August 25, 2021 |
FY 2021 |
WIN1C04273 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310108100649000
Project ID: P00505990LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Catanduanes Cir Rd – K0034+750 – K0034+820
Physical Target: CW1- Construction of Road Slope Protection Structure – 840 Square meters
Allocation: Php 12,600,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Catanduanes Cir Rd – K0034+000 – K0034+200
Physical Target: CW1- Construction of Road Slope Protection Structure – 576 Square meters
Allocation: Php 12,600,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04276 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310108100652000
Project ID: P00516176LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Catanduanes Cir Rd – K0122+500 + K0122+585, K0123+200 – K0123+275
Physical Target: CW1- Construction of Road Slope Protection Structure – 3,000 Square meters
Allocation: Php 15,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads – Catanduanes Cir Rd – K0122+500 + K0122+565
Physical Target: CW1- Construction of Road Slope Protection Structure – 1,235 Square meters
Allocation: Php 15,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04286 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310109100658000
Project ID: P00516187LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Baras-Gigmoto-Viga Rd – K0030+500 – K0030+580
Physical Target: CW1- Construction of Road Slope Protection Structure – 500 Square meters
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Baras-Gigmoto-Viga Rd – K0030+500 – K0030+580
Physical Target: CW1- Construction of Road Slope Protection Structure – 252 Square meters
Allocation: Php 5,000,000.00
|
August 25, 2021 |
FY 2021 |
WIN1C04282 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310109100659000
Project ID: P00516188LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Jct Bato-Baras Rd – K0015+800 – K0015+820
Physical Target: CW1- Construction of Road Slope Protection Structure – 500 Square meters
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Tertiary Roads – Jct Bato-Baras Rd – K0016+547 – K0016+567, K0016+660 – K0016+678
Physical Target: CW1- Construction of Road Slope Protection Structure – 330 Square meters
Allocation: Php 5,000,000.00
|
August 25, 2021 |
FY 2021 GAA |
WIN1E02795 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Naboc River leading to Agusan River, Brgy. Naboc, Monkayo, Davao de Oro (Sta. 0+000 - Sta. 3+000)
Physical Target:
CW1: 1,820.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Naboc River leading to Agusan River, Brgy. Naboc, Monkayo, Davao de Oro (Sta. 1+450.094 - Sta. 2+081.879, Sta. 1+563.098 - Sta. 2+607.110, Sta. 3+726.557 - Sta. 3+870.760)
Physical Target:
CW1: 1,820.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |
August 25, 2021 |
FY 2021 GAA |
WIN1E02794 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Hijo River, Brgy. Bucana, Maco, Davao de Oro (Sta. 1+200 - Sta. 1+960 LS)
Physical Target:
CW1: 465.080 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 68,183,000.00
CW1: P 65,796,595.00 (Construction of Flood Mitigation Structure)
EAO: P 2,386,405.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Hijo River, Brgy. Bucana, Maco, Davao de Oro (Sta. 0+537.847 - Sta. 0+582.507 LS, Sta. 1+148.813 - Sta. 1+569.233 LS)
Physical Target:
CW1: 465.080 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 68,183,000.00
CW1: P 65,796,595.00 (Construction of Flood Mitigation Structure)
EAO: P 2,386,405.00 |
August 25, 2021 |
FY 2021 GAA |
WIN1E02791 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Brgy. Fatima, New Bataan, Davao de Oro (Sta. 0+000 - Sta. 3+000)
Physical Target:
CW1: 2,200.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Brgy. Fatima, New Bataan, Davao de Oro (Sta. 7+000.000 - Sta. 7+381.268 LS, Sta. 7+699.006 - Sta. 8+089.409 LS, Sta. 8+149.866 - Sta. 9+528.195 LS)
Physical Target:
CW1: 2,200.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |
August 25, 2021 |
FY 2021 GAA |
WIN1E02788 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1508+856 - K1510+000,
K1511+000 - K1512+000, K1512+853 - K1513+068
Physical Target:
CW1: 7.147 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1503+220 - K1505+400
Physical Target:
CW1: 4.360 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 600,000.00 |
August 24, 2021 |
2021 |
WIN1E02804 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310109100582000
Project ID: P00502024MN
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134 + 050 - K1134 + 095, K1134 + 110 - K1134 + 150, K1134 + 510 - K1134 + 585
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5,925.00 Square meters
Allocation:
TOTAL: P 51,000,000
CW1: P 49,215,000
EAO: P 1,785,000
Unit Cost:
CW1: P 8,306.33/ Square meters
TO:
Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134 + 000 - K1134 + 300, K1134 + 510 - K1134 + 571.5
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4,099.25 Square meters
Allocation:
TOTAL: P 51,000,000
CW1: P 49,215,000
EAO: P 1,785,000
Unit Cost:
CW1: P 12,005.85/ Square meters
|
August 24, 2021 |
FY 2021 |
WIN1C04430 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203395000
Project ID: P00561888LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package III, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.831 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package III, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.7814 Lane Km
CW2 - Construction of Road Slope Protection Structure – 2,016.79 Square meters
Allocation: Php 100,000,000.00
|
August 24, 2021 |
FY 2021 |
WIN1C04421 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203396000
Project ID: P00561889LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.746 Lane Km
CW2 - Construction of Road Slope Protection Structure – 1,925.37 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.95 Lane Km
CW2 - Construction of Road Slope Protection Structure – 3,142 Square meters
Allocation: Php 100,000,000.00
|
August 24, 2021 |
FY 2021 |
WIN1C04421 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203396000
Project ID: P00561889LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.746 Lane Km
CW2 - Construction of Road Slope Protection Structure – 1,925.37 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package IV, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.95 Lane Km
CW2 - Construction of Road Slope Protection Structure – 3,142 Square meters
Allocation: Php 100,000,000.00
|
August 24, 2021 |
FY 2021 |
WIN1C04412 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203424000
