Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 17, 2017 2017 WIN7G01082 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Lanao - Pagadian - Zamboanga City Rd - K1757+-631 - K1757+-436, K1760+804 - K1761+100, K1761+150 - K1761+400, K1761+900 - K1762+000, K1762+800 - K1762+900, K1763+000 - K1763+549, KK1763+573 - K1764+100, K1764+200 - K1764+350, K1764+600 - K1765+600, K1766+500 - K1766+700, K1766+800 - K1767+150, K1767+400 - K1768+300, K1768+350 - K1768+500, K1768+800 - K1768+900, K1769+050 - K1769+850, K1769+900 - K1770+502, K1814+000 - K1815+000, K1815+446.5 - K1816+653, K1816+101 - K1817+192, K1817+878.5 - K1818+000, K1818+497 - K1819+370, K1819+469 - K1819+865, K1819+887.5 - K1820+000, K1838+169 - K1838+484, K1838+572.5 - K1838+856, K1839+154 - K1840+000, K1840+139 - K1841+163.5
Allocation: P 50.00 Million
Physical Target: 13,609 lm
Unit Cost: P 3,674.04/lm
April 17, 2017 GAA FY 2017 WIN7G01274 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement: Shoulder Paving/Construction - ABS-CBN Quimpo Blvd Div. Rd -
K1511+-101 - K1511+147,
K1511+411 - K1511+622,
K1511+808 - K1512+092,
K1513+784 - K1514+044

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Paving of Shoulder (Off-Carriageway) including Drainage & ROW along ABS-CBN Quimpo Blvd. Diversion Road -
K1511+(-)101 - K1511+147,
K1511+411 - K1511+622,
K1511+808 - K1512+092,
K1513+784 - K1514+044

ALLOCATION: Php 7.611 Million
April 17, 2017 2017 WIN7G01143 165003016700003 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Off-Carriageway Improvement including drainage - Primary

Off-Carriageway Improvement including Drainage (Primary), Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or. Road), Agusan del Norte, K1250+-542 - K1252+605, K1254+000 - K1254+857, (S00391MN)

Allocation:
- Php 51.70 Million (Total)
- Php 42, 895,876.36 (Paving of Shoulders)
- Php 8,604,123.64 (Construction of Bike Lanes)
- Php 200,000.00 (ROW Acquisition)

Physical Target:
- 19,163 sq.m. (Paving of Shoulders)
- 2 Bike Lanes (Construction of Bike Lanes)
- 2,571 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01259 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Roads and Bridges - National Roads -
Road Widening of Isabela - Lamitan Road, Basilan
K4+000.00 - K8+000.00
Allocation:
Php 135.000 M (Total)
Php 133,468,973.05 (Road Widening)
Php 1,531,026.95 (ROW Acquisition)
Physical Target:
8.00 lane km (Road Widening)
1,531.027 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,683,621.63/lane km (Road Widening)
Php 1,000.00 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01079 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Flood Control (Phase III) along Sibuguey River Basin, Barangay Sibuguey, Siay, Zamboanga Sibugay,
K0+940.00 - K1+700.00,
Allocation: P 40.00 Million
Physical Target: 760.00 lm
Unit Cost: P 52,631.58/lm
April 17, 2017 GAA FY 2017 WIN7G01276 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Jct. F. Torres St. - K1509+770

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Improvement/Construction of Drainage along F. Torres St., Jct. Tavera St.-Arellano St.-Mt. Apo St., K1509+770, Davao City

ALLOCATION: Php 21.091 Million
April 17, 2017 GAA FY 2017 WIN7G01285 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Fatima-Malabog Rd - K1515+000 - K1516+685

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Fatima-Malabog Road including Drainage, Davao City - K1515+000 - K1516+634

ALLOCATION: Php 41.502 Million
April 17, 2017 2017 WIN7G01087 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Repair of Flood Control along Lanao - Pagadian - Zamboanga City Road, Buayan River (Phase II), Buayan, Kabasalan, Zamboanga Sibugay
Sta. 0+003.00 - 0+690.00
Allocation: P 40.00 Million
Physical Target: 687.00 lm
Unit Cost: P 58,224.16/lm
April 17, 2017 2017 WIN7G01077 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Flood Control (Phase IV) along Sibuguey River Basin, Barangay Sibuguey, Siay, Zamboanga Sibugay
K1+700.00 - K2+312.00
Allocation: P 45.00 Million
Physical Target: 612.00 lm
Unit Cost: P 73,529.41/lm
April 17, 2017 2017 WIN7G01292 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of Vitali Bridge and Approaches along Pagadian City - Zamboanga City Road, Brgy. Vitali, Zamboanga City
Beg. of the Project: 1864+700.00
Abutment A: 1864+935.79
Abutment B: 1864+987.13
End of Project: 1865+097.03
Approaches Net Length: 345.69 ln.m.
Bridge Length: 51.34 ln.m.
Allocation:
Php 60.000 M (Total)
Php 59,824,586.29 (Widening of Bridge)
Php 175,413.71 (ROW Acquisition)
Physical Target:
51.34 ln.m./489.784 sq.m. (Widening of Bridge)
175.41 sq.m. (ROW Acquisition)
Unit Cost:
Php 122,144.84/lane km (Widening of Bridge)
Php 1,000.00/sq.m. (ROW Acquisition)
April 17, 2017 GAA FY 2017 WIN7G01286 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary
Construction of Road Slope Protection Structure - Mabuhay-Pañalum-Paquibato Rd -
K1527+800 - K1527+876

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary
Rehabilitation/Reconstruction of Mabuhay-Pañalum-Paquibato Road with Slip, Slope Collapse and Landslide, Davao City -
K1525+580 - K1525+620,
K1527+720 - K1527+940

