 |
July 14, 2021 |
CY 2021 |
WIN1F06520 |
UACS NO. 320101106443000 |
March 11, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106443000
Project ID.: P00525809LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 2+081.60 to Sta. 2+120.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 384 & Barangay 385,
Sta. 2+140.00 to Sta. 2+260.00; Sta. 1+930.40 to Sta. 1+963.20, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06520
|
July 14, 2021 |
CY 2021 |
WIN1F06522 |
UACS NO. 320101106444000 |
March 11, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106444000
Project ID.: P00525810LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+461.00 to Sta. 0+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de San Miguel Barangay 386 (Phase I),
Sta. 1+467.20 to Sta. 1+560.00; Sta. 1+660.00 to Sta. 1+720.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m. P 320,680/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06522
|
July 14, 2021 |
FY 2021 GAA |
WIN1E02536 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.500 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Tibungco, Bunawan District, Davao City, Davao del Sur
Physical Target:
CW1: 0.692 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02529 |
FY 2021 GAA RA 11518 |
January 1, 2020 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+747
Physical Target:
CW1: 574.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Surigao-Davao Coastal Rd - K1826+683.72
Physical Target:
CW1: 256.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 17,086,000.00
CW1: P 16,744,280.00 (Construction of Drainage Structure along Road)
EAO: P 341,720.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02539 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1473+479 - K1475+000
Physical Target:
CW1: 3.012 lane km (Road Widening)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Road Widening)
EAO: P 400,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1472+515 - K1472+850
Physical Target:
CW1: 0.670 lane km (Road Widening)
CW2: 0.670 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 11,654,958.00 (Road Widening)
CW2: P 7,945,042.00 (Reconstruction to Concrete Pavement)
EAO: P 400,00.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02552 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Tagum City, Davao del Norte
Physical Target:
CW1: 0.414 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00
TO: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
NRJ Sagayen-Sonlon Road connecting Asuncion Overland Transport Terminal in support of Coconut, Banana and Rice Industries, Asuncion, Davao del Norte
Physical Target:
CW1: 0.440 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 4,500,000.00
CW1: P 4,410,000.00 (Construction of Concrete Road)
EAO: P 90,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02528 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Rehabilitation of Multi-Purpose Building (Gym), Barangay Del Pilar, Mabini, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02553 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 2.401 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Concreting of Road, Canidkid-New Calape, Phase 2, Montevista, Davao de Oro
Physical Target:
CW1: 1.912 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 24,000,000.00
CW1: P 23,520,000.00 (Construction of Concrete Road)
EAO: P 480,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02548 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.612 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd -
K1511+124 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 2.182 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 300,00.00 |
July 14, 2021 |
2021 |
320102104062000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control System, Package 2, Sta. 0+296 - Sta. 0+582 (Upstream), Balasig, Cabagan, Isabela |
July 14, 2021 |
FY 2021 GAA |
WIN1E02537 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1807+462
Physical Target:
CW1: 1.978 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,00.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1806+537 - K1808+152
Physical Target:
CW1: 3.330 lane km (Road Widening)
ROW: 33,300.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,000,00.00 |
July 14, 2021 |
2021 |
310109100537000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Peñablanca - Callao Cave Road K0476+220 - K0476+677, K0477+407 - K0477+590, K0480+024 - K0480+200 |
July 14, 2021 |
2021 |
300211100067000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Road Construction/ Concreting - Centro Norte - Taligan Road, Gattaran, Cagayan |
July 14, 2021 |
2021 |
320101106043000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Flood - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/ Rehabilitation of River Bank Protection for Lower Cagayan River, Sta. Maria, Lal-lo, Cagayan, Sta. 0+000 - Sta. 0+024.40 |
July 14, 2021 |
2021 |
310201100751000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ), K0277+250 - K0277+580 |
July 14, 2021 |
2021 |
310204101023000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Dupax Del Sur Bypass Road, Nueva Vizcaya |
July 14, 2021 |
2021 |
310109100640000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0223+150 - K223+190, K0223+230 - K0223+280 |
July 14, 2021 |
2021 |
310108100610000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads - Nueva Vizcaya - Benguet Road - K0242+900 - K0243+100, K0244+000 - K0244+200, K0244+300 - K0244+393 |
July 14, 2021 |
2021 |
310202100774000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Nueva Vizcaya - Benguet Rd - K0251+280.50 - K0251+887.50 |
July 14, 2021 |
2021 |
310109100639000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Aritao - Quirino Road - K0258+405 - K0258+414, K0280+156 - K0280+192, K0286+053 - K0286+058, K0291+180 - K0291+189 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02575 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2,000.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Oregon Creek, Governor Generoso, Davao Oriental
Physical Target:
CW1: 3,330.88 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 75,00,000.00
CW1: P 72,375,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,625,000.00 |