Project ID: P00561895LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Zone 2-Sabang- San Vicente Coastal Road with Shore Protection, Package I, Bulan, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.856 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Zone 2-Sabang- San Vicente Coastal Road with Shore Protection, Package I, Bulan, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.806 Lane Km
CW2 - Construction of Road Slope Protection Structure – 1,497.87 Square meters
Allocation: Php 100,000,000.00
|
August 24, 2021 |
FY 2021 GAA |
WIN1F06563 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300119200507000
Project ID : P00565615LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Bridges -
Local Infrastructure Program
FROM :
Construction of Bridge including Drainage,
Barangay Labog, Sofronio Espanola, Palawan
Physical Target - CW1 - Construction of Bridge :
100.00 square meters
Allocation : Php 2.00 Million
To :
Construction of Bridge including drainage,
Baranghay Labog, Sofronio Espanola, Palawan
Physical Target - CW1 - Construction of Bridge :
27.00 square meters
Allocation : Php 2.00 Million
|
August 24, 2021 |
FY 2021 |
WIN1C04462 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100150000
Project ID: P00534723LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy. Road K0574+700 – K0575+096, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 6,925 Square meters
Allocation: Php 180,000,000.00
AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy. Road K0574+852 – K0575+000, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 9,381.76 Square meters
Allocation: Php 180,000,000.00
|
August 24, 2021 |
FY 2021 |
WIN1C04462 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100150000
Project ID: P00534723LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy. Road K0574+700 – K0575+096, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 6,925 Square meters
Allocation: Php 180,000,000.00
AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 – Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd Brgy. Road K0574+852 – K0575+000, Brgy. Sogod
Physical Target: CW1- Construction of Road Slope Protection Structure – 9,381.76 Square meters
Allocation: Php 180,000,000.00
|
August 24, 2021 |
FY 2021 GAA |
WIN1F06537 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300119200510000
Project ID : P00565618LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Bridges -
Local Infrastructure Program
FROM :
Construction of Hanging Bridge
(Purok Bayanihan), Barangay Panitian,
Sofronio Espanola, Palawan
Physical Target - CW1 - Construction of Bridge :
60.00 square meters
Allocation : Php 2.00 Million
TO :
Construction of Hanging Bridge
(Purok Pbayanihan), Barangay Panitian,
Sofronio Espanola, Palawan
Physical Target - CW1 - Construction of Bridge :
81.60 square meters
Allocation : Php 2.00 Million |
August 24, 2021 |
FY 2021 |
WIN1C04466 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101441000
Project ID: P00506306LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road (Access Road), Albay
Physical Target: CW1- Construction of Concrete Road – 11,356.506 Lane km.
Allocation: Php 50,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads – Legazpi City Coastal Road (Access Road), Albay
Physical Target: CW1- Construction of Concrete Road – 0.68212 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Allocation: Php 50,000,000.00
|
August 24, 2021 |
FY 2021 GAA |
WIN1F06540 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310305101221000
Project ID : P00506477LZ
001 : Ensure Safe and Reliable National Road System
Bridge - Widening of Bridge
FROM :
Malinao Bridge (B00356PW) along
Puerto Princes South Road
Physical Target - CW1 - Widening of Permanent Bridge :
424.3740 Square Meters
Allocation : Php 60.00 Million
TO :
Malinao Bridge (B00356PW) along
Puerto Prinesa South Road
Physical Target - CW1 - Widening of Permanent Bridge ;
484.960 Square Meters
Allocation : Php 60.00 Million |
August 24, 2021 |
2021 |
WIN1E02663 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203534000
Project ID: P00550698MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 3), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,00
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 3), Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 1.80 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,00
EAO: P 4,550,000
Unit Cost:
CW1: P 69,694,444.44/Lane Km
|
August 24, 2021 |
2021 |
WIN1E02682 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203533000
Project ID: P00550697MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 2), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,00
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 2), Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 1.88 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,00
EAO: P 4,550,000
Unit Cost:
CW1: P 66,728,723.40/Lane Km
|
August 24, 2021 |
2021 |
WIN1E02656 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116204630000
Project ID: P00550980MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road in Barangay Ladgaron, Claver, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.935 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 10,481,283.42/Lane Km
TO:
Construction of Road in Barangay Ladgaron, Claver, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.593 Lane Km
CW2- 961.57 Square meters
Allocation:
TOTAL: P 10,000,000
CW1: P 8,327,655
CW2: P 1,472,345
EAO: P 200,000
Unit Cost:
CW1: P 14,043,263.07/Lane Km
CW2: P 1,531.19/Square meters
|
August 23, 2021 |
FY 2021 GAA |
WIN1E02792 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Prk 1C, 1B, 1A, 7, 8 and Manat Bridge Poblacion Montevista, Davao De Oro (Sta. 15+900 - Sta. 17+200 LS)
Physical Target:
CW1: 421.190 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,800,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Prk 1C, 1B, 1A, 7, 8 and Manat Bridge Poblacion Montevista, Davao De Oro (Sta. 18+495.464 - Sta. 18+916.654 LS)
Physical Target:
CW1: 421.190 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,800,000.00 |
August 23, 2021 |
FY 2021 |
WIN1C04351 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310108100529000
Project ID: P00516174LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0507 + 620 - K0507 + 960 - Pili-Tigaon-Albay Bdry Rd - K0507 + 620 - K0507 + 960
Physical Target: CW1- Construction of Road Slope Protection Structure – 20,000 Square meters
Allocation: Php 200,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Pili-Tigaon-Albay Bdry Rd - K0507 + 620 - K0507 + 960 - Pili-Tigaon-Albay Bdry Rd - K0507 + 620 - K0507 + 960
Physical Target: CW1- Construction of Road Slope Protection Structure – 10,283.60 Square meters
