Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 23, 2021 2021 WIN1F06121 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 2nd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Tapaz-Jamindan-Altavaz Rd - K0092 + 249 - K0092 + 843

CW1- Reconstruction to Concrete Pavement:
1.188 lane km - 24,364.76

EAO - 497.24

Total: 24,862.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Tapaz-Jamindan-Altavas Rd - K0092 + 510 - K0093 + 004

CW1- Reconstruction to Concrete Pavement:
0.948 lane km - 24,364.76

EAO - 497.24

Total: 24,862.00
July 23, 2021 FY 2021 GAA WIN1E02651 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Binondo-Sitio Mantapay Road, Baganga, Davao Oriental
Physical Target:
CW1: 2.736 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Gravel Road)
EAO: P 1,050,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Binondo-Sitio Mantapay Road, Baganga, Davao Oriental
Physical Target:
CW1: 2.736 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
EAO: P 1,050,000.00
July 23, 2021 FY 2021 GAA WIN1E02643 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Salingcomot to Sitio Bobon, Brgy. Salingcomot, Baganga, Davao Oriental
Physical Target:
CW1: 2.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Concrete Road)
EAO: P 1,000,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Salingcomot to Sitio Bobon, Brgy. Salingcomot, Baganga, Davao Oriental
Physical Target:
CW1: 4.800 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Concrete Road)
EAO: P 1,000,000.00
July 23, 2021 FY 2021 GAA WIN1E02652 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Fuentes, Pantukan, Davao de Oro
Physical Target:
CW1: 1.756 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Fuentes, Pantukan, Davao de Oro
Physical Target:
CW1: 2.580 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
EAO: P 400,000.00
July 23, 2021 FY 2021 GAA WIN1E02647 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) -
K1474+091 - K1474+109, K1475+747 - K1476+282
Physical Target:
CW1: 1,128 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 28,200,000.00
CW1: P 27,636,000.00 (Construction of Drainage Structure along Road)
EAO: P 564,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1475+747 - K1476+195
Physical Target:
CW1: 918 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 28,200,000.00
CW1: P 27,636,000.00 (Construction of Drainage Structure along Road)
EAO: P 564,000.00
July 22, 2021 FY 2021 GAA WIN1F06394 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204159000
Project ID : P00562420LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Parang, Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.470 Lane Km
Allocation : Php 3.00 Million

TO :

Concreting of Road,
Brgy. Parang, Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.668 Lane Km
Allocation : Php 3.00 Million
July 22, 2021 FY 2021 GAA WIN1F06384 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204160000
Project ID : P00562421LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Aurora - Brgy. Evangelista Road,
Naujan, Oriental Mindoro
Physical Target - CW1- Construction of Concrete Road :
4.724 Lane Km
Allocation : Php 25.00 Million

TO :

Concreting of Road,
Brgy. Aurora - Brgy. Evangelista Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.480 Lane Km
Allocation : Php 25.00 Million
July 22, 2021 2021 WIN1F06464 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Jct Sn Enrique-Pontevedra By-Pass Rd –
K0039 + 000 - K0039 + 325

CW1- Road Widening: 0.650 lane km - 13,709.22

EAO - 279.78

Total: 13,989.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Jct Sn Enrique-Pontevedra By-Pass Rd –
K0039 + 000- K0039 + 310

CW1- Road Widening: 0.620 lane km - 9,663.86

ROW Acquisition: 4,045.36 sq.m - 4,045.36

EAO - 279.78

Total: 13,989.00
July 22, 2021 2021 WIN1F06559 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0803 + 250 - K0803 + 300, K0830 + 650 - K0830 + 665, K0831 + 040 - K0831 + 090, K0840 + 847 - K0840 + 897

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 14.700 M
Structure: 1,500 Square Meters
EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0829 + 865 - K0829 + 880, K0830 + 650 - K0830 + 665, K0831 + 031 - K0831 + 071, K0840 + 847 - K0840 + 897

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 14.850 M
Structure: 660.00 Square Meters
EAO P 0.150 M

Total P 15.00 M
July 22, 2021 2021 WIN1B01170 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - (S00208NR) Chainage 2900 -
Chainage 5150

CW1- Road Widening: 4.50 lane km - 49,000.00

EAO - 1,000.00

Total: 50,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd - (S00208NR) Chainage 2900 -
Chainage 4150

CW1- Road Widening: 2.50 lane km - 39,494.00

ROW Acquisition: 9,506 sq.m - 9,506.00

EAO - 1,000.00

Total: 50,000.00
July 22, 2021 2021 WIN1F06352 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod South Rd - K0015 + 1006 - K0017 + 530

CW1- Preventive Maintenance of Road: Asphalt
Overlay: 6.288 lane km -33,678.68

EAO - 687.32

Total: 34,366.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod South Rd - K0012 + 000 – K0013 +
580

CW1- Preventive Maintenance of Road: Asphalt
Overlay: 6.288 lane km -33,678.68

EAO - 687.32

Total: 34,366.00
July 22, 2021 2021 WIN1F06445 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Bacolod South Rd (Old Road) - K0024 + (-034) - K0024 + 012, K0024 + (-038) - K0024 + (-034), K0024 + 012 - K0024 + 287

CW1- Reconstruction to Concrete Pavement: 0.650 lane km - 2,779.20

EAO - 260.80

Total: 13,040.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Bacolod South Rd (Old Road) - K0024 + (-034) – K0024+287

CW1- Reconstruction to Concrete Pavement: 0.640 lane km - 12,779.20

EAO - 260.80

Total: 13,040.00
July 22, 2021 2021 WIN1F06467 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Bacolod South Rd (Old Road) - Chainage 0 - Chainage 342

CW1- Reconstruction to Concrete Pavement:
0.684 lane km - 13,447.56

EAO - 274.44

Total: 13,722.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Bacolod South Rd (Old Road) - Chainage 0 - Chainage 337

