April 18, 2017 |
2017 |
WIN7C01448 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu City District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control and Mitigation Structures along Lahug River, Brgy. Camputhaw, Cebu City
Allocation - ₱ 50 Million
Physical Target - 1,500 lm.
Unit Cost - ₱ 33,333/ lm |
April 18, 2017 |
2017 |
WIN7C01536 |
R.A 10924 |
January 14, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction of Taloto-Ubujan-Manga Coastal Road, Tagbilaran City, Bohol
Allocation - ₱ 17.0 Million
Physical Target - 2.564 lane km
Unit Cost - ₱ 6,630,265.21/ lane km |
April 18, 2017 |
2017 |
WIN7C01541 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports
Access Roads leading to Catagbacan International Cruise Ship Port, Loon, Bohol
Allocation - ₱ 42.0 Million
Physical Target - 2.028 lane km
Unit Cost - ₱ 20,710,059.17/ lane km |
April 18, 2017 |
2017 |
WIN7C01542 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination - To Seaports
Construction of Concrete Road - Access Road leading to Alburquerque Port, Bohol
Allocation - ₱ 4.0 Million
Physical Target - 0.316 lane km
Unit Cost - ₱ 12,658,227.85/ lane km |
April 18, 2017 |
2017 |
WIN7G01256 |
165003014400099 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary
Jct. Lingig-Trento Rd - K1476+663 - K1476+703, K1477+320.40 - K1477+350.40
Allocation - Php 8.129 Million
Physical Target - 572 square meters |
April 18, 2017 |
2017 |
WIN7G01255 |
165003014500268 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Surigao-Davao Coastal Rd - K1453+430 - K1453+456.20, K1453+706.80 - K1453+722.50, K1453+893 - K1453+930, K1465+384 - K1465+486, K1476+677.50 - K1476+891, K1478+643 - K1478+652, K1478+652 - K1478+673.30, K1478+673.30 - K1478+682.30, K1500+624.80 - K1500+654.80, K1506+311 - K1506+329
Allocation - Php 45.347 Million
Physical Target - 3,666.70 square meters |
April 18, 2017 |
2017 |
WIN7G01251 |
165003015300148 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Tagongon-Sta. Maria-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road
Allocation:
- Php 50.00 Million (Total)
- Php 48.40 Million (Concrete Road)
- Php 1.60 Million (ROW Acquisition)
Physical Target:
- 2.682 lane km (Concrete Road)
- 16,050 square meters (ROW Acquisition) |
April 18, 2017 |
2017 |
WIN7G01261 |
165003017100079 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Pagmam-an Br. (B01755MN) along Jct. Lingig-Trento Rd
Allocation - Php 52.00 Million
Physical Target - 239 square meters |
April 18, 2017 |
2017 |
WIN7C01573 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Reconstruction from Asphalt to Concrete - Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0032+600 - K0033+000
Allocation - ₱ 12.50 Million
Physical Target - 0.800 lane km
Unit Cost - ₱ 15,625,000.00/ lane km |
April 18, 2017 |
2017 |
WIN7G01260 |
165003030800297 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations
NRJ-Cumawas-Tinuy-an Falls Road (Mone Bridge), Borboanan, Bislig City, Surigao del Sur 2nd LD
Allocation:
- Php 34.00 Million (Total)
- Php 7,022,942.89 (Concrete Road)
- Php 26,977,057.11 (Concrete Bridge)
Physical Target:
- 0.18 lane km (Concrete Road)
- 351.07 square meters (Concrete Bridge) |
April 18, 2017 |
2017 |
WIN7G01263 |
103004010314019 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-purpose Building, Brgy. Mangagoy, Bislig City, Surigao del Sur
Allocation - Php 2.00 Million
Physical Target - 1 Building |
April 18, 2017 |
2017 |
WIN7G01303 |
103004010314014 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Anibongan, Lingig, Surigao del Sur (Phase II)
Allocation - ₱ 1.50 Million
Physical Target - 1 Building |
April 18, 2017 |
2017 |
WIN7G01310 |