Allocation: Php 200,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04219 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100139000
Project ID: P00534712LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Construction of Disaster Mitigation Structure using Rock Fall Technology along Lagonoy - Presentacion Road, KO513+200 - KO513+500
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,449.447 Square meters
Allocation: Php 95,000,000.00
AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Construction of Disaster Mitigation Structure using Rock Fall Technology along Lagonoy - Presentacion Road, KO513+200 - KO513+500
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,463.00 Square meters
Allocation: Php 95,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04179 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100142000
Project ID: P00534715LZ
AS PER GAA:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Improvement of (Asphalt Overlay) along Daang Maharlika K0535+855 - K0536+400
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 0.918 Lane Km
Allocation: Php 12,360,000.00
AS MODIFIED:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Improvement of (Asphalt Overlay) along Daang Maharlika K0535+855 - K0536+314
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 0.918 Lane Km
Allocation: Php 12,360,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04136 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100143000
Project ID: P00534716LZ
AS PER GAA:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Improvement of (Asphalt Overlay) along Daang Maharlika - K0536+500 - K0538+550
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 1.82 Lane Km
Allocation: Php 30,000,000.00
AS MODIFIED:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Improvement of (Asphalt Overlay) along Daang Maharlika - K0536+500 - K0538+3630
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 1.82 Lane Km
Allocation: Php 30,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04235 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300211100149000
Project ID: P00534722LZ
AS PER GAA:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd K0581+500 – K0582+200, Brgy. Misibis
Physical Target: CW1- Construction of Road Slope Protection Structure – 7,073 Square meters
Allocation: Php 180,000,000.00
AS MODIFIED:
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Emergency Repair/Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse Secondary Rd, Sangay-Tiwi Rd K0581+880.00 - K0582+087.80, Brgy. Misibis
Physical Target: CW1- Construction of Road Slope Protection Structure – 7,073 Square meters
Allocation: Php 180,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04317 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300209100015000
Project ID: P00531718LZ
AS PER GAA:
Convergence and Special Support Program: Construction/ Improvement of Access Roads leading to Railway Stations - Access Road leading to Naga City PNR Station, Naga City, Camarines SuR
Physical Target: CW1- Construction of Concrete Road – 0.25 Lane Km
ROW – ROW Acquisition - – 1000 Square meters
Allocation: Php 15,091,000.00
AS MODIFIED:
Convergence and Special Support Program: Construction/ Improvement of Access Roads leading to Railway Stations - Access Road leading to Naga City PNR Station, Naga City, Camarines SuR
Physical Target: CW1- Construction of Concrete Road – 0.25 Lane Km
Allocation: Php 15,091,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04310 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300209100014000
Project ID: P00531721LZ
AS PER GAA:
Convergence and Special Support Program: Construction/ Improvement of Access Roads leading to Railway Stations - Access Road leading to Iriga Railway Station, Iriga, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.727 Lane Km
ROW – ROW Acquisition – 5,250 Square meters
Allocation: Php 46,034,000.00
AS MODIFIED:
Convergence and Special Support Program: Construction/ Improvement of Access Roads leading to Railway Stations - Access Road leading to Iriga Railway Station, Iriga, Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.727 Lane Km
CW2 – Construction of Drainage Structure along Road – 766.91 Lineal meters
CW3 - Construction of Road Slope Protection Structure – 750.31 Square meters
Allocation: Php 46,034,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04327 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 320101106162000
Project ID: P00525682LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,057.22 Lineal meters
Allocation: Php 120,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 421.10 Lineal meters
Allocation: Php 120,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04328 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 320102104126000
Project ID: P00526342LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 290.59 Lineal meters
Allocation: Php 56,269,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction/Rehabilitation of Bonga Flood Control System, Legazpi City, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 204.20 Lineal meters
Allocation: Php 56,269,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04214 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300108200275000
Project ID: P00561131LZ
AS PER GAA:
Local Program: Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 1,762.0333 Lineal meters
Allocation: Php 200,000,000.00
AS MODIFIED:
Local Program: Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Pantao Storm Surge Protection along Poblacion, Libon, Albay
Physical Target: CW1- Construction of Flood Mitigation Structure – 700 Lineal meters
Allocation: Php 200,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04092 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203569000
Project ID: P00561943LZ
AS PER GAA:
Local Program: Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Caramoran Poblacion By-Pass Road, Caramoran, Catanduanes
Physical Target: CW1- Construction of Concrete Road – – 9.01 Lane Km
Allocation: Php 105,000,000.00
AS MODIFIED:
Local Program: Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Caramoran Poblacion By-Pass Road, Caramoran, Catanduanes
Physical Target: CW1- Construction of Concrete Road– 9.01 Lane Km
CW2 – Construction of Road Slope Protection Structure – 11,566.85 Square meters
Allocation: Php 105,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04105 |
FY 2021 GAA RA 11518 |
March 26, 2021 |
Region V |
Regional Office V |
UACS No.: 300117209201000
Project ID: P00564754LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Concreting of road at San Pascual-Mabayawas, Libon, Albay