ALLOCATION: Php 26.600 Million
April 17, 2017 2017 WIN7G01290 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Concrete Road, including ROW Zamboanga del Sur, Package 1, Zamboanga del Sur DEO
Chainage 116.49 - Chainage 3200
Allocation:
Php 147.000 M (Total)
Php 144,367,015.09 (Road Concreting)
Php 2,632,984.91 (ROW Acquisition)
Physical Target:
6.167 lane km (Road Concreting)
2,632.98 sq.m. (ROW Acquisition)
Unit Cost:
Php 23,409,601.91/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01142 165003014900171 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Asset Preservation of National Roads - Construction/Upgrading/rehabilitation of Drainage along National Roads - Tertiary

Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary - Const. of Drainage Structure along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1262+000 - K1263+179, K1271+000 - K1271+880, K1272+000 - K1272+100, (S00396MN)

Allocation:
- Php 36.837 Million (Total)
- Php 33,479,952.00 (Construction of Drainage)
- Php 3,357,048.00 (ROW Acquisition)

Physical Target:
- 4,258 lm (Construction of Drainage)
- 42,600 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01250 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga del Sur 2nd DEO,
Chainage 600 - Chainage 1800,
(Sta. 0+600.00 - Sta. 1+800.00)
Chainage 3400 - Chainage 5180,
(Sta. 3+400.00 - Sta. 5+180.00)
Allocation:
Php 150.000 Million (Total)
Php 149,340,871.70 (Gravel Road)
Php 659,128.28 (ROW Acquisition)
Physical Target:
5.96 lane km (Gravel Road)
659.13 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,057,193.24/lane km (Gravel Road)
Php 1,000.00/sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01065 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Poblacion, Siay, Zamboanga Sibugay.
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 17, 2017 GAA FY 2017 WIN7G01288 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Davao-Cotabato Road (Davao City-Jct. Digos Section) including RROW -
K1514+550 - K1514+590,
K1515+000 - K1516+000

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening including drainage & ROW along Davao-Cotabato Road (Davao City-Jct. Digos Section), Davao City -
K1514+267 - K1514+590,
K1515+000 - K1516+000,
K1520+090 - K1521+255

ALLOCATION: Php 39.000 Million
April 17, 2017 GAA FY 2017 WIN7G01294 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Panacan River Flood Control (Slope Protection), Panacan, Sta. 1+800 - Sta. 2+000, Davao City

TO: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Panacan River Flood Control (Slope Protection), Panacan,
Sta. 0+555 to Sta. 0+780, Right Bank,
Sta. 0+760 to Sta. 0+900, Left Bank,
Sta. 1+000 to Sta. 1+070, Davao City

ALLOCATION: Php 20.000 Million
April 17, 2017 GAA FY 2017 WIN7G01297 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Davao City Diversion -
K1511+900 - K1512+000

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Davao City Diversion Road -
K1511+900 - K1512+000

ALLOCATION: Php 30.897 Million
April 17, 2017 GAA FY 2017 WIN7G01299 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Construction of Road Slope Protection Structure - Fatima-Malabog Rd -
K1504+223 - K1504+250, K1501+409 - K1501+449, K1502+930 - K1502+956,
K1510+018 - K1510+041, K1510+081 - K1510+115
Rehabilitation/Major Repair of Road Slope Protection Structure - Fatima-Malabog Rd -
K1504+223 - K1504+250, K1501+409 - K1501+449, K1502+930 - K1502+956,
K1510+018 - K1510+041, K1510+081 - K1510+115

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Rehabilitation/Reconstruction of Fatima-Malabog Road with Slips, Slope Collapse and Landslide, Davao City
CW1 - Construction of Road Slope Protection Structure -
K1502+976 - K1502+980,
K1504+260 - K1504+293
CW2 - Rehabilitation/Major Repair of Road Slope Protection Structure -
K1501+460 - K1501+500,
K1502+940 - K1502+976

ALLOCATION: Php 69.843 Million
April 17, 2017 GAA FY 2017 WIN7G01307 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Fatima-Malabog Rd -
K1505+000 - K1505+650,
K1505+760 - K1506+339,
K1508+853 - K1508+1048

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Fatima-Malabog Road including Drainage, Davao City
K1504+940 - K1505+718,
K1505+838 - K1506+383

ALLOCATION: Php 49.805 Million
April 17, 2017 2017 WIN7G01221 103004010313956 December 29, 2016 Region XIII Dinagat Islands District Engineering Office
Modified;
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multipurpose Building, Brgy. Cuarinta, San Jose, Dinagat Islands

Allocation - Php 2.00 Million

Physical Target - 1 Building
April 17, 2017 2017 WIN7G01216 103004010313957 December 29, 2016 Region XIII Dinagat Islands District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Provincial DepEd Training Center, Brgy. White Beach, Dinagat, Dinagat Islands

Allocation - Php 5.00 Million

Physical Target - 1 Building
April 17, 2017 2017 WIN7G01222 103004010313958 December 29, 2016 Region XIII Dinagat Islands District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Improvement of Multi-Purpose Building, Brgy. Osmeña, Libjo, Dinagat Islands

Allocation - Php 2.00 Million

Physical Target - 1 Building
April 17, 2017 GAA FY 2017 WIN7G01309 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
Chainage 2424 - Chainage 3674

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Improvement of Drainage Structures along Davao-Cotabato Road -
Chainage 2424 (Jct. Davao-Cotabato Road/Jct. Tulip Section) to outfall (Davao River), Davao City

ALLOCATION: Php 41.826 Million
April 17, 2017 2017 WIN7G01223 103004010309856 December 29, 2016 Region XIII Dinagat Islands District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of DPWH Building, Dinagat Islands DEO, San Jose, Dinagat Islands

Allocation:
- Php 17.728 Million (Total)
- Php 2,922,626.50 (Building A)
- Php 5,815,893.13 (Building B)
- Php 8,989,480.37 (Building C)