July 14, 2021 |
2021 |
310109100641000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary Roads - Nueva Vizcaya - Pangasinan Road, K0225+730 - K0225+832 |
July 14, 2021 |
2021 |
310203100435000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads - Jct Abbag - Nagtipunan - Nueva Vizcaya Rd via Dupax - K0398+600 - K0399+400 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02579 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.835 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Magsaysay Ave - (S01446MN) Chainage 000 - Chainage 118
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,650,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 350,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02578 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Sitio Marquez, Purok 6, Barangay San Isidro, Davao City
Physical Target:
CW1: 0.602 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Concrete Road)
EAO: P 30,000.00 |
July 14, 2021 |
2021 |
310202100776000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Quirino District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Cordon - Aurora Bdry Rd (Isabela Bdry - Jct Dumabato) K0365+000 - K0365+533, K0365+587 - K0365+700 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02563 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1823+512 - K1824+527
Physical Target:
CW1: 2.048 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1825+460 - K1825+972
Physical Target:
CW1: 1.024 lane km (Road Widening)
CW2: 924.00 lm (Construction of Drainage Structure along Road)
ROW: 7,731.20 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 23,679,764.00 (Road Widening)
CW2: P 16,904,476.00 (Construction of Drainage Structure along Road)
ROW: P 8,415,760.00 (ROW Acquisition)
EAO: P 1,000,000.00 |
July 14, 2021 |
FY 2021 GAA |
WIN1E02556 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+784 - K1457+469
Physical Target:
CW1: 9,131.30 sq. m. (Off-Carriageway Improvement: Construction of Median/Center Island)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Median/Center Island)
EAO: P 400,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1456+600 - K1456+788
Physical Target:
CW1: 4,600.88 sq. m. (Off-Carriageway Improvement: Construction of Bike Lanes)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
EAO: P 400,000.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02527 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1523+953 - K1524+228
Physical Target:
CW1: 0.552 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 8,063,440.00 (Reconstruction to Concrete Pavement)
EAO: P 164,560.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Mati-Maragusan Rd - K1524+128 - K1524+228
Physical Target:
CW1: 0.200 Lane Km (Reconstruction to Concrete Pavement)
CW2: 400.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 8,228,000.00
CW1: P 4,184,776.00 (Reconstruction to Concrete Pavement)
CW2: P 3,878,664.00 (Construction of Road Slope Protection Structure)
EAO: P 164,560.00 |
July 13, 2021 |
2021 |
WIN1F06428 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Basey Tide Embankment, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 223.00 Lineal Meters
EAO P 1.32265 M
Total P 37.790 M
AS MODIFIED:
Construction of Basey Tide Embankment, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 36.46735 M
Structure: 73.00 Lineal Meters
EAO P 1.32265 M
Total P 37.790 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02545 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1503+670 - K1503+700, K1504+081 - K1504+122,
K1522+551 - K1522+560, K1523+063 - K1523+083.50
Physical Target:
CW1: 3,125.75 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Mati-Maragusan Rd -
K1502+510 - K1502+560, K1503+650 - K1503+700,
K1504+080 - K1504+110, K1522+550 - K1522+560,
K1523+045 - K1523+075, K1523+290 - K1523+310
Physical Target:
CW1: 934.622 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 30,800,000.00
CW1: P 30,184,000.00 (Construction of Road Slope Protection Structure)
EAO: P 616,000.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02538 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanan, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Brgy. Tibanban, Governor Generoso, Davao Oriental
Physical Target:
CW1: 2 buildings (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Multi-Purpose Building)
EAO: P 100,000.00 |
July 13, 2021 |
2021 |
WIN1F06507 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 417 - K0809 + 917
Physical Target: Allocation:
CW1-Road Widening: 1.00 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd, K0809+000 – K0809+480
Physical Target: Allocation:
CW1-Road Widening: 0.96 Lane Km P 19.600 M
EAO P 0.400 M
Total P 20.00 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02534 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building (Tribal Hall), Gupitan, Kapalong, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Multi-Purpose Building)
EAO: P 30,000.00 |
July 13, 2021 |
2021 |
WIN1F06497 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 554
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 19.600 M
along Road: 708 Lineal Meters
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Justice Romualdez St - (S00005LT) – Chainage 200 – Chainage 872
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 19.600 M
along Road: 672 Lineal Meters
EAO P 0.400 M
Total P 20.00 M
|
July 13, 2021 |
2021 |
WIN1F06514 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 640 - K0810 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500.00 Square Meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0810 + 650 - K0810 + 801
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,567.00 Square Meters
EAO P 1.925 M
Total P 55.00 M
|
July 13, 2021 |
FY 2021 GAA |
WIN1E02554 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000, K1504+(-607) - K1504+(-566)
Physical Target:
CW1: 1.296 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
R Castillo St - K1504+(-566) - K1504+000
Physical Target:
CW1: 1.132 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 14,232,000.00
CW1: P 13,947,360.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 284,640.00 |
July 13, 2021 |
FY 2021 GAA |