103004010314017 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Bogac, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01308 |
103004010314018 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities:
Construction of Multi-Purpose Building, Bongan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01266 |
103004010314020 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Cabacungan, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01302 |
103004010314021 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Campa, Hinatuan, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01595 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0024+120 - K0025+000, K0028+330 - K0028+393
Allocation - ₱ 31.494 Million
Physical Target - 1.845 lane km
Unit Cost - ₱ 17,069,918.70/ lane km |
April 18, 2017 |
FY 2017 |
WIN7E01309 |
UACS No.165003015300123 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As per GAA
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/ Diversion Roas, including ROW: Rehabilitation of Concrete Road – C-6 Napindan-ML Quezon Ave, Taguig (Rehabilitation of concrete road)
UACS No. 165003015300123
Physical Target/Cost
Original: Reconst. Raising of Grade = 13.880 lane-km
Road Widening = 9.720 lane-km
Allocation Cost (P‘000): Reconst. Raising of Grade = P177,198
Road Widening = P171,000
Unit Cost (P‘000): Reconst. Raising of Grade = P13,290/lane-km
Road Widening = P17,593/lane-km
WIN7E01309
Modified
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/Diversion Roads, including ROW: C-6, Napindan-ML Quezon Ave, Taguig, Sta. 0+000-Sta. 1+500 (Right Side); Sta. 1+340 – Sta. 4+140 (Left Side) Reconstruction: Raising of Grade/Road Widening)
UACS No. 165003015300123
Physical Target/Cost
Modified: Reconst Raising of Grade = 5.60 lane-km
Road widening: 3.00 lane-km
Estimate Cost: (P’000): Raising of Grade = P180,140
Road Widening = P168,058
Unit Cost (P’000): Reconst Raising of Grade = P32,168/lane-km
Road Widening = P56,019/lane-km
WIN7E01309
|
April 18, 2017 |
2017 |
WIN7C01551 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Network Development, Off-Carriageway Improvement including drainage - Secondary
Tagbilaran East Rd (Tagbilaran-Jagna), K0254+748-K0256+732, K0257±274-K0257+900
Allocation - ₱ 47.715 Million
Physical Target: 12,547.42 sq.m
Unit Cost (P): 3,802.77/sq.m. |
April 18, 2017 |
2017 |
WIN7G01265 |
103004010314022 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Cumawas, Bislig City, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01269 |
103004010314023 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Guinhalinan Elementary School, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7C01549 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Jct. (TER) Dauis-Panglao Road, S00020BH - Chainage 0-Chainage 505
Allocation - ₱ 3.531 Million
Physical Target - 1.515 lane km
Unit Cost - ₱ 2,330,693.00/ lane km |
April 18, 2017 |
2017 |
WIN7C01574 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Construction of Road Slope Protection Structure Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0014+350-K0014+650, K0015+060-K0015+260, K0015+580-K0015+710, K0042+250-K0042+450, K0047+580-K0047+950 Allocation: P27.345 Million (CW1); P2.655 Million (CW2)
Physical Target: Slope Protection = 6,631.60 sq.m.; Paved Shoulder: 800.00 sq.m
Unit Cost (P): Slope Protection = 4,123.44/sq.m.; Paved Shoulder = 3,318.75/sq.m. |
April 18, 2017 |
2017 |
WIN7G01296 |
103004010314024 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Handamayan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7C01555 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Slope Protection at Antequera-San Isidro-Libertad (Tubigon) Rd - K0024+000-K0024+400
Allocation - ₱ 10.00 Million
Physical Target: 1,873.03 sq.m.
