Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 18, 2017 2017 WIN7C01448 R.A 10924 January 12, 2017 Region VII Cebu City District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control and Mitigation Structures along Lahug River, Brgy. Camputhaw, Cebu City
Allocation - ₱ 50 Million
Physical Target - 1,500 lm.
Unit Cost - ₱ 33,333/ lm
April 18, 2017 2017 WIN7C01536 R.A 10924 January 14, 2017 Region VII Bohol 1st District Engineering Office
Locally-Funded Projects - Roads and Bridges - Local Roads

Construction of Taloto-Ubujan-Manga Coastal Road, Tagbilaran City, Bohol

Allocation - ₱ 17.0 Million
Physical Target - 2.564 lane km
Unit Cost - ₱ 6,630,265.21/ lane km
April 18, 2017 2017 WIN7C01541 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports

Access Roads leading to Catagbacan International Cruise Ship Port, Loon, Bohol

Allocation - ₱ 42.0 Million
Physical Target - 2.028 lane km
Unit Cost - ₱ 20,710,059.17/ lane km
April 18, 2017 2017 WIN7C01542 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination - To Seaports

Construction of Concrete Road - Access Road leading to Alburquerque Port, Bohol

Allocation - ₱ 4.0 Million
Physical Target - 0.316 lane km
Unit Cost - ₱ 12,658,227.85/ lane km
April 18, 2017 2017 WIN7G01256 165003014400099 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary

Jct. Lingig-Trento Rd - K1476+663 - K1476+703, K1477+320.40 - K1477+350.40

Allocation - Php 8.129 Million

Physical Target - 572 square meters
April 18, 2017 2017 WIN7G01255 165003014500268 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary

Surigao-Davao Coastal Rd - K1453+430 - K1453+456.20, K1453+706.80 - K1453+722.50, K1453+893 - K1453+930, K1465+384 - K1465+486, K1476+677.50 - K1476+891, K1478+643 - K1478+652, K1478+652 - K1478+673.30, K1478+673.30 - K1478+682.30, K1500+624.80 - K1500+654.80, K1506+311 - K1506+329

Allocation - Php 45.347 Million

Physical Target - 3,666.70 square meters
April 18, 2017 2017 WIN7G01251 165003015300148 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW

Tagongon-Sta. Maria-Sta. Juana-Maputi-Dreamland-Bingcongan-San Roque Bypass Road

Allocation:
- Php 50.00 Million (Total)
- Php 48.40 Million (Concrete Road)
- Php 1.60 Million (ROW Acquisition)

Physical Target:
- 2.682 lane km (Concrete Road)
- 16,050 square meters (ROW Acquisition)
April 18, 2017 2017 WIN7G01261 165003017100079 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes

Pagmam-an Br. (B01755MN) along Jct. Lingig-Trento Rd

Allocation - Php 52.00 Million

Physical Target - 239 square meters
April 18, 2017 2017 WIN7C01573 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads Including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary

Reconstruction from Asphalt to Concrete - Jct (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0032+600 - K0033+000
Allocation - ₱ 12.50 Million
Physical Target - 0.800 lane km
Unit Cost - ₱ 15,625,000.00/ lane km
April 18, 2017 2017 WIN7G01260 165003030800297 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Declared Tourism Destinations

NRJ-Cumawas-Tinuy-an Falls Road (Mone Bridge), Borboanan, Bislig City, Surigao del Sur 2nd LD

Allocation:
- Php 34.00 Million (Total)
- Php 7,022,942.89 (Concrete Road)
- Php 26,977,057.11 (Concrete Bridge)

Physical Target:
- 0.18 lane km (Concrete Road)
- 351.07 square meters (Concrete Bridge)
April 18, 2017 2017 WIN7G01263 103004010314019 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-purpose Building, Brgy. Mangagoy, Bislig City, Surigao del Sur

Allocation - Php 2.00 Million

Physical Target - 1 Building
April 18, 2017 2017 WIN7G01303 103004010314014 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Anibongan, Lingig, Surigao del Sur (Phase II)

Allocation - ₱ 1.50 Million

Physical Target - 1 Building
April 18, 2017 2017 WIN7G01310 103004010314017 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Bogac, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01308 103004010314018 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities:

Construction of Multi-Purpose Building, Bongan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01266 103004010314020 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Cabacungan, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01302 103004010314021 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Campa, Hinatuan, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01595 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary

Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0024+120 - K0025+000, K0028+330 - K0028+393