CW1- Reconstruction to
Concrete Pavement: 0.674 lane km - 9,593.64

CW2- Construction of Drainage Structure along Road:
643 lineal meters - 3,853.92

EAO - 274.44

Total: 13,722.00
July 22, 2021 FY 2021 GAA WIN1F06372 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204162000
Project ID : P00562423LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Buhangin, Naujan, Oriental Mindoro
Physical Target : CW1 - Construction of Concrete Road :
4.410 Lane Km
Allocation : Php 25.00 Million

TO :

Concreting of Road,
Brgy. Buhangin, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.758 Lane Km
Allocation : Php 25.00 Million
July 22, 2021 2021 WIN1F06396 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Jct Pontevedra-La Castellana Rd - K0045 + 436 - K0046 + 000

CW1- Reconstruction to Concrete Pavement:
1.114 lane km - 21,902.02

EAO - 446.98

Total: 22,349.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Jct Pontevedra-La Castellana Rd – K0045 + 436 – K0046 + 545

CW1- Reconstruction to Concrete Pavement:
2.204 lane km - 21,902.02

EAO - 446.98

Total: 22,349.00
July 22, 2021 2021 WIN1F06538 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0986 + 100 - K0986 + 240, K0986 + 285 - K0986 + 407

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 39.20 M
Structure: 4,000 Square Meters
EAO P 0.80 M

Total P 40.00 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0985 + 190 - K0985 + 260

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 39.20 M
Structure: 1,439.00 Square Meters
EAO P 0.80 M

Total P 40.00 M
July 22, 2021 2021 WIN1F06264 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Jct Pontevedra-La Castellana Rd - K0056 + 204 - K0057 + 090

CW1- Reconstruction to Concrete Pavement:
1.768 lane km - 34,759.62

EAO - 709.38

Total: 35,469.00

TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
Roads - Tertiary Roads

Jct Pontevedra-La Castellana Rd - K0053 + 140-K0053 + 815, K0054 + 688 - K0054 + 812, K0056 + 204 - K0057 + 090


CW1- Reconstruction to
Concrete Pavement: 3.366 lane km - 34,759.62

EAO - 709.38

Total: 35,469.00
July 22, 2021 2021 WIN1F06299 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 2nd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Binalbagan-Isabela Rd - K0064 + 1096 - K0064 + 1302, K0066 + 090 - K0066 + 140

CW1- Reconstruction to Concrete Pavement: 0.512 lane km - 10,242.96

EAO - 209.04

Total: 10,452.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Binalbagan-Isabela Rd - K0064+1096 - K0064+1302, K0066+090 - K0066+293, K0066+719 - K0066+889

CW1- Reconstruction to Concrete Pavement: 1.158 lane km - 10,242.96

EAO - 209.04

Total: 10,452.00

July 22, 2021 2021 WIN1F06057 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 2nd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Vallehermoso-Canlaon City-La Castellana Rd - K0079 + 314 - K0079 + 497

CW1- Construction of Road Slope Protection Structure:
1,187.209 sq.m - 20,011.60

EAO - 408.40

Total: 20,420.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Vallehermoso-Canlaon City-La Castellana Rd - K0079 + 314 - K0079 + 349

CW1- Construction of Road Slope Protection Structure:
1,044.40 sq.m - 20,011.60

EAO - 408.40

Total: 20,420.00

July 22, 2021 2021 WIN1F06137 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 2nd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod South Rd - K0070 + 385.70 - K0070 + 535.70

CW1- Reconstruction to Concrete Pavement: 0.600 lane km - 12,297.04

EAO - 250.96

Total: 12,548.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod South Rd - K0058+500 - K0058+738.8, K0059+080.7 - K0059+116.8, K0070+446 - K0070+600.2, K0070+640.9 - K0070+721.9, K0070+812.2 - K0071 + 042

CW1- Reconstruction to Concrete Pavement: 1.4898 lane km - 12,297.04

EAO - 250.96

Total: 12,548.00

July 22, 2021 2021 WIN1F06144 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 2nd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod South Rd - K0071 + 632 - K0071 + 813

CW1- Reconstruction to Concrete Pavement:
0.724 - 14,254.10

EAO - 290.90

Total: 14,545.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod South Rd - K0071+ 847 - K0072+015, K0073+077-K0073+413

CW1- Reconstruction to Concrete Pavement:
1.69 lane km - 14,254.10

EAO - 290.90

Total: 14,545.00
July 22, 2021 2021 WIN1G02928 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. : 300116203636000
Project ID: P00550763MN

Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Sta. Irene-San Miguel Road, Surigao del Sur

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 12.900 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 9,724,806.20/ Lane Km

TO:

Construction of Sta. Irene-San Miguel Road, Surigao del Sur

Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Slope Protection Structure

Physical Target:
CW1- 6.76 Lane Km
CW2- 20,025.3 Square meters

Allocation:
TOTAL: P 130,000,000
CW1: P 98,369,018.11
CW1: P 27,080,981.89
EAO: P 4,550,000

Unit Cost:
CW1: P 14,551,629.9/ Lane Km
CW2: P 1,352.34/ Square meters
July 22, 2021 2021 WIN1F06150 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 3rd District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod South Rd - K0085 + 070 - K0085 + 217, K0085 + 608 - K0086 + 000

CW1- Preventive Maintenance of Road: Asphalt
Overlay: - 2.168 lane km - 11,613.00

EAO - 237.00

Total: 11,850.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod South Rd - K0085 + 070 – K0085 + 608, K0087 + 608 – K0087 + 718

CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.592 lane km - 11,613.00

EAO - 237.00

Total: 11,850.00
July 22, 2021 FY 2021 GAA WIN1F06457 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310202100700000
Project ID : P00506162LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road,
K0064 + (-933) - K0064 + (-780),
K0087 + 678 - K0087 + 689,
K0087 + 832 - K0087 + 861,
K0091 + 197 - K0091 + 374,
K0102 + 237 - K0102 + 550,
K0141 + 136 - K0140 + 213,
K0141 + 502 - K0142 + 134,
K0142 + 371 - K0142 + 726,
K0143 + 197 - K0143 + 546,
K0146 + 750 - K0147 + 013,
K0148 + 568 - K0148 + 980,
K0149 + 680 - K0149 + 900,
K0149 + 960 - K0150 + 165,
K0150 + 240 - K0150 + 301,
K0152 + 030 - K0152 + 161
Physical Target - CW1 - Road Widening : 6.664 Lane Km
Allocation : Php 101.270 Million

TO :

Calapan South Road,
L0064 + (-933) - K0064 + (-780),
K0087 + 721 - K0087 + 863,
K0102 + 237 - K0102 + 550,
K0146 + 750 - K0147 + 064,
K0161 + 854 - K0163 + 000
Physical Target - CW1 - Road Widening : 4.114 Lane Km
Allocation : Php 101.270 Million
July 22, 2021 2021 WIN1E02335 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300117210457000
Project ID: P00551466MN

Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program

FROM:

Construction of Road, Barangay Mapawa, Surigao City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.234 Lane Km

Allocation:
TOTAL: P 2,500,000
CW1: P 2,475,000
EAO: P 25,000

Unit Cost:
CW1: P 10,576,923.08/ Lane Km

TO:

Construction of Road, Barangay Mapawa, Surigao City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.2592 Lane Km

Allocation:
TOTAL: P 2,500,000
CW1: P 2,475,000
EAO: P 25,000

Unit Cost:
CW1: P 9,548,611.11/ Lane Km
July 22, 2021 2021 WIN1E02360 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310205100605000
Project ID: P00509760MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

FROM:

NRJ Maug - La Purisima - San Juan - New Tubigon Road, Package 1

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.00 Lane Km

Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000

Unit Cost:
CW1: P 19,300,000/ Lane Km

TO:

NRJ Maug - La Purisima - San Juan - New Tubigon Road, Package 1

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 4.32 Lane Km

Allocation:
TOTAL: P 40,000,000
CW1: P 38,600,000
EAO: P 1,400,000

Unit Cost:
CW1: P 8,935,185.19/ Lane Km
July 22, 2021 FY 2021 GAA WIN1F06436 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310102100580000
Project ID : P00515561LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Marinduque Circumferential Road,
K0014 + 886 - K0015 + 861,
K0016 + 010 - K0019 + 300
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 8.472 Lane Km
Allocation : Php 79.637 Million

TO :

Marinduque Circumferential Road,
K0014 + 905
K0015 + 861,
K0016 + 010 - K0016 + 934,
K0016 + 961 - K0017 + 801,
K0017 + 835 - K0018 + 167
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 6.02 Lane Km
Allocation : Php 79.637 Million
July 22, 2021 FY 2021 GAA WIN1E02618 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1486+000 - K1486+050, K1487+021 - K1487+109
Physical Target:
CW1: 1.356 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,473,000.00
CW1: P 7,323,540.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 149,460.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1486+000 - K1486+093
Physical Target:
CW1: 0.372 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,473,000.00
CW1: P 7,323,540.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 149,460.00
July 22, 2021 FY 2021 GAA WIN 1F06434 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310102100581000
Project ID : P00515562LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Marinduque Circumferential Road,
K0078 + 511 - K0082 + 000,
K0087 + 000 - K0087 + 523
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay : 8.058 Lane Km
Allocation : Php 75.745 Million

TO :

Marinduque Circumferential Road,
K0078 + 511 - K0081 + 684
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay : 6.348 Lane Km
Allocation : Php 75.745 Million
July 22, 2021 FY 2021 GAA WIN1F06409 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300203101398000
Project ID : P00534415LZ

Convergence and Special Support Program

]Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations

FROM :

Concreting of Road from Poblacion to Capri Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation : Php 30.00 Million

TO :

Concreting of Road from Poblacion to Capri Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.48 Lane Km
Allocation : Php 30.00 Million

July 22, 2021 2021 WIN1F06553 GAA FY 2021 January 2, 2021 Region VIII Eastern Samar District Engineering Office
OO2: Protect Lives and Properties

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Rehabilitation/Improvement of Flood Control Structures along Suribao River, Borongan City, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation/Major Repair of Flood P 49.00 M
Control Structure: 478.444 Lineal Meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Rehabilitation/Improvement of Flood Control Structures along Suribao River, Borongan City, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation/Major Repair of Flood P 49.00 M
Control Structure: 185.00 Lineal Meters

EAO P 1.00 M

Total P 50.00 M
July 22, 2021 2021 WIN1F06556 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 1st District Engineering Office
OO2: Protect Lives and Properties

Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Poblacion, Victoria, Northern Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 10.246880 M
Structure:98.87 Lineal Meters

EAO P 0.209120 M

Total P 10.456M

AS MODIFIED:

Construction of Flood Control Structure along Poblacion, Victoria, Northern Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 10.246880 M
Structure:38.50 Lineal Meters

EAO P 0.209120 M

Total P 10.456M
July 22, 2021 2021 310204101021000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Cauayan City Alternate Route (Gov. Dy Bridge), Isabela
July 22, 2021 2021 310305100796000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Naguilian Bridge (Parallel Bridge) along Daang Maharlika (LZ)
July 22, 2021 FY 2021 GAA WIN1E02629 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road leading to Balutakay Holy Land (Way of the Cross), Managa, Bansalan, Davao del Sur
Physical Target:
CW1: 0.800 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road leading to Balutakay Holy Land (Way of the Cross), Managa, Bansalan, Davao del Sur
Physical Target:
CW1: 0.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
July 22, 2021 FY 2021 GAA WIN1E02628 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II, Barangay La Suerte, Matanao, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00

TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II, Barangay La Suerte, Matanao, Davao del Sur
Physical Target:
CW1: 1 number of water supply system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00
July 21, 2021 FY 2021 GAA WIN1F06310 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 310105100551000
Project ID : P00505610LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/
Upgrading of Damaged Paved Roads - Secondary Roads

FROM :

PPSR Jct (Abo-abo) - Quezon Road,
K0132 + 1014 - K0133 + 165
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.382 Lane Km
Allocation : Php 8.270 Million

TO :

PPSR Jct (Abo-abo) - Quezon Road,
K0132 + 1014 - K0133 + 450
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.450 Lane Km
Allocation : Php 8.270 Million
July 21, 2021 FY 2021 GAA WIN1B01163 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Marinduque District Engineering Office
UACS No. : 310102100679000
Project ID : P00505586LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Marinduque Circumferential Road,
K0017 + 000 - K0017 + 634
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.268 Lane Km
Allocation : Php 12.820 Million

TO :

Marinduque Circumferential Road,
K0043 + 263 - K0043 + 897
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 1.268 Lane Km
Allocation : Php 12.820 Million
July 21, 2021 FY 2021 GAA WIN1F06074 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Marinduque District Engineering Office
UACS No. : 310105100548000
Project ID : P00505587LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Road - Secondary Roads

FROM :

Marinduque Circumferential Road,
K0015 + 423 - K0015 + 585,
K0019 + 000 - K019 + 300
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.924 Lane Km
Allocation : Php 19.778 Million

TO :

Marinduque Circumferential Road,
K0054 + 000 - K0054 + 890
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.78 Lane Km
Allocation : Php 19.778 Million
July 21, 2021 FY 2021 GAA WIN1F06324 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310111100303000
Project ID : P00505362LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM :

Tablas Circumferential Road,
K0020 + 300
Physical Target - CW1 - Construction of Drainage Structure
along Road : 350.00 lineal meters
Allocation : Php 10.00 Million

TO :
Tablas Circumferential Road,
K0020 + 300 - K0020 + 650
Physical Target - CW1 - Construction of Drainage Structure
along Road : 350.00 Lineal meters
Allocation : Php 10.00 Million
July 21, 2021 FY 2021 GAA WIN1E02608 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office

FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System (Canal), Purok Bougainvilla, 1-Sampaguita to Purok 8-Orchid, Tinablan, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1,411.536 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,860,000.00 (Construction of Drainage Structure)
EAO: P 140,000.00

TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction of Drainage System (Canal), Purok Bougainvilla, 1-Sampaguita to Purok 8-Orchid, Tibanban, Governor Generoso, Davao Oriental
Physical Target:
CW1: 1,080.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 14,000,000.00
CW1: P 13,860,000.00 (Construction of Drainage Structure)
EAO: P 140,000.00
July 21, 2021 FY 2021 GAA WIN1F06161 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 310102100686000
Project ID : P00505596LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Mindoro West Coastal Road,
K0417 + 752 - K0419 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking - 2.492 Lane Km
Allocation : Php 12.008 Million

TO :

Mindoro West Coastal Road,
K0417 + 900 - K0419 + 000
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking - 2.196 Lane Km
Allocation : Php 12.008 Million
July 21, 2021 FY 2021 GAA WIN1F06335 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204153000
Project ID : P00562414LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Sitio Bagong Pook - Sitio Kilo - kilo,
Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.310 Lane Km
Allocation : 12.00 Million

TO :

Concreting of Road,
Sitio Bagong Pook - Sitio Kilo-kilo,
Brgy, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.460 Lane Km
Allocation : Php 12.00 Million
July 21, 2021 FY 2021 GAA WIN1E02609 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Padada-Mainit River (Bulatukan River Section-Protecting Masalam Br. & NIA Dam), Hagonoy, Davao del Sur
Physical Target:
CW1: 1,162.352 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00

TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Padada-Mainit River (Bulatukan River Section-Protecting Masalam Br. & NIA Dam), Hagonoy, Davao del Sur
Physical Target:
CW1: 500.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
July 21, 2021 FY 2021 GAA WIN1E02615 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.100 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay - Bolton St., Davao City
Physical Target:
CW1: 1.516 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 33,775,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,225,300.00
July 21, 2021 FY 2021 GAA WIN1E02614 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.694 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Juna Ave - University St., Davao City
Physical Target:
CW1: 2.560 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 35,250,000.00
CW1: P 34,016,250.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,233,750.00
July 21, 2021 FY 2021 GAA WIN1F06393 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204154000
Project ID : P00562415LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Sitio Kili - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 5.00 Million

TO :

Concreting of Road,
Sitio Kilo - kilo, Brgy. Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.518 Lane Km
Allocation : Php 5.00 Million

July 21, 2021 FY 2021 GAA WIN1E02616 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 3.626 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road (Opening) Elizalde to New Barili, Maco, Davao de Oro (Phase 1)
Physical Target:
CW1: 4.194 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 58,800,000.00 (Construction of Concrete Road)
EAO: P 1,200,000.00
July 21, 2021 FY 2021 GAA WIN1E02617 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 2.236 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road Boringot-Diat Road Pantukan (Phase 2)
Physical Target:
CW1: 4.400 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00
July 21, 2021 FY 2021 GAA WIN1E02602 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+310)
Physical Target:
CW1: 327.054 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation of Mamay Creek, Davao City (Sta. 0+000 - Sta. 0+277)
Physical Target:
CW1: 277.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
July 19, 2021 FY 2021 GAA WIN1E02595 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1459+491 - K1460+000
Physical Target:
CW1: 3.246 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum City Diversion Rd - K1456+111 - K1456+299.68, K1459+487 - K1459+990
Physical Target:
CW1: 2.012 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 400,000.00
July 19, 2021 FY 2021 GAA WIN1G02966 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 3.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Barangay Salapawan to Sitio Kinse-Kinse, Paquibato District, Davao City
Physical Target:
CW1: 2.240 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Gravel Road)
EAO: P 3,500,000.00
July 19, 2021 FY 2021 GAA WIN1E02597 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 3.528 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Ecowest Drive, Ecoland, Davao City
Physical Target:
CW1: 2.408 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
July 19, 2021 FY 2021 GAA WIN1E02601 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+764 - K1511+800 (L/S)
Physical Target:
CW1: 0.000 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+795 - K1511+820
Physical Target:
CW1: 1,073.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 45,000,000.00
CW1: P 44,100,000.00 (Construction of Road Slope Protection Structure)
EAO: P 900,000.00
July 19, 2021 2021 WIN1C04284 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd, K0103+125 - K0104+205