Unit Cost (P): 5,338.94/sq.m. |
April 18, 2017 |
2017 |
WIN7C01593 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Concreting of Toledo Street, Dao-San Isidro, Tagbilaran City, Bohol
Allocation - ₱ 10.0 Million
Physical Target - 1.14 lane km
Unit Cost - ₱ 8,771,929.82/sq.m. |
April 18, 2017 |
2017 |
WIN7C01455 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construciton/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - To Seaports - Concreting of B.M. Dimataga St. with Drainage Facilities, Lapu-Lapu City
Allocation - ₱ 7.844 Million (CW1)
- ₱ 11.568 Million (CW2)
Total Allocation - ₱ 19.412 Million
Physical Target - 1.401 lane km (CW1)
- 780.30 lineal meters (CW2)
Unit Cost - 5.599 Million/lane km (CW1)
- 14,825/lineal meters (CW2) |
April 18, 2017 |
2017 |
WIN7C01445 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Roads and Bridges - Local Roads
Roads and Bridges - Local Roads - Improvement/Rehabilitation of Panoypoy Barangay Road, Panoypoy, Consolacion, Cebu
Allocation - ₱ 13.000 Million
Physical Target: 2.636 lane Km
Unit Cost: P4.932 Million/lane km |
April 18, 2017 |
FY 2017 |
WIN7E01317 |
UACS No.103004010310289 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multipurpose Building, Kalayaan National High School, Pasay City (Construction)
UACS No. 103004010310289
Physical Target/Cost
Original: 1 building
Allocation Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
As Modified
Locally Funded Projects – Building and Other Structures – Multipurpose/Facilities: Repair/Rehabilitation/ Improvement of Multipurpose Building, Kalayaan National High School, Pasay City (Kalayaan Village, Merville, Pasay City) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310289
Modified: 1 building
Estimated Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
|
April 18, 2017 |
2017 |
WIN7C01434 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control Structure and Bridge Waterways along Mahiga Creek, Phase III, Mandaue City, Cebu
Allocation - ₱ 28.031 Million (CW1)
- ₱ 11.969 Million (CW2)
Physical Target - 120 l.m. (CW1)
- 18,563.80 cu.m. (CW2)
Unit Cost - ₱ 233,594/l.m. (CW1)
- ₱ 645/cu.m. (CW2) |
April 18, 2017 |
FY 2017 |
WIN7E01314 |
UACS No. 103004010310292 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Barangay 183 and its vicinity, Pasay City (Construction)
UACS No. 103004010310292
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose Building, Barangay 183 and its vicinity, Pasay City. (Andrew Avenue) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310292
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
|
April 18, 2017 |
FY 2017 |
WIN7E01316 |
UACS No. 103004010310290 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, T. Paez Elementary School, Pasay City (Construction)
UACS No. 103004010310290
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,000
Unit Cost (P’000): P1,000/building
WIN7E01316
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Repair/Rehab./ Improvement of T. Paez E/S, Pasay City Lone District. Apelo Cruz St., Malibay, Pasay City. (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310290
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,000
Unit Cost (P’000): P1,000/Building
WIN7E01316
|
April 18, 2017 |
2017 |
WIN7C01446 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities
Phase I Construction of Barangay Casuntingan Multipurpose Gym, Casuntingan, Mandaue City, Cebu
Allocation - ₱ 2.00 Million
Physical Target - 1 building
Unit Cost (P): 2 Million/building |
April 18, 2017 |
2017 |
WIN7C01452 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Secondary Roads - Consolacion-Tayud-Liloan Rd (S00372CB), Chainage 950-Chainage 2823, Consolacion, Cebu
Allocation - ₱ 18.777 Million (CW1)
- ₱ 31.123 Million (CW2)
Physical Target - 1.606 lane Km (CW1)
- 1,748 lm (CW2)
Unit Cost - ₱ 11.692 Million/lane Km (CW1)
- ₱ 17,805/lm (CW2) |
April 18, 2017 |
2017 |
WIN7C01437 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - School Buildings
Construction of 3-Storey/6-Classroom Building at Casili Elementary School, Casili, Mandaue City, Cebu
Allocation - ₱ 9.000 Million
Physical Target - 3 storey; 6 classroom
Unit Cost - ₱ 9 Million/ 3 Storey, 6 classroom |
April 18, 2017 |
2017 |
WIN7C01450 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Cebu North Hagnaya Wharf Road (S00161CB), K0005+(-060) - K0005+986, Mandaue City
Allocation - ₱ 19.210 Million
Physical Target - 832.03 l.m.
