April 17, 2017 |
2017 |
WIN7G01082 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Lanao - Pagadian - Zamboanga City Rd - K1757+-631 - K1757+-436, K1760+804 - K1761+100, K1761+150 - K1761+400, K1761+900 - K1762+000, K1762+800 - K1762+900, K1763+000 - K1763+549, KK1763+573 - K1764+100, K1764+200 - K1764+350, K1764+600 - K1765+600, K1766+500 - K1766+700, K1766+800 - K1767+150, K1767+400 - K1768+300, K1768+350 - K1768+500, K1768+800 - K1768+900, K1769+050 - K1769+850, K1769+900 - K1770+502, K1814+000 - K1815+000, K1815+446.5 - K1816+653, K1816+101 - K1817+192, K1817+878.5 - K1818+000, K1818+497 - K1819+370, K1819+469 - K1819+865, K1819+887.5 - K1820+000, K1838+169 - K1838+484, K1838+572.5 - K1838+856, K1839+154 - K1840+000, K1840+139 - K1841+163.5
Allocation: P 50.00 Million
Physical Target: 13,609 lm
Unit Cost: P 3,674.04/lm |
April 17, 2017 |
GAA FY 2017 |
WIN7G01274 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement: Shoulder Paving/Construction - ABS-CBN Quimpo Blvd Div. Rd -
K1511+-101 - K1511+147,
K1511+411 - K1511+622,
K1511+808 - K1512+092,
K1513+784 - K1514+044
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Paving of Shoulder (Off-Carriageway) including Drainage & ROW along ABS-CBN Quimpo Blvd. Diversion Road -
K1511+(-)101 - K1511+147,
K1511+411 - K1511+622,
K1511+808 - K1512+092,
K1513+784 - K1514+044
ALLOCATION: Php 7.611 Million |
April 17, 2017 |
2017 |
WIN7G01143 |
165003016700003 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Off-Carriageway Improvement including drainage - Primary
Off-Carriageway Improvement including Drainage (Primary), Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or. Road), Agusan del Norte, K1250+-542 - K1252+605, K1254+000 - K1254+857, (S00391MN)
Allocation:
- Php 51.70 Million (Total)
- Php 42, 895,876.36 (Paving of Shoulders)
- Php 8,604,123.64 (Construction of Bike Lanes)
- Php 200,000.00 (ROW Acquisition)
Physical Target:
- 19,163 sq.m. (Paving of Shoulders)
- 2 Bike Lanes (Construction of Bike Lanes)
- 2,571 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01259 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Roads and Bridges - National Roads -
Road Widening of Isabela - Lamitan Road, Basilan
K4+000.00 - K8+000.00
Allocation:
Php 135.000 M (Total)
Php 133,468,973.05 (Road Widening)
Php 1,531,026.95 (ROW Acquisition)
Physical Target:
8.00 lane km (Road Widening)
1,531.027 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,683,621.63/lane km (Road Widening)
Php 1,000.00 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01079 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Flood Control (Phase III) along Sibuguey River Basin, Barangay Sibuguey, Siay, Zamboanga Sibugay,
K0+940.00 - K1+700.00,
Allocation: P 40.00 Million
Physical Target: 760.00 lm
Unit Cost: P 52,631.58/lm |
April 17, 2017 |
GAA FY 2017 |
WIN7G01276 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Jct. F. Torres St. - K1509+770
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Improvement/Construction of Drainage along F. Torres St., Jct. Tavera St.-Arellano St.-Mt. Apo St., K1509+770, Davao City
ALLOCATION: Php 21.091 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01285 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Fatima-Malabog Rd - K1515+000 - K1516+685
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Fatima-Malabog Road including Drainage, Davao City - K1515+000 - K1516+634
ALLOCATION: Php 41.502 Million |
April 17, 2017 |
2017 |
WIN7G01087 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Repair of Flood Control along Lanao - Pagadian - Zamboanga City Road, Buayan River (Phase II), Buayan, Kabasalan, Zamboanga Sibugay
Sta. 0+003.00 - 0+690.00
Allocation: P 40.00 Million
Physical Target: 687.00 lm
Unit Cost: P 58,224.16/lm |
April 17, 2017 |
2017 |
WIN7G01077 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Flood Control (Phase IV) along Sibuguey River Basin, Barangay Sibuguey, Siay, Zamboanga Sibugay
K1+700.00 - K2+312.00
Allocation: P 45.00 Million
Physical Target: 612.00 lm
Unit Cost: P 73,529.41/lm |
April 17, 2017 |
2017 |
WIN7G01292 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of Vitali Bridge and Approaches along Pagadian City - Zamboanga City Road, Brgy. Vitali, Zamboanga City
Beg. of the Project: 1864+700.00
Abutment A: 1864+935.79
Abutment B: 1864+987.13
End of Project: 1865+097.03
Approaches Net Length: 345.69 ln.m.
Bridge Length: 51.34 ln.m.