July 19, 2021 2021 WIN1F06431 SR2021-02-001928 February 4, 2021 Region VI Negros Occidental 5th District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380


CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908


CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00





July 19, 2021 2021 WIN1F06431 SR2021-02-001928 February 4, 2021 Region VI Negros Occidental 5th District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 520, K0057 + 200 - K0057 + 212, K0059 + 100 - K0059 + 140, K0059 + 300 - K0059 + 380


CW1- Construction of Road Slope Protection Structure: 3,400 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0054 + 500 - K0054 + 522.5, K0057 + 200 - K0057 + 227, K0057 + 240 - K0057 + 262, K0057 + 294 - K0057 + 330, K0057 + 437 - K0057 + 491, K0058 + 094.5 - K0058 + 157, K0059 + 100 - K0059 + 140.5, K0059 + 300 - K0059 + 479.5, K0059 + 865 - K0059 + 908


CW1- Construction of Road Slope Protection Structure: 3,763 sq.m - 32,810.00

EAO - 1,190.00

Total: 34,000.00





July 19, 2021 2021 WIN1F06319 FCR 2021 RA 11518 December 28, 2020 Region VI Iloilo City District Engineering Office
FROM:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00


TO:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00
July 19, 2021 2021 WIN1F06319 FCR 2021 RA 11518 December 28, 2020 Region VI Iloilo City District Engineering Office
FROM:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Banlantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00


TO:

LOCAL PROGRAM

Local – Flood Control and Drainage - Drainage / Protection Works - Local Infrastructure
Program

Construction/Rehabilitation of Drainage System in Barangay Balantang, Jaro, Iloilo City, Iloilo

CW1- Construction of Drainage Structure : 486 lineal meters - 3,960.00

EAO - 40.00

Total: 4,000.00
July 19, 2021 2021 WIN1C04338 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) , K0076+728.56 - K0077+159.69, K0077+410 - K0077+651, K0078+280 - K0078+448.50, K0079+495 - K0079+613.50, K0079+790 - K0080+240, K0087+197 - K0087+231, K0094+127 - K0094+443.61
July 19, 2021 2021 WIN1F06338 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 1st District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Jct New Sagay-Old Sagay Rd - K0085 + 361 - K0085 + 675

CW1- Road Widening: 0.628 lane km - 28,356.30

EAO - 578.70

Total: 28,935.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Network Development - Road Widening - Tertiary
Roads

Jct New Sagay-Old Sagay Rd - K0084 + 601 - K0085 + 055, K0085 + 361 - K0085 + 675, K0087 + 783 - K0087 + 978

CW1- Road Widening: 0.628 lane km - 11,187.791

CW2- Reconstruction to Concrete Pavement: 1.20 lane km - 10,353.509

ROW Acquisition: 6,813.80 sq.m - 6,815.00

EAO - 578.70

Total: 28,935.00

July 19, 2021 2021 WIN1F06339 SR2021-02-001874 February 4, 2021 Region VI Negros Occidental 1st District Engineering Office
FROM:


OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd - K0090 + 328 - K0091 + 457

CW1- Road Widening: 2.368 lane km - 38,325.458

ROW Acquisition: 22,496 sq.m - 21,658.943

EAO - 2,175.60

Total: 62,160.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd – K0090 + 332 - K0091 + 461

CW1- Road Widening: 2.368 lane km - 37,539.90

ROW Acquisition: 22,496 sq.m - 22,444.50

EAO - 2,175.60

Total: 62,160.00

July 19, 2021 2021 WIN1F06122 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0269 + 469 - K0269 + 873

CW1- Road Widening: 0.808 lane km - 16,717.82

EAO - 341.18

Total: 17,059.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0269 + 590 - K0269 + 873

CW1- Road Widening: 0.566 lane km - 16,717.82

EAO - 341.18

Total: 17,059.00
July 19, 2021 2021 WIN1F06082 SR2021-02-000154 February 4, 2021 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Revetment Wall along Aklan River, Sta. 7+262.40 - Sta. 006+612.40, Brgy. Tigayon, Kalibo, Aklan

CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00

EAO - 3,430.00

Total: 98,000.00


TO:

ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Revetment Wall along Aklan River, Sta. 8 + 107.75 - Sta. 8 + 680, Brgy. Tigayon, Kalibo, Aklan

CW1- Construction of Flood Mitigation Structure: 572.25 lineal meters - 94,570.00

EAO - 3,430.00

Total: 98,000.00


July 19, 2021 2021 WIN1F06170 SR2021-02-000113 February 4, 2021 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 000, K0245 + 063 - K0245 + 206, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 260 - K0272 + 310, K0234 + (-933) - K0234 + (-877)