Physical Target: CW1- Construction of Concrete Road – 0.858 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Concreting of road at San Pascual-Mabayawas, Libon, Albay
Physical Target: CW1- Construction of Concrete Road – 0.66424 Lane Km
Allocation: Php 10,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04105 |
FY 2021 GAA RA 11518 |
March 26, 2021 |
Region V |
Regional Office V |
UACS No.: 300117209201000
Project ID: P00564754LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Concreting of road at San Pascual-Mabayawas, Libon, Albay
Physical Target: CW1- Construction of Concrete Road – 0.858 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Concreting of road at San Pascual-Mabayawas, Libon, Albay
Physical Target: CW1- Construction of Concrete Road – 0.66424 Lane Km
Allocation: Php 10,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04104 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300117209232000
Project ID: P00564785LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Construction/Improvement of Road, Barangay Hinipaan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.172 Lane Km
Allocation: Php 2,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Local Infrastructure Programs - Construction/Improvement of Road, Barangay Hinipaan, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Concrete Road – 0.268 Lane Km
Allocation: Php 2,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04376 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300111200348000
Project ID: P00561858LZ
AS PER GAA:
Local Program: National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Pili-Tigaon-Albay Bdry Rd - K0505 + 700 - K0505 + 970
Physical Target: CW1- Construction of Road Slope Protection Structure – 8,264 Square meters
Allocation: Php 200,000,000.00
AS MODIFIED:
Local Program: National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Pili-Tigaon-Albay Bdry Rd - K0505 + 700 - K0505 + 970
Physical Target: CW1- Construction of Road Slope Protection Structure – 9,739.30 Square meters
Allocation: Php 200,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04318 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310305101224000
Project ID: P00506629LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Pagsangahan Br. (B02731LZ) along Daang Maharlika (LZ)
Physical Target: CW1- Widening of Bridge – 484.155 Square meters
Allocation: Php 51,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Pagsangahan Br. (B02731LZ) along Daang Maharlika (LZ)
Physical Target: CW1- Widening of Bridge – 471.13 Square meters
Allocation: Php 51,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04295 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101079000
Project ID: P00506018LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Ligao Section, Albay
Physical Target: CW1- Construction of Concrete Road – 1.68 Lane Km
Allocation: Php 60,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Ligao Section, Albay
Physical Target: CW1- Reconstruction of Concrete Road – 0.53884 Lane Km
CW2 – Construction of Drainage Structure along Road – 537.73 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 4,792.67 Square meters
Allocation: Php 60,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04103 |
FY 2021 GAA RA 11518 |
March 27, 2020 |
Region V |
Regional Office V |
UACS No.: 310204101080000
Project ID: P00506019LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Oas Section, Albay
Physical Target: CW1- Construction of Concrete Road – 1.633 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,625.68 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 47,858 Square meters
Allocation: Php 60,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Oas Section, Albay
Physical Target: CW1- Construction of Road Slope Protection Structure – 4,242 Square meters
CW2 – Construction of Drainage Structure along Road – 1,504.68 Lineal meters
Allocation: Php 60,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04103 |
FY 2021 GAA RA 11518 |
March 27, 2020 |
Region V |
Regional Office V |
UACS No.: 310204101080000
Project ID: P00506019LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Oas Section, Albay
Physical Target: CW1- Construction of Concrete Road – 1.633 Lane Km
CW2 – Construction of Drainage Structure along Road – 1,625.68 Lineal meters
CW3 – Construction of Road Slope Protection Structure – 47,858 Square meters
Allocation: Php 60,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd, Oas Section, Albay
Physical Target: CW1- Construction of Road Slope Protection Structure – 4,242 Square meters
CW2 – Construction of Drainage Structure along Road – 1,504.68 Lineal meters
Allocation: Php 60,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04396 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101082000
Project ID: P00506288LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga Albay Diversion Road, (Malabog Flyover), Albay
Physical Target: CW1- Construction of Flyover – 5,724 Square meters
Allocation: Php 47,261,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga Albay Diversion Road, (Malabog Flyover), Albay
Physical Target: CW1- Construction of Flyover – 1,981.5 Square meters
Allocation: Php 47,261,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04090 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101433000
Project ID: P00506291LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd (Package 3), Albay
Physical Target: CW1- Construction of Gravel Road – 6.969 Lane Km
ROW - ROW Acquisition – 349, 200 Square meters
Allocation: Php 127,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur-Albay Diversion Rd (Package 3), Albay
Physical Target: CW1- Construction of Road Slope Protection Structure – 1895.28 Square meters
Allocation: Php 127,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C03951 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101092000
Project ID: P00506293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct Magarao-Canaman-Libmanan Jct PPH Road (Skybridge), Camarines Sur
Physical Target: CW1- Construction of Concrete Road – 0.96 Lane Km
ROW - ROW Acquisition – 16,411.041 Square meters
Allocation: Php 30,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Naga-Jct Magarao-Canaman-Libmanan Jct PPH Road (Skybridge), Camarines Sur
Physical Target: CW1- Construction of Road Slope Protection Structure – 2,675.91 Square meters
ROW - ROW Acquisition – 8,381.6 Square meters
Allocation: Php 30,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04293 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 310204101086000