Allocation:
Php 60.000 M (Total)
Php 59,824,586.29 (Widening of Bridge)
Php 175,413.71 (ROW Acquisition)
Physical Target:
51.34 ln.m./489.784 sq.m. (Widening of Bridge)
175.41 sq.m. (ROW Acquisition)
Unit Cost:
Php 122,144.84/lane km (Widening of Bridge)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 17, 2017 |
GAA FY 2017 |
WIN7G01286 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary
Construction of Road Slope Protection Structure - Mabuhay-Pañalum-Paquibato Rd -
K1527+800 - K1527+876
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary
Rehabilitation/Reconstruction of Mabuhay-Pañalum-Paquibato Road with Slip, Slope Collapse and Landslide, Davao City -
K1525+580 - K1525+620,
K1527+720 - K1527+940
ALLOCATION: Php 26.600 Million |
April 17, 2017 |
2017 |
WIN7G01290 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Concrete Road, including ROW Zamboanga del Sur, Package 1, Zamboanga del Sur DEO
Chainage 116.49 - Chainage 3200
Allocation:
Php 147.000 M (Total)
Php 144,367,015.09 (Road Concreting)
Php 2,632,984.91 (ROW Acquisition)
Physical Target:
6.167 lane km (Road Concreting)
2,632.98 sq.m. (ROW Acquisition)
Unit Cost:
Php 23,409,601.91/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01142 |
165003014900171 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Asset Preservation of National Roads - Construction/Upgrading/rehabilitation of Drainage along National Roads - Tertiary
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary - Const. of Drainage Structure along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1262+000 - K1263+179, K1271+000 - K1271+880, K1272+000 - K1272+100, (S00396MN)
Allocation:
- Php 36.837 Million (Total)
- Php 33,479,952.00 (Construction of Drainage)
- Php 3,357,048.00 (ROW Acquisition)
Physical Target:
- 4,258 lm (Construction of Drainage)
- 42,600 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01250 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga del Sur 2nd DEO,
Chainage 600 - Chainage 1800,
(Sta. 0+600.00 - Sta. 1+800.00)
Chainage 3400 - Chainage 5180,
(Sta. 3+400.00 - Sta. 5+180.00)
Allocation:
Php 150.000 Million (Total)
Php 149,340,871.70 (Gravel Road)
Php 659,128.28 (ROW Acquisition)
Physical Target:
5.96 lane km (Gravel Road)
659.13 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,057,193.24/lane km (Gravel Road)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01065 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Poblacion, Siay, Zamboanga Sibugay.
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 17, 2017 |
GAA FY 2017 |
WIN7G01288 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening - Davao-Cotabato Road (Davao City-Jct. Digos Section) including RROW -
K1514+550 - K1514+590,
K1515+000 - K1516+000
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - N1
Road Widening including drainage & ROW along Davao-Cotabato Road (Davao City-Jct. Digos Section), Davao City -
K1514+267 - K1514+590,
K1515+000 - K1516+000,
K1520+090 - K1521+255
ALLOCATION: Php 39.000 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01294 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Panacan River Flood Control (Slope Protection), Panacan, Sta. 1+800 - Sta. 2+000, Davao City
TO: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Panacan River Flood Control (Slope Protection), Panacan,
Sta. 0+555 to Sta. 0+780, Right Bank,
Sta. 0+760 to Sta. 0+900, Left Bank,
Sta. 1+000 to Sta. 1+070, Davao City
ALLOCATION: Php 20.000 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01297 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction of Drainage Structure along Road - Davao City Diversion -
K1511+900 - K1512+000
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Davao City Diversion Road -
K1511+900 - K1512+000
ALLOCATION: Php 30.897 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01299 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Construction of Road Slope Protection Structure - Fatima-Malabog Rd -
K1504+223 - K1504+250, K1501+409 - K1501+449, K1502+930 - K1502+956,
K1510+018 - K1510+041, K1510+081 - K1510+115
Rehabilitation/Major Repair of Road Slope Protection Structure - Fatima-Malabog Rd -
K1504+223 - K1504+250, K1501+409 - K1501+449, K1502+930 - K1502+956,
K1510+018 - K1510+041, K1510+081 - K1510+115
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Rehabilitation/Reconstruction of Fatima-Malabog Road with Slips, Slope Collapse and Landslide, Davao City
CW1 - Construction of Road Slope Protection Structure -
K1502+976 - K1502+980,
K1504+260 - K1504+293
CW2 - Rehabilitation/Major Repair of Road Slope Protection Structure -
K1501+460 - K1501+500,
K1502+940 - K1502+976
ALLOCATION: Php 69.843 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01307 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Fatima-Malabog Rd -
K1505+000 - K1505+650,
K1505+760 - K1506+339,
K1508+853 - K1508+1048
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Fatima-Malabog Road including Drainage, Davao City
K1504+940 - K1505+718,
K1505+838 - K1506+383
ALLOCATION: Php 49.805 Million
|
April 17, 2017 |
2017 |
WIN7G01221 |
103004010313956 |
December 29, 2016 |
Region XIII |
Dinagat Islands District Engineering Office |
Modified;
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multipurpose Building, Brgy. Cuarinta, San Jose, Dinagat Islands
Allocation - Php 2.00 Million
Physical Target - 1 Building |
April 17, 2017 |
2017 |
WIN7G01216 |
103004010313957 |
December 29, 2016 |
Region XIII |
Dinagat Islands District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Provincial DepEd Training Center, Brgy. White Beach, Dinagat, Dinagat Islands
Allocation - Php 5.00 Million
Physical Target - 1 Building |
April 17, 2017 |
2017 |
WIN7G01222 |
103004010313958 |
December 29, 2016 |
Region XIII |
Dinagat Islands District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Improvement of Multi-Purpose Building, Brgy. Osmeña, Libjo, Dinagat Islands
Allocation - Php 2.00 Million
Physical Target - 1 Building |
April 17, 2017 |
GAA FY 2017 |
WIN7G01309 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Davao-Cotabato Road (Davao City-Jct. Digos Section) -
Chainage 2424 - Chainage 3674