Physical Target:
- 1 Building (Building A)
- 1 Building (Building B)
- 1 Building (Building C)
April 17, 2017 GAA FY 2017 WIN7G01318 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges
Widening of Bridge - Libby Bridge 2 along Davao-Cotabato Old Road including RROW
ROW Acquisition - Libby Bridge 2 along Davao-Cotabato Old Road including RROW

TO: MFO 1 - National Road Network Services
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges
Construction of Parallel Bridge and Approaches at Davao-Cotabato Old Road - Libby Bridge 2 along Davao-Cotabato Old Road including RROW

ALLOCATION: 35.175 Million
April 17, 2017 GAA FY 2017 WIN7G01257 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including Drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Davao Regional Med Trng Ctr -
Chainage 374 - Chainage 540

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including Drainage - Tertiary
Paving of Shoulder (Off-Carriageway) Davao Regional Medical Training Center, Davao City -
Chainage 374 - Chainage 540

ALLOCATION: Php 1.807 Million
April 12, 2017 2017 WIN7G01099 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage of Lanao - Pagadian - Zamboanga City Road, Zamboanga del Sur 1st DEO
K1659+778.00 - K1661+131.00,
K1661+154.00 - K1661+773.00
Allocation:
Php 59.000 Million (Total)
Php 53,116,731.01 (Road Widening)
Php 5,883,268.99 (ROW Acquisition)
Physical Target:
3.96 lane km (Road Widening)
19,610.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,413,315.91/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 12, 2017 FY 2017 WIN7C01590 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Asset Preservation of National Roads - Rehab./Reconst. of National Roads with Slips, Collapse and Landslide at Jct. (LIR) Buenavista-Carmen-Danao-Getafe Road K0189+100 - K0189+200, K0194+354 - K0194+450, K0194+795 - K0194+842.48, K0195+010 - K0195+070.81, K0195+368 - K0195+399.93 Buenavista, Bohol

Allocation - ₱ 13,678,000.00
Physical Target CW1 - 336.22 lm.; 4,084.34 sq.m
CW2 - 1,115.66 sq.m
Unit Cost CW1 - 2,885.04/lm.
CW2 - 1,697.12/ sq.m
April 12, 2017 FY 2017 WIN7C01592 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage System

Construction of San Pascual River Control, Ubay, Bohol

Allocation - ₱ 5,000,000.00
Physical Target - 169.48 lm
Unit Cost - ₱ 29,502.01/ linear meter
April 12, 2017 2017 WIN7C01505 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage and RROW of Dipolog - Oroquieta National Road, Zamboanga del Norte 1st DEO
K1844+220.00 - K1846+266.00,
K1846+321.00 - K1846+418.00
Allocation:
Php 64.230 Million (Total)
Php 63,507,657.92 (Road Widening)
Php 722,342.08 (ROW Acquisition)
Physical Target:
4.286 lane km (Road Widening)
722.34 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,803,649.86/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition)
April 12, 2017 2017 WIN7G01129 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - N1 -
Road Widening including Drainage of Pagadian City - Zamboanga City Road, Zamboanga del Sur 2nd DEO
K1681+892.00 - K1684+271.00
Allocation:
Php 71.000 Million (Total)
Php 60,250,372.28 (Road Widening)
Php 10,749,627.72 (ROW Acquisition)
Physical Target:
4.758 lane km (Road Widening)
10,749.63 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,662,961.81/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition)
April 12, 2017 FY 2017 WIN7C01557 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary,

Construction of Road Slope Protection - Jct. (TER) - Jagna-Sierra Bullones Rd - K0082+349 - K0082+436, K0082+450 - K0082+600, K0089+748 - K0089+788.83

Allocation - ₱ 47.998 Million
Physical Target - 8,985.00 sq.m
Unit Cost - ₱ 5,342.01/ sq.m
April 12, 2017 2017 WIN7G01095 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Road Upgrading (Gravel to Paved) including RROW of Labangan - Midsalip Road, Zamboanga del Sur 1st DEO
Chainage 0005.45 - Chainage 6160
Allocation:
Php 150.000 M (Total)
Php 144,200,758.70 (Road Concreting)
Php 5,799,241.30 (ROW Acquisition)
Physical Target:
12.31 lane km (Road Concreting)
5,799.24 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,714,115.25/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition)
April 12, 2017 2017 WIN7G01096 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Construction of Concrete Road, Labangan - Pagadian City - Dumalinao, Zamboanga del Sur Bypass Road including ROW, Zamboanga del Sur 1st DEO
Chainage 0 - Chainage 36000,
Sta. 1651+570.30 - Sta. 1652+030.00,
Sta. 1652+340.00 - Sta. 1652+690.00,
Sta. 1652+930.00 - Sta. 1654+173.94,
Sta. 1654+201.56 - Sta. 1654+400.00
Allocation:
Php 150.000 Million (Total)
Php 131,869,804.40 (Road Concreting)
Php 18,130,195.60 (ROW Acquisition)
Physical Target:
4.5042 lane km (Road Concreting)
18,130.196 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,277,075.71/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition)
April 12, 2017 FY 2017 WIN7C01586 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Asset Preservation of National Roads, Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4), Tertiary Roads, Tagbilaran City-Corella-Sikatuna-Loboc Road - K0026+825 - K0027+586.20

Allocation - ₱ 23.025 Million
Physical Target - 1.522 lane km.
Unit Cost - ₱ 15,128,120.89/lane km.
April 12, 2017 2017 WIN7C01596 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary

Reconstruction from Concrete to Concrete - Jct. (TER) Jagna-Sierra Bullones - K0063+390 - K0063+910, K091+145 - K0091+231, K0091+377 - K0091+886.86