Project ID: P00506300LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Bulan Section, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.502 Lane Km
CW2 - Construction of Concrete Bridge – 713.16 Square meters
CW3 - Construction of Concrete Bridge – 679.2 Square meters
ROW - ROW Acquisition – 43,780 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Bulan Section, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.544 Lane Km
CW2 - Construction of Concrete Bridge – 713.16 Square meters
CW3 - Construction of Concrete Bridge – 679.2 Square meters
ROW - ROW Acquisition – 5,440 Square meters
Allocation: Php 100,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04428 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203403000
Project ID: P00561890LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Diamante- Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 9.904 Lane Km
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Diamante- Perlas Coastal Road and Shore Protection, Phase II, Prieto Diaz, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 1.35556 Lane Km
CW2- Construction of Road Slope Protection Structure – 1,074.16 Square meters
Allocation: Php 100,000,000.00
|
August 23, 2021 |
FY 2021 |
WIN1C04427 |
FY 2021 GAA RA 11518 |
March 27, 2021 |
Region V |
Regional Office V |
UACS No.: 300116203394000
Project ID: P00561887LZ
AS PER GAA:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.798 Lane Km
CW2- Construction of Road Slope Protection Structure – 2,059.64 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
Local Program: Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects - Construction of Balud del Norte- Cota na Daco- Cogon Coastal Road and Shore Protection, Package II, Gubat, Sorsogon
Physical Target: CW1- Construction of Concrete Road – 0.7756 Lane Km
CW2- Construction of Road Slope Protection Structure – 2,001.82 Square meters
Allocation: Php 100,000,000.00
|
August 20, 2021 |
CY 2021 |
WIN1F06711 |
UACS No. 320101106474000 |
March 4, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 320101106474000
Project ID.: P00525840LZ
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures at Lambakan Creek, Barangay Matandang
Balara, Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structure L=892.00 lineal meter
Unit Cost (P’000) = P 54.93/ l. m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 100.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures at Lumban Creek, Barangay Matandang
Balara, Quezon City
Physical Target: CW1 = Construction of Flood Mitigation Structure L=384.70 lineal meter
Unit Cost (P’000) = P 127.37/ l. m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 100.00
Total (P’000) = P 50,000.00
WIN1F06711
|
August 20, 2021 |
CY 2021 |
WIN1F06712 |
UACS No. 310102100614000 |
June 8, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100614000
Project ID.: P00505506LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos – (S02287LZ) K0005+229.0 – K0005+319.0
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L= 0.180 lane km.
Unit Cost (P’000) = P 6,549.00/ lane km.
Allocation = P 1,178,940.00
EAO = P 24,060.00
Total = P 1,203,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
JA Santos – (S02287LZ) K0005+299.0 – K0005+319.0
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L= 0.180 lane km.
Unit Cost (P’000) = P 6,549.00/ lane km. P13 m/km
Allocation = P 1,178,940.00
EAO = P 24,060.00
Total = P 1,203,000.00
WIN1F06712
|
August 20, 2021 |
2021 |
WIN1E02785 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300117210433000
Project ID: P00551442MN
Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
FROM:
Construction/Improvement of Circumferential Road along Marsh Road, Bunawan Section, Phase II, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.935 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,900,000
EAO: P 100,000
Unit Cost:
CW1: P 10,588,235.29/Lane Km
TO:
Construction/Improvement of Circumferential Road along Marsh Road, Bunawan Section, Phase II, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 0.110 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,900,000
EAO: P 100,000
Unit Cost:
CW1: P 90,000,000/Lane Km
|
August 18, 2021 |
2021 |
WIN1F06699 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - (S00227LT) Chainage 0 - Chainage 432
Physical Target: Allocation:
CW1-Preventive Maintenance: P 4.85296 M
Asphalt Overlay: 0.864 Lane Km
EAO P 0.09904 M
Total P 4.952 M
AS MODIFIED:
Govt Ctr Rd Network - (S00227LT) Chainage 0 - Chainage 206
Physical Target: Allocation:
CW1-Preventive Maintenance: P 4.85296 M
Asphalt Overlay: 0.412 Lane Km
EAO P 0.09904 M
Total P 4.952 M
|
August 18, 2021 |
2021 |
300211100056000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Isabela 1st District Engineering Office |
Convergence and Special Support Program - Convergence and Special Support - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Construction of Paculagu Bridge, Brgy. Naganacan, Sta. Maria, Isabela |
August 18, 2021 |
2021 |
310204101011000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Alicia Bypass Road, Isabela |
August 18, 2021 |
2021 |
310204101025000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - San Mateo - Alfonso Lista Diversion Road, San Mateo Section, Isabela |
August 17, 2021 |
FY 2021 GAA |
WIN1F06440 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204187000
Project ID : P00562448LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roiads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Pahilahan, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 2.00 Million
TO :
Concreting of Road,
Brgy. Pahilahan, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.212 Lane Km
Allocation : Php 2.00 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06456 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300117209112000
Project ID : P00564665LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM :
Concreting Sitio Manuro, Brgy. Malamig,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.510 Lane Km
Allocation : Php 8.50 Million
TO :
Concreting Sitio Manuro, Brgy. Malamig,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.535 Lane Km
Allocation : Php 8.50 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06473 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204158000
Project ID : P00562419LZ\
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road at Lemon St., Lalud,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 2.00 Million
TO :
Concreting of Concrete Road at Lemon St., Lalud,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.13 Lane Km
Allocation : Php 2.00 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06441 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204183000