Allocation - ₱ 31.494 Million
Physical Target - 1.845 lane km
Unit Cost - ₱ 17,069,918.70/ lane km
April 18, 2017 FY 2017 WIN7E01309 UACS No.165003015300123 January 1, 2017 National Capital Region NCR - Regional Office
As per GAA
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/ Diversion Roas, including ROW: Rehabilitation of Concrete Road – C-6 Napindan-ML Quezon Ave, Taguig (Rehabilitation of concrete road)
UACS No. 165003015300123
Physical Target/Cost
Original: Reconst. Raising of Grade = 13.880 lane-km
Road Widening = 9.720 lane-km
Allocation Cost (P‘000): Reconst. Raising of Grade = P177,198
Road Widening = P171,000
Unit Cost (P‘000): Reconst. Raising of Grade = P13,290/lane-km
Road Widening = P17,593/lane-km
WIN7E01309

Modified
MFO 1 – National Road Network Services – Network Development – Construction of By-Passes/Diversion Roads, including ROW: C-6, Napindan-ML Quezon Ave, Taguig, Sta. 0+000-Sta. 1+500 (Right Side); Sta. 1+340 – Sta. 4+140 (Left Side) Reconstruction: Raising of Grade/Road Widening)
UACS No. 165003015300123
Physical Target/Cost
Modified: Reconst Raising of Grade = 5.60 lane-km
Road widening: 3.00 lane-km
Estimate Cost: (P’000): Raising of Grade = P180,140
Road Widening = P168,058
Unit Cost (P’000): Reconst Raising of Grade = P32,168/lane-km
Road Widening = P56,019/lane-km
WIN7E01309
April 18, 2017 2017 WIN7C01551 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Network Development, Off-Carriageway Improvement including drainage - Secondary
Tagbilaran East Rd (Tagbilaran-Jagna), K0254+748-K0256+732, K0257±274-K0257+900
Allocation - ₱ 47.715 Million
Physical Target: 12,547.42 sq.m
Unit Cost (P): 3,802.77/sq.m.
April 18, 2017 2017 WIN7G01265 103004010314022 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Cumawas, Bislig City, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01269 103004010314023 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Guinhalinan Elementary School, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01549 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary
Jct. (TER) Dauis-Panglao Road, S00020BH - Chainage 0-Chainage 505
Allocation - ₱ 3.531 Million
Physical Target - 1.515 lane km
Unit Cost - ₱ 2,330,693.00/ lane km
April 18, 2017 2017 WIN7C01574 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -

Construction of Road Slope Protection Structure Jct. (TNR) Cortes-Balilihan-Catigbian-Macaas Rd - K0014+350-K0014+650, K0015+060-K0015+260, K0015+580-K0015+710, K0042+250-K0042+450, K0047+580-K0047+950 Allocation: P27.345 Million (CW1); P2.655 Million (CW2)
Physical Target: Slope Protection = 6,631.60 sq.m.; Paved Shoulder: 800.00 sq.m
Unit Cost (P): Slope Protection = 4,123.44/sq.m.; Paved Shoulder = 3,318.75/sq.m.
April 18, 2017 2017 WIN7G01296 103004010314024 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Handamayan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01555 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Tertiary -
Slope Protection at Antequera-San Isidro-Libertad (Tubigon) Rd - K0024+000-K0024+400
Allocation - ₱ 10.00 Million
Physical Target: 1,873.03 sq.m.
Unit Cost (P): 5,338.94/sq.m.
April 18, 2017 2017 WIN7C01593 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Locally-Funded Projects - Roads and Bridges - Local Roads
Concreting of Toledo Street, Dao-San Isidro, Tagbilaran City, Bohol
Allocation - ₱ 10.0 Million
Physical Target - 1.14 lane km
Unit Cost - ₱ 8,771,929.82/sq.m.
April 18, 2017 2017 WIN7C01455 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations

Construciton/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - To Seaports - Concreting of B.M. Dimataga St. with Drainage Facilities, Lapu-Lapu City

Allocation - ₱ 7.844 Million (CW1)
- ₱ 11.568 Million (CW2)
Total Allocation - ₱ 19.412 Million
Physical Target - 1.401 lane km (CW1)
- 780.30 lineal meters (CW2)
Unit Cost - 5.599 Million/lane km (CW1)
- 14,825/lineal meters (CW2)
April 18, 2017 2017 WIN7C01445 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Roads and Bridges - Local Roads

Roads and Bridges - Local Roads - Improvement/Rehabilitation of Panoypoy Barangay Road, Panoypoy, Consolacion, Cebu

Allocation - ₱ 13.000 Million
Physical Target: 2.636 lane Km
Unit Cost: P4.932 Million/lane km
April 18, 2017 FY 2017 WIN7E01317 UACS No.103004010310289 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multipurpose Building, Kalayaan National High School, Pasay City (Construction)
UACS No. 103004010310289
Physical Target/Cost
Original: 1 building
Allocation Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317