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Improvement of Drainage Structures along Davao-Cotabato Road -
Chainage 2424 (Jct. Davao-Cotabato Road/Jct. Tulip Section) to outfall (Davao River), Davao City
ALLOCATION: Php 41.826 Million |
April 17, 2017 |
2017 |
WIN7G01223 |
103004010309856 |
December 29, 2016 |
Region XIII |
Dinagat Islands District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of DPWH Building, Dinagat Islands DEO, San Jose, Dinagat Islands
Allocation:
- Php 17.728 Million (Total)
- Php 2,922,626.50 (Building A)
- Php 5,815,893.13 (Building B)
- Php 8,989,480.37 (Building C)
Physical Target:
- 1 Building (Building A)
- 1 Building (Building B)
- 1 Building (Building C)
|
April 17, 2017 |
GAA FY 2017 |
WIN7G01318 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges
Widening of Bridge - Libby Bridge 2 along Davao-Cotabato Old Road including RROW
ROW Acquisition - Libby Bridge 2 along Davao-Cotabato Old Road including RROW
TO: MFO 1 - National Road Network Services
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges
Construction of Parallel Bridge and Approaches at Davao-Cotabato Old Road - Libby Bridge 2 along Davao-Cotabato Old Road including RROW
ALLOCATION: 35.175 Million |
April 17, 2017 |
GAA FY 2017 |
WIN7G01257 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including Drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Davao Regional Med Trng Ctr -
Chainage 374 - Chainage 540
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including Drainage - Tertiary
Paving of Shoulder (Off-Carriageway) Davao Regional Medical Training Center, Davao City -
Chainage 374 - Chainage 540
ALLOCATION: Php 1.807 Million |
April 12, 2017 |
2017 |
WIN7G01099 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage of Lanao - Pagadian - Zamboanga City Road, Zamboanga del Sur 1st DEO
K1659+778.00 - K1661+131.00,
K1661+154.00 - K1661+773.00
Allocation:
Php 59.000 Million (Total)
Php 53,116,731.01 (Road Widening)
Php 5,883,268.99 (ROW Acquisition)
Physical Target:
3.96 lane km (Road Widening)
19,610.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,413,315.91/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 12, 2017 |
FY 2017 |
WIN7C01590 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Asset Preservation of National Roads - Rehab./Reconst. of National Roads with Slips, Collapse and Landslide at Jct. (LIR) Buenavista-Carmen-Danao-Getafe Road K0189+100 - K0189+200, K0194+354 - K0194+450, K0194+795 - K0194+842.48, K0195+010 - K0195+070.81, K0195+368 - K0195+399.93 Buenavista, Bohol
Allocation - ₱ 13,678,000.00
Physical Target CW1 - 336.22 lm.; 4,084.34 sq.m
CW2 - 1,115.66 sq.m
Unit Cost CW1 - 2,885.04/lm.
CW2 - 1,697.12/ sq.m |
April 12, 2017 |
FY 2017 |
WIN7C01592 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of San Pascual River Control, Ubay, Bohol
Allocation - ₱ 5,000,000.00
Physical Target - 169.48 lm
Unit Cost - ₱ 29,502.01/ linear meter |
April 12, 2017 |
2017 |
WIN7C01505 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage and RROW of Dipolog - Oroquieta National Road, Zamboanga del Norte 1st DEO
K1844+220.00 - K1846+266.00,
K1846+321.00 - K1846+418.00
Allocation:
Php 64.230 Million (Total)
Php 63,507,657.92 (Road Widening)
Php 722,342.08 (ROW Acquisition)
Physical Target:
4.286 lane km (Road Widening)
722.34 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,803,649.86/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 12, 2017 |
2017 |
WIN7G01129 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - N1 -
Road Widening including Drainage of Pagadian City - Zamboanga City Road, Zamboanga del Sur 2nd DEO
K1681+892.00 - K1684+271.00
Allocation:
Php 71.000 Million (Total)
Php 60,250,372.28 (Road Widening)
Php 10,749,627.72 (ROW Acquisition)
Physical Target:
4.758 lane km (Road Widening)
10,749.63 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,662,961.81/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 12, 2017 |
FY 2017 |
WIN7C01557 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary,
Construction of Road Slope Protection - Jct. (TER) - Jagna-Sierra Bullones Rd - K0082+349 - K0082+436, K0082+450 - K0082+600, K0089+748 - K0089+788.83
Allocation - ₱ 47.998 Million
Physical Target - 8,985.00 sq.m
Unit Cost - ₱ 5,342.01/ sq.m |
April 12, 2017 |
2017 |
WIN7G01095 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Road Upgrading (Gravel to Paved) including RROW of Labangan - Midsalip Road, Zamboanga del Sur 1st DEO
Chainage 0005.45 - Chainage 6160
Allocation:
Php 150.000 M (Total)
Php 144,200,758.70 (Road Concreting)
Php 5,799,241.30 (ROW Acquisition)
Physical Target:
12.31 lane km (Road Concreting)
5,799.24 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,714,115.25/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition) |
April 12, 2017 |
2017 |
WIN7G01096 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Construction of Concrete Road, Labangan - Pagadian City - Dumalinao, Zamboanga del Sur Bypass Road including ROW, Zamboanga del Sur 1st DEO
Chainage 0 - Chainage 36000,
Sta. 1651+570.30 - Sta. 1652+030.00,
Sta. 1652+340.00 - Sta. 1652+690.00,
Sta. 1652+930.00 - Sta. 1654+173.94,
Sta. 1654+201.56 - Sta. 1654+400.00
Allocation:
Php 150.000 Million (Total)
Php 131,869,804.40 (Road Concreting)
Php 18,130,195.60 (ROW Acquisition)
Physical Target:
4.5042 lane km (Road Concreting)
18,130.196 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,277,075.71/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition) |
April 12, 2017 |
FY 2017 |
WIN7C01586 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Asset Preservation of National Roads, Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4), Tertiary Roads, Tagbilaran City-Corella-Sikatuna-Loboc Road - K0026+825 - K0027+586.20
Allocation - ₱ 23.025 Million
Physical Target - 1.522 lane km.
Unit Cost - ₱ 15,128,120.89/lane km. |
April 12, 2017 |
2017 |
WIN7C01596 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary
Reconstruction from Concrete to Concrete - Jct. (TER) Jagna-Sierra Bullones - K0063+390 - K0063+910, K091+145 - K0091+231, K0091+377 - K0091+886.86
Allocation - ₱ 22.445 Million
Physical Target - 2.232 lane km.