Unit Cost - ₱ 23,088/l.m. |
April 18, 2017 |
2017 |
WIN7C01451 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Mandaue-Mactan Access Road, Lapu-Lapu City
Allocation - ₱ 1.945 Million (CW1)
- ₱ 3.055 Million (CW2)
Physical Target - 0.154 lane Km (CW1)
- 236.68 lm (CW2)
Unit Cost - ₱ 12.63/lane Km (CW1)
- ₱ 12,907/lm (CW2) |
April 18, 2017 |
2017 |
WIN7C01473 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges
Rehabilitation/Major Repair of Permanent Bridge - Pilipog Br. 1 (B00580CB) along Mactan Circumferential Road, Pilipog, Cordova, Cebu
Allocation - ₱ 2.400 Million
Physical Target - 1 Bridge
Unit Cost - 2.40 Million/Bridge |
April 18, 2017 |
FY 2017 |
WIN7E01320 |
UACS No. 165004050306310 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Slope Protection with Concreting Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City
UACS No. 165004050306310
Physical Target/Cost
Original: 0.20 km
Unit Cost (P’000): P10,000/km
Allocation Cost (P’000): P2,000
WIN7E01320
As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City (Construction of Concrete Road)
UACS No. 165004050306310
Modified: 0.360 lane km
Unit Cost (P’000): P5,556/lane km
Estimated Cost (P’000): P2,000
WIN7E01320
|
April 18, 2017 |
2017 |
WIN7C01472 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary
Preventive Maintenance based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary Roads - Cebu North Hagnaya Wharf Road (S00286CB), K0008+358-K0008+953, Mandaue City
Allocation - ₱ 24.000 Million
Physical Target - 2.380 lane Km
Unit Cost - ₱ 10.126 Million/Lane Km |
April 18, 2017 |
2017 |
WIN7C01471 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports
Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Angasil Causeway, Lapu-Lapu City
Allocation (P) - ₱ 3,448.75 Million (CW1)
- ₱ 6,647.23 Million (CW2)
- ₱ 9,904.02 Million (CW3)
Physical Target - 0.180 lane Km (CW1)
- 91.00 l.m. (CW2)
- 1,371.30 sq.m. (CW3)
Unit Cost - ₱ 19.16/lane Km (CW1)
- ₱ 73,046/l.m. (CW2)
- ₱ 7,222/sq.m. (CW3) |
April 18, 2017 |
2017 |
WIN7C01467 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 6th District Engineering Office |
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities
Phase III Construction of Cordova Municipal Hospital, Pilipog, Cordova, Cebu
Allocation - ₱ 10.723 Million
Physical Target - 1.0 Hospital
Unit Cost - ₱ 10.723Million/Hospital |
April 18, 2017 |
2017 |
WIN7C01416 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities
Construction of Multipurpose Building in Brgy. Libjo, Tabogon, Cebu
Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 2.0 Million/ Building |
April 18, 2017 |
2017 |
WIN7C01424 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy. Sambag, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project |
April 18, 2017 |
2017 |
WIN7C01418 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy. Labangon, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/ Project |
April 18, 2017 |
2017 |
WIN7G01301 |
103004010314025 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Harip, Hinatuan, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01419 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facities
Construction of Multipurpose Building Brgy. Somosa, Tabogon, Cebu
Allocation - ₱ 4.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 4.0 Million/ Project |
April 18, 2017 |
2017 |
WIN7C01420 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building Brgy Canao-Canao, Tabogon, Cebu
Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project |
April 18, 2017 |
2017 |
WIN7C01421 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Water Management - Water Supply
Construction of Water System (Level III), Bantayan, Cebu
Allocation - ₱ 5.0 MIllion
Physical Target - 1 Water System
Unit Cost - ₱ 5.0 Million/ Water System |
April 18, 2017 |
2017 |
WIN7C01423 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Covered Court) in Brgy. Hilotongan, Bantayan, Cebu
Allocation - ₱ 3.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 3.0 Million/Building |
April 18, 2017 |
2017 |
WIN7G01252 |
103004010314026 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Hinagdanan, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01415 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities
Construction of Multipurpose Building in Brgy. Calambua, San Remegio, Cebu
Allocation - ₱ 4.0 Million
Physical Target - 1 Building
Unit Cost - 4.0 Million/Building |
April 18, 2017 |
2017 |
WIN7C01417 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/ Facilities
Completion of Multipurpose Building in Brgy. Pandan, Bogo City, Cebu
Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost- ₱ 2.0 Million/Building |
April 18, 2017 |
2017 |
WIN7G01319 |
103004010314028 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Mahayahay, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7C01422 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 1st District Engineering Office |
MFO 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control of Bangon Bridge (Downstream), Poblacion, Medellin, Cebu - Flood Mitigation Structure
Allocation - ₱ 20.0 Million
Physical Target - 344 Lineal Meters
Unit Cost - ₱ 58,140/ Lineal Meter |
April 18, 2017 |
2017 |
WIN7G01305 |
103004010314029 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Maligaya Elementary School, Hinatuan, Surigao del Sur
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01306 |
103004010314030 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Mansailao, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building.