Allocation - ₱ 22.445 Million
Physical Target - 2.232 lane km.
Unit Cost - ₱ 10,056,003.58/ lane km.
April 12, 2017 2017 WIN7G01109 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps Connecting National Roads, including ROW -
Construction of Concrete Road - Zamboanga del Sur Coastal Road, Package 4, Zamboanga del Sur
Sta. 3+316.00 - Sta. 3+523.54,
Sta. 3+573.44 - Sta. 6+540.00
Allocation:
Php 98.000 M (Total)
Php 97,157,879.83 (Road Concreting)
Php 842,120.17 (ROW Acquisition)
Physical Target:
6.350 lane km (Road Concreting)
2,807.07 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,300,453.52/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 12, 2017 2017 WIN7C01598 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
LIP-Roads and Bridges - Local Roads
Concreting of Tourism Road from Ilaya - Angilan - Bangwalog - Taytay, Duero, Bohol
Allocation - ₱ 10 Million
Physical Target - 0.740 lane km
Unit Cost - ₱ 13.513 Million/lane km
April 12, 2017 2017 WIN7C01565 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
VIILP-Roads and Bridges - Local Bridges
Replacement of Bridge (Temporary to Permanent) of Calmayon Bridge, Poblacion, Jagna, Bohol

Allocation - ₱ 13 Million
Physical Target - 171.72 sq.m
Unit Cost - ₱ 75,704.64/Sq.m
April 12, 2017 2017 WIN7G01092 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges -
Construction of Datu Lumok Bridge along Zamboanga del Sur Coastal Road, Lapuyan, Zamboanga del Sur
Beg. of Porject: K0+140.00
End of Project: K0+320.00
Abutment A: K0+210.00
Abutment B: K0+260.84
Approaches Net Length: 129.16 lm.
Bridge Length: 50.84 lm.
Allocation - Php 60.840 Million
Physical Target - 50.84 lm/485.014 sq.m.
Unit Cost - Php 125,439.68/sq.m.
April 12, 2017 2017 WIN7C01559 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Concreting of Local Road at Brgy. Cutcutan - Taytay - Pangian, Valencia, Bohol

Allocation - ₱ 4 Million
Physical Target - 0.375 lane km
Unit Cost - ₱ 10.666 Million/lane km
April 12, 2017 2017 WIN7C01547 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
LIP - Buildings and Other Structures - Multipurpose Facilities
Completion/Rehabilitation of Multipurpose Building (Barangay Hall) at Brgy. Cayam, Garcia Hernandez, Bohol
Allocation - ₱ 0.500 Million
Physical Target - 1.00 project
Unit Cost - ₱ 0.500 Million/project
April 12, 2017 2017 WIN7C01566 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Box Culvert and Approaches along Tabuan - Togbongon, Garcia Hernandez, Bohol
Allocation - ₱ 10.00 Million
Physical Target - 10.15 lm.
- 219.84 lane km.
Unit Cost - ₱ 170,837.44/lm.
- ₱ 37,600.07/Lane km.
April 12, 2017 2017 WIN7C01597 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
VIILP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building, Brgy. Cogtong, Candijay, Bohol
Allocation - ₱ 5.00 Million
Physical Target - 1.00 project
Unit Cost - ₱ 5.00 Million/project
April 12, 2017 GAA FY 2017 WIN7G01204 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Bleacher) in Brgy. Gabi, Municipality of Compostela, Compostela Valley Province

TO: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (Bleacher) in Brgy. Gabi, Municipality of Compostela, Compostela Valley Province

ALLOCATION: Php 1.500 Million
April 12, 2017 2017 WIN7C01435 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities
Completion of Multipurpose Building (Barangay Hall) in Brgy. Ilihan, Tabogon, Cebu
Allocation - ₱ 2.5 Milion
Physical Target - 1 Building
Unit Cost - ₱ 2.5 Million/Building
April 12, 2017 GAA FY 2017 WIN7G01205 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Bleacher) in Brgy. Mauswagon, Municipality of Maragusan, Compostela Valley Province

TO: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (Bleacher) in Brgy. Mauswagon, Municipality of Maragusan, Compostela Valley Province

ALLOCATION: Php 1.500 Million
April 12, 2017 GAA FY 2017 WIN7G01206 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: MFO 1 – National Road Network Services:
Asset Preservation of National Roads – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary
Construction of Road Slope Protection Structure – Compostela-Cateel Rd (Compostela Side) –
K1586+500 - K1586+518, K1587+050 - K1587+070, K1587+255 - K1587+280, K1587+540 - K1587+565, K1587+900 - K1587+930, K1587+949 - K1587+960, K1588+420 - K1588+450, K1601+650 - K1601+680, K1605+100 - K1605+130

TO: MFO 1 – National Road Network Services:
Asset Preservation of National Roads – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary
Rehabilitation/Reconstruction of National Roads with Slips at Compostela-Cateel Road,
K1586+495 – K1586+517, K1587+050 – K1587+071, K1587+255 – K1587+275, K1587+540 – K1587+565, K1587+900 – K1587+940, K1588+426 – K1588+444, K1601+660 – K1601+675, K1605+120 – K1605+155

ALLOCATION: Php 7.570 Million
April 12, 2017 GAA FY 2017 WIN7G01209 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building/Senior Citizen’s Bldg., Manat, Pantukan, Compostela Valley

TO: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building/Senior Citizen’s Bldg., Manat, Nabunturan, Compostela Valley

ALLOCATION: Php 1.500 Million
April 12, 2017 GAA FY 2017 WIN7G01219 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building (Barangay Hall) in Barangay Lagab, Municipality of Compostela, Compostela Valley

TO: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Completion of Multi-Purpose Building (Barangay Hall) in Barangay Lagab, Municipality of Compostela, Compostela Valley

ALLOCATION: Php 1.000 Million
April 12, 2017 GAA FY 2017 WIN7G01220 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Locally Funded Projects:
LIP – Roads and Bridges – Local Bridges
Construction of Bridge, Barangay Mamonga, Monkayo, Compostella Valley