Unit Cost - ₱ 10,056,003.58/ lane km. |
April 12, 2017 |
2017 |
WIN7G01109 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps Connecting National Roads, including ROW -
Construction of Concrete Road - Zamboanga del Sur Coastal Road, Package 4, Zamboanga del Sur
Sta. 3+316.00 - Sta. 3+523.54,
Sta. 3+573.44 - Sta. 6+540.00
Allocation:
Php 98.000 M (Total)
Php 97,157,879.83 (Road Concreting)
Php 842,120.17 (ROW Acquisition)
Physical Target:
6.350 lane km (Road Concreting)
2,807.07 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,300,453.52/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 12, 2017 |
2017 |
WIN7C01598 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
LIP-Roads and Bridges - Local Roads
Concreting of Tourism Road from Ilaya - Angilan - Bangwalog - Taytay, Duero, Bohol
Allocation - ₱ 10 Million
Physical Target - 0.740 lane km
Unit Cost - ₱ 13.513 Million/lane km |
April 12, 2017 |
2017 |
WIN7C01565 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
VIILP-Roads and Bridges - Local Bridges
Replacement of Bridge (Temporary to Permanent) of Calmayon Bridge, Poblacion, Jagna, Bohol
Allocation - ₱ 13 Million
Physical Target - 171.72 sq.m
Unit Cost - ₱ 75,704.64/Sq.m |
April 12, 2017 |
2017 |
WIN7G01092 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges -
Construction of Datu Lumok Bridge along Zamboanga del Sur Coastal Road, Lapuyan, Zamboanga del Sur
Beg. of Porject: K0+140.00
End of Project: K0+320.00
Abutment A: K0+210.00
Abutment B: K0+260.84
Approaches Net Length: 129.16 lm.
Bridge Length: 50.84 lm.
Allocation - Php 60.840 Million
Physical Target - 50.84 lm/485.014 sq.m.
Unit Cost - Php 125,439.68/sq.m. |
April 12, 2017 |
2017 |
WIN7C01559 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
LIP - Roads and Bridges - Local Roads
Concreting of Local Road at Brgy. Cutcutan - Taytay - Pangian, Valencia, Bohol
Allocation - ₱ 4 Million
Physical Target - 0.375 lane km
Unit Cost - ₱ 10.666 Million/lane km |
April 12, 2017 |
2017 |
WIN7C01547 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
LIP - Buildings and Other Structures - Multipurpose Facilities
Completion/Rehabilitation of Multipurpose Building (Barangay Hall) at Brgy. Cayam, Garcia Hernandez, Bohol
Allocation - ₱ 0.500 Million
Physical Target - 1.00 project
Unit Cost - ₱ 0.500 Million/project |
April 12, 2017 |
2017 |
WIN7C01566 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
LIP - Flood Control and Drainage - Flood Control Structures/Facilities
Construction of Box Culvert and Approaches along Tabuan - Togbongon, Garcia Hernandez, Bohol
Allocation - ₱ 10.00 Million
Physical Target - 10.15 lm.
- 219.84 lane km.
Unit Cost - ₱ 170,837.44/lm.
- ₱ 37,600.07/Lane km. |
April 12, 2017 |
2017 |
WIN7C01597 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 3rd District Engineering Office |
Locally Funded Projects
VIILP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building, Brgy. Cogtong, Candijay, Bohol
Allocation - ₱ 5.00 Million
Physical Target - 1.00 project
Unit Cost - ₱ 5.00 Million/project |
April 12, 2017 |
GAA FY 2017 |
WIN7G01204 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Bleacher) in Brgy. Gabi, Municipality of Compostela, Compostela Valley Province
TO: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (Bleacher) in Brgy. Gabi, Municipality of Compostela, Compostela Valley Province
ALLOCATION: Php 1.500 Million |
April 12, 2017 |
2017 |
WIN7C01435 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities
Completion of Multipurpose Building (Barangay Hall) in Brgy. Ilihan, Tabogon, Cebu
Allocation - ₱ 2.5 Milion
Physical Target - 1 Building
Unit Cost - ₱ 2.5 Million/Building |
April 12, 2017 |
GAA FY 2017 |
WIN7G01205 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Bleacher) in Brgy. Mauswagon, Municipality of Maragusan, Compostela Valley Province
TO: Locally Funded Projects:
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (Bleacher) in Brgy. Mauswagon, Municipality of Maragusan, Compostela Valley Province
ALLOCATION: Php 1.500 Million |
April 12, 2017 |
GAA FY 2017 |
WIN7G01206 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: MFO 1 – National Road Network Services:
Asset Preservation of National Roads – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary
Construction of Road Slope Protection Structure – Compostela-Cateel Rd (Compostela Side) –
K1586+500 - K1586+518, K1587+050 - K1587+070, K1587+255 - K1587+280, K1587+540 - K1587+565, K1587+900 - K1587+930, K1587+949 - K1587+960, K1588+420 - K1588+450, K1601+650 - K1601+680, K1605+100 - K1605+130
TO: MFO 1 – National Road Network Services:
Asset Preservation of National Roads – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Secondary
Rehabilitation/Reconstruction of National Roads with Slips at Compostela-Cateel Road,
K1586+495 – K1586+517, K1587+050 – K1587+071, K1587+255 – K1587+275, K1587+540 – K1587+565, K1587+900 – K1587+940, K1588+426 – K1588+444, K1601+660 – K1601+675, K1605+120 – K1605+155
ALLOCATION: Php 7.570 Million |
April 12, 2017 |
GAA FY 2017 |
WIN7G01209 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building/Senior Citizen’s Bldg., Manat, Pantukan, Compostela Valley
TO: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building/Senior Citizen’s Bldg., Manat, Nabunturan, Compostela Valley
ALLOCATION: Php 1.500 Million |
April 12, 2017 |
GAA FY 2017 |
WIN7G01219 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Construction of Multi-Purpose Building (Barangay Hall) in Barangay Lagab, Municipality of Compostela, Compostela Valley
TO: Locally Funded Projects:
LIP – Buildings and Other Structures – Multipurpose/Facilities
Completion of Multi-Purpose Building (Barangay Hall) in Barangay Lagab, Municipality of Compostela, Compostela Valley
ALLOCATION: Php 1.000 Million |