|
April 18, 2017 |
2017 |
WIN7G01304 |
103004010314031 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Palo Alto, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01298 |
103004010314032 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Rajah Cabungsuan, Lingig, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01264 |
103004010314033 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Rizal, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 1.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01267 |
103004010314035 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, San Vicente II, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01254 |
103004010314036 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Sta. Cruz, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01271 |
103004010314037 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Sua, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 0.50 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01253 |
103004010314038 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Trinidad, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building
|
April 18, 2017 |
2017 |
WIN7G01262 |
103004010314039 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Tumanan, Bislig City, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01300 |
103004010314040 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Ugoban, Tagbina, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 18, 2017 |
2017 |
WIN7G01268 |
103004010314041 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Construction of Multi-Purpose Building, Wakat, Barobo, Surigao del Sur (Phase II)
Allocation : ₱ 2.00 Million
Physical Target : 1 Building |
April 17, 2017 |
2017 |
WIN7G01164 |
165003015800465 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Unpaved to Paved) along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1269+265 - K1271+178
Allocation:
- Php 38.820 Million (Total)
- Php 38,650,392.71 (Concrete Road)
- Php 169,607.29 (ROW Acquisition)
Physical Target:
- 3.790 lane km (Concrete Road)
- 37,900.00 square meters (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01160 |
165003014600265 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified;
Asset Preservation of National Roads - Rehabilitation/reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide, Construction of Road Slope Protection Structure - Agusan - Malaybalay Road, K1274+200 - K1274+374, (S00397MN)
Allocation:
- Php 40.51 Million (Total)
- Php 40,194,800.00 (Slope Protection)
- Php 315,200.00 (ROW Acquisition)
Physical Target:
- 2,000.00 sq.m. (Slope Protection)
- 1,740.00 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G001166 |
165003014600264 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/reconstruction of National Slips, Slope Collapse and Landslide - Tertiary Road
Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide - Agusan-Bukidnon Road, K1261+520 - K1261+578.85, K1261+607.81 - K1261+740, K1261+920 - K1261+982.77, K1262+000 - K1262+040, K1262+080 - K1262+140, K1262+190 - K1262+250, (S00395MN)
Allocation:
- Php 45.00 Million (Total)
- Php 44,214,526.46 (Slope Protection)
- Php 785,473.54 (ROW Acquisition)
Physical Target:
- 3,313.17 sq.m. (Slope Protection)
- 4,138.10 sq.m (ROW ACquisiion) |
April 17, 2017 |
2017 |
WIN7G01161 |
203004060100927 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified;
Locally Funded Projects: LIP - Water Management - Water Supply
Construction of Malico SWIP, Malico Creek, Brgy. Calamba, Cabadbaran, Agusan del Norte
Allocation - Php 5.00 Million
Physical Target - 1 project |
April 17, 2017 |
2017 |
WIN7G01168 |
165003014700120 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Asset Preservation of National Roads - Construction /Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Concrete Lined Canal along Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Oriental Road), K1266+558.51 - K1266+960, (S00391MN)
Allocation:
- Php 10.00 Million (Total)
- Php 8,749,240.00 (Construction of Drainage)
- Php 1,250,760.00 (ROW Acquisition)
Physical Target:
- 803 lm (Construction of Drainage)
- 8,030 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G001167 |
165003014600266 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified;
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide - Buenavista-Bunaguit Road, K1272+200 - K1272+300, K1272+460 - K1272+600, K1272+680 - K1272+747, (S00396MN)