CW1- Reconstruction to Concrete Pavement: 2.472 lane km - 49,094.375

EAO - 1,780.625

Total: 50,875.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-933) - K0234 + (-877), K0234 + (-905) - K0234 + (-860), K0235 + 667 - K0236 + 021, K0236 + 067 - K0236 + 245, K0236 + 410 - K0236 + 493, K0236 + 545 - K0236 + 560, K0236 + 588 - K0236 + 627, K0236 + 722 - K0236 + 790, K0237 + 950 - K0238 + 375, K0238 + 500 - K0239 + 150, K0241 + 495 - K0241 + 503, K0241 + 755 - K0241 + 763, K0245 + 050 - K0245 + 206, K0250 + 029 – K0250 + 116, K0250 + 193 – K0250 + 227, K0250 + 325 - K0250 + 394, K0250 + 440 - K0250 + 487, K0250 + 518 - K0250 + 697, K0250 + 734 - K0250 + 853, K0250 + 860 - K250 + 931, K0250 + 936 - K0250 + 996, K0251 + 047 - K0251 + 083, K0251 + 141 - K0251 + 192, K0251 + 435 - K0251 + 497, K0251 + 848 - K0252 + 134, K0261 + 873 - K0261 + 891, K0262 + 162 - K0262 + 214, K0272 + 106 - K0272 + 137, K0272 + 260 - K0272 + 310, K0273 + 623 - K0273 + 670

CW1- Reconstruction to Concrete Pavement: 6.340 lane km - 49,094.375

EAO - 1,780.625

Total: 50,875.00

July 19, 2021 2021 WIN1F06142 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan

CW1- Rehabilitation of Concrete Road: 3.047 lane km - 46,060.00

EAO - 940.00

Total: 47,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Improvement/ Rehabilitation of Boracay Circumferential Road, Bolabog-24/7 Road and Bolabog-Ati Village Boardwalk, Aklan

CW1- Rehabilitation of Concrete Road: 2.276 lane km - 46,060.00

EAO - 940.00

Total: 47,000.00
July 16, 2021 FY 2021 GAA WIN1F06336 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116203410000
Project ID : P00561891LZ

LOCAL PROGRAM

Local - National Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Parang - Palhi - Sapul - Bayanan bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0 Lane Km
Allocation : Php 90.00 Million

TO :

Construction of parang - Palhi - Sapul - Bayanan Bypass Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.844 Lane Km
Allocation : Php 90.00 Million
July 16, 2021 FY 2021 GAA WIN1F06332 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Marinduque District Engineering Office
UACS No. : 300116203713000
Project ID : P00561987LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation : Php 40.00 Million

TO :

Construction of Dampulan - Malibago Road,
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
3.20 Lane Km
Allocation : Php 40.00 Million
July 16, 2021 FY 2021 GAA WIN1F06364 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS NO. : 310202100813000
Project ID : P00505131LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan North Road,
K0019 + 000 - K0019 +511
Physical Target - CW1 - Network Development - Road Widening :
1.022 Lane Km
Allocation : Php 7.832 Million

TO :

Calapan North Road,
K0008 + 575 - K0009 + 000,
K0019 + 000 - K0019 + 277
Physical Target - CW1 - Network Development - Road Widening :
0.699 Lane Km
Allocation : Php 7.832
July 16, 2021 FY 2021 GAA WIN1F06371 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310103100699000
Project ID : P00505606LZ

001 : Ensure and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

CSR Jct - Pola Road,
K0060 + (-1003) - K0062 + (-955),
K0062 + (-944) - K0062 + (-693),
K0062 + (-955) - K0062 + (-944)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.122 Lane Km
Allocation : Php 7.290 Million

TO :

CSR Jct - pola Road,
K0062 + (-1003) - K0062 + (-692.5)
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.201 Lane Km
Allocation : Php 7.290 Million



July 16, 2021 FY 2021 GAA WIN1F06374 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310103100700000
Project ID : P00505607LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM :

CSR Jct - Pola Road,
K0063 + 450 - K0063 + 622
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.688 Lane Km
Allocation : Php 4.465 Million

TO :

CSR Jct - Pola oad,
K0063 + 450 - K0063 + 628.75
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.715 Lane Km
Allocation : Php 4.465 million

July 16, 2021 FY 2021 GAA WIN1F06346 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No.: 310103100701000
Project ID : P00505608LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM :

CSR Jct - Pola Road,
K0069 + 995 - K0070 + 150
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 0.620 Lane Km
Allocation : Php 4.021 Million

TO :

CSR Jct - Pola Road,
K0069 ++995 - K0070 + 156
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 0.644 Lane Km
Allocation : Php 4.021 Million
July 16, 2021 FY 2021 GAA WIN1E02603 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 2.084 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Concrete Road)
EAO: P 700,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of road (Opening) Elizalde to New Barili, Maco, Mararag, Golden Valley, Mabini, Davao de Oro (Phase 2)
Physical Target:
CW1: 4.042 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Gravel Road)
EAO: P 700,000.00
July 15, 2021 FY 2021 GAA WIN1F06251 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 300103203517000
Project ID : P00557144LZ

LOCAL PROGRAM

Local - Buildings and Other Structures - Multipurpose/ Facilities
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructures including Local Projects

FROM :

Construction of Multi-Purpose Building,
Manuel Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princes City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million

TO :

Construction of Multi-Purpose Building,
Francisco Austria Memorial Elementary School,
Barangay Maruyugon, Puerto Princesa City, Palawan
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Building
Allocation : Php 4.00 Million
July 15, 2021 2021 310212100186000 GAA FY 2021 January 25, 2021 Region II Quirino District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Victoria - Maddela - Alicia - Kasibu Bdry Rd - K0412+943 - K0413+958
July 15, 2021 FY 2021 GAA WIN1F06223 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 300103203454000
Project ID : P00557081LZ

LOCAL PROGRAM

Local Infrastructure Program - Buildings and Other Structures -
Multipurpose/Facilities

FROM :

Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Bansalay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building
1 Number of Building
Allocation : Php 2.00 Million

TO :