WIN1E02549 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+400 - Sta. 6+110 Right Bank)
Physical Target:
CW1: 813.647 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Talomo River, Davao City (Sta. 5+330 - Sta. 5+595 Right Bank)
Physical Target:
CW1: 265.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,00,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,450,000.00 |
July 13, 2021 |
2021 |
WIN1F06498 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0812 + 090 - K0812 + 275
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 5,500 Square Meters
EAO P 1.925 M
Total P 55.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0812 + 318 - K0812 + 460
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 53.075 M
Structure: 2,840.00 Square Meters
EAO P 1.925 M
Total P 55.00 M
|
July 13, 2021 |
2021 |
WIN1F06512 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Construction of Road Slope Protection Structure – Libungao-Matag-ob-Palompon Rd – K1006+(-004.9) – K1006+000, K1006+116 – K1006+132, K1006+205 – K1006+230.5, K1006+360.5 – K1006+460.5, K1006+750.5 – K1006+790, K1007+049.5 – K1007+071.5, K1007+562 – K1007+617
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.623800 M
Structure: 2,682.833 Square Meters
EAO P 0.686200 M
Total P 34.310 M
AS MODIFIED:
Construction of Road Slope Protection Structure – Libungao-Matag-ob-Palompon Rd – K1006+205 – K1006+230.5, K1006+418 – K1006+485, K1006+607 – K1006+643, K1007+049.5 – K1007+108, K1007+130 – K1007+157, K1007+260 – K1007+302, K1007+305 – K1007+260 – K1007+302, K1007+305 – K1007+355, K1008+060 – K1008+125, K1008+577 – K1008+635, K1009+(-070) – K1009+040
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.623800 M
Structure: 2,682.833 Square Meters
EAO P 0.686200 M
Total P 34.310 M
|
July 13, 2021 |
2021 |
WIN1F06495 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Construction of Road Slope Protection Structure – Palo-Carigara-Ormoc Rd – K0991+800 – K0991+900
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 9.800 M
Structure: 1,000 Square Meters
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Road Slope Protection Structure – Palo-Carigara-Ormoc Rd – K0990+000 – K0990+243, K0991+328 – K0991+350, K0992+461 – K0992+511, K0994+030 – K0994+216
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 9.800 M
Structure: 1,000 Square Meters
EAO P 0.200 M
Total P 10.00 M
|
July 13, 2021 |
2021 |
WIN1F06494 |
GAA FY 2021 |
February 1, 2021 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Catarman-Calbayog Rd - K0746 + 500 - K0746 + 800
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 183.350 M
Structure: 12,666.667 Square Meters
EAO P 6.650 M
Total P 190.00 M
AS MODIFIED:
Catarman-Calbayog Rd-K0746 + 140 - K0746 + 605, K0772 + 886 - K0773 + 000, K0773 + 000 - K0773 + 060 (S00004SM), K0782 + (-040) - K0782 + 000, K0782 + 000 - K0782 + 140 (S00050SM)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 183.350 M
Structure: 8,847.530 Square Meters
EAO P 6.650 M
Total P 190.00 M
|
July 13, 2021 |
2021 |
WIN1F06517 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calbayog-Catarman Rd - K0786 + 114 - K0786 + 210
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 6,000.00 Square Meters
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Calbayog-Catarman Rd – K0786 + (-113) -K0786 + 000, K0786 + 293.5 – K0786 + 435
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 2,695.60 Square Meters
EAO P 0.60 M
Total P 30.00 M
|
July 13, 2021 |
2021 |
WIN1G02940 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 310208100385000
Project ID: P00501576MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
FROM:
Dinagat-Loreto Rd - K0012 + 000 - K0012 + 438, K0012 + 454 - K0012 + 806, K0012 + 816 - K0013 + 263
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1-2,888.000 Square meters
Allocation:
TOTAL: P 8,129,000
CW1: P 7,966,420
EAO: P 162,580
Unit Cost:
CW1: P 2,758.46/ Square meters
TO:
Dinagat-Loreto Rd - K0012 + 460 - K0012 + 762, K0012 + 820 - K0013 + 263, K0012 + 812 - K0013 + 213, K0013 + 426 - K0014 + 118
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1- 4,832.000 Square meters
Allocation:
TOTAL: P 8,129,000
CW1: P 7,966,420
EAO: P 162,580
Unit Cost:
CW1: P 1,648.68/ Square meters |
July 13, 2021 |
2021 |
WIN1F06426 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Regional Office VIII |
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Storm Surge Protection: Embarkadero Backwater Dike, Right Bank, Barangay Buntay, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 575.00 Lineal Meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction of Storm Surge Protection: Embarkadero Backwater Dike, Right Bank, Brgy. Buntay, Brgy. Canramos, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 96.500 M
Structure: 575.00 Lineal Meters
EAO P 3.500 M
Total P 100.00 M
|
July 13, 2021 |
2021 |
WIN1E02533 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320101107176000
Project ID: P00522268MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of River Bank Protection of Ihawan River, Sta. 0 + 000 - Sta. 0 + 150, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 165.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 296,969.70/ Lineal meters
TO:
Construction of River Bank Protection of Ihawan River, Sta. 0 + 000 - Sta. 0 + 165, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 165.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 296,969.70/ Lineal meters |
July 13, 2021 |
2021 |
WIN1F06516 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Bito Flood Control Structures, Brgy Picas, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 39.200 M
Structure: 378.232 Lineal Meters
EAO P 0.800 M
Total P 40.00 M
AS MODIFIED:
Construction of Bito Flood Control Structures, Brgy Picas Norte, Javier, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 39.200 M
Structure: 538.00 Lineal Meters
EAO P 0.800 M
Total P 40.00 M
|
July 13, 2021 |
2021 |
WIN1F06486 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Rehabilitation of Multi-Purpose Building, Barangay Awang East, Calbayog City, Samar
Physical Target: Allocation:
CW1-Rehabilitation / Major Repair Multipurpose P 1.00 M
Building: 1.00 No. of Bldg.