TO: Locally Funded Projects:
LIP – Roads and Bridges – Local Bridges
Construction of Hanging Bridge @ Purok 6, Brgy. Salvacion, Monkayo, Compostela Valley

ALLOCATION: Php 5.000 Million
April 12, 2017 2017 165003017100022 SR2017-02-002656 February 3, 2017 Region XIII Surigao del Sur 1st District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lane - Widening of Permanent Bridge to more than 2 Lanes, including ROW, Bunawan Br. (B00693MN) along Surigao-Davao Coastal Rd (Construction of Parallel Bridge), K1292+200.59 to K1292+340

Allocation:
- Php 91.500 Million (Total)
- Php 91.10 Million (Concrete Bridge)
- Php 0.400 Million (ROW)

Physical Target:
- 963.50 sq.m. (Bridge)
- 139.05 sq.m. (ROW)
April 12, 2017 2017 165003015300164 SR2017-02-002563 February 2, 2017 Region XIII Butuan City District Engineering Office
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Daang Maharlika (Alternate Route) (NRJ- Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat), Package 1 (Mandamo-Las Nieves Section), Agusan del Norte - Sta. 16+800 - Sta. 18+097.899, Sta. 18+118.029 - Sta. 18+360, Sta. 19+920 - Sta. 21+700, Sta. 24+120 - Sta. 24+800

Allocation - Php 95.00 Million

Physical Target - 8.00 lane km
April 12, 2017 2017 WIN7G01098 103004010313903 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
LIP - Building and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court), Barangay Katugasan, Cabadbaran City, Agusan del Norte

Allocation - Php 2.00 Million

Physical Target - 1 Multipurpose Building

April 11, 2017 2017 WIN7G00973 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Diversion Road at Vitali - Sibulao - By-pass Road Project (Alternate Road of N1), Zamboanga City 2nd LD
Sect. 1: K9+500.00 - K11+175.49
Sect. 2: K11+233.30 - K12+020.00
Allocation:
Php 100.000 Million (Total)
Php 99,002,298.92 (Road Concreting)
Php 997,701.08 (ROW Acquisition)
Physical Target:
4.92438 lane km (Road Concreting)
3,325 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,104,520.55/lane km (Road Concreting)
Php 300.06/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G00969 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 1st DEO, (S01112MN)
K1733+426.00 - K1734+474.00,
K1734+474.00 - K1734+918.00,
K1736+463.00 - K1737+500.00,
K1747+060.00 - K1748+680.00,
K1750+800.00 - K1751+660.00
Allocation:
Php 134.516 Million (Total)
Php 127,701,016.01 (Road Widening)
Php 6,814,983.99 (ROW Acquisition)
Physical Target:
9.994 lane km (Road Widening)
22,716 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,777,768.26/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G00985 FY 2017 (R.A 10924) March 11, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - N1 -
Road Widening including Drainage and RROW Pagadian City - Zamboanga City Road, (S01315MN)
K1851+026 - K1854+590.00,
K1854+710 - K1854+800.00
Allocation:
Php 150.000 Million (Total)
Php 110.000 Million (Road Widening)
Php 40.000 Million (ROW Acquisition)
Physical Target:
7.308 lane km (Road Widening)
40,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,051,997.81/ lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition)
April 11, 2017 2017 165003015100181 SR2017-02-002494 February 2, 2017 Region XIII Regional Office XIII
Modified:
Improvement/Widening of National Roads - Secondary - Improvement/Widening of National Roads, Dapa-Jct. Cancohoy Rd - K0012+000 - K0013+500, K0016+000 - K0018+101

Allocation - Php 100.00 Million

Physical Target - 7.080 lane km
April 11, 2017 GAA FY 2017 WIN7G01218 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1- National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Inawayan-Baracatan Rd
K1534+060 - K1534+243
K1535+909 - K1539+576

TO: MFO 1- National Road Network Services
Network Development - Off-Carriageway Improvement including drainage- Tertiary
Paving of Shoulder with Drainage Improvement at Inawayan-Baracatan Road, Toril District, Davao City
K1534+060 - K1534+243
K1535+909 - K1539+616.670

ALLOCATION: Php 49.900 Million
April 11, 2017 2017 165003015400134 SR2017-02-002684 February 3, 2017 Region XIII Regional Office XIII
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary) including bridge, Agusan del Sur, Package 4

Allocation:
- Php 150.00 Million (Total)
- Php 38,055,366.80 (Gravel Road)
- Php 111,944,633.20 (Concrete Bridge)

Physical Target:
- 1.68 lane km (Gravel Road)
- 1,009.332 sq.m. (Concrete Bridge)
April 11, 2017 2017 165003030700082 SR2017-02-003026 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road Leading to Seaports, Tabon-Labisma Road leading to Lawigan Port, Bislig City, Surigao del Sur

Allocation - Php 150.00 Million

Physical Target - 6.830 lane km
April 11, 2017 2017 165003030800283 SR2017-02-003038 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations - Construction/Improvemen of Access Road leading to declared Tourism Destinations, Liboton-Ipas-Hagnaya San Marcos Road leading to Agusan Marsh, Bunawan, Agusan del Sur

Allocation - Php 165.00 Million

Physical Target - 3.40 lane km
April 11, 2017 2017 WIN7G01114 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Zamboanga West Coastal (Limpapa - Sibuco Section),
Zamboanga del Norte 2nd DEO
K1996+500 - K1998+270, (S01148MN)
K2002+855 - K2003+415,
Chainage 0 - Chainage 940.00, (S01150MN)
Allocation:
Php 141,775 Million (Total)
Php 141,201,028.40 (Gravel Road)
Php 573,971.60 (ROW Acquisition)
Physical Target:
6.54 lane km (Gravel Road)
2,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,950,371/ lane km (Gravel Road)
Php 286.99/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G00968 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-5 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN)
K1943+560.43 - K1945+067.26,
K1946+000.00 - K1946+833.24,
K1958+754.00 - K1959+000.00,
K1959+679.00 - K1961+054.86
Allocation:
Php 117.320 Million (Total)
Php 115,320,000.00 (Road Concreting)
Php 2,000,000.00 (ROW Acquisition)
Physical Target:
7.924 lane km (Road Concreting)
6,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,553,255.93/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition)
April 11, 2017 2017 165003014500140 SR2017-02-002209 February 2, 2017 Region XIII Regional Office XIII
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide, Dinagat-Loreto Rd - K0020+000 - K0020+440, K0031+000 - K0031+290