Construction of Multi-Purpose Building ( Barangay Hall ),
at Barangay Balansay, Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose BUilding
1 Number of Building
Allocation : Php 2.00 Million
July 15, 2021 FY 2021 GAA WIN1F06186 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310202100820000
Project ID : P00505138LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Tablas Circumferential Road,
K0026 + 546.21 - K0026 + 580,
K0029 + 000 - K0029 + 765
Physical Target - CW1 - Road Widening : 1.598 Lane Km
Allocation : Php 28.00 Million

TO :

Tablas Circumferential Road,
K0026 + 546.21 - K0026 +580,
K0029 + 000 - K0029 + 682.21
Physical Target - CW1 - Road Widening : 1.432 Lane Km
Allocation : Php 28.00 Million
July 15, 2021 FY 2021 GAA WIN1F06167 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310208100345000
Project ID : P00505161LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Tablas Circumferential Road,
K0001 + 243 - K0001 + 477,
K0010 + 000 - K0011 + 145,
K0011 + 182 - K0011 + 335,
K0011 + 351 - K0011 + 374
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
4,656 sq. m.
Allocation : Php 13.965 Million

TO :

Tablas Circumferential Road,
K0001 + 243 - K0001 + 536,
K0009 + 991.80 - K0011 + 133
Physical target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
3,427.71 sq. m.
Allocation : Php 13.965 Million
July 15, 2021 FY 2021 GAA WIN1E02583 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+000.000 - Sta. 1+780.000 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00

TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Agusan River, Purok 3 Brgy.Osmeña to Purok 1, Poblacion Compostela, Davao de Oro (Sta. 1+156.520 - Sta. 1+499.170 RS)
Physical Target:
CW1: 342.650 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 48,232,000.00
CW1: P 47,267,360.00 (Construction of Flood Mitigation Structure)
EAO: P 964,640.00
July 15, 2021 FY 2021 GAA WIN1E02582 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+934 - K1819+609
Physical Target:
CW1: 3.334 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1817+578 - K1819+226
Physical Target:
CW1: 3.280 lane km (Road Widening)
ROW: 32,800 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 50,000.00
July 15, 2021 FY 2021 GAA WIN1E02586 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00

TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of MPB (Brgy. Hall) Panoraon, Maco, Davao de Oro
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,860,000.00 (Construction of Multi-Purpose Building)
EAO: P 140,000.00
July 15, 2021 FY 2021 GAA WIN1E02557 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+000 - K1497+074
Physical Target:
CW1: 2.148 lane km (Road Widening)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 32,831,960.00 (Road Widening)
EAO: P 670,040.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1496+104 - K1497+454
Physical Target:
CW1: 2.700 lane km (Road Widening)
ROW: 27,000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 33,502,000.00
CW1: P 31,331,960.00 (Road Widening)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 670,040.00
July 15, 2021 FY 2021 GAA WIN1E02570 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Concreting of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00

TO: Local Program - Water Management Facilities - Water Supply - Local Infrastructure Program
Construction of Water System Level II, Barangay Darong, Sta. Cruz, Davao del Sur
Physical Target:
CW1: 1 water system (Construction of Water Supply Systems)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Water Supply Systems)
EAO: P 30,000.00
July 15, 2021 FY 2021 GAA WIN1F06153 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310208100346000
Project ID : P00505139LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Tablas Circumferential Road,
K0016 + 1075 - K0017 + 114,
K0017 + 250 - K0017 + 876
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction -
2,241 sq. m.
Allocation : Php 6.723 Million

TO :

Tablas Circumferential Road
K0016 + 1075 - K0017 + 117,
K0017 + 237 - K0018 + 023
Physical Target - CW1 - Off-Carriageway Improvement :
Shoulder Paving/Construction
2,307.98 sq. m.
Allocation : Php 6.723 Million
July 15, 2021 FY 2021 GAA WIN1E02571 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+080,
K1509+557 - K1509+846, K1511+054 - K1511+103
Physical Target:
CW1: 633.750 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1509+(-300) - K1509+070, K1509+557 - K1509+859,
K1510+191 - K1510+240, K1511+040 - K1511+105,
K1511+161 - K1511+230, K1510+706 - K1510+742
Physical Target:
CW1: 1,671.97 sq. m. (Off-Carriageway Improvement: Shoulder Paving / Construction)
Allocation:
TOTAL: P 2,051,000.00
CW1: P 2,009,980.00 (Off-Carriageway Improvement: Shoulder Paving / Construction)
EAO: P 41,020.00
July 15, 2021 FY 2021 GAA WIN1E02558 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 1.046 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Concrete Road, 2nd Street, Ecoland Phase 1, Barangay Bucana, Davao City
Physical Target:
CW1: 0.534 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 6,000,000.00
CW1: P 5,880,000.00 (Construction of Concrete Road)
EAO: P 120,000.00
July 15, 2021 2021 WIN1E02337 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310102100789000
Project ID: P00501880MN

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Mayor Democrito D. Plaza II Ave - K1247 + 057 - K1247 + 558

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 1.002 Lane Km

Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000

Unit Cost:
CW1: P 4,694,610.78/Lane Km

TO:

Mayor Democrito D. Plaza II Ave - K1247 + 000.00 -K1247 + 022.50, K1247 + 067.50 - K1247 + 130.50, K1247 + 351.00 - K1247 + 373.50, K1247 + 483.00 - K1247 + 618

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 0.486 Lane Km

Allocation:
TOTAL: P 4,800,000
CW1: P 4,704,000
EAO: P 96,000

Unit Cost:
CW1: P 9,679,012.35/Lane Km
July 15, 2021 2021 WIN1F06518 GAA FY 2021 February 11, 2021 Region VIII Leyte 3rd District Engineering Office
Convergence and Special Support Program

Special Road Fund-Motor Vehicle User’s Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte

Physical Target: Allocation:

CW1-Asphalt Overlay: 4.711 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Preventive Maintenance, Calubian Jct-Sn Isidro- Tabango- Villaba- Palompon Rd., K1056+150- K1058+355, Villaba, Leyte

Physical Target: Allocation:

CW1-Asphalt Overlay: 4.438 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
July 15, 2021 2021 WIN1E02338 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310106100645000
Project ID: P00501878MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1252 + 000 - K1252 + 050

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 0.100 Lane Km

Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140

Unit Cost:
CW1: P 20,648,600/Lane Km

TO:

Butuan City-Malaybalay Rd - K1252 + 030.50 - K1252 + 125.00

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 0.189 Lane Km

Allocation:
TOTAL: P 2,107,000
CW1: P 2,064,860
EAO: P 42,140

Unit Cost:
CW1: P 10,925,185.19/Lane Km
July 15, 2021 CY 2021 WIN1F06534 UACS NO. UACS No. 320101106446000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106446000
Project ID.: P00525812LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, Sta. 0+730.50 to
Sta. 0+888.90, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 56, (LS) Sta. 0+783.60 to
Sta. 0+843.30; (RS) Sta. 0+792.30 to Sta. 0+852.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06534
July 15, 2021 2021 WIN1E02350 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100773000
Project ID: P00501877MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1258 + 000 - K1259 + 000, K1263 + 330.12 - K1263 + 826

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 2.990 Lane Km

Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860

Unit Cost:
CW1: P 4,553,558.53/Lane Km

TO:

Butuan City-Malaybalay Rd - K1258 + 000.00 - K1258 + 832.50

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 1.665 Lane Km

Allocation:
TOTAL: P 13,893,000
CW1: P 13,615,140
EAO: P 277,860

Unit Cost:
CW1: P 8,177,261.26/Lane Km
July 15, 2021 CY 2021 WIN1F06535 UACS No. 320101106445000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
July 15, 2021 CY 2021 WIN1F06535 UACS No. 320101106445000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106445000
Project ID.: P00525811LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+138.40; Sta. 0+000.00 to Sta. 0+020.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Vitas, Barangay 94 & 147; Sta. 0+000.00 to
Sta. 0+131.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 131.00 l.m.
Unit Cost (P’000) = P 319.198/ l.m.
Allocation (P’000) = P 41,813.66
EAO (P’000) = P 853.34
Total (P’000) = P 42,667.00
WIN1F06535
July 15, 2021 CY 2021 WIN1F06536 UACS No. 320101106442000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106442000
Project ID.: P00525808LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+623.00 to
Sta. 0+680.00; (RS) Sta. 0+658.40 to 0+680.00; Sta. 0+685.00 to Sta. 0 0+692.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase II), (LS) Sta. 0+617.00 to
Sta. 0+617.00 to Sta. 0+646.40; (RS) Sta. 0+616.80 to 0+680.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 92.40 l.m.
Unit Cost (P’000) = P 318.18/ l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06536
July 15, 2021 2021 WIN1E02551 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100771000
Project ID: P00501875MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1240 + (-367) - K1240 + 000, K1240 + (-448) - K1240 + (-367), K1240 + (-535) - K1240 + (-448), K1240 + 000 - K1240 + 707, K1240 + 727.56 - K1241 + 183

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.793 Lane km

Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840

Unit Cost:
CW1: P 8,637,003.96/Lane Km

TO:

Butuan City-Malaybalay Rd - K1240 + (-471) - K1241 + 510

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 5.602 Lane km

Allocation:
TOTAL: P 42,242,000
CW1: P 41,397,160
EAO: P 844,840

Unit Cost:
CW1: P 7,389,710.82/Lane Km
July 15, 2021 CY 2021 WIN1F06531 UACS No. 320101106447000 February 24, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106447000
Project ID.: P00525813LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52, Sta. 0+889.90 to
Sta. 0+944.90 (LS), Sta. 0+841.50 to Sta. 0+944.90 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 58, 52 (LS) Sta. 0+843.30 to
Sta. 0+903.00: (RS) Sta. 0+852.00 to Sta. 0+911.70, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P 328.30/ l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06531
July 15, 2021 FY 2021 GAA WIN1F06303 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310111100297000
Project ID : P00505357LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM :

Calapan South Road,
K0036 + 486 - K0036 + 741
Physical Target - CW1 - Construction of Drainage Structure
along Road : 255.00 Lineal Meters
Allocation : Php 5.907 Million

TO :

Calapan South Road,
K0062 + 649 - K0063 + 015
Physical Target - CW1 - Construction of Drainage Structure
along Road : 490.00 Lineal Meters
Allocation : Php 5.907 Million
July 15, 2021 2021 WIN1E02555 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Butuan City District Engineering Office
UACS No. : 310103100772000
Project ID: P00501876MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1241 + (-098) - K1241 + 000, K1241 + (-131) - K1241 + (-098), K1241 + (-435) - K1241 + (-131), K1241 + (-490) - K1241 + (-435), K1241 + 000 - K1241 + 270, K1241 + 290 - K1241 + 723

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 3.405 Lane Km

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 8,634,361.23/Lane Km

TO:

Butuan City-Malaybalay Rd - K1241 + (-235) - K1240 + 257

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 4.282 Lane Km

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 6,865,950.49/Lane Km
July 15, 2021 2021 WIN1E02566 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 320101107175000
Project ID: P00522267MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 150, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 160.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 306,250/Lineal meters

TO:

Construction of Bank Protection of Agusan River Protecting Sta. Josefa Bridge, Sta. 0 + 000 - Sta. 0 + 160, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 160.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 306,250 Lineal meters
July 15, 2021 2021 WIN1F06499 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1061 + 591 - K1063 + 188

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,446.500 Square Meters
EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Biliran Circumferential Rd - K1061 + 591 - K1062 + 625

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,27100 Square Meters
EAO P 1.00 M

Total P 50.00 M

Pages