Total P 1.00 M
AS MODIFIED:
Rehabilitation of Multi-Purpose Building, Barangay East Awang, Calbayog City, Samar
Physical Target: Allocation:
CW1-Rehabilitation / Major Repair Multipurpose P 1.00 M
Building: 1.00 No. of Bldg.
Total P 1.00 M
|
July 12, 2021 |
CY 2021 |
WIN1F06482 |
UACS NO. 300103203180000 |
April 26, 2021 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300103203180000
Project ID.: P00556807LZ
Local Program
Local – Buildings And Other Structures – Multi-Purpose/Facilities – Construction/Repair/Rehabilitation/
Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building at NOH-School for Crippled Children (Covered Court), Banawe St.,
Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000) = P 9,800.00 / lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total = P 10,000,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multi-Purpose/Facilities – Construction/Repair/Rehabilitation/
Improvement of Various Infrastructure including Local Projects
Construction of Multi-Purpose Building at NOH-School for Crippled Children (Covered Court) D. Tuazon St. Brgy. Lourdes, Quezon City
Physical Target: CW1 = Construction of Multi-Purpose Building 1 Bldg.
Unit Cost (P’000) = P 9,800.00 / lane km
Allocation = P 9,800,000.00
EAO = P 200,000.00
Total = P 10,000,000.00
WIN1F06482
|
July 12, 2021 |
CY 2021 |
WIN1F06501 |
UACS NO. 30017207772000 |
April 26, 2021 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 30017207772000
Project ID.: P00562700LZ
Local Program
Local – National Roads and Bridges – Local Roads – Local Infrastructure Program
Rehabilitation of Road, Brgy. Banlat, Quezon City
Physical Target: CW1 = Rehabilitation of Concrete Road: 1.146 lane km
Unit Cost = P 8,638.74 / lane km
Allocation = P 9,900,000.00
EAO = P 100,000.00
Total = P 10,000,000.00
As Modified
Local Program
Local – National Roads and Bridges – Local Roads – Local Infrastructure Program
Rehabilitation of Banlat Road, Quezon City
Physical Target: CW1 = Rehabilitation of Concrete Road: 1.146 lane km
Unit Cost = P 8,638.74 / lane km
Allocation = P 9,900,000.00 P 17.2 M/km
EAO = P 100,000.00
Total = P 10,000,000.00
WIN1F06501
|
July 12, 2021 |
CY 2021 |
WIN1F06438 |
UACS NO. 300104219160000 |
April 6, 2021 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As per GAA/Original
UACS No. 300104219160000
Project ID.: P00557329LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Two (2) Storey Multi-Purpose Building J. De Leon St., Barangay San Dionisio,
Parañaque City, Metro Manila
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost = P 7,920.00 / No. of Bldg.
Allocation (P’000) = P 7,920.00
EAO (P’000) = P 80.00
Total (P’000) = P 8,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Four (4) Storey Multi-Purpose Building J. De Leon St., Barangay San Dionisio,
Parañaque City, Metro Manila
Physical Target: CW1 = Construction of Multi-Purpose Building 1 bldg.
Unit Cost = P 7,920.00 / No. of Bldg.
Allocation (P’000) = P 7,920.00
EAO (P’000) = P 80.00
Total (P’000) = P 8,000.00
WIN1F06438
|
July 12, 2021 |
CY 2021 |
WIN1F06480 |
UACS NO. 3101022100608000 |
March 12, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100608000
Project ID.: P00505425LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
España Blvd – K0004+(-537) – K0004+349, K0005+(-523) – K0005+377
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=3.600 lane km
CW2 = Preventive Maintenance of Road: Concrete Reblocking L=3.544 lane km
Unit Cost (P’000) = P 8,161.22/ lane km
P 1,782.74/ lane km
Allocation (P’000) = P 29,380.40
= P 6,318.06
EAO (P’000) = P 728.54
Total (P’000) = P 36,427.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
España Blvd – K0004+072.10 – K0004+478.70, K0005+476.05 – K0005+882.656
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=3.600 lane km
CW2 = Preventive Maintenance of Road: Concrete Reblocking L=3.544 lane km
Unit Cost (P’000) = P 8,161.22/ lane km P16M/km
P 1,782.74/ lane km
Allocation (P’000) = P 29,380.40
= P 6,318.06
EAO (P’000) = P 728.54
Total (P’000) = P 36,427.00
WIN1F06480
|
July 12, 2021 |
CY 2021 |
WIN1F06480 |
UACS NO. 3101022100608000 |
March 12, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100608000
Project ID.: P00505425LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
España Blvd – K0004+(-537) – K0004+349, K0005+(-523) – K0005+377
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=3.600 lane km
CW2 = Preventive Maintenance of Road: Concrete Reblocking L=3.544 lane km
Unit Cost (P’000) = P 8,161.22/ lane km
P 1,782.74/ lane km
Allocation (P’000) = P 29,380.40
= P 6,318.06
EAO (P’000) = P 728.54
Total (P’000) = P 36,427.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
España Blvd – K0004+072.10 – K0004+478.70, K0005+476.05 – K0005+882.656
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=3.600 lane km
CW2 = Preventive Maintenance of Road: Concrete Reblocking L=3.544 lane km
Unit Cost (P’000) = P 8,161.22/ lane km P16M/km
P 1,782.74/ lane km
Allocation (P’000) = P 29,380.40
= P 6,318.06
EAO (P’000) = P 728.54
Total (P’000) = P 36,427.00
WIN1F06480
|
July 12, 2021 |
CY 2021 |
WIN1F06502 |
UACS NO. 310102100621000 |
February 22, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100621000
Project ID.: P00505437LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Valenzuela St – Chainage 240.5 – Chainage 390
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=0.299 lane km
Unit Cost (P’000) = P 8,190.70/ lane km
Allocation (P’000) = P 2,449.02
EAO (P’000) = P 49.98
Total (P’000) = P 2,499.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Valenzuela St – Chainage 077.00 – Chainage 150.50
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=0.299 lane km
Unit Cost (P’000) = P 8,190.70/ lane km P 16 M/km
Allocation (P’000) = P 2,449.02
EAO (P’000) = P 49.98
Total (P’000) = P 2,499.00
WIN1F06502
|
July 12, 2021 |
FY 2021 GAA |