Allocation - Php 154.220 Million

Physical Target - 10,200 sq.m.
April 11, 2017 2017 165003030800255 SR2017-02-003029 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations - Circumferential Road leading to Lake Mainit (Mainit-Poblacion-Tagbuyawan) inc. Tapian Br. II, Mainit, Surigao del Norte

Allocation:
- Php 149.00 Million (Total)
- Php 33.080 Million (Concrete Road)
- Php 115.919 Million (Concrete Bridge)

Physical Target:
- 2.00 lane km (Concrete Road)
- 961.63 sq.m. (Concrete Bridge)

April 11, 2017 2017 165003014500151 SR2017-02-002212 February 2, 2017 Region XIII Regional Office XIII
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide - Surigao-Davao Coastal Rd - K1212+940 - K1213+268

Allocation - Php 158.563 Million

Physical Target - 8,470 sq.m.
April 11, 2017 2017 WIN7G01169 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved), Zamboanga del Sur Coastal Road, (S01168MN), Zamboanga del Sur 2nd DEO
Chainage 14556 - Chainage 16140,
Chainage 6820 - Chainage 10000
Allocation:
Php 150.000 M (Total)
Php 149,871,443.20 (Road Concreting)
Php 128,556.80 (ROW Acquisition)
Physical Target:
9.528 lane km (Road Concreting)
428.52 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,349,389.92/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G00972 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Rd., Zamboanga del Sur 2nd LD, (S01173MN)
K1750+700.00 - K1751+604.74,
K1751+662.79 - K1751+782.79,
K1751+804.30 - K1752+302.00,
K1752+332.43 - K1752+700.00
Allocation:
Php 52.500 M (Total)
Php 52,350,814.44 (Road Concreting)
Php 149,485.56 (ROW Acquisition)
Physical Target:
3.78 lane km (Road Concreting)
497.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,849,421.81/lane km (Road Concreting)
Php 300.17/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01402 R.A 10924 January 12, 2017 Region VII Regional Office VII
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, P00103607VS, Secondary Roads - Construction of Road Slope Protection Structure,
Cebu-Toledo Wharf Rd (Jct Naga-Uling) S00220CB - K0011+237 - K0013+245, K0016+500 - K0018+200, K0022+900 - K0023+900
Allocation - ₱ 299.442 Million
Physical Target - 175,800 square meters
Unit Cost - ₱ 1,703.31 / square meter
April 11, 2017 2017 WIN7G01120 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO
Chainage 1716 - Chainage2248, (S01168MN)
Chainage 3869 - Chainage 4548, (S01168MN)
Chainage 4901 - Chainage 5340, (S01168MN)
Chainage 18845 - Chainage 20545, (S01168MN)
Chainage 22000 - Chainage 23642, (S01187MN)
Allocation:
Php 150.000 M (Total)
Php 149,255,581.80 (Road Concreting)
Php 744,418.20 (ROW Acquisition)
Physical Target:
9.984 lane km (Road Concreting)
2,481 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,949,477.34/lane km (Road Concreting)
Php 300.05/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01146 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO (S01167MN)
Chainage 9685.62 - Chainage 10643.26,
Chainage 13657 - Chainage 14867.29
Allocation:
Php 100.000 M (Total)
Php 97,000,000.00 (Road Concreting)
Php 3,000,000.00 (ROW Acquisition)
Physical Target:
4.336 lane km (Road Concreting)
10,000.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 22,370,848.71/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01116 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO
Chainage 2500 - Chainage 4498.55, (with exception)
Chainage 6527.85 - Chainage 7898.70,
Chainage10280 - Chainage 12085.90
Allocation:
Php 150.000 Million (Total)
Php 147,999,999.90 (Gravel Road)
Php 2,000,000.10 (ROW Acquisition)
Physical Target:
9.830 lane km (Gravel Road)
6,666.66 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,055,951.16/lane km (Gravel Road)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01398 R.A 10924 January 12, 2017 Region VII Regional Office VII
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, P00104206VS - Tertiary Roads, S00003SJ,
Luyang-Poo-Lazi Rd - K0013+390 - K0013+480, K0022+540 - K0022+680
Allocation - ₱ 90.999 Million