As Modified
Locally Funded Projects – Building and Other Structures – Multipurpose/Facilities: Repair/Rehabilitation/ Improvement of Multipurpose Building, Kalayaan National High School, Pasay City (Kalayaan Village, Merville, Pasay City) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310289
Modified: 1 building
Estimated Cost: P800,000.00
Unit Cost: P800,000.00/building
WIN7E01317
April 18, 2017 2017 WIN7C01434 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement of Flood Control Structure and Bridge Waterways along Mahiga Creek, Phase III, Mandaue City, Cebu

Allocation - ₱ 28.031 Million (CW1)
- ₱ 11.969 Million (CW2)
Physical Target - 120 l.m. (CW1)
- 18,563.80 cu.m. (CW2)
Unit Cost - ₱ 233,594/l.m. (CW1)
- ₱ 645/cu.m. (CW2)
April 18, 2017 FY 2017 WIN7E01314 UACS No. 103004010310292 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Barangay 183 and its vicinity, Pasay City (Construction)
UACS No. 103004010310292
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose Building, Barangay 183 and its vicinity, Pasay City. (Andrew Avenue) (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310292
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,500
Unit Cost (P’000): P1,500/building
WIN7E01314
April 18, 2017 FY 2017 WIN7E01316 UACS No. 103004010310290 January 1, 2017 National Capital Region South Manila District Engineering Office
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, T. Paez Elementary School, Pasay City (Construction)
UACS No. 103004010310290
Physical Target/Cost
Original: 1 building
Allocation Cost (P’000): P1,000
Unit Cost (P’000): P1,000/building
WIN7E01316

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Repair/Rehab./ Improvement of T. Paez E/S, Pasay City Lone District. Apelo Cruz St., Malibay, Pasay City. (Rehabilitation/Major Repair Multi-Purpose Building)
UACS No. 103004010310290
Physical Target/Cost
Modified: 1 building
Estimated Cost (P’000): P1,000
Unit Cost (P’000): P1,000/Building
WIN7E01316
April 18, 2017 2017 WIN7C01446 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities

Phase I Construction of Barangay Casuntingan Multipurpose Gym, Casuntingan, Mandaue City, Cebu

Allocation - ₱ 2.00 Million
Physical Target - 1 building
Unit Cost (P): 2 Million/building
April 18, 2017 2017 WIN7C01452 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Secondary

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4 - Secondary Roads - Consolacion-Tayud-Liloan Rd (S00372CB), Chainage 950-Chainage 2823, Consolacion, Cebu

Allocation - ₱ 18.777 Million (CW1)
- ₱ 31.123 Million (CW2)
Physical Target - 1.606 lane Km (CW1)
- 1,748 lm (CW2)
Unit Cost - ₱ 11.692 Million/lane Km (CW1)
- ₱ 17,805/lm (CW2)
April 18, 2017 2017 WIN7C01437 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - School Buildings

Construction of 3-Storey/6-Classroom Building at Casili Elementary School, Casili, Mandaue City, Cebu

Allocation - ₱ 9.000 Million
Physical Target - 3 storey; 6 classroom
Unit Cost - ₱ 9 Million/ 3 Storey, 6 classroom
April 18, 2017 2017 WIN7C01450 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary

Construction/Upgrading/Rehabilitation of Drainage along National Roads - Cebu North Hagnaya Wharf Road (S00161CB), K0005+(-060) - K0005+986, Mandaue City

Allocation - ₱ 19.210 Million
Physical Target - 832.03 l.m.
Unit Cost - ₱ 23,088/l.m.
April 18, 2017 2017 WIN7C01451 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations

Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Mandaue-Mactan Access Road, Lapu-Lapu City

Allocation - ₱ 1.945 Million (CW1)
- ₱ 3.055 Million (CW2)
Physical Target - 0.154 lane Km (CW1)
- 236.68 lm (CW2)
Unit Cost - ₱ 12.63/lane Km (CW1)
- ₱ 12,907/lm (CW2)
April 18, 2017 2017 WIN7C01473 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges

Rehabilitation/Major Repair of Permanent Bridge - Pilipog Br. 1 (B00580CB) along Mactan Circumferential Road, Pilipog, Cordova, Cebu

Allocation - ₱ 2.400 Million
Physical Target - 1 Bridge
Unit Cost - 2.40 Million/Bridge
April 18, 2017 FY 2017 WIN7E01320 UACS No. 165004050306310 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Slope Protection with Concreting Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City
UACS No. 165004050306310
Physical Target/Cost
Original: 0.20 km
Unit Cost (P’000): P10,000/km
Allocation Cost (P’000): P2,000
WIN7E01320