WIN1E02465 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - 5th Ave - K1510+(-822) - K1510+(-512)
Physical Target:
CW1: 3.339 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - 5th Ave - K1510+(-804) - K1510+(-528)
Physical Target:
CW1: 2.560 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02470 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Ayagon, Brgy. Lumiad to Sitio Salukadang, Brgy. Mapula, Paquibato District, Davao City
Physical Target:
CW1: 4.122 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 41,200,000.00
CW1: P 40,376,000.00 (Construction of Concrete Road)
EAO: P 824,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Sitio Ayagon, Brgy. Lumiad to Sitio Salukadang, Brgy. Mapula, Paquibato District, Davao City
Physical Target:
CW1: 0.590 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 41,200,000.00
CW1: P 40,376,000.00 (Construction of Gravel Road)
EAO: P 824,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02459 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting/Improvement of Road, Barangay Ilangay, Lupon, Davao Oriental
Physical Target:
CW1: 0.200 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Concrete Road)
EAO: P 40,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting/Improvement of Road, Barangay Ilangay, Lupon, Davao Oriental
Physical Target:
CW1: 0.312 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,960,000.00 (Construction of Concrete Road)
EAO: P 40,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02522 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd -
K1778+619 - K1780+190, K1780+600 - K1782+800
Physical Target:
CW1: 7.084 Lane km (Road Widening)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 101,325,000.00 (Road Widening)
EAO: P 3,675,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd -
K1779+820 - K1780+190, K1780+600 - K1782+600
Physical Target:
CW1: 4.740 Lane km (Road Widening)
ROW: 35,550.00 Sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 94,570,000.00 (Road Widening)
ROW: P 6,755,000.00 (ROW Acquisition)
EAO: P 3,675,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1G02955 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1465+496 - K1466+156
Physical Target:
CW1: 1.354 Lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1465+306.34 - K1465+476.26,
K1465+658.462 - K1466+740.71, K1468+1140 - K1468+1580
Physical Target:
CW1: 3.730 Lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1G02959 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-DNAS Rd -
K1422+397.20 - K1422+945, K1422+961 - K1425+961,
K1425+1007 - K1428+776, K1428+812 - K1430+082
Physical Target:
CW1: 28.555 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 95,056,000.00
CW1: P 91,729,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,326,960.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-DNAS Rd -
K1422+040 - K1422+931, K1422+972 - K1425+950,
K1426+008 - K1428+761, K1428+825 - K1429+406
Physical Target:
CW1: 13.902 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 95,056,000.00
CW1: P 91,729,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,326,960.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1G02956 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1753+727 - K1754+000
Physical Target:
CW1: 0.538 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,284,000.00
CW1: P 7,138,320.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 145,680.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Nat'l Hi-way, K1758+920.47 - K1759+052.27
Physical Target:
CW1: 0.5472 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,284,000.00
CW1: P 7,138,320.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 145,680.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1G02957 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1515+085 - K1515+086, (S01455MN) Chainage 1101 - Chainage 1261
Physical Target:
CW1: 241.50 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 6,831,000.00
CW1: P 6,694,380.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 136,620.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Davao-Cotabato Rd (Davao City - Jct Digos Sect) -
K1515+020 - K1515 +100, (S01455MN) Chainage 1101 - Chainage 1261
Physical Target:
CW1: 524.20 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
CW2: 0.080 Lane km (Road Widening)
ROW: 85.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,831,000.00
CW1: P 2,919,420.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
CW2: P 883,960.00 (Road Widening)
ROW: P 2,891,000.00 (ROW Acquisition)
EAO: P 136,620.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02521 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off‐Carriageway Improvement of Road, Barangay 3‐A, Davao City
Physical Target:
CW1: 0.503 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Rehabilitation of Concrete Road)
EAO: P 37,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off‐Carriageway Improvement of Road, Barangay 3‐A, Davao City
Physical Target:
CW1: 2,015.93 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 37,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02514 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road including Drainage, Purok Talisay, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 0.340 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00 (Rehabilitation of Concrete Road)
EAO: P 25,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation of Road including Drainage, Purok Talisay, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 0.200 Lane Km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.0 (Rehabilitation of Concrete Road)
EAO: P 25,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1G02953 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Andap Road leading to Kalamokan Whitewater Rafting Site, Brgy. Andap, New Bataan, Compostela Valley
Physical Target:
CW1: 1.822 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 18,750,000.00