April 12, 2017 |
GAA FY 2017 |
WIN7G01220 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Locally Funded Projects:
LIP – Roads and Bridges – Local Bridges
Construction of Bridge, Barangay Mamonga, Monkayo, Compostella Valley
TO: Locally Funded Projects:
LIP – Roads and Bridges – Local Bridges
Construction of Hanging Bridge @ Purok 6, Brgy. Salvacion, Monkayo, Compostela Valley
ALLOCATION: Php 5.000 Million |
April 12, 2017 |
2017 |
165003017100022 |
SR2017-02-002656 |
February 3, 2017 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lane - Widening of Permanent Bridge to more than 2 Lanes, including ROW, Bunawan Br. (B00693MN) along Surigao-Davao Coastal Rd (Construction of Parallel Bridge), K1292+200.59 to K1292+340
Allocation:
- Php 91.500 Million (Total)
- Php 91.10 Million (Concrete Bridge)
- Php 0.400 Million (ROW)
Physical Target:
- 963.50 sq.m. (Bridge)
- 139.05 sq.m. (ROW) |
April 12, 2017 |
2017 |
165003015300164 |
SR2017-02-002563 |
February 2, 2017 |
Region XIII |
Butuan City District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Daang Maharlika (Alternate Route) (NRJ- Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat), Package 1 (Mandamo-Las Nieves Section), Agusan del Norte - Sta. 16+800 - Sta. 18+097.899, Sta. 18+118.029 - Sta. 18+360, Sta. 19+920 - Sta. 21+700, Sta. 24+120 - Sta. 24+800
Allocation - Php 95.00 Million
Physical Target - 8.00 lane km |
April 12, 2017 |
2017 |
WIN7G01098 |
103004010313903 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
LIP - Building and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court), Barangay Katugasan, Cabadbaran City, Agusan del Norte
Allocation - Php 2.00 Million
Physical Target - 1 Multipurpose Building
|
April 11, 2017 |
2017 |
WIN7G00973 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Diversion Road at Vitali - Sibulao - By-pass Road Project (Alternate Road of N1), Zamboanga City 2nd LD
Sect. 1: K9+500.00 - K11+175.49
Sect. 2: K11+233.30 - K12+020.00
Allocation:
Php 100.000 Million (Total)
Php 99,002,298.92 (Road Concreting)
Php 997,701.08 (ROW Acquisition)
Physical Target:
4.92438 lane km (Road Concreting)
3,325 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,104,520.55/lane km (Road Concreting)
Php 300.06/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G00969 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 1st DEO, (S01112MN)
K1733+426.00 - K1734+474.00,
K1734+474.00 - K1734+918.00,
K1736+463.00 - K1737+500.00,
K1747+060.00 - K1748+680.00,
K1750+800.00 - K1751+660.00
Allocation:
Php 134.516 Million (Total)
Php 127,701,016.01 (Road Widening)
Php 6,814,983.99 (ROW Acquisition)
Physical Target:
9.994 lane km (Road Widening)
22,716 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,777,768.26/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G00985 |
FY 2017 (R.A 10924) |
March 11, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - N1 -
Road Widening including Drainage and RROW Pagadian City - Zamboanga City Road, (S01315MN)
K1851+026 - K1854+590.00,
K1854+710 - K1854+800.00
Allocation:
Php 150.000 Million (Total)
Php 110.000 Million (Road Widening)
Php 40.000 Million (ROW Acquisition)
Physical Target:
7.308 lane km (Road Widening)
40,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,051,997.81/ lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
165003015100181 |
SR2017-02-002494 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Improvement/Widening of National Roads - Secondary - Improvement/Widening of National Roads, Dapa-Jct. Cancohoy Rd - K0012+000 - K0013+500, K0016+000 - K0018+101
Allocation - Php 100.00 Million
Physical Target - 7.080 lane km |
April 11, 2017 |
GAA FY 2017 |
WIN7G01218 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1- National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Inawayan-Baracatan Rd
K1534+060 - K1534+243
K1535+909 - K1539+576
TO: MFO 1- National Road Network Services
Network Development - Off-Carriageway Improvement including drainage- Tertiary
Paving of Shoulder with Drainage Improvement at Inawayan-Baracatan Road, Toril District, Davao City
K1534+060 - K1534+243
K1535+909 - K1539+616.670
ALLOCATION: Php 49.900 Million |
April 11, 2017 |
2017 |
165003015400134 |
SR2017-02-002684 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary) including bridge, Agusan del Sur, Package 4
Allocation:
- Php 150.00 Million (Total)
- Php 38,055,366.80 (Gravel Road)
- Php 111,944,633.20 (Concrete Bridge)
Physical Target:
- 1.68 lane km (Gravel Road)
- 1,009.332 sq.m. (Concrete Bridge)
|
April 11, 2017 |
2017 |
165003030700082 |
SR2017-02-003026 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road Leading to Seaports, Tabon-Labisma Road leading to Lawigan Port, Bislig City, Surigao del Sur
Allocation - Php 150.00 Million
Physical Target - 6.830 lane km |
April 11, 2017 |
2017 |
165003030800283 |
SR2017-02-003038 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations - Construction/Improvemen of Access Road leading to declared Tourism Destinations, Liboton-Ipas-Hagnaya San Marcos Road leading to Agusan Marsh, Bunawan, Agusan del Sur
Allocation - Php 165.00 Million
Physical Target - 3.40 lane km |
April 11, 2017 |
2017 |
WIN7G01114 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Zamboanga West Coastal (Limpapa - Sibuco Section),
Zamboanga del Norte 2nd DEO
K1996+500 - K1998+270, (S01148MN)
K2002+855 - K2003+415,
Chainage 0 - Chainage 940.00, (S01150MN)
Allocation:
Php 141,775 Million (Total)
Php 141,201,028.40 (Gravel Road)
Php 573,971.60 (ROW Acquisition)
Physical Target:
6.54 lane km (Gravel Road)
2,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,950,371/ lane km (Gravel Road)
Php 286.99/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G00968 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-5 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN)