As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Construction/ Improvement of Lourdes Street, Fatima Subdivision, Barangay Zapote, Las Piñas City (Construction of Concrete Road)
UACS No. 165004050306310
Modified: 0.360 lane km
Unit Cost (P’000): P5,556/lane km
Estimated Cost (P’000): P2,000
WIN7E01320
April 18, 2017 2017 WIN7C01472 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary

Preventive Maintenance based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary Roads - Cebu North Hagnaya Wharf Road (S00286CB), K0008+358-K0008+953, Mandaue City

Allocation - ₱ 24.000 Million
Physical Target - 2.380 lane Km
Unit Cost - ₱ 10.126 Million/Lane Km
April 18, 2017 2017 WIN7C01471 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports

Construction/Improvement of Access Roads leading to Seaports and Declared Tourism Destinations - to Seaports - Angasil Causeway, Lapu-Lapu City

Allocation (P) - ₱ 3,448.75 Million (CW1)
- ₱ 6,647.23 Million (CW2)
- ₱ 9,904.02 Million (CW3)
Physical Target - 0.180 lane Km (CW1)
- 91.00 l.m. (CW2)
- 1,371.30 sq.m. (CW3)
Unit Cost - ₱ 19.16/lane Km (CW1)
- ₱ 73,046/l.m. (CW2)
- ₱ 7,222/sq.m. (CW3)
April 18, 2017 2017 WIN7C01467 R.A 10924 January 12, 2017 Region VII Cebu 6th District Engineering Office
Locally Funded Projects - LIP - Buildings and Other Structures - Multipurpose/Facilities

Phase III Construction of Cordova Municipal Hospital, Pilipog, Cordova, Cebu

Allocation - ₱ 10.723 Million
Physical Target - 1.0 Hospital
Unit Cost - ₱ 10.723Million/Hospital
April 18, 2017 2017 WIN7C01416 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities

Construction of Multipurpose Building in Brgy. Libjo, Tabogon, Cebu

Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 2.0 Million/ Building
April 18, 2017 2017 WIN7C01424 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy. Sambag, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project
April 18, 2017 2017 WIN7C01418 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy. Labangon, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/ Project
April 18, 2017 2017 WIN7G01301 103004010314025 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Harip, Hinatuan, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01419 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facities

Construction of Multipurpose Building Brgy. Somosa, Tabogon, Cebu

Allocation - ₱ 4.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 4.0 Million/ Project
April 18, 2017 2017 WIN7C01420 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Buildings and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building Brgy Canao-Canao, Tabogon, Cebu

Allocation - ₱ 3.00 Million
Physical Target - 1 Project
Unit Cost - ₱ 3.0 Million/Project
April 18, 2017 2017 WIN7C01421 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Water Management - Water Supply

Construction of Water System (Level III), Bantayan, Cebu

Allocation - ₱ 5.0 MIllion
Physical Target - 1 Water System
Unit Cost - ₱ 5.0 Million/ Water System
April 18, 2017 2017 WIN7C01423 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and Other Structures - Multipurpose/Facilities

Construction of Multipurpose Building (Covered Court) in Brgy. Hilotongan, Bantayan, Cebu

Allocation - ₱ 3.0 Million
Physical Target - 1 Building
Unit Cost - ₱ 3.0 Million/Building
April 18, 2017 2017 WIN7G01252 103004010314026 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Hinagdanan, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01415 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/Facilities

Construction of Multipurpose Building in Brgy. Calambua, San Remegio, Cebu

Allocation - ₱ 4.0 Million
Physical Target - 1 Building
Unit Cost - 4.0 Million/Building
April 18, 2017 2017 WIN7C01417 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
Locally Funded Projects (LIP) - Building and other Structures - Multipurpose/ Facilities

Completion of Multipurpose Building in Brgy. Pandan, Bogo City, Cebu

Allocation - ₱ 2.0 Million
Physical Target - 1 Building
Unit Cost- ₱ 2.0 Million/Building
April 18, 2017 2017 WIN7G01319 103004010314028 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Mahayahay, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7C01422 R.A 10924 January 12, 2017 Region VII Cebu 1st District Engineering Office
MFO 2 - Construction/Maintenance of Flood Mitigation Structures and Drainage System

Construction of Flood Control of Bangon Bridge (Downstream), Poblacion, Medellin, Cebu - Flood Mitigation Structure

Allocation - ₱ 20.0 Million
Physical Target - 344 Lineal Meters
Unit Cost - ₱ 58,140/ Lineal Meter
April 18, 2017 2017 WIN7G01305 103004010314029 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Maligaya Elementary School, Hinatuan, Surigao del Sur