Allocation:
- Php 49.90 Million (Total)
- Php 48,755,986.00 (Slope Protection)
- Php 1,144,014.00 (ROW Acquisition)
Physical Target:
- 3,291.36 sq.m. (Slope Protection)
- 3,070 sq.m. (ROW Acquisition)
|
April 17, 2017 |
2017 |
WIN7G01165 |
165003015400106 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Missing Gaps connecting National Roads, inc. ROW at Cabadbaran-Puting Bato-Lanuza Road, Cabadbaran, Agusan del Norte
Allocation:
- Php 70.00 Million (Total)
- Php 38,956,764.00 (Concrete Road)
- Php 29,567,336.00 (Gravel Road)
- Php 1,475,900.00 (ROW Acquisition)
Physical Target:
- 2.24 lane km (Concrete Road)
- 7.216 lane km (Gravel Road)
- 35,520 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01163 |
165003015200212 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary Road
Road Widening including Drainage, Paving of Shoulder and RROW Acquisition along Agusan-Malaybalay Road, K1271+-756 - K1271+-041, K1271+199 - K1271+984, (S00397MN)
Allocation:
- Php 49.50 Million (Total)
- Php 46,341,541.00 (Road Widening)
- Php 3,158,459.00 (ROW Acquisition)
Physical Target:
- 3.00 lane km (Road Widening)
- 30,090 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G001162 |
292003020403467 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rechanneling of Puyo River, Barangay Bangonay, Magsaysay and Cuyago, Jabonga, Agusan del Norte, Sta. 0+000 - Sta. 0+762.92
Allocation:
- Php 50.00 Million (Total)
- Php 49,394,740.00 (Flood Control)
- Php 605,260.00 (ROW Acquisition)
Physical Target:
- 762.92 lm (Flood Control)
- 7,629 sq.m. (ROW Acquisition)
|
April 17, 2017 |
2017 |
WIN7C01558 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Road Slope Protection Structure along Cebu-Balamban Transcentral Highway (S00266CB) - K0038+737 - K0038+960, Brgy. Cansumoroy, Balamban, Cebu
Allocation: ₱ 50,000,000.00
Physical Target: 3,345 sq.m
Unit Cost: ₱ 14,947.68/ sq.m |
April 17, 2017 |
2017 |
WIN7G01137 |
165003015100339 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - Secondary
Improvement/Widening of National Road - Secondary, Nasipit Port Road, Nasipit, Agusan del Norte, K1263+-681 - K1263+575, (S00392MN)
Allocation:
- Php 49.50 Million (Total)
- Php 30,699,246,00 (Road Widening)
- Php 18,800,754.00 (ROW Acquisition)
Physical Target:
- 2.512 lane km (Road Widening)
- 25,120 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01141 |
165003014400093 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Construction of Road Slope Protection Structure - Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or. Road), (S00391MN), K1265+652 - K1265+780
Allocation:
- Php 30.821 Million (Total)
- Php 29,882,431.00 (Slope Protection)
- Php 938,569.00 (ROW Acquisition)
Physical Target:
- 3,424 sq.m. (Slope Protection)
- 1,38/0 sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7C01604 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Drainage Structure (1 unit Triple Barrel Box Culvert and 2 units Single Barrel Box Culvert) along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
Section 1: K0059+087, Section 2: K0064+000
Section 3: K0063+915
Total Allocation - ₱ 7,000,000.00
Allocation - ₱ 2,580,060.00 - CW1
- ₱ 232,740.00 - CW2
- ₱ 4,187,200.00 - CW3
Physical Target - 46.57 l.m. - CW1
- 174 sq. m - CW2
- 147 l.m. - CW3
Unit Cost - ₱ 55,401.76/ l.m -CW1
- ₱ 1,337.58/ sq.m - CW2
- ₱ 28,484.35/ sq. m - CW3 |
April 17, 2017 |
2017 |
WIN7C01575 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Flood Control (Revetment) along Cebu-Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295 (Sta. 00+910 - Sta. 01+025), Brgy. Luray 2, Toledo City, Cebu
Allocation - ₱ 3,000,000.00
Physical Target - 230 l.m.
Unit Cost - ₱ 13,043.48/ l.m. |
April 17, 2017 |
2017 |
WIN7C01571 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Flood Control (Revetment) at Camachilles River along Toledo-Tabuelan-San Remegio Road, K0048+864 (Sta. 00+720 - Sta. 01+280), Sitio Camachilles, Talavera, Toledo City, Cebu
Total Allocation - ₱ 45,000,000.00
Allocation - ₱ 39,174,090.00 - CW1
- ₱ 5,825,910.00 - CW2
Physical Target - 1,120 l.m - CW1
- 20,941.50 cu. m. - CW2
Unit Cost - 34,976.87/l.m - CW1
- 278.20/ cu.m - CW2 |
April 17, 2017 |
2017 |
WIN7C01570 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Revetment (Rubble concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+762 - Sta. 3+182, Brgy. Sta. Ana, Barili, Cebu
Allocation - ₱ 45,000,000.00
Physical Target - 840 l.m.