K1943+560.43 - K1945+067.26,
K1946+000.00 - K1946+833.24,
K1958+754.00 - K1959+000.00,
K1959+679.00 - K1961+054.86
Allocation:
Php 117.320 Million (Total)
Php 115,320,000.00 (Road Concreting)
Php 2,000,000.00 (ROW Acquisition)
Physical Target:
7.924 lane km (Road Concreting)
6,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,553,255.93/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
165003014500140 |
SR2017-02-002209 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide, Dinagat-Loreto Rd - K0020+000 - K0020+440, K0031+000 - K0031+290
Allocation - Php 154.220 Million
Physical Target - 10,200 sq.m. |
April 11, 2017 |
2017 |
165003030800255 |
SR2017-02-003029 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations - Circumferential Road leading to Lake Mainit (Mainit-Poblacion-Tagbuyawan) inc. Tapian Br. II, Mainit, Surigao del Norte
Allocation:
- Php 149.00 Million (Total)
- Php 33.080 Million (Concrete Road)
- Php 115.919 Million (Concrete Bridge)
Physical Target:
- 2.00 lane km (Concrete Road)
- 961.63 sq.m. (Concrete Bridge)
|
April 11, 2017 |
2017 |
165003014500151 |
SR2017-02-002212 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide - Surigao-Davao Coastal Rd - K1212+940 - K1213+268
Allocation - Php 158.563 Million
Physical Target - 8,470 sq.m. |
April 11, 2017 |
2017 |
WIN7G01169 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved), Zamboanga del Sur Coastal Road, (S01168MN), Zamboanga del Sur 2nd DEO
Chainage 14556 - Chainage 16140,
Chainage 6820 - Chainage 10000
Allocation:
Php 150.000 M (Total)
Php 149,871,443.20 (Road Concreting)
Php 128,556.80 (ROW Acquisition)
Physical Target:
9.528 lane km (Road Concreting)
428.52 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,349,389.92/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G00972 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Rd., Zamboanga del Sur 2nd LD, (S01173MN)
K1750+700.00 - K1751+604.74,
K1751+662.79 - K1751+782.79,
K1751+804.30 - K1752+302.00,
K1752+332.43 - K1752+700.00
Allocation:
Php 52.500 M (Total)
Php 52,350,814.44 (Road Concreting)
Php 149,485.56 (ROW Acquisition)
Physical Target:
3.78 lane km (Road Concreting)
497.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,849,421.81/lane km (Road Concreting)
Php 300.17/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01402 |
R.A 10924 |
January 12, 2017 |
Region VII |
Regional Office VII |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, P00103607VS, Secondary Roads - Construction of Road Slope Protection Structure,
Cebu-Toledo Wharf Rd (Jct Naga-Uling) S00220CB - K0011+237 - K0013+245, K0016+500 - K0018+200, K0022+900 - K0023+900
Allocation - ₱ 299.442 Million
Physical Target - 175,800 square meters
Unit Cost - ₱ 1,703.31 / square meter |
April 11, 2017 |
2017 |
WIN7G01120 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO
Chainage 1716 - Chainage2248, (S01168MN)
Chainage 3869 - Chainage 4548, (S01168MN)
Chainage 4901 - Chainage 5340, (S01168MN)
Chainage 18845 - Chainage 20545, (S01168MN)
Chainage 22000 - Chainage 23642, (S01187MN)
Allocation:
Php 150.000 M (Total)
Php 149,255,581.80 (Road Concreting)
Php 744,418.20 (ROW Acquisition)
Physical Target:
9.984 lane km (Road Concreting)
2,481 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,949,477.34/lane km (Road Concreting)
Php 300.05/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01146 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO (S01167MN)
Chainage 9685.62 - Chainage 10643.26,
Chainage 13657 - Chainage 14867.29
Allocation:
Php 100.000 M (Total)
Php 97,000,000.00 (Road Concreting)
Php 3,000,000.00 (ROW Acquisition)
Physical Target:
4.336 lane km (Road Concreting)
10,000.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 22,370,848.71/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01116 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO
Chainage 2500 - Chainage 4498.55, (with exception)
Chainage 6527.85 - Chainage 7898.70,
Chainage10280 - Chainage 12085.90
Allocation:
Php 150.000 Million (Total)
Php 147,999,999.90 (Gravel Road)
Php 2,000,000.10 (ROW Acquisition)
Physical Target:
9.830 lane km (Gravel Road)
6,666.66 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,055,951.16/lane km (Gravel Road)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01398 |
R.A 10924 |
January 12, 2017 |
Region VII |
Regional Office VII |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, P00104206VS - Tertiary Roads, S00003SJ,
Luyang-Poo-Lazi Rd - K0013+390 - K0013+480, K0022+540 - K0022+680
Allocation - ₱ 90.999 Million
Physical Target - 6,194.17 Square meters
Unit cost - ₱ 14,691 / Square meter |
April 11, 2017 |
2017 |
WIN7G01121 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Unpaved to Paved) of Rizal - Dakak - Dapitan Coastal Loop Road, Zamboanga del Norte 3rd DEO
K1814+780.00 - K1815+570.00,
K1817+485.00 - K1817+815.00,
K1817+825.00 - K1818+755.00,
K1818+801.00 - K1819+708.58,
K1823+430.00 - K1823+646.00,
K1823+658.00 - K1823+780.00
Allocation:
Php 103.000 M (Total)
Php 102,880,809.80 (Road Concreting)
Php 119,190.20 (ROW Acquisition)
Physical Target:
6.591 lane km (Road Concreting)
397.30 sq.m. (ROW Acquisition)
Unit Cost:
Php 15,609,286.88/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01110 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Off-Carriageway Improvement including Drainage - Tertiary -
Shoulder Paving with Drainage Improvement at Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga Sibugay 1st DEO
K1763+(-698) - K1763+(-687),
K1763+(-660) - K1763+840,
K1768+488 - K1769+693,
K1751+(-602) - K1752+838,
K1764+028 - K1768+488,
K1772+917 - K1773+969,
K1752+838 - K1754+800
Allocation - Php 91.000 Million
Physical Target - 12,630.00 ln.m./18,945.00 sq.m.