Project ID : P00562444LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Various Roads,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.906 Lane Km
CW2 - Construction of Concrete Road :
1.906 Lane Km
CW3 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Various Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.739 Lane Km
CW2 - Construction of Concrete Road :
1.912 Lane Km
CW3 - Construction of Concrete Road :
1.24 Lane Km
Allocation : Php 25.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06442 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204157000
Project ID : P00562418LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Brgy. Palangan Circumferential Road,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
30340 lane Km
Allocation : Php 20.00 Million
TO :
Concreting of Brgy. Palangan Circumferential Road,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.584 Lane Km
Allocation : Php 20.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06447 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204167000
Project ID : P00562428LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Nag-Iba II, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.43 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Nag-Iba II, Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.274 Lane Km
Allocation : Php 25.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06463 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100465000
Project ID : P00505133LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0066 + 935 - K0067 + 027
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.244 Lane Km
Allocation : Php 3.74 Million
TO :
CSR Jct - Pola Road,
K0065 + 052 - K0065 + 254
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.202 Lane Km
Allocation ; Php 3.74 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06463 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310203100465000
Project ID : P00505133LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
CSR Jct - Pola Road,
K0066 + 935 - K0067 + 027
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.244 Lane Km
Allocation : Php 3.74 Million
TO :
CSR Jct - Pola Road,
K0065 + 052 - K0065 + 254
Physical Target - CW1 - Network Development - Road Widening -
Tertiary Roads - 0.202 Lane Km
Allocation ; Php 3.74 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06470 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300117209111000
Project ID : P00564664LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Local Infrastructure Program
FROM :
Concreting of Sitio Silangan, Balingayan,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.510 Lane Km
Allocation : Php 8.50 Million
TO :
Concreting of Sitio Silangan, Balingayan,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.352 Lane Km
Allocation : Php 8.50 Million
|
August 17, 2021 |
FY 2021 GAA |
WIN1F06489 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300106200714000
Project ID : P00561577Lz
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Shore protection/Causeway leading to
Poctoy Port, Odiongan, Romblom
Physical Target - CW1 - Construction of Flood Mitigation Structure :
586.988 lineal meters
Allocation : Php 50.00 Million
TO :
Construction of ShoreProtection/Causeway leading to
Poctoy Port, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
161.88 lineal meters
Allocation : Php 50.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06472 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300116203716000
Project ID : P00561990LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Causeway along
Mabini Fish Port, San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.000 Lane Km
Allocation : Php 30.00 Million
TO :
Construction of Causeway along
Mabini Fish Port, San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.120 Lane Km
Allocation : Php 30.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1F06416 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 310203100467000
Project ID : P00505156LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
Road Widening of Coron - Busuanga Road,
K0046 + 690 - K0047 + 721
Physical Target - CW1 - Road Widening ; 2.072 lane Km
Allocation : Php 28.00 Million
TO :
Road Widening of Coron - Busuanga Road,
K0046 + 690 - K0047 + 383
Physical Target - Road Widening : 1.386 Lane Km
Allocation : Php 28.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1E02779 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - (S01456MN) Chainage 647 - Chainage 838
Physical Target:
CW1: 0.764 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,481,000.00
CW1: P 4,391,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 89,620.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - (S01456MN) Chainage 647 - Chainage 748
Physical Target:
CW1: 0.202 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,481,000.00
CW1: P 4,391,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 89,620.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1F06415 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310205100686000
Project ID : P00506143LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.00 Lane Km
Allocation : Php 50.00 Million
TO :
Sofronio Espanola - Quezon Cross Country Road
( Pulot Interior - Tagusao Section ), Palawan
Physical Target - CW1 - Construction of Gravel Road :
3.00 Lane Km
Allocation : Php 50.00 Million |
August 17, 2021 |
FY 2021 GAA |
WIN1E02772 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at NHA Bangkal, Matutum St to Outfall, Davao City
Physical Target:
CW1: 3,000.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Drainage Structure)
EAO: P 3,220,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at NHA Bangkal, Matutum St to Outfall, Davao City
Physical Target:
CW1: 1,600.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Drainage Structure)
EAO: P 3,220,000.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02780 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+225 - Sta. 2+565)
Physical Target:
CW1: 763.010 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Sandawa Section, Right Bank, Davao City (Sta. 2+246 - Sta. 2+635)
Physical Target:
CW1: 389.00 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,450,000.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02773 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City
Physical Target:
CW1: 410.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 90,750,000.00
CW1: P 87,573,750.00 (Construction of Revetment)
EAO: P 3,176,250.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Downstream, Matina Pangi Section, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 90,750,000.00