Physical Target - 6,194.17 Square meters
Unit cost - ₱ 14,691 / Square meter
April 11, 2017 2017 WIN7G01121 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Unpaved to Paved) of Rizal - Dakak - Dapitan Coastal Loop Road, Zamboanga del Norte 3rd DEO
K1814+780.00 - K1815+570.00,
K1817+485.00 - K1817+815.00,
K1817+825.00 - K1818+755.00,
K1818+801.00 - K1819+708.58,
K1823+430.00 - K1823+646.00,
K1823+658.00 - K1823+780.00
Allocation:
Php 103.000 M (Total)
Php 102,880,809.80 (Road Concreting)
Php 119,190.20 (ROW Acquisition)
Physical Target:
6.591 lane km (Road Concreting)
397.30 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,609,286.88/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01110 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Off-Carriageway Improvement including Drainage - Tertiary -
Shoulder Paving with Drainage Improvement at Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga Sibugay 1st DEO
K1763+(-698) - K1763+(-687),
K1763+(-660) - K1763+840,
K1768+488 - K1769+693,
K1751+(-602) - K1752+838,
K1764+028 - K1768+488,
K1772+917 - K1773+969,
K1752+838 - K1754+800
Allocation - Php 91.000 Million
Physical Target - 12,630.00 ln.m./18,945.00 sq.m.
Unit Cost - Php 4,803.38/sq.m.
April 11, 2017 FY 2017 WIN7C01401 R.A 10924 January 12, 2017 Region VII Regional Office VII
Network Development, Off-Carriageway Improvement including drainage, Secondary Roads, S00078BH,
Tagbilaran East Road (Tagbilaran-Jagna), K0170+145 - K0171+074; K0178+618 - K0179+004; K0179+118 - K0179+561; K0179+582 - K0179+622 (LS); K0180+384 - K0181+252; K0222+069 - K0223+000; K0224+056 - K0224+881; K0240+219 - K0241+780
Allocation - ₱ 62.533 Million
Physical Target - 23,932 Square Meters
Unit Cost - ₱ 2,612/ Square Meter
April 11, 2017 2017 WIN7G01124 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - N1
Road Widening including Drainage of Tukuran Jct. - Karomatan Jct. Road, Zamboanga del Sur, 1st DEO (S01103MN)
K1648+(-262) - K1648+664,
K1649+321 - K1650+404,
K1651+(-536) - K1651+456
Allocation:
Php 89.000 Million (Total)
Php 78,456,175.62 (Road Widening)
Php 10,543,824.38 (ROW Acquisition)
Physical Target:
6.002 lane km (Road Widening)
35,146.08 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,071,672.05/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7C01506 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to decalred Tourism Destinations -
Road Upgrading (Gravel to Concrete) of Jct. Tagasilay along MCLL Highway - Tagasilay - Vitali Section leading to Merloquet Falls, Vitali, Zamboanga City
Sta. 009+930.00 - Sta. 012+842.64
Exception 17.18 ln.m. - Existing Spillway
(Sta. 010+534.64 - Sta. 010+551.82 = 17.18 ln.m.)
Sta. 008+510.00 - Sta. 009+500 = 0.990 km.
Allocation:
Php 150.000 M (Total)
Physical Target:
7.771 lane km (Road Concreting)
Unit Cost:
Php 19,302,535.07/lane km (Road Concreting)
April 11, 2017 FY 2017 WIN7C01392 R.A 10924 January 12, 2017 Region VII Regional Office VII
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4), P00102145VS - Secondary Roads, S00303CB,
Santander-Barili-Toledo Road - K0186+000 - K0186+300, K0188+000 - K0188+367, K0190+000 - K0191+021.04, K0195+144 - K0195+198, K0195+210 - K0195+320, K0208+179 - K0208+393, K0208+393 - K0208+760
Allocation - ₱ 89.992 Million
Physical Target - 4.866 lane km
Unit Cost - ₱ 18.494 Million / lane km
April 11, 2017 2017 WIN7G01130 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Talinga - Dagohoy - Tinaplan - Titik, Zamboanga del Norte 2nd LD
K0023+000.00 - K0024+130.00
Allocation:
Php 150.000 M (Total)
Php 149,477,048.01 (Road Concreting)
Php 522,951.99 (ROW Acquisition)
Physical Target:
2.26 lane km (Road Concreting)
280.23 sq.m. (ROW Acquisition)
Unit Cost:
Php 66,140,286.73/lane km. (Road Concreting)
Php 1,866.15/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01400 R.A 10924 January 12, 2017 Region VII Regional Office VII
Construction/Improvement of Access Roads leading to Seaports, P00130505VS,
Maria-Basac-Larena Road leading to Larena RORO Port, Larena, Siquijor Lone District