CW1: P 18,375,000.00 (Construction of Concrete Road)
EAO: P 375,000.00
TO: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Andap Road leading to Kalamokan Whitewater Rafting Site, Brgy. Andap, New Bataan, Compostela Valley
Physical Target:
CW1: 0.812 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 18,750,000.00
CW1: P 18,375,000.00 (Construction of Concrete Road)
EAO: P 375,000.00 |
July 12, 2021 |
2021 |
WIN1E02477 |
FY 2021 GAA RA 11518 |
January 19, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No.: 320102104444000
Project ID: P00522382MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of River Bank Protection along Ihawan River, Sta. 0+000.00 - Sta. 0+140.00, Loreto, Agusan del Sur
Type of Work:
CW1-Construction of Flood Mitigation Structure
Physical Target:
CW1- 18.000 Lineal meters
Allocation :
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00
EAO: P 100,000.00
Unit Cost:
CW1: P 272,222.22/lm
TO:
Construction of River Bank Protection along Ihawan River, Sta. 0+000.00 - Sta. 0+018.00, Loreto, Agusan del Sur
Type of Work:
CW1-Construction of Flood Mitigation Structure
Physical Target:
CW1 - 18.000 Lineal meters
Allocation :
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00
EAO: P 100,000.00
Unit Cost:
CW1: P 272,222.22/lm |
July 12, 2021 |
FY 2021 GAA |
WIN1E02423 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1712+(-695) - K1712+013,
K1712+014 - K1712+838, K1718+500 - K1718+749
Physical Target:
CW1: 3,390.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 18,645,000.00
CW1: P 18,272,100.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 372,900.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1712+(-695) - K1712+(-115),
K1712+046.096 - K1712+136.425, K1712+146.272 - K1712+822
Physical Target:
CW1: 6,839.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 18,645,000.00
CW1: P 18,272,100.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 372,900.00 |
July 12, 2021 |
2021 |
WIN1E02517 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No.: 320101107178000
Project ID: P00522270MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Improvement/Rehabilitation of Adlayan Riverbank, Sta. 0+000 - Sta. 0+120, San Francisco, Agusan del Sur
Type of Work:
CW1-Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1-55.000 Lineal meters
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 178,181.82/Lineal meters
TO:
Improvement/Rehabilitation of Adlayan Riverbank, Sta. 0+000 - Sta. 0+055, San Francisco, Agusan del Sur
Type of Work:
CW1-Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1-55.000 Lineal meters
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 178,181.82/Lineal meters |
July 12, 2021 |
2021 |
WIN1E02518 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310201100857000
Project ID: P00501571MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1341 + 000 - K1341 + 446
Type of Work:
CW1-Road Widening
Physical Target:
CW1-0.892 Lane Km
Allocation:
TOTAL: P 14,859,000
CW1: P 14,561,820
EAO: P 297,180
Unit Cost:
CW1: P 16,324,910.31/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1341 + 000 - K1341 + 230, K1376+726.00 – K1376+841.00, K1376+891 – K1376+896.00
Type of Work:
CW1- Road Widening
Physical Target:
CW1-0.700 Lane Km
Allocation:
TOTAL: P 14,859,000
CW1: P 14,561,820
EAO: P 297,180
Unit Cost:
CW1: P 20,802,600.00/Lane Km
|
July 12, 2021 |
2021 |
WIN1E02351 |
FY 2021 GAA RA 11518 |
January 19, 2021 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300203102023000
Project ID: P00537672MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
Access road leading to Toril Rock Formation,Brgy. Pandanon, Tandag City, Surigao del Sur
Type of Work:
CW1-Construction of Concrete Road
CW2-Construction of Gravel Road
Physical Target:
CW1-1.200 Lane Km
CW2-1.254 Lane Km
Allocation:
TOTAL: P 21,810,000
CW1: P 17,965,840
CW2: P 3,407,960
EAO: P 436,200
Unit Cost:
CW1:P 14,971,533.33/Lane Km
CW2: P 2,717,671.45/Lane Km
TO:
Access road leading to Toril Rock Formation,Brgy. Pandanon, Tandag City, Surigao del Sur
Type of Work:
CW1-Construction of Concrete Road
CW2-Construction of Gravel Road
Physical Target:
CW1-1.128 Lane Km
CW2-1.326 Lane Km
Allocation:
TOTAL: P 21,810,000
CW1: P 17,931,070
CW2: P 3,442,730
EAO: P 436,200
Unit Cost:
CW1:P 15,896,338.65/Lane Km
CW2: P 2,596,327.30/Lane Km |
July 12, 2021 |
FY 2021 GAA |
WIN1E02526 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Widening, Barangay 26-C, Poblacion, Davao City
Physical Target:
CW1: 0.805 Lane Km (Road Widening)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Road Widening)
EAO: P 35,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Road Widening, Barangay 26-C, Poblacion, Davao City
Physical Target:
CW1: 0.300 Lane Km (Road Widening)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Road Widening)
EAO: P 35,000.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02544 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1504+789 - K1504+938
Physical Target:
CW1: 4,700.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 21,733,000.00
CW1: P 21,298,340.00 (Construction of Road Slope Protection Structure)
EAO: P 343,660.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1504+780 - K1504+803
Physical Target:
CW1: 1,009.01 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 21,733,000.00
CW1: P 21,298,340.00 (Construction of Road Slope Protection Structure)
EAO: P 343,660.00 |
July 12, 2021 |
FY 2021 GAA |
WIN1E02550 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 5-A, Davao City
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,297,000.00 (Construction of Concrete Road)
EAO: P 30,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Local Road, Barangay 5-A, Davao City
Physical Target:
CW1: 0.116 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,297,000.00 (Reconstruction to Concrete Pavement)
EAO: P 30,000.00