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01306 103004010314030 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Mansailao, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building.
April 18, 2017 2017 WIN7G01304 103004010314031 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Palo Alto, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01298 103004010314032 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Rajah Cabungsuan, Lingig, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01264 103004010314033 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Rizal, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 1.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01267 103004010314035 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, San Vicente II, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01254 103004010314036 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Sta. Cruz, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01271 103004010314037 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Sua, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 0.50 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01253 103004010314038 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Trinidad, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01262 103004010314039 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Tumanan, Bislig City, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01300 103004010314040 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Ugoban, Tagbina, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 18, 2017 2017 WIN7G01268 103004010314041 December 29, 2016 Region XIII Surigao del Sur 2nd District Engineering Office
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities

Construction of Multi-Purpose Building, Wakat, Barobo, Surigao del Sur (Phase II)

Allocation : ₱ 2.00 Million

Physical Target : 1 Building
April 17, 2017 2017 WIN7G01164 165003015800465 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary

Road Upgrading (Unpaved to Paved) along Buenavista-Bunaguit Road, Buenavista, Agusan del Norte, K1269+265 - K1271+178

Allocation:
- Php 38.820 Million (Total)
- Php 38,650,392.71 (Concrete Road)
- Php 169,607.29 (ROW Acquisition)

Physical Target:
- 3.790 lane km (Concrete Road)
- 37,900.00 square meters (ROW Acquisition)
April 17, 2017 2017 WIN7G01160 165003014600265 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified;
Asset Preservation of National Roads - Rehabilitation/reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary

Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide, Construction of Road Slope Protection Structure - Agusan - Malaybalay Road, K1274+200 - K1274+374, (S00397MN)

Allocation:
- Php 40.51 Million (Total)
- Php 40,194,800.00 (Slope Protection)
- Php 315,200.00 (ROW Acquisition)

Physical Target:
- 2,000.00 sq.m. (Slope Protection)
- 1,740.00 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G001166 165003014600264 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/reconstruction of National Slips, Slope Collapse and Landslide - Tertiary Road

Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide - Agusan-Bukidnon Road, K1261+520 - K1261+578.85, K1261+607.81 - K1261+740, K1261+920 - K1261+982.77, K1262+000 - K1262+040, K1262+080 - K1262+140, K1262+190 - K1262+250, (S00395MN)

Allocation:
- Php 45.00 Million (Total)
- Php 44,214,526.46 (Slope Protection)
- Php 785,473.54 (ROW Acquisition)

Physical Target:
- 3,313.17 sq.m. (Slope Protection)
- 4,138.10 sq.m (ROW ACquisiion)
April 17, 2017 2017 WIN7G01161 203004060100927 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified;
Locally Funded Projects: LIP - Water Management - Water Supply

Construction of Malico SWIP, Malico Creek, Brgy. Calamba, Cabadbaran, Agusan del Norte

Allocation - Php 5.00 Million

Physical Target - 1 project
April 17, 2017 2017 WIN7G01168 165003014700120 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Asset Preservation of National Roads - Construction /Upgrading/Rehabilitation of Drainage along National Roads - Primary

Construction of Concrete Lined Canal along Butuan-Cagayan de Oro-Iligan (Agusan-Misamis Oriental Road), K1266+558.51 - K1266+960, (S00391MN)

Allocation:
- Php 10.00 Million (Total)
- Php 8,749,240.00 (Construction of Drainage)
- Php 1,250,760.00 (ROW Acquisition)

Physical Target:

- 803 lm (Construction of Drainage)
- 8,030 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G001167 165003014600266 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified;
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary

Rehab./Reconst. of National Roads with Slips, Slope Collapse and Landslide - Buenavista-Bunaguit Road, K1272+200 - K1272+300, K1272+460 - K1272+600, K1272+680 - K1272+747, (S00396MN)

Allocation:
- Php 49.90 Million (Total)
- Php 48,755,986.00 (Slope Protection)
- Php 1,144,014.00 (ROW Acquisition)

Physical Target:
- 3,291.36 sq.m. (Slope Protection)
- 3,070 sq.m. (ROW Acquisition)

April 17, 2017 2017 WIN7G01165 165003015400106 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Missing Gaps connecting National Roads, inc. ROW at Cabadbaran-Puting Bato-Lanuza Road, Cabadbaran, Agusan del Norte

Allocation:
- Php 70.00 Million (Total)
- Php 38,956,764.00 (Concrete Road)
- Php 29,567,336.00 (Gravel Road)
- Php 1,475,900.00 (ROW Acquisition)