Unit Cost - ₱ 53,571.428/ l.m. |
April 17, 2017 |
2017 |
WIN7C01556 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads w/ Slips, Slope Collapse and Landslide - Secondary Road, Toledo-Pinamungajan-Aloguinsan-Mantalongon Road (S00235CB), K0078+023 - K0078+186, Aloguinsan, Cebu
Total Allocation - ₱ 5,737,000.00
Allocation - ₱ 4,112,163.34 - CW1
- ₱ 1,587,836.66 - CW2
Physical Target - 978.00 sq.m - CW1
- 0.054 lane. km. - CW2
Unit Cost - ₱ 4,204.67/sq.m - CW1
- ₱ 29,404.38/ lane km. - CW2 |
April 17, 2017 |
2017 |
WIN7C01564 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu-Toledo Wharf Road (Jct. Naga-Uling), Sta. 18+440 - Sta. 18+690, Brgy. Cantabaco, Toledo City, Cebu
Allocation - ₱ 10,000,000.00
Physical Target - 290 l.m.
Unit Cost - ₱ 34,482.76/ l.m. |
April 17, 2017 |
2017 |
WIN7C01572 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Improvement/Road Widening (4 lanes) of Toledo-Tabuelan-Sn Remegio Rd, C.Y. 2017, K0048+(-863) - K0048+(-570), Brgy. Sangi, Toledo City, Cebu
Total Allocation - ₱ 15,000,000.00 - CW1
- ₱ 5,000,000.00- ROW
Physical Target - 1.172 lane km. - CW1
- 2,440 sq. m - ROW
Unit Cost - ₱ 12,798,634.81/ lane km. - CW1
- ₱2,049.18/ sq.m - ROW |
April 17, 2017 |
2017 |
WIN7C01545 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Flood Control (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 1+623 - Sta. 1+936, Barili, Cebu 3rd LD
Total Allocation - ₱ 40,000,000.00
Allocation - ₱ 38,587,943.00 - CW1
- ₱ 1,412,057.00 - CW2
Physical Target - 626 l.m. - CW1
- 7,719.55 cu.m. - CW2
Unit Cost - ₱ 61,642.08/l.m - CW1
- ₱ 182.92/cu.m - CW2 |
April 17, 2017 |
2017 |
WIN7C01602 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Revetment (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+068 - Sta. 2+220, Brgy. Sta. Ana, Barili, Cebu
Allocation - ₱ 20,000,000.00
Physical Target - 304 l.m.
Unit Cost - ₱ 65,789.47/l.m. |
April 17, 2017 |
2017 |
WIN7C01591 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary, Cebu-Toledo Wharf Rd(Uling-Toledo Wharf), K0054+317 - K0055+000, Brgy. Luray 2, Toledo City, Cebu
Allocation - ₱ 5,581,000.00
Physical Target - 509 l.m.
Unit Cost - 10,964.64/ l.m. |
April 17, 2017 |
2017 |
WIN7C01587 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Revetment (Rubble Concrete) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Rd, Sta. 01+515 - Sta. 02+110, Brgy. Sta. Lucia, Asturias, Cebu
Allocation - ₱ 40,000,000.00
Physical Target - 1,190.00 l.m.
Unit Cost - ₱ 33,613.44/l.m. |
April 17, 2017 |
2017 |
WIN7C01576 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads - Naga-Uling Road, Sitio Apid, Brgy. Cantabaco, Toldeo City
1. K0037+120 - K0037+156
2. K0037+(-137) - K0037+026
Total Allocation - ₱ 5,700,000.00
Allocation - ₱ 5,622,562.00 - CW1
- ₱ 77,438.00 - CW2]
Physical Target - 724 sq.m - CW1
- 72.50 sq.m - CW2
Unit Cost - ₱ 7,765.97/ sq.m. - CW1
- ₱ 1,068.11/ sq. m. - CW2 |
April 17, 2017 |
2017 |
WIN7G01331 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Locally Funded Projects - Roads and Bridges - Local Bridges -
Replacement of Barra Bridge No. 2 Phase II along Barra - Minaog Road leading to Dipolog City Airport, Dipolog City, Zamboanga del Norte -
Sta. 0000+080.00 - Sta. 0000+380.00
Abutment A: 0000+169.16
Abutment B: 0000+290.00
Approaches Net Length: 179.16 ln.m.
Bridge Length: 120.84 ln.m.