|
July 12, 2021 |
FY 2021 GAA |
WIN1E02425 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 2), Davao del Sur
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Road)
EAO: P 6,300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 2), Davao del Sur
Physical Target:
CW1: 5.096 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 123,473,272.00 (Construction of Gravel Road)
CW2: P 50,226,728.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00 |
July 12, 2021 |
2021 |
WIN1E0235 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300204101162000
Project ID: P00537673MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
FROM:
Road from Barangay Kinabigtasan to Barangay Lindoy in support to Lumber Industry, Tago, Surigao del Sur
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-3.660 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1:P 8,032,786.89/Lane Km
TO:
Road from Barangay Kinabigtasan to Barangay Lindoy in support to Lumber Industry, Tago, Surigao del Sur
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-3.739 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1:P 7,863,064.99/Lane Km
|
July 10, 2021 |
CY 2021 |
WIN1F06506 |
UACS NO. 300104219180000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219180000
Project ID.: P00557350LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Filrezam Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Filrezam Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
WIN1F06506
|
July 10, 2021 |
CY 2021 |
WINF106508 |
UACS NO. 300104219188000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219188000
Project ID.: P00557358LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Trinidad Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Trinidad Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
WIN1F06508
|
July 10, 2021 |
CY 2021 |
WIN1F06509 |
UACS NO. 300104219175000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219175000
Project ID.: P00557345LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court), Barangay Mapulang Lupa, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Mapulang Lupa, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
WIN1F06509
|
July 10, 2021 |
CY 2021 |
WIN1F06505 |
UACS NO. 300104219187000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219187000
Project ID.: P00557357LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay T. Santiago Phase 2, Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, T. Santiago Phase 2, Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
WIN1F06505
|
July 10, 2021 |
CY 2021 |
WIN1F06505 |
UACS NO. 300104219187000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219187000
Project ID.: P00557357LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay T. Santiago Phase 2, Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, T. Santiago Phase 2, Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
WIN1F06505
|
July 10, 2021 |
2021 |
WIN1C04241 |
GAA 2021 |
July 2, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Mt. Province-Ifugao Rd (Kiling-Paracelis Sect) - K0458 + 294 - K0458 + 375, K0463 + 433 - K0463 + 533, K0470 + 178 - K0470 + 200, K0470 + 347 - K0470 + 390, K0470 + 402 - K0470 + 491;
Physical Target: CW1: 2,450 Square meters;
Allocation= Php 24,350,000
To: Mt. Province-Ifugao Road (Kiling-Paracelis Sect)- K0458 + 109 - K0458 + 193, K0458 + 294 - K0458 + 364, K0463+ 433 - K0463 + 454, K0470 + 111 - K0470 + 153, K0470 + 347 - K0470 + 390, K0470 + 404 - K0470 + 448, K0470 + 437 - K0470 + 494;
Physical Target: CW1: 2,128 Square meters;
Allocation= Php 24,350,000
|
July 10, 2021 |
2021 |
WIN1C04266 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0540 + 520 - K0540 + 560;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1,250 Square meters;
Allocation= Php 25,000,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0513 + 188 – K0513 + 797, K0513 + 816 – K0514 + 088, K0514 + 525 – K0514 + 677, K0516 + 689 – K0516 + 723, K0533 + 720 – K0533 + 780, K0537 + 480 – K0537 + 540, K0542 + 620, K0542 + 660;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: CW1: 1,100 Square meters
CW2: 2.038 Lane Km;
Allocation= Php 25,000,000
|
July 10, 2021 |
2021 |
WIN1C04254 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0537 + 760 - K0537 + 862;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1,388.889 Square meters;
Allocation= Php 25,000,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 685 - K0510 + 745, K0512 + 458 - K0512 + 473, K0514 + 120 - K0514 + 160, K0514 + 930 - K0514 + 940, K0518 + 650 - K0518 + 680, K0524 + 489 - K0524 + 514, K0541 + 700 - K0541 + 748, K0509 + (-157)-K0509 + 193, K0509 + 564-K0509 + 900, K0510 + 909-K0511 + 191, K0513 + 054-K0513 + 188;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: CW1: 1,631 Square meters
CW2: 2.242 Lane Km;
Allocation= Php 25,000,000
|
July 10, 2021 |
CY 2021 |
WIN1F06511 |
UACS NO. 300104219206000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219206000
Project ID.: P00557378LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Rehabilitation of Sitio Kabatuhan Multi-Purpose Building (Covered Court), Barangay General T. de Leon,
Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Rehabilitation of Sitio Kabatuhan Multi-Purpose Building, Barangay General T. de Leon,
Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
WIN1F06511
|
July 10, 2021 |
CY 2021 |
WIN1F06511 |
UACS NO. 300104219206000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219206000
Project ID.: P00557378LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Rehabilitation of Sitio Kabatuhan Multi-Purpose Building (Covered Court), Barangay General T. de Leon,
Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Rehabilitation of Sitio Kabatuhan Multi-Purpose Building, Barangay General T. de Leon,
Valenzuela City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 2,970.0 / No. of Bldg.