Unit Cost - Php 4,803.38/sq.m. |
April 11, 2017 |
FY 2017 |
WIN7C01401 |
R.A 10924 |
January 12, 2017 |
Region VII |
Regional Office VII |
Network Development, Off-Carriageway Improvement including drainage, Secondary Roads, S00078BH,
Tagbilaran East Road (Tagbilaran-Jagna), K0170+145 - K0171+074; K0178+618 - K0179+004; K0179+118 - K0179+561; K0179+582 - K0179+622 (LS); K0180+384 - K0181+252; K0222+069 - K0223+000; K0224+056 - K0224+881; K0240+219 - K0241+780
Allocation - ₱ 62.533 Million
Physical Target - 23,932 Square Meters
Unit Cost - ₱ 2,612/ Square Meter |
April 11, 2017 |
2017 |
WIN7G01124 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - N1
Road Widening including Drainage of Tukuran Jct. - Karomatan Jct. Road, Zamboanga del Sur, 1st DEO (S01103MN)
K1648+(-262) - K1648+664,
K1649+321 - K1650+404,
K1651+(-536) - K1651+456
Allocation:
Php 89.000 Million (Total)
Php 78,456,175.62 (Road Widening)
Php 10,543,824.38 (ROW Acquisition)
Physical Target:
6.002 lane km (Road Widening)
35,146.08 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,071,672.05/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7C01506 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to decalred Tourism Destinations -
Road Upgrading (Gravel to Concrete) of Jct. Tagasilay along MCLL Highway - Tagasilay - Vitali Section leading to Merloquet Falls, Vitali, Zamboanga City
Sta. 009+930.00 - Sta. 012+842.64
Exception 17.18 ln.m. - Existing Spillway
(Sta. 010+534.64 - Sta. 010+551.82 = 17.18 ln.m.)
Sta. 008+510.00 - Sta. 009+500 = 0.990 km.
Allocation:
Php 150.000 M (Total)
Physical Target:
7.771 lane km (Road Concreting)
Unit Cost:
Php 19,302,535.07/lane km (Road Concreting) |
April 11, 2017 |
FY 2017 |
WIN7C01392 |
R.A 10924 |
January 12, 2017 |
Region VII |
Regional Office VII |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4), P00102145VS - Secondary Roads, S00303CB,
Santander-Barili-Toledo Road - K0186+000 - K0186+300, K0188+000 - K0188+367, K0190+000 - K0191+021.04, K0195+144 - K0195+198, K0195+210 - K0195+320, K0208+179 - K0208+393, K0208+393 - K0208+760
Allocation - ₱ 89.992 Million
Physical Target - 4.866 lane km
Unit Cost - ₱ 18.494 Million / lane km |
April 11, 2017 |
2017 |
WIN7G01130 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Talinga - Dagohoy - Tinaplan - Titik, Zamboanga del Norte 2nd LD
K0023+000.00 - K0024+130.00
Allocation:
Php 150.000 M (Total)
Php 149,477,048.01 (Road Concreting)
Php 522,951.99 (ROW Acquisition)
Physical Target:
2.26 lane km (Road Concreting)
280.23 sq.m. (ROW Acquisition)
Unit Cost:
Php 66,140,286.73/lane km. (Road Concreting)
Php 1,866.15/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01400 |
R.A 10924 |
January 12, 2017 |
Region VII |
Regional Office VII |
Construction/Improvement of Access Roads leading to Seaports, P00130505VS,
Maria-Basac-Larena Road leading to Larena RORO Port, Larena, Siquijor Lone District
Allocation - ₱ 114.498 Million
Physical Target - CW1 - 8.000 lane km
- CW2 - 2,400 Square meters
Unit Cost - CW1 - ₱ 13,437.55 Million / lane km
- CW2 - ₱ 2,915.71 / Square Meter |
April 11, 2017 |
2017 |
WIN7G01112 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO
Chainage 7599 - Chainage 9881
(Sta. 1936+440.00 - Sta. 1938+722.00)
Allocation:
Php 150.000 M (Total)
Php 147,426,266.78 (Road Concreting)
Php 2,573,733.22 (ROW Acquisition)
Physical Target:
4.564 lane km (Road Concreting)
8,579.11 sq.m. (ROW Acquisition)
Unit Cost:
Php 32,301,986.57/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01546 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Tapon River Control, Ubay, Bohol
Allocation - ₱ 3,000,000.00
Physical Target - 89.11 lm
Unit Cost - ₱ 33,666.25/linear meter |
April 11, 2017 |
2017 |
WIN7G01132 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Improvement of Access Roads leading to Airports, Seaports, and declared Tourism Destinations - To declared Tourism Destinations -
Concreting of Road from Junction Highway to Ayala - La Paz Road leading to La Paz Resort (Package II), Zamboanga City, (1st LD)
Sta. 1971+160.00 - Sta. 1973+324.50,
Sta. 1979+060.00 - Sta. 1979+690.00
Allocation:
Php 100.000 M (Total)
Physical Target:
5.589 lane km (Road Concreting)
Unit Cost:
Php 17,892,288.42/lane km (Road Concreting) |
April 11, 2017 |
FY 2017 |
WIN7C01588 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Asset Preservation of National Roads
Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide at Antequera-San Isidro-Libertad (Tubigon) Road K0026+244 - K0026+268, K0026+-670 - K0027+-620, K0027+940 - K0027+980, K0030+525 - K0030+555, K0032+246 - K0032+284, K0032+457 - K0032+487, K0035+096 - K0035+170, San Isidro, Bohol
Allocation - ₱ 3,945,000.00
Physical Target - 286 lm., 791.66 sq. m
Unit Cost - ₱ 4,983.20 / square meter |
April 11, 2017 |
2017 |
WIN7G01111 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO
K1826+588 - K1829+543
Allocation:
Php 100,650,000.00 (Total)
Php 100,369,768.00 (Road Widening)
Php 280,232.00 (ROW Acquisition)
Physical Target:
5.938 lane km. (Road Widening)