CW1: P 87,573,750.00 (Construction of Revetment)
EAO: P 3,176,250.00 |
August 17, 2021 |
FY 2021 GAA |
WIN1E02778 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Boulevard (MN) (S01457MN) Chainage 0 - Chainage 2005
Physical Target:
CW1: 4.284 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 79,000,000.00
CW1: P 76,235,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,765,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Boulevard (MN) (S01457MN) Chainage 0 - Chainage 1848
Physical Target:
CW1: 3.814 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 79,000,000.00
CW1: P 76,235,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,765,000.00 |
August 16, 2021 |
2021 |
WIN1E02689 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310110100202000
Project ID: P00501648MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1233 + 584, K1235 + 130 - K1236 + 229
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 3,616.00 Lineal meters
Allocation:
TOTAL: P 58,000,000
CW1: P 55,970,000
EAO: P 2,030
Unit Cost:
CW1: P 15,478.43/Lineal meters
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + 244.00 - K1234 + 125, K1235 + 322 -K1236 + 372
Type of Work:
CW1- Construction of Drainage Structure along Road
Physical Target:
CW1- 3,207.00 Lineal meters
Allocation:
TOTAL: P 58,000,000
CW1: P 55,970,000
EAO: P 2,030
Unit Cost:
CW1: P 17,452.45/Lineal meters
|
August 16, 2021 |
2021 |
WIN1C04475 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0095+400 - K0095+451.20 |
August 16, 2021 |
2021 |
WIN1C04335 |
GAA 2021 |
July 16, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Repair/Rehabilitation of Lap-angan Water System at Barangay Lap-angan, Mankayan, Benguet;
Physical Target: CW1: 1 Number of Water Supply Systems;
Allocation= Php 3,000,000
To: Repair/Rehabilitation of Lap-angan Water System at Barangay Palasaan, Mankayan, Benguet;
Physical Target: CW1: 1 Number of Water Supply Systems;
Allocation= Php 3,000,000
|
August 16, 2021 |
2021 |
WIN1C04155 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0454+000 - K0455 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement ;
Physical Target: CW1: 2.026 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0454+000 - K0455 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.026 Lane Km
CW2: 3,307.68 Square meters;
Allocation= Php 99,000,000
|
August 16, 2021 |
2021 |
WIN1C04156 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Presentar Flood Control, Barangay Presentar, Lagangilang, Abra;
Physical Target: CW1: 224.40 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Presentar Flood Control, Barangay Presentar, Lagangilang, Abra;
Physical Target: CW1: 538 Lineal meters;
Allocation= Php 50,000,000
|
August 16, 2021 |
2021 |
WIN1C04154 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Wayangan Flood Control, Tubo, Abra;
Physical Target: CW1: 1,224 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Wayangan Flood Control, Tubo, Abra;
Physical Target: CW1: 1,120 Lineal meters;
Allocation= Php 100,000,000
|
August 16, 2021 |
2021 |
WIN1C04153 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bollilising Flood Control Phase II, Sta. 27+000 - Sta. 27+500, Villaviciosa, Abra;
Physical Target: CW1: 339 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Bollilising Flood Control Phase II, Sta. 27+000 - Sta. 27+500, Villaviciosa, Abra;
Physical Target: CW1: 481.5 Lineal meters;
Allocation= Php 20,000,000
|
August 16, 2021 |
2021 |
WIN1C04152 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Bucay-Manabo Road, Bucay and Manabo, Abra;
Physical Target: CW1: 3.794 Lane Km;
Allocation= Php 40,000,000
To: Rehabilitation/Improvement of Bucay-Manabo Road, Bucay and Manabo, Abra;
Physical Target: CW1: 4.64 Lane Km;
Allocation= Php 40,000,000
|
August 13, 2021 |
2021 |
WIN1F06677 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St. – (S00003LT) Chainage 000 – Chainage 110
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 2.617580 M
Road : 220 Lineal Meters
EAO P 0.53420 M
Total P 2.671 M
AS MODIFIED:
Avenida Veteranos St. – (S00003LT) Chainage 011 – Chainage 102
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 2.617580 M
Road : 91 Lineal Meters
EAO P 0.53420 M
Total P 2.671 M
|
August 13, 2021 |
2021 |
WIN1F06667 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika LT - K0905+077-K0905+423, K0905+453-K0905+982, K0906+000-K0906+261,K909+333-K909+371
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 11.854080 M
along Road: 1,174 Lineal Meters
EAO P 0.241920 M
Total P 12.096 M
AS MODIFIED:
Daang Maharlika (S00022LT) - K0909+260-K0910+000, K0909+377-K0909+415, K0909+549-K0909+573
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 11.854080 M
along Road: 386 Lineal Meters
EAO P 0.241920 M
Total P 12.096 M
|
August 13, 2021 |
2021 |
WIN1F06668 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Avenida Veteranos St. – (S00004LT) Chainage 000 – Chainage 123
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 246 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Avenida Veteranos St. – (S00004LT) Chainage 119 – Chainage 223
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 208 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
August 13, 2021 |
2021 |
WIN1F06679 |
GAA FY 2021 |
January 25, 2021 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0772 + 829 - K0773 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.33334 M
Asphalt Overlay: 0.680 Lane Km
EAO P 0.14966 M
Total P 7.483 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro – Sn Juanico Br.) K0727 + 280 - K0727 + 500
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 7.33334 M
Asphalt Overlay: 0.440 Lane Km
EAO P 0.14966 M
Total P 7.483 M
|
August 13, 2021 |
FY 2021 GAA |
WIN1E02648 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structures, Barangay 30-C, Davao City
Physical Target:
CW1: 140.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Construction/Upgrading of Drainage Structures, Barangay 30-C, Davao City
Physical Target:
CW1: 110.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00 |
August 13, 2021 |
FY 2021 GAA |
WIN1E02742 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction Flood Mitigation Structure)
EAO: P 500,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction Flood Mitigation Structure protecting Daang Maharlika (MN) at Brgy. Sasa, Davao City
Physical Target:
CW1: 115.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction Flood Mitigation Structure)
EAO: P 500,000.00 |
August 13, 2021 |
FY 2021 GAA |