Allocation (P’000) = P 2,970.00
EAO (P’000) = P 30.00
Total (P’000) = P 3,000.00
WIN1F06511
|
July 10, 2021 |
CY 2021 |
WIN1F06479 |
UACS NO. 300104219186000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219186000
Project ID.: P00557356LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay San Simon Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, San Simon Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
WIN1F06479
|
July 10, 2021 |
CY 2021 |
WIN1F06478 |
UACS NO. 300104219189000 |
March 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300104219189000
Project ID.: P00557359LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Victoria Covered Court Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
As Modified
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building, San Simon Phase 2, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 1,980.0 / No. of Bldg.
Allocation (P’000) = P 1,980.00
EAO (P’000) = P 20.00
Total (P’000) = P 2,000.00
WIN1F06478
|
July 10, 2021 |
2021 |
WIN1C04238 |
GAA 2021 |
June 22, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0520 + 540 - K0520 + 560;
Physical Target: CW1: 2,239.30 Square meters;
Allocation= Php 44,786,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0543 + 394 - K0543 + 474;
Physical Target: CW1: 1,680 Square meters;
Allocation= Php 44,786,000
|
July 10, 2021 |
2021 |
WIN1C04267 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Bulanao-Paracelis Rd - K0505 + 997 - K0506 + 000, K0507 + 523 - K0507 + 538;
Physical Target: CW1: 321 Square meters;
Allocation= Php 2,718,000
To: Bulanao-Paracelis Rd - K0505 + 997 - K0506 + 000;
Physical Target: CW1: 192 Square meters; Allocation= Php 2,718,000
|
July 10, 2021 |
2021 |
WIN1C04245 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Balbalan-Pinukpuk Rd - (S00537LZ) Chainage 1023 - Chainage 1062, Chainage 2332 - Chainage 2383, Chainage 18742 - Chainage 18814, Chainage 19569 - Chainage 19593, Chainage 24711 - Chainage 24738, Chainage 25580 - Chainage 25652, Chainage 25722 - Chainage 26069;
Physical Target: CW1: 3,121.4 Square meters;
Allocation= Php 35,521,000
To: Balbalan-Pinukpuk Rd - (S00537LZ) Chainage 1023 - Chainage 1062, Chainage 2366 - Chainage 2383, Chainage 18742 - Chainage 18814, Chainage 24711 - Chainage 24738, Chainage 25580 - Chainage 25652, Chainage 25722 - Chainage 25882;
Physical Target: CW1: 2,752 Square meters; Allocation= Php 35,521,000
|
July 10, 2021 |
2021 |
WIN1C04223 |
GAA 2021 |
June 19, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0510 + 438 - K0510 + 780, K0512 + 000 - K0512 + 294;
Physical Target: CW1: 1,653.60 Square meters;
Allocation= Php 16,530,000
To: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0510 + 438 - K0510 + 538, K0510 + 644 - K0510 + 768, K0512 + 000 - K0512 + 294, K0513 + 414 - K0513 + 465, K0518 + 840 - K0518 + 880 ; Physical Target: CW1: 2,111 Square meters;
Allocation= Php 16,530,000
|
July 10, 2021 |
2021 |
WIN1C04272 |
GAA 2021 |
June 24, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0536 + 440 - K0536 + 500;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1,250 Square meters;
Allocation= Php 25,000,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0524 + 050.5 – K0525 + 110, K0525 + 114 – K0525 + 228.5 , K0539 + 750 – K0539 + 790, K0538 + 640 - K0538 + 706, K0544 + 347 - K0544 + 600;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: CW1: 1,209 Square meters
CW2: 2.226 Lane Km;
Allocation= Php 25,000,000
|
July 10, 2021 |
2021 |
WIN1C04230 |
GAA 2021 |
June 6, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Cacaligan, Bantay Flood Control along Chico River Sta.100+000-Sta.100+800, Bantay, Tabuk City, Kalinga;
Physical Target: CW1: 255.271 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Cacaligan, Bantay Flood Control along Chico River Sta.000+000-Sta.000+310, Bantay, Tabuk City, Kalinga;
Physical Target: CW1: 310 Lineal meters;
Allocation= Php 20,000,000
|
July 10, 2021 |
2021 |
WIN1C04222 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Jct Potia-Mt Province Bdry Rd K0450 + 185 – K0451 + 857;
Physical Target: CW1: 7,717.5 Square meters;
Allocation= Php 21,600,000
To: Jct Potia-Mt Province Bdry Rd K0450 + 185 – K0451 + 380;
Physical Target: CW1: 6,376.5 Square meters;
Allocation= Php 21,600,000
|