Physical Target:
- 2.24 lane km (Concrete Road)
- 7.216 lane km (Gravel Road)
- 35,520 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01163 165003015200212 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary Road

Road Widening including Drainage, Paving of Shoulder and RROW Acquisition along Agusan-Malaybalay Road, K1271+-756 - K1271+-041, K1271+199 - K1271+984, (S00397MN)

Allocation:
- Php 49.50 Million (Total)
- Php 46,341,541.00 (Road Widening)
- Php 3,158,459.00 (ROW Acquisition)

Physical Target:
- 3.00 lane km (Road Widening)
- 30,090 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G001162 292003020403467 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rechanneling of Puyo River, Barangay Bangonay, Magsaysay and Cuyago, Jabonga, Agusan del Norte, Sta. 0+000 - Sta. 0+762.92

Allocation:
- Php 50.00 Million (Total)
- Php 49,394,740.00 (Flood Control)
- Php 605,260.00 (ROW Acquisition)

Physical Target:
- 762.92 lm (Flood Control)
- 7,629 sq.m. (ROW Acquisition)

April 17, 2017 2017 WIN7C01558 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Road Slope Protection Structure along Cebu-Balamban Transcentral Highway (S00266CB) - K0038+737 - K0038+960, Brgy. Cansumoroy, Balamban, Cebu
Allocation: ₱ 50,000,000.00
Physical Target: 3,345 sq.m
Unit Cost: ₱ 14,947.68/ sq.m
April 17, 2017 2017 WIN7G01137 165003015100339 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - Secondary

Improvement/Widening of National Road - Secondary, Nasipit Port Road, Nasipit, Agusan del Norte, K1263+-681 - K1263+575, (S00392MN)

Allocation:
- Php 49.50 Million (Total)
- Php 30,699,246,00 (Road Widening)
- Php 18,800,754.00 (ROW Acquisition)

Physical Target:
- 2.512 lane km (Road Widening)
- 25,120 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01141 165003014400093 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide, Construction of Road Slope Protection Structure - Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or. Road), (S00391MN), K1265+652 - K1265+780

Allocation:
- Php 30.821 Million (Total)
- Php 29,882,431.00 (Slope Protection)
- Php 938,569.00 (ROW Acquisition)

Physical Target:
- 3,424 sq.m. (Slope Protection)
- 1,38/0 sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7C01604 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Drainage Structure (1 unit Triple Barrel Box Culvert and 2 units Single Barrel Box Culvert) along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
Section 1: K0059+087, Section 2: K0064+000
Section 3: K0063+915

Total Allocation - ₱ 7,000,000.00

Allocation - ₱ 2,580,060.00 - CW1
- ₱ 232,740.00 - CW2
- ₱ 4,187,200.00 - CW3
Physical Target - 46.57 l.m. - CW1
- 174 sq. m - CW2
- 147 l.m. - CW3
Unit Cost - ₱ 55,401.76/ l.m -CW1
- ₱ 1,337.58/ sq.m - CW2
- ₱ 28,484.35/ sq. m - CW3
April 17, 2017 2017 WIN7C01575 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Flood Control (Revetment) along Cebu-Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295 (Sta. 00+910 - Sta. 01+025), Brgy. Luray 2, Toledo City, Cebu
Allocation - ₱ 3,000,000.00
Physical Target - 230 l.m.
Unit Cost - ₱ 13,043.48/ l.m.
April 17, 2017 2017 WIN7C01571 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Flood Control (Revetment) at Camachilles River along Toledo-Tabuelan-San Remegio Road, K0048+864 (Sta. 00+720 - Sta. 01+280), Sitio Camachilles, Talavera, Toledo City, Cebu

Total Allocation - ₱ 45,000,000.00

Allocation - ₱ 39,174,090.00 - CW1
- ₱ 5,825,910.00 - CW2
Physical Target - 1,120 l.m - CW1
- 20,941.50 cu. m. - CW2
Unit Cost - 34,976.87/l.m - CW1
- 278.20/ cu.m - CW2
April 17, 2017 2017 WIN7C01570 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Revetment (Rubble concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+762 - Sta. 3+182, Brgy. Sta. Ana, Barili, Cebu

Allocation - ₱ 45,000,000.00
Physical Target - 840 l.m.
Unit Cost - ₱ 53,571.428/ l.m.
April 17, 2017 2017 WIN7C01556 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads w/ Slips, Slope Collapse and Landslide - Secondary Road, Toledo-Pinamungajan-Aloguinsan-Mantalongon Road (S00235CB), K0078+023 - K0078+186, Aloguinsan, Cebu