WIN1E02648 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - School Buildings - Local Infrastructure Program
Construction of two (2) Classroom Building at Barangay San Miguel, Matanao, Davao del Sur
Physical Target:
CW1: 1 classroom (Construction of Classrooms)
Allocation:
TOTAL: P 1,000,000.00
CW1: P 1,000,000.00 (Construction of Drainage Structure)
TO: Local Program - Buildings And Other Structures - School Buildings - Local Infrastructure Program
Construction of one (1) Classroom Building at Barangay San Miguel, Matanao, Davao del Sur
Physical Target:
CW1: 1 classroom (Construction of Classrooms)
Allocation:
TOTAL: P 1,000,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02741 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City
Physical Target:
CW1: 1,700.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Flood Mitigation Structure at Purok 6, Bago Gallera, Talomo District, Davao City
Physical Target:
CW1: 1,306.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02732 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Aplaya Section, Davao City
Physical Target:
CW1: 450.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Aplaya Section, Davao City
Physical Target:
CW1: 300.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02724 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City
Physical Target:
CW1: 200.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage System at Libby Bridge, Purok 6, Bago Gallera. Talomo District, Davao City
Physical Target:
CW1: 252.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00
|
August 12, 2021 |
FY 2021 GAA |
WIN1E02714 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Camia St., Juna - Jct Davao-Cotabato Road, Davao City
Physical Target:
CW1: 1.602 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 700,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Camia St., Juna - Jct Davao-Cotabato Road, Davao City
Physical Target:
CW1: 1.748 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,300,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 700,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02731 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Marang St., Juna, Davao City
Physical Target:
CW1: 0.554 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,755,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 245,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Preventive Maintenance of Road, Asphalt Overlay along Marang St., Juna, Davao City
Physical Target:
CW1: 0.602 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,755,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 245,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02755 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction of Road in Barangay Sumimao (Paquibato District), Davao City, Davao del Sur
Physical Target:
CW1: 1.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Construction of Road in Barangay Sumimao (Paquibato District), Davao City, Davao del Sur
Physical Target:
CW1: 0.640 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02704 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Connecting Bridge from Eye Institute to OPD JICA Building, Southern Philippines Medical Center, Davao City
Physical Target:
CW1: 195.00 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 24,037,000.00
CW1: P 23,556,260.00 (Construction of Bridge)
EAO: P 480,740.00
TO: Local Program - Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Connecting Bridge from Eye Institute to OPD JICA Building, Southern Philippines Medical Center, Davao City
Physical Target:
CW1: 120.00 sq. m. (Construction of Bridge)
Allocation:
TOTAL: P 24,037,000.00
CW1: P 23,556,260.00 (Construction of Bridge)
EAO: P 480,740.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02761 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off-Carriageway Improvement of Road, Barangay 34-D, Davao City
Physical Target:
CW1: 0.503 lane km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Rehabilitation of Concrete Road)
EAO: P 37,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Off-Carriageway Improvement of Road, Barangay 34-D, Davao City
Physical Target:
CW1: 1,130.66 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 3,700,000.00
CW1: P 3,663,000.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 37,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02612 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Daang Maharlika Bunawan Proper - Barangay San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte
Physical Target:
CW1: 7.920 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Concrete Road)
EAO: P 3,220,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, NRJ Daang Maharlika Bunawan Proper - Barangay San Isidro - Kiotoy - Mabunao - Kauswagan - Jct. Panabo City Fatima - Malabog Road, Panabo City, Davao del Norte
Physical Target:
CW1: 7.420 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 92,000,000.00
CW1: P 88,780,000.00 (Construction of Concrete Road)
EAO: P 3,220,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02763 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1380+686 - K1380+786,
K1381+693 - K1382+072, K1387+000 - K1387+176
Physical Target:
CW1: 7.164 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 31,863,000.00
CW1: P 31,225,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 637,260.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1396+793 - K1397+353, K1397+396 - K1398+100
Physical Target:
CW1: 5.120 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 31,863,000.00
CW1: P 31,225,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 637,260.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02746 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+671 to Sta. 1+000, Left Bank, Davao City
Physical Target:
CW1: 452.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+465 to Sta. 0+790, Left Bank, Davao City
Physical Target:
CW1: 325.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
August 12, 2021 |
FY 2021 GAA |
WIN1E02750 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. 5th Ave - Soliman St. - Jct. Leon Garcia St, Barangay 27-C and Barangay Kap Tomas Monteverde, Sr., Davao City
Physical Target:
CW1: 1.448 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 82,575,000.00
CW1: P 79,684,875.00 (Construction of Concrete Road)
EAO: P 2,890,125.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. 5th Ave - Soliman St. - Jct. Leon Garcia St, Barangay 27-C and Barangay Kap Tomas Monteverde, Sr., Davao City
Physical Target:
CW1: 0.920 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 82,575,000.00
CW1: P 79,684,875.00 (Construction of Concrete Road)
EAO: P 2,890,125.00 |