Allocation:
Php 75.000 M (Total)
Php 74,811,682.44 (Replacement of New Bridge)
Php 188,317.56 (ROW Acquisition)
Physical Target:
1,152.814 sq.m. (Replacement of New Bridge)
188.32 sq.m. (ROW Acquisition)
Unit Cost:
Php 64,894.84/sq.m. (Replacement of New Bridge)
Php 999.99/sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01284 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Diversion Road including ROW, Zamboanga City (Cabaluay - Zambowood - Mampang Section), Zamboanga City 2nd LD
Sta. 00+040.00 - Sta. 02+445.93,
Sta. 00+040.00 - Sta. 00+220.00
Allocation:
Php 150.000 Million (Total)
Php 97,028,219.66 (Road Concreting)
Php 52,971,780.34 (ROW Acquisition)
Physical Target:
5.172 lane km (Road Concreting)
22,248.15 sq.m. (ROW Acquisition)
Unit Cost:
Php 18,760,289.96/ lane km (Road Concreting)
Php 2,380.952/sq.m. (ROW Acquisition) |
April 17, 2017 |
GAA FY 2017 |
WIN7G01258 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement: Construction of Laybys - Davao City Div Rd -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278
Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections - Davao City Div Rd -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement including Drainage of Davao City Diversion Road, Davao City -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278
CW1 - Construction of Laybys & Center Island -
K1498+000 - K1502+590, K1503+260 - K1504+170
CW2 - Flaring of Intersections/ Improvement of Intersection & Center Island -
K1499+397, K1499+445, K1499+594, K1499+699, K1500+399, K1500+419, K1500+672, K1502+798, K1501+590, K1506+278
ALLOCATION: Php 41.390 Million |
April 17, 2017 |
2017 |
WIN7G01291 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps Connecting National Roads, including ROW -
Construction of Concrete Road, including ROW Zamboanga del Sur Coastal Road, Package 2, Zamboanga del Sur DEO,
Chainage 3200 - Chainage 5000,
Chainage 5120 - Chainage 6160
Allocation:
Php 147.000 M (Total)
Php 146,492,239.50 (Road Concreting)
Php 507,760.45 (ROW Acquisition)
Physical Target:
5.680 lane km (Road Concreting)
507.76 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,790,887.24/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 17, 2017 |
2017 |
WIN7G01081 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary Road Widening - Ipil - Magdaup Wharf Road, Ipil Zamboanga Sibugay,
K2014+800 - K2015+157, (SOO1143MN)
Allocation: P 17.79 Million
Physical Target: 0.714 lane km
Unit Cost: P 24,915,966.39/lane km |
April 17, 2017 |
GAA FY 2017 |
WIN7G01272 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Mabuhay-Pañalum-Paquibatio Rd -
K1525+260 - K1525+346,
K1526+123 - K1526+163,
K1526+220 - K1526+488,
K1528+205 - K1528+287,
K1526+978 - K1527+061
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Mabuhay-Pañalum-Paquibato Road, Davao City, including drainage -
K1525+246 - K1525+346,
K1526+123 - K1526+163,
K1526+220 - K1526+488,
K1526+978 - K1527+061,
K1527+940 - K1528+205,
K1528+205 - K1528+300
ALLOCATION: Php 19.670 Million |
April 17, 2017 |
2017 |
WIN7G01244 |
FY 2017 (R.A 10924) |
April 7, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Concrete Road at Midsalip - Buboan Road, Zamboanga del Sur 1st LD
Chainage 0000.00 - Chainage 2380.00
Allocation:
Php 150.000 Million (Total)
Php 149,844,106.17 (Road Concreting)
Php 155,893.93 (ROW Acquisition)
Physical Target:
4.76 lane km (Road Concreting)
155.89 sq.m. (ROW Acquisition)
Unit Cost:
Php 31,479,854.22/lane km (Road Concreting)
1,000/sq.m. (ROW Acquisition) |
April 17, 2017 |
GAA FY 2017 |
WIN7G01273 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Davao River Flood Control (Sta. 7+400 to Sta. 7+600, Left Bank), Ledesma Section, Davao City
TO: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Davao River Flood Control (Sta. 7+250 to Sta. 7+778, Right Bank), Ledesma Section, Davao City
ALLOCATION: Php 49.510 Million |
April 17, 2017 |
2017 |
WIN7G01139 |
165003015200213 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Pandanon-Magallanes Road, K1216+-536 - K1217+100, (S00398MN)
Allocation:
- Php 49.50 Million (Total)
- Php 45,085,312.00 (Road Widening)
- Php 4,414,688.00 (ROW Acquisition)
Physical Target:
- 3.300 lane km (Road Widening)
- 33,000 sq.m. (ROW Acquisition) |