Total Allocation - ₱ 5,737,000.00

Allocation - ₱ 4,112,163.34 - CW1
- ₱ 1,587,836.66 - CW2
Physical Target - 978.00 sq.m - CW1
- 0.054 lane. km. - CW2
Unit Cost - ₱ 4,204.67/sq.m - CW1
- ₱ 29,404.38/ lane km. - CW2
April 17, 2017 2017 WIN7C01564 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu-Toledo Wharf Road (Jct. Naga-Uling), Sta. 18+440 - Sta. 18+690, Brgy. Cantabaco, Toledo City, Cebu

Allocation - ₱ 10,000,000.00
Physical Target - 290 l.m.
Unit Cost - ₱ 34,482.76/ l.m.
April 17, 2017 2017 WIN7C01572 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Improvement/Road Widening (4 lanes) of Toledo-Tabuelan-Sn Remegio Rd, C.Y. 2017, K0048+(-863) - K0048+(-570), Brgy. Sangi, Toledo City, Cebu

Total Allocation - ₱ 15,000,000.00 - CW1
- ₱ 5,000,000.00- ROW
Physical Target - 1.172 lane km. - CW1
- 2,440 sq. m - ROW
Unit Cost - ₱ 12,798,634.81/ lane km. - CW1
- ₱2,049.18/ sq.m - ROW
April 17, 2017 2017 WIN7C01545 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Flood Control (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 1+623 - Sta. 1+936, Barili, Cebu 3rd LD

Total Allocation - ₱ 40,000,000.00

Allocation - ₱ 38,587,943.00 - CW1
- ₱ 1,412,057.00 - CW2
Physical Target - 626 l.m. - CW1
- 7,719.55 cu.m. - CW2
Unit Cost - ₱ 61,642.08/l.m - CW1
- ₱ 182.92/cu.m - CW2
April 17, 2017 2017 WIN7C01602 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Revetment (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+068 - Sta. 2+220, Brgy. Sta. Ana, Barili, Cebu
Allocation - ₱ 20,000,000.00
Physical Target - 304 l.m.
Unit Cost - ₱ 65,789.47/l.m.
April 17, 2017 2017 WIN7C01591 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary, Cebu-Toledo Wharf Rd(Uling-Toledo Wharf), K0054+317 - K0055+000, Brgy. Luray 2, Toledo City, Cebu
Allocation - ₱ 5,581,000.00
Physical Target - 509 l.m.
Unit Cost - 10,964.64/ l.m.
April 17, 2017 2017 WIN7C01587 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Construction of Revetment (Rubble Concrete) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Rd, Sta. 01+515 - Sta. 02+110, Brgy. Sta. Lucia, Asturias, Cebu
Allocation - ₱ 40,000,000.00
Physical Target - 1,190.00 l.m.
Unit Cost - ₱ 33,613.44/l.m.
April 17, 2017 2017 WIN7C01576 R.A 10924 January 12, 2017 Region VII Cebu 3rd District Engineering Office
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads - Naga-Uling Road, Sitio Apid, Brgy. Cantabaco, Toldeo City
1. K0037+120 - K0037+156
2. K0037+(-137) - K0037+026

Total Allocation - ₱ 5,700,000.00

Allocation - ₱ 5,622,562.00 - CW1
- ₱ 77,438.00 - CW2]
Physical Target - 724 sq.m - CW1
- 72.50 sq.m - CW2
Unit Cost - ₱ 7,765.97/ sq.m. - CW1
- ₱ 1,068.11/ sq. m. - CW2
April 17, 2017 2017 WIN7G01331 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Locally Funded Projects - Roads and Bridges - Local Bridges -
Replacement of Barra Bridge No. 2 Phase II along Barra - Minaog Road leading to Dipolog City Airport, Dipolog City, Zamboanga del Norte -
Sta. 0000+080.00 - Sta. 0000+380.00
Abutment A: 0000+169.16
Abutment B: 0000+290.00
Approaches Net Length: 179.16 ln.m.
Bridge Length: 120.84 ln.m.
Allocation:
Php 75.000 M (Total)
Php 74,811,682.44 (Replacement of New Bridge)
Php 188,317.56 (ROW Acquisition)
Physical Target:
1,152.814 sq.m. (Replacement of New Bridge)
188.32 sq.m. (ROW Acquisition)
Unit Cost:
Php 64,894.84/sq.m. (Replacement of New Bridge)
Php 999.99/sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01284 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW -
Construction of Diversion Road including ROW, Zamboanga City (Cabaluay - Zambowood - Mampang Section), Zamboanga City 2nd LD
Sta. 00+040.00 - Sta. 02+445.93,
Sta. 00+040.00 - Sta. 00+220.00
Allocation:
Php 150.000 Million (Total)
Php 97,028,219.66 (Road Concreting)
Php 52,971,780.34 (ROW Acquisition)
Physical Target:
5.172 lane km (Road Concreting)
22,248.15 sq.m. (ROW Acquisition)
Unit Cost:
Php 18,760,289.96/ lane km (Road Concreting)
Php 2,380.952/sq.m. (ROW Acquisition)
April 17, 2017 GAA FY 2017 WIN7G01258 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement: Construction of Laybys - Davao City Div Rd -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278
Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections - Davao City Div Rd -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Secondary
Off-Carriageway Improvement including Drainage of Davao City Diversion Road, Davao City -
K1498+000 - K1498+599, K1498+695 - K1499+397, K1499+500 - K1499+900, K1501+000 - K1501+400, K1501+900 - K1502+790,
K1502+820 - K1503+300, K1503+400 - K1503+930, K1504+100 - K1504+350, K1505+605 - K1506+106, K1506+164 - K1506+278
CW1 - Construction of Laybys & Center Island -
K1498+000 - K1502+590, K1503+260 - K1504+170
CW2 - Flaring of Intersections/ Improvement of Intersection & Center Island -
K1499+397, K1499+445, K1499+594, K1499+699, K1500+399, K1500+419, K1500+672, K1502+798, K1501+590, K1506+278