Allocation - ₱ 114.498 Million

Physical Target - CW1 - 8.000 lane km
- CW2 - 2,400 Square meters

Unit Cost - CW1 - ₱ 13,437.55 Million / lane km
- CW2 - ₱ 2,915.71 / Square Meter
April 11, 2017 2017 WIN7G01112 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO
Chainage 7599 - Chainage 9881
(Sta. 1936+440.00 - Sta. 1938+722.00)
Allocation:
Php 150.000 M (Total)
Php 147,426,266.78 (Road Concreting)
Php 2,573,733.22 (ROW Acquisition)
Physical Target:
4.564 lane km (Road Concreting)
8,579.11 sq.m. (ROW Acquisition)
Unit Cost:
Php 32,301,986.57/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01546 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Tapon River Control, Ubay, Bohol
Allocation - ₱ 3,000,000.00
Physical Target - 89.11 lm
Unit Cost - ₱ 33,666.25/linear meter
April 11, 2017 2017 WIN7G01132 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Improvement of Access Roads leading to Airports, Seaports, and declared Tourism Destinations - To declared Tourism Destinations -
Concreting of Road from Junction Highway to Ayala - La Paz Road leading to La Paz Resort (Package II), Zamboanga City, (1st LD)
Sta. 1971+160.00 - Sta. 1973+324.50,
Sta. 1979+060.00 - Sta. 1979+690.00
Allocation:
Php 100.000 M (Total)
Physical Target:
5.589 lane km (Road Concreting)
Unit Cost:
Php 17,892,288.42/lane km (Road Concreting)
April 11, 2017 FY 2017 WIN7C01588 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Asset Preservation of National Roads
Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide at Antequera-San Isidro-Libertad (Tubigon) Road K0026+244 - K0026+268, K0026+-670 - K0027+-620, K0027+940 - K0027+980, K0030+525 - K0030+555, K0032+246 - K0032+284, K0032+457 - K0032+487, K0035+096 - K0035+170, San Isidro, Bohol
Allocation - ₱ 3,945,000.00
Physical Target - 286 lm., 791.66 sq. m
Unit Cost - ₱ 4,983.20 / square meter
April 11, 2017 2017 WIN7G01111 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO
K1826+588 - K1829+543
Allocation:
Php 100,650,000.00 (Total)
Php 100,369,768.00 (Road Widening)
Php 280,232.00 (ROW Acquisition)
Physical Target:
5.938 lane km. (Road Widening)
140.60 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,902,958.57/lane km (Road Widening)
Php 1,993.12/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01553 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Kinan-oan River Control, Trinidad, Bohol
Allocation - ₱ 5,000,000.00
Physical Target - 163.50 lm
Unit Cost - ₱ 30,581.04/ linear meter
April 11, 2017 2017 WIN7G01115 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Bypasses/Diversion Roads including ROW at Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road, (Surabay - San Fernandino), Zamboanga Sibugay 2nd DEO
K1827+600 - K1835+800
Allocation:
Php 250.000 M (Total)
Php 240,000,000.00 (Road Concreting)
Php 10,000,000.00 (ROW Acquisition)
Physical Target:
16.400 lane km (Road Concreting)
33,333.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,634,146.34/ lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01562 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Camanaga River Control, San Miguel, Bohol
Allocation - ₱ 6,500,000.00
Physical Target - 191.00 lm
Unit Cost - ₱ 34,031.41/ linear meter
April 11, 2017 2017 WIN7G01126 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga Sibugay 1st DEO,
K1767+106.00 - K1768+463.07,
K1770+555.00 - K1770+730.00,
K1770+950.08 - K1770+967.00,
K1771+150.00 - K1771+460.00
Allocation:
Php 135.846 Million (Total)
Php 134,836,920.20 (Gravel Road)
Php 1,009,079.80 (ROW Acquisition)
Physical Target:
3.718 lane km (Gravel Road)
3,363.60 sq.m. (ROW Acquisition)
Unit Cost:
Php 36,265,981.76/lane km (Gravel Road)
Php 286.99/sq.m. (ROW Acquisition)
April 11, 2017 2017 165003013800089 GAA FY 2017 January 1, 2017 Region II Nueva Vizcaya 2nd District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4):Primary Roads
Daang Maharlika (LZ) - K0209 + -896 - K0209 + 000, K0223+400 - K0223+450, K0236+192.60 - K0236+756, K0236+ 756 - K0237+102, K0237+102 - K0237+597, K0237+622 - K0237+908, K0238+903 - K0239+273, K0239+291 - K0239+400, K0239+400 - K0240 + 345
April 11, 2017 FY 2017 WIN7C01561 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Locally Funded Projects

Local Infrastructure Program

Building and Other Structures - Multipurpose Facilities

Repair/Rehabilitation of Multi-Purpose Building, Barangay Puerto San Pedro, Bien Unido, Bohol

Allocation - ₱ 700,000.00
Physical Target - 1 Project
Unit Cost - ₱ 700,000.00/ Project
April 11, 2017 2017 WIN7G01117 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Construction of Diversion Road at Vitali - Sibulao By-pass alternate Road of N1, Zamboanga City 2nd LD.
K012+020.00 - K013+579.33
K013+604.13 - K013+617.89
Allocation:
Php 100.000 Million (Total)
Php 89,986,432.75 (Road Concreting)
Php 10,013567.25 (ROW Acquisition)
Physical Target:
3.146 lane km (Road Concreting)
33,378.56 sq.m. (ROW Acquisition)
Unit Cost:
Php 28,603,443.34/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 FY 2017 WIN7C01594 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Improvement of Access road leading to Seaport

Construction/Improvement of Access Road leading to Getafe Port and Declared Tourism Destinations, Getafe, Bohol

Allocation - ₱ 17,133,000.00
Physical Target - 1.330 Lane Km
Unit Cost - ₱ 12,881,954.89/ Lane Km
April 11, 2017 FY 2017 WIN7C01552 R.A 10924 January 12, 2017 Region VII Bohol 2nd District Engineering Office
Construction/Improvement of Access Road leading to Seaport

Construction/Improvement of Access Road leading to Clarin Port and Declared Tourism Destinations, Calrin, Bohol

Allocation - ₱ 15,593,000.00
Physical Target - 1.000 Lane Km
Unit Cost - ₱ 15,593.00/ Lane Km
April 11, 2017 2017 WIN7G01108 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Improvement/Concreting of Baliguian - Coastal Road, Junction Baliguian - Kauswagan - Mamad Section, Zamboanga del Norte 2nd DEO
Sta. 2047+640.00 - Sta. 2048+180.00,
Sta. 2048+610.00 - Sta. 2050+984.86,
Sta. 2051+050.00 - Sta. 2051+967.40
Allocation:
Php 188.740 Million (Total)
Php 188,640,461.20 (Road Concreting)
Php 279,538.80 (ROW Acquisition)
Physical Target:
7.665 lane km (Road Concreting)
931.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,587,144.32/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01113 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Dipolog River Basin Flood Control, Dipolog City, Zamboanga del Norte
Barra Br. River Control:
Sta. 0+000.00 - Sta. 0+412.02,
Sta. 0+479.02 - Sta. 0+600.00,
Quezon Bridge:
Sta. 0+000.00 - Sta. 0+442.30
Allocation:
Php 100.000 Million (Total)
Php 99,719,716.62 (Const. of Flood Control Structure)
Php 280,283.38 (ROW Acquisition)
Physical Target:
975.30 ln.m. (Const. of Flood Control Structure)
280.28 sq.m. (ROW Acquisition)
Unit Cost:
Php 102,245.17/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition)
April 11, 2017 2017 165003014600171 GAA FY 2017 January 1, 2017 Region II Nueva Vizcaya 2nd District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Aritao-Quirino Rd - K0257+890 - K0257+926, K0258+990 - K0259+005.9, K0260+335-K0260+370, K0260+450-K0260+470, K0263+078 - K0263+094, K0263+167 - K0263+192, K0282+044 - K0282+069.2, K0284+803 - K0284+825, K0291+840 - K0291+851

Pages