140.60 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,902,958.57/lane km (Road Widening)
Php 1,993.12/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01553 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Kinan-oan River Control, Trinidad, Bohol
Allocation - ₱ 5,000,000.00
Physical Target - 163.50 lm
Unit Cost - ₱ 30,581.04/ linear meter |
April 11, 2017 |
2017 |
WIN7G01115 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Bypasses/Diversion Roads including ROW at Jct. Nat'l Highway R.T. Lim - Jct. Nat'l Highway Siocon Road, (Surabay - San Fernandino), Zamboanga Sibugay 2nd DEO
K1827+600 - K1835+800
Allocation:
Php 250.000 M (Total)
Php 240,000,000.00 (Road Concreting)
Php 10,000,000.00 (ROW Acquisition)
Physical Target:
16.400 lane km (Road Concreting)
33,333.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,634,146.34/ lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01562 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Camanaga River Control, San Miguel, Bohol
Allocation - ₱ 6,500,000.00
Physical Target - 191.00 lm
Unit Cost - ₱ 34,031.41/ linear meter |
April 11, 2017 |
2017 |
WIN7G01126 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Zamboanga Sibugay 1st DEO,
K1767+106.00 - K1768+463.07,
K1770+555.00 - K1770+730.00,
K1770+950.08 - K1770+967.00,
K1771+150.00 - K1771+460.00
Allocation:
Php 135.846 Million (Total)
Php 134,836,920.20 (Gravel Road)
Php 1,009,079.80 (ROW Acquisition)
Physical Target:
3.718 lane km (Gravel Road)
3,363.60 sq.m. (ROW Acquisition)
Unit Cost:
Php 36,265,981.76/lane km (Gravel Road)
Php 286.99/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
165003013800089 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4):Primary Roads
Daang Maharlika (LZ) - K0209 + -896 - K0209 + 000, K0223+400 - K0223+450, K0236+192.60 - K0236+756, K0236+ 756 - K0237+102, K0237+102 - K0237+597, K0237+622 - K0237+908, K0238+903 - K0239+273, K0239+291 - K0239+400, K0239+400 - K0240 + 345
|
April 11, 2017 |
FY 2017 |
WIN7C01561 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Locally Funded Projects
Local Infrastructure Program
Building and Other Structures - Multipurpose Facilities
Repair/Rehabilitation of Multi-Purpose Building, Barangay Puerto San Pedro, Bien Unido, Bohol
Allocation - ₱ 700,000.00
Physical Target - 1 Project
Unit Cost - ₱ 700,000.00/ Project |
April 11, 2017 |
2017 |
WIN7G01117 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Construction of Diversion Road at Vitali - Sibulao By-pass alternate Road of N1, Zamboanga City 2nd LD.
K012+020.00 - K013+579.33
K013+604.13 - K013+617.89
Allocation:
Php 100.000 Million (Total)
Php 89,986,432.75 (Road Concreting)
Php 10,013567.25 (ROW Acquisition)
Physical Target:
3.146 lane km (Road Concreting)
33,378.56 sq.m. (ROW Acquisition)
Unit Cost:
Php 28,603,443.34/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
FY 2017 |
WIN7C01594 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Improvement of Access road leading to Seaport
Construction/Improvement of Access Road leading to Getafe Port and Declared Tourism Destinations, Getafe, Bohol
Allocation - ₱ 17,133,000.00
Physical Target - 1.330 Lane Km
Unit Cost - ₱ 12,881,954.89/ Lane Km |
April 11, 2017 |
FY 2017 |
WIN7C01552 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 2nd District Engineering Office |
Construction/Improvement of Access Road leading to Seaport
Construction/Improvement of Access Road leading to Clarin Port and Declared Tourism Destinations, Calrin, Bohol
Allocation - ₱ 15,593,000.00
Physical Target - 1.000 Lane Km
Unit Cost - ₱ 15,593.00/ Lane Km |
April 11, 2017 |
2017 |
WIN7G01108 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-passes/Diversion Roads, including ROW -
Improvement/Concreting of Baliguian - Coastal Road, Junction Baliguian - Kauswagan - Mamad Section, Zamboanga del Norte 2nd DEO
Sta. 2047+640.00 - Sta. 2048+180.00,
Sta. 2048+610.00 - Sta. 2050+984.86,
Sta. 2051+050.00 - Sta. 2051+967.40
Allocation:
Php 188.740 Million (Total)
Php 188,640,461.20 (Road Concreting)
Php 279,538.80 (ROW Acquisition)
Physical Target:
7.665 lane km (Road Concreting)
931.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,587,144.32/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01113 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Dipolog River Basin Flood Control, Dipolog City, Zamboanga del Norte
Barra Br. River Control:
Sta. 0+000.00 - Sta. 0+412.02,
Sta. 0+479.02 - Sta. 0+600.00,
Quezon Bridge:
Sta. 0+000.00 - Sta. 0+442.30
Allocation:
Php 100.000 Million (Total)
Php 99,719,716.62 (Const. of Flood Control Structure)
Php 280,283.38 (ROW Acquisition)
Physical Target:
975.30 ln.m. (Const. of Flood Control Structure)
280.28 sq.m. (ROW Acquisition)
Unit Cost:
Php 102,245.17/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
165003014600171 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Aritao-Quirino Rd - K0257+890 - K0257+926, K0258+990 - K0259+005.9, K0260+335-K0260+370, K0260+450-K0260+470, K0263+078 - K0263+094, K0263+167 - K0263+192, K0282+044 - K0282+069.2, K0284+803 - K0284+825, K0291+840 - K0291+851
|