ALLOCATION: Php 41.390 Million
April 17, 2017 2017 WIN7G01291 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps Connecting National Roads, including ROW -
Construction of Concrete Road, including ROW Zamboanga del Sur Coastal Road, Package 2, Zamboanga del Sur DEO,
Chainage 3200 - Chainage 5000,
Chainage 5120 - Chainage 6160
Allocation:
Php 147.000 M (Total)
Php 146,492,239.50 (Road Concreting)
Php 507,760.45 (ROW Acquisition)
Physical Target:
5.680 lane km (Road Concreting)
507.76 sq.m. (ROW Acquisition)
Unit Cost:
Php 25,790,887.24/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition)
April 17, 2017 2017 WIN7G01081 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary Road Widening - Ipil - Magdaup Wharf Road, Ipil Zamboanga Sibugay,
K2014+800 - K2015+157, (SOO1143MN)
Allocation: P 17.79 Million
Physical Target: 0.714 lane km
Unit Cost: P 24,915,966.39/lane km
April 17, 2017 GAA FY 2017 WIN7G01272 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Reconstruction from Concrete to Concrete - Mabuhay-Pañalum-Paquibatio Rd -
K1525+260 - K1525+346,
K1526+123 - K1526+163,
K1526+220 - K1526+488,
K1528+205 - K1528+287,
K1526+978 - K1527+061

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Rehabilitation/Reconstruction/Upgrading of Mabuhay-Pañalum-Paquibato Road, Davao City, including drainage -
K1525+246 - K1525+346,
K1526+123 - K1526+163,
K1526+220 - K1526+488,
K1526+978 - K1527+061,
K1527+940 - K1528+205,
K1528+205 - K1528+300

ALLOCATION: Php 19.670 Million
April 17, 2017 2017 WIN7G01244 FY 2017 (R.A 10924) April 7, 2017 Region IX Regional Office IX
Network Development - Construction of Missing Gaps connecting National Roads, including ROW -
Construction of Concrete Road at Midsalip - Buboan Road, Zamboanga del Sur 1st LD
Chainage 0000.00 - Chainage 2380.00
Allocation:
Php 150.000 Million (Total)
Php 149,844,106.17 (Road Concreting)
Php 155,893.93 (ROW Acquisition)
Physical Target:
4.76 lane km (Road Concreting)
155.89 sq.m. (ROW Acquisition)
Unit Cost:
Php 31,479,854.22/lane km (Road Concreting)
1,000/sq.m. (ROW Acquisition)
April 17, 2017 GAA FY 2017 WIN7G01273 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure - Construction of Davao River Flood Control (Sta. 7+400 to Sta. 7+600, Left Bank), Ledesma Section, Davao City

TO: MFO 2 - Flood Management Services
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Davao River Flood Control (Sta. 7+250 to Sta. 7+778, Right Bank), Ledesma Section, Davao City

ALLOCATION: Php 49.510 Million
April 17, 2017 2017 WIN7G01139 165003015200213 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - Tertiary

Road Widening - Pandanon-Magallanes Road, K1216+-536 - K1217+100, (S00398MN)

Allocation:
- Php 49.50 Million (Total)
- Php 45,085,312.00 (Road Widening)
- Php 4,414,688.00 (ROW Acquisition)

Physical Target:
- 3.300 lane km (Road Widening)
- 33,000 sq.m. (ROW Acquisition)